Simsbury Public Schools
BOE Strategic Plan: Improvement Indicator #8 “Provide increased access to quality
information technology hardware and software for students and staff.” and staff.”
District Network Infrastructure Project:$1.8 million
Client Virtualization of our computer network (“Thin Client”) over a 3 year period
•What is virtualization? •Why do we need to make this investment?•Why is this the best option?
District Network InfrastructureCreate a new district-owned network infrastructure to replace approximately 2,000 aging desktops with virtual “Thin Clients” to achieve the following:
1.Reduce the long-term total cost of ownership of the district’s network infrastructure,
2.Improve over all network performance and management efficiency, and
3.Provide a platform for remote access, mobile devices and instruction.
Thin Client Thin Client versus Distributed ComputingDistributed Computing
•A popular alternative since the early 1990’s•Client only passes keyboard/monitor/mouse signals to the network•Lowest upgrade costs / Low Total Cost of Ownership•Every logon performs like a freshly built PC•Centralized management•Platform neutral•Consumer-grade Internet connection friendly •Over time can significantly reduce electricity consumption•This is a different approach to networking
Client Virtualization
Technology Equipment Funding History
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
2007-08 2008-09 2009-10 2010-11 2011-12
SlownessSlowness
Most frequent computer issues:
McAfee updatesMcAfee updates
Real Player Real Player instancesinstances
MS policy downloadsMS policy downloadsMalwareMalware
SpywareSpyware
IE ToolbarsIE Toolbars
Heightened expectationsHeightened expectations
On-access scanningOn-access scanningIntermittent problemsIntermittent problems
Age: ½ of computers from 2002Age: ½ of computers from 2002
Startup itemsStartup items
Low memoryLow memory
Anti-virusAnti-virusAnti-Anti-spywarespyware
Anti-malwareAnti-malware
• Upgrade to Windows 7 and Office 2010
• Improve PC Performance—
Sustainability
• Improve Repair Response Times
• Remote options for students and staff
Access and Quality Needs:
Option A Option A – More of the same (distributed computing)
Two options to meet these needs::
NetworkResourc
es
NetworkResourc
es
Operating system, apps,and processing happen at the client PC
All processing happens at centrally managed network servers
Option B Option B – Thin Client
Option A Option A – More of the same (distributed computing)Follow a traditional replacementschedule for PCs.Hire additional tech support.
Two options to meet these needs:
‘12 ‘13 ‘14 ‘15 ‘16 ‘17
$ Current Spending Level $
$ Option A $
$ Option B $
‘12 ‘13 ‘14 ‘15 ‘16 ‘17
$ Current Spending Level $
Option B Option B – Thin Client• Change the current
computing paradigm.• Improve PC performance at
a fraction of the cost.• Do not hire additional tech
support.
Client VirtualizationProject Budget SummaryThin client ComponentsRacks & UPS 28,896$ Dell PowerEdge Servers 260,964$ Equalogic Hybrid Storage 489,772$ Equalogic SAS Storage 217,152$ Network Switches 35,324$ VMware Software 357,336$ Labor 313,200$ Infrastructure Contingency 97,356$
Total 1,800,000$