Dollo-Ado Shelter Project
-
Upload
armstrong-p-punneyasingam -
Category
Documents
-
view
21 -
download
0
Transcript of Dollo-Ado Shelter Project
![Page 1: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/1.jpg)
International Organization
for Migration
![Page 2: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/2.jpg)
Objective………..
Construction of 1145 Transitional shelters
for the Year 2013
![Page 3: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/3.jpg)
Funding source :- UNHCR / DFID
![Page 4: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/4.jpg)
Brief description about IOM
Shelter design
Floor area - 6.0mx3.5m=21.0Sqm
Wall Height - 2.4m
Ridge Height - 3.4m
Main components of the shelter………
Eucalyptus timber frame work
Bamboo walling
CGI sheet roofing
![Page 5: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/5.jpg)
Floor Plan of the shelter
![Page 6: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/6.jpg)
![Page 7: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/7.jpg)
Sequence of operation in shelter
construction……….
At workshop….
Preparing timber columns and components
for frames.
Preparing roof trusses .
Preparing doors and windows .
Slicing bamboo poles .
![Page 8: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/8.jpg)
Preparing timber columns and
components for frames.
![Page 9: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/9.jpg)
Preparing timber columns and
components for frames.
![Page 10: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/10.jpg)
Preparing roof trusses
![Page 11: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/11.jpg)
Preparing doors and windows
![Page 12: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/12.jpg)
Slicing bamboo poles
![Page 13: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/13.jpg)
Sequence of operation in shelter
construction……….
At site…..
Setting out and column erection.
Fabricating timber Skelton.
Fixing roof trusses.
Attaching bamboo slices.
Roofing
Fixing door and windows
![Page 14: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/14.jpg)
Setting out and column erection
![Page 15: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/15.jpg)
column erection
![Page 16: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/16.jpg)
Fabricating timber Skelton
![Page 17: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/17.jpg)
Attaching bamboo slices
![Page 18: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/18.jpg)
Roofing
![Page 19: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/19.jpg)
Materials and prefabricated items
delivered to the site for shelter
construction…..
From Workshop….
![Page 20: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/20.jpg)
Transporting shelter components to
the site……
![Page 21: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/21.jpg)
Materials and prefabricated items
delivered to the site for shelter
construction…..
From Store….
![Page 22: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/22.jpg)
Quality Control monitoring…….
At workshop…….
![Page 23: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/23.jpg)
Quality Controlling at workshop…...
![Page 24: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/24.jpg)
Quality Control monitoring…….
At site….
![Page 25: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/25.jpg)
Shelters completed per Zone
. ZONE # OF SHELTERS COMPLETED
ZONE A 26
ZONE B 69
ZONE C 51
ZONE D 51
ZONE E 54
ZONE F 29
ZONE G 35
ZONE H 50
ZONE I 55
ZONE J 59
ZONE K 62
ZONE L 56
ZONE M 50
ZONE N 54
ZONE O 77
ZONE P 73
ZONE Q 100
ZONE R 70
ZONE S 64
ZONE T 70
TOTAL 1155
![Page 26: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/26.jpg)
![Page 27: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/27.jpg)
![Page 28: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/28.jpg)
Monthly Progress-2013
MELKEDIDA SHELTER CONSTRUCTION
PROGRAM & PROGRESS-2013
0.0
100.0
200.0
300.0
400.0
# O
F SH
ELTE
RS
ORIGINEL PROGRAM 100.0 120.0 140.0 140.0 140.0 140.0 140.0 140.0 85.0
PROGRESS 54.0 108.0 105.0 67.0 56.0 120.0 102.0 197.0 346.0
Apr- May- Jun- Jul-13 Aug-1 Sep- Oct- Nov- Dec-
![Page 29: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/29.jpg)
![Page 30: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/30.jpg)
![Page 31: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/31.jpg)
![Page 32: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/32.jpg)
A tool using to find the impact of IOM shelters and gathering beneficiary
details
![Page 33: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/33.jpg)
Major challenges Encountered
Delay in Commencement of the project
Failure in supplying the materials in time by local
suppliers from Dollo-Ado
Poor quality materials by the local supplier
Delay in material supply due to road taxation
Delay in supplying the materials due to rain in
November.
Road condition between Dollo and Melkedida
![Page 34: Dollo-Ado Shelter Project](https://reader031.fdocuments.us/reader031/viewer/2022022414/5872fa2c1a28ab8c718b6d35/html5/thumbnails/34.jpg)
THANK YOU