Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract...
3
Transcript of Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract...
![Page 1: Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract demand inclusive of existing demand withoui any upper limit will be dealt at Reaional](https://reader033.fdocuments.us/reader033/viewer/2022050422/5f91664c453897776b2ee2cf/html5/thumbnails/1.jpg)
![Page 2: Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract demand inclusive of existing demand withoui any upper limit will be dealt at Reaional](https://reader033.fdocuments.us/reader033/viewer/2022050422/5f91664c453897776b2ee2cf/html5/thumbnails/2.jpg)
![Page 3: Document1€¦ · Note: - To expedite the load sanction process, the loads above 10 M VA contract demand inclusive of existing demand withoui any upper limit will be dealt at Reaional](https://reader033.fdocuments.us/reader033/viewer/2022050422/5f91664c453897776b2ee2cf/html5/thumbnails/3.jpg)