    A 15 hour count was done from 6am to 9pm for three days Tuesday, Wednesday and Thursday.

    An observer counted the numbers of vehicles along with its type, passing through the section for 

    a definite time interval. or light volumes, tally mar!s on a form was ade"uate. The following is

    a sample of the table that was used to record the volumetric data.

    Table 1 : Volumetric data collected.

    #assenger $ar %nit $%' is a metric used in Transportation (ngineering, to assess traffic)flow

    rate on a highway. A #assenger $ar %nit is a measure of the impact that a mode of transport has

    on traffic variables &such as headway, speed, density' compared to a single standard passenger

    car. This is also !nown as passenger car e"uivalent. &*ighway $apacity +anual, ---'

     or eample, typical values of #$% &or #$(' are/

    0+

    &Time'

    T

    &Time'

    *$2 3$2 $A0 4W W

  • 8/17/2019 DOWNLOAD ME.docx

    2/5

    Table 2; Values of pcu

    $ar 1.-

    +otorcycle -.5

    icycle -.

    3$2 .

    us, Truc! 4.5

    4)wheeler -.

    The solution of was tabulated as follows7

    Table 3: Solution to the problem

    0+ &Time' T&Time' 3W 8 #$%

    The first step in this solution was to find the total traffic volume for each 15 minute period in

    terms of passenger car units. or this purpose the #$% values given in the above table was used.

    The hour with the highest volume was located and the 15 minute interval with the highest

    volume.

    The pea! hour volume is :ust the sum of the volumes of the four 15 minute intervals within the

     pea! hour. The pea! hour factor *' was found by dividing the pea! hour volume by four

    times the pea! 15 minute volume.

     P.H.F=

    4×V 15

  • 8/17/2019 DOWNLOAD ME.docx

    3/5

    Where #*; #ea! hour actor 

      2;*ourly volume &veh--

    ?topwatches 4--5 15--

    *iring observation

    vehicle

    4---

    *ardcopy reports 5-- 1---Travelling 1,5--

    ield #articipants 4--1- 4,---

    8nternet and $omputer services 1,---

    Tape measure 14-- 4--

    0eflector :ac!ets 5- 5 1,5-

    Total 14,@5-

  • 8/17/2019 DOWNLOAD ME.docx

    4/5

    (/+ S',DU)

    The pro:ects wor!)time frame will be as follows/

    Table 5: Proposed Work Schedule

      T!#

    %'T!V!T&"(V#B

    / D'#B/ 0%"U%/&

    B/U%/ 

    & #%/', %/!)

    ?ubmission f

     proposal 

    Approval of

    research proposal 

    ?ourcing for funds  

    Preparation of

    writing materials

    and sourcing of

    required material

    resourcesSelection of

    trac study

    sections

    Data collection

    (Trac volume &Speed counts)Data collection

    (Interviewing and

    administering

    questionnaires) Transcribe oral

    interviewsinali!e

    organi!ational

    samples

    Data cleaningData analysis

    "rite up #ndings

    $esearc% #ndings

    dissemination

  • 8/17/2019 DOWNLOAD ME.docx