PROJECT CURING

Transcript of DMAIC- Communication - Curing new

Page 1: DMAIC- Communication - Curing new

PROJECT CURING

Page 2: DMAIC- Communication - Curing new

2

Project CharterCommunication

Objective: To improve the Curing performance and features to make process more reliable with conformance and durability through better service, aesthetics and to ensure its sustainability.

D M A I C

Performance:The performance of Curing can be improved by adopting the following steps:

1- Production Target on daily basis.2- Cost reduction can be achieved by enhancing output, on-time preventive maintenance, control fabric mixing and wastage control.3- The best quality can be achieved when we have no stoppages, follow 5S theory and motivation of workers .4-Follow the sequence of program of ready to cure fabric according to FIFO method.5- Should maintain record keeping.

Page 3: DMAIC- Communication - Curing new

DEFINE PHASE

Page 4: DMAIC- Communication - Curing new

1-Travel cards are not properly attached with batchers and trolleys.

Challenges faced in curing are listed below:

2- Mix fabric

3-Provide unidentified fabric to Finishing & washing.4-Mis-management in handling of batchers and trolleys.5-House keeping issue.

6-Registers are not properly maintained.7-Overlapping of curing fabric on RFP fabric.

8- Different Width

Page 5: DMAIC- Communication - Curing new

MEASURE

Page 6: DMAIC- Communication - Curing new

- Do not have receiving procedure of fabric from Previous department-Do not have production target on daily basis.-Workers are not properly trained.-Same number on two different batchers.

Page 7: DMAIC- Communication - Curing new

ANALYZE

Page 8: DMAIC- Communication - Curing new
Page 9: DMAIC- Communication - Curing new
Page 10: DMAIC- Communication - Curing new

TRACIBILITY OF ACTIVITIES THROUGH PRIMAVERA P6

Page 11: DMAIC- Communication - Curing new

IMPROVE

Page 12: DMAIC- Communication - Curing new

RECEIVED BATCHERS WITH TRAVEL CARDS

NO MIX FABRICRECEIVED & SEND STITCHED FABRIC

MANAGEMENT OF BATCHERS & TROLLEYS

HOUSE KEEPINGPROPER RECORD KEEPINGSAME WIDTHPRODUCTION TARGET OF CURINGRECEIVE PRODUCTION TARGET ON DAILY BASISFABRIC RECEIVING FORM FROM PRINTING DEPARTMENT

Page 13: DMAIC- Communication - Curing new

TRAINING OF STAFFShift: A, B, C

• We provided training about the nature of working and how to improve their skills.

• Trained them how to work in a team and organized way.• Provided them the knowledge of housekeeping and motivated them to

work in a neat and clean environment.• Arranged lectures on safety and made them understand how much safety

is important.

30th May, 20151st June, 201518th June, 2015

Page 14: DMAIC- Communication - Curing new

15th June, 2015 ASSESSMENT THROUGH EVALUATION FORM Provided trainings to curing department of different shifts and assessed

them through evaluation form.

Page 15: DMAIC- Communication - Curing new

5th June, 2015 MAINTENANCE OF TROLLEYS Most of the trolleys were without wheels and some were in a very bad

condition. List of the repaired trolleys are given below.

Page 16: DMAIC- Communication - Curing new

8th June, 2015 ARRANGEMENT OF WIRES It was observed that Electrical wires on Arioli were exposed to

environment. Then they were covered properly by taking help from maintenance department.

Before After

Page 17: DMAIC- Communication - Curing new

19th June,2015 PROBLEM IN GUIDER OF ARIOLI• Maintenance of guider.

BEFORE AFTER

Page 18: DMAIC- Communication - Curing new

5S IMPLEMENTATION• Implementation of 5S is our next target:

SORT (July 11 – Aug 11):

Remove unnecessary items and dispose them properly Make work easier by eliminating obstacles Reduce chance of being disturbed with unnecessary items Segregate unwanted material from the workplaceDefine a red-tagged area to keep those unnecessary items

Page 19: DMAIC- Communication - Curing new

SET (Aug 12 – Sep 12) Arrange all necessary items so they can be easily selected for

use Make it easy to find and pick up necessary items All above work should be done on regular basis

Page 20: DMAIC- Communication - Curing new

SHINE (Sep 14- Sep 30)

Clean workplace completely Prevent machinery and equipment deterioration Keep workplace safe and easy to work Need fully skilled supervisor for checking on regular basis

Page 21: DMAIC- Communication - Curing new

STANDARDIZE (Oct 01 – Oct 15)

Maintain standards of housekeeping and workplace organization at all times.

Maintain orderliness. Maintain everything in order and according to its standard. Everything in its right place.

Every process has a standard.

Page 22: DMAIC- Communication - Curing new

SUSTAIN (Oct 16- cont.)

Perform regular audits Training and Discipline Training is goal oriented process. Maintenance Feedback & Evaluation form.

Page 23: DMAIC- Communication - Curing new

CONTROL

Page 24: DMAIC- Communication - Curing new

RECEIVING PROCEDURE & 1st June, 2015 PRODUCTION TARGET

Implemented procedure of fabric receiving report from Printing Department. Implemented production target report on daily basis in Curing department to monitor the progress of Curing Department.

Page 25: DMAIC- Communication - Curing new

6th June, 2015 FEEDBACK FORM

Developed feedback form and provided it to Finishing ,Kuster washing and Curing department.

Page 26: DMAIC- Communication - Curing new

EVALUATION FORM• Assessed the performance of workers through evaluation form.

Page 27: DMAIC- Communication - Curing new

25th June,2015 PROVIDE STOPPAGE FORM• To obtain the zero downtime of breakdowns and other stoppages, developed

stoppage form .

Page 28: DMAIC- Communication - Curing new

Phase Complete DateDefine 18/05/2015Measure 19/05/2015Analyze 20/05/2015Improve 01/06/2015Control 06/06/2015 Approved

Status: On track At Risk Delayed

Restriction of fabric receiving without Travel cards Control of Mixed Fabric from printing and curing ..Optimize Sample testing procedure. Implementation of proper receiving procedure of printed fabric Controlling of unidentified fabric from Printing and Curing.Prepare KPIHouse KeepingProper handling of Batchers and trolleysTraining of workers on daily basisStoppage ReductionMaintenance related downtime5S ImplementationSafety shoes and Uniform

Project Plan Projected Benefits

Better performance

More efficient working

Wastage control

Cost Reduction

Quality improvement

Project Status

Page 29: DMAIC- Communication - Curing new

ACHIEVEMENTS

Page 30: DMAIC- Communication - Curing new

Highest production. Zero downtime of Trolley waiting Zero downtime of Batchers waiting. Reduction of Selvedge cut fault by avoiding fabric mixing. Trolleys repaired Identified and Stitched fabric Better House keeping through 5S. Stoppage Reduction Feed back & Improvement Training and Evaluation