Revitalization Goals
• Improve the overall look of the downtown area
• Increase pedestrian traffic through downtown
• Reinforce the image of downtown as a shopping destination
Current Projects
• Sidewalk repair
• Move all utility lines underground
• Hanging garden baskets placed on light poles
• Bike lane repainted
Upcoming Projects
• Repainting city owned posts
• Work with business owners on building updates and upgrades
• Sidewalk improvement project
Downtown Aspen Falls Revitalization Effort
Contact Donald Norris, City Engineer