DISTRICT RURAL DEVELOPMENT CELL BURDWAN ZILLA PARISHAD
description
Transcript of DISTRICT RURAL DEVELOPMENT CELL BURDWAN ZILLA PARISHAD
S.KAR, LDO, DRDC, BZPS.KAR, LDO, DRDC, BZP
DISTRICT RURAL DEVELOPMENT CELLBURDWAN ZILLA PARISHAD
WELCOMEWELCOMEWELCOMEWELCOME
S.KAR, LDO, DRDC, BZPS.KAR, LDO, DRDC, BZP
SELECTION OF NEW GPRPSELECTION OF NEW GPRP In case of selection of new GPRP, Memo No. 2038(31)/DRDC/ZP/BDN/VIII/44(Vol.-14)dated 08.06.10. of this Office should be followed strictlyGram Panchayat Resource Person (GPRP) Gram Panchayat Resource Person (GPRP) should be discontinued who has already been should be discontinued who has already been engaged in ICDS, ASHA etc. projects. A engaged in ICDS, ASHA etc. projects. A competent woman SHG (preferably SGSY) competent woman SHG (preferably SGSY) member would be engaged in that place and the member would be engaged in that place and the report would be sent to this Cell in the report would be sent to this Cell in the prescribed format immediatelyprescribed format immediately Honorarium of newly selected GPRP may not be Honorarium of newly selected GPRP may not be considered until the Engagement Report to be received considered until the Engagement Report to be received as per prescribed formatas per prescribed format
S.KAR, LDO, DRDC, BZPS.KAR, LDO, DRDC, BZP
HONORARIUM OF GPRPHONORARIUM OF GPRP Strictly follow the instruction as per Memo No. 2530(31)/DRDC/ZP/BDN/VIII/44(Vol.-4)dated 11.09.2009. GPRP working as SHPI should only claim honorarium @ Rs.500/- / @ Rs.750/- (for ‘A’ graded GPRP) per month and honorarium @ Rs.100/- for attending the monthly meeting. Honorarium for extra work (full day/Half day) may be considered only for performing the SGSY work and this should claimed as per prescribed format. Presence of GPRP for sanctioning of bank loans disbursement (both C-C & Project) is not mandatory, so it should not be encouraged.
S.KAR, LDO, DRDC, BZP4
ANALYSIS OF ANALYSIS OF PERFORMANCE OF PERFORMANCE OF
GPRPGPRP
On the basis of On the basis of Monthly Report of Monthly Report of
GPRP GPRP February, 2012February, 2012
S.KAR, LDO, DRDC, BZPS.KAR, LDO, DRDC, BZP
REPORT PENDINGREPORT PENDING
FOR THE MONTH OF February, 2012FOR THE MONTH OF February, 2012
Name of the Panchayat Samity:Name of the Panchayat Samity:
Galsi-I Galsi-I (Late submission)(Late submission)
Purbasthali-IPurbasthali-I
% SHG for which C-C A/C yet to be opened% SHG for which C-C A/C yet to be opened
10%
-10%-5%
0%5%10%
15%20%25%
30%35%40%45%
50%55%60%
65%70%75%
80%85%90%
95%100%
Andal
Ausgram-I
Ausgram-II
Barabani
Bhatar
Burdwan-I
Burdwan-II
DGP-Faridpur
Galsi-I
Galsi-II
Jamalpur
Jamuria
Kalna-I
Kalna-II
Kanksa
Katwa-I
Katwa-II
Ketugram
-I
Ketugram
-II
Khandaghosh
Mem
ari-I
Mem
ari-II
Mongalkote
Monteswar
Pandaveswar
Purbasthali-I
Purbasthali-II
Raina-I
Raina-II
Raniganj
Salanpur
DISTR
ICT
Block
% o
f C-C
A/C
yet
to
be o
pene
d
Average limit of C-C A/C per SHG (Rs.)Average limit of C-C A/C per SHG (Rs.)
65831.17
0.00
200000.00
400000.00
600000.00
800000.00
1000000.00
1200000.00
Andal
Ausgram-I
Ausgram-II
Barabani
Bhatar
Burdwan-I
Burdwan-II
DGP-Faridpur
Galsi-I
Galsi-II
Jamalpur
Jamuria
Kalna-I
Kalna-II
Kanksa
Katwa-I
Katwa-II
Ketugram
-I
Ketugram
-II
Khandaghosh
Mem
ari-I
Mem
ari-II
Mongalkote
Monteswar
Pandaveswar
Purbasthali-I
Purbasthali-II
Raina-I
Raina-II
Raniganj
Salanpur
DISTR
ICT
BLOCKS
Avg
. lim
it of
C-C
A/C
Average loan absorption capacity per SHG from C-C A/C (Rs.)Average loan absorption capacity per SHG from C-C A/C (Rs.)
68836.11
0.00
10000.00
20000.00
30000.00
40000.00
50000.00
60000.00
70000.00
80000.00
90000.00
100000.00
110000.00
120000.00
130000.00
140000.00
150000.00
Andal
Ausgram-I
Ausgram-II
Barabani
Bhatar
Burdwan-I
Burdwan-II
DGP-Faridpur
Galsi-I
Galsi-II
Jamalpur
Jamuria
Kalna-I
Kalna-II
Kanksa
Katwa-I
Katwa-II
Ketugram
-I
Ketugram
-II
Khandaghosh
Mem
ari-I
Mem
ari-II
Mongalkote
Monteswar
Pandaveswar
Purbasthali-I
Purbasthali-II
Raina-I
Raina-II
Raniganj
Salanpur
DISTR
ICT
Block
Loan
from
C-C
A/C
(Rs.
)
Average loan absorption capacity per SHG from Savings A/CAverage loan absorption capacity per SHG from Savings A/C
8853.15
0.00
2000.00
4000.00
6000.00
8000.00
10000.00
12000.00
14000.00
16000.00
18000.00
20000.00Andal
Ausgram-I
Ausgram-II
Barabani
Bhatar
Burdwan-I
Burdwan-II
DGP-Faridpur
Galsi-I
Galsi-II
Jamalpur
Jamuria
Kalna-I
Kalna-II
Kanksa
Katwa-I
Katwa-II
Ketugram
-I
Ketugram
-II
Khandaghosh
Mem
ari-I
Mem
ari-II
Mongalkote
Monteswar
Pandaveswar
Purbasthali-I
Purbasthali-II
Raina-I
Raina-II
Raniganj
Salanpur
DISTR
ICT
Blocks
Loan
fron
Sav
ings
A/C
(Rs.
)
% of SHG not enjoyed C-C A/C% of SHG not enjoyed C-C A/C
0%0%2%4%6%8%10%12%14%16%18%20%22%24%26%28%30%32%34%36%38%40%
Andal
Ausgram-I
Ausgram-II
Barabani
Bhatar
Burdwan-I
Burdwan-II
DGP-Faridpur
Galsi-I
Galsi-II
Jamalpur
Jamuria
Kalna-I
Kalna-II
Kanksa
Katwa-I
Katwa-II
Ketugram
-I
Ketugram
-II
Khandaghosh
Mem
ari-I
Mem
ari-II
Mongalkote
Monteswar
Pandaveswar
Purbasthali-I
Purbasthali-II
Raina-I
Raina-II
Raniganj
Salanpur
DISTR
ICT
Blocks
% o
f SH
G
Times of Bank Loan over Savings of SHGTimes of Bank Loan over Savings of SHG
2.98
0.00
1.00
2.00
3.00
4.00
Andal
Ausgram-I
Ausgram-II
Barabani
Bhatar
Burdwan-I
Burdwan-II
DGP-Faridpur
Galsi-I
Galsi-II
Jamalpur
Jamuria
Kalna-I
Kalna-II
Kanksa
Katwa-I
Katwa-II
Ketugram
-I
Ketugram
-II
Khandaghosh
Mem
ari-I
Mem
ari-II
Mongalkote
Monteswar
Pandaveswar
Purbasthali-I
Purbasthali-II
Raina-I
Raina-II
Raniganj
Salanpur
DISTR
ICT
Block
Tim
es o
f Ban
k lo
an
% of SHG to be linked with economic activity% of SHG to be linked with economic activity
18%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%Andal
Ausgram-I
Ausgram-II
Barabani
Bhatar
Burdwan-I
Burdwan-II
DGP-Faridpur
Galsi-I
Galsi-II
Jamalpur
Jamuria
Kalna-I
Kalna-II
Kanksa
Katwa-I
Katwa-II
Ketugram
-I
Ketugram
-II
Khandaghosh
Mem
ari-I
Mem
ari-II
Mongalkote
Monteswar
Pandaveswar
Purbasthali-I
Purbasthali-II
Raina-I
Raina-II
Raniganj
Salanpur
DISTR
ICT
Blocks
% S
HG
S.KAR, LDO, DRDC, BZP