Don’t Get Left Out In the Cold - HKTDC · 64 km CDS Warehouse 4,900 km 1 1 2 3 Pre-trip...
Transcript of Don’t Get Left Out In the Cold - HKTDC · 64 km CDS Warehouse 4,900 km 1 1 2 3 Pre-trip...
Don’t Get Left Out In the ColdWinning @ Cold Supply Chain Logistics
Alexandre Tarini | Vice President Logistics
Olymel
Asian Logistics and Maritime Conference
Hong Kong | November 20 - 21, 2018
13 500EMPLOYEES
1 100 000 KGBACON
25 PLANTS
2 500 000 KGOTHER
PROCESSED
350 000 KGFRESH
SAUSAGES
157 000HOGS
Olymel in numbers
2 000 000 POULTRY
HEADCOUNT
MAIN ASSETS
WEEKLY SLAUGHTERINGCAPACITY
WEEKLY PROCESSING CAPACITY
CHILLED PORK COLD CHAIN CONTROL PRIOR TO SHIPPING
4
1
2
3
4
Temperature control during production
Creovac packaging
Paksense meat probe sensors
Loading pattern
1
2
3
4
Vancouver
Montreal
Tokyo
Shanghai
4,272
NM
4,900 km
TRAVELING TIME AND DISTANCE
(± 7,911 km)
Maximum of 20 days transit
Montreal
Intermodal
TerminalVallee
Jonction
Vancouver
Intermodal
Terminal
300 km
Port of
Vancouver
(Deltaport)
CDS Warehouse64 km
4,900 km
1
1
2
3
Pre-trip inspection prior to loading
Reefer inspection before rail transfer
Download of meat probe temperature and trans load into 40’ container
2
3
Yearly temperature
variation
+36C summer highest
-35C winter lowest
CONTROL POINTS