DMP Formwork Panel System

Transcript of DMP Formwork Panel System - Gael Form Ltd

Page 2: DMP Formwork Panel System - Gael Form Ltd

Table of Contents

General Instructions 2

Elementary Safety Warnings 2

DMP Panel In Detail 4

Adaptability 6

Connecting Panels 7

Bracing the panels 8

Vertical stacking of panels 9

Form-tie system 10

With DMP outside corner 11

Stripping corners & shaft formwork 12

Plumbing accessories 13

Pouring platforms with single brackets 14

Gael Form Refurbishment Service 17

Product Listing 18

Page 3: DMP Formwork Panel System - Gael Form Ltd

2

• This User Guide is reference

for those who will be working

with the DMP Panel system. It

contains information on how to

set up this system, and on its

correct utilization.

• The functional/technical

instructions, safety warnings

and loading data must all be

strictly observed and complied

with. Failure to comply with

these requirements may cause

accidents, injury and damage.

• The customer must ensure that

the User Guide is available to all

users and that they have been

made aware of it and can easily

access it.

• Always observe all industrial

safety regulations and other

safety rules applying to the

application and utilization of

our products in the country

and/or region in which you are

operating.

• All materials must be inspected

by the customer before use to

ensure that they are in perfect

condition. Any components

that are damaged, deformed,

or weakened due to wear,

corrosion or fatigue, must not

be used.

• DMP Formwork panels,

products and systems must be

set up in the correct manner to

ensure all loads are transferred

as per intended use.

• The stability of all components

and assemblies must be

ensured during all phases of the

construction work.

• Provide safe access for those

using the formwork.

• Do not exceed the permitted

fresh-concrete pressures.

Excessively high pouring rates

lead to formwork overload,

cause greater deflection and

risk causing breakage.

• Do not strike the formwork

until the concrete has reached

sufficient strength and have

been given the order for the

formwork to be struck.

• When stripping the gang-form,

never use the crane to break

concrete cohesion. Use suitable

tools such as timber wedges or

a special pry-bar.

• When striking the formwork,

do not endanger the stability

of any part of the structure, or

of any scaffolding, platforms or

formwork that is still in place.

• Observe all regulations applying

to the handling of formwork and

scaffolding.

• Remove any loose parts or

secure them in place.

• All components must be

stored safely.

General Instructions Compliant Utilisation

Elementary Safety Warnings

Page 4: DMP Formwork Panel System - Gael Form Ltd

3

Wall Formwork

Permitted pressure of the fresh concrete: 80kN/m2

• The DMP Panel System is the

ideal framed formwork for

large-area forming using the

crane.

• The high load-bearing capacity

and long lifespan of the DMP

Panel make it highly economical

for all wall-forming tasks.

• The panels can be joined

together at any point around the

frame, quickly and safely, using

the DMP Uni Formwork clamp

or the Adjustable clamp.

• The DMP panels have such

rigidity, you only need 2

form-ties per 2.70 m of panel

height. Any fitting-gaps left

between the panels are very

easy to close. The system

has numerous options for the

optimum length adjustment in

each case.

• DMP Panel System provides

solutions for corners, stop-end

column formwork and wall

junctions.

• Comprehensive range of panel

sizes available.

• Bespoke sizes can also be

manufactured to customer

specifications.

Page 5: DMP Formwork Panel System - Gael Form Ltd

4

Clean concrete surfaces with the thermoplastic sheet

The sheet consists of a combination of a traditional

plywood core and innovative thermoplastic coating.

This combination of materials ensures high numbers

of repeat uses, with superb concrete results every

time.

• High quality concrete finish.

• Less touching-up needed.

• Less cleaning work - the thermoplastic sheet

can also be cleaned using a high-pressure spray

cleaner.

• ●No breaking away of plywood chips, and less water

is absorbed through nail-holes.

• Screwed-on from the rear, so no screw marks are

visible.

DMP Panel In Detail

Page 6: DMP Formwork Panel System - Gael Form Ltd

5

• DMP panel.

• DMP wedge clamp.

• DMP universal waling.

• Diameter 25 m

• 32 mm

• 42 mm

Handy setting recess (insertion point for a pry-bar.)

The integrated handles make the formwork

easier to relocate.

Tie-rods are very easy to insert through the large,

conical form-tie sleeves.

Tie-rods 20.0mm may also be used (up to 80 kN/ m2).

Only 2 form-ties are needed for every 2.70 m of

panel height.

Quick Assembly of waling Components

Form-tie sleeves

Setting recess

Handles

Page 7: DMP Formwork Panel System - Gael Form Ltd

6

A 12.3cm

B DMP wedge clamp

C Squared timber

D Formwork sheet

E DMP Panel

Timber make up

The DMP panel system also allows for simple timber

make ups. The universal waling and wedge clamp

make it simple to join the panels to squared timbers

and ply sheets.

With universal adjustable clampSelf-aligning inter-panel connections and make up

The multifunction clamp jaw profile gives a

continuous clamping pressure on the panel profile;

meaning no additional bracing is required when

stacking panels up to 4m.

Joining the panels using the universal adjustable

clamp provides additional bracing of the gang-form

(as the clamp bears directly onto the profile).

More functions Inter-panel joints

Schematic representationAdaptability

• When used with the DMP panel system

permitted tensile force: 15.0 kN

permitted shear force: 9.0 kN

permitted moment: 0.9 kNm

Universal adjustable clamp:

Make up to 15 cm

Page 8: DMP Formwork Panel System - Gael Form Ltd

7

The universal formwork clamp & universal adjustable clamp

• Create fast, self-aligning and tension-proof joints.

• Have no loose parts.

• Are hard wearing for site use.

• Can be fixed using only a hammer.

Quick panel connectionsWith universal formwork clamp

The continuous profile in the panel frame means that

panels can be clamped together at any point.

Connecting Panels

• When used with the DMP panel system

permitted tensile force: 15.0 kN

permitted shear force: 6.0 kN

permitted moment: 0.5 kNm

Universal formwork clamp:

Height of Panel Number of Clamps

1.35 m 2

2.70 m 3

3.30 m 3

Upright Panels

Height of Panel Number of Clamps

0.30 m 1

0.45 m 1

0.60 m 2

0.90 m 2

1.35 m 2

Horizontal Panels

Page 9: DMP Formwork Panel System - Gael Form Ltd

8

DMP universal waling

When used with DMP panel system

Permitted moment (for vertical stacking of panels): 5.0

kNm.

Due to the max. tensile load of 14 kN in the waling

profile, even stiffer components such as multi-purpose

walings Ws10 Uni Waling are also subject to: Permitted

moment 5.0 kNm.

With closures, the universal walings bring the gang-

forms firmly into alignment and transfer the form-tie

forces to the framed panels. Using additional universal

walings gives gangforms better rigidity, especially in

higher vertically stacked configurations. This makes

it possible to pick up and set down large gang-forms

by crane without any problems. The additional universal

walings are also useful for transferring the loads from

platforms.

Note: Instead of the universal waling, it is also possible to

use a Multi-purpose waling.

Bracing the panelsDMP universal waling

How to attach using the universal wedge clamp

A DMP universal waling

B Universal wedge clamp

A DMP universal waling

C DMP Universal fixing bolt

D GF Plate

Using the DMP universal fixing bolt and Super- plate

Page 10: DMP Formwork Panel System - Gael Form Ltd

9

Formwork heights up to 4.05 m

On each inter-panel joint, 2 multi-function clamps are attached for each

panel (max. 1.35 m).

Formwork heights up to 5.40 m

On each inter-panel joint, 1 universal waling and 2 Universal adjustment

clamps are attached for each panel (max. 1.35 m).

Formwork heights up to 8.10 m

On each inter-panel joint, 1 universal waling and 2 universal adjustment

clamps are attached for each panel (max. 1.35 m).

Positions of the interconnecting and form-tie components and accessories needed for:• Lifting and setting down

• Crane-handling

• Platform loads

• Pouring

Rules for vertical stacking of panelsWith universal adjustment clamp

Vertical stacking of panels

permitted tensile force: 15.0 kN

permitted shear force: 6.0 kN

permitted moment: 0.5 kNm

Universal formwork clamp:

permitted tensile force: 15.0 kN

permitted shear force: 9.0 kN

permitted moment: 0.9 kNm

Values apply only when mounted on profile

Universal adjustment clamp:

With universal formwork clamp.

A Form-tie 15.0 mm

+ plate 15.0

B Universal Formwork

Clamp

C Universal Adjustment

Clamp

D DMP universal waling

E DMP wedge clamp

Page 11: DMP Formwork Panel System - Gael Form Ltd

10

A Tie-rod 20.0mm

B GF Plate 20.0

C Plastic tube 32mm

D Universal cone 32mm

A Tie-rod 15.0mm

B GF Plate 15.00

C Plastic tube 22mm

D Universal cone 22mm

The “Plastic tubes 22 mm” that are left behind in the

concrete are sealed off with Plugs 22 mm.

In general:

Fix a form-tie in every form-tie sleeve that is not

covered over by a super-plate.

Always tie in the bigger (wider) of the two panels.

For exceptions, see the sections headed “Length

adjustment using closures” and “Vertical stacking

of panels”.

Form-tie system 15mm

Form-tie system 20.0

For high formwork pressures of up to 80 kN/m2,

use the Form-tie system 20.0 mm.

Seal off uneeded form-tie sleeves with

Universal plugs.

Form-tie systemPlacing form-ties in the frame profile

Permitted load with safety factor

of 1.6: 120 kN

Permitted load to DIN 18216: 90 kN

Tie-rod 15.0mm:

Permitted load, allowing a 1.6:

1 factor of safety: 220 kN

Permitted load to DIN 18216: 150 kN

Tie-rod 20.0mm:

Only use approved tie-rodsNever weld or heat tie-rods.!

Page 12: DMP Formwork Panel System - Gael Form Ltd

11

The DMP outside corner is an easy way of forming corners.

With DMP outside corner

A DMP panel

B DMP outside corner

C DMP wedge bolt

D DMP tensioning wedge

a) 40 cm

b) 30 cm

A DMP outside corner

B DMP inside corner

C DMP Universal Formwork Clamp

D DMP Universal Adjustable Clamp

E DMP Universal waling

F DMP wedge clamp

G Fitting timber

H DMP panel 0.60m

Height of outisde corner Number of Clamps

1.35 m 4

2.70 m 8

3.30 m 10

Number of universal formwork clamps needed:

b

For concrete pressures of over 60 kN/m2 or wall

thicknesses of over 40 cm, wedge bolts and

tensioning wedges must be used instead of

quick-acting clamps.

Page 13: DMP Formwork Panel System - Gael Form Ltd

12

Shaft formwork with Stripping corner

The DMP stripping corner is

manufactured specifically for use

with shaft formwork. With the

DMP stripping corner, the entire

DMP formwork unit is detached

from the wall, in one piece, and

repositioned with the aid of a

DMP lifting hook and a

four-part lifting tackle.

Vertically stacking the Stripping corner:• Pull out the coupling bolt (A).

• Manoeuvre the Stripping corner (B) into place so that it is flush with

the one below it.

• Push the coupling bolt (A) back in.

• Bolt the Stripping corners together with 2 hex- agonal bolts M16x45 (C).

Mounting the DMP stripping spindle:• ●Place the spindle (A) on the push-rod (C).

• ●Position the nut (D) between the holes in the push-rod and bolt in

place with the fastening clamp (B).

Operating the spindle:• ●Stripping = Turn the nut anti-clockwise.

• ●Erecting = Turn the nut clockwise.

In order to obtain the full available stripping- play, make sure that the DMP universal formwork clamp are mounted at staggered heights (i.e. not opposite one another).

Stripping corners & shaft formwork

Height of the Stripping Number of Clamps

1.35 m 4

2.70 m 6

3.30 m 8

Number of DMP universal formwork clamp needed:

A DMP stripping corner

B DMP stripping spindle

Product features:

• No negative impression in the

concrete.

• Formwork erection and stripping

function integrated in the inside

corner.

• Using the Stripping spindle.

• With no need for the crane.

• The entire shaft formwork is

repositioned in one piece.

Page 14: DMP Formwork Panel System - Gael Form Ltd

13

Formwork height (M)

Panel strut Europrop 20 550/ Adjustable plumbing strut340 540

4. 1*

5. 1

6. 1 1

7. 1 2

8. 1 1

Max. anchoring load: 153.5 kN

Number of struts per 2.70m width of gang-form

Fixing to the ground

Anchor the plumbing

accessories in such a way

as to resist tensile and

compressive forces.

A ø 26 mmB ø18 mmC ø 28 mmD ø 18 mmE Slotted hole

ø 18x38mmF ø 35 mm

* Up to a height of 3.30 m, the spacing of the props

can be extended to 4.05 m apart.

The values given here apply up to a height of 8 m

above the surrounding ground. For heights of more

than 8 m, the correct spacing of the props must be

calculated as required by the higher wind loads.

Plumbing accessories

IMPORTANT NOTE: The formwork elements must be held stable in every phase of the construction work! Please observe all applicable safety regulations.

!

Connection in the waling profile

NOTE: Every gang-form must be supported by

at least 2 panel struts.

Example: Where the formwork height is 7.20 m,

the following are needed for every 5.40 m wide

gang-form:

• 2 Panel struts 340

• 4 Panel struts 540

Follow the manufacturer’s applicable

fitting instructions.

Required load-bearing capacity of alternative dowels: min. 13.5 kNPanel struts, Europrop

20 550 and Adjustable plumbing struts

Secure the elements against wind loads, and make it

easier to plumb and align the formwork.

Page 15: DMP Formwork Panel System - Gael Form Ltd

14

The DMP brackets 90 and/or DMP GF platforms

enable you to assemble pouring platforms that can

easily be mounted by hand.

Preconditions for use:Only fix the pouring platform onto formwork

constructions that are sufficiently stable to transfer

the expected loads.

Shore the formwork in a windproof manner when

erecting it and when it is temporarily placed in the

standing position.

Ensure that the formwork gang has sufficient stiffness.

Observe all applicable safety regulations.

DMP bracket 90

With the DMP bracket 90, pouring platforms

with a platform width of 90 cm can

be assembled.

b) 87 cmh) 103 cm

Pouring platforms with single brackets

Permitted live load: 1.5 kN/m2 (150 kg/m2)

Load Class 2 to EN 12811-1:2003 Max.

influence width: 2.00 m

Page 16: DMP Formwork Panel System - Gael Form Ltd

15

Using Scaffolding tubes

Tools: Fork spanner 22 for mounting the

couplers and scaffolding tubes.

A Scaffold tube connector

B Scaffolding tube 48.3mm

C Screw-on couplers 48mm 50

D Hexagon screw M14x70 + hexagon nut M14

(not included in scope of supply)

Deck-boards and guard- rail boards:

Per 1 metre length of platform, 0.9 m2 of deck-

boards and 0.6 m2 of guard-rail boards are

needed (in-situ).

Plank thicknesses for support centres of up to

2.50 m:

• Deck-boards min. 20/5 cm.

• Guard-rail boards min. 20/3 cm.

Fastening the deck-boards:

With 5 square bolts M 10x120 per bracket (not

included in scope of supply).

Page 17: DMP Formwork Panel System - Gael Form Ltd

16

A DMP bracket 90

B Spring cotter

C Wedge bolt

POSSIBLE WAYS OF FIXING

In the frame profile

In the cross profile

In the cross profile on horizontal panels

C

A

B

B

A

Page 18: DMP Formwork Panel System - Gael Form Ltd

17

Gael Form Refurbishment ServiceSo that your formwork is in “top form” for its next assignment

Inspecting, cleaning and

maintaining your DMP framed

formwork - all tasks that Gael

Forms Reconditioning Service

will be pleased to take off your

hands. Its highly qualified staff and

special equipment will quickly get

your formwork back in top form -

quickly and economically.

The advantage for you: You always have formwork

that is ready for use, and also

extend the service life of your

equipment.

What’s more: It is only with well-

maintained formwork that you

will achieve the desired quality of

concrete surface.

In our modern plants, your

formwork will be carefully

cleaned using energy-saving

and environmentally sound

technology.

The panels are then inspected for

damage and dimensional accuracy

and overhauled where necessary.

Any damaged form-facing is

repaired, or - if necessary replaced.

Page 20: DMP Formwork Panel System - Gael Form Ltd

19

Page 22: DMP Formwork Panel System - Gael Form Ltd

21

Page 24: DMP Formwork Panel System - Gael Form Ltd

23

Page 26: DMP Formwork Panel System - Gael Form Ltd

25

Page 28: DMP Formwork Panel System - Gael Form Ltd

www.gaelform.comwww.gaelform.com

300321

ABOUT US

Gael Form is a leading international manufacturer and distributor of high-quality new and used formwork solutions used within the global construction industry.

We proudly operate from a 20-acre state-of-the art facility, where our products are manufactured and shipped globally to 3 continents and are used across a wide variety of infrastructure projects such as high-rise buildings, stadiums, bridges, tunnels, airports, seaports, mines and power plants.

At Gael Form Ltd, we pride ourselves on being a Guaranteed Irish company. This means that all of our formwork panel products and systems are manufactured in Ireland. All products are rigorously tested and certified to industry standards.

HEAD OFFICEBallivor,

Co. Meath,C15 HK09.

P:+353 (0) 46 954 6210

UK OFFICEUnit 2, Beckingham Business Park,

Beckingam Street, Tolleshunt Major,

CM9 8LZ, United Kingdom. P: +44 (0)1621 868 329