Domer L. Javier resume_rev.1

22
0 Domer Lozano Javier Block 5 Lot 18 Champaca Street Maligaya Park Subdivision Novaliches, Quezon City Mobile No. +966506993894/+639273433903 Email Address: [email protected]/[email protected] ELECTRICAL ENGINEER PROFESSIONAL WORK EXPERIENCE CAREER SUMMARY 10+ years of work experience in the field of Electrical Power System and Mechanical works. Knowledge in design & construction activities of Oil, Gas, and Water Rehabilitation, primary and secondary overhead power distribution lines, installation and maintenance of Electrical & Instrument such as Motor Operated Valves, electric motors, motor control system, lightning systems, high medium and low voltage Switch Gears, Transformers & Switch Racks specialized in distribution control panel and remote control. Knowledge in implementation of Cathode Protection/Civil works, Telecommunication works, Security System Facilities works, Design & Engineering. EDUCATIONAL ATTAINMENT College : Cagayan State University Bachelor of Science in Electrical Engineering 1999 2005 Other Course : Industrial Motor Control National Polytechnic Institute November 9 23 2005 Secondary : Our Lady of Snows Academy 1995 - 1999 Tertiary : Sabino T. Acorda Central School 1988 1994 PERSONAL DATA Age & Date of Birth : 33 years old & September 05, 1981 Nationality : Filipino Sex : Male Height : 5’7 ½” Weight : 165 lbs. Civil Status : Married Wife : Lailanie B. Javier Religion : Roman Catholic

Transcript of Domer L. Javier resume_rev.1

Page 1: Domer L. Javier resume_rev.1

0

Domer Lozano Javier

Block 5 Lot 18 Champaca Street Maligaya Park Subdivision Novaliches, Quezon City

Mobile No. +966506993894/+639273433903

Email Address: [email protected]/[email protected]

ELECTRICAL ENGINEER

PROFESSIONAL WORK EXPERIENCE

CAREER SUMMARY

10+ years of work experience in the field of Electrical Power System and Mechanical

works. Knowledge in design & construction activities of Oil, Gas, and Water

Rehabilitation, primary and secondary overhead power distribution lines, installation and

maintenance of Electrical & Instrument such as Motor Operated Valves, electric

motors, motor control system, lightning systems, high medium and low voltage Switch

Gears, Transformers & Switch Racks specialized in distribution control panel and

remote control. Knowledge in implementation of Cathode Protection/Civil works,

Telecommunication works, Security System Facilities works, Design & Engineering.

EDUCATIONAL ATTAINMENT

College : Cagayan State University

Bachelor of Science in Electrical Engineering

1999 – 2005

Other Course : Industrial Motor Control

National Polytechnic Institute

November 9 – 23 2005

Secondary : Our Lady of Snows Academy

1995 - 1999

Tertiary : Sabino T. Acorda Central School

1988 – 1994

PERSONAL DATA

Age & Date of Birth : 33 years old & September 05, 1981

Nationality : Filipino

Sex : Male

Height : 5’7 ½”

Weight : 165 lbs.

Civil Status : Married

Wife : Lailanie B. Javier

Religion : Roman Catholic

Page 2: Domer L. Javier resume_rev.1

Position Title : Electrical Design Engineer

Company : Saudi Engineering Group International

Saihati Building King Abdul Aziz Street

P.O. Box 5289 - Dammam, K.S.A.

Under supply contract with WorleyParsons Engineering

Consultancies Company

Al-Jazira Building King Abdullah Bin Abdul Aziz Road

P.O. Box 31699, Al – Khobar, 31952 Eastern Province K.S.A.

Project Title : Upgrade Offshore Security Facility (Kingdom Wide)

(BI #10-01377).

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : June 29, 2015 up to Present

Estimating material, construction, and labor costs, and project

timescale.

Develop engineering projects analysis to include preliminary design,

calculations, budget analysis, life cycle costs plus equipment selection.

Cost and weight targets must be managed and met.

Position Title : Electrical Design Engineer

Company : Saudi Engineering Group International

Saihati Building King Abdul Aziz Street

P.O. Box 5289 - Dammam, K.S.A.

Under supply contract with WorleyParsons Engineering

Consultancies Company

Al-Jazira Building King Abdullah Bin Abdul Aziz Road

P.O. Box 31699, Al – Khobar, 31952 Eastern Province K.S.A.

Project Title : Yanbu Refinery Project MC – 2 TETRA Radio System

(Contract Job Code # 403011-00334).

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : April 16, 2015 up to Present

Develop engineering projects analysis to include preliminary design,

calculations, budget analysis, life cycle costs plus equipment selection.

Estimating material, construction, and labor costs, and project

timescales.

Create and amend own drawings on Auto CAD 2D & micro station

version-8.

Voltage drop and Cables sizing summary and adequacy calculation for

UPS and circuit breakers.

Review designs development for conformance with applicable codes,

utilizing engineering standards along with good engineering practices.

Manage own portfolio of design work, on time and within budget.

Ensure compliance and offer recommendations for Health, Safety &

Environmental issues relating to technical activities,

Page 3: Domer L. Javier resume_rev.1

Maintain an on-going awareness of national and international standards of

technical expertise, reporting back any significant changes.

Cost and weight targets must be managed and met.

Follow and contribute to the development of the Best Practice guidelines

as laid out in quality documentation.

Record of employment;

Position Title : Lead Electrical Engineer

Company : Saudi Engineering Group International

Saihati Building King Abdul Aziz Street

P.O. Box 5289 - Dammam, K.S.A.

Client : Maaden Aluminium Company (MAC) Central of Engineering

Inclusive Date : November 04, 2014 up to April 02, 2015

Duties and responsibilities;

Create detailed technical engineering specifications for the production team

to ensure the product’s functionality and that it meets the specific required

standards of performance. Required specifications for electrical control

system and equipment’s for use across many sectors, including:

Refinery Aluminum Plant

Rolling Mill Aluminum Plant

Smelter Aluminum Plant

Modification fore Electrical Works:

Position Title : Electrical Lead Engineer

Project Title : Provide power supply for Crimping Machine in CE &

Maintenance Workshop

(MOC Request no. MA-CE-MOC-0001).

Inclusive Date : December 12, 2014 to February 16, 2015

Project Title : Installation of NCB ATM

(MOC Request no. MA-CE-MOC-0002).

Inclusive Date : July 16, 2014 to up March 04, 2015

Project Title : 3 Phase Power Supply to new Kitchen Equipment in MA Admin

Canteen

(MOC Request no. MA-CE-MOC-0003).

Inclusive Date : November 12, 2014 to up Present

Project Title : Identification of Useable Breakers in 2 Sub Stations for use Air

Monitoring Stations in Natural Gas Line (NGL)

(MOC Request no. MA-CE-MOC-0004).

Inclusive Date : August 18, 2014 to up Present

Project Title : Modification of UPS (11KVA) in Admin/IT Room

(MOC Request no. MA-CE-MOC-0005).

Inclusive Date : January 28, 2015 to February 16, 2015

Project Title : Install 2 Additional Power Sockets in Display Chiller and Hot

Cabinets and Provide 3 New Power Points in Salad Preparation

Page 4: Domer L. Javier resume_rev.1

Area in MA Admin Canteen

(MOC Request no. MA-CE-MOC-0006 & 0007).

Inclusive Date : February 09, 2015 to up March 31, 2015

Project Title : To Build 3 Storage Room under Stair and 01 Mail Storage Room

along Corridor in MA Admin Ground Flour

(MOC Request no. MA-CE-MOC-0008).

Inclusive Date : January 06, 2015 to up March 23, 2015

Project Title : To Build 3 Storage Rooms and Expansion of HR/General

Services Department 4 Offices in MA Admin Building Area

(MOC Request no. MA-CE-MOC-0010).

Inclusive Date : February 17, 2015 to up Present

Project Title : To provide power for Air Compressor and 6 power outlets for

Fire Trucks Charger in Fire Station/Security Command Center

(MOC Request no. MA-CE-MOC-0011 & 0013).

Inclusive Date : February 24, 2015 to up Present

Project Title : To Build Gypsum Partition and Door opening on the wall to

make new Office Facility in CE & M Building 1/Floor

(MOC Request no. MA-CE-MOC-0012).

Inclusive Date : March 03, 2015 to up Present

Project Title : Permanent connection for Oxyfuel Machine in CE & M

Workshop 1/Floor

(MOC Request no. MA-CE-MOC-0014).

Inclusive Date : March 14, 2015 to up Present

Project Title : Electrical Connection for Welding Machine in CE & M

Workshop 1/Floor

(MOC Request no. MA-CE-MOC-0015).

Inclusive Date : March 14, 2015 to up Present

Project Title : Installation of 480VSocket connection for Welding Machine in

CE & M Workshop 1/Floor

(MOC Request no. MA-CE-MOC-0016).

Inclusive Date : March 14, 2015 to up Present

Project Title : Provide power supply to new Hydraulic Column Lift in

CE & M Workshop Ground Floor

(MOC Request no. MA-CE-MOC-0020).

Inclusive Date : March 11, 2015 up to Present

Project Title : Installation of 8 Cameras in MA Main Clinic

(MOC Request no. MA-CE-MOC-0021).

Inclusive Date : March 25, 2015 up to Present

Project Title : Installation of 4 Additional Light in CE File Room

(MOC Request no. MA-CE-MOC-0022).

Inclusive Date : March 30, 2015 up to April 0, 2015

Page 5: Domer L. Javier resume_rev.1

Duties and responsibilities;

Make site visits to ascertain detailed information related to the design and

planning of a project.

Preparing for scope of work of the project.

Manage own portfolio of design work, on time and within budget.

Proven ability in the supervision and management of a team with regard to

all aspects from Master plan, Concept, Preliminary and Final Design

stages, including single line diagrams, panel schedules, electrical

schematics diagram.

Estimates, prepares and assigns the resources such as manpower,

materials, consumables, equipment, tools, etc., required for all electrical

and related works prior to execution.

Monitoring and Supervise to install of electrical cable, electrical main

distribution panels, non-fusible disconnect switch air circuit breaker,

convenient outlet and lay out electrical cables including necessary

conduiting.

Voltage drop and Cables sizing summary and adequacy calculation for

UPS and circuit breakers.

Lead in the implementation of innovative design solutions using the latest

industry standards considering quality, safety and sustainability as a

minimum.

Preparing for Management of Change (MOC) and Minor Plant Monitoring

Request (MPMR) to get signatory for designation person.

Preparing for Pre Startup Safety Review (PSSR) Form, Minor Plant

Modification – Close Out Form and Minor Plant Modification – Turn

Over Checklist.

Testing and Commissioning of Electrical panel boards and convenient

outlet ready for startup.

Take responsibility for all technical aspects of electrical / building services

work performed by the company from the inception stage through to final

completion of projects and client handover.

Completion of project and documents shall turn over to the engineering

document controller.

Direct report to Project Manager for the status of works.

Position Title : Electrical Design Engineer

Company : Saudi Engineering Group International

Saihati Building King Abdul Aziz Street

P.O. Box 5289 - Dammam, K.S.A.

Under supply contract with WorleyParsons Engineering

Consultancies Company

Al-Jazira Building King Abdullah Bin Abdul Aziz Road

P.O. Box 31699, Al – Khobar, 31952 Eastern Province K.S.A.

Project Title : Replacement of Telephone Switches Kingdom Wide

(BI–10–000246, Contract # 6600028287).

Client : Saudi Arabian Oil Company (ARAMCO)

Page 6: Domer L. Javier resume_rev.1

Inclusive Date : July 28, 2013 to November 03, 2014

Project Title : Rabigh Phase II Petrochemical UPS System Project by Petrofac

(Contract Job Code: 6600028287).

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : September 01, 2013 to May 15, 2014

Project Title : Rabigh Phase II Petrochemical Permanent Facilities UPS System

Sirti by Project (Contract Job Code: 0-5361-20-0000).

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : December 29, 2013 to May 15, 2014

Project Title : Design for Abu Safah SCADA/RTU Communication Network

Upgrade (BI-1003040-0001).

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : April 06, 2014 to May 15, 2014

Duties and responsibilities;

Make site visits to ascertain detailed information related to the design and

planning of a project.

Manage own portfolio of design work, on time and within budget.

Take responsibility for all technical aspects of electrical / building services

work performed by the company from the inception stage through to final

completion of projects and client handover.

Manage the calculation for DC Rectifier Systems, Inverter Systems, UPS

System.

Create and amend own drawings on Auto CAD 2D & micro station

version-8.

Liaising with structural engineers, architects, surveyors etc.

Estimating material, construction, and labor costs, and project

timescales.

Preparing for engineering mark ups for the design, and issued for

Check Print & Squad Check ready for Issued for Construction.

Voltage drop and Cables sizing summary and adequacy calculation for

UPS and circuit breakers.

Ensure compliance and offer recommendations for Health, Safety &

Environmental issues relating to technical activities,

Maintain an on-going awareness of national and international standards of

technical expertise, reporting back any significant changes.

Assist the operating units to undertake design assignments, i.e. schematic

and detailed design of installations/schemes within the remit of the

jobholder's specialist skill area.

Develop engineering projects analysis to include preliminary design,

calculations, budget analysis, life cycle costs plus equipment selection.

Use AutoCAD and calculations software as part of the design process.

Assist in the preparation of drawings of high quality in Micro station for

the infrastructure disciplines.

Page 7: Domer L. Javier resume_rev.1

Cost and weight targets must be managed and met.

Follow and contribute to the development of the Best Practice guidelines

as laid out in quality documentation

The selection and application of materials and processes appropriate to

each design element.

Lead in the implementation of innovative design solutions using the latest

industry standards considering quality, safety and sustainability as a

minimum.

Review designs development for conformance with applicable codes,

utilizing engineering standards along with good engineering practices.

Record of employment;

Position Title : Site Engineer (Self Employed)

Project Title : 3 Story Building & 2 Story Building in Maligaya Park

Subdivision Novaliches, Quezon City

Subject : Electrical work

Inclusive Date : August 25, 2012 to February 10, 2013

Duties and responsibilities;

Directly responsible for the safety of all electrical groups’ personnel of the

project by ensuring that the project execution will be done according to all

applicable health, safety, sanitary and environmental standards.

Assign targets for accomplishments and ensure targets are met on daily

basis for all electrical groups at site.

Coordinates all parties involved in the planning, design, and construction

process.

To identify and recommend opportunities to improve the range, quality

and cost effectiveness of services to the client.

Ensures that the facilities are maintained and repaired in a cost effective

manner, with consideration given to quality and customer service.

Prioritize and resolve all technical problems within minimum amount of

time and cost.

Must be able to demonstrate leadership and influencing skills.

Has overall responsibility for the planning, management, coordinating and

construction project and will work closely with a range of other

professional during the contract progress.

Proven ability in the supervision and management of a team with regard to

all aspects from Master plan, Concept, Preliminary and Final Design

stages, including single line diagrams, panel schedules, electrical

schematics diagram.

Installation of electrical main distribution panels, air circuit breaker,

convenient outlet, electrical metallic tubing pipe, flexible hose and lay -

out electrical cables.

Termination of cables and testing commissioning of electrical panel

boards and convenient outlet ready for startup.

Page 8: Domer L. Javier resume_rev.1

Coordinate with site in charge and make sure that all activities are in

accordance with standard drawings and Philippines Electrical Codes

(PEC) standard and specification.

Providing indigent professional advice and guidance.

Ensuring that the quality standards and all health and safety checks are

adhered to.

Coordinate to the owner for the payment of accomplished project.

Develops conceptual plans and budgets for facilities project to support

fiscal decision making.

Prepare for requests for proposal and conducts all necessary meeting to

facilitate hiring architectural and construction management services.

Monitors and reports on all phases of planning and construction.

Record of employment;

Position Title : Project Engineer (Self Employed)

Company : Kashmir Line Contracting Company

Block 5 Lot-18 Champaca St. Maligaya park subdivision,

Quezon City

Project Title : 8 Doors Building in Ugong, Valenzuela City Philippines

Subject : Electrical Works

Inclusive Date : July 20, 2012 to September 26, 2012

Duties and responsibilities;

Has overall responsibility for the planning, management, coordinating and

construction project and will work closely with a range of other

professional during the contract progress.

Proven ability in the supervision and management of a team with regard to

all aspects from Master plan, Concept, Preliminary and Final Design

stages, including single line diagrams, panel schedules, electrical

schematics diagram

Installation of electrical main distribution panels, air circuit breaker,

convenient outlet and lay out electrical cables.

Testing and Commissioning of Electrical panel boards and convenient

outlet ready for startup.

Coordinate with site in charge and make sure that all activities are in

accordance with standard drawings and Philippines Electrical Codes

(PEC) standard and specification.

Providing indigent professional advice and guidance.

Ensuring that the quality standards and all health and safety checks are

adhered to.

Coordinate to the owner for the payment of accomplished project.

Develops conceptual plans and budgets for facilities project to support

fiscal decision making.

Prepare for requests for proposal and conducts all necessary meeting to

facilitate hiring architectural and construction management services.

Monitors and reports on all phases of planning and construction.

Page 9: Domer L. Javier resume_rev.1

Proven ability in the supervision and management of a team with regard to

all aspects from Master plan, Concept, Preliminary and Final Design

stages, including single line diagrams, panel schedules, electrical

schematics diagram.

Installation of electrical main distribution panels, air circuit breaker,

convenient outlet, electrical metallic tubing pipe, flexible hose and lay -

out electrical cables.

Termination of cables and testing commissioning of electrical panel

boards and convenient outlet ready for startup.

Record of employment;

Position Title : Project Engineer / Senior Electrical Engineer

Company : Seas of Technology Contracting Company

Al – Khobar, 31952 Eastern Province, P.O. Box 31668, K.S.A

Project Title : Replacement of Data Network Equipment BI-10-00074

Kingdom Wide, Saudi Arabia (Tele-Communication &

Electrical Works)

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : September 28, 2010 to July 13, 2012

Duties and responsibilities;

Has overall responsibility for the planning, management, coordinating and

construction project and will work closely with a range of other

professional during the contract progress.

Estimates, prepares and assigns the resources such as manpower,

materials, consumables, equipment, tools, etc., required for all electrical

and related works prior to execution.

Attending pre - site and on – site meeting during the contract, liaising of

range of other professionals involved with the project in Saudi Aramco

and Saudi Electric Company.

Providing indigent professional advice and guidance.

Ensuring that the quality standards and all health and safety checks are

adhered to.

Develops conceptual plans and budgets for facilities project to support

fiscal decision making.

Coordinates with the proponent groups and building committees to

facilitate the rational facility planning, budgeting and scheduling.

Prepare for requests for proposal and conducts all necessary meeting to

facilitate hiring architectural and construction management services.

Monitors and reports on all phases of planning and construction.

Conduct site surveys, Prepare plans, lay out and designs.

Coordinates all parties involved in the planning, design, and construction

process.

Develops and maintains facility project budgets.

Conduct pre-construction conference, review bids, is recommends award

of contract.

Page 10: Domer L. Javier resume_rev.1

Check plans estimating the bill of quantity; send the quotation to the

suppliers, clients and purchasing of materials, equipment for conformity

with specifications.

Reviews contract plans and specifications for compliance with appropriate

building codes and project requirements.

Receives pay request for professional consultants and contractors and

approved for payments.

Monitors and facilitates resolution of construction contract disputes and

claims.

Monitors construction contract close-out and maintain documentation

files.

Monitor the announcement projects of Saudi Electric Company (SEC) in

their website.

Assists in development of new standards of practice for Project

Management activities.

Skill in reading and interpreting plans and specifications and to compare

with them construction progress.

In case of emergency, I should be able to solve problems for his team

members.

Knowledge of current status of costs of new construction, escalation

factors, and market trends.

Knowledge of building codes and standards of practice.

Must suggest new policies and modifications in order to reform the nature

of work.

It is his prime most duty to participate in meetings, discussions, project

site visits, workshops and hearings.

Must has keep preparing status reports and presenting them to higher

managing authorities for scrutinizing.

Monitor the installation of Access Data Network Equipments in North

Area, Central Region & Western Region.

Monitor the installation of PROCURVE Switch, HP 3500yl-24G-PWR

(J8692A).

Monitor the installation of PROCURVE Switch, HP 5406zl Intelligent

Edge (J8697A).

Monitor the installation of PROCURVE Switch, HP 8212zl Switch Base

System (J8715B).

Monitor the installation of Remote Serial Router (RSR), Cisco 3945, &

Multi – Mode Extender (MME), MACS ET-CB20.

Monitor the installation of Cube IT Cabinet, 12RU & 7 feet.

Record of employment;

Position Title : Project Manager

Company : Sumitomo Corporation

Seas of Technology Contracting Company

Al–Khobar, 31952 Eastern Province P.O. Box 31668, K.S.A.

Page 11: Domer L. Javier resume_rev.1

Project Title : Manifa (Civil & Electrical Works, BI-10-00450-006)

: Manifa Communication SCADA/RTU & Security Systems

Projects (GOSP Plant)

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : April 5, 2010 up to September 25, 2011

Duties and responsibilities;

Knowledge of estimating the cost and bill of quantity for the project.

Monitoring and execute the work of our teams and preparing the report to

submit in the meeting.

Must has keep preparing status reports and presenting them to higher

managing authorities for scrutinizing.

Has overall responsibility for the planning, management, coordinating and

construction project and will work closely with a range of other

professional during the contract progress.

Representing the interest of the Clients.

Attending pre - site and on – site meeting during the contract, liaising of

range of other professionals involved with the project.

Direct reporting to the Chief of Executive Officer for update and progress

report of the project.

Ensuring that the quality standards and all health and safety checks are

adhered to.

Keeping track of progress and ensuring that the project is on time and on

budget.

Prepare for requests for proposal and conducts all necessary meeting to

facilitate hiring architectural and construction management services.

Monitors and reports on all phases of planning and construction.

Coordinates all parties involved in the planning, design, and construction

process.

Prepares contracts change orders and monitors their execution.

Costs estimate the additional work and preparing for change order to the

contractor.

Reviews contract plans and specifications for compliance with appropriate

building codes and project requirements.

Monitors and facilitates resolution of construction contract disputes and

claims.

Monitors construction contract close-out and maintain documentation

files.

Skill in reading and interpreting plans and specifications and to compare

with them construction progress.

Knowledge of facilities planning and construction management processes

and procedures.

Prepares contracts change orders and monitors their execution.

Knowledge of laws governing construction contracts and contracting.

Knowledge of construction materials and methods.

Page 12: Domer L. Javier resume_rev.1

Knowledge of supervisory practices and principles.

It is his prime most duty to participate in meetings, discussions, project

site visits, workshops and hearings.

Must determine the resources required for the purpose of production.

Responsible for Health, Safety and Environment (HSE) of my people

while working on job sites as well as on the quality and man hour safety.

Record of employment;

Position Title : Electrical Engineer QA/QC Inspector

Company : Abdulla Fuoad Holding Company

Industrial Security & System Division

P.O. Box 257 Damman 31411 K.S.A

Project Title : King Abdullah University Science and Technology

(Communication Security System & Facilities)

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : January 20, 2009 to January 20, 2010

Duties and responsibilities;

Direct responsible for the materials inspection delivered on the job site

base on SAMSS and Saudi Aramco standard.

Assist to the QA/QC Manager for preparation Inspection Assignment

Package, Construction method statement of Material Submittal.

Coordinates and monitoring that the location of HVAC and MVAC power

cables that installed as per Drawing of Issued for Construction (IFC) that

approved by Aramco Standard.

Preparing of Ready for Inspection (RFI) Check list.

Prepare inspection schedule for the planned quality activities during the

procurement, construction and pre - commissioning work phases.

Conduct of inspection and test of electrical and civil works.

Preparing of BOQ and Technical Query for Request for Approval (RFA)

Checklist as per Aramco Standard.

Preparing for the Technical Query (TQ) for the new drawing, red line

drawing and submit to the Aramco office of Project Management Team.

Maintain and monitor the implementation of approved QA/QC

procedures, Inspection plan and Construction Work Methods.

Monitors daily site progress and evaluate the project schedule,

construction workmanship including QA/QC issues, procurement

activities and status.

Monitoring of High, Medium Voltage and Low Voltage cables for

meggering resistance test and splicing.

Monitoring, Pre-Commissioning of High Voltage Step–Up and Step–

Down Transformers and high potential test as per Aramco procedures.

Coordinate the implementation of commissioning plan with

Commissioning lead at site.

Responsible for ensuring timely completion of commissioning progress

Page 13: Domer L. Javier resume_rev.1

Conduct and Inspection the termination of High and Medium voltage

power cables to the transformers.

Monitoring of installation of Radar and termination of power cables.

Calculated the power cables schedule for Voltage drop and Load schedule

as per Aramco Standard for additional works.

Experienced in reading and following electrical program as per Aramco

Standard.

Monitoring and assembled of Walkthrough machine and installation of X-

Ray machines and Radio Frequency Identification (RFID) License Plate

Readers System (LPRS), Arm Barriers, Card Readers, Hydraulic Crash

Barriers.

Coordinate to the Project Inspector Division (PID) and inspect the location

of Card readers, Magnetic Door Lock, Door Strike, and Snap Shot

Cameras, Hydraulic Crash Barrier and Metal Detector.

Expedite the connectivity of Fiber Optic cables to the Cisco Switch.

Ensure availability of critical materials, expedite material issues,

coordinate and push company buyers to deliver critical materials as soon

as possible.

Ensure material traceability keeping of vendor inspection certificates,

purchase orders, materials receipt records and calibration certificates.

Conduct and inspection upon arrival of the materials to the lay down yard

prepare materials receiving report and attach inspection checklist and

testing report.

Ensure commitment of site material deliveries.

Expedite the technical issues to facilitate construction phase.

Ensure all works done by construction supervisions are all within client

specifications engineering standards, materials specifications scope of

works and contract amendments.

Monitoring of field activities lay down yard and issues Non Conformance

Report against non – complying and proposed corrective action.

Monitoring of continuity testing for Medium and Low voltage power and

control cables.

Conduct an inspection for Fusion Bonded Epoxy coated rebar's (FBE).

Reinforcing steel, embedded item form closures for Cameras and

Microwaves foundation.

Coordinates the location of Compaction Testing Test to the PID.

Coordinates the location of Lean concrete for ready for concrete casting

pouring.

Conduct an inspection for the coming of the new delivery materials as per

the Bill of Quantity (BOQ) ordered.

Monitoring of concrete casting pouring for Cameras and Microwaves

foundations.

To prepare updated daily accomplishment reports of the team.

Knowledge of estimating, budgeting, scheduling practices.

Set-up and operate test equipment to evaluate of development parts.

Page 14: Domer L. Javier resume_rev.1

Assembles and system under simulated operating conditions and record

result.

Review and update all construction drawing prior to the start of electrical

and civil works construction for installation activities.

Concrete Moisture Field Test of Cameras and Microwaves foundation

ready for applying of Bitumen coating.

Monitoring and installation of Cameras, Microwaves Intrusion Detection

Systems poles.

Perform miscellaneous duties as directed by Site Manager/Project

Manager.

Coordinate the locations of Camera's and Microwaves Intrusion Detection

System (MIDS) Foundation as per Aramco Standard drawing.

Answering inspections to the owners RFI in line with approved

procedures, specifications, codes and standards or site technical queries

and field change design issued by engineering. Follow-up owner’s

inspection plans and approved inspection procedures. Keep the original

required documentation of inspections in order to document the works

provided. Specify if the owner works status is endorsed and inform them

about any encountered aspects the job.

Inspection of the HVAC, MVAC & LVAC cables installation, start-up, air

balancing, pre-commissioning and commissioning of the Electrical System

and building service scope.

Clearing of generated Punch List Items, as well as leading and provide

details to subcontractor on how to clear punch list on easy manner of work

execution.

Review, comment and recommend approval on contractor’s shop

drawings, technical field queries, Method Statements, Inspection and Test

Plans

Monitoring and installation of Pan Tilt Zoom (PTZ) & Dome,

Fixed cameras, Microwaves Intrusion Detection Systems, Ex–Ray

Machine and ID Budging.

Record of Employment;

Position Title : Electrical & Mechanical Site Supervisor

Company : Skope Technology Incorporated

Unit 202, 2nd

Floor 1st Midland Condo

109 Gamboa St. Legaspi Village, Makati City, Philippines

Project Title : Fire Alarm Protection

Client : Silver City/Auto Mall Center

Inclusive Date : July10, 2008 to December 23, 2008

Duties and responsibilities;

Supervise and Installation of 1” - 6” diameter pipe schedule 40 - 80

fabricated and welding.

Supervise and installation of gate valves and supervisory switch to the

pipe.

Page 15: Domer L. Javier resume_rev.1

Monitoring and installation of electrical cables to the supervisory switch

and termination.

Trained or informs the employees of new work methods and procedures,

changes in safety regulations, work policies and electrical codes and

standards.

Plans and develops work schedules, equipment usage schedules, priority

of electrical expenditures and procedures for equipment and appliance

maintenance.

Reviews plans for future buildings and inspects new buildings to ensure

compatibility with existing electrical codes and maintenance standards.

Supervise and Installation of Fire Hose Cabinet Protection (FHCP) as per

drawing.

Conduct an inspection for testing of electrical and mechanical works.

To prepare updated daily accomplishment reports of the team.

Set-up and operate test equipment to evaluate of development parts.

Assembles and system under simulated operating conditions and record

result.

Supervise and assisting the electrical and mechanical foreman in

performing the meggering and testing of cables.

Prepared design of electrical and mechanical system and other electrical

equipments.

Review and update all construction drawings prior to the start of

mechanical and electrical construction for installation activities.

Monitoring and sand blasting of pipe for final coating.

Record of employment;

Position Title : Electrical Foreman

Company : R.H. Al–Marri & Sons Company

P.O. Box 1 Abqaiq 31992 K.S.A.

Project Title : Khursaniyah Pipelines and Communication Rehabilitation

Client : Saudi Arabian Oil Company (ARAMCO)

Inclusive Date : February 4, 2006 to May 10, 2008

Duties and responsibilities;

Experienced in reading and following electrical program.

Knowledgeable in executing plans and procedures of preventive and

corrective maintenance.

Knowledge of electrical applications for high and low voltage electrical

systems.

Ability to connect and repair the electrical devices according to diagram

such as contractors, photocell, limit switches, thermal overload relay,

relay, motors and other electrical component.

Responsible for the installation of galvanic and magnesium anode

according to Aramco standard procedures.

Page 16: Domer L. Javier resume_rev.1

Responsible for the installation & termination of outdoor type switch low

voltage, digital and analog box, (MOV) motor operated valve, 9M – 12M

Poles outdoor type lightning fixture.

Conduct an Earth resistance testing for ground cables.

Monitoring for excavation of trenches, laying for underground cables.

Cable Laying of Power and Instrument cables to the cable tray as per

Saudi Aramco Standard.

Installation & Termination of digital and analog junction box.

Installation & Termination of transmitters such as temperature indicator,

flow indicator, pressure indicator, and pressure gauges.

Competent in operating Hand-Control machine like electric threading

machine, hydraulic knock out puncher, hydraulic crimper and hydraulic

bearing machine.

Installation & fabricated using hydraulic machines of PVC coated and

RGS conduit to the Switch Rack.

Fabricated and assembled of Impulse stainless steel tube for Pressure

indicator transmitter (PIT) and Flow indicator transmitter (FIT).

Installation of electrical main distribution panels, bus bars, air circuit

breaker, cable tray and lay out electrical cables.

Impulse tubing of stainless steel for Pressure Indicator Transmitter (PIT)

and Flow Indicator Transmitter (FIT).

Installation of Uninterrupted Power Supply (UPS) Battery from Remote

Terminal Units (RTU) and termination.

Installation of motor for air handling units, contractor’s timer, limit

switches, water booster pump, sewage pump, compressor for chiller and

electrical termination.

Installation of motor control with double speed Wye, Delta connection.

Performs preventive and corrective maintenance for stand by generator

and automatic transfer switchgear.

Installation of electrical main distribution panel.

Installation of Main Control Circuit Breakers (MCCB) and monitoring for

Pre – Commissioning.

Meggering of insulation resistance and testing of power, instrument, and

grounding cables.

Installation of cable tray as per Issued for Construction (IFC) drawing.

Facilitate all implementation works regarding electrical and

instrumentation scope of works.

Monitoring and Installation of Switch Rack & Transformer.

Monitoring and Pre – Commissioning of Switch rack.

Installation of galvanic anode for 1- pin station & 3 – pin station to the

given lateral pipes as per drawing.

Cad welding of cables for cathode protection in the lateral pipes and

termination.

Page 17: Domer L. Javier resume_rev.1

Record of employment;

Position : Project Engineer & Electrical Site Supervisor

Company : Skope Technology Incorporated

Unit 202 2nd

floor 1st midland Condo 109 Gamboa St. Legaspi

Village, Makati City Philippines

Project Title : Building Construction & Structures Projects

Inclusive Date : April 28, 2005 to January 20, 2006

Duties and responsibilities;

Build, calibrate, maintain, troubleshoot, and repair electrical instruments

and testing equipments.

Responsible to assure performance of the work within scope, also comply

the specification and standard drawings.

Proven ability in the supervision and management of a team with regard

to all aspects from Master plan, Concept, Preliminary and Final Design

stages, including single line diagrams, panel schedules, electrical

schematics and communication plans.

Coordinate with site in charge and make sure that all activities are in

accordance with standard drawings and Philippines Electrical Codes

(PEC) standard and specification.

Conduct meggering test and other electrical test such as lightning,

grounding, and metering equipment testing as per specification

requirements and approved procedure.

Knowledge of electrical installation including substation, power, lighting,

cabling, wiring and grounding and an understanding of installation

specifications and ability to conduct demand load calculations.

Set up and operate test equipment to evaluate performance of development

parts, assemblies, and system under simulated operating conditions and

record results.

Conduct inspection for quality control and assurance programs, reporting

findings and recommendations.

Knowledge of electrical installation including substation, power, lighting,

cabling, wiring and grounding and an understanding of installation

specifications and ability to conduct demand load calculations.

Supervise and assist Electrical Foreman and Electricians in performing

megger testing on cables, transformer oil circuit breaker, bushing current

and potential transformer and also performed oil circuit breaker and

transformer oil testing.

Prepared design of electrical distribution system including lighting, power

outlets, motors, fire alarm system, and other electrical equipment.

Prepares construction contracts and monitor their execution and

distribution.

Use AutoCAD and calculations software as part of the design process.

Page 18: Domer L. Javier resume_rev.1

SUMMARY OF VARIOUS PROJECTS COMPLETED

Project Title : Provide power supply for Crimping Machine in CE &

Maintenance Warehouse

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00001).

Project Title : Installation of NCB ATM

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00002).

Project Title : 3 Phase power supply to new Kitchen Equipment in MA

Admin Canteen

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00003).

Project Title : Identification of Useable Breakers in 2 Sub Stations for use

Air Monitoring Stations

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00004).

Project Title : Modification of UPS 11 KVA in Admin/IT Room

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00005).

Project Title : Install 2 Additional power Sockets in Display Chiller, Hot

Cabinets and provide 3 New Power Points in Salad

preparation Area in MA Admin Canteen

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00006 & 0007).

Project Title : To Build 3 Storage Rooms under Stair and 01 Mail Storage

Room along Corridor in MA Admin Ground Floor

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00008).

Project Title : To Build 3 Store Rooms & Expansions of HR/General

Service Department Office in MA Admin Building Area.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00010).

Project Title : To Provide power for Air Compressor and 6 Power outlets

for Fire Trucks Charger in Fire Station/Security Command

Center.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00011 & 0013).

Project Title : To Build Gypsum Partition and Door opening on the wall to

make new Office Facility in CE & M Building Ground Floor.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00012).

Page 19: Domer L. Javier resume_rev.1

Project Title : Permanent connection for Oxyfuel Machine in CE & M

Building Ground Floor.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00014).

Project Title : Electrical Connection for Welding Machine in CE & M

Building Ground Floor.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00015).

Project Title : Installation of 480VSocket connection for Welding Machine

in CE & M Building Ground Floor.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00016).

Project Title : Provide power supply to new Hydraulic Column Lift in CE

& M Building Ground Floor.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00020).

Project Title : Installation of 8 Cameras in MA Main Clinic.

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00021).

Project Title : Installation of 4 Additional Light in Central Engineering

Department in File Room First Floor

Ma’aden Aluminum Company (MOC Request no. MA-CE-

MOC-00022).

Project Title : Replace Telephone Switches Kingdom Wide (BI-10-

000246) Rabigh Phase II Petrochemical Project

(Contract # 6600028287) (Electrical Works) K.S.A.

Subject : Communication & Security Projects, Worley Parsons

Project Title : Rabigh Phase II Petrochemical UPS System Project by

Petrofac (Contract Job Code: 6600028287).

Project Title : Rabigh Phase II Petrochemical Permanent Facilities UPS

System Sirti by Project (Contract Job Code: 0 – 5361 –

20- 0000).

Project Title : Design for Abu Safah SCADA/RTU Communication

Network Upgrade (BI-1003040-0001).

Project Title : Replacement of Data Network Equipment, BI-10-00074

Subject : Tele-communication & Electrical work Kingdom Wide

Project Title : Manifa (Civil & Electrical Works, BI-10-00450-006)

(Manifa, K.S.A.) .

Subject : Industrial Security System Division

Project Title : King Abdullah University Sciences

and Technology (KAUST-Thuwal, Jeddah K.S.A.)

Page 20: Domer L. Javier resume_rev.1

Subject : Industrial Security System Division

Project Title : Silver / Auto Mall Center

Subject : Mechanical and Electrical Works for Bldg. 1 & 3

Project Title : Khursaniyah Pipelines and Communication

Projects (Khursaniyah, K.S.A.)

Subject : 16” Oil Pipelines and Scraper Area for Electrical &

Instruments.

Project Title : Star pacific Bldg.

Subject : Electrical Ducting and Civil Works Bldg. Level# 20 & 21

Project Title : Pasig City General Hospital, Pasig City, Philippines

Subject : Electrical Facilities & CCTV Projects

Bldg. Level 1, 2, 3, 4 up to 5

Project Title : Smart Tower

Ayala Makati, Philippines

Subject : Electrical and Communication Projects

Bldg. Level 53, Level 54 to Level 55

Project Title : Banco De Oro, Makati City, Philippines

Subject : Construction of Electrical & Communication Facilities

Projects

PROFESSIONAL LICENSE / AFFILIATION

Member of the Saudi Council of Engineers (ID No. 215058)

TRAININGS AND SEMINARS

Helicopter Underwater Escape Training (HUET)

Gulf Technical & Safety Training Center (GTSC)

Location: P.O. Box: 3599 2nd

Industrial Area, Dammam Gulf Technical & Safety

Training Compound, Saudi Arabia

Date: September 09, 2014 valid until September 08, 2017

Work Permit Receiver Certificate (Saudi Aramco)

Southern Area Industrial Training Division

Location: Box: 5653 Abqaiq, Saudi Arabia

Date: February 27, 2012 until February 27, 2014 (Expired)

QC Inspector Aramco Approved

Reference No. SC-KAUST–ARAMCO-0697

In-House Quality Training Program

Saudi Aramco Desktop Standard Version 2007

Location: Sumitomo Conference Room, Kaust Site, Thuwal, K.S.A.

Date: June 25, 2009

In-House Quality Training Program

Page 21: Domer L. Javier resume_rev.1

Schedule “Q” As Applied in Saudi Aramco LSTK Projects

Location: Sumitomo Conference Room, Kaust Site, Thuwal, K.S.A.

Date: June 15, 2009

CERTIFICATES

Helicopter Underwater Escape Training Certificate (HUET)

Saudi Aramco Safety Certificate

Aramco ID No. 8983193

Aramco Certificate

Seas of Technology Contracting Company

Abdullah Fuoad Holding Company

Saudi Aramco Work Permit Receiver Certificate

R.H. Al-Marri Sons @ Company

Skope Technology Incorporated

National Polytechnic Institute

Valid Saudi Driving License

Philippines Driving License (Code # 1,2,3)

OTHER SKILLS

Computer Literate

Light and Heavy Vehicle Driver

Impulse Tubing of Stainless Steel

Mechanical Works

Cathode Protection

GTAW and SMAW

Civil Works

Microsoft Word, Excel, PowerPoint, Windows 95, 98,2000,2003,2005,2007,2012

Operating System, AutoCAD 2003,20005,2007

Bentleys Micro Station Version 7 & 8

Communication Security System Facilities Works

Planning and Scheduling

Tele – Communication Works

April 2004 to May 2004 Engineering Aid On Job Training (OJT):

Skope Technology Incorporated

Unit 202 2nd

floor 1st Midland Condo 109

Gamboa Street. Legaspi Village

Makati City Philippines

SCHOOL SCHOLARSHIP

Cagayan Provincial Government Scholarships (CPGS) since year 1999 up to 2005.

LANGUAGE SPOKEN

English

Arabic (Common use)

Tagalog (Pilipino)

Page 22: Domer L. Javier resume_rev.1

CHARACTER REFERENCES

Engr. Emmanuel Jotojot Engr. Isagani Torres

QC Manager Sr. Project Inspector

Sumitomo Corporation, KSA Electrical Inspector Group

Email:[email protected] KAUST-PIS/PID

Engr. Antonino Mendoza Engr. Jimmy Hatamosa SR. Telecommunication Engineer SR. Project Inspector

WorleyParsons Engineering Consultancies Co. Communication Inspector Group

Email:[email protected] KAUST-PIS/PID

I hereby certify that the above information’s are true and correct to the best of my

knowledge and belief.

___________________