December 13, 2017 Project No: 170081 Malon Haris Dove Academy of Detroit 20001 Wexford Street Detroit, Michigan 48234 Re: AHERA Periodic Surveillance Report Dear Mrs. Haris: The following AHERA Periodic Surveillance Report was completed for Dove Academy of Detroit which is located at 20001 Wexford Street, Detroit, Michigan 48234. Re-Inspection activities were limited to the known or assumed asbestos containing materials identified in the most recent three-year re-inspection report. During the 12/01/2017 periodic surveillance, NAS found the following conditions to be true of the ACM materials identified in the most recent 3 year report: 1950 Building All materials were found to be in good condition, maintain in accordance with the Management Plan and test any assumed material prior to disturbance. 1963 Building All materials were found to be in good condition, maintain in accordance with the Management Plan and test any assumed material prior to disturbance. A copy of the AHERA Periodic Surveillance Form (Form F-4) and a copy of our material check list is attached to this report. Please do not hesitate to call if there are any questions regarding this report. Sincerely John J. Rehkopf President

Transcript of Dove Academy of Detroit 20001 Wexford Street

December 13, 2017 Project No: 170081 Malon Haris Dove Academy of Detroit 20001 Wexford Street Detroit, Michigan 48234 Re: AHERA Periodic Surveillance Report Dear Mrs. Haris: The following AHERA Periodic Surveillance Report was completed for Dove Academy of Detroit which is located at 20001 Wexford Street, Detroit, Michigan 48234. Re-Inspection activities were limited to the known or assumed asbestos containing materials identified in the most recent three-year re-inspection report. During the 12/01/2017 periodic surveillance, NAS found the following conditions to be true of the ACM materials identified in the most recent 3 year report: 1950 Building

All materials were found to be in good condition, maintain in accordance with the Management Plan and test any assumed material prior to disturbance.

1963 Building

All materials were found to be in good condition, maintain in accordance with the Management Plan and test any assumed material prior to disturbance.

A copy of the AHERA Periodic Surveillance Form (Form F-4) and a copy of our material check list is attached to this report. Please do not hesitate to call if there are any questions regarding this report. Sincerely

John J. Rehkopf President

OH-260 Rev. 6/02 AUTH: PA 368 OF 1978(IN FORM F-4) COMPLETION OF THIS FORM (OR

EQUIVALENT) IS REQUIRED BY AHERA

MICHIGAN DEPARTMENT OF LABOR AND ECONOMIC GROWTH CONSTRUCTION SAFETY AND HEALTH DIVISION - ASBESTOS PROGRAM AHERA MANAGEMENT PLAN

LEA Name

SB#

Periodic Surveillance

1. Name of Person Performing Surveillance

Last First M.I.

2. Date of Surveillance

3. Description of Changes in the Condition of the Materials

Dove Academy of Detroit

1

Rehkopf Juston L

12-1-17

See attached Periodic Surveillance Report.

OH-260 Rev. 6/02 AUTH: PA 368 OF 1978(IN FORM F-4) COMPLETION OF THIS FORM (OR

EQUIVALENT) IS REQUIRED BY AHERA

MICHIGAN DEPARTMENT OF LABOR AND ECONOMIC GROWTH CONSTRUCTION SAFETY AND HEALTH DIVISION - ASBESTOS PROGRAM AHERA MANAGEMENT PLAN

LEA Name

SB#

Periodic Surveillance

1. Name of Person Performing Surveillance

Last First M.I.

2. Date of Surveillance

3. Description of Changes in the Condition of the Materials

Dove Academy of Detroit

2

Rehkopf Juston L

12-1-17

See attached Periodic Surveillance Report.