Transcript of Division of Responsabilities
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 1/9
~
R E F I N E R fA B A L B O A
REFERENCE DOCUMENTS FORREFINERiA BALBOA EXECUTION PROJECT
OWNER I CONTRACTOR DIVISION OF
RESPONSIBILITIES
Approved by: Date Sign:
Formato [dd-rnrn-afio]
Reviewed by: Date Sign:
A.M. CALERO Formato [dd-rnrn-afio]
Prepared by: Date Sign:
A.M. CALERO Formato [dd-rnrn-afio]
August, 2008
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 2/9
DIVISION OF RESPONSABILITIES
CONTENT
DISTRIBUTION LIST 3
REVISION STATUS 3
LIST OF ABBREVIATIONS 4
1.0 DEFINITIONS 5
DESCRIPTION 5
2.0 PROJECT SERVICES 5
3.0 MOBILIZATION & SITE SERVICES 7
4.0 EPC 7
5.0 QUALITY ASSURANCE AND QUALITY CONTROL 8
6.0 SAFETY, HEALTH & ENVIRONMENT (SHE) 9
7.0 MISCELLANEOUS SUPPLlES 9
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev. O. August 2008 Page 2 of 9
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 3/9
DIVISION OF RESPONSABILITIES
This document is one of a series of Business Controls to be adopted by Refinerfa Balboa S.A as
reference for REFINERfA BALBOA EXECUTION PROJECT.
Comment and feedback from users of this document is encouraged, by means of a Proposal for
Modification for this document.
Copyright
Copyright @ 2001, Refineria Balboa S.A
This document is the property of Refinerfa Balboa, S.A. Circulation is
restricted to Refinerfa Balboa S.A and its designated associates,
contractors and consultants. It must not be copied or used for any purpose
other than which it is supplied, without the express written authority of
RBSA.
Except where provided for purposes of contractual requirements, RBSA
disclaims any responsibility or liability for any use or misuse of thedocument by any person and makes no warranty as to the accuracy or
suitability of the information to any third party.
Symbols:
Denote a reference document
DISTRIBUTION LIST
Copy I English Spanish I User LocationNumber
IIIEF: Electronic distribution
P: Hard Copy (Paper) distribution.
REVISION STATUS
IssueDate of Next I Change Details Prep. Sign I App. SignRev. Rev. Description
0
August August I First IssueOriginal I008 2012 IssueI I
I IThe organization of PMC must review and adapt this document to incorporate as complement into
the information to be provided to FEED/EPC CONTRACTORS for REFINERfA BALBOA
EXECUTION PROJECT. These documents establish the scope of work and requirements that
contractors should be considered for during the development phases of ENGINEERING,
PROCUREMENT, CONSTRUCTION, PRE-COMMISSIONING, COMMISSIONING, START-UP,
NORMAL OPERATION Period and PERFORMANCE TESTS, according EPC CONTRACTS.
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev. O . August 2008 Page 3 of 9
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 4/9
DIVISION OF RESPONSABILITIES
LIST OF ABBREVIATIONS
C Contractor
RB OWNER
E Engineering
P Procurement
Ct Construction
Cm Commissioning
SU Start-Up
NO Normal Operation Period
PT Performance Tests
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev. O. August 2008 Page 4of9
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 5/9
DIVISION OF RESPONSABILITIES
1.0 DEFINITIONS
ENGINEERING
Engineering, Design and Coordination work including preparation of purchase specifications,
evaluation of bids and review and approval of vendor drawings.
MATERIAL & SERVICES SUPPLY
The supply of an item, system or service and accountability for all associated costs. This includes
responsibilities such as manufacture and associated studies, soliciting bids and procurement
where applicable, scheduling, ordering, quality control, and inspecting
SITEWORK & ERECTION
Responsible for the unloading at site, proper erection installation, cleaning, testing and other work
and services.
COMMISSIONING, START-UP, NORMAL OPERATION PERIOD AND PERFORMANCE TESTS
The provision of technical advisors (TA's) for erection commissioning, start-up, normal operation
period and performance testing of equipment supplied and the overall management, direction
and execution of the facilities commissioning, start-up, normal operation period and performance
testing activities
DIVISION OF RESPONSABILITIES
DESCRIPTION E P Ct I Cm I SU I NO I PT NOTES
2.0 PROJECT SERVICES
2 . 1 PROJECT MANAGEMENT C C C C C C C
2 . 2 PROJECT CONTROLS C C C C C C C
2 . 3 INSURANCES
A Employer C C C C C C C
B General-Civil C C C C C C C
C Vehicles-Civil C C C C C C C
D Construction All Risk C/RB C/RB C/RB C/RB C/RB
2 . 4 FINANCIAL INSTRUMENTS
A Performance Bond C C C C C C C
B Labor Bond C C C C C C C
2 . 5 DETAILED DESIGN
ABasic Engineering Val idat ion by
CContractor
BMain Contractor Offices, Computers,
C COffice Services
B Surveys & Studies
1 IDetailed Site Surveys C
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev. O. August 2008 Page 5 of 9
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 6/9
DIVISION OF RESPONSABILITIES
2 Soil Studies C
C Design
1
Calculations, Studies,
CDescriptions
2Drawings, Diagrams, Indexes,
CLists, Details
3 Data Sheets and Specifications C
4 As Built Drawings C
5 Data / Project Books C
6Operating and Maintenance
CManuals & Catalogs
7Vendor and Subcontractor
C C C C C C CDrawings & Specs
0 Purchasing Support by Engineering
1 Bills of Material C
2RFQ & Tech Evaluation for
CI purchase orders
3RFQ & Tech Evaluation for
CSubcontracts
4Review & Approval of Vendor
CDrawings
5 Support to Expediting C
6 Support to Inspection Services C
2.6PURCHASING CONTRACTING,
LOGISTICS, PERMITS
AVendor and Subcontracts Approved
RB RB RB RB RB RB RBContractor may propose
List alternates for approval
BRequisi tioning / Commercial Bid
C C C C C CEvaluations / Order Placement
C Supplier and Subcontractor Payments C C C C C C
0Expediting of Suppl iers and
C C C C C CSubcontractors
EInland Transportation for Foreign
CPurchases (Country of Origin)
FOcean/Air Freight for Foreign
CPurchases
GPre-Shipment Inspection for Foreign
N/APurchases
Applies in case of off-
H CAU List and Customs Clearance C shore equipment and
material by Contractor
I Duties RB
J Permits by Contractor C C C C C C
KPermits - Land, Affectation of Natural
RB RB RB RB RBResources
L Permits - Construction, Hot Work C C C C C
M Access to Site RB RB RB RB RB
NRight of Way/Clearance for All Plant
C C C C C CEquip and Material to Site
0Transportation from Port of Import to
C C C C C CSite
P
Unloading and Receiving Equipment
C C C C Cand Material (at s ite)
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev.O.August2008 Page 6 of 9
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 7/9
DIVISION OF RESPONSABILITIES
QReceiving, Inspecting, Checking &
C C C C CInventory (Including OS&D}
RAll Req'd Indoor/Outdoor Storage of
C C C C C CEquip' & Material
S Local Registration Fees, License, Etc. C C C C C C
TTransport of Damaged/Defective
C C C C C CMaterial for Rep,air
2 . 7 TAXES
A Sales & Use Taxes C C C C C C
B Value Added Taxes (IVA) C C C C C C
C Corporate Taxes C C C C C C
0 Municipal Taxes C C C C C C C
2 . 8 TRAINING OF OWNER PERSONNEL
A Training Manual C C C C C
B Training Facility and Materials C C C C C
COwner O&M Personnel salaries,
RB RB RB RB RBTransportat ion & Living Expenses
2 . 9 FACTORY TEST REPORTS C C C C C C
2 . 1 0 WARRANTY SERVICES C C C C C C
3.0 MOBILIZATION & SITE SERVICES
3 . 1 CONSTRUCTION PLAN, UTILITIES PLAN C C C C C C
3 . 2 SITE SECURITY & SUPERVISION C C C C C C
3 . 3 SITE MEDICAL SERVICES C C C C C C
3 . 4 CONSTRUCTION TOOLS & EQUIPMENT C C C C C C
3 . 5 SITE SANITARY FACILITIES C C C C C C
3 . 6 SITE TEMPORARY FACILITIES C C C C C C
3 . 7 OWNER OFFICES AT SITE C C C C C C
3 . 8 SITE MEALS C C C C C C
3 . 9 SITE MOBILIZATION & DEMOBILIZATION C C C C C I C
3 . 1 0 SITE FUELS & LUBRICANTS FOR C C C C C CCONSTRUCTION EQUIPMENT
3 . 1 1SITE CLEANLINESS, DUST CONTROL,
C C C C CGARBAGE & DEBRIS
4.0 EPC
4.1SITE FACILITIES, OTHERS - LABOR &
MATERIAL
ASite Preparation including Clearing/Grubbing,
C C C C C C CEarthwork
B Site Improvements C C C C C C C
C Underground Drainage C C C C C C C
0 Foundations C C C C C C C
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev.Q,August2QQ8 Page 7 of 9
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 8/9
DIVISION OF RESPONSABILITIES
EMiscellaneous Steel, ladders, platforms,
C C C C C C Csupports
F Erection C C C C C C C
G Piping Systems C C C C C C C
HElectrical Systems incl Grounding, Cathodic
C C C C C C CProtection, Lighting
I Painting C C C C C C C
J Fire-Fighting System C C C C C C C
4 . 2 CONSTRUCTION SUPERVISION C C C C C
PRECOMMISSIONING, COMMISSIONING,
4 . 3 START-UP (SU), NORMAL OPERATION C C C C C
AND PERFORMANCE TESTS
A Fuel
B Operators C C C C C
C Supervision C C C C C
D Craft Labor C C C C C
E Electrical Power C RB RB RB RB
FStandard and Special Test Instruction, Tools, &
C C C C CEquipment
G Instrumentation Calibration C C C C C
HPrecommissioning, Commissioning, SU, NO,
C C C C CPT Consumables
IConstruction, Precommissioning and
C C C C CCommissioning, SU, NO, PT Spares
J Documentation, Tests, Data, & Reports C C C C C
K Equipment & System Walk down and Turnover C C C C C
L Punch List Creation and Maintenance C C C C C
4 . 4 TESTING
A Procedures C C C
B Fuel C C C
C Operators C RB RB RB RB
D Supervision & Craft Labor Support C C C C C
5.0 QUALITY ASSURANCE AND QUALITY CONTROL
A Quality Assurance/Quality Control Plans C C C C C C C
BVendor Shop Inspection for Purchased
CMaterials, Equip, Services
C Positive Materials Identification C C
D Control of Special Processes C C C C C C
E Test Control C C C C C C
FUse, Control and Calibration of Tools,
C C C C C CMeasurement Devices, Equip
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev.O.August2008 Page 8 of 9
8/4/2019 Division of Responsabilities
http://slidepdf.com/reader/full/division-of-responsabilities 9/9
DIVISION OF RESPONSABILITIES
G Nonconformance and Corrective Action C C C C C C C
H Documentation C C C C C C C
IQuality Audits C C C C C C C
6.0 SAFETY, HEALTH & ENVIRONMENT (SHE)
A SHE Plan C C C C C C C
B SHE Procedures C C C C C C C
C SHE Execution C C C C C C C
0 SHE Audits C C C C C C C
E SHE Documentation C C C C C C C
7.0 MISCELLANEOUS SUPPLIES
A Site Vehicles C C C C C
B Chemicals and Gases (Initial Fill) C C C C C
C Oils and Greases (Initial Fill) C C C C C
0 Other Consumables C C C C C
Grupo Alfonso Gallardo. Refinerfa Balboa, S. A
REFERENCE DOCUMENTS FOR REFINERiA BALBOA EXECUTION PROJECT Rev. o . August 2008 Page 9 of 9