DOD Protocol & Guidance for Conducting Integrated Facility ......GEORGETTE MYERS USAEC 410-436-1218...

18
1 DOD Protocol & Guidance for Conducting Integrated Facility Watershed Impact Assessments Developed by the USAEC for DOD Presented by Georgette Myers U.S. Army Environmental Center (USAEC) Heather Cisar, LMI NDIA Conference – April 9, 2003

Transcript of DOD Protocol & Guidance for Conducting Integrated Facility ......GEORGETTE MYERS USAEC 410-436-1218...

  • 1

    DOD Protocol & Guidance forConducting Integrated Facility

    Watershed ImpactAssessments

    Developed by the USAEC for DOD

    Presented by Georgette MyersU.S. Army Environmental Center (USAEC)

    Heather Cisar, LMINDIA Conference – April 9, 2003

  • Agenda

    § Protocol DevelopmentàBackground

    àApproach

    àObjectives

    àImplementation

    àBenefits for DoD

    § Overview of FinalProtocol

  • 3

    Background

    Why Develop a DOD WatershedAssessment Protocol?§ Integrated Federal Strategies &

    Agreements & New ComplianceRequirements§ Crosswalks Between Regulations§ Automation Of Data Collection &

    Reporting§ Watershed Approach Used To Address

    Regulatory Requirements§ No Standard DoD Approach Exists

    Pro

    toco

    l Ove

    rvie

    w

  • WATER QUALITY

    RCRA

    SDWATOSCA

    ESA

    CAA FIFRA

    CWA CERCLA

    Haz.Waste&MaterialStorage,Landfills,OB/OD,SludgeMgmt

    Cleanup &Restoration

    Drinking Water Treatment & SourceWater Protection, Pesticide Application,

    Deposition from Air Emissions

    Construction &Maintenance,WastewaterTreatment

    Storm waterRunoff fromMissionActivities

    Land Use Planning to ProtectSpecies & Habitat

    NEPA

    Approach - Step 1:Determine the Need

  • 5

    Approach (cont.)

    § Step 2: Determine Best Practices toIncorporate into Protocol• Review existing studies & Provide

    Recommendations on Methods to Usefor DOD Protocol

    § Step 3: Test Protocol at FiveInstallations• Army: Ft. Stewart, McAlester• Navy/Marines/Air Force: Mayport;

    Beaufort; Moody

    Pro

    toco

    l Ove

    rvie

    w

  • 6

    Objectives

    § Provide Standard Methods EasilyModified to Site Conditions§ Provide Step-by-Step User Friendly

    Product That Is Web Interactive§ Use Key Performance Metrics to

    Determine Current Conditions &Track Results§ Identify and Assess Potential

    Impacts of an Installation’s LandUse Conditions and Activities toWatershed

    Pro

    toco

    l Ove

    rvie

    w

  • 7

    Objectives (cont.)

    § Involve Stakeholders§ Provide Prioritized List of

    Installation Impacts & Solutions § Enable Easy Access to Wealth of

    Existing Data§ Identify Innovative Yet Proven

    Solutions§ Identify Partnerships & Funding

    SourcesPro

    toco

    l Ove

    rvie

    w

  • 8

    Implementation

    § Implement at Installations That Are:• In Impaired Watersheds or Source Water

    Protection Zones• Have Recurring Non-compliance Under

    Any Regulation That Identifies WaterQuality Issues or will have newrequirement due to TMDL development

    • Identified by DOD As Mission EssentialInstallations

    § Re-evaluate Based on TMDL 303dList Schedule

    Pro

    toco

    l Ove

    rvie

    w

  • 9

    Benefits to DOD Facilities

    § Holistic Approach toEnvironmentalManagement andPlanning

    § Use by All PillarsCould ReduceRedundancy

    § Allows QuickResponse toAddressing DODEnvironmentalIssues &Requirements

    § ProvidesJustification forFuture POMs

    § Assist DOD inPrioritizing byMission, ComplianceStatus, and FutureStationing / Re-Alignment

    § Could Assist in theReduction ofEnvironmentalLiabilities

    Pro

    toco

    l Ove

    rvie

    w

  • 10

    Overview: Final Protocol Phases

    Phase 1Quick

    ScreeningAnalysis Phase 2

    Assess Receiving Watersheds Conditions

    and Key Progress Metrics

    Phase 3 Assess Potential

    Impact of Installation Activities

    A. Develop a baseline of physical characteristics

    B. Identify potential impacts activities

    Phase 4Identify Cost-Effective

    Solutions to Mitigate HighPriority Impacts

    Phase 5Identify Partnerships &

    Funding Sources

    Phase 6Implement Solutions,

    Track Progress & ReassessOn a Regular Basis

  • 11

    Phase IQuick Screening Analysis

    See Handout

  • 12

    Phase II: Develop a WatershedPriority Score (WPS)

    Using EPA’s Indicator Watershed ScoreIdentify Installation’s Watershed Using EPA

    Surf Your Watershed

    Pro

    toco

    l Ph

    ases

    http:// http:// www.www.epaepa..govgov//wateratlaswateratlas/geo//geo/maplistmaplist.html..html.

  • 13

    Phase III. Develop a TotalActivity Burden Score (TABS)

    § Identify Installation PhysicalCharacteristics§ Develop “Activity Impact Score”

    (AIS)§ Add WPS and AIS= TABS§ Develop Baseline and Prioritize

    Activities§ Integrate with GIS

    Pro

    toco

    l Ph

    ases

  • 14

    Sample GIS OutputValidation of Site Activities in Relationship

    to 303(d) Listed Impaired Waterbodies

    Watershed boundaries

    Significant ActivitiesImpaired waterbodies

  • 15

    Phase IV. Develop Solutions

    GoalGoal:Reduce Activity Impacts (TABS) to

    the greatest amount for the leastamount of cost

    ApproachApproach:Select Innovative Solutions That Are

    Low Cost, Low Maintenance &Effective in Reducing Pollutants in

    Water Bodies

    Pro

    toco

    l Ph

    ases

  • 16

    Phase V. Identify Partners

    Guidance for Potential PartnersGuidance for Potential Partners§ Regulators§ Citizens Groups§ Private Landowners

    Reasons for PartnershipsReasons for Partnerships§ Technical Expertise§ Provide Media Relations§ Support Educational Programs

    Pro

    toco

    l Ph

    ases

  • 17

    Phase VI. Implement Solutions,Track Progress & Reassess

    àTracking key performancemetricsàReducing installationenvironmental burden score

    Pro

    toco

    l Ph

    ases

    •Identify Funding Sources•Template for Project Sheets•Method for Tracking Progress

  • QUESTIONS?

    GEORGETTE MYERSUSAEC

    410-436-1218EMAIL: [email protected]