Dos agujas tunecinas.pdf
Transcript of Dos agujas tunecinas.pdf
-
8/10/2019 Dos agujas tunecinas.pdf
1/30
CROCHET
by DONNA JONES
A new andexciting technique!
Crochet in theround on multipledouble-ended
hooks.
8710
Double-ended Hook Crochet,,,
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
2/30
Contents 2On the Doublein the Round
6Socks
9Doily
11Table Mat
13Hot Pad
16Pebble-Stitch Hat
19Pebble-Stitch Gloves 23Fingerless Gloves
27Stitch Guide
28 Metric Conversion Charts
Double-ended Hook Crochet,
,
,
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
3/30
IN THE ROUND
CIRCULAR TECHNIQUE
Projects worked using this technique are crochetedin rounds on multiple double-ended hooks(see photo 1), similar to knitting with double-pointed needles.
This method can combine techniques suchas Aghan stitch, Crochet on the Doubleand Crochenit, as well as standard knit andcrochet, using variations o any o the stitchesor each o these techniquesall this is doneon the same set o hooks.
Flat items such as hot pads, pillows, doilies,etc., and tubular items such as gloves, socks,
hats, sweaters, etc., can be made withoutobvious seams.
Flat pieces begin at the center using shortdouble-ended hooks (see photo 2). Stitchesare added on each round so the piece lies lat,and then are moved to longer hooks when thestitches become crowded on the short hooks.I necessary, extremely large pieces can beinished with a double-ended swivel hook.
Tubular pieces begin at one end o the tube witha circular base such as a crocheted chain-stitch
ring or any desired cu (see photo 1).
The circular technique uses 3- or 4-piece setso 10-inch-long or 14-inch-long double-endedhooks. A double-ended swivel hook can be usedor large projects.
On the Doublein the Round
Photo 1
Photo 2
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
2
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
4/30
TECHNIQUE STITCHES
Instructions or Special Stitches will be includedwith each pattern.
When pulling up loops, unless the patternspeciies exact numbers or each hook,distribute the stitches evenly on 3 or 4double-ended hooks.
Here are stitches used in this pattern book:
Pull up a loop: Insert hook in stitch or space asinstructed, yarn over, pull through, leave loopon hook.
Knit:With yarn behind work, insert hook romront to back through center o stitch andunder horizontal bar directly behind it, yarnover counterclockwise, pull through to ront,orming new loop on hook.
Purl:With yarn in ront o work, insert hook romback to ront under horizontal bar and throughcenter o stitch, yarn over clockwise, pul lthrough to back, orming new loop on hook.
Knit increase:With yarn behind work, insert hookrom ront to back in space between stitches,
yarn over, pull through.Purl increase:With yarn in ront o work, insert
hook rom back to ront in space betweenstitches, yarn over, pull through.
Decrease at beginning of row: Yarn over, pullthrough 2 loops on hook. When pickingup loops on next row or round, insert hookthrough both loops o decrease as one.
Decrease anywhere other than at beginning:Yarn over, pull through 3 loops on hook. W henpicking up loops on next row or round, insert
hook through both loops o decrease as one.
Work loops off hooks: Yarn over, pull throughirst loop on hook, [yarn over, pull through 2loops] across irst hook, *transer last loop onhook to next hook, [yarn over, pull through 2loops] across hook, repeat rom * around. Lastloop on last hook will be joined to irst stitch.
Join knitwise: Pull up last loop on last hook anddrop rom hook, with yarn behind work, inserthook rom ront to back through center o irststitch and under horizontal bar directly behindit, return dropped loop to hook, yarn over, pullthrough last loop and through irst stitch toront. One loop on hook counts as irst stitchon next round.
Join purlwise: With yarn in ront o work, inserthook rom back to ront under horizontal barand through center o irst st, yarn over, pullthrough stitch and loop to back. One loop onhook counts as irst stitch on next round.
Work off 2 together: Yarn over, pull through
3 loops on hook.Join new color purlwise: Insert hook rom back to
ront through irst stitch o round, with yarn inront o work, yarn over with new color and pullthrough stitch and loop on hook. Pull cut endsnug and tie ends together.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
5/30
SAMPLE SWATCHCENTERRow 1:With 1 size K hook, ch 15, insert hook in
back bar(see illustration)o 2nd ch rom hook,yo, pull lp through, holding all lps on hook, pullup lp(see Technique Stitches) in back bar o eachch across in same manner (15 lps on hook), yo,pull through 1 lp on hook, [yo, pull through 2lps on hook] across.
Use Technique Stitches as needed.
Rows 218:Sk irst vertical bar, knit(seeTechnique Stitches)in each st across (15 lps onhook), yo, pull through 1 lp on hook, [yo, pullthrough 2 lps on hook] across.
Row 19:Ch 1, sl st in irst st, sl st in each stacross. Do not fasten off.
BORDERRnd 1 (RS):Now working in rnds around outer
edge o Center, sk rows 19 and 18, pull up lp on1 back strand at end o rows 171 (see photo 3)(18 lps on hook),with separate hook, workingin starting ch on opposite side o row 1, pullup lp in each ch across (see photo 4) (15 lps onhook),with separate hook, pull up lps in backstrand at end o rows 118 (see photo 5) (18 lpson hook),with separate hook, pull up lp in
back lp(see Stitch Guide)o each st across (seeBack Bar of Chain
Hook #1
Hook #2
Hook #1
Photo 3
Photo 4
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
4
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
6/30
photo 6) (15 lps on hook), turn,work lps offhooks(see Technique Stitches)around, turn,drop old color with new color, join purlwise
(see Technique Stitches).
Rnd 2 (RS): Sk irst vertical bar, purl(seeTechnique Stitches)in each o next 17 sts (18lps on hook),with separate hook, pull up lpin sp between next 2 sts (corner), purl in eacho next 15 sts, pull up lp in sp between next 2sts (17 lps on hook),with separate hook, purl
in each o next 18 sts (18 lps on hook),withseparate hook, pull up lp in sp between next 2sts (corner), purl in each o next 15 sts, pull up
lp in sp between next 2 sts (corner) (17 lps onhook), turn, work lps o hooks around, turn,join knitwise(see Technique Stitches).
Last rnd:With size H hook, sl st in irst st,sl st in sp between sts around, join with slst in beg sl st. Fasten o.
Hook #1
Hook #2
Hook #2
Hook #3Hook #4
Hook #1
Hook #3
Photo 5 Photo 6
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
7/30
SKILL LEVEL
FINISHED SIZES
Instructions given it small (size 67shoe); changes or medium (size78 shoe)and large (size 910 shoe)are in [ ].
MATERIALS
Cascade Fixation light (DK) weightelastic yarn (1 oz/100 yds/50gper ball):
1 ball each #44 47 red, #9880 variegatedgreen/gold, #3417 orange, #9903variegated teal/li lac and #2406 blue
Size K/10/6.5mm double-ended hooksor size needed to obtain gauge: 3 hooks,each 10 inches long
Size D/3/3.25mm crochet hookor size needed to obtain gauge Tapestry needle Stitch markers
GAUGE
Size K double-ended hook: 5 knit sts = 1 inch;11 knit rows = 2 inches
Size D crochet hook:5 dc post sts = 1 inch;7 dc post st rows = 2 inches
PATTERN NOTES
Read technique inormation on pages 25beore beginning.
Do not stretch elastic yarn while working.Make stitches with yarn relaxed.
Use same color or Ribbing, Heel and Toe.
Change colors ater 1, 2 or 3 rounds o each color,changing colors randomly as desired.
Front post single crochet and chain-2 at begin-ning o row or round counts as irst doublecrochet unless otherwise stated.
Join with sl ip stitch as indicated unlessotherwise stated.
Ater working marked stitch, move marker tostitch just worked.
When picking up loops in work o 2 together,insert hook through all loops instead o topunless otherwise stated.
SPECIAL STITCHES
Foundation double crochet (foundation dc):Yo,insert hook in first ch o beg ch-3, yo, pull lpthrough, yo, pull through 1 lp on hook (ch-1worked), [yo, pull through 2 lps on hook]twice (dc worked), *yo, insert hook in lastch-1 worked, yo, pull lp through, yo, pullthrough 1 lp on hook (ch-1), [yo, pull through2 lps on hook] twice (dc), rep rom * number
times stated.
Joining double crochet (joining dc): Yo, inserthook in ch-1 at base o last dc, insert hook infirst ch o beg ch-3, yo, pull through first chand through ch-1, [yo, pull through 2 lps onhook] twice.
Pull up loop (pull up lp):Insert hook in st or sp asinstructed, yo, pull through, leave lp on hook.
Socks
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
6
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
8/30
Knit:With yarn behind work,insert hook rom ront to backthrough center o st and under
horizontal bar(see illustration)directly behind it, yo counter-clockwise, pull through to ront,orming new lp on hook.
Change colors:Afer working off last st o rnd,use next color to join. Do not asten offdropped color.
Work loops off hooks (work lps off hooks): Yo,pull through first lp on hook, [yo, pull through2 lps] across first hook, *transer last lp on hookto next hook, [yo, pull through 2 lps] acrosshook, rep rom * around. Last lp on last hookwil l be joined to first st.
Work off 2 together (work off 2 tog): Yo, pullthrough 3 lps on hook.
Join knitwise: Pull up last lp on last hook anddrop rom hook, with yarn behind work, inserthook rom ront to back through center o firstst and under horizontal bar directly behind it,return dropped lp to hook, yo, pull through lastlp and through first st to ront. One lp on hook
counts as first st on next rnd.
INSTRUCTIONS
SOCK
MAKE 2.RIBBINGRnd 1:With color of choice(see Pattern Notes)
and size D hook, ch 3 (counts as first dc), founda-tion dc(see Special Stitches)28 [32, 36] times,joining dc(see Special Stitches),join(see Pattern
Notes)in 3rd ch o beg ch-3. (30 [34, 38] dc)
Rnds 28 or desired length:Fpsc(see StitchGuide)around irst st, ch 2(see Pattern Notes),bpdc(see Stitch Guide)around next st, [fpdc(see Stitch Guide)around next st, bpdc aroundnext st] around, join in 2nd ch o beg ch-2. Atend o last rnd, asten o.
FOOTRnd 1:Working in sts on Ribbing and dividing
lps onto 3 size K hooks, with next color, pullup lp(see Special Stitches)in each st around
(30 [34, 38] lps on hooks), turn,work lps offhooks(see Special Stitches)around, turn, joinknitwise(see Special Stitches).
Rnds 29:Maintaining sts on 3 hooks, sk irst st,knit(see Special Stitches)in each st across eachhook around, turn, work lps o hooks around,turn, join knitwise, changing colors(seeSpecial Stitches and Pattern Notes)as desired.
HEELRow 1:With 1 hook and same color as Ribbing,
knit in first st beside knitwise joining, knit in eachof next 14 [16, 18] sts, leaving rem sts unworked(15 [17, 19] lps on hook), do not turn,work off 2tog(see Special Stitches), work lps off hook acrossto last 3 lps, work off 2 tog, do not turn.
Row 2:Sk irst st, knit in each st across,workingin lps of work off 2 tog(see Pattern Notes)(13 [15, 17] lps on hook), work lps o hookacross, do not turn.
Row 3:Sk irst st, k nit in each st across, worko 2 tog, work lps o hook across to last 3 lps,work o 2 tog, do not turn.
Row 4:Sk irst st, knit in each st across (11 [13,
15] lps on hook), work lps o hook across,do not turn.
Row 5:Sk irst st, knit in each st across, worko 2 tog, work lps o hook across to last 3 lps,work o 2 tog, do not turn.
Row 6:Sk irst st, knit in each st across (9 [11,13] lps on hook), work lps o hook across,do not turn.
Row 7:Sk irst st, knit in each st across, worko 2 tog, work lps o hook across to last 3 lps,
work o 2 tog, do not turn.
Row 8:Sk first st, knit in each st across (7 [9, 11]lps on hook), work lps off hook across, do not turn.
Row 9:Sk irst st, knit in each st across, worko 2 tog, work lps o hook across to last 3 lps,work o 2 tog, do not turn.
SMALL & MEDIUM SIZES ONLYFasten o.
Horizontal Bar
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
9/30
LARGE SIZE ONLYRow [10]:Sk irst st, k nit in each st across ([9]
lps on hook), work o 2 tog, work lps o hook
across to last 3 lps, work o 2 tog, do not turn.
Row [11]:Sk irst st, knit in each st across ([7]lps on hook), work o 2 tog, work lps o hookacross to last 3 lps, work o 2 tog, do not turn.Fasten o.
CONTINUE FOOTRnd 10:Now working in rnds, continuing on
Foot, with size K hooks and changing colors atrandom, pick up dropped lp rom last rnd, pullup lp in end o each row across side o Heel,knit in each st across last row o Heel, pull uplp in end o each row across Heel, knit in lastworked st on Foot beside st already worked,mark last st worked, knit in each unworked stacross Foot (40 [44, 50] lps on hooks), turn,work o 2 tog, work lps o hooks around to lastst beore marker, work o 2 tog, work lps ohooks around, turn, join knitwise.
Rnds 1113 [1113, 1114]:Maintaining stson 3 hooks, sk irst st, knit in each st around,working in both lps o marked sts and movingmarker (32 [36, 40] lps on hooks on last rnd),
turn, work o 2 tog, work lps o hooks aroundto last st beore next marker, work o 2 tog,work lps o hooks around, turn, join knitwise.Remove marker.
Rnd 14 [14, 15]: Maintaining sts on 3 hooks, skirst st, knit in each st across each hook around,turn, work lps o hooks around, turn, joinknitwise.
Next rnds:Rep rnd 14 [14, 15] until Footmeasures 5 [6, 7] inches rom last row o Heelor 2 inches less than actual oot length rom
heel to toes. At end o last row, change toRibbing color and asten o all other colors.
TOERnd 1:Dividing lps onto size K hooks, sk irst
st, knit in each st around (32 [36, 40] lps onhooks), turn, work lps o hooks around, turn,join knitwise.
Rnd 2:Maintaining sts on 3 hooks, sk irst st,knit in each st across each hook around, turn,
*work o 2 tog, work next 12 [14, 16] lps ohooks, work o 2 tog, rep rom * once, turn,join knitwise.
Rnds 3 & 4:Maintaining sts on 3 hooks, sk irstst, knit in each st across each hook around (28[32, 36] lps on hooks), turn, work lps o hooksaround, turn, join knitwise.
Rnd 5:Maintaining sts on 3 hooks, sk irst st,knit in each st across each hook around, turn,*work o 2 tog, work next 10 [12, 14] lps ohooks, work o 2 tog, rep rom * once, turn,join knitwise.
Rnd 6:Maintaining sts on 3 hooks, sk irst st,knit in each st across each hook around (24[28, 32] lps on hooks), turn, work lps o hooksaround, turn, join knitwise.
Rnd 7:Maintaining sts on 3 hooks, sk irst st, knitin each st across each hook around, turn, *worko 2 tog, work next 8 [10, 12] lps o hook, worko 2 tog, rep rom * once, turn, join knitwise.
MEDIUM & LARGE SIZES ONLYRnd [8]:Maintaining sts on 3 hooks, sk irst st,
knit in each st across each hook around, ([24,
28] lps on hooks), turn, *work o 2 tog, worknext [8, 10] lps o hooks, work o 2 tog, reprom * once, turn, join knitwise.
LARGE SIZE ONLYRnd [9]:Maintaining sts on 3 hooks, sk irst st,
knit in each st across each hook around ([24]lps on hooks), turn, *work o 2 tog, work next[8] lps o hooks, work o 2 tog, rep rom *once, turn, join knitwise.
ALL SIZESRnd 8 [9, 10]:Maintaining sts on 3 hooks, sk
irst st, knit in each st across each hook around(20 [20, 20] lps on hooks), turn, yo, pull through3 lps on hook, [yo, pull through 2 lps on hook]4 times, [yo, pull through 4 lps] twice, [yo,pull through 2 lps on hook] 4 times, yo, pullthrough last 4 lps on hook, turn, join knitwise.Leaving 8-inch end, asten o.
With 8-inch end, sew opening closed.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
8
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
10/30
SKILL LEVEL
FINISHED SIZE
14 inches in diameter
MATERIALS
Pisgah Yarn & Dyeing Inc. AmericasBest Country size 10 crochet cotton(150 yds per ball):
1 ball each #89 camel, #467 khaki and#190 painted desert
Size K/10/6.5mm double-ended hooksor size needed to obtain gauge: 4 hooks,each 10 inches long
Sizes D/3/3.25mm and G/6/4mm crochethooks or sizes needed to obtain gauge
Stitch markersGAUGES
Size K double-ended hook: 6 knit sts = 1 inch
Size D hook:Rnds 16 = 3 inches in diameter
Size G hook:5 sts = 1 inch
PATTERN NOTES
Read technique inormation on pages 25 beorebeginning.
Join with sl ip stitch as indicated unlessotherwise stated.
When working into small stitches or chains, itmay be easier to use size D hook to pull up eachlp and place it on the larger size K hook.
SPECIAL STITCHES
Pull up loop (pull up lp): Insert hook in st or sp asinstructed, yo, pull through, leave lp on hook.
Knit:With yarn behind work, inserthook rom ront to back throughcenter o st and under horizontalbar(see illustration)directlybehind it, yo counterclockwise,pull through to ront, orming new lp on hook.
Work loops off hooks (work lps off hooks):Yo,pull through first lp on hook, [yo, pull through2 lps] across first hook, *transer last lp on hookto next hook, [yo, pull through 2 lps] acrosshook, rep rom * around. Last lp on last hookwil l be joined to first st.
Join knitwise: Pull up last lp on last hook anddrop rom hook, with yarn behind work, inserthook rom ront to back through center o firstst and under horizontal bar directly behind it,return dropped lp to hook, yo, pull through lastlp and through first st to ront. One lp on hook
counts as first st on next rnd.
INSTRUCTIONS
DOILY
CENTERRnd 1:With size D hook and camel, ch 6, sl st in
irst ch to orm ring, ch 1, sc in irst ch, [ch 4, scin next ch] 5 times, ch 1, join with dc in beg sc,orming last ch sp. (6 ch sps)
Doily
Horizontal Bar
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
11/30
Rnd 2:Ch 1, sc in last ch sp ormed, (ch 4, sc)twice in each ch sp around, ch 4, sc in same chsp as beg sc, ch 1, join with dc in beg sc orming
last ch sp. (12 ch sps)
Rnd 3:Ch 1, sc in last ch sp ormed, ch 4, (sc, ch4, sc) in next ch sp, [ch 4, sc in next ch sp, ch 4,(sc, ch 4, sc) in next ch sp] around, ch 1, joinwith dc in beg sc, orming last ch sp. (18 ch sps)
Rnd 4:Ch 1, sc in last ch sp ormed, *[ch 4, sc innext ch sp] twice, ch 4**, (sc, ch 4, sc) in next chsp, rep rom * around, ending last rep at **, scin same ch sp as beg sc, ch 1, join with dc in begsc, orming last ch sp.
Rnds 5 & 6:Ch 1, sc in last ch sp ormed, [ch 4,sc in next ch sp] around, ch 1, join with dc inbeg sc, orming last ch sp.
Rnd 7:With size G hook, ch 1, sc in last ch spormed, ch 3, [sc in next ch sp, ch 3] around,join(see Pattern Notes)in beg sc. Fasten o.(24 sc, 24 ch sps)
FIRST RINGRnd 1:With RS acing, dividing sts onto 4 size
K hooks, join painted desert in irst ch o any
ch-3 sp, pull up lp(see Special Stitches andPattern Notes)in each ch and st around (96 lpson hooks), turn,work lps off hooks(see SpecialStitches)around, turn, join knitwise(seeSpecial Stitches).
Rnds 26:Maintaining sts on 4 hooks, sk irstst, knit(see Special Stitches)in each st around,turn, work lps o hooks around, turn, joinknitwise.
Rnd 7:With size G hook, ch 1, sc in each staround, join in beg sc. Fasten o. (96 sc)
2ND RINGRnd 8:With size D hook, join khaki with sc in
irst st, [ch 3, sk next st, sc in next st] around,ch 1, sk last st, join with dc in beg sc, orminglast ch sp. (48 ch sps)
Rnd 9: Ch 1, sc in last ch sp ormed, [ch 4, sc innext ch sp] around, ch 1, join with dc in beg sc,orming last ch sp.
Rnd 10:With size G hook, ch 1, sc in last ch spormed, ch 3, [sc in next ch sp, ch 3] around,join in beg sc. Fasten o.
3RD RINGRnd 11:Dividing sts onto 4 size K hooks, join
painted desert in irst ch o any ch-3 sp, pullup lp in each ch and in each st around (192 lpson each hook), turn, work lps o hooks around,turn, join knitwise.
Rnds 1217:Maintaining sts on 4 hooks, sk irstst, knit in each st across each hook around,turn,work lps o hooks, turn, join knitwise.
Rnd 18:With size G hook, ch 1, sc in each staround changing colors to camel in last st, joinin beg sc. Do not fasten offpainted desert.
Rnd 19:Working in back lps(see Stitch Guide),ch 3 (counts as first dc), dc in each st around,changing to painted desert in last st, join in 3rdch o beg ch-3. Fasten o camel.
EDGINGRnd 20:Working in back lp andback bar of dc(see illustration)o each st, ch 1, sc in each oirst 7 sts, 2 sc in next st, [sc in each o next7 sts, 2 sc in next st] around, join in beg sc.
(216 sc)
Rnd 21: Working in both lps, ch 1, sc in irst st,*sk next 2 sts, (3 dc, ch 3, sl st in last dc worked,3 dc) in next st, sk next 2 sts**, sc in next st, reprom * around, ending last rep at **, join in begsc. Fasten o.
Back Bar of Double Crochet
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
10
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
12/30
SKILL LEVEL
FINISHED SIZE
10 x 12 inches
MATERIALS Pisgah Yarn & Dyeing Co. Peaches &
Creme medium (worsted) weight yarn(2 oz/122 yds/71g per ball):
1 ball each #33 persimmon and#96 brick red
Size K/10/6.5mm double-ended hooksor size needed to obtain gauge: 4 hooks,each 10 inches long
Size H/8/5mm crochet hook Stitch markers
GAUGE
Size K double-ended hook: 4 knit sts = 1 inch;5 knit rows = 1 inch
PATTERN NOTES
Read technique information on pages 25 beforebeginning.
When changing colors, leaving 4-inch end cutdropped yarn, tie ends together to secure untilready to weave in.
Join with sl ip stitch as indicated unless
otherwise stated.
When picking up loops in work o 2 together,insert hook through all loops instead o topunless otherwise stated.
SPECIAL STITCHES
Pull up loop (pull up lp): Insert hookin st or sp as instructed, yo, pullthrough, leave lp on hook.
Knit:With yarn behind work, insert hook romront to back through center o st and underhorizontal bar(see illustration)directly behind
it, yo counterclockwise, pul l through to ront,orming new lp on hook.
Purl:With yarn in ront o work, insert hook romback to ront under horizontal bar and throughcenter o st, yo clockwise, pull through to back,orming new lp on hook.
Knit increase (knit inc): With yarn behind work,insert hook rom ront to back in sp betweensts, yo, pull through.
Table Mat
Horizontal Bar
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
13/30
-
8/10/2019 Dos agujas tunecinas.pdf
14/30
Rnd 4:Maintaining sts on 4 hooks, sk irst st,knit under next horizontal bar, knit across tonext corner st, knit inc(see Special Stitches),
*knit in next corner st, knit inc, knit in eachst across to next corner st, knit inc, rep rom *twice, turn, work lps o hooks around, turn,do not join. Leaving 4-inch end, asten o, pullend through lp on hook, with persimmon, joinnew color purlwise.
Rnd 5: Maintaining sts on 4 hooks, sk irst st,purl in each st around, turn, work lps o hooksaround, turn, join knitwise.
Rnd 6:Maintaining sts on 4 hooks, sk irst st,knit in each st around, turn, work lps o hooksaround, turn, join knitwise.
Rnd 7:Maintaining sts on 4 hooks, sk irst st,knit inc, knit in each st across to corner st, knitinc, *knit in next corner st, knit inc, knit in eachst across to next corner sp, knit inc, rep rom *
twice, turn, work lps o hooks around, turn,join knitwise.
Rnd 8:Maintaining sts on 4 hooks, sk irst st,knit in each st around, turn, work lps o hooks,turn, do not join. Leaving 4-inch end, asteno, pull end through lp on hook, with brick red,join new color purlwise.
Rnd 9:Maintaining sts on 4 hooks, sk irstst, purl in each st around, turn, work lpso hooks around, turn,join purlwise(see Special Stitches).
Rnd 10:Maintaining sts on 4 hooks, sk irst st,purl in each st around, turn, work lps o hooksaround, turn, join knitwise.
Rnd 11:With size H hook, sk irst st, *sl st in spbetween each st across to corner st, (sl st, ch 1,sl st) in corner st, rep rom * around, join(seePattern Notes)in beg sl st. Fasten o.
SKILL LEVEL
FINISHED SIZE
7 inches square, excluding hanging loop
MATERIALS Pisgah Yarn & Dyeing Co. Peaches
& Creme medium (worsted) weightyarn (2 oz/122 yds/71g per ball):
1 ball each #33 persimmon and#96 brick red
Size K/10/6.5mm double-ended hooksor size needed to obtain gauge: 4 hooks,each 10 inches long
Size H/8/5mm crochet hook Stitch markers
Hot Pad
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
15/30
GAUGE
Size K double-ended hook: 4 knit sts = 1 inch;5 knit rows = 1 inch
PATTERN NOTES
Read technique inormation on pages 25beore beginning.
When changing colors, leaving 4-inch end cutdropped yarn, tie ends together to secure untilready to weave in.
Join with sl ip stitch as indicated unlessotherwise stated.
SPECIAL STITCHES
Pull up loop (pull up lp):Insert hook in st or sp asinstructed, yo, pull through, leave lp on hook.
Knit:With yarn behind work,insert hook rom ront toback through center o st andunder horizontal bar(seeillustration)directly behind it, yocounterclockwise, pull throughto ront, orming new lp on hook.
Purl:With yarn in ront o work, insert hook rom
back to ront under horizontal bar and throughcenter o st, yo clockwise, pull through to back,orming new lp on hook.
Knit increase (knit inc): With yarn behind work,insert hook rom ront to back in next spbetween sts, yo, pull through.
Purl increase (purl inc): With yarn in ront owork, insert hook rom back to ront in next spbetween sts, yo, pull through.
Work loops off hooks (work lps off hooks):Yo,
pull through first lp on hook, [yo, pull through2 lps] across first hook, *transer last lp on hookto next hook, [yo, pull through 2 lps] acrosshook, rep rom * around. Last lp on last hookwill be joined to first st.
Join knitwise: Pull up last lp on last hook anddrop rom hook, with yarn behind work, inserthook rom ront to back through center o firstst and under horizontal bar directly behind it,return dropped lp to hook, yo, pull through last
lp and through first st to ront. One lp on hookcounts as first st on next rnd.
Join purlwise: With yarn in ront o work, inserthook rom back to ront under horizontal barand through center o first st, yo, pull throughst and lp to back. One lp on hook counts as firstst on next rnd.
Join new color purlwise: Insert hook rom back toront through first st o rnd, with yarn in ronto work, yo with new color and pull through stand lp on hook. One lp on hook counts as firstst on next rnd.
INSTRUCTIONS
HOT PAD
CENTERRow 1:With 1 size K hook and persimmon, ch
15, insert hook inback bar(see illustration)o2nd ch rom hook, yo, pull lp through, holdingall lps on hook, pull up lp in back bar o each chacross in same manner (15 lps on hook), yo, pullthrough 1 lp on hook, [yo, pull through 2 lps onhook] across.
Rows 218:Sk irst vertical bar, knit(see SpecialStitches)in each st across (15 lps on hook), yo,pull through 1 lp on hook, [yo, pull through2 lps on hook] across.
Row 19: Ch 1, sl st in irst st, sl st in each stacross. Do not fasten off.
BORDERRnd 1 (RS):Now working in rnds around outeredge o Center, sk rows 19 and 18, pull up lp(see Special Stitches)in back strand at end oeach row 171 (18 lps on hook),with separatehook, working in starting ch on opposite siderow 1, pull up lp in each ch across (15 lps onhook),with separate hook, pull up lp in backstrand at end o each row 118 (18 lps on hook),
with separate hook, pull up lp inback lp(seeStitch Guide)o each st across (15 lps on hook),
Back Bar of Chain
Horizontal Bar
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
14
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
16/30
-
8/10/2019 Dos agujas tunecinas.pdf
17/30
Pebble-Stitch
SKILL LEVEL
FINISHED SIZE
One size its most
MATERIALS
Plymouth Yarn Encore Worstedmedium (worsted) weight yarn(3 oz/200 yds/100g per ball):
1 ball #389 gray Size K/10/6.5mm double-ended hooks
or size needed to obtain gauge: 4 hooks,
each 10 inches long Size H/8/5mm crochet hook Tapestry needle Stitch markers
GAUGE
Size K double-ended hook: 4 knit sts = 1 inch;5 knit rnds = 1 inch
PATTERN NOTES
Read technique inormation on pages 25 beorebeginning.
When changing colors, leaving 4-inch end, cutdropped yarn, tie ends together to secure untilready to weave in.
Join with sl ip stitch as indicated unlessotherwise stated.
When picking up loops in work o 2 together,insert hook through all loops instead o topunless otherwise stated.
SPECIAL STITCHES
Pull up loop (pull up lp):Insert hook in st or sp asinstructed, yo, pull through, leave lp on hook.
Knit:With yarn behind work, inserthook rom ront to back through
center o st and under horizontalbar(see illustration)directlybehind it, yo counterclockwise,pull through to ront, orming newlp on hook.
Work loops off hooks (work lps off hooks):Yo,pull through first lp on hook, [yo, pull through2 lps] across first hook, *transer last lp on hookto next hook, [yo, pull through 2 lps] acrosshook, rep rom * around. Last lp on last hookwill be joined to first st.
Work off 2 together (work off 2 tog): Yo, pullthrough 3 lps on hook.
Join knitwise: Pull up last lp on last hook anddrop rom hook, with yarn behind work, inserthook rom ront to back through center o firstst and under horizontal bar directly behind it,return dropped lp to hook, yo, pull throughlast lp and through first st to ront. 1 lp on hookcounts as first st on next rnd.
Hat
Horizontal Bar
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
16
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
18/30
Pebble-stitch (pebble-st):Pull up lp in next spbetween sts, knit in next st , pull up lp in nextsp between sts, working back and orth over
last 3 lps on hook, work off first lp, work offeach o next 2 lps, knit in each o last 2 sts, yo,pull through last 3 lps on hook, push st to ronto work.
INSTRUCTIONS
HAT
RIBBINGRow 1:With size H hook, ch 9, sc in 2nd ch rom
hook and in each ch across, turn. (8 sc)
Rows 278:Working in back lps(see StitchGuide), ch 1, sc in each st across, turn.
Row 79:Fold irst and last rows tog, workingthrough both thicknesses, sl st in each st across,do not turn.
CROWNRnd 1:Now working in rnds and in ends o rows,
evenly sp 78 sc around, join(see Pattern Notes)in beg sc.
Rnd 2:Ch 1, fpsc(see Stitch Guide)around irst
st, ch 1 (fpsc and ch-1 counts as first hdc), [fphdc(see Stitch Guide)around each o next 6 sts, hdcin next sp between sts] 12 times, phdc aroundeach o last 5 sts, join in beg ch-1. (90 hdc)
Rnd 3 (RS):With size K hook, dividing sts on 4double-ended hooks with 23 on irst hook, 22on next hook, 23 on next hook and 22 on lasthook, sk irst st, pull up lp(see Special Stitches)in each st around, turn,work lps off hooks(see Special Stitches),turn, join knitwise (seeSpecial Stitches).
Rnd 4: Maintaining sts on 4 hooks, sk irst st,knit(see Special Stitches)in each st across eachhook around, turn, work lps o hooks around,turn, join knitwise.
Rnd 5:Maintaining sts on 4 hooks, sk irst st,pebble-st(see Special Stitches), [knit in each onext 5 sts, pebble-st] 14 times, knit in each o
last 4 sts, turn, work lps o hooks around, turn,join knitwise.
Rnds 6 & 7:Maintaining sts on 4 hooks, sk irstst, knit in each st around, turn, work lps ohooks around, turn, join knitwise.
Rnd 8:Maintaining sts on 4 hooks, sk irst st,knit in each o next 3 sts, pebble-st, [knit ineach o next 5 sts, pebble-st] 14 times, knit inlast st, turn, work lps o hooks around, turn,join knitwise.
Rnds 9 & 10: Maintaining sts on 4 hooks, skirst st, knit in each st around, turn, work lpso hooks around, turn, join knitwise.
Rnds 1114:Rep rnds 58.
Rnd 15:Maintaining sts on 4 hooks, sk irst st,knit in each st around, turn, [work next 13 lpso hooks,work off 2 tog(see Special Stitches),mark front lps(see Stitch Guide)o last 2 stsworked] 6 times, turn, join knitwise.
Rnd 16:Maintaining sts on 4 hooks, sk irst st,knit in each st around,working in lps of workoff 2 tog(see Pattern Notes), turn, [work next
12 lps o hooks, work o 2 tog, move markerto ront lps o 2 sts just worked o tog] 6 times,turn, join knitwise.
Rnd 17:Maintaining sts on 4 hooks, sk irst st,pebble-st, *knit in each o next 5 sts, pebble-st,[knit in each o next 4 sts, pebble-st] 4 times,rep rom * once, knit in each o next 5 sts,pebble-st, [knit in each o next 4 sts, pebble-st]3 times, knit in each o last 3 sts, turn, work lpso hooks around, turn, join knitwise.
Rnd 18:Maintaining sts on 4 hooks, sk irst st,
knit in each st around, turn, [work o 2 tog,work next 9 lps o hooks, work o 2 tog] 6times, turn, join knitwise.
Rnd 19:Maintaining sts on 4 hooks, sk irst st,knit in each st around, turn, work lps o hooksaround, turn, join knitwise.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
19/30
Rnd 20:Maintaining sts on 4 hooks, sk irstst, knit in each o next 2 sts, pebble-st, *[knitin each o next 4 sts, pebble-st, knit in each o
next 3 sts, pebble-st] twice, knit in each o next3 sts pebble-st, rep rom * once, [knit in each
o next 4 sts, pebble-st, knit in each o next 3sts, pebble-st] twice, turn, work lps o hooksaround, turn, join knitwise.
Rnd 21:Maintaining sts on 4 hooks, sk first st,knit in each st around, turn, [work off 2 tog, worknext 7 lps off hooks] 6 times, turn, join knitwise.
Rnd 22:Maintaining sts on 4 hooks, sk irst st,knit in each st around, turn, [work o 2 tog,work next 5 lps o hooks, work o 2 tog] 6times, turn, join knitwise.
Rnd 23:Maintaining sts on 4 hooks, sk irst st,knit in next st, pebble-st, [knit in each o next5 sts, pebble-st] 6 times, knit in each o last3 sts, turn, work lps o hooks around, turn,join knitwise.
Rnd 24:Maintaining sts on 4 hooks, sk irst st,knit in each st around, turn, [work o 2 tog,work next 3 lps o hooks, work o 2 tog] 6times, turn, join knitwise.
Rnd 25:Dividing sts onto 3 hooks, sk irst st,knit in each st around (10 lps on each hook),turn, work lps o hooks around, turn,join knitwise.
Rnd 26:Maintaining sts on 3 hooks, sk irst st,knit in each st around, turn, [work next 3 lpso hooks, work o 2 tog] 6 times, turn,join knitwise.
Rnd 27:Maintaining sts on 3 hooks, sk irst st,knit is each st around (8 lps on each hook), turn,[work next 2 lps o hooks, work o 2 tog] 6times, turn, join knitwise.
Rnd 28:Maintaining sts on 3 hooks, sk irst st,knit in each st around (6 lps on each hook), turn,
[work 1 lp o hooks, work o 2 tog] 6 times,turn, join knitwise.
Rnd 29:Maintaining sts on 3 hooks, sk irstst, knit in each st around (4 lps on each hook).Leaving 8-inch end, asten o. Thread end intotapestry needle.
Removing lps rom hooks as you go, run needlethrough each lp on hooks, pull to close.Secure end.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
18
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
20/30
SKILL LEVEL
FINISHED SIZES
Instructions given it small; changes or mediumand large are in [ ].
MATERIALS
Plymouth Yarn Encore Worstedmedium (worsted) weight yarn(3 oz/200 yds/100g per ball):
1 ball #389 gray Size K/10/6.5mm double-ended hooks
or size needed to obtain gauge: 3 hooks,
each 10 inches long Size H/8/5mm crochet hookor size needed to obtain gauge
Tapestry needle Stitch markers
GAUGE
Size K double-ended hook: 4 knit sts = 1 inch;5 knit rnds = 1 inch
Size H crochet hook:5 sc = 1 inch; 5 sc rows =1 inch
PATTERN NOTESRead technique inormation on pages 25beore beginning.
Join with sl ip stitch as indicated unlessotherwise stated.
When picking up loops in work o 2 together,insert hook through all loops instead o topunless otherwise stated.
SPECIAL STITCHES
Pull up loop (pull up lp): Insert hook in st or sp asinstructed, yo, pull through, leaving lp on hook.
Knit:With yarn behind work, inserthook rom ront to back throughcenter o st and under horizontalbar(see illustration)directly behindit, yo counter-clockwise, pullthrough to ront, orming new lpon hook.
Pebble-Stitch
Gloves
Horizontal Bar
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
21/30
Knit increase (knit inc):Pull up lp under horizontalbar between sts.
Work loops off hooks (work lps off hooks):Yo,pull through first lp on hook, [yo, pull through2 lps] across first hook, *transer last lp on hookto next hook, [yo, pull through 2 lps] acrosshook, rep rom * around. Last lp on last hookwill be joined to first st.
Work off 2 together (work off 2 tog): Yo, pullthrough 3 lps on hook.
Join knitwise: Pull up last lp on last hook anddrop rom hook, with yarn behind work, inserthook rom ront to back through center o firstst and under horizontal bar directly behind it,return dropped lp to hook, yo, pull through lastlp and through first st to ront. One lp on hookcounts as first st on next rnd.
Pebble-stitch (pebble-st):Pull up lp in next spbetween sts, knit in next st, pull up lp in next spbetween sts, working back and forth over last 3lps on hook, work off first lp, work off each of next2 lps, knit in each of last 2 sts, yo, pull throughlast 3 lps on hook, push st to front of work.
INSTRUCTIONS
LEFT HAND
RIBBINGRow 1:With size H hook, ch 11, sc in 2nd ch
rom hook and in each ch across, turn. (10 sc)
Rows 226 [230, 234]:Working inback lps(see Stitch Guide), ch 1, sc in each st across, turn.
Row 27 [31, 35]:Fold irst and last rows tog,working through both thicknesses, sl st in eachst across, do not turn.
HANDRnd 1:Now working in rnds and in ends o rows,
dividing lps onto 3 double-ended hooks, pullup lp(see Special Stitches)in end o each rowaround (26 [30, 34] lps on hooks), turn,worklps off hooks(see Special Stitches) around, turn,join knitwise(see Special Stitches).
Rnds 25:Maintaining sts on 3 hooks, sk irst st,knit(see Special Stitches)in each st across each
hook around, turn, work lps o hooks around,turn, join knitwise.
Rnd 6:Maintaining sts on 3 hooks, sk irst st,knit in each o next 9 [11, 13] sts, knit inc(seeSpecial Stitches),knit in each o next 3 sts, knitinc, knit in each o next 6 [7, 8] sts, pebble-st(see Special Stitches), knit in each o last 6 [7, 8]sts (28 [32, 36] lps on hooks), turn, work lps ohooks around, turn, join knitwise.
Rnds 7 & 8:Maintaining sts on 3 hooks, sk irstst, knit in each st across each hook around,turn, work lps o all hooks around, turn,join knitwise.
Rnd 9:Maintaining sts on 3 hooks, sk irst st,knit in each o next 9 [11, 13] sts, knit inc,knit in each o next 5 sts, k nit inc, knit in eacho next 4 [5, 6] sts, pebble-st, knit in next st,pebble-st, knit in each o last 4 [5, 6] sts (30[34, 38] lps on hooks), turn, work lps o hooksaround, turn, join knitwise.
Rnds 10 & 11:Maintaining sts on 3 hooks, skirst st, knit in each st across each around, turn,work lps o hooks around, turn, join knitwise.
Rnd 12:Maintaining sts on 3 hooks, sk irst st,knit in each o next 9 [11, 13] sts, knit inc, knitin each o next 7 sts, knit inc, knit in each onext 6 [7, 8] sts, pebble-st, knit in each o last 6[7, 8] sts (32 [36, 40] lps on hooks), turn, worklps o hooks around, turn, join knitwise.
Rnds 13 & 14 [1315, 1316]:Maintaining stson 3 hooks, sk irst st, knit in each st around,turn, work lps o hooks around, turn, joinknitwise. Drop lp rom hook.
THUMB
With separate strand o yarn, sk irst 9 [11, 13]sts, including irst lp, join(see Pattern Notes)in next sp between sts, ch 4, sk next 8 [10, 12]sts, sl st in next sp, leaving rem sts unworked.Fasten o.
CONTINUE HANDRnd 15 [16, 17]:Return lp to hook, sk irst st,
knit in each st across to sl st, pull up lp in nextsp beside sl st, pull up lp in each o next 4 chs,pull up lp in next sp beside next sl st, knit in
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
20
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
22/30
each st around (30 [32, 34] lps on hooks), turn,work lps o hooks around, turn, join knitwise.
Rnds 16 & 17 [1719, 1821]: Maintaining stson 3 hooks, sk irst st, knit in each st around,turn, work lps o hooks around, turn, joinknitwise. Drop lp rom hook.
LITTLE FINGERUsing separate strand, sk irst 3 [4, 4] sts,
including irst lp, join with sl st in next spbetween sts, ch 1, sk next 24 [25, 26] sts, sl stin next sp. Fasten o.
Rnd 1:Dividing sts on 3 size K hooks, returnlp to hook, sk irst st, knit in each o next 2[3, 3] sts, pull up lp in sp beside sl st, pull uplp in ch-1, pull up lp in next sp, knit in each olast 3 [3, 4] sts, (9 [10, 11] lps on hooks), turn,work o next 3 [3, 4] times,work off 2 tog(seeSpecial Stitches), work rem lps o hooks, turn,join knitwise.
Rnds 210 [211, 212]:Maintaining sts on3 hooks, sk irst st, knit in each st around,
working in lps of work off 2 tog(see PatternNotes), (8 [9, 10] lps on hooks), turn, work lpso hooks around, turn, join knitwise.
Rnd 11 [12, 13]:Maintaining sts on 3 hooks, skirst st, knit in each st around. Leaving 8-inchend, asten o.
Removing lps as you go, weave 8-inch endthrough lps on hooks, pull to close. Secure end.
CONTINUE HANDRnd 18 [20, 22]:Dividing sts on 3 size K hooks,
join in ch-1 of Little Finger, pull up lp in next spbeside sl st, knit in each st around, pull up lp innext sp beside sl st (27 [28, 29] lps on hooks), turn,
work lps off hooks around, turn, join knitwise.
Rnd 19 [21, 23]:Maintaining sts on 3 hooks, skirst st, knit in each st around, turn, work lps ohooks around, turn, join knitwise.
RING FINGERRnd 1:Sk irst 6 sts on last rnd o Hand, join
in next sp between sts, ch 1, sk next 16 [17, 18]sts, sl st in next sp, knit in each o last 5 stsand in each o irst 6 sts, pull up lp in next sp
beside sl st, pull up lp in ch-1 (14 lps on hooks),turn, work next 10 lps o hooks, [work o2 tog] twice, work rem lps o hooks, turn,
join knitwise.
Rnds 212 [213, 214]:Maintaining sts on 3hooks, sk irst st, knit in each st around (12 lpson hook), turn, work lps o hooks around, turn,join knitwise.
Rnd 13 [14, 15]:Maintaining sts on 3 hooks, skirst st, knit in each st around. Leaving 8-inchend, asten o.
Removing lps as you go, weave 8-inch endthrough lps on hooks, pull to close. Secure end.
MIDDLE FINGERRnd 1:Maintaining sts on 3 hooks, sk irst
4 unworked sts on last rnd o Hand, join innext sp between sts, ch 1, sk next 8 [9, 10] sts, slst in next sp between sts, knit in each o next4 sts, pull up lp in next sp beside sl st, pull uplp in ch-1, pull up lp in next sp beside sl st,knit in each o next 4 sts, pul l up lp in nextsp beside sl st, pull up lp in ch-1 (14 lps onhooks), turn, [work next 5 lps o hooks, worko 2 tog] twice, work rem lps o hooks, turn,
join knitwise.Rnds 213 [214, 215]:Maintaining sts on 3
hooks, sk irst st, knit in each st around (12 lpson hook), turn, work lps o hooks around, turn,join knitwise.
Rnd 14 [15, 16]:Maintaining sts on 3 hooks,sk irst st, knit in each st around. Leaving8-inch end, asten o.
Removing lps as you go, weave 8-inch endthrough lps on hooks, pull to close. Secure end.
INDEX FINGERRnd 1:Join in ch-1 o Middle Finger, pull up lp in
next sp beside sl st, knit in each o next 8 [9, 10]sts, pull up lp in next sp beside sl st (11 [12, 13]lps on hooks), turn, work o 2 tog, work rem lpso hooks around, turn, join knitwise.
Rnds 211 [212, 213]:Maintaining sts on 3hooks, sk irst st, knit in each st around, turn,work lps o hooks, turn, join knitwise.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
23/30
Rnd 12 [13, 14]:Maintaining sts on 3 hooks, skirst st, knit in each st around. Leaving 8-inchend, asten o.
Removing lps as you go, weave 8-inch endthrough lps on hooks, pull to close. Secure end.
THUMBRnd 1:Maintaining sts on 3 hooks, join in sp
beside irst sl st at base o Thumb, knit in eacho next 8 [10, 12] sts, pull up lp in sp beside slst, pull up lp in each o next 4 chs (14 [16, 18]lps on hooks), turn, work next 8 [10, 12] lps ohooks, work o 2 tog, work next 2 lps o hook,work o 2 tog, turn, join knitwise.
Rnd 2:Maintaining sts on 3 hooks, sk irst st,knit in each st around (12 [14, 16] lps on hooks),turn, work next 9 [11, 13] lps o hooks, worko 2 tog, work rem lps o hooks, turn,join knitwise.
Rnd 3:Maintaining sts on 3 hooks, sk irst st,knit in each st around (11 [13, 15] lps on hooks),turn, work next 7 [9, 11] lps o hooks, [work o2 tog] twice, turn, join knitwise.
Rnds 49 [410, 411]:Maintaining sts on
3 hooks, sk irst st, knit in each st around (9[11, 13] lps on hooks), turn, work lps o hooksaround, turn, join knitwise.
Row 10 [11, 12]:Maintaining sts on 3 hooks, skirst st, knit in each st around, turn, work next1 [3, 1] lp(s) o hooks, *work o 2 tog, worknext 2 lps o hook, rep rom * 1 [1, 2] time(s),turn, join knitwise.
Rnd 11 [12, 13]:Maintaining sts on 3 hooks, skirst st, knit in each st around. Leaving 8-inchend, asten o.
Removing lps as you go, weave 8-inch endthrough lps on hooks, pull to close. Secure end.
RIGHT HAND
RIBBINGWork same as Ribbing on Let Hand.
HANDRnds 15:Rep rnds 15 o Hand on Let Hand.
Rnd 6:Maintaining sts on 3 hooks, sk irst st,knit in each o next 5 [6, 7] sts, pebble-st, knitin each o next 6 [7, 8] sts, knit inc, knit in eacho next 3 sts, knit inc, knit in each o next 10[12, 14] sts (28 [32, 36] lps on hooks), turn,work lps o hooks around, turn, join knitwise.
Rnds 7 & 8:Maintaining sts on 3 hooks, sk irstst, knit in each st around, turn, work lps ohooks around, turn, join knitwise.
Rnd 9:Maintaining sts on 3 hooks, sk irst st,knit in each o next 4 [5, 6] sts, pebble-st, knitin next st, pebble-st, knit in each o next 5 [6,7] sts, pull up lp under next horizontal bar,knit in each o next 5 sts, pull up lp under nexthorizontal bar, knit in each o next 10 [12, 14]sts (30 [34, 38] lps on hooks), turn, work lps ohooks around, turn, join knitwise.
Rnds 10 & 11:Maintaining sts on 3 hooks, skirst st, knit in each st around, turn, work lps ohooks around, turn, join knitwise.
Rnd 12:Sk irst st, knit in each o next 5 [6, 7]
sts, pebble-st, knit in each o next 6 [7, 8] sts,knit inc, knit in each o next 7 sts, knit inc, knitin each o next 10 [12, 14] sts, (32 [36, 40] lps onhooks), turn, work lps o hooks around, turn,join knitwise.
Rnds 13 & 14 [1315, 1316]:Maintaining stson 3 hooks, sk irst st, knit in each st around, turn,work lps o hooks around, turn, join knitwise.
THUMBWith separate strand o yarn, sk irst 15 sts,
including irst lp, join in next sp between sts,
ch 4, sk next 8 [10, 12] sts, sl st in next sp,leaving rem sts unworked. Fasten o.
CONTINUE RIGHT HANDBeg with rnd 15 [16, 17] on Hand, rep Hand,
Little Finger, Ring Finger, Middle Finger,Index Finger and Thumb same as Let Hand.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
22
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
24/30
Fingerless
SKILL LEVEL
FINISHED SIZES
Instructions given it small; changes or mediumand large are in [ ].
MATERIALS
Red Heart Bamboo Wool medium(worsted) weight yarn (1 oz/87 yds/50g per skein):
1 skein #3265 gold Size K/10/6.5mm double-ended hooks
or size needed to obtain gauge: 3 hooks,
each 10 inches long Size F/5/3.75mm crochet hookor size needed to obtain gauge
Tapestry needle Stitch markers
GAUGE
Size K double-ended hook: 4 knit sts = 1 inch;5 knit rows = 1 inch
Size F crochet hook:6 sc = 1 inch; 5 sc rows =1 inch
PATTERN NOTESRead technique inormation on pages 25 beorebeginning.
Join with sl ip stitch as indicated unlessotherwise stated.
Ater working marked stitch, move marker tostitch just worked.
When picking up loops in work o 2 together,insert hook through all loops instead o topunless otherwise stated.
SPECIAL STITCHES
Pull up loop (pull up lp): Insert hook in st or sp asinstructed, yo, pull through, leave lp on hook.
Knit:With yarn behind work, inserthook rom ront to back throughcenter o st and under horizontalbar(see illustration)directlybehind it, yo counterclockwise,pull through to ront, ormingnew lp on hook.
Knit increase (knit inc):Pull up lp under horizontalbar between sts.
Work loops off hooks (work lps off hooks):Yo,pull through first lp on hook, [yo, pull through2 lps] across first hook, *transer last lp on hookto next hook, [yo, pull through 2 lps] acrosshook, rep rom * around. Last lp on last hookwil l be joined to first st.
Work off 2 together (work off 2 tog): Yo, pullthrough 3 lps on hook.
Gloves
Horizontal Bar
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
25/30
Join knitwise: Pull up last lp on last hook anddrop rom hook, with yarn behind work, inserthook rom ront to back through center o firstst and under horizontal bar directly behind it,return dropped lp to hook, yo, pull through lastlp and through first st to ront. One lp on hookcounts as first st on next rnd.
INSTRUCTIONS
LEFT HAND
RIBBINGRow 1:With size F hook, ch 9, sc in 2nd ch romhook and in each ch across, turn. (8 sc)
Rows 226 [230, 234]:Working in backlps(see Stitch Guide), ch 1, sc in each stacross, turn.
Row 27 [31, 35]:Fold irst and last rows tog,working through both thicknesses, sl st in eachst across, do not turn.
HANDRnd 1:Now working in rnds and in ends o rows,
dividing lps onto 3 double-ended hooks, pull
up lp(see Special Stitches)in end o each rowaround (26 [30, 34] lps on hooks), turn,worklps off hooks(see Special Stitches) around, turn,join knitwise(see Special Stitches).
Rnds 25:Maintaining sts on 3 hooks, sk irst st,knit(see Special Stitches)in each st across eachhook around, turn, work lps o hooks around,turn, join knitwise.
Rnd 6:Maintaining sts on 3 hooks, sk irst st,knit in each o next 8 [11, 14] sts, mark last st
worked (see Pattern Notes), knit inc(see SpecialStitches), knit in each o next 3 sts, knit inc, knitin next st, mark last st worked, knit in each olast 13 [14, 15] sts (28 [32, 36] lps on hooks),turn, work lps o hooks around, turn,join knitwise.
Rnds 7 & 8:Maintaining sts on 3 hooks, sk irstst, knit in each st around, turn, work lps ohooks around, turn, join knitwise.
Rnd 9:Maintaining sts on 3 hooks, sk irstst, knit in each st around to marker, knit in
marked st, knit inc, k nit in each st around tonext marker, knit inc, knit in marked st (30 [34,38] lps on hooks), turn, work lps o hooks, turn,join knitwise.
Rnds 10 & 11:Maintaining sts on 3 hooks, skirst st, knit in each st around, turn, work lps ohooks around, turn, join knitwise.
Rnd 12:Maintaining sts on 3 hooks, sk irstst, knit in each st around to marker, knit inmarked st, knit inc, k nit in each st around tonext marker, knit inc, knit in marked st (32
[36, 40] lps on hooks), turn, work lps o hooks,turn, join knitwise. Remove markers.
Rnds 13 & 14 [1315, 13-16]:Maintaining stson 3 hooks, sk irst st, knit in each st around,turn, work lps o hooks around, turn, joinknitwise, drop lp rom hook.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
24
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
26/30
THUMBWith separate strand o yarn, sk irst 9 [11, 13]
sts, including irst lp, join(see Pattern Notes)
in next sp between sts, ch 4, sk next 8 [10, 12]sts, sl st in next sp, leaving rem sts unworked.Fasten o.
CONTINUE HANDRnd 15 [16, 17]:Return lp to hook, maintaining
sts on 3 hooks, sk irst st, knit in each st acrossto sl st, pull up lp in next sp beside sl st, pullup lp in each o next 4 chs, pull up lp in nextsp beside next sl st, knit in each st around (30[32, 34] lps on hooks), turn, work lps o hooksaround, turn, join knitwise.
Rnds 16 & 17 [1719, 1821]: Maintaining stson 3 hooks, sk irst st, knit in each st around,turn, work lps o hooks around, turn, joinknitwise. Drop lp rom hook.
LITTLE FINGERUsing separate strand, sk irst 3 [4, 4] sts, include
irst lp, join in next sp between sts, ch 1, sk next24 [25, 26] sts, sl st in next sp. Fasten o.
Rnd 1:Dividing sts on 3 size K hooks, returnlp to hook, sk irst st, knit in each o next 2 [3,
3] sts, pull up lp in sp beside sl st, pull up lp inch-1, pull up lp in next sp, knit in each o last 3[3, 4] sts, (9 [10, 11] lps on hooks), turn, worknext 3 [3, 4] lps o hooks,work off 2 tog(seeSpecial Stitches), work rem lps o hooks, turn,join knitwise.
Rnds 2 & 3:Maintaining sts on 3 hooks, skirst st, knit in each st around,working in lpsof work off 2 tog (see Pattern Notes), (8 [9, 10]lps on hooks), turn, work lps o hooks around,turn, join knitwise.
Rnd 4:With size F hook, ch 1, sc in each staround, join in beg sc. Fasten o.
CONTINUE HANDRnd 18 [20, 22]:Dividing sts on 3 size K hooks,
join in ch-1 o Little Finger, pull up lp in nextsp beside sl st, knit in each st around, pull up lpin next sp beside sl st (27 [28, 29] lps on hooks),turn, work lps o hooks around, turn, joinknitwise.
Rnd 19 [21, 23]:Maintaining sts on 3 hooks, skirst st, knit in each st around, turn, work lps ohooks around, turn, join knitwise.
RING FINGERRnd 1:Maintaining sts on 3 hooks, sk irst 6 sts
on last rnd o Hand, join in next sp between sts,ch 1, sk next 16 [17, 18] sts, sl st in next sp, knitin each o last 5 sts and in each o irst 6 sts, pul lup lp in next sp beside sl st, pull up lp in ch-1(14 lps on hooks), turn, work each o next 10 lpso hooks, [work o 2 tog] twice, work rem lpso hooks, turn, join knitwise.
Rnds 2 & 3:Maintaining sts on 3 hooks, sk irstst, knit in each st around (12 lps on hook), turn,work lps o hooks around, turn, join knitwise.
Rnd 4:With size F hook, ch 1, sc in each staround, join in beg sc. Fasten o.
MIDDLE FINGERRnd 1:Maintaining sts on 3 hooks, sk irst 4
unworked sts on last rnd o Hand, join in nextsp between sts, ch 1, sk next 8 [9, 10] sts, sl st innext sp between sts, knit in each o next 4 sts,pull up lp in next sp beside sl st, pull up lp inch-1 sp, pull up lp in next sp beside sl st, knit in
each o next 4 sts, pull up lp in next sp beside slst, pull up lp in ch-1 sp (14 lps on hooks), turn,work next 5 lps o hooks, work o 2 tog, [yo,pull through 2 lps on hook] 5 times, work o 2tog, work rem lps o hooks, turn, join knitwise.
Rnds 2 & 3:Maintaining sts on 3 hooks, sk irstst, knit in each st around (12 lps on hook), turn,work lps o hooks around, turn, join knitwise.
Rnd 4:With size F hook, ch 1, sc in each staround, join in beg sc. Fasten o.
INDEX FINGERRnd 1:Join in ch-1 sp o Middle Finger,maintaining sts on 3 hooks, pull up lp in nextsp beside sl st, knit in each o next 8 [9, 10] sts,pull up lp in next sp beside sl st (11 [12, 13] lpson hooks), turn, work o 2 tog, work rem lps ohooks around, turn, join knitwise.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
27/30
Rnds 2 & 3:Maintaining sts on 3 hooks, sk irstst, knit in each st around, turn, work lps ohooks, turn, join knitwise.
Rnd 4:With size F hook, ch 1, sc in each staround, join in beg sc. Fasten o.
THUMBRnd 1:Maintaining sts on 3 hooks, join in sp
beside irst sl st at base o Thumb, knit in eacho next 8 [10, 12] sts, pull up lp in sp beside slst, pull up lp in each o next 4 chs (14 lp [16, 18]lps on hooks), turn, work next 8 [10, 12] lps ohooks, work o 2 tog, work next 2 lps o hooks,work o 2 tog, turn, join knitwise.
Rnd 2:Maintaining sts on 3 hooks, sk irst st,knit in each st around (12 [14, 16] lps on hooks),turn, work next 9 [11, 13] lps o hooks, worko 2 tog, work rem lp o hook, turn,join knitwise.
Rnd 3:Maintaining sts on 3 hooks, sk irst st,knit in each st around (11 [13, 15] lps on hooks),turn, work next 7 [10, 11] lps o hooks, [worko 2 tog] twice, turn, join knitwise.
Rnd 4:With size F hook, ch 1, sc in each st
around, join in beg sc. Fasten o.
RIGHT HAND
RIBBINGWork same as Ribbing on Let Hand.
HANDRnds 15:Rep rnds 15 o Hand on Let Hand.
Rnd 6:Maintaining sts on 3 hooks, sk irst st,knit in each o next 12 [14, 16] sts, mark last stworked, knit inc, knit in each o next 3 sts, knitinc, mark next st worked, knit in each o next 9[11, 13] sts (28 [32, 36] lps on hooks), turn, worklps o hooks around, turn, join knitwise.
Rnds 714 [715, 716]:Rep rnds 714 [715,716] o Let Hand.
THUMBWith separate strand o yarn, sk irst 15 sts
including irst lp, join in next sp between sts,ch 4, sk next 8 [10, 12] sts, sl st in next sp,leaving rem sts unworked. Fasten o.
CONTINIUE RIGHT HANDBeg with rnd 15 [16, 17] on Hand, rep Hand,
Little Finger, Ring Finger, Middle Finger,Index Finger and Thumb same as Let Hand.
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
26
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
-
8/10/2019 Dos agujas tunecinas.pdf
28/30
Chain (ch):Yo, pullthrough lp on hook.
Slip stitch (sl st):Inserthook in st, pull throughboth lps on hook.
Single crochet (sc):Insert hook in st, yo,pull through st, yo,pull through bothlps on hook.
Front loop (front lp)Back loop (back lp)
Front Loop Back Loop
Treble crochet (tr):Yo twice, insert hook
in st, yo, pull throughst, [yo, pull through 2lps] 3 times.
Double treblecrochet (dtr): Yo 3times, insert hook inst, yo, pull through st,[yo, pull through 2 lps]4 times.
Half double crochet(hdc):Yo, insert hookin st, yo, pull throughst, yo, pull through all 3lps on hook.
Treble crochetdecrease (tr dec):Hold-ing back last lp of eachst, tr in each of the sts in-dicated, yo, pull throughall lps on hook.
Example of 2-tr dec
Y A R N C O N V E R S I O N
Chain Color Change(ch color change)Yo with new color,draw through last lpon hook.
Double CrochetColor Change (dccolor change)Drop first color, yowith new color, drawthrough last 2 lps of st.
Front post stitch (fp):Back post stitch (bp):When working post st,insert hook from rightto left around post ston previous row.
Back Front
Postof
Stitch
Reverse Single Crochet (reversesc): Ch 1. Skip first st. [Workingfrom left to right, insert hook innext st from front to back, drawup lp on hook, yo, and drawthrough both lps on hook.]
OUNCES TO GRAMS1 ............... 28.42 ............... 56.73 ............... 85.04 ............ 113.4
GRAMS TO OUNCES25 .................40 ..............150 .............. 1100 ............3
=======
sc (single crochet)dc (double crochet)htr (half treble crochet)tr (treble crochet)dtr (double treble crochet)ttr (triple treble crochet)miss
sl st (slip stitch)sc (single crochet)
hdc (half double crochet)dc (double crochet)
tr (treble crochet)dtr (double treble crochet)
skip
U N I T E D K I N G D O MU N I T E D S T AT E S
beg . . . . . . . . . . . . . . . . . . . . . . . . . . . .begin/begins /beginningbpdc. . . . . . . . . . . . . . . . . . . . . . . . . . back post double crochetbpsc . . . . . . . . . . . . . . . . . . . . . . . . . . . .back post single crochetbptr. . . . . . . . . . . . . . . . . . . . . . . . . . . . .back post treble crochetCC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . c ontrasting colorch(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . chain(s)ch-. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r efers to chain or space
previously made (i.e., ch-1 space)ch sp(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . chain space(s)
cl(s). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . cluster(s)cm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . c entimeter(s)dc. . . . . . . . . . . . . . . . . . . . . . . double crochet (singular/plural)dc dec. . . . . . . . . . . . . . . . . . . . . . . . . double crochet 2 or more
stitches together, as indicateddec . . . . . . . . . . . . . . . . . . . . . . decrease/decreases/decreasingdtr. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . double treble crochetext . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .extendedfpdc. . . . . . . . . . . . . . . . . . . . . . . . . . . f ront post double crochetfpsc. . . . . . . . . . . . . . . . . . . . . . . . . . . . f ront post single crochetfptr . . . . . . . . . . . . . . . . . . . . . . . . . . . . front post treble crochetg. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . gram(s)hdc . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . half double crochethdc dec. . . . . . . . . . . . . . . . . . . half double crochet 2 or more
stitches together, as indicatedinc . . . . . . . . . . . . . . . . . . . . . . . . increase/increases/increasinglp(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .loop(s)MC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . main color
mm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . m i l l i m e t e r ( s )oz . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ounce(s)pc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . popcorn(s)rem . . . . . . . . . . . . . . . . . . . . . . . . . . remain/remains/remainingrep(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r e p e a t ( s )rnd(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . round(s)RS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . right sidesc . . . . . . . . . . . . . . . . . . . . . . . . single crochet (singular/plural)sc dec. . . . . . . . . . . . . . . . . . . . . . . . . . . s ingle crochet 2 or more
stitches together, as indicatedsk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . skip/skipped/skippingsl st(s). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . slip stitch(es)sp(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . space(s)/spacedst(s). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . stitch(es)tog . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .togethertr. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . t reble crochettrtr. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .triple trebleWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . w r o n g s i d e
yd(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . yard(s)yo. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . yarn over
S T I T C H G U I D EFOR MORE COMPLETE INFORMATION, VISITFREEPATTERNS.COM
Double crochet (dc):Yo, insert hook in st,yo, pull through st,[yo, pull through 2 lps]twice.
S T I T C H A B B R E V I A T I O N S
Single crochetdecrease (sc dec):(Insert hook, yo, draw lpthrough) in each of thests indicated, yo, drawthrough all lps on hook.
Example of 2-sc dec Example of 2-dc dec
Double crochetdecrease (dc dec): Yo,insert hook, yo, draw loopthrough, draw through2 lps on hook) in each ofthe sts indicated, yo, drawthrough all lps on hook.
Example of 2-hdc dec
Half double crochetdecrease (hdc dec):(Yo, insert hook, yo,draw lp through)in each of the stsindicated, yo, drawthrough all lps on hook.
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
http://www.freepatterns.com/http://www.freepatterns.com/http://www.freepatterns.com/ -
8/10/2019 Dos agujas tunecinas.pdf
29/30
1,2,3,4 Double-ended Hook Crochetis published by DRG, 306 East Parr Road, Berne, IN 46711. Printed in USA.Copyright 2010 DRG. All rights reserved. This publication may not be reproduced
in part or in whole without written permission from the publisher.
RETAIL STORES:If you would like to carry this pattern book or any other DRG publications, visit DRGwholesale.com
Every effort has been made to ensure that the instructions in this publication are complete and accurate.We cannot, however, take responsibility for human error, typographical mistakes or variations in individual work.
Please visit AnniesCustomerCare.comto check for pattern updates.
ISBN: 978-1-59635-333-6 1 2 3 4 5 6 7 8
1/8 3 5 12.5 21 53.5 38 96.5
1/4 6 51/2 14 22 56 39 99
3/8 10 1 6 15 23 58.5 40 101.5
1/2 13 1.3 7 18 24 61 41 104
5/8 15 1.5
0 .6
0 .3
8 20.5 25 63.5 42 106.5
3/4 20 2 9 23 26 66 43 109
7/8 22 2.2 10 25.5 27 68.5 44 112
1 25 2.5 11 28 28 71 45 114.5
11/4 32 3.2 12 30.5 29 73.5 46 117
11/2 38 3.8 13 33 30 76 47 119.5
13/4 45 4.5 14 35.5 31 79 48 122
2 50 5 15 38 32 81.5 49 124.5
21/2 65 6.5 16 40.5 33 84 50 127
3 75 7.5 17 43 34 86.5
31/2 90 9 18 46 35 89
4 100 10 19 48.5 36 91.5
41/2 115 11 .5 20 51 37 94
inches mm cm inches cm inches cm inches cm
INCHES INTO MILLIMETRES & CENTIMETRES (Rounded off slightly)
Canada/U.S. 1/B 2/C 3/D 4/E 5/F 6/G 8/H 9/I 10/J 10/K N
Metric (mm) 2.25 2.75 3.25 3.5 3.75 4.25 5 5.5 6 6.5 9.0
CROCHET HOOKS CONVERSION CHART
Canada/U.S. 0 1 2 3 4 5 6 7 8 9 10 10 11 13 15
Metric (mm) 2 2 2 3 3 3 4 4 5 5 6 6 8 9 10
KNITTING NEEDLES CONVERSION CHART
centimetres x .3937 = inches
metres x 1.0936 = yards
METRIC
CONVERSIONS
yards x .9144 = metres (m)
yards x 91.44 = centimetres (cm)
inches x 2.54 = centimetres (cm)
inches x 25.40 = millimetres (mm)
inches x .0254 = metres (m)
MetricConversionCharts
Copyright 2010 DRG, 306 East Parr Road, Berne, IN 46711. All rights reserved. This publication may
not be reproduced or transmitted in part or in whole without written permission from the publisher.
28
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.
http://www.drgwholesale.com/http://www.anniescustomercare.com/http://www.anniescustomercare.com/http://www.drgwholesale.com/ -
8/10/2019 Dos agujas tunecinas.pdf
30/30
Purchased by: MARIA ORTIZ. 02/18/2014. Purchased at e-PatternsCentral.com. Copying and distribution prohibited. For personal use only.