Do you need to move your overhead electricity supply ? If so read our guide for the costs, timings, processes and how to apply ukpowernetworks .co.uk 0845 234 0040  I need to move the overhead power cable   attached to my house because I’m replac ing the guttering

description

c

Transcript of Do You Need to Move Your Overhead Power Supply

  • 5/21/2018 Do You Need to Move Your Overhead Power Supply

    1/4

    Do you need to move youroverhead electricity supply?

    If so read our guide for the costs,timings, processes and how to apply

    ukpowernetworks.co.uk

    0845 234 0040

    I need to move theoverhead power cableattachedto my house because Imreplacing the guttering

  • 5/21/2018 Do You Need to Move Your Overhead Power Supply

    2/4

    1 Is the power cable positionedhigher than three storeys ordifficult to reach?If so then wemay need to put up scaffoldingwhich will add costs.

    Price from 795

    2 Parking.Do you have a parking spacewe can use to get close to the powercable? If not there will be an extra costto arrange this with the council.

    Price from 30 - 300 per parking bay(dependent on council)

    3 Moving the position of the meter?There willbe an additional charge to relocate the service andremove the redundant equipment. You will need tocontact your electricity supplier to move the meter.

    Price from 200 to relocate service

    Price from 90 for your electricity supplier tomove the meter

    4 weeks

    This is an approximate time that

    the work could take from payment

    What next?

    Please proceed to next page to

    make an application

    I need to move theoverhead power cableattachedto my house because Im replacing

    the guttering

    5 Meter box.If youwant to move yourmeter position youmay require a newelectricity meter box.

    You can either buy thisyourself or ask us tobuy it for you.

    Price from: 40

    4 If you want to move your meterpositionyou will need to employ aqualified electrician who will charge you afee for any internal wir ing (e.g. fuse board).

    He will need to certify his work. Price from 200

    Price from 250*

    This is the approximate price tomove the position of your cable(bracket move). There may be someadditional costs. Please follow the5 steps below to find out whichadditional costs might affect you...

    250UK Power Networks standard cost from

    Costs from 1 to 5 on the diagram

    Probable total cost

    +

    If you are not sure about what

    your job might entail please give

    us a call on 0845 234 0040

    Please be aware that not all the above costs are payable to UK Power Networks.For example you would pay your electricity supplier and electrician separately.

    Please proceed to next page to make an application

    *Please note all our pr ices our exclusive of VAT.

  • 5/21/2018 Do You Need to Move Your Overhead Power Supply

    3/4

    Application form to move your overhead

    power cable

    If you have an overhead electricity supply, have gone through the stages outlined on previous page and want toapply to have your electricity supply moved, please complete your application here.

    Site details Where you need the work doneName: Company name:

    Address:

    Postcode: Email:

    Telephone: Mobile:

    Customer Correspondence details (if different from site address)Name: Company name:

    Address:

    Postcode: Email:

    Telephone: Mobile:

    How would you prefer to be contacted by us? Email Phone Letter

    When do you need the work completed? (This gives us an idea of your anticipated timescales) Month: Year:

    Would you like to receive your quote by email? Yes No

    Property detailsWhat is the type of property? If flat/maisonette, please state which floor level the work is on

    What is the main use for the property? Domestic Non-domestic

    Is there enough parking for two of our vans? Yes No

    Please make us aware of any issues restricting access to your site. For example, parking permits, double yellow lines etc.

    Your project

    What service do you need?

    I want the electricity cable that is currently attached to my house moved (bracket move). (see point A on diagram)

    Move your electricity meter and overhead power cable.

    Move your electricity meter and put your power cable underground.

    Description of the existing meter position: (e.g. In kitchen) ---------------------------------------------------------------------------------------

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Description of new meter position: (e.g. In box outside of kitchen) ------------------------------------------------------------------------

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Would you like us to provide a new electricity meter box? (see point B on diagram):

    If so, what type of meter box do you require? Surface mounted Built-in (normally new build)

    If the above criteria dont fit your project please call us on 0845 234 0040

    Please also include:To enable us to accurately quote your

    work we need a clear plan showingwhere your current electricity meter islocated. Where you want it moved to isreally important too.

    It would also help us if you could identifyyour site boundary and let us know ofany hazards or obstructions at site.

    Location map

    Site map

    Submitting your application

    Save this form then mail it to:[email protected]

    Print the form and post it to:Small Services Department,UK Power Networks, Metropolitan House,Darkes Lane, Potters Bar, Hertfordshire EN6 1AG

    or Fax it to: 08701 964133

    A

    B

    New meter position

    X

    Submit

    Colin Pickard

    91 Wivelsfield Road, Haywards Heath, West Sussex

    RH16 4EP [email protected]

    01444 411343 07966 070811

    March 2014

    House

    Meter is next to back door. Cable runs

    through the door frame.

    Cable needs relocating out of

    door frame so the door can be replaced

  • 5/21/2018 Do You Need to Move Your Overhead Power Supply

    4/4

    7

    6

    5

    4

    3

    2

    Enquiry and ApplicationOnce you have an understanding of the potential costsinvolved and are confident that you want to go ahead,please complete and submit an application form.

    QuotationHaving applied, we will provide you with a formal quotation.This will be valid for 90 days.

    PaymentWe require full payment before any work is started. Normallywe accept card payments, cheques, and BACS/CHAPS.

    When you pay we will appoint a co-ordinator who willsupport you in getting your connection delivered.

    Site visitWe will arrange a site visit to firm up plans. It is advisablefor you and your electrician and possibly your builder to bethere. Sometimes we might need to undertake a site visitbefore you have made payment.

    Agreeing datesWe may be able to provide dates for your work with you onsite. If we cant we will contact you to agree dates.

    Your on-site workYou will need to carry out any on-site works according to thedesign drawn up at your site visit. You also need to ensureyour electrician has completed all his works and prepared acertificate that your electricity supplier will want to see whenthey connect your meter.

    Making your connectionIf your new or altered supply requires us to carry out anyexcavations we will normally complete this one or two daysbefore the electrical works. It is helpful if your electrician isavailable on the day we complete the electrical works.

    Installing or moving your meterYou will need to arrange for your electricity supplier to fit ormove your electricity meter. You should give your electricitysupplier at least two weeks notice. If you have not arrangedmetering you will be without power. If you are having a new

    meter installed we will provide you with an MPAN numberto give to your electricity supplier.

    1

    Time to completeResponsibility

    Anticipated total time: 4 6 weeks(for simple works)

    8

    What next?

    Explaining the process

    2 5 days

    5 7 days

    15 20 days(for simple

    works)

    You

    Us

    You

    Us/You

    Us/You

    You

    You

    You &your

    electricity

    supplier

    UK Power Networks (Operations) Limited

    Registered office: Newington House, 237 Southwark Bridge Road, London SE1 6NP

    Registered number: 3870728 registered in England and Wales

    V1Jan2013