DIVISION - Utah · 'apiwellno:43013503920000''apiwellno:43013503920000' t4s, r2w, u.s.b.&m. nerd...

55
STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL, GAS AND MINING APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUMBER Ute Tribal 13-18-4-2 2. TYPE OF WORK DRILL NEW WELL REENTER P&A WELL DEEPEN WELL 3. FIELD OR WILDCAT UNDESIGNATED 4. TYPE OF WELL Oil Well Coalbed Methane Well: NO 5. UNIT or COMMUNITIZATION AGREEMENT NAME 6. NAME OF OPERATOR NEWFIELD PRODUCTION COMPANY 7. OPERATOR PHONE 435 646-4825 8. ADDRESS OF OPERATOR Rt 3 Box 3630 , Myton, UT, 84052 9. OPERATOR E-MAIL [email protected] 10. MINERAL LEASE NUMBER (FEDERAL, INDIAN, OR STATE) 2OG0005609 11. MINERAL OWNERSHIP FEDERAL INDIAN STATE FEE 12. SURFACE OWNERSHIP FEDERAL INDIAN STATE FEE 13. NAME OF SURFACE OWNER (if box 12 = 'fee') Todd and Camille Moon 14. SURFACE OWNER PHONE (if box 12 = 'fee') 15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') Route 3 Box 3622, Myton, UT 84052 16. SURFACE OWNER E-MAIL (if box 12 = 'fee') 17. INDIAN ALLOTTEE OR TRIBE NAME (if box 12 = 'INDIAN') 18. INTEND TO COMMINGLE PRODUCTION FROM MULTIPLE FORMATIONS YES (Submit Commingling Application) NO 19. SLANT VERTICAL DIRECTIONAL HORIZONTAL 20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN LOCATION AT SURFACE 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U Top of Uppermost Producing Zone 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U At Total Depth 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U 21. COUNTY DUCHESNE 22. DISTANCE TO NEAREST LEASE LINE (Feet) 638 23. NUMBER OF ACRES IN DRILLING UNIT 40 25. DISTANCE TO NEAREST WELL IN SAME POOL (Applied For Drilling or Completed) 1302 26. PROPOSED DEPTH MD: 7470 TVD: 7470 27. ELEVATION - GROUND LEVEL 5540 28. BOND NUMBER RLB0010462 29. SOURCE OF DRILLING WATER / WATER RIGHTS APPROVAL NUMBER IF APPLICABLE 43-7478 ATTACHMENTS VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY DRILLED) TOPOGRAPHICAL MAP NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825 SIGNATURE DATE 06/04/2010 EMAIL [email protected] API NUMBER ASSIGNED 43013503920000 Permit Manager APPROVAL FORM 3 AMENDED REPORT API Well No: 43013503920000 Received: 6/4/2010 API Well No: 43013503920000 Received: 6/4/2010 FORM 3 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES AMENDED REPORT DIVISION OF OIL, GAS AND MINING APPLICATION FOR PERMIT TO DRILL 1. WELL NAME andUt T ban3-18-4-2 2. TYPE OF WORK 3. FIELD OR WILDCAT DRILL NEW WELL REENTER P&A WELL DEEPEN WELL UNDESIGNATED 4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAME Oil Well Coalbed Methane Well: NO 6. NAME OF OPERATOR 7. OPERATOR PHONE NEWFIELD PRODUCTION COMPANY 435 646-4825 8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL Rt 3 Bo× 3630 , Myton, UT, 84052 [email protected] 10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP (FEDERAL, INDIAN, O2ROSTOAO 609 FEDERAL INDIAN STATE FEE FEDERAL INDIAN STATE I FEE I 13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee') Todd and Camille Moon 15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee') Route 3 Bo× 3622, Myton, UT 84052 17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT (if box 12 = 'INDIAN') MULTIPLE FORMATIONS YES I (Submit Commingling Application) NO l' VERTICALI DIRECTIONAL I HORIZONTAL 20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN LOCATION AT SURFACE 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U Top of Uppermost Producing Zone 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U At Total Depth 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U 21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNIT DUCHESNE 638 40 25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH (Applied For Drilling or Completed) MD: 7470 TVD: 7470 1302 27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER / WATER RIGHTS APPROVAL NUMBER IF APPLICABLE 5540 RLBOO10462 43-7478 ATTACHMENTS VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN [2 AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP DRILLED) NAME Mandle Crozier TITLE Regulatory Tech PHONE 435 646-4825 SIGNATURE DATE 06/04/2010 EMAIL [email protected] API NUMBER ASSIGNED APPROVAL 43013503920000 Permit API Well No: 43013503920000 Received 6/4/2010 EORM 3 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES AMENDED REPORT DIVISION OF OIL, GAS AND MINING APPLICATION FOR PERMIT TO DRILL 1. WELL NAME andUt T ba 3-18-4-2 2. TYPE OF WORK 3. FIELD OR WILDCAT DRILL NEW WELL REENTER P&A WELL DEEPEN WELL UNDESIGNATED 4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAME Oil Well Coalbed Methane Well: NO 6. NAME OF OPERATOR 7. OPERATOR PHONE NEWFIELD PRODUCTION COMPANY 435 646-4825 8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL Rt 3 Box 3630 , Myton, UT, 84052 [email protected] 10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP (FEDERAL, INDIAN, O2RSTOAO 609 FEDERAL INDIAN STATE FEE FEDERAL INDIAN STATE I FEE I 13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee') Todd and Camille Moon 15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee') Route 3 Box 3622, Myton, UT 84052 17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT (if box 12 = 'INDIAN') MULTIPLE FORMATIONS YES I (Submit Commingling Application) NO l' VERTICALI DIRECTIONAL I HORIZONTAL 20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN LOCATION AT SURFACE 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U Top of Uppermost Producing Zone 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U At Total Depth 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U 21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNIT DUCHESNE 638 40 25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH (Applied For Drilling or Completed) MD: 7470 TVD: 7470 1302 27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER / WATER RIGHTS APPROVAL NUMBER IF APPLICABLE 5540 RLBOO10462 43-7478 ATTACHMENTS VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN [2 AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP DRILLED) NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825 SIGNATURE DATE 06/04/2010 EMAIL [email protected] API NUMBER ASSIGNED APPROVAL 43013503920000 Permit

Transcript of DIVISION - Utah · 'apiwellno:43013503920000''apiwellno:43013503920000' t4s, r2w, u.s.b.&m. nerd...

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUMBER

Ute Tribal 13-18-4-2

2. TYPE OF WORK

DRILL NEW WELL REENTER P&A WELL DEEPEN WELL 3. FIELD OR WILDCAT

UNDESIGNATED

4. TYPE OF WELLOil Well Coalbed Methane Well: NO

5. UNIT or COMMUNITIZATION AGREEMENT NAME

6. NAME OF OPERATORNEWFIELD PRODUCTION COMPANY

7. OPERATOR PHONE435 646-4825

8. ADDRESS OF OPERATORRt 3 Box 3630 , Myton, UT, 84052

9. OPERATOR [email protected]

10. MINERAL LEASE NUMBER(FEDERAL, INDIAN, OR STATE)

2OG0005609

11. MINERAL OWNERSHIP

FEDERAL INDIAN STATE FEE 12. SURFACE OWNERSHIP

FEDERAL INDIAN STATE FEE

13. NAME OF SURFACE OWNER (if box 12 = 'fee')Todd and Camille Moon

14. SURFACE OWNER PHONE (if box 12 = 'fee')

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee')Route 3 Box 3622, Myton, UT 84052

16. SURFACE OWNER E-MAIL (if box 12 = 'fee')

17. INDIAN ALLOTTEE OR TRIBE NAME(if box 12 = 'INDIAN')

18. INTEND TO COMMINGLE PRODUCTION FROMMULTIPLE FORMATIONS

YES (Submit Commingling Application) NO

19. SLANT

VERTICAL DIRECTIONAL HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

Top of Uppermost Producing Zone 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

At Total Depth 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

21. COUNTYDUCHESNE

22. DISTANCE TO NEAREST LEASE LINE (Feet)638

23. NUMBER OF ACRES IN DRILLING UNIT40

25. DISTANCE TO NEAREST WELL IN SAME POOL(Applied For Drilling or Completed)

1302

26. PROPOSED DEPTHMD: 7470 TVD: 7470

27. ELEVATION - GROUND LEVEL

5540

28. BOND NUMBER

RLB0010462

29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

43-7478

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY

DRILLED)

TOPOGRAPHICAL MAP

NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825

SIGNATURE DATE 06/04/2010 EMAIL [email protected]

API NUMBER ASSIGNED

43013503920000

Permit Manager

APPROVAL

FORM 3

AMENDED REPORT

API Well No: 43013503920000 Received: 6/4/2010API Well No: 43013503920000 Received: 6/4/2010

FORM 3STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME andUtT ban3-18-4-2

2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL UNDESIGNATED

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO

6. NAME OF OPERATOR 7. OPERATOR PHONENEWFIELD PRODUCTION COMPANY 435 646-4825

8. ADDRESS OF OPERATOR 9. OPERATOR E-MAILRt 3 Bo× 3630 , Myton, UT, 84052 [email protected]

10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, O2ROSTOAO

609 FEDERAL INDIAN STATE FEE FEDERAL INDIAN STATE I FEE I

13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')Todd and Camille Moon

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')Route 3 Bo× 3622, Myton, UT 84052

17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT

(if box 12 = 'INDIAN')MULTIPLE FORMATIONS

YES I (Submit Commingling Application) NO l' VERTICALI DIRECTIONAL I HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

Top of Uppermost Producing Zone 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

At Total Depth 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITDUCHESNE 638 40

25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 7470 TVD: 74701302

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

5540 RLBOO10462 43-7478

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

[2 AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAPDRILLED)

NAME Mandle Crozier TITLE Regulatory Tech PHONE 435 646-4825

SIGNATURE DATE 06/04/2010 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL

43013503920000

Permit

API Well No: 43013503920000 Received 6/4/2010

EORM 3STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME andUtT ba 3-18-4-2

2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL UNDESIGNATED

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO

6. NAME OF OPERATOR 7. OPERATOR PHONENEWFIELD PRODUCTION COMPANY 435 646-4825

8. ADDRESS OF OPERATOR 9. OPERATOR E-MAILRt 3 Box 3630 , Myton, UT, 84052 [email protected]

10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, O2RSTOAO

609 FEDERAL INDIAN STATE FEE FEDERAL INDIAN STATE I FEE I

13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')Todd and Camille Moon

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')Route 3 Box 3622, Myton, UT 84052

17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT

(if box 12 = 'INDIAN')MULTIPLE FORMATIONS

YES I (Submit Commingling Application) NO l' VERTICALI DIRECTIONAL I HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

Top of Uppermost Producing Zone 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

At Total Depth 748 FSL 638 FWL SWSW 18 4.0 S 2.0 W U

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITDUCHESNE 638 40

25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 7470 TVD: 74701302

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

5540 RLBOO10462 43-7478

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

[2 AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP

DRILLED)

NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825

SIGNATURE DATE 06/04/2010 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL

43013503920000

Permit

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 7470

Pipe Grade Length Weight

Grade J-55 LT&C 7470 15.5

API Well No: 43013503920000 Received: 6/4/2010API Well No: 43013503920000 Received: 6/4/2010

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 7470

Pipe Grade Length Weight

Grade J-55 LT&C 7470

API Well No: 43013503920000 Received: 6/4/2010

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 7470

Pipe Grade Length Weight

Grade J-55 LT&C 7470

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 8.625 0 300

Pipe Grade Length Weight

Grade J-55 ST&C 300 24.0

API Well No: 43013503920000 Received: 6/4/2010API Well No: 43013503920000 Received: 6/4/2010

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 8.625 0 300

Pipe Grade Length Weight

Grade J-55 ST&C 300

API Well No: 43013503920000 Received: 6/4/2010

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 8.625 0 300

Pipe Grade Length Weight

Grade J-55 ST&C 300

'APIWellNo:43013503920000''APIWellNo:43013503920000'

T4S, R2W, U.S.B.&M. NERD EBORATIONCOMPANY

WELL LOWCAFTIOEN,13-188 4-42, LOCA4TED

cap U.S.B.&M. DUCHESNE COUNTY, UTAH.

Lot i'o - "oo o o

I o o - o

IL LOCA7/0H.• BAR SCALE

Lot 2LEY UNGRADED GROUND = 5539.8'

N18 .

La SetN Stone

o Lot3

THIS IS TO CERTIFY THA WASPREPARED FROM FIELD g, RVEYS

-------

---- - MADE BY ME OR UN OW¢ THATTHE SAME ARE TRU AÍ RECT TH TOF MY KNOWLEDGE g .189377 g

ISTE LA

STACY W.

CISTRA N os2003

Lot 4 Aium. S TE OFSandsten Rock Rite cm OF

NBB56'56"E (Basis of Bearings)NB911'16"E - 262709' (Meas.) 2647.84' (Measured) TRI STATELANDSURVEYING& CONSULTING

EAST -- 80.06 (G.L.O.) 180 NORTH VERNAL AVE. - VERNAL, UTAH 84078= SECTION CORNERS LOCATED (435) 781-2501

I1J-18-4-2 DATE SURVEYED:

BASIS OF ELEV; Elevations are base on (Surface Locotlan) HAD BJ 3-24-10 SURVEYED BY: D.G.

LOCATION: an N.G.S. OPUS Correction. LA717UDE = 40 07' 46.92" DATE DRAWN:LAT. 40°04'09.56" LONG. 110°00'43.28" LONGRUDE = 110 09' 33.87" 3-26-10 DRAWN BY: M.W.

(Tristate Aluminum Cap) Elev. 5281.57' REVISED: SCALE: 1" =

'APIWellNo:43013503920000'

T4S, R2W, U.S.B.&M. NERD EBORATIONCOMPANY

WELL LOWCAFTIOEN,13-188 4-42, LOCA4TED

cap U.S.B.&M. DUCHESNE COUNTY, UTAH.

Lot i'o - "oo o o

I o o - o

IL LOCA7/0H.• BAR SCALE

Lot 2LEY UNGRADED GROUND = 5539.8'

N18 .

La SetN Stone

o Lot3

THIS IS TO CERTIFY THA WASPREPARED FROM FIELD g, RVEYS

-------

---- - MADE BY ME OR UN OW¢ THATTHE SAME ARE TRU AÍ RECT TH TOF MY KNOWLEDGE g .189377 g

ISTE LA

STACY W.

CISTRA N os2003

Lot 4 Aium. S TE OFSandsten Rock Rite cm OF

NBB56'56"E (Basis of Bearings)NB911'16"E - 262709' (Meas.) 2647.84' (Measured) TRI STATELANDSURVEYING& CONSULTING

EAST -- 80.06 (G.L.O.) 180 NORTH VERNAL AVE. - VERNAL, UTAH 84078= SECTION CORNERS LOCATED (435) 781-2501

I1J-18-4-2 DATE SURVEYED:

BASIS OF ELEV; Elevations are base on (Surface Locotlan) HAD BJ 3-24-10 SURVEYED BY: D.G.

LOCATION: an N.G.S. OPUS Correction. LA717UDE = 40 07' 46.92" DATE DRAWN:LAT. 40°04'09.56" LONG. 110°00'43.28" LONGRUDE = 110 09' 33.87" 3-26-10 DRAWN BY: M.W.

(Tristate Aluminum Cap) Elev. 5281.57' REVISED: SCALE: 1" =

'APIWellNo:43013503920000''APIWellNo:430 13503920000'

MEMORANDUMof

EASEMENT, RIGHT-OF-WAYand

SURFACE USE AGREEMENT

This Easement, Right-of-Way and Surface Use Agreement ("Agreement") is entered into this 2ndday of June, 2010 by and between Todd and Camille Moon, whose address is Route 3 Box 3622, Myton,Utah 84052 ("Surface Owner," whether one or more) and Newfield ProductionCompany,a Texascorporation ("NEWFIELD"),with offices at 1001 Seventeenth Street, Suite2000, Denver, Colorado 80202,covering certain lands, (the "Lands") situated in DuchesneCounty,Utah describedas follows:

Township 4 South, Rqnye 3 WestSection 23: E¼; SESWTownship 4 South, Range 2 WestSection 7: NWNE; NENW; NWNWSection 18: SWSW; SESW; SWSE; E1/2E1/2

Duchesne County, Utah

For and in consideration of the sum of ten dollars ($10.00),and other valuable consideration, thereceipt and sufficiency of which are hereby acknowledged, the undersignedhereby agree to theterms andprovisions set forth as follows:

1. Compensationfor Well; Release of All Claims

NEWFIELDshall pay to Surface Owner the sum as set forth in and according to the terms of thatcertain Letter Agreement for Easement, Right-of Way and Surface Use by and between SurfaceOwner andNEWFIELD,dated June 2, 2010, as full paymentand satisfaction for any and all detriment,depreciation,injury or damageof any nature to the Lands or growing crops thereon that may occur as a result ofNEWFIELD's drilling or completion operations or its continuing activities for the production ortransportationof oil, gas, or other hydrocarbonsor products associated with the foregoingincluding,but notlimitedto, surface use, access, pipelines, gathering lines, pipeline interconnections,and any and all otherreasonableor customary uses of land related to said operations or activities.

2. Grant of Right of Way and Easement

SurfaceOwner hereby grants,bargains, leases, assigns, and conveys to NEWFIELDan easement andright-of-wayfor thepurpose of construction, using and maintaining access roads, locations for surfaceequipment and subsurface gathering lines for each well drilled upon the Lands,pipelines, and pipelineinterconnectionsfor two years from date of this agreement and so long thereafter as NEWFIELD's oil andgas leases remain in effect.

Page 1 of

'APIWellNo:430 13503920000'

MEMORANDUMof

EASEMENT, RIGHT-OF-WAYand

SURFACE USE AGREEMENT

This Easement, Right-of-Way and Surface Use Agreement ("Agreement") is entered into this 2ndday of June, 2010 by and between Todd and Camille Moon, whose address is Route 3 Box 3622, Myton,Utah 84052 ("Surface Owner," whether one or more) and Newfield ProductionCompany,a Texascorporation ("NEWFIELD"),with offices at 1001 Seventeenth Street, Suite2000, Denver, Colorado 80202,covering certain lands, (the "Lands") situated in DuchesneCounty,Utah describedas follows:

Township 4 South, Rqnye 3 WestSection 23: E¼; SESWTownship 4 South, Range 2 WestSection 7: NWNE; NENW; NWNWSection 18: SWSW; SESW; SWSE; E1/2E1/2

Duchesne County, Utah

For and in consideration of the sum of ten dollars ($10.00),and other valuable consideration, thereceipt and sufficiency of which are hereby acknowledged, the undersignedhereby agree to theterms andprovisions set forth as follows:

1. Compensationfor Well; Release of All Claims

NEWFIELDshall pay to Surface Owner the sum as set forth in and according to the terms of thatcertain Letter Agreement for Easement, Right-of Way and Surface Use by and between SurfaceOwner andNEWFIELD,dated June 2, 2010, as full paymentand satisfaction for any and all detriment,depreciation,injury or damageof any nature to the Lands or growing crops thereon that may occur as a result ofNEWFIELD's drilling or completion operations or its continuing activities for the production ortransportationof oil, gas, or other hydrocarbonsor products associated with the foregoingincluding,but notlimitedto, surface use, access, pipelines, gathering lines, pipeline interconnections,and any and all otherreasonableor customary uses of land related to said operations or activities.

2. Grant of Right of Way and Easement

SurfaceOwner hereby grants,bargains, leases, assigns, and conveys to NEWFIELDan easement andright-of-wayfor thepurpose of construction, using and maintaining access roads, locations for surfaceequipment and subsurface gathering lines for each well drilled upon the Lands,pipelines, and pipelineinterconnectionsfor two years from date of this agreement and so long thereafter as NEWFIELD's oil andgas leases remain in effect.

Page 1 of

'APIWellNo:43013503920000''APIWellNo:430 13503920000'

This Agreement shall be binding upon the respective heirs, executors, administrators, successors, andassigns of the undersigned.

These Parties hereto have executed this documenteffective as of the day first above written.

TODD AND CAMILLE MOON NEWFIELD PRODUCTION COMPANY

-7. By.Todd Moon,private surface owner Dan Shewmake,

Vice President-Development

CÀMilÍecon, private surface owner

STATE OF UTAH ))ss

COUNTYOF < Mewt )

This instmment was acknowledged before me this 1 day of , 2010 byTodd andCamille Moon, private surface owners.

Witness my hand and official scal. JEFFHNDERSONI

My commission expires O - i 0 a O

STATEOF COLORADO ))ss

COUNTYOF Denver )

This instrumentwas acknowledged before me this , 2010 byDan Shewmake, Vice President-Development a Texas corporation, on behalf of the corporation.

Witness my hand and official seal.

NotaryPublic

My commission expires

Page 2 of

'APIWellNo:430 13503920000'

This Agreement shall be binding upon the respective heirs, executors, administrators, successors, andassigns of the undersigned.

These Parties hereto have executed this documenteffective as of the day first above written.

TODD AND CAMILLE MOON NEWFIELD PRODUCTION COMPANY

-7. By.Todd Moon,private surface owner Dan Shewmake,

Vice President-Development

CÀMilÍecon, private surface owner

STATE OF UTAH ))ss

COUNTYOF < Mewt )

This instmment was acknowledged before me this 1 day of , 2010 byTodd andCamille Moon, private surface owners.

Witness my hand and official scal. JEFFHNDERSONI

My commission expires O - i 0 a O

STATEOF COLORADO ))ss

COUNTYOF Denver )

This instrumentwas acknowledged before me this , 2010 byDan Shewmake, Vice President-Development a Texas corporation, on behalf of the corporation.

Witness my hand and official seal.

NotaryPublic

My commission expires

Page 2 of

'APIWellNo:43013503920000''APIWellNo:43013503920000'

NEWFIELD PRODUCTION COMPANYUTE TRIBAL 13-18-4-2

SW/SW (LOT #4) SECTION 18, T4S, R2WDUCHESNE COUNTY, UTAH

TEN POINT DRILLING PROGRAM

1. GEOLOGIC SURFACE FORMATION:

Uinta formation of Upper Eocene Age

2. ESTIMATED TOPS OF IMPORTANT GEOLOGIC MARKERS:

Uinta 0' - 2090'Green River 2090'Wasatch 7170'Proposed TD 7470'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER, OIL, GAS OR MINERALS:

Green River Formation (Oil) 2090' -7170'

Fresh water may be encountered in the Uinta Formation, but would not be expected below about350'. All water shows and water bearing geologic units shall be reported to the geologic andengineering staff of the Vernal Office prior to running the next string of casing or before pluggingorders are requested. All water shows must be reported within one (1) business day after beingencountered.

All usable (<10,000PPM TDS) water and prospectively valuable minerals (as described by BLMat onsite) encountered during drilling will be recorded by depth and adequately protected. Thisinformation shall be reported to the Vernal Office.

Detected water flows shall be sampled, analyzed, and reported to the geologic & engineering staffof the Vernal Office. The office may request additional water samples for further analysis. Usageof the State of Utah form Report of Water Encountered is acceptable, but not required.

The following information is requested for water shows and samples where applicable:

Location & Sampled Interval Date SampledFlow Rate TemperatureHardness pHWater Classification (State of Utah) Dissolved Calcium (Ca) (mg/l)Dissolved Iron (Fe) (ug/l) Dissolved Sodium (Na) (mg/l)Dissolved Magnesium (Mg) (mg/l) Dissolved Carbonate (CO3) (mg/l)Dissolved Bicarbonate (NaHCO3)(mg/l) Dissolved Chloride (Cl) (mg/l)Dissolved Sulfate (SO4) (mg/l) Dissolved Total Solids (TDS)

'APIWellNo:43013503920000'

NEWFIELD PRODUCTION COMPANYUTE TRIBAL 13-18-4-2

SW/SW (LOT #4) SECTION 18, T4S, R2WDUCHESNE COUNTY, UTAH

TEN POINT DRILLING PROGRAM

1. GEOLOGIC SURFACE FORMATION:

Uinta formation of Upper Eocene Age

2. ESTIMATED TOPS OF IMPORTANT GEOLOGIC MARKERS:

Uinta 0' - 2090'Green River 2090'Wasatch 7170'Proposed TD 7470'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER, OIL, GAS OR MINERALS:

Green River Formation (Oil) 2090' -7170'

Fresh water may be encountered in the Uinta Formation, but would not be expected below about350'. All water shows and water bearing geologic units shall be reported to the geologic andengineering staff of the Vernal Office prior to running the next string of casing or before pluggingorders are requested. All water shows must be reported within one (1) business day after beingencountered.

All usable (<10,000PPM TDS) water and prospectively valuable minerals (as described by BLMat onsite) encountered during drilling will be recorded by depth and adequately protected. Thisinformation shall be reported to the Vernal Office.

Detected water flows shall be sampled, analyzed, and reported to the geologic & engineering staffof the Vernal Office. The office may request additional water samples for further analysis. Usageof the State of Utah form Report of Water Encountered is acceptable, but not required.

The following information is requested for water shows and samples where applicable:

Location & Sampled Interval Date SampledFlow Rate TemperatureHardness pHWater Classification (State of Utah) Dissolved Calcium (Ca) (mg/l)Dissolved Iron (Fe) (ug/l) Dissolved Sodium (Na) (mg/l)Dissolved Magnesium (Mg) (mg/l) Dissolved Carbonate (CO3) (mg/l)Dissolved Bicarbonate (NaHCO3)(mg/l) Dissolved Chloride (Cl) (mg/l)Dissolved Sulfate (SO4) (mg/l) Dissolved Total Solids (TDS)

'APIWellNo:43013503920000''APIWellNo:43013503920000'

Ten Point Well Program &Thirteen Point Well ProgramPage 2 of4

4. PROPOSED CASING PROGRAM

a. Casing Desi n: Ute Tribal 13-18-4-2Interval Design Factors

Size Weight Grade CouplingTop Bottom Burst Collapse Tension

Surface casingO' 300' 24.0 J-55 STC

2,950 1,370 244,0008-5/8" 17.53 14.35 33.89Prod casing 4,810 4,040 217,000

O' 7,470' 15.5 J-55 LTC5-1/2" 2.02 1.70 1.87

Assumptions:1) Surface casing max anticipated surface press (MASP) = Frac gradient - gas gradient2) Prod casing MASP (production mode) = Pore pressure - gas gradient3) All collapse calculations assume fully evacuated casing w/ gas gradient4) All tension calculations assume air weight

Frac gradient at surface casing shoe = 13.0 ppgPore pressure at surface casing shoe = 8.33 ppgPore pressure at prod casing shoe = 8.33 ppgGas gradient = 0.115 psi/ft

All casing shall be new or, if used, inspected and tested. Used casing shall meet or exceedAPI standards for new casing.

All casing strings shall have a minimum of 1 (one) centralizer on each of the bottom three (3)joints.

b. Cementing Design: Ute Tribal 13-18-4-2Sacks OH Weight YieldJob Fill Description aga Excess* (ppg) (ft /sk)

138Surface casing 300' Class G w/ 2% CaCI 30% 15.8 1.17

161

Prod casing Prem Lite IIw/ 10% gel + 3% 3785,470' 30% 11.0 3.26

Lead KCI 1232

Prod casing 50/50 Poz wl 2% gel + 3% 3632,000' 30% 14.3 1.24

Tail KCI451

*Actual volume pumped will be 15% over the caliper log- Compressive strength of lead cement: 1800 psi @24 hours, 2250 psi @72 hours

- Compressive strength of tail cement: 2500 psi @24 hours

Hole Sizes: A 12-1/4" hole will be drilled for the 8-5/8" surface casing. A 7-7/8" hole will bedrilled for the 5-1/2" production casing.

The 8-5/8" surface casing shall in all cases be cemented back to surface. In the event that duringthe primary surface cementing operation the cement does not circulate to surface, or if the cementlevel should fall back more than 8 feet from surface, then a remedial surface cementing operationshall be performed to insure adequate isolation and stabilization of the surface casing.

5. MINIMUM SPECIFICATIONS FOR PRESSURE

'APIWellNo:43013503920000'

Ten Point Well Program &Thirteen Point Well ProgramPage 2 of4

4. PROPOSED CASING PROGRAM

a. Casing Desi n: Ute Tribal 13-18-4-2Interval Design Factors

Size Weight Grade CouplingTop Bottom Burst Collapse Tension

Surface casingO' 300' 24.0 J-55 STC

2,950 1,370 244,0008-5/8" 17.53 14.35 33.89Prod casing 4,810 4,040 217,000

O' 7,470' 15.5 J-55 LTC5-1/2" 2.02 1.70 1.87

Assumptions:1) Surface casing max anticipated surface press (MASP) = Frac gradient - gas gradient2) Prod casing MASP (production mode) = Pore pressure - gas gradient3) All collapse calculations assume fully evacuated casing w/ gas gradient4) All tension calculations assume air weight

Frac gradient at surface casing shoe = 13.0 ppgPore pressure at surface casing shoe = 8.33 ppgPore pressure at prod casing shoe = 8.33 ppgGas gradient = 0.115 psi/ft

All casing shall be new or, if used, inspected and tested. Used casing shall meet or exceedAPI standards for new casing.

All casing strings shall have a minimum of 1 (one) centralizer on each of the bottom three (3)joints.

b. Cementing Design: Ute Tribal 13-18-4-2Sacks OH Weight YieldJob Fill Description aga Excess* (ppg) (ft /sk)

138Surface casing 300' Class G w/ 2% CaCI 30% 15.8 1.17

161

Prod casing Prem Lite IIw/ 10% gel + 3% 3785,470' 30% 11.0 3.26

Lead KCI 1232

Prod casing 50/50 Poz wl 2% gel + 3% 3632,000' 30% 14.3 1.24

Tail KCI451

*Actual volume pumped will be 15% over the caliper log- Compressive strength of lead cement: 1800 psi @24 hours, 2250 psi @72 hours

- Compressive strength of tail cement: 2500 psi @24 hours

Hole Sizes: A 12-1/4" hole will be drilled for the 8-5/8" surface casing. A 7-7/8" hole will bedrilled for the 5-1/2" production casing.

The 8-5/8" surface casing shall in all cases be cemented back to surface. In the event that duringthe primary surface cementing operation the cement does not circulate to surface, or if the cementlevel should fall back more than 8 feet from surface, then a remedial surface cementing operationshall be performed to insure adequate isolation and stabilization of the surface casing.

5. MINIMUM SPECIFICATIONS FOR PRESSURE

'APIWellNo:43013503920000''APIWellNo:43013503920000'

Ten Point Well Program &Thirteen Point Well ProgramPage 3 of 4

The operator's minimum specifications for pressure control equipment are as follows:

An 8" Double Ram Hydraulic unit with a closing unit will be utilized. Function test of BOP's willbe check daily.

Refer to Exhibit C for a diagram of BOP equipment that will be used on this well.

6. TYPE AND CHARACTERISTICS OF THE PROPOSED CIRCULATION MUDS:

From surface to ±350 feet will be drilled with an air/mist system. The air rig is equipped with a 6½" blooie line that is straight run and securely anchored. The blooie line is used with a dischargeless than 100 ft from the wellbore in order to minimize the well pad size. The blooie line is notequipped with an automatic igniter or continuous pilot light and the compressor is located lessthan 100 ft from the well bore due to the low possibility of combustion with the air dust mixture.The trailer mounted compressor (capacity of 2000 CFM) has a safety shut-off valve which islocated 15 feet from the air rig. A truck with 70 bbls of water is on stand by to be used as killfluid, if necessary. From about ±350 feet to TD, a fresh water system will be utilized. Clayinhibition and hole stability will be achieved with a KCl substitute additive. This additive will beidentified in the APD and reviewed to determine if the reserve pit shall be lined. This fresh watersystem will typically contain Total Dissolved Solids (TDS) of less than 3000 PPM. Anticipatedmud weight is 8.4 lbs/gal. If necessary to control formation fluids or pressure, the system will beweighted with the addition of bentonite gel, and if pressure conditions warrant, with barite

No chromate additives will be used in the mud system on Federal and/or Indian lands withoutprior BLM approval to ensure adequate protection of fresh aquifers.

No chemicals subject to reporting under SARA Title III in an amount equal to or greater than10,000 pounds will be used, produced, stored, transported, or disposed of annually in associationwith the drilling, testing, or completing of this well. Furthermore, no extremely hazardoussubstances, as defined in 40 CFR 355, in threshold planning quantities, will be used, produced,stored, transported, or disposed of in association with the drilling, testing, or completing of thiswell.

Hazardous substances specifically listed by the EPA as a hazardous waste or demonstrating acharacteristic of a hazardous waste will not be used in drilling, testing, or completion operations.

Newfield Production will visually monitor pit levels and flow from the well during drillingoperations.

7. AUXILIARY SAFETY EQUIPMENT TO BE USED:

Auxiliary safety equipment will be a Kelly Cock, bit float, and a TIW valve with drill pipethreads.

8. TESTING, LOGGING AND CORING PROGRAMS:

The logging program will consist of a Dual Induction, Gamma Ray and Caliper log from TD tobase of surface casing @300' +/-, and a Compensated Neutron-Formation Density Log from TDto 3500' +-. A cement bond log will be run from PBTD to cement top. No drill stem testing orcoring is planned for this well.

9. ANTICIPATED ABNORMAL PRESSURE OR TEMPERATURE:

No abnormal temperatures or pressures are anticipated. No hydrogen sulfide has been encounteredor is known to exist from previous drilling in the area at this depth. Maximum

'APIWellNo:43013503920000'

Ten Point Well Program &Thirteen Point Well ProgramPage 3 of 4

The operator's minimum specifications for pressure control equipment are as follows:

An 8" Double Ram Hydraulic unit with a closing unit will be utilized. Function test of BOP's willbe check daily.

Refer to Exhibit C for a diagram of BOP equipment that will be used on this well.

6. TYPE AND CHARACTERISTICS OF THE PROPOSED CIRCULATION MUDS:

From surface to ±350 feet will be drilled with an air/mist system. The air rig is equipped with a 6½" blooie line that is straight run and securely anchored. The blooie line is used with a dischargeless than 100 ft from the wellbore in order to minimize the well pad size. The blooie line is notequipped with an automatic igniter or continuous pilot light and the compressor is located lessthan 100 ft from the well bore due to the low possibility of combustion with the air dust mixture.The trailer mounted compressor (capacity of 2000 CFM) has a safety shut-off valve which islocated 15 feet from the air rig. A truck with 70 bbls of water is on stand by to be used as killfluid, if necessary. From about ±350 feet to TD, a fresh water system will be utilized. Clayinhibition and hole stability will be achieved with a KCl substitute additive. This additive will beidentified in the APD and reviewed to determine if the reserve pit shall be lined. This fresh watersystem will typically contain Total Dissolved Solids (TDS) of less than 3000 PPM. Anticipatedmud weight is 8.4 lbs/gal. If necessary to control formation fluids or pressure, the system will beweighted with the addition of bentonite gel, and if pressure conditions warrant, with barite

No chromate additives will be used in the mud system on Federal and/or Indian lands withoutprior BLM approval to ensure adequate protection of fresh aquifers.

No chemicals subject to reporting under SARA Title III in an amount equal to or greater than10,000 pounds will be used, produced, stored, transported, or disposed of annually in associationwith the drilling, testing, or completing of this well. Furthermore, no extremely hazardoussubstances, as defined in 40 CFR 355, in threshold planning quantities, will be used, produced,stored, transported, or disposed of in association with the drilling, testing, or completing of thiswell.

Hazardous substances specifically listed by the EPA as a hazardous waste or demonstrating acharacteristic of a hazardous waste will not be used in drilling, testing, or completion operations.

Newfield Production will visually monitor pit levels and flow from the well during drillingoperations.

7. AUXILIARY SAFETY EQUIPMENT TO BE USED:

Auxiliary safety equipment will be a Kelly Cock, bit float, and a TIW valve with drill pipethreads.

8. TESTING, LOGGING AND CORING PROGRAMS:

The logging program will consist of a Dual Induction, Gamma Ray and Caliper log from TD tobase of surface casing @300' +/-, and a Compensated Neutron-Formation Density Log from TDto 3500' +-. A cement bond log will be run from PBTD to cement top. No drill stem testing orcoring is planned for this well.

9. ANTICIPATED ABNORMAL PRESSURE OR TEMPERATURE:

No abnormal temperatures or pressures are anticipated. No hydrogen sulfide has been encounteredor is known to exist from previous drilling in the area at this depth. Maximum

'APIWellNo:43013503920000''APIWellNo:43013503920000'

Ten Point Well Program &Thirteen Point Well ProgramPage 4 of4

bottomhole pressure will approximately equal total depth in feet multiplied by a 0.433 psilfootgradient,

10. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONS:

It is anticipated that the drilling operations will commence the foru·thquarter of2010, and takeapproximately seven (7) days from spud to rig

'APIWellNo:43013503920000'

Ten Point Well Program &Thirteen Point Well ProgramPage 4 of4

bottomhole pressure will approximately equal total depth in feet multiplied by a 0.433 psilfootgradient,

10. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONS:

It is anticipated that the drilling operations will commence the foru·thquarter of2010, and takeapproximately seven (7) days from spud to rig

'APIWellNo:43013503920000''APIWellNo:43013503920000'2-M SYSTEM

BlowoutPrevention Equipment Systems

EXHIBlT

'APIWellNo:43013503920000'2-M SYSTEM

BlowoutPrevention Equipment Systems

EXHIBlT

'APIWellNo:43013503920000''A IWellNo:43013503920000'

Access Road Map

L n,

-L

seeTopo "a |

LegendM Existing Road

Proposed Road y.

e<=s> a N NEWFIELD EXPLORATION COMPANYF: {435) 781.2518

Tri State 13-18-4-2Land Surveying, Inc. SEC. 18, T4S, R2W, U.S.B.&M.

TO

PD MR PCH n-gM

P

'A IWellNo:43013503920000'

Access Road Map

L n,

-L

seeTopo "a |

LegendM Existing Road

Proposed Road y.

e<=s> a N NEWFIELD EXPLORATION COMPANYF: {435) 781.2518

Tri State 13-18-4-2Land Surveying, Inc. SEC. 18, T4S, R2W, U.S.B.&M.

TO

PD MR PCH n-gM

P

'APIWellNo:43013503920000''A 'IWellNo:43013503920000'

Access Road Map

18

Proposed Location13-18-4-2

I

± 910'

L

568/

Legend- Proposed Road

M Existing Road ¡

P<=s>ra12sof N NEWFIELD EXPLORATION COMPANYTri State

" 13-18-4-2Land Surveying, Inc. SEC. 18, T4S, R2W, U.S.B.&M.

180 NORTH VERNALAVE. VERNAL,UTAHB4078 - Duchesne County, UT.DRAWN BY: C H.M SHEETDATE: 03-30-2010 TO PDG RA PH I C MA P gSCALE 1 " = 2.000

'A 'IWellNo:43013503920000'

Access Road Map

18

Proposed Location13-18-4-2

I

± 910'

L

568/

Legend- Proposed Road

M Existing Road ¡

P<=s>ra12sof N NEWFIELD EXPLORATION COMPANYTri State

" 13-18-4-2Land Surveying, Inc. SEC. 18, T4S, R2W, U.S.B.&M.

180 NORTH VERNALAVE. VERNAL,UTAHB4078 - Duchesne County, UT.DRAWN BY: C H.M SHEETDATE: 03-30-2010 TO PDG RA PH I C MA P gSCALE 1 " = 2.000

'APIWellNo:43013503920000''A IWellNo:43013503920000'

Proposed Pipeline Map

Proposed Location13-18-4-2

Tie in at ProposedWaterline 951

Tie in at Proposed 972' -Gas Pipeilne

i

I

I

LegencO--O Existing Road

-• Proposed Gas Pipeline

---- Proposed Waterline

e (4x>ram N _NEWFIELDEXPLORATION COMPANYF (435) 781-2618

Tri State 13-18-4-2Land Surveying, Inc. SEC. 18, T48, R2W, U.S.B.&M.

TO

PD-o MR PCH

M PSH

'A IWellNo:43013503920000'

Proposed Pipeline Map

Proposed Location13-18-4-2

Tie in at ProposedWaterline 951

Tie in at Proposed 972' -Gas Pipeilne

i

I

I

LegencO--O Existing Road

-• Proposed Gas Pipeline

---- Proposed Waterline

e (4x>ram N _NEWFIELDEXPLORATION COMPANYF (435) 781-2618

Tri State 13-18-4-2Land Surveying, Inc. SEC. 18, T48, R2W, U.S.B.&M.

TO

PD-o MR PCH

M PSH

'APIW

ellNo:43013503920000'

•• - gr

s a

e .swa

1 47

ne

.I-- -

œ

ta u te

.%eaAh as

95 N |L ) F pg Em 43 al

F .F. A.5.

m .e, .s 4. a. g a. .2. an.

A4 AAA

d. .s. 4. g s, .4 a, ,4...1. g.a. J...a .5,, .a J..g, al»L & a J. se a t g,A ,s. A J. - 4, · A L•,,, a 1. .a ,¾ -a .5. 4

.54 gy A a, ,s A A 6 a. .9. E 5. > .t. sg a / a ga .5 A 1. -5. ga a a A. A A M. o .3. . , A A A La9.. .5.,4. .†,,6.

:o.A..A.4,b.g··¾• "No.A,2·gAh,t..AJ ma.f,L",LAA A AA e...,4 4..L,a..9%.A.A

S-R1 26 fk-P V 64· * N'½ s A a. s a. a.s g,75 mrt fft .*/ N 75 m

74

3a og - FI M N N m >s 11 27 23 3 SE M 31 z• 13 >4 ap | m þ1

er x -- NEWFIELD

3gts 42tist II-543RII(MMVARRIN1AINS

-y rË T .' yt - --- - 7 - - mumrash-gt.narm I

15 ‡1 ri & a †0 11 17 r y e ta 11 17 & g 10 i‡ 12

M ‡ 94 I) *b. IF Es is ta

•• - gr

s a

e .swa

1 47

ne

.I-- -

œ

ta u te

.%eaAh as

95 N |L ) F pg Em 43 al

F .F. A.5.

m .e, .s 4. a. g a. .2. an.

A4 AAA

d. .s. 4. g s, .4 a, ,4...1. g.a. J...a .5,, .a J..g, al»L & a J. se a t g,A ,s. A J. - 4, · A L•,,, a 1. .a ,¾ -a .5. 4

.54 gy A a, ,s A A 6 a. .9. E 5. > .t. sg a / a ga .5 A 1. -5. ga a a A. A A M. o .3. . , A A A La9.. .5.,4. .†,,6.

:o.A..A.4,b.g··¾• "No.A,2·gAh,t..AJ ma.f,L",LAA A AA e...,4 4..L,a..9%.A.A

S-R1 26 fk-P V 64· * N'½ s A a. s a. a.s g,75 mrt fft .*/ N 75 m

74

3a og - FI M N N m >s 11 27 23 3 SE M 31 z• 13 >4 ap | m þ1

er x -- NEWFIELD

3gts 42tist II-543RII(MMVARRIN1AINS

-y rË T .' yt - --- - 7 - - mumrash-gt.narm I

15 ‡1 ri & a †0 11 17 r y e ta 11 17 & g 10 i‡ 12

M ‡ 94 I) *b. IF Es is ta

'APIWellNo:43013503920000''A IWellNo:43013503920000'

Exhibit "B" Map. I 2%

i)

I I

5434

, I

Proposed Locatio PLE A S >

13-18-4-2

V A L

' e e e

' I

24 ,

e 0 g

i

ssas

Legend1 MileRadius

Proposed Location25 ..

E Nas N NEWFIELD EXPLORATION COMPANYTri State 13-18-4-2

Land Surveying, Inc. SEC. 18, T4S, R2W, U.S.B.&M.

TO

PD M CH

M PSH

'A IWellNo:43013503920000'

Exhibit "B" Map. I 2%

I I

5434

I

13

Proposed Locatio PL E. A S :

13-18-4-2 |

V A LLE

e e e e

' I

24 ,

& 4

ssas

Legend '

1 MileRadius

Proposed Location25 ..

E Nas N NEWFIELD EXPLORATION COMPANYTri State 13-18-4-2

Land Surveying, Inc. SEC. 18, T4S, R2W, U.S.B.&M.

TO

PD M CH

M PSH

'APIWellNo:43013503920000''APIWellNo:43013503920000'

NEWFIELD PRODUCTION COMPANYUTE TRIBAL 13-18-4-2

SWISW (LOT #4) SECTION 18, T4S, R2WDUCHESNE COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI-POINT SURFACE USE & OPERATIONS PLAN

1. EXISTING ROADS

See attached Topographic Map "A"

To reach Newfield Production Company well location site Ute Tribal 13-18-4-2 located in the SW1/4 SW 1/4 Section 18, T4S, R2W, Duchesne County, Utah:

Proceed southwesterly out of Myton, Utah along Highway 40 - 1.4 miles ± to the junctionof thishighway and UT State Hwy 53; proceed in a southwesterly direction approximately 6.4 miles toit's junctionwith an existing road to the southwest; proceed in a southwesterly directionapproximately 2.7 miles to it's junctionwith an existing road to the northwest; proceed in anorthwesterly direction approximately 0.7 miles to it's junctionwith an existing road to thenortheast; proceed northeasterly approximately 2.6 miles to it's junctionwith an existing road tothe southeast; proceed southeasterly approximately 0.6 miles to it's junctionwith an existing roadto the northeast; proceed northeasterly approximately 0.6 miles to it's junctionwith the beginningof the proposed access road; proceed in a northeasterly direction along the proposed access roadapproximately 910' to the proposed well location.

The aforementioned dirt oil field service roads and other roads in the vicinity are constructed outof existing native materials that are prevalent to the existing area they are located in and rangefrom clays to a sandy-clay shale material.

The roads for access during the drilling, completion and production phase will be maintained at thestandards required by the State of Utah, or other controlling agencies. This maintenance willconsist of some minor grader work for smoothing road surfaces and for snow removal. Anynecessary fill material for repair will be purchase and hauled from private sources.

2. PLANNED ACCESS ROAD

Approximately 910'of access road is proposed for the proposed well. See attached TopographicMap "B".

The proposed access road will be an 18' crown road (9' either side of the centerline) with drainageditches along either side of the proposed road whether it is deemed necessary in order to handleany run-off from normal meteorological conditions that are prevalent to this area. The maximumgrade will be less than 8%.

There will be no culverts required along this access road. There will be barrow ditches andturnouts as needed along this road.

There are no fences encountered along this proposed road. There will be no new gates or cattleguards required.

All construction material for this access road will be borrowed material accumulated duringconstruction of the access

'APIWellNo:43013503920000'

NEWFIELD PRODUCTION COMPANYUTE TRIBAL 13-18-4-2

SWISW (LOT #4) SECTION 18, T4S, R2WDUCHESNE COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI-POINT SURFACE USE & OPERATIONS PLAN

1. EXISTING ROADS

See attached Topographic Map "A"

To reach Newfield Production Company well location site Ute Tribal 13-18-4-2 located in the SW1/4 SW 1/4 Section 18, T4S, R2W, Duchesne County, Utah:

Proceed southwesterly out of Myton, Utah along Highway 40 - 1.4 miles ± to the junctionof thishighway and UT State Hwy 53; proceed in a southwesterly direction approximately 6.4 miles toit's junctionwith an existing road to the southwest; proceed in a southwesterly directionapproximately 2.7 miles to it's junctionwith an existing road to the northwest; proceed in anorthwesterly direction approximately 0.7 miles to it's junctionwith an existing road to thenortheast; proceed northeasterly approximately 2.6 miles to it's junctionwith an existing road tothe southeast; proceed southeasterly approximately 0.6 miles to it's junctionwith an existing roadto the northeast; proceed northeasterly approximately 0.6 miles to it's junctionwith the beginningof the proposed access road; proceed in a northeasterly direction along the proposed access roadapproximately 910' to the proposed well location.

The aforementioned dirt oil field service roads and other roads in the vicinity are constructed outof existing native materials that are prevalent to the existing area they are located in and rangefrom clays to a sandy-clay shale material.

The roads for access during the drilling, completion and production phase will be maintained at thestandards required by the State of Utah, or other controlling agencies. This maintenance willconsist of some minor grader work for smoothing road surfaces and for snow removal. Anynecessary fill material for repair will be purchase and hauled from private sources.

2. PLANNED ACCESS ROAD

Approximately 910'of access road is proposed for the proposed well. See attached TopographicMap "B".

The proposed access road will be an 18' crown road (9' either side of the centerline) with drainageditches along either side of the proposed road whether it is deemed necessary in order to handleany run-off from normal meteorological conditions that are prevalent to this area. The maximumgrade will be less than 8%.

There will be no culverts required along this access road. There will be barrow ditches andturnouts as needed along this road.

There are no fences encountered along this proposed road. There will be no new gates or cattleguards required.

All construction material for this access road will be borrowed material accumulated duringconstruction of the access

'APIWellNo:43013503920000''APIWellNo:430 13503920000'

3. LOCATION OF EXISTING WELLS

Refer to Exhibit "B".

4. LOCATION OF EXISTING AND/OR PROPOSED FACILITIES

There are no existing facilities that will be used by this well.

It is anticipated that this well will be a producing oil well.

Upon construction of a tank battery, the well pad will be surrounded by a dike of sufficientcapacity to contain at minimum 110% of the largest tank volume within the facility battery.

Tank batteries will be built to State specifications.

All permanent (on site for six (6) months or longer) structures, constructed or installed (includingpumping units), will be painted a flat, non-reflective, earth tone color to match one of the standardenvironmental colors, as determined by the Rocky Mountain Five State Interagency Committee.All facilities will be painted within six months of installation.

5. LOCATION AND TYPE OF WATER SUPPLY

Newfield Production will transport water by truck from nearest water source as determined by aNewfield representative for the purpose of drilling the above mentioned well. The available watersources are as follows:

Johnson Water DistrictWater Right : 43-7478

Neil Moon PondWater Right: 43-11787

Newfield Collector WellWater Right: 41-3530 (A30414DV, contracted with the Duchesne County Conservancy District).

There will be no water well drilled at this site.

6. SOURCE OF CONSTRUCTION MATERIALS

All construction material for this location shall be borrowed material accumulated duringconstruction of the location site and access road.

A mineral material application is not required for this location.

7. METHODS FOR HANDLING WASTE DISPOSAL

A small reserve pit (90' x 40' x 8' deep, or less) will be constructed from native soil and claymaterials. The reserve pit will receive the processed drill cutting (wet sand, shale & rock)removed from the wellbore. Any drilling fluids, which do accumulate in the pit as a result ofshale-shaker carryover, cleaning of the sand trap, etc., will be promptly reclaimed. All drillingfluids will be fresh water based, typically containing Total Dissolved Solids of less than 3000PPM. No potassium chloride, chromates, trash, debris, nor any other substance deemed hazardouswill be placed in this pit. Therefore, it is proposed that no synthetic liner be required in the reservepit. However, if upon constructing the pit there is insufficient fine clay and silt present, a liner willbe used for the purpose of reducing water loss throughpercolation.

Newfield requests approval that a flare pit not be constructed or utilized on this

'APIWellNo:430 13503920000'

3. LOCATION OF EXISTING WELLS

Refer to Exhibit "B".

4. LOCATION OF EXISTING AND/OR PROPOSED FACILITIES

There are no existing facilities that will be used by this well.

It is anticipated that this well will be a producing oil well.

Upon construction of a tank battery, the well pad will be surrounded by a dike of sufficientcapacity to contain at minimum 110% of the largest tank volume within the facility battery.

Tank batteries will be built to State specifications.

All permanent (on site for six (6) months or longer) structures, constructed or installed (includingpumping units), will be painted a flat, non-reflective, earth tone color to match one of the standardenvironmental colors, as determined by the Rocky Mountain Five State Interagency Committee.All facilities will be painted within six months of installation.

5. LOCATION AND TYPE OF WATER SUPPLY

Newfield Production will transport water by truck from nearest water source as determined by aNewfield representative for the purpose of drilling the above mentioned well. The available watersources are as follows:

Johnson Water DistrictWater Right : 43-7478

Neil Moon PondWater Right: 43-11787

Newfield Collector WellWater Right: 41-3530 (A30414DV, contracted with the Duchesne County Conservancy District).

There will be no water well drilled at this site.

6. SOURCE OF CONSTRUCTION MATERIALS

All construction material for this location shall be borrowed material accumulated duringconstruction of the location site and access road.

A mineral material application is not required for this location.

7. METHODS FOR HANDLING WASTE DISPOSAL

A small reserve pit (90' x 40' x 8' deep, or less) will be constructed from native soil and claymaterials. The reserve pit will receive the processed drill cutting (wet sand, shale & rock)removed from the wellbore. Any drilling fluids, which do accumulate in the pit as a result ofshale-shaker carryover, cleaning of the sand trap, etc., will be promptly reclaimed. All drillingfluids will be fresh water based, typically containing Total Dissolved Solids of less than 3000PPM. No potassium chloride, chromates, trash, debris, nor any other substance deemed hazardouswill be placed in this pit. Therefore, it is proposed that no synthetic liner be required in the reservepit. However, if upon constructing the pit there is insufficient fine clay and silt present, a liner willbe used for the purpose of reducing water loss throughpercolation.

Newfield requests approval that a flare pit not be constructed or utilized on this

'APIWellNo:43013503920000''APIWellNo:43013503920000'

A portable toilet will be provided for human waste.

A trash basket will be provided for garbage (trash) and hauled away to an approved disposal site atthe completion of the drilling activities.

Immediately upon first production, all produced water will be confined to a steel storage tank. Ifthe production water meets quality guidelines, it is transported to the Ashley, Monument Butte,Jonah, and Beluga water injection facilities by company or contract trucks. Subsequently, theproduced water is injected into approved Class II wells to enhance Newfield's secondary recoveryproject.

Water not meeting quality criteria, is disposed at Newfield's Pariette #4 disposal well (Sec. 7, T9SRI9E), State of Utah approved surfàce disposal facilities, or Federally approved surface disposalfacilities.

8. ANCILLARY FACILITIES

There are no ancillary facilities planned for at the present time and none foreseen in the nearfuture.

9. WELL SITE LAYOUT

See attached Location Layout Sheet.

Fencing Requirements

All pits will be fenced according to the following minimum standards:

a) A 39-inch net wire shall be used with at least one strand of barbed wire on top of the net.

b) The net wire shall be no more than two (2) inches above the ground. The barbed wireshall be three (3) inches above the net wire. Total height of the fence shall be at leastforty-two (42) inches.

c) Corner posts shall be centered and/or braced in such a manner to keep tight at all times

d) Standard steel, wood or pipe posts shall be used between the corner braces. Maximumdistance between any two posts shall be no greater than sixteen (16) feet.

e) All wire shall be stretched, by using a stretching device, before it is attached to the cornerposts.

The reserve pit fencing will be on three (3) sides during drilling operations and on the fourth sidewhen the rig moves off location. Pits will be fenced and maintained until cleanup.

Existing fences to be crossed by the access road will be braced and tied off before cutting so as toprevent slacking in the wire. The opening shall be closed temporarily as necessary duringconstruction to prevent the escape of livestock, and upon completion of construction the fenceshall be repaired to BLM specifications.

10. PLANS FOR RESTORATION OF SURFACE:

a) Producing Location

Immediately upon well completion, the location and surrounding area will be cleared of all unusedtubing, equipment, debris, material, trash and junk not required for

'APIWellNo:43013503920000'

A portable toilet will be provided for human waste.

A trash basket will be provided for garbage (trash) and hauled away to an approved disposal site atthe completion of the drilling activities.

Immediately upon first production, all produced water will be confined to a steel storage tank. Ifthe production water meets quality guidelines, it is transported to the Ashley, Monument Butte,Jonah, and Beluga water injection facilities by company or contract trucks. Subsequently, theproduced water is injected into approved Class II wells to enhance Newfield's secondary recoveryproject.

Water not meeting quality criteria, is disposed at Newfield's Pariette #4 disposal well (Sec. 7, T9SRI9E), State of Utah approved surfàce disposal facilities, or Federally approved surface disposalfacilities.

8. ANCILLARY FACILITIES

There are no ancillary facilities planned for at the present time and none foreseen in the nearfuture.

9. WELL SITE LAYOUT

See attached Location Layout Sheet.

Fencing Requirements

All pits will be fenced according to the following minimum standards:

a) A 39-inch net wire shall be used with at least one strand of barbed wire on top of the net.

b) The net wire shall be no more than two (2) inches above the ground. The barbed wireshall be three (3) inches above the net wire. Total height of the fence shall be at leastforty-two (42) inches.

c) Corner posts shall be centered and/or braced in such a manner to keep tight at all times

d) Standard steel, wood or pipe posts shall be used between the corner braces. Maximumdistance between any two posts shall be no greater than sixteen (16) feet.

e) All wire shall be stretched, by using a stretching device, before it is attached to the cornerposts.

The reserve pit fencing will be on three (3) sides during drilling operations and on the fourth sidewhen the rig moves off location. Pits will be fenced and maintained until cleanup.

Existing fences to be crossed by the access road will be braced and tied off before cutting so as toprevent slacking in the wire. The opening shall be closed temporarily as necessary duringconstruction to prevent the escape of livestock, and upon completion of construction the fenceshall be repaired to BLM specifications.

10. PLANS FOR RESTORATION OF SURFACE:

a) Producing Location

Immediately upon well completion, the location and surrounding area will be cleared of all unusedtubing, equipment, debris, material, trash and junk not required for

'APIWellNo:43013503920000''APIWellNo:43013503920000'

The reserve pit and that portion of the location not needed for production facilities/operations will

be recontoured to the approximated natural contours. Weather perrnitting, the reserve pit will bereclaimed within one hundred twenty (120) days from the date of well completion. Before any dirtwork takes place, the reserve pit must have all fluids and hydrocarbons removed.

b) Dry Hole Abandoned Location

At such time as the well is plugged and abandoned, the operator shall submit a subsequent report

of abandonment and the State of Utah will attach the appropriate surface rehabilitation conditions

of approval.

11. SURFACE OWNERSHIP- Todd and Camille Moon (proposed location).See attached Memorandum of Surface Use Agreement and Easement ROW.

12. OTHER ADDITIONAL INFORMATION

Newfield Production Company requests 910' of planned access road to be granted. Refer toTopographic Map "B". Newfield Production Company requests 951' of surface gas line to begranted. Newfield Production Company requests 972' of buried water line to be granted.

It is proposed that the disturbed area will be 60' wide to allow for construction of the proposedaccess road, a 10" or smaller gas gathering line, a 3" poly fuel gas line, a buried 3" steel waterinjection line and a buried 3" poly water return line. The planned access road will consist of a 18'permanent running surface (9' either side of the centerline) crowned and ditched in order to handleany run-off from any precipitation events that are prevalent to this area. The maximum grade will

be less than 8%. There will be no culverts required along this access road. There will be turnoutsas needed along this road to allow for increases in potential traffic issues. There are no fencesencountered along this proposed road. There will be no new gates or cattle guards required. Allconstruction material for this access road will be borrowed material accumulated duringconstruction of the access road.

Both the proposed surface gas and buried water lines will tie in to the existing pipelineinfrastructure. Refer to Topographic Map "C." The proposed water pipelines will be buried ina 4-5' deep trench constructed with a trencher or backhoe for the length of the proposal. The

equipment will run on the surface and not be flat bladed to minimize surface impacts to precious

topsoil in these High Desert environments. If possible, all proposed surface gas pipelines will beinstalled on the same side of the road as existing gas lines. The construction phase of the planned

access road, proposed gas lines and proposed water lines will last approximately (5) days.

In the event that the proposed well is converted to a water injection well, a Sundry Notice 3160-5

form will be applied for through the Bureau of Land Management field office.

a) Newfield Production Company is responsible for informing all persons in the area who

are associated with this project that they will be subject to prosecution for knowinglydisturbing historic or archaeological sites, or for collecting artifacts. If historic orarchaeological materials are uncovered during construction, Newfield is to immediatelystop work that might further disturb such materials and contact the Authorized Officer.

b) Newfield Production will control noxious weeds along rights-of-way for roads, pipelines,well sites or other applicable facilities. On State administered land it is required that aPesticide Use Proposal shall be submitted and given approval prior to the application of

herbicides or other possible hazardous chemicals.

c) Drilling rigs and/or equipment used during drilling operations on this well site will not bestacked or stored on State Lands after the conclusion of drilling operations or at any other

time without State authorization. However, if State authorization is obtained, it is only atemporary measure to allow time to make arrangements for permanent storage oncommercial

'APIWellNo:43013503920000'

The reserve pit and that portion of the location not needed for production facilities/operations will

be recontoured to the approximated natural contours. Weather perrnitting, the reserve pit will bereclaimed within one hundred twenty (120) days from the date of well completion. Before any dirtwork takes place, the reserve pit must have all fluids and hydrocarbons removed.

b) Dry Hole Abandoned Location

At such time as the well is plugged and abandoned, the operator shall submit a subsequent report

of abandonment and the State of Utah will attach the appropriate surface rehabilitation conditions

of approval.

11. SURFACE OWNERSHIP- Todd and Camille Moon (proposed location).See attached Memorandum of Surface Use Agreement and Easement ROW.

12. OTHER ADDITIONAL INFORMATION

Newfield Production Company requests 910' of planned access road to be granted. Refer toTopographic Map "B". Newfield Production Company requests 951' of surface gas line to begranted. Newfield Production Company requests 972' of buried water line to be granted.

It is proposed that the disturbed area will be 60' wide to allow for construction of the proposedaccess road, a 10" or smaller gas gathering line, a 3" poly fuel gas line, a buried 3" steel waterinjection line and a buried 3" poly water return line. The planned access road will consist of a 18'permanent running surface (9' either side of the centerline) crowned and ditched in order to handleany run-off from any precipitation events that are prevalent to this area. The maximum grade will

be less than 8%. There will be no culverts required along this access road. There will be turnoutsas needed along this road to allow for increases in potential traffic issues. There are no fencesencountered along this proposed road. There will be no new gates or cattle guards required. Allconstruction material for this access road will be borrowed material accumulated duringconstruction of the access road.

Both the proposed surface gas and buried water lines will tie in to the existing pipelineinfrastructure. Refer to Topographic Map "C." The proposed water pipelines will be buried ina 4-5' deep trench constructed with a trencher or backhoe for the length of the proposal. The

equipment will run on the surface and not be flat bladed to minimize surface impacts to precious

topsoil in these High Desert environments. If possible, all proposed surface gas pipelines will beinstalled on the same side of the road as existing gas lines. The construction phase of the planned

access road, proposed gas lines and proposed water lines will last approximately (5) days.

In the event that the proposed well is converted to a water injection well, a Sundry Notice 3160-5

form will be applied for through the Bureau of Land Management field office.

a) Newfield Production Company is responsible for informing all persons in the area who

are associated with this project that they will be subject to prosecution for knowinglydisturbing historic or archaeological sites, or for collecting artifacts. If historic orarchaeological materials are uncovered during construction, Newfield is to immediatelystop work that might further disturb such materials and contact the Authorized Officer.

b) Newfield Production will control noxious weeds along rights-of-way for roads, pipelines,well sites or other applicable facilities. On State administered land it is required that aPesticide Use Proposal shall be submitted and given approval prior to the application of

herbicides or other possible hazardous chemicals.

c) Drilling rigs and/or equipment used during drilling operations on this well site will not bestacked or stored on State Lands after the conclusion of drilling operations or at any other

time without State authorization. However, if State authorization is obtained, it is only atemporary measure to allow time to make arrangements for permanent storage oncommercial

'APIWellNo:43013503920000''APIWellNo:43013503920000'

The Archaeological and Paleontological Report Waiver is attached.

Additional Surface Stipulations

All lease and/or unit operations will be conducted in such a manner that full compliance is madewith all applicable laws and regulations, Onshore Oil and Gas Orders, the approved plan of operations andany applicable Notice to Lessees. A copy of these conditions will be furnished to the field representative toensure compliance.

Hazardous Material Declaration

Newfield Production Company guarantees that during the drilling and completion of the Ute Tribal 13-18-4-2, Newfield will not use, produce, store, transport or dispose 10,000# annually of any of the hazardouschemicals contained in the Environmental Protection Agency's consolidated list of chemicals subject toreporting under Title HI Superfund Amendments and Reauthorization Act (SARA) of 1986. Newfleld alsoguarantees that during the drilling and completion of the Ute Tribal 13-18-4-2, Newfield will use, produce,store, transport or dispose less than the threshold planning quantity (T.P.Q.)of any extremely hazardoussubstances as defined in 40 CFR 355.

A complete copy of the approved APD, if applicable, shall be on location during the construction of thelocation and drilling activities.

Newfield Production Company or a contractor employed by Newfield Production shall contact the Stateoffice at (801) 722-3417, 48 hours prior to construction activities.

The State office as well as the Ute Tribe Energy and Mineral Department shall be notified upon sitecompletion prior to moving on the drilling rig.

13. LESSEE'S OR OPERATOR'S REPRENSENTATIVE AND CERTIFICATION:

Representative

Name: Tim EatonAddress: Newfield Production Company

Route 3, Box 3630Myton, UT 84052

Telephone: (435) 646-3721

CertificationPlease be advised that Newfield Production Company is considered to be the operator of well #13-18-4-2,SWISW Section 18, T4S, R2W, Duchesne County, Utah and is responsible under the terms and conditionsof the lease for the operations conducted upon the leased lands. Bond coverage for this well is covered bythe Bureau of Indian Affairs Bond #RLB0010462.

I hereby certify that the proposed drill site and access route have been inspected, and I am familiar with theconditions which currently exist; that the statements made in this plan are true and correct to the best of myknowledge; and that the work associated with the operations proposed here will be performed by NewfieldProduction Company and its contractors and subcontractors in conformity with this plan and the terms andconditions under which it is approved. This statement is subject to the provisions of the 18 U.S.C. 1001 forthe filing of a false statement.

Date M ÁCrozierRegulatory Specialist

Newfield Production

'APIWellNo:43013503920000'

The Archaeological and Paleontological Report Waiver is attached.

Additional Surface Stipulations

All lease and/or unit operations will be conducted in such a manner that full compliance is madewith all applicable laws and regulations, Onshore Oil and Gas Orders, the approved plan of operations andany applicable Notice to Lessees. A copy of these conditions will be furnished to the field representative toensure compliance.

Hazardous Material Declaration

Newfield Production Company guarantees that during the drilling and completion of the Ute Tribal 13-18-4-2, Newfield will not use, produce, store, transport or dispose 10,000# annually of any of the hazardouschemicals contained in the Environmental Protection Agency's consolidated list of chemicals subject toreporting under Title HI Superfund Amendments and Reauthorization Act (SARA) of 1986. Newfleld alsoguarantees that during the drilling and completion of the Ute Tribal 13-18-4-2, Newfield will use, produce,store, transport or dispose less than the threshold planning quantity (T.P.Q.)of any extremely hazardoussubstances as defined in 40 CFR 355.

A complete copy of the approved APD, if applicable, shall be on location during the construction of thelocation and drilling activities.

Newfield Production Company or a contractor employed by Newfield Production shall contact the Stateoffice at (801) 722-3417, 48 hours prior to construction activities.

The State office as well as the Ute Tribe Energy and Mineral Department shall be notified upon sitecompletion prior to moving on the drilling rig.

13. LESSEE'S OR OPERATOR'S REPRENSENTATIVE AND CERTIFICATION:

Representative

Name: Tim EatonAddress: Newfield Production Company

Route 3, Box 3630Myton, UT 84052

Telephone: (435) 646-3721

CertificationPlease be advised that Newfield Production Company is considered to be the operator of well #13-18-4-2,SWISW Section 18, T4S, R2W, Duchesne County, Utah and is responsible under the terms and conditionsof the lease for the operations conducted upon the leased lands. Bond coverage for this well is covered bythe Bureau of Indian Affairs Bond #RLB0010462.

I hereby certify that the proposed drill site and access route have been inspected, and I am familiar with theconditions which currently exist; that the statements made in this plan are true and correct to the best of myknowledge; and that the work associated with the operations proposed here will be performed by NewfieldProduction Company and its contractors and subcontractors in conformity with this plan and the terms andconditions under which it is approved. This statement is subject to the provisions of the 18 U.S.C. 1001 forthe filing of a false statement.

Date M ÁCrozierRegulatory Specialist

Newfield Production

'APIWellNo:43013503920000''APIVellNo:43013503920000'

NEWFIELD EXPLORATION COMPANYLOCATION LAYOUT

13-18-4-2Section 18, T4S, R2W, U.S.B.&M

PROPOSED ACCESS

STA. 3+05

ExistingTwo- Track

C 1.6

STA. 2+35

F/0. 5 iso C/1. J 3 4STA. 1+75

\ Top ofcut Slope

C/1. 4

WELL HEADUNGRADEO = 5539.8' stoc Note:E/N. GRADE = 5538.5' E/are pit is to

be /ocated aminimum of 80'from we// head.

I I. ExcEss |

Toe of / STA. 0+00

S / REFERENCE POINTS225' NORTHEAST - 5538.0'275' NORTHEAST - 5537.7'170' SOUTHEAST - 5536.5'220' SOUTHEAST - 5533.7'

SURVEYED BY: D.G. DATE SURVEYED: 03-24-10 i State t'27"'-2'°'DRAWN BY: M.W. DATE DRAWN: 03-26-10 La,nd Surveying, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNALAVE. VERNAL,UTAH

'APIVellNo:43013503920000'

NEWFIELD EXPLORATION COMPANYLOCATION LAYOUT

13-18-4-2Section 18, T4S, R2W, U.S.B.&M

PROPOSED ACCESS

STA. 3+05

ExistingTwo- Track

C 1.6

STA. 2+35

F/0. 5 iso C/1. J 3 4STA. 1+75

\ Top ofcut Slope

C/1. 4

WELL HEADUNGRADEO = 5539.8' stoc Note:E/N. GRADE = 5538.5' E/are pit is to

be /ocated aminimum of 80'from we// head.

I I. ExcEss |

Toe of / STA. 0+00

S / REFERENCE POINTS225' NORTHEAST - 5538.0'275' NORTHEAST - 5537.7'170' SOUTHEAST - 5536.5'220' SOUTHEAST - 5533.7'

SURVEYED BY: D.G. DATE SURVEYED: 03-24-10 i State t'27"'-2'°'DRAWN BY: M.W. DATE DRAWN: 03-26-10 La,nd Surveying, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNALAVE. VERNAL,UTAH

'APIWellNo:43013503920000''API' lellNo:43013503920000'

NEWFIELD EXPLORATION COMPANYCROSS SECTIONS

13-18-4-2Section 18, T4S, R2W, U.S.B.&M.

i so' SM. J+05

i so' S M. 2+ JS

RN/SHED EX/SDNGGRADE GRADE

1" - 50' SM. 1+75

Il

1" = so' SM. 0+00 ESTIMATEDEARTHWORK QUANTITIES(No Shrink or swell adJustmentshave been used)

(Expressed in Cubic Yards)

ITEM CUT FILL 6" TOPSOIL EXCESS

NOTE: PAD 770 770 ToPacil is 0UNLESS OTHERWISE PIT 640 0 n Pa

cded640

NOTED ALL CUT/FILLSLOPES ARE AT 1.5:1 TOTALS 1,410 770 1,000 640

SURVEYED BY: D.G. DATE SURVEYED: 03-24-10 i State 3'> '''¯26°'

DRAWNBY: M.W. DATE DRAWN: 03-26-10 Land Surveying, Inc.SCALE: 1" = 50' REVISED: i 180 NORTH VERNALAVE. VERNAL,UTAH

'API' lellNo:43013503920000'

NEWFIELD EXPLORATION COMPANYCROSS SECTIONS

13-18-4-2Section 18, T4S, R2W, U.S.B.&M.

i so' SM. J+05

i so' S M. 2+ JS

RN/SHED EX/SDNGGRADE GRADE

1" - 50' SM. 1+75

Il

1" = so' SM. 0+00 ESTIMATEDEARTHWORK QUANTITIES(No Shrink or swell adJustmentshave been used)

(Expressed in Cubic Yards)

ITEM CUT FILL 6" TOPSOIL EXCESS

NOTE: PAD 770 770 ToPacil is 0UNLESS OTHERWISE PIT 640 0 n Pa

cded640

NOTED ALL CUT/FILLSLOPES ARE AT 1.5:1 TOTALS 1,410 770 1,000 640

SURVEYED BY: D.G. DATE SURVEYED: 03-24-10 i State 3'> '''¯26°'

DRAWNBY: M.W. DATE DRAWN: 03-26-10 Land Surveying, Inc.SCALE: 1" = 50' REVISED: i 180 NORTH VERNALAVE. VERNAL,UTAH

'APIWellNo:43013503920000''APII.TellNo:43013503920000'

NEWFIELD EXPLORATION COMPANYTYPICAL RIG LAYOUT

13-18-4-2Section 18, T4S, R2W, U.S.B.&M. ',

PROPOSED ACCESS /ROAD (Max 6% Grade)

\ ProposedTwo Track

ExistingTwo- Track N tow \

BOlLER 5

PUMP

O TOLETUMP

n z z z 'Oo SJB I- REFER

O P/T- 120' 34' y - (a' Deep) - I I

FIAREPIPE RACKS P/T

PtPE RACKS \ B- 1 9-

\ \

|\ \

SURVEYED BY: D.G. DATE SURVEYED: 03-24-10 i State ("'a '"'¯2

DRAWN BY: M.W. DATE DRAWN: 03-26-10 Land Surveying, Inc.SCALE: 1" = 50' REVISED: s 180 NORTH VERNAL AVE. VERNAL,UTAH

'APII.TellNo:43013503920000'

NEWFIELD EXPLORATION COMPANYTYPICAL RIG LAYOUT

13-18-4-2Section 18, T4S, R2W, U.S.B.&M. ',

PROPOSED ACCESS /ROAD (Max 6% Grade)

\ ProposedTwo Track

ExistingTwo- Track N tow \

BOlLER 5

PUMP

O TOLETUMP

n z z z 'Oo SJB I- REFER

O P/T- 120' 34' y - (a' Deep) - I I

FIAREPIPE RACKS P/T

PtPE RACKS \ B- 1 9-

\ \

|\ \

SURVEYED BY: D.G. DATE SURVEYED: 03-24-10 i State ("'a '"'¯2

DRAWN BY: M.W. DATE DRAWN: 03-26-10 Land Surveying, Inc.SCALE: 1" = 50' REVISED: s 180 NORTH VERNAL AVE. VERNAL,UTAH

'APIWellNo:43013503920000''APIWellNo:43013503920000'

Newfield Production CompanyProposed Site Facility Diagram

Ute Tribal 13-18-4-2

SW/SW (Lot #4) Sec. 18, T4S, R2W

Duchesne County, Utah

2OGOOO5609

Well Head 55 GallonsMethonol

Pumping Un¡t 150 Gallons LegendChemical Drums

Emulsion Line ---------------...

LoadRack -----------

55 GallonsWater Line -- --·--·-----

Motor Di] Heater Gas Sales -- --

Treater Oil Line

Gas Sales Meter

II

Water Tank 6 -- - -

400 bbl I Production Phase:I 1) Valves 1, 3, and 4 sealed closed

2) Valves 2, 5, and 6 sealed open

2Sales Phase:

4 Production Tank 3 - - - - - - - - - - - -Load Rack

1) Valves 1, 2, 4, 5, and 6 sealed closed400 bbl 1 - -. I

I 2) Valve 3 open

5 IDraining Phase:

2 1) Valves 1 and 6 open

Production Tank4 3 --

400 bbl

Diked

'APIWellNo:43013503920000'

Newfield Production CompanyProposed Site Facility Diagram

Ute Tribal 13-18-4-2

SW/SW (Lot #4) Sec. 18, T4S, R2W

Duchesne County, Utah

2OGOOO5609

Well Head 55 GallonsMethonol

Pumping Un¡t 150 Gallons LegendChemical Drums

Emulsion Line -------

LoadRack -----------

55 GallonsWater Line -- --·--·-----

Motor Di] Heater Gas Sales -- --

Treater Oil Line

II

Water Tank 6 -- - -

400 bbl I Production Phase:I 1) Valves 1, 3, and 4 sealed closed

2) Valves 2, 5, and 6 sealed open

2Sales Phase:

4 Production Tank 3 - - - - - - - - - - - -Load Rack

1) Valves 1, 2, 4, 5, and 6 sealed closed400 bbl 1 - -. I

I 2) Valve 3 open

5 IDraining Phase:

2 1) Valves 1 and 6 open

Production Tank4 3 --

400 bbl

Diked

'APIWellNo:43013503920000''APIWellNo:43013503920000'

EXHIBIT D

Township 4 South, Range 3 WestSection 23: E½; SESW

Township 4 South, Range 2 WestSection 7: NWNE; NENW; NWNWSection 18: SWSW; SESW; SWSE; E1/2E1/2

Duchesne County, Utah

ARCHAEOLOGICAL & PALEOTOLOGICAL REPORT WAIVER

For the above referenced location, Todd and Camille Moon, the private surface owners.(Having a Surface Owner Agreement with Newfield Production Company)

Todd Moon, representing this entity does agree to waive the request from the State ofUtah and Bureau of Land Management for an Archaeological/Cultural and PaleotologicalResource Survey for any wells covered by the Surfàce Use Agreement dated 6/2/2010between the above said private land owner and Newfield Production. This waiver herebyreleases Newfield Production Company from this request.

Todd Moon Date Jeff H&derson DatePrivate Surface Owner Newfield Production

'APIWellNo:43013503920000'

EXHIBIT D

Township 4 South, Range 3 WestSection 23: E½; SESW

Township 4 South, Range 2 WestSection 7: NWNE; NENW; NWNWSection 18: SWSW; SESW; SWSE; E1/2E1/2

Duchesne County, Utah

ARCHAEOLOGICAL & PALEOTOLOGICAL REPORT WAIVER

For the above referenced location, Todd and Camille Moon, the private surface owners.(Having a Surface Owner Agreement with Newfield Production Company)

Todd Moon, representing this entity does agree to waive the request from the State ofUtah and Bureau of Land Management for an Archaeological/Cultural and PaleotologicalResource Survey for any wells covered by the Surfàce Use Agreement dated 6/2/2010between the above said private land owner and Newfield Production. This waiver herebyreleases Newfield Production Company from this request.

Todd Moon Date Jeff H&derson DatePrivate Surface Owner Newfield Production

ªª

ª

'

ª

N

N

' ''

'H

'

H ' H

'H

' '

H'

'

H

H

H

'

!

!

!

!

!

!! ! !Ute Tribal 15-18-4-2 4301350394

Ute Tribal 14-18-4-2 4301350393

Ute Tribal 13-18-4-2 4301350392

Ute Tribal 9-14-4-3 4301350377

Ute Tribal 14-13-4-3 4301350376

Ute Tribal 9-13-4-3 4301350375

Ute Tribal 13-13-4-3 4301350374

Ute Tribal 6-13-4-3 4301350373

Ute Tribal 12-17-4-2 4301350360

Ute Tribal 8-23-4-3 4301350345

Ute Tribal 1-23-4-3 4301350343

Ute Tribal 6-17-4-2 4301350321

Ute Tribal 11-19T-4-2 4301350223

Ute Tribal 9-24-4-3 4301350173

Ute Tribal 15-24-4-3 4301350172

Ute Tribal 13-24-4-3 4301350171

Ute Tribal 3-24-4-3 4301350168

Ute Tribal 1-24-4-3 4301350167

Ute Tribal 15-13-4-3 4301350156

Ute Tribal 16-23-4-3 4301350154

Ute Tribal 9-23-4-3 4301350151

Moon 1-20-4-2 4301350008

MOON 3-20-4-2 4301350007

Moon 4-20-4-2 4301350002

Moon 2-20-4-2 4301350001

UTE TRIBAL 13-19-4-2 4301334244

UTE TRIBAL 12-19-4-2 4301334243 UTE TRIBAL 10-19-4-2

4301334242

UTE TRIBAL 9-19-4-2 4301334241

UTE TRIBAL 7-19-4-2 4301334240

UTE TRIBAL 6-19-4-2 4301334239

UTE TRIBAL 5-19-4-2 4301334238

UTE TRIBAL 4-19-4-2 4301334237

UTE TRIBAL 3-19-4-2 4301334236

UTE TRIBAL 2-19-4-2 4301334235

UTE TRIBAL 14-19-4-2 4301333947

DUCHESNE UTE TRIBAL 7-13 4301330947

UTE TRIBAL 7-19 4301330890

DUCHESNE UTE TRIBAL 11-24 4301330860

UTE TRIBAL 7-24 4301330768

UTE TRIBAL 11-19 4301330767

UTE TRIBAL 11-13 4301330766

SOUTHWEST MYTON 1 4301330043

S O U T H M Y T O N B E N C H F I E L DS O U T H M Y T O N B E N C H F I E L D

13 18

24 19

7

17

20

12 8

23

14

11

30 292526

T 4 S R 2 WT 4 S R 3 W

Map Produced by Diana MasonMap Prepared:

Well Name: Ute Tribal 13-18-4-2API Number: 4301350392

Township 04.0 S Section 18Range 02.0 WMeridian: UBM

F1,600 0 1,600800 Feet

1:15,013

UnitsSTATUS

ACTIVE

EXPLORATORY

GAS STORAGE

NF PP OIL

NF SECONDARY

PI OIL

PP GAS

PP GEOTHERML

PP OIL

SECONDARY

TERMINATED

FieldsSections

Township

Wells Query

D <all other values>

StatusAPD - Aproved Permit

H DRL - Spuded (Drilling Commenced)

4 GIW - Gas Injection

!* GS - Gas Storage

N LA - Location Abandoned

! LOC - New Location

7 OPS - Operation Suspended

ª PA - Plugged Abandoned

* PGW - Producing Gas Well

' POW - Producing Oil Well

O RET - Returned APD

¸ SGW - Shut-in Gas Well

· SOW - Shut-in Oil Well

6 TA - Temp. Abandoned

" TW - Test Well

¸ WDW - Water Disposal

¸ WIW - Water Injection Well

=* WSW - Water Supply Well

Tooele

Millard

Iron

San Juan

Kane

Juab

Uintah

Box Elder

Emery

Garfield

Grand

Utah

Beaver Wayne

Duchesne

Sevier

Summit

Rich

Washington

Carbon

Sanpete

Cache

Piute

Davis

Wasatch

Weber

DaggettSalt Lake

Morgan

Location Map

Operator: NEWFIELD PRODUCTION COMPANY

'APIW

ellNo:43013503920000'

OAPI Number: 4301350392 ¿

Well Name: Ute Tribal 13-18-4-2 $11 12 7 8 Township 04.0 S Range 02.0 W Section 18 Q

Meridian: UBMOperator: NEWFIELD PRODUCTION COMPANY

Map Prepared:Map Produced by Diana Mason

Units Wells QuerySTATus <aiiothervoue

AcrivE statusExPLaRATaRY # APD Aproved Perm

Ute Tribal 6-13-4-3 Ute Tribal 6-17-4-2 oAs svoRAGE o one spaceatoriiiinocomm

4301350373 4301350321 °"

DUCHESNE UTE TRIBAL 7-13 co one

4301330947esoAs × ' ^6336°366

PPGEaTHEmviL e Lac New

14 , 13 18 ,,,,2 .

SOUTHWEST MYTON 1 Ute Tribal 12-17-4-2 secomoAm 66^6336°366

Ute Tribal 9-14-4-3 UTE TRIBAL 11-13 Ute Tribal 9-13-4-3 4301330043 4301350360 TERriiNATeo °6 36

4301350317 4301330766 4301350375 Fields Pow Producingaliweii

Ute Tribal 13-13-4-3Ute Tribal 14-13-4-3 4

5b0a 23-18-4-2Ute Tribal 14-18-4-2 Ute Tribal 15-18-4-2

a veii43013503744301350376 e 4301350393 4301350394 e

Ute Tribal 15-13-4-34301350156

Ute Tribal 3-24-4-3 UTE TRIBAL 4-19-4-2 UTE TRIBAL 2-19-4-2Cache

Ute Tri al 1-23-4-3 4301350168 4301334237 4301334235 Box Elder Rich Location Map43013 343 * Ute Tribal 1-24-4- 430E133RIBAL3-19-4-2 / e

r -

4301350167 summit

SOUTH MYTON BENCH FIELD cosisakLak

sate DuchesnUtah O Uintah

UTE TRIBAL 7-24 UTE TRIBAL 6-19-4-2 UTE TRIBAL 7-19-4-2

4U Tri5b0al523-4-3 4301330768 g430E T3RL353 34

2E334R240

L 7-19

JuabCarbon

4301330890 Millard Emery Grand

23 24 19 20 sevier

MOON 3-20-4-2 Beaver Wayne

41Tri5b0a9-23-4-3

41Tri5b0al9324-4-3 430E133RIBAL11-19

Ute Tribal 11-19T-4-2430E133RIB L 9-19-4- 43MO13n50402007-4-2

iron GarfeldD3UCHE0S8NEUTE TRIBAL 11-24 *

l TE TRIBAL 12-19-4-2301350223 4301350002 san Juan

4 101334243 UTE TRIBAL 10-19-4-2 Washington Kane4301334242

Moon 1-20-4-2UTE TRIBAL 13-19-4-2

4301350008Ute Tribal 16-23- 3 Ute Tribal 13-24-4-3 Ute Tribal 15-24-4-3 43013342444301350154 4301350171 4301350172 UTE TRIBAL 14-19-4-2

4301333947 Moon 2-20-4-24301350001 1600 soo o 1eooFeet

26 25 30 29

OAPI Number: 4301350392 ¿

Well Name: Ute Tribal 13-18-4-2 $11 12 7 8 Township 04.0 S Range 02.0 W Section 18 Q

Meridian: UBMOperator: NEWFIELD PRODUCTION COMPANY

Map Prepared:Map Produced by Diana Mason

Units Wells QuerySTATus <aiiothervoue

AcrivE statusExPLaRATaRY # APD Aproved Perm

Ute Tribal 6-13-4-3 Ute Tribal 6-17-4-2 oAs svoRAGE o one spaceatoriiiinocomm

4301350373 4301350321 °"

DUCHESNE UTE TRIBAL 7-13 co one

4301330947esoAs × ' ^6336°366

PPGEaTHEmviL e Lac New

14 , 13 18 ,,,,2 .

SOUTHWEST MYTON 1 Ute Tribal 12-17-4-2 secomoAm 66^6336°366

Ute Tribal 9-14-4-3 UTE TRIBAL 11-13 Ute Tribal 9-13-4-3 4301330043 4301350360 TERriiNATeo °6 36

4301350317 4301330766 4301350375 Fields Pow Producingaliweii

Ute Tribal 13-13-4-3Ute Tribal 14-13-4-3 4

5b0a 23-18-4-2Ute Tribal 14-18-4-2 Ute Tribal 15-18-4-2

a veii43013503744301350376 e 4301350393 4301350394 e

Ute Tribal 15-13-4-34301350156

Ute Tribal 3-24-4-3 UTE TRIBAL 4-19-4-2 UTE TRIBAL 2-19-4-2Cache

Ute Tri al 1-23-4-3 4301350168 4301334237 4301334235 Box Elder Rich Location Map43013 343 * Ute Tribal 1-24-4- 430E133RIBAL3-19-4-2 / e

r -

4301350167 summit

SOUTH MYTON BENCH FIELD cosisakLak

sate DuchesnUtah O Uintah

UTE TRIBAL 7-24 UTE TRIBAL 6-19-4-2 UTE TRIBAL 7-19-4-2

4U Tri5b0al523-4-3 4301330768 g430E T3RL353 34

2E334R240

L 7-19

JuabCarbon

4301330890 Millard Emery Grand

23 24 19 20 sevier

MOON 3-20-4-2 Beaver Wayne

41Tri5b0a9-23-4-3

41Tri5b0al9324-4-3 430E133RIBAL11-19

Ute Tribal 11-19T-4-2430E133RIB L 9-19-4- 43MO13n50402007-4-2

iron GarfeldD3UCHE0S8NEUTE TRIBAL 11-24 *

l TE TRIBAL 12-19-4-2301350223 4301350002 san Juan

4 101334243 UTE TRIBAL 10-19-4-2 Washington Kane4301334242

Moon 1-20-4-2UTE TRIBAL 13-19-4-2

4301350008Ute Tribal 16-23- 3 Ute Tribal 13-24-4-3 Ute Tribal 15-24-4-3 43013342444301350154 4301350171 4301350172 UTE TRIBAL 14-19-4-2

4301333947 Moon 2-20-4-24301350001 1600 soo o 1eooFeet

26 25 30 29

ON-SITE PREDRILL EVALUATIONUtah Division of Oil, Gas and Mining

Operator NEWFIELD PRODUCTION COMPANY

Well Name Ute Tribal 13-18-4-2

API Number 43013503920000 APD No 2707 Field/Unit UNDESIGNATED

Location: 1/4,1/4 SWSW Sec 18 Tw 4.0S Rng 2.0W 748 FSL 638 FWL

GPS Coord (UTM) 571662 4442201 Surface Owner Todd and Camille Moon

Participants

Floyd Bartlett (DOGM), Tim Eaton (Newfield Permitting) and Cheryl Laroque (BLM).

Regional/Local Setting & Topography

The proposed location is approximately 15.0 road miles southwest of Myton, UT in the South Myton

Bench/Antelope Creek area. Drainages in the area run northerly toward the Duchesne River about 2 miles away but

are intercepted by the Gray Mountain or Pleasant Valley Irrigation Canals. Broad flats and rolling hills with those

near the edge of the benches becoming steep and intersected with draws, characterize the area. Access is by State,

County and planned or existing oil field development roads. Approximately 910 feet of new construction across

Moon’s private land will be required to reach the location.

The proposed Ute Tribal 13-18-4-2 oil well pad is laid out in an west to east direction on a flat topped ridge which

slopes off to the south beyond Location Corner 1 into a wide swale or drainage. The ridge top has a gentle slope to

the east and south. Maximum excavation is a cut of 2.1 feet to construct the pad or reserve pit. No drainages

intersect the location. No springs, streams or seeps are known to exist in the immediate area. The selected site

appears to be a suitable location for constructing a pad, drilling and operating a well.

Todd Moon and Camille Moon own the surface of the location. The BLM contacted Mr. Moon by telephone and

invited him to the pre-site visit. He said he would not attend. A signed landowner agreement exists. The minerals

are owned by the United States Government and held in trust for the Ute Indian Tribe.

Surface Use Plan

Current Surface Use

Grazing

Wildlfe Habitat

New Road Miles Well Pad Src Const Material Surface Formation

0.18 Width 204 Length 305 Onsite UNTA

Ancillary Facilities N

Waste Management Plan Adequate?

Environmental Parameters

Affected Floodplains and/or Wetlands N

Flora / Fauna

A desert shrub type vegetation covers the area. Principal plants consist of black sage, winter fat, shadscale,

halogeton, globe mallow, cheat grass, erigeron sp. Blue gramma, Indian ricegrass, sitanion, horse brush, curly

mesquite and annuals.

Cattle, goats, deer, prairie dogs, small mammals and birds.

6/29/2010 Page 1

'APIWellNo:43013503920000''APIWellNo:43013503920000'

ON-SITE PREDRILL EVALUATIONUtah Division of Oil, Gas and Mining

Operator NEWFIELD PRODUCTION COMPANYWell Name Ute Tribal 13-18-4-2

API Number 43013503920000 APD No 2707 Field/Unit UNDESIGNATEDLocation: 1/4,1/4 SWSW Sec 18 Tw 4.0S Rng 2.0W 748 FSL 638 FWLGPS Coord (UTM) 571662 4442201 Surface Owner Todd and Camille Moon

ParticipantsFloyd Bartlett (DOGM), Tim Eaton (Newfield Permitting) and Cheryl Laroque (BLM).

Regional/Local Setting & TopographyThe proposed location is approximately 15.0 road miles southwest of Myton, UT in the South MytonBench/Antelope Creek area. Drainages in the area run northerly toward the Duchesne River about 2 miles away butare intercepted by the Gray Mountain or Pleasant Valley Irrigation Canals. Broad flats and rolling hills with thosenear the edge of the benches becoming steep and intersected with draws, characterize the area. Access is by State,County and planned or existing oil field development roads. Approximately 910 feet of new construction acrossMoon's private land will be required to reach the location.

The proposed Ute Tribal 13-18-4-2 oil well pad is laid out in an west to east direction on a flat topped ridge whichslopes off to the south beyond Location Corner 1 into a wide swale or drainage. The ridge top has a gentle slope tothe east and south. Maximum excavation is a cut of 2.1 feet to construct the pad or reserve pit. No drainagesintersect the location. No springs, streams or seeps are known to exist in the immediate area. The selected siteappears to be a suitable location for constructing a pad, drilling and operating a well.

Todd Moon and Camille Moon own the surface of the location. The BLM contacted Mr. Moon by telephone andinvited him to the pre-site visit. He said he would not attend. A signed landowner agreement exists. The mineralsare owned by the United States Government and held in trust for the Ute Indian Tribe.

Surface Use PlanCurrent Surface UseGrazingWildlfe Habitat

New Road Miles Well Pad Src Const Material Surface Formation0.18 Width 204 Length 305 Onsite UNTA

Ancillary Facilities N

Waste Management Plan Adequate?

Environmental ParametersAffected Floodplains and/or Wetlands N

Flora / FaunaA desert shrub type vegetation covers the area. Principal plants consist of black sage, winter fat, shadscale,halogeton, globe mallow, cheat grass, erigeron sp. Blue gramma, Indian ricegrass, sitanion, horse brush, curlymesquite and annuals.

Cattle, goats, deer, prairie dogs, small mammals and birds.

I

6/29/2010 Page

'APIWellNo:43013503920000'

ON-SITE PREDRILL EVALUATIONUtah Division of Oil, Gas and Mining

Operator NEWFIELD PRODUCTION COMPANYWell Name Ute Tribal 13-18-4-2

API Number 43013503920000 APD No 2707 Field/Unit UNDESIGNATEDLocation: 1/4,1/4 SWSW Sec 18 Tw 4.0S Rng 2.0W 748 FSL 638 FWLGPS Coord (UTM) 571662 4442201 Surface Owner Todd and Camille Moon

ParticipantsFloyd Bartlett (DOGM), Tim Eaton (Newfield Permitting) and Cheryl Laroque (BLM).

Regional/Local Setting & TopographyThe proposed location is approximately 15.0 road miles southwest of Myton, UT in the South MytonBench/Antelope Creek area. Drainages in the area run northerly toward the Duchesne River about 2 miles away butare intercepted by the Gray Mountain or Pleasant Valley Irrigation Canals. Broad flats and rolling hills with thosenear the edge of the benches becoming steep and intersected with draws, characterize the area. Access is by State,County and planned or existing oil field development roads. Approximately 910 feet of new construction acrossMoon's private land will be required to reach the location.

The proposed Ute Tribal 13-18-4-2 oil well pad is laid out in an west to east direction on a flat topped ridge whichslopes off to the south beyond Location Corner 1 into a wide swale or drainage. The ridge top has a gentle slope tothe east and south. Maximum excavation is a cut of 2.1 feet to construct the pad or reserve pit. No drainagesintersect the location. No springs, streams or seeps are known to exist in the immediate area. The selected siteappears to be a suitable location for constructing a pad, drilling and operating a well.

Todd Moon and Camille Moon own the surface of the location. The BLM contacted Mr. Moon by telephone andinvited him to the pre-site visit. He said he would not attend. A signed landowner agreement exists. The mineralsare owned by the United States Government and held in trust for the Ute Indian Tribe.

Surface Use PlanCurrent Surface UseGrazingWildlfe Habitat

New Road Miles Well Pad Src Const Material Surface Formation0.18 Width 204 Length 305 Onsite UNTA

Ancillary Facilities N

Waste Management Plan Adequate?

Environmental ParametersAffected Floodplains and/or Wetlands N

Flora / FaunaA desert shrub type vegetation covers the area. Principal plants consist of black sage, winter fat, shadscale,halogeton, globe mallow, cheat grass, erigeron sp. Blue gramma, Indian ricegrass, sitanion, horse brush, curlymesquite and annuals.

Cattle, goats, deer, prairie dogs, small mammals and birds.

I

6/29/2010 Page

Soil Type and Characteristics

Deep gravely sandy loam .

Erosion Issues N

Sedimentation Issues N

Site Stability Issues N

Drainage Diverson Required? N

Berm Required? N

Erosion Sedimentation Control Required? N

Paleo Survey Run? N Paleo Potental Observed? N Cultural Survey Run? N Cultural Resources?

Reserve Pit

Site-Specific Factors Site Ranking

Distance to Groundwater (feet) 100 to 200 5

Distance to Surface Water (feet) >1000 0

Dist. Nearest Municipal Well (ft) >5280 0

Distance to Other Wells (feet) 300 to 1320 10

Native Soil Type Mod permeability 10

Fluid Type Fresh Water 5

Drill Cuttings Normal Rock 0

Annual Precipitation (inches) 0

Affected Populations

Presence Nearby Utility Conduits Not Present 0

Final Score 30 1 Sensitivity Level

Characteristics / Requirements

A reserve pit 40' x 80' x 8' deep will be located in an area of cut on the northwest side of the location. A pit

liner is required. Newfield commonly uses a 16-mil liner.

Closed Loop Mud Required? N Liner Required? Y Liner Thickness 16 Pit Underlayment Required? Y

Other Observations / Comments

Floyd Bartlett 6/17/2010

Evaluator Date / Time

6/29/2010 Page 2

'APIWellNo:43013503920000''APIWellNo:43013503920000'

Soil Type and CharacteristicsDeep gravely sandy loam .

Erosion Issues N

Sedimentation Issues N

Site Stability Issues N

Drainage Diverson Required? N

Berm Required? N

Erosion Sedimentation Control Required? N

Paleo Survey Run? N Paleo Potental Observed? N Cultural Survey Run? N Cultural Resources?

Reserve Pit

Site-Specific Factors Site Ranking

Distance to Groundwater (feet) 100 to 200 5Distance to Surface Water (feet) >1000 0Dist. Nearest Municipal Well (ft) >5280 0

Distance to Other Wells (feet) 300 to 1320 10Native Soil Type Mod permeability 10

Fluid Type Fresh Water 5Drill Cuttings Normal Rock 0

Annual Precipitation (inches) 0Affected Populations

Presence Nearby Utility Conduits Not Present 0Final Score 30 1 Sensitivity Level

Characteristics / RequirementsA reserve pit 40' x 80' x 8' deep will be located in an area of cut on the northwest side of the location. A pitliner is required. Newfield commonly uses a 16-mil liner.

Closed Loop Mud Required? N Liner Required? Y Liner Thickness 16 Pit Underlayment Required? Y

Other Observations / Comments

Floyd Bartlett 6/17/2010Evaluator Date / Time

I

6/29/2010 Page

'APIWellNo:43013503920000'

Soil Type and CharacteristicsDeep gravely sandy loam .

Erosion Issues N

Sedimentation Issues N

Site Stability Issues N

Drainage Diverson Required? N

Berm Required? N

Erosion Sedimentation Control Required? N

Paleo Survey Run? N Paleo Potental Observed? N Cultural Survey Run? N Cultural Resources?

Reserve Pit

Site-Specific Factors Site Ranking

Distance to Groundwater (feet) 100 to 200 5Distance to Surface Water (feet) >1000 0Dist. Nearest Municipal Well (ft) >5280 0

Distance to Other Wells (feet) 300 to 1320 10Native Soil Type Mod permeability 10

Fluid Type Fresh Water 5Drill Cuttings Normal Rock 0

Annual Precipitation (inches) 0Affected Populations

Presence Nearby Utility Conduits Not Present 0Final Score 30 1 Sensitivity Level

Characteristics / RequirementsA reserve pit 40' x 80' x 8' deep will be located in an area of cut on the northwest side of the location. A pitliner is required. Newfield commonly uses a 16-mil liner.

Closed Loop Mud Required? N Liner Required? Y Liner Thickness 16 Pit Underlayment Required? Y

Other Observations / Comments

Floyd Bartlett 6/17/2010Evaluator Date / Time

I

6/29/2010 Page

APD No API WellNo Status Well Type Surf Owner CBM

2707 43013503920000 LOCKED OW P No

Operator NEWFIELD PRODUCTION COMPANY Surface Owner-APD Todd and Camille Moon

Well Name Ute Tribal 13-18-4-2 Unit

Field UNDESIGNATED Type of Work DRILL

Location SWSW 18 4S 2W U 748 FSL 638 FWL GPS Coord (UTM) 571687E 4442278N

Geologic Statement of Basis

The mineral rights for the proposed well are owned by the Ute Tribe. The BLM will be the agency responsible

for evaluating and approving the drilling, casing and cement programs.

Brad Hill

APD Evaluator

6/28/2010

Date / Time

Surface Statement of Basis

The proposed location is approximately 15.0 road miles southwest of Myton, UT in the South Myton

Bench/Antelope Creek area. Drainages in the area run northerly toward the Duchesne River about 2 miles away

but are intercepted by the Gray Mountain or Pleasant Valley Irrigation Canals. Broad flats and rolling hills with

those near the edge of the benches becoming steep and intersected with draws, characterize the area. Access is

by State, County and planned or existing oil field development roads. Approximately 910 feet of new

construction across Moon’s private land will be required to reach the location.

The proposed Ute Tribal 13-18-4-2 oil well pad is laid out in an west to east direction on a flat topped ridge

which slopes off to the south beyond Location Corner 1 into a wide swale or drainage. The ridge top has a

gentle slope to the east and south. Maximum excavation is a cut of 2.1 feet to construct the pad or reserve pit.

No drainages intersect the location. No springs, streams or seeps are known to exist in the immediate area. The

selected site appears to be a suitable location for constructing a pad, drilling and operating a well.

Todd Moon and Camille Moon own the surface of the location. The BLM contacted Mr. Moon by telephone

and invited him to the pre-site visit. He said he would not attend. A signed landowner agreement exists. The

minerals are owned by the United States Government and held in trust for the Ute Indian Tribe. Acting for the

Ute Indian Tribe, Ms. Cheryl Laroque of the BLM attended the pre-site evaluation. She specified the color of

paint the facilities were to be painted and had no other surface concerns. Reclamation of the site will be as

directed in the Multi-Point Operating Plan.

Floyd Bartlett

Onsite Evaluator

6/17/2010

Date / Time

Conditions of Approval / Application for Permit to Drill

Category Condition

Pits A synthetic liner with a minimum thickness of 16 mils with a felt subliner shall be properly installed and maintained in thereserve pit.

Surface The well site shall be bermed to prevent fluids from leaving the pad.

Surface The reserve pit shall be fenced upon completion of drilling operations.

Application for Permit to Drill

Statement of Basis6/29/2010 Utah Division of Oil, Gas and Mining Page 1

'APIWellNo:43013503920000''APIWellNo:43013503920000'I

Application for Permit to DrillStatement of Basis

6/29/2010 Utah Division of Oil, Gas and Mining Page l

I

APD No API WellNo Status Well Type Surf Owner CBM2707 43013503920000 LOCKED OW P NoOperator NEWFIELD PRODUCTION COMPANY Surface Owner-APD Todd and Camille MoonWell Name Ute Tribal 13-18-4-2 UnitField UNDESIGNATED Type of Work DRILLLocation SWSW 18 4S 2W U 748 FSL 638 FWL GPS Coord (UTM) 571687E 4442278NGeolooic Statement of Basis

The mineral rights for the proposed well are owned by the Ute Tribe. The BLM will be the agency responsiblefor evaluating and approving the drilling, casing and cement programs.

Brad Hill 6/28/2010APD Evaluator Date / Time

Surface Statement of BasisThe proposed location is approximately 15.0 road miles southwest of Myton, UT in the South MytonBench/Antelope Creek area. Drainages in the area run northerly toward the Duchesne River about 2 miles awaybut are intercepted by the Gray Mountain or Pleasant Valley Irrigation Canals. Broad flats and rolling hills withthose near the edge of the benches becoming steep and intersected with draws, characterize the area. Access isby State, County and planned or existing oil field development roads. Approximately 910 feet of newconstruction across Moon's private land will be required to reach the location.

The proposed Ute Tribal 13-18-4-2 oil well pad is laid out in an west to east direction on a flat topped ridgewhich slopes off to the south beyond Location Corner 1 into a wide swale or drainage. The ridge top has agentle slope to the east and south. Maximum excavation is a cut of 2.1 feet to construct the pad or reserve pit.No drainages intersect the location. No springs, streams or seeps are known to exist in the immediate area. Theselected site appears to be a suitable location for constructing a pad, drilling and operating a well.

Todd Moon and Camille Moon own the surface of the location. The BLM contacted Mr. Moon by telephoneand invited him to the pre-site visit. He said he would not attend. A signed landowner agreement exists. Theminerals are owned by the United States Government and held in trust for the Ute Indian Tribe. Acting for theUte Indian Tribe, Ms. Cheryl Laroque of the BLM attended the pre-site evaluation. She specified the color ofpaint the facilities were to be painted and had no other surface concerns. Reclamation of the site will be asdirected in the Multi-Point Operating Plan.

Floyd Bartlett 6/17/2010Onsite Evaluator Date / Time

Conditions of Approval / Application for Permit to DrillCategory ConditionPits A synthetic liner with a minimum thickness of 16 mils with a felt subliner shall be properly installed and maintained in the

reserve pit.Surface The well site shall be bermed to prevent fluids from leaving the pad.Surface The reserve pit shall be fenced upon completion of drilling

'APIWellNo:43013503920000'I

Application for Permit to DrillStatement of Basis

6/29/2010 Utah Division of Oil, Gas and Mining Page l

I

APD No API WellNo Status Well Type Surf Owner CBM2707 43013503920000 LOCKED OW P NoOperator NEWFIELD PRODUCTION COMPANY Surface Owner-APD Todd and Camille MoonWell Name Ute Tribal 13-18-4-2 UnitField UNDESIGNATED Type of Work DRILLLocation SWSW 18 4S 2W U 748 FSL 638 FWL GPS Coord (UTM) 571687E 4442278NGeolooic Statement of Basis

The mineral rights for the proposed well are owned by the Ute Tribe. The BLM will be the agency responsiblefor evaluating and approving the drilling, casing and cement programs.

Brad Hill 6/28/2010APD Evaluator Date / Time

Surface Statement of BasisThe proposed location is approximately 15.0 road miles southwest of Myton, UT in the South MytonBench/Antelope Creek area. Drainages in the area run northerly toward the Duchesne River about 2 miles awaybut are intercepted by the Gray Mountain or Pleasant Valley Irrigation Canals. Broad flats and rolling hills withthose near the edge of the benches becoming steep and intersected with draws, characterize the area. Access isby State, County and planned or existing oil field development roads. Approximately 910 feet of newconstruction across Moon's private land will be required to reach the location.

The proposed Ute Tribal 13-18-4-2 oil well pad is laid out in an west to east direction on a flat topped ridgewhich slopes off to the south beyond Location Corner 1 into a wide swale or drainage. The ridge top has agentle slope to the east and south. Maximum excavation is a cut of 2.1 feet to construct the pad or reserve pit.No drainages intersect the location. No springs, streams or seeps are known to exist in the immediate area. Theselected site appears to be a suitable location for constructing a pad, drilling and operating a well.

Todd Moon and Camille Moon own the surface of the location. The BLM contacted Mr. Moon by telephoneand invited him to the pre-site visit. He said he would not attend. A signed landowner agreement exists. Theminerals are owned by the United States Government and held in trust for the Ute Indian Tribe. Acting for theUte Indian Tribe, Ms. Cheryl Laroque of the BLM attended the pre-site evaluation. She specified the color ofpaint the facilities were to be painted and had no other surface concerns. Reclamation of the site will be asdirected in the Multi-Point Operating Plan.

Floyd Bartlett 6/17/2010Onsite Evaluator Date / Time

Conditions of Approval / Application for Permit to DrillCategory ConditionPits A synthetic liner with a minimum thickness of 16 mils with a felt subliner shall be properly installed and maintained in the

reserve pit.Surface The well site shall be bermed to prevent fluids from leaving the pad.Surface The reserve pit shall be fenced upon completion of drilling

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 6/4/2010 API NO. ASSIGNED: 43013503920000

WELL NAME: Ute Tribal 13-18-4-2

OPERATOR: NEWFIELD PRODUCTION COMPANY (N2695) PHONE NUMBER: 435 646-4825

CONTACT: Mandie Crozier

PROPOSED LOCATION: SWSW 18 040S 020W Permit Tech Review:

SURFACE: 0748 FSL 0638 FWL Engineering Review:

BOTTOM: 0748 FSL 0638 FWL Geology Review:

COUNTY: DUCHESNE

LATITUDE: 40.12966 LONGITUDE: -110.15861

UTM SURF EASTINGS: 571687.00 NORTHINGS: 4442278.00

FIELD NAME: UNDESIGNATED

LEASE TYPE: 2 - Indian

LEASE NUMBER: 2OG0005609 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 4 - Fee COALBED METHANE: NO

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: INDIAN - RLB0010462 Unit:

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: 43-7478 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

Comments: Presite Completed

Stipulations: 4 - Federal Approval - dmason 5 - Statement of Basis - bhill 23 - Spacing - dmason

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 6/4/2010 API NO. ASSIGNED: 43013503920000

WELL NAME: Ute Tribal 13-18-4-2

OPERATOR: NEWFIELD PRODUCTION COMPANY (N2695) PHONE NUMBER: 435 646-4825

CONTACT: Mandie Crozier

PROPOSED LOCATION: SWSW 18 040S 020W Permit Tech Review:

SURFACE: 0748 FSL 0638 FWL Engineering Review:

BOTTOM: 0748 FSL 0638 FWL Geology Review:

COUNTY: DUCHESNE

LATITUDE: 40.12966 LONGITUDE: -110.15861

UTM SURF EASTINGS: 571687.00 NORTHINGS: 4442278.00

FIELD NAME: UNDESIGNATED

LEASE TYPE: 2 - Indian

LEASE NUMBER: 2OGOOO5609 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 4 - Fee COALBED METHANE: NO

I

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: INDIAN - RLBOO10462 Unit:

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: 43-7478 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I

Comments: Presite Completed

Stipulations: 4 - Federal Approval - dmason5 - Statement of Basis - bhill23 - Spacing -

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 6/4/2010 API NO. ASSIGNED: 43013503920000

WELL NAME: Ute Tribal 13-18-4-2

OPERATOR: NEWFIELD PRODUCTION COMPANY (N2695) PHONE NUMBER: 435 646-4825

CONTACT: Mandie Crozier

PROPOSED LOCATION: SWSW 18 040S 020W Permit Tech Review:

SURFACE: 0748 FSL 0638 FWL Engineering Review:

BOTTOM: 0748 FSL 0638 FWL Geology Review:

COUNTY: DUCHESNE

LATITUDE: 40.12966 LONGITUDE: -110.15861

UTM SURF EASTINGS: 571687.00 NORTHINGS: 4442278.00

FIELD NAME: UNDESIGNATED

LEASE TYPE: 2 - Indian

LEASE NUMBER: 2OGOOO5609 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 4 - Fee COALBED METHANE: NO

I

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: INDIAN - RLBOO10462 Unit:

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: 43-7478 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I

Comments: Presite Completed

Stipulations: 4 - Federal Approval - dmason5 - Statement of Basis - bhill23 - Spacing -

Permit To Drill

******************Well Name:  Ute Tribal 13-18-4-2

API Well Number:  43013503920000

Lease Number:  2OG0005609

Surface Owner:   FEE (PRIVATE) 

Approval Date:  6/29/2010

Issued to:NEWFIELD PRODUCTION COMPANY , Rt 3 Box 3630 , Myton, UT 84052

Authority:Pursuant to Utah Code Ann. §40-6-1 et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling. 

This proposed well is located in an area for which drilling units (well spacing patterns) have not beenestablished through an order of the Board of Oil, Gas and Mining (the “Board”). In order to avoid thepossibility of waste or injury to correlative rights, the operator is requested, once the well has beendrilled, completed, and has produced, to analyze geological and engineering data generatedtherefrom, as well as any similar data from surrounding areas if available. As soon as is practicableafter completion of its analysis, and if the analysis suggests an area larger than the quarter-quartersection upon which the well is located is being drained, the operator is requested to seek anappropriate order from the Board establishing drilling and spacing units in conformance with suchanalysis by filing a Request for Agency Action with the Board. 

Compliance with the Conditions of Approval/Application for Permit to Drill outlined in theStatement of Basis (copy attached). 

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions during

API Well No: 43013503920000API Well No: 43013503920000

State of UtahDEPARTMENT OF NATURAL RESOURCES

- MICHAEL R. STYLER

GARY R. HERBERT Excutiw Drotor

comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor

Permit To Drillkkkkkkkkkkkkkkkkkk

Well Name: Ute Tribal 13-18-4-2API Well Number: 43013503920000

Lease Number: 2OGOOO5609Surface Owner: FEE (PRIVATE)Approval Date: 6/29/2010

Issued to:NEWFIELD PRODUCTION COMPANY , Rt 3 Box 3630 , Myton, UT 84052

Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.

This proposed well is located in an area for which drilling units (well spacing patterns) have not beenestablished through an order of the Board of Oil, Gas and Mining (the "Board"). In order to avoid thepossibility of waste or injury to correlative rights, the operator is requested, once the well has beendrilled, completed, and has produced, to analyze geological and engineering data generatedtherefrom, as well as any similar data from surrounding areas if available. As soon as is practicableafter completion of its analysis, and if the analysis suggests an area larger than the quarter-quartersection upon which the well is located is being drained, the operator is requested to seek anappropriate order from the Board establishing drilling and spacing units in conformance with suchanalysis by filing a Request for Agency Action with the Board.

Compliance with the Conditions of Approval/Application for Permit to Drill outlined in theStatement of Basis (copy attached).

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions

API Well No: 43013503920000

State of UtahDEPARTMENT OF NATURAL RESOURCES

- MICHAEL R. STYLER

GARY R. HERBERT Excutiw Drotor

comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor

Permit To Drillkkkkkkkkkkkkkkkkkk

Well Name: Ute Tribal 13-18-4-2API Well Number: 43013503920000

Lease Number: 2OGOOO5609Surface Owner: FEE (PRIVATE)Approval Date: 6/29/2010

Issued to:NEWFIELD PRODUCTION COMPANY , Rt 3 Box 3630 , Myton, UT 84052

Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.

This proposed well is located in an area for which drilling units (well spacing patterns) have not beenestablished through an order of the Board of Oil, Gas and Mining (the "Board"). In order to avoid thepossibility of waste or injury to correlative rights, the operator is requested, once the well has beendrilled, completed, and has produced, to analyze geological and engineering data generatedtherefrom, as well as any similar data from surrounding areas if available. As soon as is practicableafter completion of its analysis, and if the analysis suggests an area larger than the quarter-quartersection upon which the well is located is being drained, the operator is requested to seek anappropriate order from the Board establishing drilling and spacing units in conformance with suchanalysis by filing a Request for Agency Action with the Board.

Compliance with the Conditions of Approval/Application for Permit to Drill outlined in theStatement of Basis (copy attached).

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions

drilling of this well:   • Within 24 hours following the spudding of the well – contact Carol Daniels at 801-538-5284     (please leave a voicemail message if not available)     OR     submit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas website     at https://oilgas.ogm.utah.gov

Reporting Requirements:All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:   • Entity Action Form (Form 6) – due within 5 days of spudding the well   • Monthly Status Report (Form 9) – due by 5th day of the following calendar month   • Requests to Change Plans (Form 9) – due prior to implementation   • Written Notice of Emergency Changes (Form 9) – due within 5 days   • Notice of Operations Suspension or Resumption (Form 9) – due prior to implementation   • Report of Water Encountered (Form 7) – due within 30 days after completion   • Well Completion Report (Form 8) – due within 30 days after completion or plugging

Approved By:

Acting Associate Director, Oil & Gas 

API Well No: 43013503920000API Well No: 43013503920000

drilling of this well:• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284

(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov

Reporting Requirements:All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:

• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging

Approved By:

Acting Associate Director, Oil &

API Well No: 43013503920000

drilling of this well:• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284

(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov

Reporting Requirements:All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:

• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging

Approved By:

Acting Associate Director, Oil &

Fomi3160-3 FORM APPROVED(August2007) OMBNo.1004-0137

ExpiresJuly31, 2010UNITED STATESDEPARTMENTOF THE INTERIOR 5. LeaseSerialNo.

2OGOOO5609BUREAUOF LAND MANAGEMENT6. If Indian,Alloteeor TribeNameAPPLICATION FOR PERMIT TO DRILL OR REENTER UTE

la. Typeof work: DRILL REENTER 2 IfUnitor CAAgreement,NameandNo.

8. Lease Nameand WellNo.Ib. Typeof Well OilWell O GasWelf Other Sin e Zone MultipleZone Ute Tribal 13418422. Nameof Operator Newfield Production Company 9. API WellNo.

3a. Address Route #3 Box 3630, Myton UT84052 3b. PhoneNo.(include area code) 10.Fiekiand Pool,or Exploratory(435) 646-3721 Undesignated

4. Locationof Well (Report Ïocationclearly and in acordoce with ariy Staterequirements.*) 11 Sec.,T. R. lvÏ.or Blk.andSurveyorAreaAt surface SWISW (Lot #4) 748' FSL 638' FWL Sec. 18, T4S R2W

Atproposedprod.zone

14. Distanceinmilesanddirectionfrom nearesttown or postofice* 12.Countyor Parish 13. State .Approximately 15.1 miles southwest of Myton, UT Duchesne UT

15. Distancefromproposed* 16.No of acresin lease 17 SpacingUnitdedicated10thiswelllocationtonearestpropertyor leaseline,ft. Approx. 638' f/lse, NA' flunit NA(Alsotonearest drig.unit line,if any) 40 Acres

18. Distancefrompoposed location* 19.ProposedDepth 20. BLM/BIABondNo.on fileappn estor

o thiiing,completed' Approx. 1302' I 470' RLBOO10462

21. Elevations(ShowwhetherDF,KDB,RT,GL,etc.) 22. Approximatedateworkwillstart* 23. Estimatedduration5540' GL (i) days from SPUD to rig release

24. AttachmentsThefollowing,completed inaccordancewith theretiuirementsof OnshoreOilandGasOrderNo.1,mustbe attachedto thisform:

1. Wellplatcertifiedby a registered surveyor. 4. Bondtocover the operationsunlesscoveredbyan existingbondon file(see2. A DrillingPlan. Item20 above).3. A SurfaceUse Plan (if the location is on National Forest SystemLands,the 5. Operatorcertification

SUPO mustbe filedwith the appropriate ForestServiceOffice) 6. Suchother site specific informationand/or plansas may be required by the

T2

e

NMamerint ped) Date

Regul ry Specialist

Approvedb atuk) Ndgmed H. Sparger alle27 2610go..i.

°"iVERNALFIELDOFFICE

Applicationapprovaldoes90w0aran f i te a icantholdslegalorequitabletitletothoserights.inthesubjectleasewhichwouldentitletheapplicanttoc°"addonpse opn n$ny,

areattached. CONDITIONSOFAPPROVALATTACHEDTitle 18U.S.C.Section1001and Title43 U.S.C Section1212,make it a crime fbyanypersgiggúl)iglgþd illglý f aketo any departmentor agencyofthe UnitedStatesany false,fictitiousor fraudulent statementsor representationsas toanfmatter thin itsjunsdiction.

(Continued oli page 2) *(Instructions on page 2)

NOTICEOFAPPROVALRECElyEDs MB 83380aan AFMSS#lmu°

U SEP4 5 2010DIV.0F0lLGAS&

Fomi3160-3 FORM APPROVED(August2007) OMBNo.1004-0137

ExpiresJuly31, 2010UNITED STATESDEPARTMENTOF THE INTERIOR 5. LeaseSerialNo.

2OGOOO5609BUREAUOF LAND MANAGEMENT6. If Indian,Alloteeor TribeNameAPPLICATION FOR PERMIT TO DRILL OR REENTER UTE

la. Typeof work: DRILL REENTER 2 IfUnitor CAAgreement,NameandNo.

8. Lease Nameand WellNo.Ib. Typeof Well OilWell O GasWelf Other Sin e Zone MultipleZone Ute Tribal 13418422. Nameof Operator Newfield Production Company 9. API WellNo.

3a. Address Route #3 Box 3630, Myton UT84052 3b. PhoneNo.(include area code) 10.Fiekiand Pool,or Exploratory(435) 646-3721 Undesignated

4. Locationof Well (Report Ïocationclearly and in acordoce with ariy Staterequirements.*) 11 Sec.,T. R. lvÏ.or Blk.andSurveyorAreaAt surface SWISW (Lot #4) 748' FSL 638' FWL Sec. 18, T4S R2W

Atproposedprod.zone

14. Distanceinmilesanddirectionfrom nearesttown or postofice* 12.Countyor Parish 13. State .Approximately 15.1 miles southwest of Myton, UT Duchesne UT

15. Distancefromproposed* 16.No of acresin lease 17 SpacingUnitdedicated10thiswelllocationtonearestpropertyor leaseline,ft. Approx. 638' f/lse, NA' flunit NA(Alsotonearest drig.unit line,if any) 40 Acres

18. Distancefrompoposed location* 19.ProposedDepth 20. BLM/BIABondNo.on fileappn estor

o thiiing,completed' Approx. 1302' I 470' RLBOO10462

21. Elevations(ShowwhetherDF,KDB,RT,GL,etc.) 22. Approximatedateworkwillstart* 23. Estimatedduration5540' GL (i) days from SPUD to rig release

24. AttachmentsThefollowing,completed inaccordancewith theretiuirementsof OnshoreOilandGasOrderNo.1,mustbe attachedto thisform:

1. Wellplatcertifiedby a registered surveyor. 4. Bondtocover the operationsunlesscoveredbyan existingbondon file(see2. A DrillingPlan. Item20 above).3. A SurfaceUse Plan (if the location is on National Forest SystemLands,the 5. Operatorcertification

SUPO mustbe filedwith the appropriate ForestServiceOffice) 6. Suchother site specific informationand/or plansas may be required by the

T2

e

NMamerint ped) Date

Regul ry Specialist

Approvedb atuk) Ndgmed H. Sparger alle27 2610go..i.

°"iVERNALFIELDOFFICE

Applicationapprovaldoes90w0aran f i te a icantholdslegalorequitabletitletothoserights.inthesubjectleasewhichwouldentitletheapplicanttoc°"addonpse opn n$ny,

areattached. CONDITIONSOFAPPROVALATTACHEDTitle 18U.S.C.Section1001and Title43 U.S.C Section1212,make it a crime fbyanypersgiggúl)iglgþd illglý f aketo any departmentor agencyofthe UnitedStatesany false,fictitiousor fraudulent statementsor representationsas toanfmatter thin itsjunsdiction.

(Continued oli page 2) *(Instructions on page 2)

NOTICEOFAPPROVALRECElyEDs MB 83380aan AFMSS#lmu°

U SEP4 5 2010DIV.0F0lLGAS&

UNITED STATES DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT

VERNAL FIELD OFFICE170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TO DRILL

Company: Newfield Production Company Location: Lot 4, Sec. 18, T4S, R2WWell No: Ute Tribal 13-18-4-2 Lease No: 2OG0005609API No: 43-013-50392 Agreement: N/A

OFFICE NUMBER: (435) 781-4400OFFICE FAX NUMBER: (435) 781-3420

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance is made withthe applicable laws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drillincluding Surface and Downhole Conditions of Approval. The operator is considered fully responsiblefor the actions of his subcontractors. A copy of the approved APD must be on location duringconstruction, drilling, and completion operations. This permit is approved for a two (2) year period,or until lease expiration, whichever occurs first. An additional extension, up to two (2) years, maybe applied for by sundry notice prior to expiration.

NOTIFICATION REOUIREMENTS

Construction Activity - The Ute Tribe Energy & Minerals Dept. and BLM(Notify Ute Tribe Energy & Minerals Environmental Scientist shall be notified at least 48 hoursDept. and BLM Environmental in advance of any construction activity. The Ute TribalScientist) office is open Monday through Thursday.

Construction Completion - Upon completion of the pertinent APD/ROW construction,(Notify Ute Tribe Energy & Minerals notify the Ute Tribe Energy & Minerals Dept. for a TribalDept. and BLM Environmental Technician to verify the Affidavit of Completion. NotifyScientist) the BLM Environmental Scientist prior to moving on the

drilling rig.

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify BLM Petroleum Engineer)

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and(Notify BLM Supv. Petroleum Tech.) cementing all casing strings to: ut vn [email protected].

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify BLM Supv. Petroleum Tech.)

First Production Notice - Within Five (5) business days after new well begins or(Notify BLM Petroleum Engineer) production resumes after well has been off production for

more than ninety (90)

UNITED STATES DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT

VERNAL FIELD OFFICE170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TO DRILL

Company: Newfield Production Company Location: Lot 4, Sec. 18, T4S, R2WWell No: Ute Tribal 13-18-4-2 Lease No: 2OG0005609API No: 43-013-50392 Agreement: N/A

OFFICE NUMBER: (435) 781-4400OFFICE FAX NUMBER: (435) 781-3420

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance is made withthe applicable laws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drillincluding Surface and Downhole Conditions of Approval. The operator is considered fully responsiblefor the actions of his subcontractors. A copy of the approved APD must be on location duringconstruction, drilling, and completion operations. This permit is approved for a two (2) year period,or until lease expiration, whichever occurs first. An additional extension, up to two (2) years, maybe applied for by sundry notice prior to expiration.

NOTIFICATION REOUIREMENTS

Construction Activity - The Ute Tribe Energy & Minerals Dept. and BLM(Notify Ute Tribe Energy & Minerals Environmental Scientist shall be notified at least 48 hoursDept. and BLM Environmental in advance of any construction activity. The Ute TribalScientist) office is open Monday through Thursday.

Construction Completion - Upon completion of the pertinent APD/ROW construction,(Notify Ute Tribe Energy & Minerals notify the Ute Tribe Energy & Minerals Dept. for a TribalDept. and BLM Environmental Technician to verify the Affidavit of Completion. NotifyScientist) the BLM Environmental Scientist prior to moving on the

drilling rig.

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify BLM Petroleum Engineer)

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and(Notify BLM Supv. Petroleum Tech.) cementing all casing strings to: ut vn [email protected].

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify BLM Supv. Petroleum Tech.)

First Production Notice - Within Five (5) business days after new well begins or(Notify BLM Petroleum Engineer) production resumes after well has been off production for

more than ninety (90)

Page 2 of 7Well: LJteTribal 13-18-4-2

9/8/2010

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

• None - Private surfacePrivate surface use agreement

Page 2 of 7Well: LJteTribal 13-18-4-2

9/8/2010

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

• None - Private surfacePrivate surface use agreement

Page 3 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

DOWNIIOLE PROGRAMCONDITIONS OF APPROVAL (COAs)

SITE SPECIFIC DOWNHOLE COAs:

• The operator shall comply with all applicable requirements in the SOP (version: "Ute TribeGreen River Development Program", April 17, 2008). The operator shall also comply withapplicable laws and regulations; with the lease terms, Onshore Oil and Gas Orders, NTL's; andwith other orders and instructions of the authorized officer.

All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:

DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS

• The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.

• Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least 24 hours inadvance of casing cementing operations and BOPE & casing pressure tests.

• All requirements listed in Onshore Order #2 III. E. Special Drilling Operations are applicable forair drilling of surface hole.

• Blowout prevention equipment (BOPE) shall remain in use until the well is completed orabandoned. Closing unit controls shall remain unobstructed and readily accessible at all times.Choke manifolds shall be located outside of the rig substructure.

• All BOPE components shall be inspected daily and those inspections shall be recorded in thedaily drilling report. Components shall be operated and tested as required by Onshore Oil & GasOrder No. 2 to insure good mechanical working order. All BOPE pressure tests shall beperformed by a test pump with a chart recorder and by the rig pumps. Test shall bereported in the driller's log.

• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out fromunder the surface casing and weekly thereafter as specified in Onshore Oil & Gas Order No. 2.

• Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.

• No aggressive/fresh hard-banded drill pipe shall be used within casing.

• Cement baskets shall not be run on surface

Page 3 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

DOWNIIOLE PROGRAMCONDITIONS OF APPROVAL (COAs)

SITE SPECIFIC DOWNHOLE COAs:

• The operator shall comply with all applicable requirements in the SOP (version: "Ute TribeGreen River Development Program", April 17, 2008). The operator shall also comply withapplicable laws and regulations; with the lease terms, Onshore Oil and Gas Orders, NTL's; andwith other orders and instructions of the authorized officer.

All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:

DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS

• The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.

• Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least 24 hours inadvance of casing cementing operations and BOPE & casing pressure tests.

• All requirements listed in Onshore Order #2 III. E. Special Drilling Operations are applicable forair drilling of surface hole.

• Blowout prevention equipment (BOPE) shall remain in use until the well is completed orabandoned. Closing unit controls shall remain unobstructed and readily accessible at all times.Choke manifolds shall be located outside of the rig substructure.

• All BOPE components shall be inspected daily and those inspections shall be recorded in thedaily drilling report. Components shall be operated and tested as required by Onshore Oil & GasOrder No. 2 to insure good mechanical working order. All BOPE pressure tests shall beperformed by a test pump with a chart recorder and by the rig pumps. Test shall bereported in the driller's log.

• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out fromunder the surface casing and weekly thereafter as specified in Onshore Oil & Gas Order No. 2.

• Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.

• No aggressive/fresh hard-banded drill pipe shall be used within casing.

• Cement baskets shall not be run on surface

Page 4 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

• The operator must report all shows of water or water-bearing sands to the BLM. If flowingwater is encountered it must be sampled, analyzed, and a copy of the analyses submitted to theBLM Vernal Field Office.

• The operator must report encounters of all non oil & gas mineral resources (such as Gilsonite, tarsands, oil shale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of eachencounter. Each report shall include the well name/number, well location, date and depth (fromKB or GL) of encounter, vertical footage of the encounter and, the name of the person makingthe report (along with a telephone number) should the BLM need to obtain additionalinformation.

• A complete set of angular deviation and directional surveys of a directional well will besubmitted to the Vernal BLM office engineer within 30 days of the completion of the well.

• While actively drilling, chronologic drilling progress reports shall be filed directly with theBLM, Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the PetroleumEngineers until the well is completed.

• A cement bond log (CBL) will be run from the production casing shoe to the top of cement andshall be utilized to determine the bond quality for the production casing. Submit a field copy ofthe CBL to this office.

• Please submit an electronic copy of all other logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM.

• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operationmust have prior approval from the BLM Vernal Field

Page 4 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

• The operator must report all shows of water or water-bearing sands to the BLM. If flowingwater is encountered it must be sampled, analyzed, and a copy of the analyses submitted to theBLM Vernal Field Office.

• The operator must report encounters of all non oil & gas mineral resources (such as Gilsonite, tarsands, oil shale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of eachencounter. Each report shall include the well name/number, well location, date and depth (fromKB or GL) of encounter, vertical footage of the encounter and, the name of the person makingthe report (along with a telephone number) should the BLM need to obtain additionalinformation.

• A complete set of angular deviation and directional surveys of a directional well will besubmitted to the Vernal BLM office engineer within 30 days of the completion of the well.

• While actively drilling, chronologic drilling progress reports shall be filed directly with theBLM, Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the PetroleumEngineers until the well is completed.

• A cement bond log (CBL) will be run from the production casing shoe to the top of cement andshall be utilized to determine the bond quality for the production casing. Submit a field copy ofthe CBL to this office.

• Please submit an electronic copy of all other logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM.

• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operationmust have prior approval from the BLM Vernal Field

Page 5 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

OPERATING REQUIREMENT REMINDERS:

• All wells, whether drilling, producing, suspended, or abandoned, shall be identified inaccordance with 43 CFR 3162.6. There shall be a sign or marker with the name of the operator,lease serial number, well number, and surveyed description of the well.

• In accordance with 43 CFR 3162.4-3, this well shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in whichoperations commence and continue each month until the well is physically plugged andabandoned. This report shall be filed in duplicate, directly with the Minerals ManagementService, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

• Should the well be successfully completed for production, the BLM Vernal Field office must benotified when it is placed in a producing status. Such notification will be by writtencommunication and must be received in this office by not later than the fifth business dayfollowing the date on which the well is placed on production. The notification shall provide, as aminimum, the following informational items:

o Operator name, address, and telephone number.

o Well name and number.

o Well location (¼¼, Sec., Twn, Rng, and P.M.).

o Date well was placed in a producing status (date of first production for which royalty willbe paid).

o The nature of the well's production, (i.e., crude oil, or crude oil and casing head gas, ornatural gas and entrained liquid hydrocarbons).

o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i.e., State or private.

o Unit agreement and/or participating area name and number, if applicable.

o Communitization agreement number, if applicable.

• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLM Vernal Field Office.

• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A willbe reported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall bereported verbally within 24 hours, followed by a written report within 15 days. "Other thanMajor Events" will be reported in writing within 15 days. "Minor Events" will be reported onthe Monthly Report of Operations and

Page 5 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

OPERATING REQUIREMENT REMINDERS:

• All wells, whether drilling, producing, suspended, or abandoned, shall be identified inaccordance with 43 CFR 3162.6. There shall be a sign or marker with the name of the operator,lease serial number, well number, and surveyed description of the well.

• In accordance with 43 CFR 3162.4-3, this well shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in whichoperations commence and continue each month until the well is physically plugged andabandoned. This report shall be filed in duplicate, directly with the Minerals ManagementService, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

• Should the well be successfully completed for production, the BLM Vernal Field office must benotified when it is placed in a producing status. Such notification will be by writtencommunication and must be received in this office by not later than the fifth business dayfollowing the date on which the well is placed on production. The notification shall provide, as aminimum, the following informational items:

o Operator name, address, and telephone number.

o Well name and number.

o Well location (¼¼, Sec., Twn, Rng, and P.M.).

o Date well was placed in a producing status (date of first production for which royalty willbe paid).

o The nature of the well's production, (i.e., crude oil, or crude oil and casing head gas, ornatural gas and entrained liquid hydrocarbons).

o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i.e., State or private.

o Unit agreement and/or participating area name and number, if applicable.

o Communitization agreement number, if applicable.

• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLM Vernal Field Office.

• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A willbe reported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall bereported verbally within 24 hours, followed by a written report within 15 days. "Other thanMajor Events" will be reported in writing within 15 days. "Minor Events" will be reported onthe Monthly Report of Operations and

Page 6 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

• Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) shall be submitted not later than 30 daysafter completion of the well or after completion of operations being performed, in accordancewith 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and all other surveys ordata obtained and compiled during the drilling, workover, and/or completion operations, shall befiled on BLM Form 3160-4. Submit with the well completion report a geologic report including,at a minimum, formation tops, and a summary and conclusions. Also include deviation surveys,sample descriptions, strip logs, core data, drill stem test data, and results of production tests ifperformed. Samples (cuttings, fluid, and/or gas) shall be submitted only when requested by theBLM, Vernal Field Office.

• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall haveprior written approval from the BLM Vernal Field Office.

• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLM Vernal FieldOffice Petroleum Engineers will be provided with a date and time for the initial meter calibrationand all future meter proving schedules. A copy of the meter calibration reports shall besubmitted to the BLM Vernal Field Office. All measurement facilities will conform to the APIstandards for liquid hydrocarbons and the AGA standards for natural gas measurement. Allmeasurement points shall be identified as the point of sale or allocation for royalty purposes.

• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submittedto the BLM Vernal Field Office within 30 days of installation or first production, whicheveroccurs first. All site security regulations as specified in Onshore Oil & Gas Order No. 3 shall beadhered to. All product lines entering and leaving hydrocarbon storage tanks will be effectivelysealed in accordance with Onshore Oil & Gas Order No. 3.

• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which will result in the disturbance of new ground, shall require the filing ofa suitable plan and need prior approval of the BLM Vernal Field Office. Emergency approvalmay be obtained orally, but such approval does not waive the written report requirement.

• No location shall be constructed or moved, no well shall be plugged, and no drilling or workoverequipment shall be removed from a well to be placed in a suspended status without priorapproval of the BLM Vernal Field Office. If operations are to be suspended for more than 30days, prior approval of the BLM Vernal Field Office shall be obtained and notification givenbefore resumption of operations.

• Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. A permanentdisposal method must be approved by this office and in operation prior to the end of this 90-dayperiod. In order to meet this deadline, an application for the proposed permanent disposalmethod shall be submitted along with any necessary water analyses, as soon as possible, but nolater than 45 days after the date of first production. Any method of disposal which has not beenapproved prior to the end of the authorized 90-day period will be considered as an Incident ofNoncompliance and will be grounds for issuing a shut-in order until an acceptable manner fordisposing of said water is provided and approved by this

Page 6 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

• Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) shall be submitted not later than 30 daysafter completion of the well or after completion of operations being performed, in accordancewith 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and all other surveys ordata obtained and compiled during the drilling, workover, and/or completion operations, shall befiled on BLM Form 3160-4. Submit with the well completion report a geologic report including,at a minimum, formation tops, and a summary and conclusions. Also include deviation surveys,sample descriptions, strip logs, core data, drill stem test data, and results of production tests ifperformed. Samples (cuttings, fluid, and/or gas) shall be submitted only when requested by theBLM, Vernal Field Office.

• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall haveprior written approval from the BLM Vernal Field Office.

• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLM Vernal FieldOffice Petroleum Engineers will be provided with a date and time for the initial meter calibrationand all future meter proving schedules. A copy of the meter calibration reports shall besubmitted to the BLM Vernal Field Office. All measurement facilities will conform to the APIstandards for liquid hydrocarbons and the AGA standards for natural gas measurement. Allmeasurement points shall be identified as the point of sale or allocation for royalty purposes.

• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submittedto the BLM Vernal Field Office within 30 days of installation or first production, whicheveroccurs first. All site security regulations as specified in Onshore Oil & Gas Order No. 3 shall beadhered to. All product lines entering and leaving hydrocarbon storage tanks will be effectivelysealed in accordance with Onshore Oil & Gas Order No. 3.

• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which will result in the disturbance of new ground, shall require the filing ofa suitable plan and need prior approval of the BLM Vernal Field Office. Emergency approvalmay be obtained orally, but such approval does not waive the written report requirement.

• No location shall be constructed or moved, no well shall be plugged, and no drilling or workoverequipment shall be removed from a well to be placed in a suspended status without priorapproval of the BLM Vernal Field Office. If operations are to be suspended for more than 30days, prior approval of the BLM Vernal Field Office shall be obtained and notification givenbefore resumption of operations.

• Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. A permanentdisposal method must be approved by this office and in operation prior to the end of this 90-dayperiod. In order to meet this deadline, an application for the proposed permanent disposalmethod shall be submitted along with any necessary water analyses, as soon as possible, but nolater than 45 days after the date of first production. Any method of disposal which has not beenapproved prior to the end of the authorized 90-day period will be considered as an Incident ofNoncompliance and will be grounds for issuing a shut-in order until an acceptable manner fordisposing of said water is provided and approved by this

Page 7 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notified at least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended orabandoned, all pits must be fenced immediately until they are backfilled. The "SubsequentReport of Abandonment" (Form BLM 3160-5) must be submitted within 30 days after the actualplugging of the well bore, showing location of plugs, amount of cement in each, and amount ofcasing left in hole, and the current status of the surface

Page 7 of 7Well: Ute Tribal 13-18-4-2

9/8/2010

• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notified at least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended orabandoned, all pits must be fenced immediately until they are backfilled. The "SubsequentReport of Abandonment" (Form BLM 3160-5) must be submitted within 30 days after the actualplugging of the well bore, showing location of plugs, amount of cement in each, and amount ofcasing left in hole, and the current status of the surface

BLM- Vernal Field Office - Notification Form

Operator Newfield Exploration RigName/# Ross Rig # 29 Submitted By AlvinNielsen Phone Number 435-823-7468Well Name/Number Ute Tribal 13-18-4-2.Qtr/QtrSW/SW Section 18 Township 4S Range2WLease Serial Number20GOOO5609API Number 43-013-50392

Spud Notice -- Spud is the initial spudding of the well, not drillingout below a casing string.

Date/Time niaman 9 y AM PM

Casing - Please report timecasing run starts, not cementingtimes.

Surface CasingIntermediate CasingProduction CasingLinerOther

Date/Time 11/29/10 2:00 AMPM

BOPEInitial BOPEtest at surface casing pointBOPEtest at intermediate casing

BLM- Vernal Field Office - Notification Form

Operator Newfield Exploration RigName/# Ross Rig # 29 Submitted By AlvinNielsen Phone Number 435-823-7468Well Name/Number Ute Tribal 13-18-4-2.Qtr/QtrSW/SW Section 18 Township 4S Range2WLease Serial Number20GOOO5609API Number 43-013-50392

Spud Notice -- Spud is the initial spudding of the well, not drillingout below a casing string.

Date/Time niaman 9 y AM PM

Casing - Please report timecasing run starts, not cementingtimes.

Surface CasingIntermediate CasingProduction CasingLinerOther

Date/Time 11/29/10 2:00 AMPM

BOPEInitial BOPEtest at surface casing pointBOPEtest at intermediate casing

30 day BOPE testOther

Date/Time AM PM

Remarks Ross Riq # 29 spud the Ute Tribal 13-18-4-2W @8:00AMon 11/29/10 & Run 85/8" casinq @2:00 PM on

30 day BOPE testOther

Date/Time AM PM

Remarks Ross Riq # 29 spud the Ute Tribal 13-18-4-2W @8:00AMon 11/29/10 & Run 85/8" casinq @2:00 PM on

STATEOF UTAH OPERATOR: NEWFIELD PRODUCTION COMPANY OPERATORACCT. No. N2695DIVISIONOF OlL,GAS AND MINING ADDRESS: RT. 3 BOX 3630ENTITYACTION FORM -FORM 6 MYTON, UT 84052

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE E9N919Y9N T YS4301350392 UTE TRIBAL 13-18-4-2 S SW

1LS

4S DU HE3NE

11/2D9/

010 / OWELL 1 COMMENTS:

ACTION CURRENT NEW API NUMBER WELLNAME WELL LOCATION SPUD EFFECTIVECODE E Y9

4304751129 UTE TRIBAL 15-19-4-2E S SE 19 4S

2ERG

UI AH

11/2D4Al

010 / / /O

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTITYNO, ENTITYNO QQ 80 IP RG COUNIY DATE

GREATER MON BUTTEB 99999 17400 4301350216 R-34-8-16 SWSE 34 8S 16E DUCHESNE 11/29/2010 / /ð

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTlTYNO. ENTITYNO QQ SC TP RG COUNTY DATE DATE

B 99999 17400 4301350215GREATER MÓ1N6BUTTE

SWSE ' 16E DUCHESNE 11/24/2010 / / /b

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTITY NO. ENTITY NO. QQ SC TP RG COUNTY DATE DATE

A 99999 QŠ$ 4301350405 UTE TRIBAL 8-/-4-3W SENE g 4S 3W DUCHESNE 12/3/2010 / /O

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTlTY NO. ENTITY NO. QQ SC TP RG COUNTY DATE DATE

ACTIONCODES (See instructions on back of form)A - i new entityfor newweit(singlewellonly)B - wellto existingentity(groupor unitwell) RECE IVED ISI Jentri ParkC - romone existingentityto anotherexisting entRy SignatureD - wellfrom one existingentityto a new entityE- her(explainincommentssection) DECO6 2010 Production Clerk 12/03/10

NOTE: Use COMMENT section to explainwhyeach Action Code was selected.

DIV.0F0lt,GAS&

STATEOF UTAH OPERATOR: NEWFIELD PRODUCTION COMPANY OPERATORACCT. No. N2695DIVISIONOF OlL,GAS AND MINING ADDRESS: RT. 3 BOX 3630ENTITYACTION FORM -FORM 6 MYTON, UT 84052

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE E9N919Y9N T YS4301350392 UTE TRIBAL 13-18-4-2 S SW

1LS

4S DU HE3NE

11/2D9/

010 / OWELL 1 COMMENTS:

ACTION CURRENT NEW API NUMBER WELLNAME WELL LOCATION SPUD EFFECTIVECODE E Y9

4304751129 UTE TRIBAL 15-19-4-2E S SE 19 4S

2ERG

UI AH

11/2D4Al

010 / / /O

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTITYNO, ENTITYNO QQ 80 IP RG COUNIY DATE

GREATER MON BUTTEB 99999 17400 4301350216 R-34-8-16 SWSE 34 8S 16E DUCHESNE 11/29/2010 / /ð

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTlTYNO. ENTITYNO QQ SC TP RG COUNTY DATE DATE

B 99999 17400 4301350215GREATER MÓ1N6BUTTE

SWSE ' 16E DUCHESNE 11/24/2010 / / /b

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTITY NO. ENTITY NO. QQ SC TP RG COUNTY DATE DATE

A 99999 QŠ$ 4301350405 UTE TRIBAL 8-/-4-3W SENE g 4S 3W DUCHESNE 12/3/2010 / /O

ACTION CURRENT NEW API NUMBER WELL NAME WELL LOCATION SPUD EFFECTIVECODE ENTlTY NO. ENTITY NO. QQ SC TP RG COUNTY DATE DATE

ACTIONCODES (See instructions on back of form)A - i new entityfor newweit(singlewellonly)B - wellto existingentity(groupor unitwell) RECE IVED ISI Jentri ParkC - romone existingentityto anotherexisting entRy SignatureD - wellfrom one existingentityto a new entityE- her(explainincommentssection) DECO6 2010 Production Clerk 12/03/10

NOTE: Use COMMENT section to explainwhyeach Action Code was selected.

DIV.0F0lt,GAS&

FORM 316 UNITED STATES FORM APPROVED(Àugust20 DEPARTMENT OF THE INTERIOR OMB No. 1004-0137

Expires: July 31,2010BUREAU OF LAND MANAGEMENT 5. Lease SerialNo.

SUNDRY NOTICES AND REPORTS ON WELLS MON BUTTE EDA 20GOOO5609Do not use this form for proposals to drill or to re-enter an .

abandoned welL Use Form 3160-3 (APD) for such proposals. 6. If Indian, Allottee or Tribe Name.

SUBMIT IN TRIPLICATE - Other Instructions on page 2 7. If Unit or CA/Agreement,Name and/or

Type of WellOil Well O Gas Well O Other 8. Well Name and No.

Name of Operator UTE TRIBAL 13-18-4-2NEWFIELD PRODÛCTIONCOMPANY 9. API Wall l'Ic.

3 . Address Route3 Box 3630 3b. Phone (include are code) 4301350392Myton,UT 84052 | 435646 3771 10 Fielvisn<lPoni or FYpinratory Area

4 LocationofWell (Footage,Sec., T.,R.,M,orSurveyDescription) MYTON-TRIBALEDA11. Countyor Parish, State

SWSW Section 18 T4S R2W DUCHESNE,UT

12. CHECK APPROPRIATE BOX(ES)TO INIDICATE NATURE OF NOTICE, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Acidize O Deepen Q Production (Start/Resume) Water Shut-OffNotice of Intent

Alter Casing Q Fracture Treat Q Reclamation Well IntegritySubsequentReport Casing Repair Q New Construction Q Recomplete Other

Change Plans O Plug & Abandon Q Temporarily Abandon SpudNoticeFinal Abandonment Convert to Injector O Plug Back Q Water Disposal

Describe Proposed or CompletedOperation: (Clearly state all pertinent details, includingestimated starting date of any proposed work and approximate durationthereof. Iftheproposal is to deependirectionallyor recomplete horizontally,give subsurfacelocationsand measured and true vertical depths ofall pertinent markers and zones. AttachtheBond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filed within 30 days following completionof the involvedoperations. Ifthe operation results in a multiple completion or recompletion in a new interval,a Form 3160-4 shall be filed once testing has been completed.Final Abandonment Noticesshall be filed only after all requirements, includingreclamation, havebeen completed, and the operator has determined that the site is ready for finalinspection.)

On 11-29-10 MIRUROSS spud rig #21. Drill310' of 12 1/4" hole with air mist. TlH Wl7 Jt's 8 5/8" J-55 24# csgn. Set @313.95.On 11-3Q-10Cement with 160 sks of Class "G" w/ 2% CaCL+ 1/4# Cello Flake. Mixed @ 15.8 ppg> 1.17 cf/sk yeild. Returned 3bbis cement to pit.

RECEIVEDDEC07 2010

DIV.0FOlL,GAS&MINING

ereby certify that the foregoingis true and Titlerect (Printed/ Typed)

ignXaDa

r/illin20 reman

THIS SPACE FOR FEDERAL OR STATE OFFICE USE

Approved bv Title Dateonditions of approval, ifany, are attached. Approval ofthis notice does not warrant or

cèrtify that the applicant holds legalor equitable title to those rights in the subject lease Officehich would entitle the applicant to conduct operations thereon.

Title 18U.S.C.Section 1001and Title 43 U.S.C.Section 1212, make it a crime for any person knowinglyand willfully to make to any departmentor agency ofthe United$fatesanv false. fictitious ud frqudulent statemepts or representations as to anv mqtter within its judsdiction

structions on page

FORM 316 UNITED STATES FORM APPROVED(Àugust20 DEPARTMENT OF THE INTERIOR OMB No. 1004-0137

Expires: July 31,2010BUREAU OF LAND MANAGEMENT 5. Lease SerialNo.

SUNDRY NOTICES AND REPORTS ON WELLS MON BUTTE EDA 20GOOO5609Do not use this form for proposals to drill or to re-enter an .

abandoned welL Use Form 3160-3 (APD) for such proposals. 6. If Indian, Allottee or Tribe Name.

SUBMIT IN TRIPLICATE - Other Instructions on page 2 7. If Unit or CA/Agreement,Name and/or

Type of WellOil Well O Gas Well O Other 8. Well Name and No.

Name of Operator UTE TRIBAL 13-18-4-2NEWFIELD PRODÛCTIONCOMPANY 9. API Wall l'Ic.

3 . Address Route3 Box 3630 3b. Phone (include are code) 4301350392Myton,UT 84052 | 435646 3771 10 Fielvisn<lPoni or FYpinratory Area

4 LocationofWell (Footage,Sec., T.,R.,M,orSurveyDescription) MYTON-TRIBALEDA11. Countyor Parish, State

SWSW Section 18 T4S R2W DUCHESNE,UT

12. CHECK APPROPRIATE BOX(ES)TO INIDICATE NATURE OF NOTICE, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Acidize O Deepen Q Production (Start/Resume) Water Shut-OffNotice of Intent

Alter Casing Q Fracture Treat Q Reclamation Well IntegritySubsequentReport Casing Repair Q New Construction Q Recomplete Other

Change Plans O Plug & Abandon Q Temporarily Abandon SpudNoticeFinal Abandonment Convert to Injector O Plug Back Q Water Disposal

Describe Proposed or CompletedOperation: (Clearly state all pertinent details, includingestimated starting date of any proposed work and approximate durationthereof. Iftheproposal is to deependirectionallyor recomplete horizontally,give subsurfacelocationsand measured and true vertical depths ofall pertinent markers and zones. AttachtheBond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filed within 30 days following completionof the involvedoperations. Ifthe operation results in a multiple completion or recompletion in a new interval,a Form 3160-4 shall be filed once testing has been completed.Final Abandonment Noticesshall be filed only after all requirements, includingreclamation, havebeen completed, and the operator has determined that the site is ready for finalinspection.)

On 11-29-10 MIRUROSS spud rig #21. Drill310' of 12 1/4" hole with air mist. TlH Wl7 Jt's 8 5/8" J-55 24# csgn. Set @313.95.On 11-3Q-10Cement with 160 sks of Class "G" w/ 2% CaCL+ 1/4# Cello Flake. Mixed @ 15.8 ppg> 1.17 cf/sk yeild. Returned 3bbis cement to pit.

RECEIVEDDEC07 2010

DIV.0FOlL,GAS&MINING

ereby certify that the foregoingis true and Titlerect (Printed/ Typed)

ignXaDa

r/illin20 reman

THIS SPACE FOR FEDERAL OR STATE OFFICE USE

Approved bv Title Dateonditions of approval, ifany, are attached. Approval ofthis notice does not warrant or

cèrtify that the applicant holds legalor equitable title to those rights in the subject lease Officehich would entitle the applicant to conduct operations thereon.

Title 18U.S.C.Section 1001and Title 43 U.S.C.Section 1212, make it a crime for any person knowinglyand willfully to make to any departmentor agency ofthe United$fatesanv false. fictitious ud frqudulent statemepts or representations as to anv mqtter within its judsdiction

structions on page

NEWFIELD PRODUCTION COMPANY - CASING & CEMENT REPORT

8 5/8" CASING SET AT 313.95

LAST SASING 14 SET AT 5 OPERATOR Newfield Exploration CompanyDATUM 13 WELL UTE TRIBAL 13-18-4-2DATUMTO CUT OFF CASING 13 FIELD/PROSPECT Monument ButteDATUMTO BRADENHEAD FLANGE 13 CONTRACTOR & RIG # Ross # 29TD DRILLER 310 LOGGERHOLE SIZE 12 1/4"

LOG OF CASING STRING:PIECES OD ITEM - MAKE - DESCRIPTION WT / FT GRD THREAD CONDT LENGTH

1 Wellhead A 0.957 8 5/8" Casing (shoe jt.43.85') 24 J-55 STC A 301.11 8 5/8" Guide shoe A 0.9

CASING INVEN¯IORY BAL. FEET JTS TOTAL LENGTH OF STRINGTOTAL LENGTH OF STRING 302.95 7 LESS CUT OFF PIECE 2LESS NON CSG. ITEMS 1.85 PLUS DATUMTO T/CUT OFF CSG 13PLUS FULL JTS. LEFT OUT 0 CASINGSET DEPTH

TOTAL 301.1 7 -

TOTAL CSG. DEL. (WlOTHRDS) 301.1 7 ~ COMPARETIMING

BEGIN RUN CSG. Spud 8:00 AM 11/29/2010 GOOD CIRC THRU JOB YesCSG. IN HOLE 1:30 PM 11/30/2010 Bbis CMT CIRC TO SURFACE 3BEGIN ClRC 3:13 PM 11/30/2010 RECIPROCATED PIPi NoBEGIN PUMP CMT 3:27 PM 11/30/2010BEGIN DSPL. CMT 3:37 PM 11/30/2010 BUMPED PLUGTO 330PLUGDOWN 3:42 PM

NEWFIELD PRODUCTION COMPANY - CASING & CEMENT REPORT

8 5/8" CASING SET AT 313.95

LAST SASING 14 SET AT 5 OPERATOR Newfield Exploration CompanyDATUM 13 WELL UTE TRIBAL 13-18-4-2DATUMTO CUT OFF CASING 13 FIELD/PROSPECT Monument ButteDATUMTO BRADENHEAD FLANGE 13 CONTRACTOR & RIG # Ross # 29TD DRILLER 310 LOGGERHOLE SIZE 12 1/4"

LOG OF CASING STRING:PIECES OD ITEM - MAKE - DESCRIPTION WT / FT GRD THREAD CONDT LENGTH

1 Wellhead A 0.957 8 5/8" Casing (shoe jt.43.85') 24 J-55 STC A 301.11 8 5/8" Guide shoe A 0.9

CASING INVEN¯IORY BAL. FEET JTS TOTAL LENGTH OF STRINGTOTAL LENGTH OF STRING 302.95 7 LESS CUT OFF PIECE 2LESS NON CSG. ITEMS 1.85 PLUS DATUMTO T/CUT OFF CSG 13PLUS FULL JTS. LEFT OUT 0 CASINGSET DEPTH

TOTAL 301.1 7 -

TOTAL CSG. DEL. (WlOTHRDS) 301.1 7 ~ COMPARETIMING

BEGIN RUN CSG. Spud 8:00 AM 11/29/2010 GOOD CIRC THRU JOB YesCSG. IN HOLE 1:30 PM 11/30/2010 Bbis CMT CIRC TO SURFACE 3BEGIN ClRC 3:13 PM 11/30/2010 RECIPROCATED PIPi NoBEGIN PUMP CMT 3:27 PM 11/30/2010BEGIN DSPL. CMT 3:37 PM 11/30/2010 BUMPED PLUGTO 330PLUGDOWN 3:42 PM

CEMENT USED CEMENT COMPANY- BJ ServicesSTAGE # SX CEMENT TYPE &ADDITIVES

1 160 Class G+2%Kcl+.25#[email protected] 1.17yield

CENTRALIZER I: SCRATCHER PLACEMENT SHOW MAKE& SPACINGMiddle of first , top of second and thirdfor a totalof 3.

COMPANYREPRESENTATIVE Xabier Lasa DATE

CEMENT USED CEMENT COMPANY- BJ ServicesSTAGE # SX CEMENT TYPE &ADDITIVES

1 160 Class G+2%Kcl+.25#[email protected] 1.17yield

CENTRALIZER I: SCRATCHER PLACEMENT SHOW MAKE& SPACINGMiddle of first , top of second and thirdfor a totalof 3.

COMPANYREPRESENTATIVE Xabier Lasa DATE

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

5. LEASEDESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS AND MINING MON BUTTE EDA 20GOOO5609

SUNDRY NOTICES AND REPORTS ON WELLS6. IFINDIAN,ALLOTTEEORTRIBENAME:

Do not use this form for proposals to drill new wells, significantlydeepen existing wells below current bottom-holedepth,reenter plugged7. UNIT or CA AGREEMENT NAME:

wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILL form for such proposals.

L TYPE OF WELL: 8. WELL NAME and NUMBER:

OIL WELL GAS WELL O OTHER UTE TRIBAL 13-18-4-2

2. NAME OF OPERATOR: 9. API NUMBER:

NEWFIELD PRODUCTION COMPANY 43013503923. ADDRESSOF OPERATOR: PHONE NUMBER 10. FIELD AND POOL, OR WILDCAT:

Route 3 Box 3630 CITY Myton STATE UT ZIP 84052 435.646.3721 MYTON-TRIBAL EDA4. LOCATION OF WELL:

FOOTAGES AT SURFACE: COUNTY: DUCHESNE

OTR/OTR, SECTION, TOWNSHIP. RANGE.MERIDIAN: SWSW, 18, T4S, R2W STATE: UT

n. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONO NOTICE OF INTENT(Submitin Duplicate> O ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL

Approximate date work will CASING REPAIR NEWCONSTRUCTION O TEMPORARITLY ABANDON

O CHANGE TO PREVIOUSPLANS OPERATOR CHANGE TUBINGREPAIR

O CHANGE TUBING PLUGAND ABANDON VENT OR FLAIR

SUBSEOUENT REPORT Q CHANGE WELL NAME O PLUGBACK WATER DISPOSAL(SubmitOriginalForm Only)

CHANGE WELL STATUS PRODUCTION (START/STOP) WATER SHUT-OFFDate of Work Completion: O COMMINGLE PRODUCINGFORMATlONS RECLAMATION OF WELL SITE OTHER: - Weekly StatusReport

01/07/2011 O CONVERT WELLTYPE O RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths,volumes, etc.

The above subject well was completed on 01-07-11, attached is a daily completion status report

NAME (PLEASEP Lucy Chav Nau TFTLE Administrative Assis

ECENED(This space for State use only)

DIV.0FOIL,GAS&

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

5. LEASEDESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS AND MINING MON BUTTE EDA 20GOOO5609

SUNDRY NOTICES AND REPORTS ON WELLS6. IFINDIAN,ALLOTTEEORTRIBENAME:

Do not use this form for proposals to drill new wells, significantlydeepen existing wells below current bottom-holedepth,reenter plugged7. UNIT or CA AGREEMENT NAME:

wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILL form for such proposals.

L TYPE OF WELL: 8. WELL NAME and NUMBER:

OIL WELL GAS WELL O OTHER UTE TRIBAL 13-18-4-2

2. NAME OF OPERATOR: 9. API NUMBER:

NEWFIELD PRODUCTION COMPANY 43013503923. ADDRESSOF OPERATOR: PHONE NUMBER 10. FIELD AND POOL, OR WILDCAT:

Route 3 Box 3630 CITY Myton STATE UT ZIP 84052 435.646.3721 MYTON-TRIBAL EDA4. LOCATION OF WELL:

FOOTAGES AT SURFACE: COUNTY: DUCHESNE

OTR/OTR, SECTION, TOWNSHIP. RANGE.MERIDIAN: SWSW, 18, T4S, R2W STATE: UT

n. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONO NOTICE OF INTENT(Submitin Duplicate> O ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL

Approximate date work will CASING REPAIR NEWCONSTRUCTION O TEMPORARITLY ABANDON

O CHANGE TO PREVIOUSPLANS OPERATOR CHANGE TUBINGREPAIR

O CHANGE TUBING PLUGAND ABANDON VENT OR FLAIR

SUBSEOUENT REPORT Q CHANGE WELL NAME O PLUGBACK WATER DISPOSAL(SubmitOriginalForm Only)

CHANGE WELL STATUS PRODUCTION (START/STOP) WATER SHUT-OFFDate of Work Completion: O COMMINGLE PRODUCINGFORMATlONS RECLAMATION OF WELL SITE OTHER: - Weekly StatusReport

01/07/2011 O CONVERT WELLTYPE O RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths,volumes, etc.

The above subject well was completed on 01-07-11, attached is a daily completion status report

NAME (PLEASEP Lucy Chav Nau TFTLE Administrative Assis

ECENED(This space for State use only)

DIV.0FOIL,GAS&

Summary Rig Activity Page 1 of 2

Daily Activity Report

Format For SundryUTE TRIBAL 13-18-4-211/1/2010To3/28/2011

12/15/2010 Day: 1 Completion

Rigless on 12/15/2010 - Run CBL & shoot first stage. - Install SM frac head. NU 5M CameronBOP. RU H/O truck & pressure test casing, blind rams, frac head & casing valves to 4500 psi.RU Perforators LLC WLT w/ mast & run CBL under pressure. WLTD © 7393' cement top @ 40'.Perforate CP4/CP3/CP2/CP1 sds as shown in perforation report. 176 BWTR. SWIFN.Daily Cost: $0Cumulative Cost: $13,071

12/20/2010 Day: 2 Completion

Rigless on 12/20/2010 - Perforate, frac & flowback well - Perforate & frac well as detailed.1603 BWTR. Open for immediate flowback @ approx 3 BPM. Well flowed for 6 1/2 hours &started to turn to oil. Recovered approx 792 bbis. 811 BWTRDaily Cost: $0Cumulative Cost: $83,687

12/27/2010 Day: 3 Completion

NC #2 on 12/27/2010 - MIRUSU, P/U Tbg - 1:00 PM MIRUSU, R/D Cameron BOPS, R/UWeatherford BOPS, Rig Maintenance, SWI, CSDFN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $92,610

12/28/2010 Day: 4 Completion

NC #2 on 12/28/2010 - Start To Drill Out PIgs - 5:30 To 6:00 AM C/Trvl, 6:00 AM OWU, P/U &TIH W/- Bit & Bit Sub, 172- Jts Tbg To PIg # 1 @ 5390', POOH W/- 3- Jts Tbg, R/U Rig Pmp,SWI, CSDFN @ 5:30 PM, 5:30 To 6:00 PM C/Trvl.Daily Cost: $0Cumulative Cost: $141,286

12/29/2010 Day: 5 Completion

NC #2 on 12/29/2010 - Finish Drilling Out PIgs, Swab Well - 5:30 To 6:00 AM C/Trvl, 6:00 AMOWU, TIH W/- 3 Jts Tbg, R/U RBS Pwr Swvl, Drill Out Plg, 29 Min Drill Time, Swvl In The HoleTo Pig # 2 @ 5562', Drill Out Plg, 32 Min Drill Time, Swvl In The Hole To Plg # 3 @ 5678', DrillOut Plg, 30 Min Drill Time, Swvl In The Hole To Plg # 4 @ 6333', Drill Out PIg, 27 Min DrillTime, Swvl In The Hole To PBTD @ 7425', PBTD Had 87' Of Fill, Circ Well Clean For Approx. 1Hr, R/D RBS Pwr Swvl, POOH W/- 5 Jts Tbg, R/U Sandline, Swab Well, Made 6 Swab Runs,Swab Back Approx. 70 Bbis Fluid, SWI, CSDFN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $149,566

12/30/2010 Day: 6 Completion

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

Summary Rig Activity Page 1 of 2

Daily Activity Report

Format For SundryUTE TRIBAL 13-18-4-211/1/2010To3/28/2011

12/15/2010 Day: 1 Completion

Rigless on 12/15/2010 - Run CBL & shoot first stage. - Install SM frac head. NU 5M CameronBOP. RU H/O truck & pressure test casing, blind rams, frac head & casing valves to 4500 psi.RU Perforators LLC WLT w/ mast & run CBL under pressure. WLTD © 7393' cement top @ 40'.Perforate CP4/CP3/CP2/CP1 sds as shown in perforation report. 176 BWTR. SWIFN.Daily Cost: $0Cumulative Cost: $13,071

12/20/2010 Day: 2 Completion

Rigless on 12/20/2010 - Perforate, frac & flowback well - Perforate & frac well as detailed.1603 BWTR. Open for immediate flowback @ approx 3 BPM. Well flowed for 6 1/2 hours &started to turn to oil. Recovered approx 792 bbis. 811 BWTRDaily Cost: $0Cumulative Cost: $83,687

12/27/2010 Day: 3 Completion

NC #2 on 12/27/2010 - MIRUSU, P/U Tbg - 1:00 PM MIRUSU, R/D Cameron BOPS, R/UWeatherford BOPS, Rig Maintenance, SWI, CSDFN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $92,610

12/28/2010 Day: 4 Completion

NC #2 on 12/28/2010 - Start To Drill Out PIgs - 5:30 To 6:00 AM C/Trvl, 6:00 AM OWU, P/U &TIH W/- Bit & Bit Sub, 172- Jts Tbg To PIg # 1 @ 5390', POOH W/- 3- Jts Tbg, R/U Rig Pmp,SWI, CSDFN @ 5:30 PM, 5:30 To 6:00 PM C/Trvl.Daily Cost: $0Cumulative Cost: $141,286

12/29/2010 Day: 5 Completion

NC #2 on 12/29/2010 - Finish Drilling Out PIgs, Swab Well - 5:30 To 6:00 AM C/Trvl, 6:00 AMOWU, TIH W/- 3 Jts Tbg, R/U RBS Pwr Swvl, Drill Out Plg, 29 Min Drill Time, Swvl In The HoleTo Pig # 2 @ 5562', Drill Out Plg, 32 Min Drill Time, Swvl In The Hole To Plg # 3 @ 5678', DrillOut Plg, 30 Min Drill Time, Swvl In The Hole To Plg # 4 @ 6333', Drill Out PIg, 27 Min DrillTime, Swvl In The Hole To PBTD @ 7425', PBTD Had 87' Of Fill, Circ Well Clean For Approx. 1Hr, R/D RBS Pwr Swvl, POOH W/- 5 Jts Tbg, R/U Sandline, Swab Well, Made 6 Swab Runs,Swab Back Approx. 70 Bbis Fluid, SWI, CSDFN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $149,566

12/30/2010 Day: 6 Completion

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

Summary Rig Activity Page 2 of 2

NC #2 on 12/30/2010 - Round Trip Tbg - 5:30 To 6:00 AM C/Trvl, Rig Maintenance, CSDFN @1:00 PM, 1:00 To 1:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $153,336

1/4/2011 Day: 7 Completion

NC #2 on 1/4/2011 - Finish Swabbing Well, Round Trip Tbg - 5:30 To 6:00 AM C/Trvl, 6:00AM OWU, Swab Well, Swab Back Approx. 70 Bbis Wtr, R/D Sandline, TIH W/- 5 Jts Tbg ToPBTD, PBTD Had Approx. 70' Of Fill, Circ Well Clean For Approx. 1 Hr, L/D 18- Jts Tbg, POOHW/- 30 Jts Tbg, SWI, CSDN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $160,890

1/5/2011 Day: 8 Completion

NC #2 on 1/5/2011 - Round Trip Tbg, Start To TIH W/- Rods - 5:30 To 6:00 AM C/Trvl, 6:00AM Thaw Out Well, Well Was Flowing Out Both Sides, R/U Rig Pmp, Circ Well, POOH W/- 191Jts Tbg, Bit Sub & Bit, P/U & TIH W/- NC, 2- Jts Tbg, SN, 1- Jt Tbg, TA, 218- Jts Tbg, Set TAIn 18000 Lbs Tension, R/D Weatherford BOPS, R/U Wellhead, X - Over For Rods, P/U & StrokeTest W/- Central Hydraulics 2 1/2 x 1 1/2 x 21 x 24' RHAC Rod Pmp, TIH W/- Pmp, 6- 1 1/2"x 25' Wt Bars, 40- 3/4" Guided Rods, SWI, CSDFN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $165,585

1/6/2011 Day: 9 Completion

NC #2 on 1/6/2011 - P/U Rod String - 5:30 To 6:00 AM C/Trvl, 6:00 AM Thaw Out Well, WellWas Flowing Out Of The Csg & Tbg, R/U Rig Pmp, Circ Well, P/U & TIH W/- 129- 3/4" GuidedRods, 100- 7/8" Guided Rods, 90- 7/8" Pony Subs, Do Some Rig Maintenance, SWI, CSDFN @3:00 PM, 3:00 To 3:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $172,294

1/7/2011 Day: 10 Completion

NC #2 on 1/7/2011 - PWOP - 5:30 To 6:00 AM C/Trvl, 6:00 AM Thaw Out Well, RigMaintenance, OWU, P/U 7- 7/8" Guided Rods, 1- 4', 1- 2' x 7/8" Pony Subs, 1 1/2" x 26'Polished Rod, R/U Pmp Unit, Tbg Standing Full, Pressure Test Tbg To 800 Psi, Good Test,Could Not PWOP Due To Flowline Being Frozen. FINAL REPORT FinalizedDaily Cost: $0Cumulative Cost: $199,283

Pertinent Files: Go to File List

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

Summary Rig Activity Page 2 of 2

NC #2 on 12/30/2010 - Round Trip Tbg - 5:30 To 6:00 AM C/Trvl, Rig Maintenance, CSDFN @1:00 PM, 1:00 To 1:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $153,336

1/4/2011 Day: 7 Completion

NC #2 on 1/4/2011 - Finish Swabbing Well, Round Trip Tbg - 5:30 To 6:00 AM C/Trvl, 6:00AM OWU, Swab Well, Swab Back Approx. 70 Bbis Wtr, R/D Sandline, TIH W/- 5 Jts Tbg ToPBTD, PBTD Had Approx. 70' Of Fill, Circ Well Clean For Approx. 1 Hr, L/D 18- Jts Tbg, POOHW/- 30 Jts Tbg, SWI, CSDN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $160,890

1/5/2011 Day: 8 Completion

NC #2 on 1/5/2011 - Round Trip Tbg, Start To TIH W/- Rods - 5:30 To 6:00 AM C/Trvl, 6:00AM Thaw Out Well, Well Was Flowing Out Both Sides, R/U Rig Pmp, Circ Well, POOH W/- 191Jts Tbg, Bit Sub & Bit, P/U & TIH W/- NC, 2- Jts Tbg, SN, 1- Jt Tbg, TA, 218- Jts Tbg, Set TAIn 18000 Lbs Tension, R/D Weatherford BOPS, R/U Wellhead, X - Over For Rods, P/U & StrokeTest W/- Central Hydraulics 2 1/2 x 1 1/2 x 21 x 24' RHAC Rod Pmp, TIH W/- Pmp, 6- 1 1/2"x 25' Wt Bars, 40- 3/4" Guided Rods, SWI, CSDFN @ 6:00 PM, 6:00 To 6:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $165,585

1/6/2011 Day: 9 Completion

NC #2 on 1/6/2011 - P/U Rod String - 5:30 To 6:00 AM C/Trvl, 6:00 AM Thaw Out Well, WellWas Flowing Out Of The Csg & Tbg, R/U Rig Pmp, Circ Well, P/U & TIH W/- 129- 3/4" GuidedRods, 100- 7/8" Guided Rods, 90- 7/8" Pony Subs, Do Some Rig Maintenance, SWI, CSDFN @3:00 PM, 3:00 To 3:30 PM C/Trvl.Daily Cost: $0Cumulative Cost: $172,294

1/7/2011 Day: 10 Completion

NC #2 on 1/7/2011 - PWOP - 5:30 To 6:00 AM C/Trvl, 6:00 AM Thaw Out Well, RigMaintenance, OWU, P/U 7- 7/8" Guided Rods, 1- 4', 1- 2' x 7/8" Pony Subs, 1 1/2" x 26'Polished Rod, R/U Pmp Unit, Tbg Standing Full, Pressure Test Tbg To 800 Psi, Good Test,Could Not PWOP Due To Flowline Being Frozen. FINAL REPORT FinalizedDaily Cost: $0Cumulative Cost: $199,283

Pertinent Files: Go to File List

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

Form 3160-4(Au 2007)'

- UNIT TATESFORM APPROVED

DEPARTMENT OF THE INTERIOR OMB NO. 1004-0137BUREAU OF LAND MANAGEMENT Expires: July 31, 2010

WELL COMPLETION OR RECOMPLETION REPORT AND LOG 5. Lease Serial No.EDA 2OGOOO5609

la. Type of Well Oil Well Gas Well Dry O Other 6. If Indian, Allottee or Tribe Nameb. Type of Completion: O New Well Work Over Deepen Plug Back Diff. Resvr.,

Other: 7. Unit or CA Agreement Name and No.

2. Name of Operator 8. Lease Name and Well No.NEWFIELD EXPLORATION COMPANY UTE TRIBAL 13-18-4-23. Address 3a. Phone No. (include area code) 9. AFI Well No.

1401 17TH ST. SUITE 1000 DENVER, CO 80202 (435)646-3721 43-013-503924. Location of ell (Répõ/t locationclearly and in accordance with Federal requirements)* l 0. Field and Pool or Exploratory

MYTON-TRIBALEDAAt surface SL 638' FEL (SWISW) SEC. 18, T4S, R2W 11. Sec., T., R., M., on Block and

Survey or AreaSEC. 18, T4S, R2W

At top prod. interval reýorted below 12. County or Parish 13. State

At total deptW7470' DUCHESNE UT

14. Date Spudded 15. Date T.D. Reached 16. Date Completed 01/07/2011 17. Elevations (DF, RKB, RT, GL)*

11/29/2010 12/08/2010 D & A Ready to Prod. 5540' GL 5552' KB18. Total Depth: MD 7470' 19. Plug Back T.D.: MD 7427' 20. Depth Bridge Plug Set: MD

TVD TVD TVD2 L Type Electric & Other Mechanical Logs Run (Submit copy of each) 22. Was well cored? 2 No Yes (Submit analysis)

DUAL IND GRD, SP, COMP. DENSITY,COMP. NEUTRON,GR,CALIPER, CMT BOND WasDSTnm? No Yes (Submitreport)Directional Survey? O No Yes (Submit copy)

2L Casing and Liner Record (Report all strings set in well)

: H le Size Sige/Grade Wt. (#lft.) Top (MD) Bottom (MD) Stage C enter No of SCk & SI ry Vol. Cement Top* Amount Pulled

12-1/4" 8-5/8" J-55 24# 0 314' 160 CLASS G7-7/8" M/2" J-55 15.5# 0 7469' 400 PRIMLITE 40'

495 50/50 POZ

24 Tubing Re rdSize Dépth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) PackerDepth (MD)

2-7/8" EÒT( 6917' TA @6818'25. Producing Intervals 26. Perforation Record

Formation Top Bottom Perforated Interval Size No. Holes Pert StatusAl Green River 5461' 6866' 5461-6866'

.36" 93

D)

27 Acid, Fracture, Treatment, Cement Squeeze, etc.Depth Interval Amount and Type of Material

5462-6866' Frac w/ 129291#'s 20/40 sand in 980 bbis of Lightning 17 fluid in 4 stages

Production IntervalADate First fest Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity 2-1/2" x 1-1/2" x 21' x 24' RHAC Pump

01/03/11 1/17/11 4 13 24 138Choke I bg.Press. Cyg. 24 Hr Oil Gas Water Gas/Oil Well StatusSize gg. Prey. Rate BBL MCF BBL Ratio PRODUCING

Production - Interval BDã e First fest Date Houri Test Oil Gas Water 3il Gravity Gas Production MethodIfroduced Tested Production BBL MCF BBL Corr. API Gravity

Moke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize FIwg, Press. Rate BBL MCF BBL Ratio

e instructions and spaces for additional data on page 2)

JAN21 2011DIV.OFOIL,GAS&

Form 3160-4(Au 2007)'

- UNIT TATESFORM APPROVED

DEPARTMENT OF THE INTERIOR OMB NO. 1004-0137BUREAU OF LAND MANAGEMENT Expires: July 31, 2010

WELL COMPLETION OR RECOMPLETION REPORT AND LOG 5. Lease Serial No.EDA 2OGOOO5609

la. Type of Well Oil Well Gas Well Dry O Other 6. If Indian, Allottee or Tribe Nameb. Type of Completion: O New Well Work Over Deepen Plug Back Diff. Resvr.,

Other: 7. Unit or CA Agreement Name and No.

2. Name of Operator 8. Lease Name and Well No.NEWFIELD EXPLORATION COMPANY UTE TRIBAL 13-18-4-23. Address 3a. Phone No. (include area code) 9. AFI Well No.

1401 17TH ST. SUITE 1000 DENVER, CO 80202 (435)646-3721 43-013-503924. Location of ell (Répõ/t locationclearly and in accordance with Federal requirements)* l 0. Field and Pool or Exploratory

MYTON-TRIBALEDAAt surface SL 638' FEL (SWISW) SEC. 18, T4S, R2W 11. Sec., T., R., M., on Block and

Survey or AreaSEC. 18, T4S, R2W

At top prod. interval reýorted below 12. County or Parish 13. State

At total deptW7470' DUCHESNE UT

14. Date Spudded 15. Date T.D. Reached 16. Date Completed 01/07/2011 17. Elevations (DF, RKB, RT, GL)*

11/29/2010 12/08/2010 D & A Ready to Prod. 5540' GL 5552' KB18. Total Depth: MD 7470' 19. Plug Back T.D.: MD 7427' 20. Depth Bridge Plug Set: MD

TVD TVD TVD2 L Type Electric & Other Mechanical Logs Run (Submit copy of each) 22. Was well cored? 2 No Yes (Submit analysis)

DUAL IND GRD, SP, COMP. DENSITY,COMP. NEUTRON,GR,CALIPER, CMT BOND WasDSTnm? No Yes (Submitreport)Directional Survey? O No Yes (Submit copy)

2L Casing and Liner Record (Report all strings set in well)

: H le Size Sige/Grade Wt. (#lft.) Top (MD) Bottom (MD) Stage C enter No of SCk & SI ry Vol. Cement Top* Amount Pulled

12-1/4" 8-5/8" J-55 24# 0 314' 160 CLASS G7-7/8" M/2" J-55 15.5# 0 7469' 400 PRIMLITE 40'

495 50/50 POZ

24 Tubing Re rdSize Dépth Set (MD) Packer Depth (MD) Size Depth Set (MD) Packer Depth (MD) Size Depth Set (MD) PackerDepth (MD)

2-7/8" EÒT( 6917' TA @6818'25. Producing Intervals 26. Perforation Record

Formation Top Bottom Perforated Interval Size No. Holes Pert StatusAl Green River 5461' 6866' 5461-6866'

.36" 93

D)

27 Acid, Fracture, Treatment, Cement Squeeze, etc.Depth Interval Amount and Type of Material

5462-6866' Frac w/ 129291#'s 20/40 sand in 980 bbis of Lightning 17 fluid in 4 stages

Production IntervalADate First fest Date Hours Test Oil Gas Water Oil Gravity Gas Production MethodProduced Tested Production BBL MCF BBL Corr. API Gravity 2-1/2" x 1-1/2" x 21' x 24' RHAC Pump

01/03/11 1/17/11 4 13 24 138Choke I bg.Press. Cyg. 24 Hr Oil Gas Water Gas/Oil Well StatusSize gg. Prey. Rate BBL MCF BBL Ratio PRODUCING

Production - Interval BDã e First fest Date Houri Test Oil Gas Water 3il Gravity Gas Production MethodIfroduced Tested Production BBL MCF BBL Corr. API Gravity

Moke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well StatusSize FIwg, Press. Rate BBL MCF BBL Ratio

e instructions and spaces for additional data on page 2)

JAN21 2011DIV.OFOIL,GAS&

Date First Test Date Hours Test Oil Gas Water Oil Gravity 3as Production Method

Produced Teated Production BBL MCF BBL Corr. API Gravity

Choke Tbg. Press.Osg. 24 Hr. Oil Gas Water Gas/Oil Well Status

Size Flwg Press. Rate BBL MCF BBL Ratio

SI

28c. Production - Interval DDate First Test Date Hours Test Dil Gas Water Oil Gravity Gas Production Method

Produced Tested Production BBL MCF BBL Corr. API Gravity

Çhoke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well Status

Size Flwg. Press. Rate BBL MCF BBL RatioSI

29. Disposition of Gas (Solid, usedfor fuel,vented etc.)

SOLD & USED FOR FUEL

30. Summary of Porous Zones (Include Aquifers): 31. Formation (Log) Markers

Show all important zones of porosity and contents thereof: Cored intervals and all drill-stem tests' GEOLOGICAL MARKERSmeludmg depth mterval tested, cushion used, time tool open, flowingand shut-in pressures and

recoveries.

Top

Fonfation Top Bottom Descriptions, Contents, etc. NameMeas. Depth

GREEN RIVER 5461' 6866' GARDENGULCHMRK 4633'GARDENGULCH1 4870'

GARDENGULCH2 5002'POINT 3 5309'

XMRKR 5557'Y MRKR 5583'

DOUGALSCREEKMRK 5704'BI CARBONATE MRK 5988'

B LIMESTON MRK 6141'CASTLEPEAK 6640'

BASAL CARBONATE 7035'WASATCH 7175'

n Additional n½narks (include plugging procedure):

IndÏcatewhich items have been attached by placing a check in the appropriate boxes:

Electrical/Mechanical Logs (1 full set req'd.) Geologic Report DST Report Directional Survey

O Sundry Notice for plugging and cement verification Core Analysis Other: Drilling Daily Activity

34. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records (see attached instructions)*

Name (please print) Lucy Chavez-Naupoto Title Administrative Assistant

Signat e ey Date 01/18/2011

Title 18 U S.C. Secti n Í001and Title 43 U.S. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any

false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

(Continued on page 3)(Form 3160-4, page

Date First Test Date Hours Test Oil Gas Water Oil Gravity 3as Production Method

Produced Teated Production BBL MCF BBL Corr. API Gravity

Choke Tbg. Press.Osg. 24 Hr. Oil Gas Water Gas/Oil Well Status

Size Flwg Press. Rate BBL MCF BBL Ratio

SI

28c. Production - Interval DDate First Test Date Hours Test Dil Gas Water Oil Gravity Gas Production Method

Produced Tested Production BBL MCF BBL Corr. API Gravity

Çhoke Tbg. Press. Csg. 24 Hr. Oil Gas Water Gas/Oil Well Status

Size Flwg. Press. Rate BBL MCF BBL RatioSI

29. Disposition of Gas (Solid, usedfor fuel,vented etc.)

SOLD & USED FOR FUEL

30. Summary of Porous Zones (Include Aquifers): 31. Formation (Log) Markers

Show all important zones of porosity and contents thereof: Cored intervals and all drill-stem tests' GEOLOGICAL MARKERSmeludmg depth mterval tested, cushion used, time tool open, flowingand shut-in pressures and

recoveries.

Top

Fonfation Top Bottom Descriptions, Contents, etc. NameMeas. Depth

GREEN RIVER 5461' 6866' GARDENGULCHMRK 4633'GARDENGULCH1 4870'

GARDENGULCH2 5002'POINT 3 5309'

XMRKR 5557'Y MRKR 5583'

DOUGALSCREEKMRK 5704'BI CARBONATE MRK 5988'

B LIMESTON MRK 6141'CASTLEPEAK 6640'

BASAL CARBONATE 7035'WASATCH 7175'

n Additional n½narks (include plugging procedure):

IndÏcatewhich items have been attached by placing a check in the appropriate boxes:

Electrical/Mechanical Logs (1 full set req'd.) Geologic Report DST Report Directional Survey

O Sundry Notice for plugging and cement verification Core Analysis Other: Drilling Daily Activity

34. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records (see attached instructions)*

Name (please print) Lucy Chavez-Naupoto Title Administrative Assistant

Signat e ey Date 01/18/2011

Title 18 U S.C. Secti n Í001and Title 43 U.S. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any

false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

(Continued on page 3)(Form 3160-4, page

' Summary Rig Activity Page 1 of 2

Daily Activity Report

Format For Sundry

UTE TRIBAL 13-18-4-29/1/2010 To 1/30/2011

UTE TRIBAL 13-18-4-2 Waiting on CementDate: 11/28/2010Ross #29 at 314. Days Since Spud - On 11-29-10 Ross # 29 spud and drill 310' of 12 1/4"hole, P/U and run 7 jts of 8 5/8" 24# casing - set @ 313.95', On 11-30-10 cement w/ BJ w/160sks of Class G+2%kcl+.25#CF mixed @ 15.8ppg and 1.17 - yield, returned 3 bbls to pit,bump plug to 330 psi, BLM and State were notified of spud via emailDaily Cost: $0Cumulative Cost: $61,514

UTE TRIBAL 13-18-4-2 Rigging downDate: 12/3/2010Capstar #328 at 314. O Days Since Spud - Rig down & get ready to move to the Ute Tribe 13-18-4-2W on 12/3/10Daily Cost: $0Cumulative Cost: $61,864

UTE TRIBAL 13-18-4-2 Drill 7 7/8" hole with fresh waterDate: 12/4/2010Capstar #328 at 2113. 1 Days Since Spud - they tested & test blind rams & Outside chokevalves they did not test work rams they tested - to 2000#s for 10 min & Tested casing to1500#s for 30 min - Hook up flair lines & work on Ruffneck - PU MI 616 bit, Hunting MM,NMDC, Gap sub, Index Sub, 24 4.5" HWDP & TIH & Tag @ 240' - Drill f/ 240' to 2113' WOB=15K & GPM= 409 RPMS= 184 Rop= 170' per hr - did not test work valves & it tested - testpipe rams inside choke valves did not test work valves & - Accept rig @ 1:00 PM on 12/3/10 &Held saftey mtg w/ B&C QuickTest & test Upper Kelly & Foor valve - Nipple up Bops - Moverig w/ Howcroft Trucking 5 miles to the Ute Tribe 13-18-4-2W on 12/3/10 - Rig upDaily Cost: $0Cumulative Cost: $106,991

UTE TRIBAL 13-18-4-2 Drill 7 7/8" hole with fresh waterDate: 12/5/2010Capstar #328 at 5418. 2 Days Since Spud - Rig serv - Drill f/3925' to 5418' WOB= 22K &GPM= 409 RPMS= 184 Rop= 114' per hr - Drill f/2113' to 3925' WOB= 22K & GPM= 409RPMS= 184 Rop= 172' per hrDaily Cost: $0Cumulative Cost: $127,176

UTE TRIBAL 13-18-4-2 Circulate & Condition HoleDate: 12/6/2010Capstar #328 at 7470. 3 Days Since Spud - Drill f/ 5418' to 6369' WOB= 22K & GPM= 409RPMS= 184 Rop= 90' per hr - Rig serv - Work on directional tools - Drill f/ 7184' to 7470'WOB= 22K & GPM= 409 RPMS= 184 Rop= 81' per hr - Circ f/ Laydown - Drill f/ 6369' to7184' WOB= 22K & GPM= 409 RPMS= 184 Rop= 108' per hrDaily Cost: $0Cumulative Cost: $161,525

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

' Summary Rig Activity Page 1 of 2

Daily Activity Report

Format For Sundry

UTE TRIBAL 13-18-4-29/1/2010 To 1/30/2011

UTE TRIBAL 13-18-4-2 Waiting on CementDate: 11/28/2010Ross #29 at 314. Days Since Spud - On 11-29-10 Ross # 29 spud and drill 310' of 12 1/4"hole, P/U and run 7 jts of 8 5/8" 24# casing - set @ 313.95', On 11-30-10 cement w/ BJ w/160sks of Class G+2%kcl+.25#CF mixed @ 15.8ppg and 1.17 - yield, returned 3 bbls to pit,bump plug to 330 psi, BLM and State were notified of spud via emailDaily Cost: $0Cumulative Cost: $61,514

UTE TRIBAL 13-18-4-2 Rigging downDate: 12/3/2010Capstar #328 at 314. O Days Since Spud - Rig down & get ready to move to the Ute Tribe 13-18-4-2W on 12/3/10Daily Cost: $0Cumulative Cost: $61,864

UTE TRIBAL 13-18-4-2 Drill 7 7/8" hole with fresh waterDate: 12/4/2010Capstar #328 at 2113. 1 Days Since Spud - they tested & test blind rams & Outside chokevalves they did not test work rams they tested - to 2000#s for 10 min & Tested casing to1500#s for 30 min - Hook up flair lines & work on Ruffneck - PU MI 616 bit, Hunting MM,NMDC, Gap sub, Index Sub, 24 4.5" HWDP & TIH & Tag @ 240' - Drill f/ 240' to 2113' WOB=15K & GPM= 409 RPMS= 184 Rop= 170' per hr - did not test work valves & it tested - testpipe rams inside choke valves did not test work valves & - Accept rig @ 1:00 PM on 12/3/10 &Held saftey mtg w/ B&C QuickTest & test Upper Kelly & Foor valve - Nipple up Bops - Moverig w/ Howcroft Trucking 5 miles to the Ute Tribe 13-18-4-2W on 12/3/10 - Rig upDaily Cost: $0Cumulative Cost: $106,991

UTE TRIBAL 13-18-4-2 Drill 7 7/8" hole with fresh waterDate: 12/5/2010Capstar #328 at 5418. 2 Days Since Spud - Rig serv - Drill f/3925' to 5418' WOB= 22K &GPM= 409 RPMS= 184 Rop= 114' per hr - Drill f/2113' to 3925' WOB= 22K & GPM= 409RPMS= 184 Rop= 172' per hrDaily Cost: $0Cumulative Cost: $127,176

UTE TRIBAL 13-18-4-2 Circulate & Condition HoleDate: 12/6/2010Capstar #328 at 7470. 3 Days Since Spud - Drill f/ 5418' to 6369' WOB= 22K & GPM= 409RPMS= 184 Rop= 90' per hr - Rig serv - Work on directional tools - Drill f/ 7184' to 7470'WOB= 22K & GPM= 409 RPMS= 184 Rop= 81' per hr - Circ f/ Laydown - Drill f/ 6369' to7184' WOB= 22K & GPM= 409 RPMS= 184 Rop= 108' per hrDaily Cost: $0Cumulative Cost: $161,525

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

Summary Rig Activity Page 2 of 2. g e

UTE TRIBAL 13-18-4-2 Cleaning mud pitsDate: 12/7/2010Capstar #328 at 7470. 4 Days Since Spud - Pump slug & LDDP & BHA - Circ for laydown - &Compensated Neutron & Gamma ray Loggers TD 7480' - Test 5.5" casing rams - RU & run 175jts of 5.5" ]55 15.5# LT&C shoe @ 7468.75' Float coller @ 7427.12' Trans - 3 jts of casing tothe Ute Tribal 1-28-4-3W - Circ for cement job - Held saftey mtg & RU BJ & Test lines & pump400 sks of lead cement Mixed @11ppg 3.53 yeild PLII - +3%KCL+5#CSE+0.5#CF+2#KOL+.5SMS+FP+SF & 495 sks tail cmt mixed @ 50:50:2+3%KCL -

+0.5%EC-1+.25#CF+.05#SF+.3SMS+FP-6L Disp 176 bb\s 70 bbis cmt to pit - Nipple down &set 5.5" casing slips w/ 100,000#s - Clean mud pits - Held saftey mtg w/ Phoenix Survey IncRU & log with Duel guard Log & Gamma Ray & Compensated DensityDaily Cost: $0Cumulative Cost: $357,314

UTE TRIBAL 13-18-4-2 Rigging downDate: 12/8/2010Capstar #328 at 7470. 5 Days Since Spud - Release rig @ 8:00 AM - Cleaning mud pitsFinalizedDaily Cost: $0Cumulative Cost: $358,744

Pertinent Files: Go to File List

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

Summary Rig Activity Page 2 of 2. g e

UTE TRIBAL 13-18-4-2 Cleaning mud pitsDate: 12/7/2010Capstar #328 at 7470. 4 Days Since Spud - Pump slug & LDDP & BHA - Circ for laydown - &Compensated Neutron & Gamma ray Loggers TD 7480' - Test 5.5" casing rams - RU & run 175jts of 5.5" ]55 15.5# LT&C shoe @ 7468.75' Float coller @ 7427.12' Trans - 3 jts of casing tothe Ute Tribal 1-28-4-3W - Circ for cement job - Held saftey mtg & RU BJ & Test lines & pump400 sks of lead cement Mixed @11ppg 3.53 yeild PLII - +3%KCL+5#CSE+0.5#CF+2#KOL+.5SMS+FP+SF & 495 sks tail cmt mixed @ 50:50:2+3%KCL -

+0.5%EC-1+.25#CF+.05#SF+.3SMS+FP-6L Disp 176 bb\s 70 bbis cmt to pit - Nipple down &set 5.5" casing slips w/ 100,000#s - Clean mud pits - Held saftey mtg w/ Phoenix Survey IncRU & log with Duel guard Log & Gamma Ray & Compensated DensityDaily Cost: $0Cumulative Cost: $357,314

UTE TRIBAL 13-18-4-2 Rigging downDate: 12/8/2010Capstar #328 at 7470. 5 Days Since Spud - Release rig @ 8:00 AM - Cleaning mud pitsFinalizedDaily Cost: $0Cumulative Cost: $358,744

Pertinent Files: Go to File List

http://www.inewfld.com/denver/SumActRpt.asp?RC=276391&API=4301350392&MinDa...

RECEIVED: Sep. 10, 2018

 

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING 

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: 2OG0005609

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wellsbelow current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals.Use APPLICATION FOR PERMIT TO DRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: 

7.UNIT or CA AGREEMENT NAME: 

1. TYPE OF WELL  Oil Well 

8. WELL NAME and NUMBER: UTE TRIBAL 13-18-4-2

2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY

9. API NUMBER: 43013503920000

3. ADDRESS OF OPERATOR: PHONE NUMBER:  4 WATERWAY SQUARE PL STE 100 , THE WOODLANDS, TX, 77380  435-646-4802  

9. FIELD and POOL or WILDCAT: SOUTH MYTON BENCH

4. LOCATION OF WELL  FOOTAGES AT SURFACE:     748 FSL 638 FWL  QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:     Qtr/Qtr: SWSW Section: 18 Township: 4S Range: 2W Meridian: U

COUNTY: DUCHESNE

STATE: UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

 

NOTICE OF INTENTApproximate date work will start:

SUBSEQUENT REPORTDate of Work Completion:

9/5/2018

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

      ACIDIZE         ALTER CASING          CASING REPAIR  

      CHANGE TO PREVIOUS PLANS         CHANGE TUBING          CHANGE WELL NAME  

      CHANGE WELL STATUS         COMMINGLE PRODUCING FORMATIONS         CONVERT WELL TYPE  

      DEEPEN         FRACTURE TREAT          NEW CONSTRUCTION  

      OPERATOR CHANGE         PLUG AND ABANDON         PLUG BACK   

      PRODUCTION START OR RESUME         RECLAMATION OF WELL SITE         RECOMPLETE DIFFERENT FORMATION  

      REPERFORATE CURRENT FORMATION         SIDETRACK TO REPAIR WELL         TEMPORARY ABANDON  

      TUBING REPAIR         VENT OR FLARE         WATER DISPOSAL  

      WATER SHUTOFF          SI TA STATUS EXTENSION         APD EXTENSION  

      WILDCAT WELL DETERMINATION         OTHER   OTHER: 

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.  The above mentioned well returned to production on 09/05/2018. This well has

been SI since June of 2014.

NAME (PLEASE PRINT)  PHONE NUMBER  Mandie Crozier 435 646-4825

TITLE Regulatory Specialist

SIGNATURE N/A

DATE 9/10/2018

September 13, 2018

Sundry Number: 90559 API Well Number: 43013503920000Sundry Number: 90559 API Well Number: 43013503920000

FORM 9STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING 2OG0005609

SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wellsbelow current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. 7.UNIT or CA AGREEMENT NAME:

Use APPLICATION FOR PERMIT TO DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well UTE TRIBAL 13-18-4-2

2. NAME OF OPERATOR: 9. API NUMBER:NEWFIELD PRODUCTION COMPANY 43013503920000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:4 WATERWAY SQUARE PL STE 100 , THE WOODLANDS, TX, 77380 435-646-4802 SOUTH MYTON BENCH

4. LOCATION OF WELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE

748 FSL 638 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr:SWSW Section: 18 Township: 4S Range: 2W Meridian: U UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENTApproximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORTDate of Work Completion: DEEPEN FRACTURE TREAT NEW CONSTRUCTION

9/5/20 18OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT

Date of Spud:REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED )R COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.The above mentionec well returned to production on 09/05/2018. This well has

been SI since June of 2014. Accepted by theUtah Division of

Oil, Gas and Mining

FOR RECORD ONLYSeptember 13, 2018

NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Specialist

SIGNATURE DATEN/A 9/10/2018

RECEIVED: Sep. 10,