    PT Priamanaya EnergiKEBAN AGUNG

    fiw 1 / 201/11/1179755627.doc

    no.scope

    turn-key based1 EBOP 1 Contractor2 EBOP 2 Contractor

    remarks

    1 drawings,in addition to the documents as per GeneralTechnical Specification GTS-EBOP-012011 Rev. 0:

    1.1 single line diagram, overall for 150 kV, 13,8 kV 1

    1.2 single line diagram, overall for 6,6 kV, 400 V and less 2

    1.3 equipment foundations including foundation loads 1

    2 earthing system2.1 basic grid for the entire project area 1

    2.2 connection of the respective equipment with the basicgrid

    1 2

    3 IPBConnection to the generator terminals, the excitationtransformers, the unit transformers and the generatortransformers

    1 supervised by thegenerator respectivelythe generatortransformer supplier

    4 cables

    4.1 cables,for the inter connection within the respective scope

    1 2

    4.2 excitation cables

    connection to the excitation panels and the generatorslip ring terminals

    1 supervised by the

    generator respectivelythe generatortransformer supplier

    4.3 150 kV cable system 2

    4.3.1 cable termination 2

    4.3.2 connecting the cable with GIS and the generatortransformer

    2 supervised by the GISrespectively thegenerator transformersupplier

    4.4 conductor,for the connection of the 150 kV cable system withthe next gantry

    2

    5 DCS ;

    Supply:HMI, Large Screen, Control Station / IO & RIOCubicle, Historian & Performance calculation station,CMMS server and module, Printer, Connectionbetween supplied equipment.

    Work :Engineering , installation, commissioning, baby sitting

    Out of scope :- DC power and UPS- Grounding for panels- Cable tray / raise floor- Connection to field instrument- CMMS user PC and network

    1 DCS vendor must

    lead thecoordination duringengineering designphase. HBED willresponsible for finaldesign.

    Installation /erection work canbe done by S4EPCor EBOP 1 turnkey.

    6 clarification with PLN:

    meetings with PLN together with PT PriamanayaEnergi (PE) at the beginning of the design stage tooptimize the implementation of the systems (i.e. SAS,control & protection, metering and communication)into the existing PLN systems.

    The Contractor informs the agenda to PE two weeksin advance of such required meeting with PLN

    1

    7 Site

    7.1 Site management 1 2

    7.2 Site facilities (i. e. accommodations, office, warehouse, vehicles, crane, tools, electricity, telephone,internet, water, etc.)

    1 2

    7.3 health safety and environment management 1 2

  • 8/3/2019 Division of Scope - EBOP A

    2/2

    PT Priamanaya EnergiKEBAN AGUNG

    DIVISION OF SCOPE EBOP including Lahat SS extension

    fiw 2 / 201/11/1179755627.doc