District Council of Mount Barker
Urban Reach Assessment
Totness Freeway Creek Catchment
ADELAIDE | MOUNT GAMBIER | www.southfront.com.au
District Council of Mount Barker
Urban Reach Assessment
Totness Freeway Creek Catchment
Our Ref.: 16063‐1A
Southfront
170 Greenhill Road Parkside SA 5063 P 08 8172 1088 E [email protected]
© Southfront 2017
Document Status
Revision Date Approved Details
A 30 June 2017 DJ Final
B 17 July 2017 DJ Final
Urban Reach Assessment for District Council of Mount Barker i
Contents
1 Introduction 1
1.1 Background 1
1.2 Catchment Context 1
2 Hydrology Review 3
2.1 Scope 3
2.2 Assessment 3
3 Hydraulic Capacity Assessment 5
3.1 Scope 5
3.2 Assessment 5
3.3 Private Dam Spillway 7
3.4 Existing, Future Management Issues 9
4 Creek Condition Assessment 10
4.1 Scope 10
4.2 Assessment 10
4.3 Existing, Future Management Issues 12
5 Future Management Strategy Directions 13
5.1 Lower Reach (Hill Street to Druids Avenue) 13
5.2 Upper Reach (Freeway to Hill Street) 13
5.3 Subject Development Land 14
5.4 Future Greenfield Land Development 15
5.5 Upper Catchment 16
6 References 17
Tables
Table 2.1 Peak Flow Summary, Existing Scenario (m3/s) 3 Table 3.1 Creek Features Summary, Hill Street to Druids Ave 6 Table 4.1 Creek Features Summary, Freeway to Hill Street 11 Table 5.1 Peak Flow Summary, Post‐Development Scenario (m3/s) 15
Figures
Figure 1.1 Catchment Features, Development Zones 2 Figure 3.1 Totness Freeway Creek Alignment, Hill Street to Druids Ave 5 Figure 3.2 Totness Freeway Creek Profile, Hill Street to Druids Ave 6 Figure 3.3 Private Dam Arrangement, 19 Cavanagh Street 7 Figure 4.1 Totness Freeway Creek Alignment, Freeway to Hill Street 10
Appendices
Urban Reach Assessment for District Council of Mount Barker ii
Appendix A Creek Survey (AMB Surveys, 2016) Appendix B DPTI Stormwater Infrastructure Drawings Appendix C CCTV Report Appendix D Creek Inspection Photos
Urban Reach Assessment for District Council of Mount Barker 1
1 Introduction
1.1 Background
A privately owned development proposal is currently being prepared to subdivide and develop a largely undeveloped 34.6ha site (the ‘subject development land’) on the eastern edge of the existing Totness development area into an industrial estate. The subject development land is located on a watercourse that drains into the Mount Barker township. A Stormwater Management Plan (SMP) was recently prepared for the urban areas across Totness, Littlehampton and Mount Barker (Southfront, 2016), however the SMP was prepared on the basis of land zoning during 2014 (i.e. after approval of the Mount Barker Urban Growth Development Plan Amendment in 2010). The subject land was zoned for Primary Production at that time, and hence the Stormwater Management Plan was silent with respect to management strategies associated with flows from the subject development land. The creek system downstream of the subject development land (and specifically, the reach between the Freeway and Druids Avenue) is comprised of a mixture of open channel and enclosed sections, with some development located over the original creek alignment. A general concern has been expressed in relation to the ability of this watercourse reach to safely convey peak flood flows, and the potential for this risk to be exacerbated by upstream development. This assessment was commissioned by the District Council of Mount Barker to assess hydrological and flood plain management issues and opportunities associated with the proposed land development.
1.2 Catchment Context
Figure 1.1 depicts the local watercourse catchment area, existing drainage features and current development zones. The upper western portion of the catchment is comprised of rural land and a significant proportion of the Totness Recreation Park. A dam is located within the park which is understood to have been constructed in 1884 to supply water to passing steam locomotives (DEH, 2007). The dam is maintained by DEWNR for passive recreational purposes (perimeter walking track, shore based fishing). The subject development land drains to the 1500mm dia culvert at the Freeway. An orifice plate was fitted to this culvert entrance in the mid 2000’s following identification of the opportunity to reduce downstream flood risk through the town centre by making use of the flood storage volume available on the northern side of the Freeway embankment. An open creek channel has been maintained between the Freeway and Hill Street. Between Hill Street and Druids Avenue, the creek has progressively been enclosed in what would appear to be a series of private landowner and public (road) works. The wide variety of conduit sizes would suggest that these works have been developed in an ad‐hoc manner over time. A short open section remains immediately upstream of Druids Avenue. The creek enters an underground drain at Druids Avenue, which connects through to the Morphett Street underground main drain that passes through to the Town Centre and discharges into Littlehampton Creek.
Urban Reach Assessment for District Council of Mount Barker 2
Figure 1.1 Catchment Features, Development Zones
Urban Reach Assessment for District Council of Mount Barker 3
2 Hydrology Review
2.1 Scope
Previous hydrological modelling of this catchment has been updated and revised to facilitate assessment of different management strategies associated with the subject development land against the existing scenario. The model developed for this review has been informed by previous hydrological assessments of this area and electronic data associated with:
Mount Barker, Littlehampton & Totness Stormwater Management Plan (Southfront, 2016)
Mount Barker Town Centre Drainage Advice Modelling Summary (Tonkin Consulting, 2014)
Mount Barker Floodplain Mapping Hydrological Study report (AWE, 2010)
2.2 Assessment
The ‘existing scenario’ DRAINS model utilised for Town Centre flood plain mapping in Southfront (2016) was revised for this assessment as follows:
Subdivision of rural catchments, with additional delineation of the Freeway corridor. Storages (such as the Totness Recreation Park dam) are assumed to provide no mitigating effect and hence are not represented in the model, thus in effect representing a ‘dam full’ condition. This is approach is consistent with all previous hydrological modelling across the Mount Barker Creek catchment, as described in AWE (2010), Tonkin Consulting (2014), Southfront (2016) and Wallbridge & Gilbert (2016).
Subdivision of the urban catchment above Druids Avenue to major road crossings
Replacement of ARR 1987 design rainfall data with ARR 2016 data, and application of ARR 2016 modelling techniques (storm ensembles) within the DRAINS model
Inclusion of the recently approved Oakfield Retirement Village development at Hawthorn Road (MLEI, 2017)
A summary of peak flows at locations of interest are summarised in Table 2.1.
Table 2.1 Peak Flow Summary, Existing Scenario (m3/s)
Location ARI (years) / AEP
1 / 1EY 5 / 0.2EY 50 / 2% 100 / 1%
Totness Freeway Creek
Us Employment Lands 0.2 1.4 2.8 3.5
Us Freeway 0.2 2.0 4.3 5.2
Freeway culvert 0.2 1.6 2.2 2.4
Hill Street 0.4 1.8 3.0 3.3
Adelaide Road 0.5 1.9 3.3 3.7
Urban Reach Assessment for District Council of Mount Barker 4
Location ARI (years) / AEP
1 / 1EY 5 / 0.2EY 50 / 2% 100 / 1%
Druids Ave 0.6 1.9 3.4 3.9
Hawthorn Road Creek
Adelaide Road 0.6 3.1 7.0 7.5
Urban Reach Assessment for District Council of Mount Barker 5
3 Hydraulic Capacity Assessment
3.1 Scope
Hydraulic modelling of the creekline and associated enclosed sections of the lower reach, notionally between Hill Street and Druids Avenue has been undertaken to identify critical capacity constraints and opportunities for ‘small scale upgrades’. This assessment has been informed by:
engineering survey of some details and channel sections between 52 Adelaide Road and Druids Avenue (AMB Surveys, 2016) (refer Appendix A)
DPTI construction drawings of the Adelaide Road section of 2100 x 900 box culvert (refer Appendix B)
CCTV survey of some enclosed reaches (Plumbing & Pipeline Solutions, 2006) (refer Appendix C)
3.2 Assessment
The lower reach of the ‘Totness Freeway’ Creek, below Hill Street, has largely been enclosed in culverts (refer Figure 3.1). Sufficient details of the reach from immediately upstream of Adelaide Road through to Druids Avenue were available to enable a Hec‐Ras hydraulic model to be established for this reach.
Figure 3.1 Totness Freeway Creek Alignment, Hill Street to Druids Ave
Urban Reach Assessment for District Council of Mount Barker 6
The longitudinal profile of this reach, as represented in the Hec‐Ras model, is shown in Figure 3.2.
Figure 3.2 Totness Freeway Creek Profile, Hill Street to Druids Ave
A summary of the reach characteristics and estimated hydraulic capacity is presented in Table 3.1. Details relating to creek / culvert ownership through this reach have not been confirmed through property title searches, however it is assumed that in general that drainage easements do not exist over those reaches within private property.
Table 3.1 Creek Features Summary, Hill Street to Druids Ave
Address Tenure Features Est Capacity (m3/s)
Hill Street Council 1200 dia culvert 3.0 (inlet control at pipe culvert inlet)
1A Hill Street Private 1200 dia culvert 5.0 (coarse estimate of pipe capacity)
2 Cherington Street ‐ Open channel, Adelaide Road culvert extends partway into property
3.2 (inlet control at box culvert inlet)
Adelaide Road DPTI / Council
2100 x 900 box culvert 7.0
Urban Reach Assessment for District Council of Mount Barker 7
54 Adelaide Road Private 2200 x 800 box drain, block walls with deck cover
>7.0
52 Adelaide Road Private Open drop structure at upstream boundary, 900 dia culvert across property with a number of grated inlets across hardstand area
1.6
50 Adelaide Road / 3 Druids Avenue / 5 Druids Avenue
Private From inspection at the upstream and downstream boundary, the creek appears to have been modified by property owners with sleeper retaining walls / stone walls to stabilise creek banks and integrate with private gardens. Footbridge and driveway crossings of the channel were also noted.
2.0 (channel).
A higher flow is likely to be able to be passed in a major event without inundating dwellings, however a detailed assessment of this reach utilising more detailed survey would be required to determine this.
Druids Avenue Council Twin 1200 dia culvert 4.0 (inlet control at inlet to culverts)
3.3 Private Dam Spillway
The ‘Totness Freeway’ creek discharges into a farm dam, immediately downstream of the Freeway, as depicted in Figure 3.3.
Figure 3.3 Private Dam Arrangement, 19 Cavanagh Street
Spillway / Overflow
Urban Reach Assessment for District Council of Mount Barker 8
Dam Spillway / Overflow
The following observations were made from the site inspection:
The creek has no defined channel upstream of the dam, with flows from the freeway culvert and local catchment below the freeway passing into the dam via surface flow across the land.
The dam has no outlet or overflow structure, but as pictured above an overflow channel with a trapezoidal section on a relatively flat gradient directs flows in excess of the dam capacity towards the southern boundary
The dam has a high water level / wall, rising well above adjoining southern residential properties
Dam overflows are directed to a steep embankment along the southern boundary. There is no well‐defined channel on this boundary alignment, and some evidence of minor scour protection works (placement of gravel, rocks) was noted in some locations where flows spill to the valley floor.
From these observations it is concluded that:
The existing overflow has a flow capacity in range of 1 – 2 m3/s
Day‐to‐day flows currently experienced through the site are infrequent and below a threshold level to cause channelisation
The existing arrangements in general across the property are agricultural in nature and not of a standard suitable to cater for an urban catchment hydrological regime
Dam failure poses a risk to downstream residential properties that requires due consideration
While inspecting the property, it was also noted that the drainage path within the Freeway corridor was heavily overgrown with woody weeds, to the extent that the 1500 mm diameter Freeway culvert outlet and associated downstream open drain could not be located.
Urban Reach Assessment for District Council of Mount Barker 9
3.4 Existing, Future Management Issues
The following issues, with respect to existing development and future development of the subject land, are identified from this assessment:
The pipe reach through 52 Adelaide Road is inadequate, based on current catchment conditions. This drain reach is known to have flooded on 2 occasions in 2016 resulting in inundation of the business premises.
The section of open channel between 52 Adelaide Road and Druids Avenue has a functional but limited capacity to convey flows in excess of 2 m3/s, equivalent to the existing 5 year ARI peak flow. This is a constraint that should be taken into account in future network planning considerations to ensure that the flood risk posed to these properties is not increased.
A short section of open channel within 2 Cherington Street has not been assessed. It is noted that this property was sold in January 2017, and hence Council may have an opportunity to pursue options with respect to easements and capacity upgrades in coordination with redevelopment of the site.
The inlet to the Hill Street culvert has a capacity just below that of the estimated 100 year ARI peak flow. Stormwater management measures upstream should be tailored to reducing the 100 year ARI peak flow to meet the culvert inlet capacity at this location.
Ownership arrangements for a number of enclosed sections is not clear. Council ownership of these assets is vital to ensure that the network can be appropriately managed to serve the needs of the community in the long term.
The existing farm dam and associated overflow channel immediately downstream of the Freeway is not equipped to be integrated into an urban drainage network.
The risk of failure of dams on the downstream urban areas is an emerging but important area in stormwater / flood management. There are issues in this regard for Council to consider with respect to the existing farm dam.
Urban Reach Assessment for District Council of Mount Barker 10
4 Creek Condition Assessment
4.1 Scope
Inspection and assessment of the upper reach, notionally between the Freeway and Hill Street has been undertaken to provide a high level assessment of existing creek condition and identification of any relevant measures, particularly in relation to the subject development land. This assessment has been informed by:
Inspection of the creekline with Council staff
Digital Terrain Model data, aerial photography, cadastral data supplied by Council
4.2 Assessment
The upper reach of the ‘Totness Freeway’ Creek, above Hill Street, has been retained in an open channel form (refer Figure 3.2). An inspection was conducted over the full length of this creek reach for the purposes of this assessment.
Figure 4.1 Totness Freeway Creek Alignment, Freeway to Hill Street
A summary of the reach characteristics and condition is presented in Table 4.1. Details relating to creek ownership through this reach have not been confirmed through property title searches, however it is assumed that in general that drainage easements do not exist over those reaches within private property.
Urban Reach Assessment for District Council of Mount Barker 11
Table 4.1 Creek Features Summary, Freeway to Hill Street
Address Tenure Features, [Appendix D Photograph Ref]
South Eastern Freeway Road reserve under DPTI control
1500 dia culvert outlet, base of road embankment overgrown with weeds [1], flow path not clearly defined
19 Cavanagh Street Private Undefined flow path from Freeway to dam, Farm dam, bare earth overflow channel, largely undefined at southern boundary [2]. Some gravel / rocks placed on flow line along steep drop across southern boundary
22 Manor Crescent Private Heavy vegetation growth across northern boundary [3], private footbridge crossing with low clearance [4]
20A Manor Crescent Council reserve
Shallow swale, upstream reach infested with kikuyu grass [5, 6]. Downstream reach passes adjacent to very large redgum [8], some bed erosion at this location with erosion head progressing immediately upstream of a tree root
81 Adelaide Road Private On‐line small ornamental pond, concrete weir / overflow structure [7]
F215697 A109 SA Water Bare earth swale [9]
16 Manor Crescent Private Bare earth swale [10]
73A Adelaide Road Private Bare earth swale [11]
73 Adelaide Road Private Bare earth swale, vacant allotment [12]
71A Adelaide Road Private Landscaped channel [13]
71 Adelaide Road Private Bare earth swale
69A Adelaide Road Private Bare earth swale, Council drain system from Adelaide Road discharges at this location [14]
69 Adelaide Road Private Bare earth swale [15]
3/2C Hill Street Private Bare earth swale, some bed erosion / channel formation [16]
2/2C Hill Street Private Bare earth swale, some bed erosion / channel formation
1/2C Hill Street Private Bare earth swale, some bed erosion / channel formation. Large tree in channel centreline, service conduit and concrete anchor block intersecting channel at Hill Street culvert inlet [17]
Urban Reach Assessment for District Council of Mount Barker 12
This creek reach is generally consistent along its full length, in having the following properties:
Little to no channel definition, that would suggest flows along the creek reach historically are infrequent and of a relatively low level
Little to no bed erosion. Some erosion of the channel bed was noted at the downstream end approaching Hill Street, which may be associated with additional flows generated by adjoining Adelaide Road residential construction.
Heavily modified biodiversity with plantings of exotic trees, some infestations of weeds and exotic grasses.
Encroachment (filling) from a number of recent residential developments into the creek corridor
Low levels of maintenance / efforts to protect and enhance the creek corridor. One property owner (71A Adelaide Road) has invested in planting out the channel with native species, while in most other locations the adjoining development has not been designed to integrate with the creek.
With the exception of some significant trees such as large redgums in the Council reserve, this creek reach is best categorised as a neglected open swale, with few natural environmental features.
4.3 Existing, Future Management Issues
The following issues, with respect to existing development and future development of the subject land, are identified from this assessment:
The creek reach has fragmented land ownership, such that any task to implement capital works and/or perform maintenance activities to protect and enhance the corridor would require broad consultation. Due consideration should also be given to acquisition of the creek corridor land.
The existing creek is poorly defined and currently receives very little day‐to‐day flow. It does not have the capability to perform a drainage role catering for significant upstream urban development, in its current form.
The creek has limited environmental value, such that works to create a channel with appropriate erosion protection lining is considered feasible and appropriate for consideration.
Urban Reach Assessment for District Council of Mount Barker 13
5 Future Management Strategy Directions
5.1 Lower Reach (Hill Street to Druids Avenue)
50 Adelaide Road / 3 Druids Avenue / 5 Druids Avenue
Consider opportunities to acquire creek corridor
Review flood protection to existing development and consider flood mitigation opportunities, future development controls
52 Adelaide Road
Duplicate existing 900 dia drain to achieve 100 year ARI capacity
Install a transition junction box structure on the northern boundary to efficiently and safely convey flows from the wide box culvert reach into the duplicated pipe reach
2 Cherington Street
Consider opportunities to acquire creek corridor
Consider opportunities to increase capacity / enclose open channel section General
Consider opportunities to acquire easements over all enclosed sections in private property
5.2 Upper Reach (Freeway to Hill Street)
22 Manor Crescent to Hill Street
Consider opportunities to acquire creek corridor
Undertake works (full length, 290m) to establish a channel with erosion lining to the 5 year ARI level and containment of the 100 year ARI flow.
19 Kavanagh Street (Farm Dam site)
Undertake assessments to determine geotechnical condition, risk rating of existing dam
Acquire easement, install an express drain (length 310m, preliminary estimated size 750 mm dia) linking the Freeway culvert directly to the upgraded creek adjacent to 22 Manor Crescent.
Consider low‐flow dam offtake, dam overflow integration, subject to feasibility and water licensing conditions
Urban Reach Assessment for District Council of Mount Barker 14
Express Drain alignment through 19 Kavanagh Street
5.3 Subject Development Land
Detention
Provide multi‐stage outlet structure, integrated with existing Freeway culvert / orifice arrangement, to achieve the following performance standards:
- Mitigate 5 year ARI flow to 1.0 m3/s, such that 5 year ARI flow at Druids Avenue is no greater than the existing corresponding flow of 1.9 m3/s.
- Mitigate 100 year ARI flow to 1.4 m3/s, such that 100 year ARI flow at Hill Street is reduced to 3.0 m3/s, and 100 year ARI flow at Druids Avenue is not increased.
- It should be noted that the flow discharge limits from the subject land proposed above are less than those currently achieved via the orifice plate, due to the changed hydrology resulting from the change in land use. (i.e. the flow peak from the developed land becomes coincident with the flow peak of the downstream residential area, exacerbating flood risk).
DRAINS modelling of the post‐development scenario, on the basis of 70% impervious site coverage, as nominated in Wallbridge & Gilbert (2016), has been utilised to develop a preliminary design arrangement demonstrating that the above requirements could be achieved by replacing the existing orifice plate with a 560mm diameter orifice plate. A summary of these modelling results is presented in Table 5.1. Any future design development of such a detention facility will need to take into account the change in risk profile (associated with the change in hydrological regime from a rural catchment to an urban catchment) and identify appropriate risk mitigation measures, specifically in association with:
Blockage of the orifice plate ‐ the modelling results presented in this report assume no blockage; and
Suitability of the Freeway embankment as a temporary water retaining structure
Urban Reach Assessment for District Council of Mount Barker 15
Consequences associated with more extreme events – noting that the post‐development 100 year ARI flood level is within 400mm of the estimated threshold spill level at this site of 359.0mAHD, beyond which it is expected that flows would spill east towards Littlehampton Creek via the interchange ramp road.
Table 5.1 Peak Flow Summary, Post‐Development Scenario (m3/s)
Location ARI (years) / AEP
5 / 0.2EY, Existing
5 / 0.2EY, Post‐Dev
100 / 1%, Existing
100 / 1%, Post‐Dev
Totness Freeway Creek
Us Freeway 2.0 2.6 5.2 5.3
Flood Level above Freeway (mAHD) 355.7 356.5 357.6 358.6
Freeway culvert 1.6 1.0 2.4 1.4
Hill Street 1.8 1.3 3.3 2.7
Adelaide Road 1.9 1.4 3.7 3.6
Druids Ave 1.9 1.4 3.9 3.9
Other Ensure existing point discharges from the Freeway are appropriately integrated into the site development.
5.4 Future Greenfield Land Development
The current land zoning (refer Figure 1.1) envisages a future land use transition of some portions of the catchments from rural to urban. Without provision of appropriate corresponding controls, this has the potential to increase flood risk to existing downstream development. Flood risk within the Mount Barker ‘Town Centre’ was assessed in detail in the preparation of the Mt Barker, Totness and Littlehampton Stormwater Management Plan (Southfront, 2016). This identified that:
The culvert at Druids Avenue has a capacity of approximately 4 m3/s (equivalent to a 100 year ARI standard for the existing scenario presented in Section 2.2)
The Morphett Street drain commencing at Adelaide Road has a capacity of 7 m3/s (equivalent to a 50 year ARI standard for the existing scenario presented in Section 2.2)
The following comments are provided to guide Council in defining appropriate stormwater management measures associated with future greenfield land development in these areas. Totness Freeway Creek A relatively small portion of ‘Residential Neighbourhood’ zoned land is subject to potential future development within the catchment. This land would most likely drain to the Totness Freeway Creek via 19 Kavanagh Street, the site containing the private dam described in Section 3.3. Detention storage would need to be provided in association with development of this land such that downstream 5 / 100 year ARI peak flows are not increased beyond the post‐
Urban Reach Assessment for District Council of Mount Barker 16
development flows listed in Table 5.1. Subject to design feasibility / reconstruction of the existing dam, there may be merit in locating the detention storage at the site of the existing dam in order to optimise development within the area zoned for urban development. Hawthorn Road Creek This creek catchment contains a relatively significant portion of ‘Residential’ and ‘Residential Neighbourhood’ zoned land, subject to potential future development. Due to the existing flood protection standard at Adelaide Road being less than desirable, the Mt Barker, Totness and Littlehampton Stormwater Management Plan (Southfront, 2016) nominates that a diversion drain be constructed at Adelaide Road (estimated value $1.6m) to accommodate future upstream development and protect the downstream Town Centre precinct. It is recommended that Council require future development provide a combination of on‐site detention storage (to the extent that this is practical) and financial contributions to the diversion drain works in order to ensure that development does not result in increased downstream flood risk. It is noted that past regional detention storage concepts within this catchment have been assessed to be infeasible, due to excessive bank heights and associated costs and safety concerns. This inherent limitation within the catchment may be a driver for financial contributions towards the diversion drain works.
5.5 Upper Catchment
Recreation Park Dam
Liaise with DEWNR to ensure dam condition, risk category is consistent with proposed change in downstream land use
Urban Reach Assessment for District Council of Mount Barker 17
6 References
AWE (2010), Mount Barker Floodplain Mapping Hydrological Study Report, prepared for District Council of Mount Barker Department for Environment and Heritage (2007), Totness Recreation Park Management Plan MLEI (2017), Oakfield Retirement Village, Mt Barker, Detention Basin & Cutoff Pipe Sizing Calculations, Issue B, dated 23 March 2017. Plumbing & Pipeline Solutions (2016), CCTV Inspection Report, Survey date 19/12/16, prepared for District Council of Mount Barker Southfront (2016), Mt Barker, Totness & Littlehampton Stormwater Management Plan, prepared for District Council of Mount Barker Tonkin Consulting (2013), Mount Barker Stormwater Network Existing Drainage Standards, prepared for District Council of Mount Barker Tonkin Consulting (2014), Mount Barker Town Centre Drainage Advice Modelling Summary, prepared for District Council of Mount Barker Wallbridge & Gilbert (2016), Totness Proposed Development, Infrastructure Assessment Report, prepared for Adelin Pty Ltd
Urban Reach Assessment for District Council of Mount Barker
Appendix A Creek Survey (AMB Surveys,
2016)
3
3
0
3
3
2
3
3
4
334.10
STN
1000
333.35
GIN
1100
332.66
GIN
61200
332.55
MN
1300
329.98
GIN
1400
3
3
4
.
2
8
K
1
3
3
4
.
2
6
E
B
1
3
3
4
.
1
4
G
U
1
3
3
4
.
1
2
E
B
1
3
3
4
.
1
5
K
1
3
3
4
.
0
1
G
U
1
334.23
333.87
3
3
3
.
9
6
E
B
1
3
3
4
.
0
0
K
1
3
3
3
.
8
6
G
U
1
3
3
3
.
7
5
G
U
1
3
3
3
.
8
9
K
1
3
3
3
.
8
4
E
B
1
3
3
3
.
9
6
E
B
2
3
3
3
.
9
3
E
B
2
3
3
3
.
8
5
E
B
2
3
3
3
.
8
9
E
B
2
3
3
3
.
8
5
E
B
1
334.01
333.97
3
3
3
.
8
6
K
1
3
3
3
.
7
1
G
U
1
333.92
TR 0.8 10
3
3
3
.
9
3
E
B
2
3
3
3
.
8
6
E
B
1
334.39
333.78
334.21
334.21
BUSH 04
334.13
334.07
BUSH 05
333.72
333.36
332.99
335.36 LP
335.52
BUSH 01
335.42
BUSH 01
335.19
BUSH 02
335.19
BUSH 02
333.75
333.67
333.28
333.01
332.67
333.48
332.78
3
3
3
.
7
8
K
1
3
3
3
.
6
4
G
U
1
3
3
3
.
7
1
E
B
2
3
3
3
.
7
8
E
B
2
3
3
3
.
7
6
E
B
2
3
3
3
.
8
4
E
B
1
3
3
3
.
7
2
E
B
1
3
3
3
.
7
2
E
B
1
3
3
2
.
7
8
332.61
3
3
2
.
6
2
3
3
2
.
5
4
332.62
332.50
333.55
333.07
332.66
332.59
332.62
332.79
332.58
3
3
2
.
5
9
3
3
2
.
6
1
332.63
332.66
332.78
3
3
2
.
7
9
331.39
331.35
331.69
332.88
333.33
332.62
332.66
332.26
332.49
332.52
332.05
332.28
332.38
3
3
1
.
6
2
3
3
2
.
6
9
3
3
2
.
6
8
3
3
2
.
6
5
332.53
332.47
332.55
332.56
332.55
332.56
330.58
330.55
330.55
330.63
330.64
330.56
330.86
331.09
331.16
331.08
331.06
331.07
331.07
3
3
1
.
0
7
331.06
331.09
3
3
1
.
0
8
3
3
1
.
0
7
3
3
1
.
0
9
331.07
331.10
331.12
330.99
3
3
1
.
0
9
3
3
1
.
0
6
3
3
1
.
0
6
3
3
1
.
5
0
331.14
3
3
1
.
1
1
3
3
1
.
5
2
331.04
331.07
330.93
3
3
1
.
2
1
3
3
1
.
7
4
3
3
1
.
8
1
331.64
331.59
332.43
3
3
2
.
3
3
3
3
1
.
7
8
H
W
1
3
3
2
.
0
0
H
W
1
3
3
1
.
8
6
H
W
1
3
3
1
.
6
5
H
W
1
3
3
0
.
8
4
3
3
0
.
9
6
329.67
3
3
0
.
8
7
3
3
1
.
0
0
3
3
1
.
0
7
330.53
330.51
330.51
3
3
0
.
4
0
3
3
0
.
3
8
3
3
0
.
3
5
3
3
0
.
3
5
330.36
3
3
0
.
3
8
330.38
3
3
0
.
6
2
3
3
0
.
5
6
3
3
0
.
1
6
3
2
9
.
9
0
3
2
9
.
7
9
3
2
9
.
4
4
329.27
3
2
9
.
0
9
H
W
2
3
2
9
.
7
6
H
W
2
3
2
9
.
7
7
H
W
2
3
2
8
.
9
5
H
W
2
329.59
329.67
329.87
329.87
3
2
9
.
9
5
3
2
9
.
9
4
329.94
3
2
9
.
7
7
3
2
9
.
7
5
3
2
8
.
4
4
3
2
9
.
7
8
329.91
330.23
3
3
0
.
4
2
330.55
329.75
329.50
3
3
0
.
0
6
3
3
0
.
2
0
329.87
330.52
330.65
330.57
330.08
330.58 IPS 0.65
330.53
3
3
0
.
4
3
330.39
329.94
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
3
3
2
.
6
8
J
S
1
3
3
2
.
6
4
J
S
1
3
3
2
.
7
2
J
S
1
.
R
RAMP
3 DOWN PIPES
Ă 90mm
SHED
GRATE
INV=329.54
GRATE
INV=329.44
GRATE
INV=329.08
SUMP
INV=329.23
GRATE
INV=331.39
GRATE
INV=331.35
SEPTIC TANK
LID = 331.69
B
R
I
C
K
W
A
L
L
SHED
WASHING BAY
CONCRETE FLOOR
SHED
INLET
PIPE Ă375mm
\
\
\
DOWN PIPE
Ă 75mm
COMPRESSOR
SHED
SHED
CONCRETE
SUMP
CONCRETE
CONC]
OLD WOOD
BRIDGE
SPOON
DRAIN
SUMP LID
WELDED CLOSED
CONC] PIPE
Ă 900mm
INV=329.67
R
E
T
A
I
N
I
N
G
W
A
L
L
IRREGULAR
OPEN SUMP
CONC] PIPE
Ă 900mm
INV=328.44
TBM
NAIL IN PAVERS
RL=333.35
A1
D15508
A2
D15508
A601
D88498
A602
D88498
A603
D88498
A91
F206866
A
D
E
L
A
I
D
E
R
O
A
D
BOX CULVERT
800 x 2200
B
D
Y
B
D
Y
B
D
Y
B
D
Y
B
D
Y
B
D
Y
B
D
Y
S
W
S
W
S
W
BITUMEN
BITUMEN
BITUMEN
LOCATED BY
PPS 19/12/16
3
2
8
.
2
7
3
2
8
.
5
3
3
2
8
.
5
7
328.46
3
2
8
.
4
4
328.40
3
2
8
.
4
3
3
2
8
.
3
2
3
2
8
.
2
3
329.22
329.00
328.95
329.29
329.29
0 10
5 15
20
DETAIL PLAN
NOTES
METRES
SCALE
ALLOTMENT 1 & 2 IN D15508 &
MT BARKER
CLIENT
ADELAIDE ROAD MT BARKER
DC MT BARKER
HEIGHTS ARE AHD
DATUM: MGA 94
SCALE 1:200 @A1
DATE
REFERENCE No]
REVISION
FIELD
DRAWN
CHECK
ALLOTMENT 601,602 & 603 IN D88498
19/12/16
16079
01
SF
SF
SF
LEGEND
BANK BOTTOM
BANK TOP
BUSH
DOWN PIPE
S
W
GUTTER
IP SEPTIC
KERB
LIGHT POLE
FENCE
\ \
PSM
STATION
TREE
BOUNDARIES ARE APPROXIMATE ONLY
SEE CT FOR EASMEMENT DETAILS
Urban Reach Assessment for District Council of Mount Barker
Appendix B DPTI Stormwater
Infrastructure Drawings
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
-35.063918 138.854270
no w
arran
ty is
made f
or the
accu
racy o
f this
drawing
- the
user
relies
on th
is dra
wing at
their
own r
isk
Urban Reach Assessment for District Council of Mount Barker
Appendix C CCTV Report
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel.: 08 8297 1000Fax: 08 8297 0088
Email: [email protected]
Table of contentsProject Name: Project number: Date: Contact:
Mt Barker Council Hill St & A 19/12/2016
Profile Report 40
Inspection Summary 41
Inspection: 19.12.2016
Project Information 46
Legend of Classification 47
Section: 1, Head Wall Hill Street --- 1A 48
Section: 2, Crash Repair --- Out fall 50 A 60
Section: 3, Adelaide Rd 375 pipe --- Crash repairer 68
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033 Tel:
Website: www.ppssa.com.auEmail: [email protected]
City :
åÆ / Main sectionsProject name Project Number: Responsible: Date:
Mt Barker Council Hill St & Adel Rd s 19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 40
No. Start MH End MH Date Location/Street Tape No. Material m (m)
2 Crash Repair Out fall 50 A 19/12/2016 Car park Reinforced concrete 51.70 51.70
Pipe size: CIRCULAR 900 = 51.7 m (51.7 m)
No. Start MH End MH Date Location/Street Tape No. Material m (m)
1 Head Wall Hill Street 1A 19/12/2016 Hill Street Reinforced concrete 62.80 62.80
Pipe size: CIRCULAR 1200/0 = 62.8 m (62.8 m)
No. Start MH End MH Date Location/Street Tape No. Material m (m)
3 Adelaide Rd 375pipe
Crash repairer 19/12/2016 Adelaide Rd Brickwork 50.00 50.00
Pipe size: RECTANGULAR 800/2200 = 50 m (50 m)
All sections = 164.5 m (164.5 m)
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel.:
Website: www.ppssa.com.auEmail [email protected]
Inspection summaryProject Name: Project number: Date: Contact:
Mt Barker Council Hill St &Adel Rd storm water 19.12.2
19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 41
Please find per enclosure the inspection report
Total Length of sewer network 101.70 m
Inspected Length of sewer network 101.70 m
Not inspected Length of sewer network 0.00 m
Total Length of house connections (satellite) 0.00 m
Inspected Length of house connections (satellite) 0.00 m
Not inspected Length of house connections (satellite) 0.00 m
Number of Sections 2
Number of house connections 0
Number of Photos 95
Inspection SummaryDate: Responsible:
19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 42
Inspection SummaryDate: Responsible:
19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 42
Sewer Reference: Section length: 62.80 mSection Numer: 1 Pipe Width: 0 mmUS MH: Head Wall Hill Street Material Reinforced concreteDS MH: 1A Shape: Circular
Head Wall Hill Street 0.00 STIO Start node, inspection opening, Nodename: Head Wall HillStreet ,
0.00 WLC Water level, clear flow (the invert is visible), depth 0%
0.90 GPF General photograph, the camera is pointing in the direction oftravel (forward), SEP, at 12 o'clock
10.40 GPF General photograph, the camera is pointing in the direction oftravel (forward), SEP, at 12 o'clock
10.50 GPF General photograph, the camera is pointing in the direction oftravel (forward) , at 12 o'clock
16.10 GVF General video clip, camera pointing in direction of travel(forward) , restart of video, at 12 o'clock
16.10 JDL Joint displaced longitudinaly, longitudinal displacement10-20mm
0.5;
16.10 VV Void visible through defect, at joint 60;
16.10 IR Infiltration, running , at 4 o'clock ; 2
16.10 LL The conduit curves to the left
20.30 WLC Water level, clear flow (the invert is visible), depth 5%
25.80 GPF General photograph, the camera is pointing in the direction oftravel (forward) , at 12 o'clock
25.80 LR The conduit curves to the right
26.80 CNGO Connection, good workmanship, connection appears to beopen, height 100mm , at 12 o'clock
34.60 SS Spalling of the conduit fabric, bricks, localized chipping of oneor more of each, at joint, Obstruction: <5% , at 2 o'clock
20;
42.60 GVF General video clip, camera pointing in direction of travel(forward) , restart of video, at 12 o'clock
42.60 CNPO Connection, poor workmanship, connection appears to beopen , height 100mm , Approx
42.60 CNGO Connection, good workmanship, connection appears to beopen, height 75mm , at 12 o'clock, Approx
55.60 LL The conduit curves to the left
58.60 JDL Joint displaced longitudinaly, longitudinal displacement10-20mm
0.5;
Inspection SummaryDate: Responsible:
19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 43
58.60 VV Void visible through defect, at joint 60;
58.60 OBJ Obstruction, an object is wedged in the joint , reduction in crosssectional area: <5%, Stick, at 5 o'clock
60.40 CNGO Connection, good workmanship, connection appears to be open,height 100mm , at 12 o'clock, Approx
60.50 DES Fine sediments, sand or silt in the invert , Obstruction: 5-20% , from 5to 7 o'clock
; 30
62.80 SAOB Inspection (survey) abandoned, obstruction , unable to pass silt1A
Inspection SummaryDate: Responsible:
19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 44
Sewer Reference: Section length: 51.70 mSection Numer: 2 Pipe Width:US MH: Crash Repair Material Reinforced concreteDS MH: Out fall 50 A Shape: Circular
Out fall 50 A 0.00 STO Start node, outfall, Nodename: Out fall 50 A
0.00 WLC Water level, clear flow (the invert is visible), depth 5%
0.70 CNGO Connection, good workmanship, connection appears to beopen, height 1000mm , at 2 o'clock, Approx
7.40 CNPO Connection, poor workmanship, connection appears to beopen , height 100mm
9.30 GPF General photograph, the camera is pointing in the direction oftravel (forward) , at 3 o'clock
12.00 GPF General photograph, the camera is pointing in the direction oftravel (forward), GIP, at 12 o'clock
14.30 CNPO Connection, poor workmanship, connection appears to beopen , height 100mm , Approx
14.30 CNGO Connection, good workmanship, connection appears to beopen, height 100mm , at 10 o'clock, Approx
16.90 JDL Joint displaced longitudinaly, longitudinal displacement21-30mm
2;
25.60 GPF General photograph, the camera is pointing in the direction oftravel (forward), GIP, at 12 o'clock
36.60 OBZ Obstruction, some other object is lying in the invert , reductionin cross sectional area: 5-20%, debris and tree branch, at 6o'clock
; 30
38.20 GPF General photograph, the camera is pointing in the direction oftravel (forward), GIP, at 12 o'clock
44.00 IS Infiltration, sweating, at joint , at 4 o'clock ; 0
45.90 CNGO Connection, good workmanship, connection appears to beopen, height 100mm , at 10 o'clock
51.70 FHO Finish node, outfall or culvert headwall, Nodename: CrashRepair
Crash Repair
Inspection SummaryDate: Responsible:
19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 45
Sewer Reference: Section length: 50.00 mSection Numer: 3 Pipe Width: 2200 mmUS MH: Adelaide Rd 375 pipe Material BrickworkDS MH: Crash repairer Shape: Rectangular
Crash repairer 0.00 STO Start node, outfall, Nodename: Crash repairer
0.00 WLC Water level, clear flow (the invert is visible), depth 5%
0.00 CLW Longitudinal wall crack , width 2mm , at 6 o'clock, Start
0.00 GPF General photograph, the camera is pointing in the direction oftravel (forward), sleepers for roof, at 12 o'clock
8.60 CNGO Connection, good workmanship, connection appears to beopen, height 100mm , at 12 o'clock, Approx looks to be IP
20.10 CNGO Connection, good workmanship, connection appears to beopen, height 75mm , at 1 o'clock, Approx
23.10 CNGO Connection, good workmanship, connection appears to beopen, height 100mm , at 12 o'clock, Approx
24.00 CNGO Connection, good workmanship, connection appears to beopen, height 75mm , at 1 o'clock, Approx
27.80 CNGO Connection, good workmanship, connection appears to beopen, height 100mm , at 12 o'clock
33.50 CNGO Connection, good workmanship, connection appears to beopen, height 100mm , at 12 o'clock, Approx GIP
40.50 IS Infiltration, sweating , at 5 o'clock, Start
40.80 SH Hole in wall , Obstruction: <5% , at 3 o'clock
44.40 SH Hole in wall , Obstruction: <5% , at 3 o'clock
48.90 GPF General photograph, the camera is pointing in the direction oftravel (forward), where water is comming from, at 7 o'clock
48.90 JNGO Junction open, good workmanship, height 375mm , at 9o'clock
49.40 CNGO Connection, good workmanship, connection appears to beopen, height 90mm , at 7 o'clock, Approx appears to be AGpipe
50.00 IS Infiltration, sweating , at 5 o'clock, End ; 0
50.00 CLW Longitudinal wall crack , width 2mm , at 6 o'clock, End 250;
50.00 FHC Finish node, major connection without a maintenancestructure, Nodename: Adelaide Rd 375 pipe
Adelaide Rd 375 pipe
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel: 08 8297 1000Fax: 08 8297 0088
Email: [email protected]
Project informationProject name Project number: Contact: Date :
Mt Barker Council Hill St & Adel Rd s 19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 46
Client:Contact Name:Department:Po Box:Street:City:Telephone:Fax:Mobile:E-mail:
Mt Barker CouncilMegan
Site:Contact Name:Department:Po Box:Street:City:Telephone:Fax:Mobile:E-mail:
Plumbing & Pipeline SolutionsMr. Chris HamsCCTV Opperator732Grove AveMarleston08 8297 1000
0418 348 [email protected]
ContractorContact Name:Department:Po Box:Street:City:Telephone:Fax:Mobile:E-mail:
Plumbing & Pipeline SolutionsMr. Brenton LewisHead Office45Grove AveMarleston SA 503308 8297 100008 8297 0088
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel: 08 8297 1000Fax: 08 8297 0088
Email [email protected]
Grade Defect Guide and RecommendationsProject Name : Project number: Contact: Date :
Mt Barker Council Hill St & Adel Rd s 19/12/2016
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 47
1: These codes describe the physical condition of the sewer and the severity of the damage
STRUCTURAL CONDITION
2: These codes describe the capability of the sewer to meet its service requirements andindicate loss of capacity, potential for blockage and watertightness
SERVICE DEFECTS
3: These codes define features relating to the construction of the sewer
CONSTRUCTIONAL FEATURES
4: These codes define general items concerning the sewer
MISCELLANEOUS FEATURES
5: Collapsed or collapse imminent
Brick Sewers: Already collapsed, Missing Invert,Deformation >10% and fractured,Displaced/hanging brickwork and deformation <10%, Extensive areas of missingbrickwork Clayware, concrete and plastic pipe sewers: Already collapsed, Deformation>10% and brok
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
www.ppssa.com.auEmail: [email protected]
WSA assessmentDate: Asset owner's job ref.: Asset Owner: Operator : Section number: Pipe Asset Id:
Time of inspection: Cleaning: Standard: LRP Conduit Unit Length Method of Inspection
Town: Catchment: US MH:Suburb: Asset Owner: Survey Dir:Street: Precipitation.: DS MH:Asset Location Flow control Inspect Lenght :
Purpose of inspection : Shape :Use of Conduit: Dia/Height:Type of Conduit: Width:Lining Method: Pipe Material:
Remarks :
19/12/2016 Mt Barker council Chris Hams 1
08:35:15 not cleaned WSA 05-2008 2.2 Inside Face of the Wall Television Camera
Mt BarkerHill StreetEasement
Mt Barker councilNoNo measures
Head Wall Hill StreetDownstream1A62.80 m
Routine InspectionStorm WaterGravity
Circular1200 mm0 mmReinforced concrete
1:500 Position Code Observation Str Rate
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 48
0.00 STIO Start node, inspection opening, Nodename:Head Wall Hill Street ,
0.00 WLC Water level, clear flow (the invert is visible),depth 0%
0.90 GPF General photograph, the camera is pointing inthe direction of travel (forward), SEP, at 12o'clock
10.40 GPF General photograph, the camera is pointing inthe direction of travel (forward), SEP, at 12o'clock
10.50 GPF General photograph, the camera is pointing inthe direction of travel (forward) , at 12 o'clock
16.10 GVF General video clip, camera pointing in directionof travel (forward) , restart of video, at 12 o'clock
16.10 JDL S 0.5Joint displaced longitudinaly, longitudinaldisplacement 10-20mm
16.10 VV S 60Void visible through defect, at joint
16.10 IR M 2Infiltration, running , at 4 o'clock
16.10 LL The conduit curves to the left
20.30 WLC Water level, clear flow (the invert is visible),depth 5%
25.80 GPF General photograph, the camera is pointing inthe direction of travel (forward) , at 12 o'clock
25.80 LR The conduit curves to the right
26.80 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 12o'clock
34.60 SS S 20Spalling of the conduit fabric, bricks, localizedchipping of one or more of each, at joint,Obstruction: <5% , at 2 o'clock
Head Wall Hill Street
0 m
0 m
0.9 m
0.9 m
10.4 m
Plumbing & Pipeline Solutions Grove Ave
City : Marleston SA 5033Tel:
www.ppssa.com.auEmail: [email protected]
City :
Inspection ReportDate : Job number : Weather : Operator : Counter : Pipe Asset Id :
Present : Vehicle : Camera : Preset : Cleaned : Rate :19/12/2016 No Chris Hams 1
Orpheus not cleaned
1:500 Position Code Observation Str Rate
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 49
42.60 GVF General video clip, camera pointing in directionof travel (forward) , restart of video, at 12 o'clock
42.60 CNPO Connection, poor workmanship, connectionappears to be open , height 100mm , Approx
42.60 CNGO Connection, good workmanship, connectionappears to be open, height 75mm , at 12 o'clock,Approx
55.60 LL The conduit curves to the left
58.60 JDL S 0.5Joint displaced longitudinaly, longitudinaldisplacement 10-20mm
58.60 VV S 60Void visible through defect, at joint
58.60 OBJ Obstruction, an object is wedged in the joint ,reduction in cross sectional area: <5%, Stick, at5 o'clock
60.40 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 12o'clock, Approx
60.50 DES M 30Fine sediments, sand or silt in the invert ,Obstruction: 5-20% , from 5 to 7 o'clock
62.80 SAOB Inspection (survey) abandoned, obstruction ,unable to pass silt
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade5 60.5 2.25 141 5 2 30 0.51 32 3
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 50
Photo: 1_1_1_A.JPG0m, Start node, inspection opening, Nodename: Head Wall Hill Street ,
Photo: 1_1_47_A.JPG0m, Water level, clear flow (the invert is visible), depth 0%
Photo: 1_1_48_A.JPG0.9m, General photograph, the camera is pointing in the direction of travel (forward), SEP, at 12 o'clock
Photo: 1_1_48_B.JPG0.9m, General photograph, the camera is pointing in the direction of travel (forward), SEP, at 12 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 51
Photo: 1_1_49_A.JPG10.4m, General photograph, the camera is pointing in the direction of travel (forward), SEP, at 12 o'clock
Photo: 1_1_49_B.JPG10.4m, General photograph, the camera is pointing in the direction of travel (forward), SEP, at 12 o'clock
Photo: 1_1_50_A.JPG10.5m, General photograph, the camera is pointing in the direction of travel (forward) , at 12 o'clock
Photo: 1_1_53_A.JPG16.1m, Joint displaced longitudinaly, longitudinal displacement 10-20mm
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 52
Photo: 1_1_54_A.JPG16.1m, Void visible through defect, at joint
Photo: 1_1_54_B.JPG16.1m, Void visible through defect, at joint
Photo: 1_1_55_A.JPG16.1m, Infiltration, running , at 4 o'clock
Photo: 1_1_55_B.JPG16.1m, Infiltration, running , at 4 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 53
Photo: 1_1_56_A.JPG16.1m, The conduit curves to the left
Photo: 1_1_56_B.JPG16.1m, The conduit curves to the left
Photo: 1_1_57_A.JPG20.3m, Water level, clear flow (the invert is visible), depth 5%
Photo: 1_1_58_A.JPG25.8m, General photograph, the camera is pointing in the direction of travel (forward) , at 12 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 54
Photo: 1_1_58_B.JPG25.8m, General photograph, the camera is pointing in the direction of travel (forward) , at 12 o'clock
Photo: 1_1_59_A.JPG25.8m, The conduit curves to the right
Photo: 1_1_60_A.JPG26.8m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock
Photo: 1_1_60_B.JPG26.8m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 55
Photo: 1_1_61_A.JPG34.6m, Spalling of the conduit fabric, bricks, localized chipping of one or more of each, at joint, Obstruction: <5% , at 2 o'clock
Photo: 1_1_61_B.JPG34.6m, Spalling of the conduit fabric, bricks, localized chipping of one or more of each, at joint, Obstruction: <5% , at 2 o'clock
Photo: 1_1_62_A.JPG42.6m, Connection, poor workmanship, connection appears to be open , height 100mm , Approx
Photo: 1_1_62_B.JPG42.6m, Connection, poor workmanship, connection appears to be open , height 100mm , Approx
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 56
Photo: 1_1_63_A.JPG42.6m, Connection, good workmanship, connection appears to be open, height 75mm , at 12 o'clock, Approx
Photo: 1_1_63_B.JPG42.6m, Connection, good workmanship, connection appears to be open, height 75mm , at 12 o'clock, Approx
Photo: 1_1_65_A.JPG55.6m, The conduit curves to the left
Photo: 1_1_65_B.JPG55.6m, The conduit curves to the left
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 57
Photo: 1_1_66_A.JPG58.6m, Joint displaced longitudinaly, longitudinal displacement 10-20mm
Photo: 1_1_67_A.JPG58.6m, Void visible through defect, at joint
Photo: 1_1_67_B.JPG58.6m, Void visible through defect, at joint
Photo: 1_1_68_A.JPG58.6m, Obstruction, an object is wedged in the joint , reduction in cross sectional area: <5%, Stick, at 5 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 58
Photo: 1_1_68_B.JPG58.6m, Obstruction, an object is wedged in the joint , reduction in cross sectional area: <5%, Stick, at 5 o'clock
Photo: 1_1_69_A.JPG60.4m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx
Photo: 1_1_69_B.JPG60.4m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx
Photo: 1_1_70_A.JPG60.5m, Fine sediments, sand or silt in the invert , Obstruction: 5-20% , from 5 to 7 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Hill Street 19/12/2016 1
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 59
Photo: 1_1_70_B.JPG60.5m, Fine sediments, sand or silt in the invert , Obstruction: 5-20% , from 5 to 7 o'clock
Photo: 1_1_71_A.JPG62.8m, Inspection (survey) abandoned, obstruction , unable to pass silt
Photo: 1_1_71_B.JPG62.8m, Inspection (survey) abandoned, obstruction , unable to pass silt
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
www.ppssa.com.auEmail: [email protected]
WSA assessmentDate: Asset owner's job ref.: Asset Owner: Operator : Section number: Pipe Asset Id:
Time of inspection: Cleaning: Standard: LRP Conduit Unit Length Method of Inspection
Town: Catchment: US MH:Suburb: Asset Owner: Survey Dir:Street: Precipitation.: DS MH:Asset Location Flow control Inspect Lenght :
Purpose of inspection : Shape :Use of Conduit: Dia/Height:Type of Conduit: Width:Lining Method: Pipe Material:
Remarks :
19/12/2016 Mt Barker council Chris Hams 2
09:49:00 not cleaned WSA 05-2008 2.2 Inside Face of the Wall Television Camera
Mt BarkerCar parkEasement
Mt Barker councilNoNo measures
Crash Repair UpstreamOut fall 50 A51.70 m
Routine InspectionStorm WaterGravity
Circular900 mm
Reinforced concrete
1:500 Position Code Observation Str Rate
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 60
0.00 STO Start node, outfall, Nodename: Out fall 50 A
0.00 WLC Water level, clear flow (the invert is visible),depth 5%
0.70 CNGO Connection, good workmanship, connectionappears to be open, height 1000mm , at 2o'clock, Approx
7.40 CNPO Connection, poor workmanship, connectionappears to be open , height 100mm
9.30 GPF General photograph, the camera is pointing inthe direction of travel (forward) , at 3 o'clock
12.00 GPF General photograph, the camera is pointing inthe direction of travel (forward), GIP, at 12o'clock
14.30 CNPO Connection, poor workmanship, connectionappears to be open , height 100mm , Approx
14.30 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 10o'clock, Approx
16.90 JDL S 2Joint displaced longitudinaly, longitudinaldisplacement 21-30mm
25.60 GPF General photograph, the camera is pointing inthe direction of travel (forward), GIP, at 12o'clock
36.60 OBZ M 30Obstruction, some other object is lying in theinvert , reduction in cross sectional area: 5-20%,debris and tree branch, at 6 o'clock
38.20 GPF General photograph, the camera is pointing inthe direction of travel (forward), GIP, at 12o'clock
44.00 IS M 0Infiltration, sweating, at joint , at 4 o'clock
45.90 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 10o'clock
51.70 FHO Finish node, outfall or culvert headwall,Nodename: Crash Repair
Out fall 50 A
0 m
0 m
0.7 m
0.7 m
7.4 m
Crash Repair
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 2 0.04 2 1 2 30 0.58 30 3
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Car park 19/12/2016 2
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 61
Photo: 3_3_13_A.JPG0m, Start node, outfall, Nodename: Out fall 50 A
Photo: 3_3_14_A.JPG0m, Water level, clear flow (the invert is visible), depth 5%
Photo: 3_3_15_A.JPG0.7m, Connection, good workmanship, connection appears to be open, height 1000mm , at 2 o'clock, Approx
Photo: 3_3_15_B.JPG0.7m, Connection, good workmanship, connection appears to be open, height 1000mm , at 2 o'clock, Approx
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Car park 19/12/2016 2
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 62
Photo: 3_3_16_A.JPG7.4m, Connection, poor workmanship, connection appears to be open , height 100mm
Photo: 3_3_16_B.JPG7.4m, Connection, poor workmanship, connection appears to be open , height 100mm
Photo: 3_3_17_A.JPG9.3m, General photograph, the camera is pointing in the direction of travel (forward) , at 3 o'clock
Photo: 3_3_18_A.JPG12m, General photograph, the camera is pointing in the direction of travel (forward), GIP, at 12 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Car park 19/12/2016 2
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 63
Photo: 3_3_18_B.JPG12m, General photograph, the camera is pointing in the direction of travel (forward), GIP, at 12 o'clock
Photo: 3_3_19_A.JPG14.3m, Connection, poor workmanship, connection appears to be open , height 100mm , Approx
Photo: 3_3_19_B.JPG14.3m, Connection, poor workmanship, connection appears to be open , height 100mm , Approx
Photo: 3_3_20_A.JPG14.3m, Connection, good workmanship, connection appears to be open, height 100mm , at 10 o'clock, Approx
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Car park 19/12/2016 2
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 64
Photo: 3_3_20_B.JPG14.3m, Connection, good workmanship, connection appears to be open, height 100mm , at 10 o'clock, Approx
Photo: 3_3_21_A.JPG16.9m, Joint displaced longitudinaly, longitudinal displacement 21-30mm
Photo: 3_3_21_B.JPG16.9m, Joint displaced longitudinaly, longitudinal displacement 21-30mm
Photo: 3_3_22_A.JPG25.6m, General photograph, the camera is pointing in the direction of travel (forward), GIP, at 12 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Car park 19/12/2016 2
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 65
Photo: 3_3_22_B.JPG25.6m, General photograph, the camera is pointing in the direction of travel (forward), GIP, at 12 o'clock
Photo: 3_3_23_A.JPG36.6m, Obstruction, some other object is lying in the invert , reduction in cross sectional area: 5-20%, debris and treebranch, at 6 o'clock
Photo: 3_3_23_B.JPG36.6m, Obstruction, some other object is lying in the invert , reduction in cross sectional area: 5-20%, debris and treebranch, at 6 o'clock
Photo: 3_3_24_A.JPG38.2m, General photograph, the camera is pointing in the direction of travel (forward), GIP, at 12 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Car park 19/12/2016 2
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 66
Photo: 3_3_24_B.JPG38.2m, General photograph, the camera is pointing in the direction of travel (forward), GIP, at 12 o'clock
Photo: 3_3_25_A.JPG44m, Infiltration, sweating, at joint , at 4 o'clock
Photo: 3_3_25_B.JPG44m, Infiltration, sweating, at joint , at 4 o'clock
Photo: 3_3_26_A.JPG45.9m, Connection, good workmanship, connection appears to be open, height 100mm , at 10 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:
Car park 19/12/2016 2
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 67
Photo: 3_3_26_B.JPG45.9m, Connection, good workmanship, connection appears to be open, height 100mm , at 10 o'clock
Photo: 3_3_27_A.JPG51.7m, Finish node, outfall or culvert headwall, Nodename: Crash Repair
Photo: 3_3_27_B.JPG51.7m, Finish node, outfall or culvert headwall, Nodename: Crash Repair
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
www.ppssa.com.auEmail: [email protected]
WSA assessmentDate: Asset owner's job ref.: Asset Owner: Operator : Section number: Pipe Asset Id:
Time of inspection: Cleaning: Standard: LRP Conduit Unit Length Method of Inspection
Town: Catchment: US MH:Suburb: Asset Owner: Survey Dir:Street: Precipitation.: DS MH:Asset Location Flow control Inspect Lenght :
Purpose of inspection : Shape :Use of Conduit: Dia/Height:Type of Conduit: Width:Lining Method: Pipe Material:
Remarks :
19/12/2016 Mt Barker council Chris Hams 3
10:11:06 not cleaned WSA 05-2008 2.2 Inside Face of the Wall Television Camera
Mt Barker Adelaide RdEasement
Mt Barker councilNoNo measures
Adelaide Rd 375 pipeUpstreamCrash repairer50.00 m
Routine InspectionStorm WaterGravity
Rectangular800 mm2200 mmBrickwork
1:500 Position Code Observation Str Rate
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 68
0.00 STO Start node, outfall, Nodename: Crash repairer
0.00 WLC Water level, clear flow (the invert is visible),depth 5%
0.00 S1 CLW Longitudinal wall crack , width 2mm , at 6 o'clock,Start
0.00 GPF General photograph, the camera is pointing inthe direction of travel (forward), sleepers for roof,at 12 o'clock
8.60 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 12o'clock, Approx looks to be IP
20.10 CNGO Connection, good workmanship, connectionappears to be open, height 75mm , at 1 o'clock,Approx
23.10 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 12o'clock, Approx
24.00 CNGO Connection, good workmanship, connectionappears to be open, height 75mm , at 1 o'clock,Approx
27.80 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 12o'clock
33.50 CNGO Connection, good workmanship, connectionappears to be open, height 100mm , at 12o'clock, Approx GIP
40.50 S2 IS Infiltration, sweating , at 5 o'clock, Start
40.80 SH Hole in wall , Obstruction: <5% , at 3 o'clock
44.40 SH Hole in wall , Obstruction: <5% , at 3 o'clock
Crash repairer
0 m
0 m
0 m
0 m
0 m
Plumbing & Pipeline Solutions Grove Ave
City : Marleston SA 5033Tel:
www.ppssa.com.auEmail: [email protected]
City :
Inspection ReportDate : Job number : Weather : Operator : Counter : Pipe Asset Id :
Present : Vehicle : Camera : Preset : Cleaned : Rate :19/12/2016 No Chris Hams 3
Orpheus not cleaned
1:500 Position Code Observation Str Rate
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 69
48.90 GPF General photograph, the camera is pointing inthe direction of travel (forward), where water iscomming from, at 7 o'clock
48.90 JNGO Junction open, good workmanship, height375mm , at 9 o'clock
49.40 CNGO Connection, good workmanship, connectionappears to be open, height 90mm , at 7 o'clock,Approx appears to be AG pipe
50.00 E2 IS M 0Infiltration, sweating , at 5 o'clock, End
50.00 E1 CLW S 250Longitudinal wall crack , width 2mm , at 6 o'clock,End
50.00 FHC Finish node, major connection without amaintenance structure, Nodename: Adelaide Rd375 pipe
Adelaide Rd 375 pipe
STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade1 5 5 250 4 1 0 0 0 1
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 70
Photo: 4_4_28_A.JPG0m, Start node, outfall, Nodename: Crash repairer
Photo: 4_4_29_A.JPG0m, Water level, clear flow (the invert is visible), depth 5%
Photo: 4_4_30_A.JPG0m, Longitudinal wall crack , width 2mm , at 6 o'clock, Start
Photo: 4_4_30_B.JPG0m, Longitudinal wall crack , width 2mm , at 6 o'clock, Start
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 71
Photo: 4_4_31_A.JPG0m, General photograph, the camera is pointing in the direction of travel (forward), sleepers for roof, at 12 o'clock
Photo: 4_4_32_A.JPG8.6m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx looks to be IP
Photo: 4_4_32_B.JPG8.6m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx looks to be IP
Photo: 4_4_33_A.JPG20.1m, Connection, good workmanship, connection appears to be open, height 75mm , at 1 o'clock, Approx
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 72
Photo: 4_4_33_B.JPG20.1m, Connection, good workmanship, connection appears to be open, height 75mm , at 1 o'clock, Approx
Photo: 4_4_34_A.JPG23.1m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx
Photo: 4_4_34_B.JPG23.1m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx
Photo: 4_4_35_A.JPG24m, Connection, good workmanship, connection appears to be open, height 75mm , at 1 o'clock, Approx
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 73
Photo: 4_4_35_B.JPG24m, Connection, good workmanship, connection appears to be open, height 75mm , at 1 o'clock, Approx
Photo: 4_4_36_A.JPG27.8m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock
Photo: 4_4_36_B.JPG27.8m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock
Photo: 4_4_37_A.JPG33.5m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx GIP
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 74
Photo: 4_4_37_B.JPG33.5m, Connection, good workmanship, connection appears to be open, height 100mm , at 12 o'clock, Approx GIP
Photo: 4_4_38_A.JPG40.5m, Infiltration, sweating , at 5 o'clock, Start
Photo: 4_4_38_B.JPG40.5m, Infiltration, sweating , at 5 o'clock, Start
Photo: 4_4_39_A.JPG40.8m, Hole in wall , Obstruction: <5% , at 3 o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 75
Photo: 4_4_39_B.JPG40.8m, Hole in wall , Obstruction: <5% , at 3 o'clock
Photo: 4_4_40_A.JPG44.4m, Hole in wall , Obstruction: <5% , at 3 o'clock
Photo: 4_4_40_B.JPG44.4m, Hole in wall , Obstruction: <5% , at 3 o'clock
Photo: 4_4_41_A.JPG48.9m, General photograph, the camera is pointing in the direction of travel (forward), where water is comming from, at 7o'clock
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 76
Photo: 4_4_42_A.JPG48.9m, Junction open, good workmanship, height 375mm , at 9 o'clock
Photo: 4_4_43_A.JPG49.4m, Connection, good workmanship, connection appears to be open, height 90mm , at 7 o'clock, Approx appears to be AGpipe
Photo: 4_4_43_B.JPG49.4m, Connection, good workmanship, connection appears to be open, height 90mm , at 7 o'clock, Approx appears to be AGpipe
Photo: 4_4_46_A.JPG50m, Finish node, major connection without a maintenance structure, Nodename: Adelaide Rd 375 pipe
Plumbing & Pipeline Solutions Grove Ave
Marleston SA 5033Tel:
Website: www.ppssa.com.auEmail: [email protected]
Inspection PicturesLocation/Street Town or suburb: Date : Section number: Sewer Ref.:Adelaide Rd 19/12/2016 3
Mt Barker Council Hill St & Adel Rd storm water 19.12.2016 // Page: 77
Photo: 4_4_46_B.JPG50m, Finish node, major connection without a maintenance structure, Nodename: Adelaide Rd 375 pipe
Urban Reach Assessment for District Council of Mount Barker
Appendix D Creek Inspection Photos
District Council of Mount Barker D‐1
South Eastern Freeway [1]
19 Cavanagh Street southern boundary [2]
District Council of Mount Barker D‐2
22 Manor Crescent northern boundary [3]
22 Manor Crescent [4]
District Council of Mount Barker D‐3
20A Manor Crescent [5]
20A Manor Crescent [6]
District Council of Mount Barker D‐4
81 Adelaide Road [7]
20A Manor Crescent [8]
District Council of Mount Barker D‐5
20A Manor Crescent ‐ SA Water Reserve [9]
16 Manor Crescent [10]
District Council of Mount Barker D‐6
73A Adelaide Road [11]
73 Adelaide Road [12]
District Council of Mount Barker D‐7
71A Adelaide Road [13]
Council Drain outlet, 69A Adelaide Road [14]
District Council of Mount Barker D‐8
69A, 69 Adelaide Road [15]
2C Hill Street [16]
District Council of Mount Barker D‐9
Hill Street culvert inlet [17]