DOCKLANDS LIGHT RAILWAY – CITY AIRPORT EXTENSION (DEC 2005)
Facts & FiguresMain Contractor – Amec Spie RailProject Value - £6mConstruction of:4.5km viaductNew Stations including:• West Silvertown• Pontoon Dock• London City Airport
2PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 3: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/3.jpg)
SITE OPERATION - PRE-CAST YARD
OverviewSite located at: Dock Road, Canning Town. London E16.• Office facilities & factory set up
on site.• Manufacture of the various
concrete products.
3PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 4: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/4.jpg)
4
CIVIL ENGINEERING
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 5: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/5.jpg)
SITE OPERATION – CONSTRUCTING THE VIADUCT
5PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 6: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/6.jpg)
SITE OPERATION – CONSTRUCTING THE VIADUCT
Constructing the viaductThe viaduct segments were cast on site, stored & installed over the first phase of the project duration.
Services.Cable penetrations for services were catered for to eliminate any external fastening to the structure.
Alignment.This was essential & each segment was moulded from the previous section to ensure an exact fit.
6PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 7: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/7.jpg)
THAMES WHARF VIADUCT
7PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 8: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/8.jpg)
TRANSITION SLAB
8PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 9: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/9.jpg)
9
TRACK BED PREPERATION
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 10: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/10.jpg)
TRACK BED CONSTRUCTION
10
Permanent Way installation could take place once the viaduct was assembled.Various light rail components were utilised.Preparation was key.• Resourcing.• Logistics (delivery).• Availability of products.• Storage.
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 11: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/11.jpg)
TRACK BED CONSTRUCTION
11
Permanent Way installation could take place once the viaduct was assembled.Various light rail components were utilised.Preparation was key.• Resourcing.• Logistics (delivery).• Availability of products.• Storage.
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
Drainage
![Page 12: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/12.jpg)
TRACK BED PREPARATION - SCABBLING
12
• Scabbling of the concrete surface was part of the preparation works.
• This would provide the ideal base for the grout that was going to be installed.
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 13: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/13.jpg)
TRACK BED PREPARATION - SCABBLING
13
• Scabbling of the concrete surface was part of the preparation works.
• This would provide the ideal base for the grout that was going to be installed.
• Working in a controlled fashion although a manual process a template was used.
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 14: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/14.jpg)
TRACK BED PREPARATION - SCABBLING
14
• Scabbling of the concrete surface was part of the preparation works.
• This would provide the ideal base for the grout that was going to be installed.
• Working in a controlled fashion although a manual process a template was used.
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 15: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/15.jpg)
TRACKWORK PREPARATION
Component parts laid out.On both the curved track & straight.
15PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 16: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/16.jpg)
TRACKWORK PREPARATION
Track geometryTrackwork set up to represent the initial layout.
16PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 17: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/17.jpg)
TRACKWORK PREPARATION – PANDROL VIPA BASEPLATE
Plain line track assembly• Pandrol Vipa 2 hole baseplate was used.
• Shown here suspended from the rail above the prepared ‘scabbled’ concrete.
17PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 18: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/18.jpg)
18
ANCHOR TESTING
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 19: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/19.jpg)
TRACKWORK – ANCHOR PROOF TESTING
Anchor testing (70kN)• 5 different chemical anchors tested with an M24 anchor.
– Injectable resin & Capsule.• Results were quite ‘variable’…….• Bond failure in some cases.
19PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 20: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/20.jpg)
TRACKWORK – ANCHOR PROOF TESTING
Anchor testing.• 2 Hilti chemical anchor variants were tested with Hilti HRT anchors:
– Injectable resin (RE500) & Capsule (HVU).• Concrete cone failure was the mode of failure.• 150kN achieved (RE).
20PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 21: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/21.jpg)
TRACKWORK – ANCHOR PROOF TESTING
Replication of ‘poor workmanship’.• 28mm Dia. holes were drilled. Holes were filled with water.
– Hilti Injectable resin (RE500) was installed into the holes with standing water.• Once cured, the anchors were tested.
21PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 22: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/22.jpg)
TRACKWORK – INTERNAL/INDEPENDENT ANCHOR TESTING
Test Reports.
Internal (Schaan)• 3m cycles.
External• TUM submitted.• Joseff Eisenmann.
22PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 23: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/23.jpg)
TRACKWORK – HOLE CLEANING
Anchor hole cleaningEssential for when using chemical anchors.
23PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 24: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/24.jpg)
24
DRILLING TRIALS
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 25: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/25.jpg)
TRACKWORK – DRILLING TRIALS
Options for drilling holes for holding down bolts.• Diamond drilling (DD150 & DD200).
• Percussive (TE80).
25PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 26: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/26.jpg)
TRACKWORK – DRILLING METHOD CONFIRMED
Preference Hilti ‘rig mounted’ drilling wagon.• Perpendicular to slab.• Percussive Hilti TE80 drill with TE-YX 28 drill bits were attached (x 2).
– Reduced HAV’s.• Depth stop was attached to prevent over drilling & minimize resin wastage.
26PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 27: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/27.jpg)
TRACKWORK – DRILLING METHOD CONFIRMED
Preference Hilti ‘rig mounted’ drilling wagon.• Perpendicular to slab.• Percussive Hilti TE80 drill with TE-YX 28 drill bits were attached (x 2).
– Reduced HAV’s.• Depth stop was attached to prevent over drilling & minimize resin wastage.• Drilling jig used.
27PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 28: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/28.jpg)
28
VIBRATION TESTING
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 29: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/29.jpg)
TRACKWORK – VIBRATION TESTING
Testing set up.• Wired up to rig.• Vibration measured over several trials.• Results ave. 7ms2.
29PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 30: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/30.jpg)
30
TRACKWORK INSTALLATION
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 31: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/31.jpg)
TRACKWORK INSTALLATION – PART 1 (HOLDING DOWN BOLTS)
Installation of M24 holding down bolts• Using Hilti RE500 injectable resin.• Piston Plugs were also supplied.• P8000 pneumatic dispenser.
– Dosage meter.31PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 32: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/32.jpg)
TRACKWORK INSTALLATION – PART 2 (GROUT BED)
Grout bed installation• Shuttering applied confirming ‘footprint’.
• For inclement weather, covering was used.
32PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 33: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/33.jpg)
TRACKWORK INSTALLATION – PART 2 (GROUT BED)
Grout bed installation• Grout mixed & applied.• Plasticine used to prevent any overflow.• Sand around the base.
33PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 34: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/34.jpg)
34
ADDITIONAL P. WAY COMPONENTRY
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 35: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/35.jpg)
TRACKWORK – S. & C. COMPONENTRY
S. & C. Baseplate• Cologne Egg 4-hole baseplate was specified.• Installed with Hilti RE500 injectable resin.
35PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 36: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/36.jpg)
TRACKWORK – ADDITIONAL COMPONENTRY
36PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 37: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/37.jpg)
TRACKWORK – ADDITIONAL COMPONENTRY
Third Rail• Brecknell Willis system deployed in pre-cast spacing.• ‘Pick up’ from the underside.• Fastening ‘cast in’.
37PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 38: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/38.jpg)
38
ANCHOR INTEGRITY
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 39: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/39.jpg)
TRACKWORK – ANCHOR INTEGRITY
Testing & Recording• 5% of anchors tested.• Independent Company used.
– Sheer load recorded.39PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 40: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/40.jpg)
40
STATION WORKS
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 41: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/41.jpg)
DOCKLANDS LIGHT RAILWAY – CITY AIRPORT EXTENSION (DEC 2005)
Station ConstructionSilver Town & Pontoon Dock
Presentation title | Month 202x 41
![Page 42: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/42.jpg)
42
SUMMARY
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 43: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/43.jpg)
DLR CITY AIRPORT EXTENSION – TRACKWORK SUMMARY• 80Lb Rail used.• Plain line.
– Pandrol Vipa 2-hole baseplate.• S. & C.
– Cologne Egg 4-hole baseplate• Drilling wagons & Hilti TE80’s with TE-YX
28/81 drill bits.• Hilti RE500 (1400ml) injectable resin.• M24 HDG Holding down bolts.• Grout – SBD Epoxy plus.• Third Rail – Brecknell Willis
43PWI Ashford Section Mtg – Colin Burnikell | Feb 2021
![Page 44: DLR CITY AIRPORT EXT.](https://reader031.fdocuments.us/reader031/viewer/2022012410/616a644d11a7b741a351fcd8/html5/thumbnails/44.jpg)
PWI Ashford Section Mtg – Colin Burnikell | Feb 2021 44