DOE Workshop Business Opportunities Available in Energy Sector 31August 2012
description
Transcript of DOE Workshop Business Opportunities Available in Energy Sector 31August 2012
![Page 1: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/1.jpg)
DOE WorkshopBusiness Opportunities Available in Energy Sector31August 2012
Act.Change.Power.
![Page 2: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/2.jpg)
2
Energy is everywhere.
Cennergi aims to be the leading cleaner energy producer in Southern Africa.
Our VISION is to become the leading cleaner energy Independent Power Producer in Southern Africa, serving an expanding energy market
We endeavor to win a significant share of a planned 16 GW by 2025 in Southern
Africa
![Page 3: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/3.jpg)
Gas40%
Generation mix.3
Renewables45%
Coal15%
Aspirational target of of 0.3 - 0.5 grid emission factor
![Page 4: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/4.jpg)
4
Company formation.
2nd March 2012: 50:50 joint venture between Exxaro and Tata Power creates Cennergi (Pty) Limited
+ =
Created by companies from
developing nations to serve developing
nations
Play a key role in the African electricity generation market
Focus on the investigation of
feasibility, development,
ownership, operation, maintenance,
acquisition and management of
electricity generation
The initial project pipeline focuses on renewable energy projects in South
Africa and Cennergi’ s strategy is to create a balanced portfolio of
generation assets
![Page 5: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/5.jpg)
5
![Page 6: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/6.jpg)
• Launched by SA Government’s Department of Energy – 3 August 2011
• Programme objectives:– Job creation– Entrepreneurial development and support– Education and development of skills– Socio-economic development through support of community programmes– Community participation through equity shareholding in the wind project
• Programme was designed to:– Procure 3725MW of renewable energy through 5 bidding windows
(November 2011 – March 2013)– Start and stimulate the renewable energy industry in South Africa
South Africa’s IPP procurement programme.
![Page 7: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/7.jpg)
21st May 2012: Cennergi was awarded preferred bidder status for 2 wind farm projects
Cennergi- preferred bidder status.
7
• Tsitsikamma• 95MW• 75% Cennergi• 16% Watt Energy• 9% Trust
• Bedford• 139MW• 95% Cennergi• 5% Trusts
Tsistikamma Community Wind Farm
Amakhala Emoyeni Wind Farm
![Page 8: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/8.jpg)
Tsitsikamma Community wind farm.• Technology: Onshore Wind• Capacity: 95MW (31 wind turbines)• Location: Portions 3-9 of Wittekleibosch
Farm 787, Tsitsikamma Region, Eastern Cape
• Substation: Melkhout (via Dieprivier)• Project Structure:
75% Cennergi (Pty) Ltd, 16% Watt Energy9% Tsitsikamma Community Trust
• EPC and O&M Contractor: Vestas Southern Africa
• MLA: Nedbank Limited• Committed to spending 1.5% of its revenue
on socio-economic development and 0.6% on enterprise development
Tsistikamma
![Page 9: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/9.jpg)
Amakhala Emoyeni wind farm.• Technology: Onshore Wind• Capacity: 139MW (66 x 2.1MW turbines)• Location: Blue Crane Route District
Municipality of the Eastern Cape Province• Substation: Kopleegte switching station
(132kV) and Poseidon (400kV) • Project Structure:
95% Cennergi (Pty) Ltd, 5% Community Trusts
• EPC and O&M Contractor: Suzlon Wind Energy South Africa (Pty) Ltd
• MLA: Standard Bank of South Africa• Committed to spending 1.5% of its revenue
on socio-economic development and 0.6% on enterprise development
Amakhala Emoyeni
![Page 10: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/10.jpg)
![Page 11: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/11.jpg)
Tsitsikamma Wind FarmConstruction Period
Total Construction PeriodCivil WorksElectrical WorksDeliveryInstallationCommissioning
Total Construction period approx. 20 months22 February 2013
![Page 12: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/12.jpg)
Construction Period: Local BusinessJobs to be sourced from the local community
Transport, Crane, Installation
Civil Works Electrical Works
- Equipment rental (forklifts, trailers, cranes)
- Safety gear
- Material supply (concrete, rebar, piping, earthing, etc.)
- Equipment Supply- Fencing- Engineering- Equipment Rental (Drilling
rigs, earth movers, cars, trucks)
- Temporary offices/ accommodation
- safety gear- security during construction- accommodation, restaurants
- equipment supply (cables, substation equipment, switchgear, transformers, etc.)
- Engineering- safety gear- security during
construction- accommodation,
restaurants- Fencing
![Page 13: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/13.jpg)
Construction Period: JobsJobs to be sourced from the local community
Transport, Crane, Installation
Civil Works Electrical Works
- General Labour- Transport assistants (eyes
on the ground)- Flagmen- Assistant Riggers- Forklift drivers- Security- Clerk (administration- Cleaners // House
Keeping
- General Labour- Pipe-laying- Trench backfilling- Foundation base
preparations- Steel fixing- Erect & Strip Formwork- Pouring of concrete
- General Labour- Trenching and
backfilling - Excavate - Bolt structures - Pull cables- Messengers - Cleaners - Security - Making good – cleaning,
removing rubble, etc - Any other unskilled
work
![Page 14: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/14.jpg)
Cennergi’s Business Principles
Sustainable Communities Model
Cennergi’s Growth Strategy (MW capacity growth)
Regional Growth Offtaker Technology
Cennergi’s Vision, Mission and Values
Financial Capital Manufactured Capital Human Capital Social Capital Natural Capital
• Superior returns• Community ownership• Local financial benefit• Energy Impact Fund
• Quality funding
• Energy and supporting infrastructure
• Support local manufacturing
• Representative workforce
• Training programmes• Fair and transparent
• Safe and healthy
• Understand community needs
• Energy solutions• Respect
• Building trust
• GEF < Regional• Minimise impact of operations and office
• Responsible, efficient resource use
Global Objectives: MDG, UNGC
Regional Objectives: NEPAD
National Objectives e.g. National Growth Plan
• Thriving Financially• Equitable
• Equipped to contribute
• Fair labour practices
• Well Run• Well Served
• Fair for everyone• Active, inclusive and
safe
• Well Connected• Adequate utilities• Well designed and
built
• Environmentally Sensitive
Sustainable Communities
![Page 15: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/15.jpg)
• With expertise, resolve and resources we strive to create benefit for all
• Cennergi, making a positive difference in the communities we work with
Social and Economic Development.
People
Economy
Environment
Shareholders
![Page 16: DOE Workshop Business Opportunities Available in Energy Sector 31August 2012](https://reader035.fdocuments.us/reader035/viewer/2022070500/56816886550346895ddf0629/html5/thumbnails/16.jpg)
Energy is everywhere.
Cennergi aims to be the leading cleaner energy producer in Southern Africa.
Thank you.
16