Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference...
-
Upload
tucker-winsett -
Category
Documents
-
view
216 -
download
0
Transcript of Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference...
![Page 1: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/1.jpg)
Dorothy Brewster-Lee
Senior Technical Advisor , Tanzania
March 30, 2011
ICT4 Development Conference
Lusaka, Zambia
Improving OVC Programming with Mobile Reporting
![Page 2: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/2.jpg)
Project Background
OVC PEPFAR TK1 PROJECT
Strategic Objectives• To increase the capacity of communities, families and orphans
to respond effectively to the needs of OVC and their families. • To increase the institutional capacity of the local government
and CRS Partners to deliver high quality and sustainable OVC interventions .
Location• 5 regions across Tanzania
![Page 3: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/3.jpg)
A Mobile Application for OVC Care
Vision• Enhance the quality and effectiveness of our
OVC programming through mobile applications
Mission• Quality OVC information captured, synthesized,
and made easy to use for decision makers, community volunteers, program managers and service providers
![Page 4: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/4.jpg)
Challenges to be addressed through ICT solution
1. Real –time data: Long time delays between data collection. reporting and decision making
2. Data quality: Data collection in the field and office incomplete and inaccurate
3. Decision and referral support: CV requiring more technical support relative to referrals.
4. Program quality: Inadequate system volunteer performance monitoring
5. Data storage
6. Inadequate data storage mechanism
![Page 5: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/5.jpg)
Moving from M&E paperwork…
• Phase 1 : Design prototypes
• Phase 2: Field test & refinement
• Phase 3 : Train 35 stakeholders and assess
• Phases 4 &5 (Not completed) : CRS staff field management and roll out with local government
![Page 6: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/6.jpg)
ICT Solution
Solution: Using telephones for completion of OVC routine management , monitoring and reporting
Hardware / platform : Nokia 3100c or 2700c mobile phones with a removal SD memory card, to allow local backups to be taken.
Software: The CommCare mobile phone application is written using JavaRosa, the open source API. CommCare HQ, the backend system and reporting tool is written in
Python/Django.
Vendors: D-Tree & Dimagi
![Page 7: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/7.jpg)
ICT Solution
Required External Support
Phase 1 2 3 4 5 Total Days
IT Specialist USA5 5 1 3 2 15
IT Specialist TZ15 21 5 9 6 56
Computer Programming
20 20 15 10 10 75
![Page 8: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/8.jpg)
Key Challenges
1. Electronic feedback mechanism for community
2. Budget for on-going maintenance
3. Maintaining IC volunteer team user support mechanism
4. User errors
5. Quality assurance for telephone enabled referrals
![Page 9: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/9.jpg)
Lessons Learned
• Mobile data collection was accepted widely by volunteers
• Reduced volunteer field time, travel time and travel costs
• Shorten time for information exchange with project office
• Increased ability for VC activity monitoring
• Importance of a community record
• Requires a technical support mechanism for partners and field implementers
• Importance of ensuring community and new partner integration through training and equipment .
![Page 10: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/10.jpg)
Sustainability
On-going technical requirements:
• CRS server maintenance (post D-Tree)• Periodic updating on forms will require programming time• Volunteer retention and retraining
Sustainability issues: • Limited to the life of the funded project.• Sustainability of the mobile process will be enhanced by
linkage to the national electronic data base and data sharing with other community stakeholders.
![Page 11: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/11.jpg)
Summary
• Our communities maybe far more ready to receive this technology than we are ready to offer it.
• Care must be taken that the technology actually empowers rather than dis-empowers local stakeholders
![Page 12: Dorothy Brewster-Lee Senior Technical Advisor, Tanzania March 30, 2011 ICT4 Development Conference Lusaka, Zambia Improving OVC Programming with Mobile.](https://reader038.fdocuments.us/reader038/viewer/2022110116/55163e36550346c6758b52cb/html5/thumbnails/12.jpg)
Thank You!