2018 Outreach Agenda
Resources
District Profile
Leslie S. Richards, Secretary of Transportation
Construction Projects
Projects in Design
County Maintenance
Innovation & Improvements
Upcoming Programs
District 10 Profile
INTERESTING TO KNOW:
PA has roughly as many state-maintained miles of highway as New
England, New York, & New Jersey combined (40,000).
PA has the 5th largest roadway system & the 3rd largest number of
bridges in the country.
Back to Agenda
Feature Armstrong Butler Clarion Indiana Jefferson Total
Population 66,486 186,847 38,513 86,364 44,073 422,283
-Townships 28 33 22 24 23 130
-Boroughs 16 23 12 14 11 76
-Cities 1 1 0 0 0 2
State Highway
(Linear Miles) 664 670 476 813 559 3,182
State Highway
(Lane Miles)1,382 1,496 1,006 1,728 1,173 6,785
Interstate Miles 0 29 28 0 24 81
National Highway
System Miles68 107 45 113 39 372
State Routes
ADT >2000103 230 84 112 83 612
State Routes
ADT <2000492 304 319 588 413 2116
Bridges (over 8' span) 372 355 208 430 265 1630
PennDOT Vision
PennDOT Mission
County Accreditation
PennDOT Connects
Road MaP
Diversity
Leslie S. Richards, Secretary of Transportation
Back to Agenda
TOPICS
PennDOT Vision
A better quality of life built on
transportation excellence.
Back to Agenda Back to Secretary’s Topics
PennDOT Mission
To provide a sustainable transportation system and quality services that are
embraced by our communities and add value to our customers.
Back to Agenda Back to Secretary’s Topics
• Truck Skills Rodeo
• Safety Stand Down Days
• Training Videos
• School Awareness
County Accreditation – Best Practices
Touch-A-Truck Event
Truck Skills Rodeo
Safety First
Back to Agenda Back to Secretary’s Topics
• Safety Innovation Presentations
• Rolling Roadblock Sign Setting
• Cone Setting Platform
• Seal Coat Signing Pilot
• Flashing Yellow Arrow
County Accreditation – Best Practices
I-80 Rolling Roadblock
Cone Setting Insert
Flashing Yellow Arrow
Safety First
Back to Agenda Back to Secretary’s Topics
County Accreditation – Best Practices
• Asset: People
– Forming effective partnerships
– Recruitment, training, retention
• Asset: Roads
– Sectional Cycle Maintenance
– 5-year Paving Plans
• Asset: Bridges
– Maintenance & preservation
– Rehabilitation or replacement of structurally-deficient (SD) bridges
• Asset: Equipment & Materials
– Equipment sharing between Counties and other Districts
– Efficient procurement & use of winter supplies
Asset Management
Back to Secretary’s TopicsBack to Agenda
Structurally Deficient Bridges
2008 2018
Statewide 6,034 3,114
District 10 580 283
Road MaP
Road Maintenance and Preservation
ROAD MaP - Overview
• Funding & Allocation
– Act 89
– Decade of Investment
– Capital Projects
– Preservation & Reconstruction
• Innovation
– RAP
– Equipment Sharing
Back to Agenda Back to Secretary’s Topics
Road MaP
Maintenance
• RAP (Recycled Asphalt Paving)
– Environmentally Conscious
– Ideal for less-traveled roads
• Department Force vs. Outsourcing
• 18-year Sign Life Management
• Sectional Cycle Maintenance
– Increased from 4 to 5 years
• Equipment Sharing
Back to Agenda Back to Secretary’s Topics
Diversity
• Diversity
– All-inclusive Workforce
– Stimulates Innovation
– Sparks Creativity
– Strengthens the Organization
• Recruitment
– Identifying Target Audiences
– Incorporating Results-Driven Strategies
– Participating in Community Outreach
• Retention
– Inclusion Committees
– Training & Organizational Support
Back to Agenda Back to Secretary’s Topics
CONSTRUCTION
Paul F. Koza, Jr., P.E.
Assistant District Engineer for Construction
724-357-2812
Back to Agenda
Grove Chapel Climbing Lane
• ECMS #25472
• SR 119
• Rayne Twp.
• Relocation/New Construction
• Cost: $16,094,110
• Ligonier Construction
• Let: 4/21/16
• Fall 2018 Completion
Back to Agenda
Brush Valley Bridge #3
• ECMS #83206
• SR 56
• Brush Valley Twp.
• Bridge Replacement & New Alignment
• C.H. & D. Enterprises Inc.
• Cost: $1,893,036
• Let: 8/25/16
• Fall 2018 Completion
Back to Agenda
Plumville Bridge #1
• ECMS #83210
• SR 85
• Plumville Boro
• Bridge Replacement
• Plum Contracting, Inc.
• Cost: $1,996,347
• Let: 10/20/16
• Spring 2018 Completion
Back to Agenda
US 119 Three Bridges
• ECMS #101483
• SR 119
• Center Twp.
• Bridge Replacement, 2 Removals and Tide Road connection to Route 119
• Swank Construction Company, LLC
• Cost: $15,232,664
• Let: 5/4/17
• Summer 2019 Completion
Back to Agenda
T-460 Aultman Bridge #3
• ECMS #25419
• SR 7203 T-460
• Black Lick Twp.
• Bridge Replacement
• Gregori Construction Inc.
• Cost: $614,416
• Let: 6/22/17
• Detour
Back to Agenda
Upper Juneau Bridge
• ECMS #25790
• SR 1045
• Canoe Twp.
• Bridge Replacement
• Francis J. Palo, Inc.
• Cost: $1,253,668
• Let: 7/13/17
• Detour
Back to Agenda
Newport Road Bridge No.3
• ECMS #83384
• SR 3009
• Black Lick Twp.
• Bridge Rehabilitation
• Clearwater Construction, Inc.
• Cost: $2,176,000
• Let: 7/13/17
• Detour
Back to Agenda
Onberg Bridge and Ruffner Church Bridge
• ECMS #25546 / 92666
• SR 1005
• Rayne Twp.
• Bridge and Pipe Replacement
• Francis J. Palo, Inc.
• Cost: $1,571,005
• Let: 10/5/17
• Detour
Back to Agenda
PA 286 over North Branch of Two Lick
• ECMS #83301
• SR 286
• Banks, Green & Montgomery Twps.
• Bridge Replacement
• Allison Park Contractors, Inc.
• Cost: $2,500,000
• Let: 10/19/17
• Detour
Back to Agenda
Pollock Bridge
• ECMS #95847
• SR 119
• Rayne Twp.
• Bridge Replacement
• Gregori Construction Inc.
• Cost: $964,469
• Let: 12/7/17
• Temporary Road for 20 days
Back to Agenda
Penn Run – North Harmony to PA 403
• ECMS #100102
• SR 422
• Pine Twp.
• Resurfacing / Overlay
• Cost: $2.5 to $5.0M
• Let: 3/15/18
Back to Agenda
SR 4005 Wayne Ave. Resurfacing
• ECMS #110019
• SR 4005
• Indiana Borough
• Resurfacing / Overlay
• Cost: $0.5 to $1.0M
• Let: 3/15/18
• Detour
• Night Work
Back to Agenda
Home Bridge #3
• ECMS #95848
• SR 119
• Rayne Twp.
• Bridge Replacement
• Cost: $0.5 to $1.0M
• Let: 6/7/18
• Phased Construction
– Maintaining Two Way Traffic throughout Project
Back to Agenda
Five Points Road Bridge
• ECMS #74303
• SR 4001
• Armstrong Twp.
• Bridge Replacement
• Cost: $1.0 to $2.5M
• Let: 6/21/18
• Detour
Back to Agenda
Gas Center Thin Overlay
• ECMS #105378
• SR 22
• East Wheatfield Twp.
• Resurfacing / Overlay
• Cost: $1.0 to $2.5M
• Let: 4/26/19
Back to Agenda
2018 District Wide Contracts
• 2018 RPM: ECMS #110105
– Cost: $300,000
– Let: 4/12/18
• 2018 Small Paint: ECMS #110106
– Cost: $300,000
– Let: 6/7/18
• Guiderail Contracts:• Armstrong: ECMS #110870, Cost $200,000
• Butler: ECMS #110871, Cost $250,000
• Clarion: ECMS #110872, Cost $225,000
• Indiana: ECMS #110873, Cost $250,000
• Jefferson: ECMS #110874, Cost $225,000
– Let: 6/7/18
Back to Agenda
Plenary Walsh Keystone Partners – P3 Bridges
– Clarksburg Bridge SR 286 Young Twp.
• JV 386
• Temp Signal
– Willet Run Bridge SR 954
• JV 388
• Detour
– http://parapidbridges.com
Back to Agenda
Dixonville #1 & Barr Slope Bridges
• Routes 403 and 1012
• Bridge Replacements
• Green Twp.
• Over Dixon Run
• Phased Construction
• Construction in 2019
• Estimate: $2.5M - $5M
Back to Agenda
McKee Run Bridges Group
• Routes 110 & 4005
• Bridge Replacements
• White Twp.
• Over McKee Run
• Phased Construction
− Shick Drive, Muller, Grove
• Detour
− Frances (2 weeks)
• Construction in 2019
• Estimate: $2.5M - $5M
Back to Agenda
North Branch Plum Creek Bridge
• Route 4035
• Bridge Replacement
• Plumville Borough
• Over North Branch of Plum Creek
• Detour
• Construction in 2019
• Estimate: $1M - $2.5M
Back to Agenda
Oakland Avenue Resurfacing
• Route 286
• Resurfacing
• Indiana Borough & White Twp.
• Construction in 2019
• Estimate: $1M - $2.5M
Back to Agenda
Trade City South PM
• Route 210
• Resurfacing
• North, South & East Mahoning Twps.
• Construction in 2019
• Estimate: $2.5M - $5M
Back to Agenda
Shelocta West Resurfacing
• Route 422 – Resurfacing
− Elderton Borough & Plumcreek Twp., Armstrong County
− Armstrong Twp., Indiana County
• Construction in 2019
• Estimate: $2.5M - $5M
Back to Agenda
Armagh Bypass PM
• Route 22 - Resurfacing
• East Wheatfield Twp.
• Construction in 2019
• Estimate: $2.5M - $5M
Back to Agenda
Route 422 Cunningham Culvert
• Route 422
• Two Bridge Replacements
• Armstrong Twp.
• Over Curry Run & Tributary to Curry Run
• Maintain Two Lanes of Traffic
• Construction not funded
• Estimate: $5M - $7.5M
Back to Agenda
Philadelphia Street Bridges Group
• Route 286 & 4032
• Bridge Replacements
• Indiana Borough
• Over Whites Run & Marsh Run
• Construction in 2020
• Estimate: $2.5M - $5M
Back to Agenda
SR 4005 Mack Park & SR 4030 Carter Avenue Bridges
• Routes 4005 & 4030
• Bridge Replacements
• White Twp., Indiana Borough
• Over Marsh Run
• Construction in 2020
• Estimate: $2.5M - $5M
Back to Agenda
Smicksburg #3 Bridge
• Route 4026
• Bridge Rehabilitation
• West Mahoning Twp.
• Over Little Mahoning Creek
• Detour
• Construction in 2020
• Estimate: $2.5M - $5M
Back to Agenda
SR 1004 over US 119
• Route 1004
• Bridge Replacement
• White Twp.
• Construction in 2020
• Estimate:$5 to $10M
Back to Agenda
PA 286: US 422 Interchange East
• Route 286 - Highway Capacity - Lane Additions
• Intersection Improvements w/ Bike/Ped Facilities
• SR 422 Interchange to Rustic Lodge Road
• White Twp.
• Construction in 2020
• Estimate: $15M - $20M
Back to Agenda
Park Road Slide
• Route 3025 Seg 0040
• Roadway Slide Repair
• Young Twp.
• Construction in 2020
• Estimate: $100,000 - $500,000
Back to Agenda
Lockvale Bridge
• Route 1053
• Bridge Replacement
• Banks Twp.
• Over S. Branch Of Bear Run
• Construction in 2021
• Estimate: $1M - $2.5M
Back to Agenda
SR 4422 Claypoole Heights Bridge
• Route 4422
• Bridge Replacement
• White Twp.
• Over tributary to McCarthy Run
• Construction in 2022
• Estimate: $1M - $2.5M
Back to Agenda
SR 954 Windows Bridge
• Route 954
• Bridge Replacement
• West Mahoning Twp.
• Over tributary to Little Mahoning Creek
• Construction in 2022
• Estimate: $1M - $2.5M
Back to Agenda
SR 3007 Marshall Run Bridge #1
• Route 3007
• Bridge Replacement
• Conemaugh Twp.
• Over Marshall Run
• Construction in 2022
• Estimate: $1M - $2.5M
Back to Agenda
SR 403 Marion Center Bridge #1
• Route 403
• Bridge Replacement
• Marion Center Borough
• Over a tributary to Pine Run
• Construction in 2022
• Estimate: $1M - $2.5M
Back to Agenda
SR 1002 Ramsey Run Bridge #1
• Route 1002
• Bridge Replacement
• White Twp.
• Over Ramsey Run
• Construction in 2022
• Estimate: $1M - $2.5M
Back to Agenda
SR 3016 over Two Lick Creek
• Route 3016
• Bridge Replacement
• Homer City Borough
• Over Two Lick Creek
• Construction in 2022
• Estimate: $1M to $2.5M
Back to Agenda
SR 286 over Trib. to Cherry Run
• Route 286
• Bridge Replacement
• White Twp.
• Over a tributary to Cherry Run
• Construction not funded
• Estimate: $1M - $2.5M
Back to Agenda
PA 553 – PA 403 to Cambria County
• Route 553
• Resurfacing
• Cherryhill Twp.
• Construction not funded
• Estimate: $2.5M - $5M
Back to Agenda
Grange Hall Bridge
• Route 2013
• Bridge Replacement
• East Wheatfield Twp.
• Over Tributary to Conemaugh River
• Detour
• Construction not funded
• Estimate: $500K to $1M
Back to Agenda
Satterlee Bridge
• Route 119
• Bridge Replacement or Rehabilitation
• East Mahoning Twp.
• Over Little Mahoning Creek
• Construction not funded
• Estimate: $2.5M - $5M
Back to Agenda
Green Valley Bridge #1
• SR 3031
• Bridge Replacement
• Young Twp.
• Over Blacklegs Creek
• Detour
• Construction not funded
• Estimate: $500,000 - $1M
Back to Agenda
Margaret Road Intersection
• Route 422 - New Alignment
• Plumcreek Township
• Construction not funded
• Estimate: $25M - $30M
Back to Agenda
MAINTENANCE
Brian N. Allen, P.E.
Assistant District Engineer for Maintenance
724-357-2809
Back to Agenda
2018 Indiana County Maintenance
• John Serian County Maintenance Manager
• Ron Gresko Asst. County Manager
• Ed Kaylor Asst. County Manager
• George McFeaters Asst. County Manager
• Tim Clevenger Equipment Manager
• Glenda Palmer Roadway Programs Coordinator & Adopt-A-Highway Coordinator
2550 Oakland AvenueIndiana, PA 15701
724-357-2817
Back to Agenda
Indiana County Winter
2017-2018 Indiana County Winter Budget (personnel & operations) $4,013,000
Salt (5-year average in tons) 16,552
Anti-Skid (5-year average in tons) 16,966
Brine (5-year average in gallons) 200,341
Back to Agenda
Sectional Cycle Maintenance
• Section 1 – North east section of the County activities will include pipe flushing and tail ditching
• Section 2 – South east section of the County activities will include tow paving and the seal coat program
• Section 3 – South west section of the County activities will include pipe replacement and tail ditching
• Section 4 – North west section of the County activities will shoulder cutting and shoulder stabilization
Back to Agenda
Manual Patching / Edge Box Patching
2018 Planned Manual Patching: 1,200 tons2017 Completed Manual Patching: 800 tons
2018 Planned Edge Box Patching: 4,000 tons2017 Completed Edge Box Patching: 4,770 tons
Back to Agenda
Sweeping / Debris Removal
2018 Planned Sweeping: 2,500 hours
2017 Completed Sweeping: 3,100 hours
Back to Agenda
Mowing and Brushing
2018 Planned Mowing: 1,200 acres
2017 Completed Brushing: 7,685 hours
2018 Planned Brushing: 7,500 hours
2017 Completed Mowing: 1,180 acres
Back to Agenda
Innovation & Improvements
BUTLER VO-TECH, JUDGE’S PICK
Keystone Area (Clarion) Facebook Fan Favorite
Back to Agenda
Innovation & Improvement
ALL ABOUT
SAFETY• Slower Speeds• 90% Reduction in Fatal
Crashes• 75% Reduction in Injury
Crashes• 30-40% Reduction in
Pedestrian Crashes• 10% Reduction in
Bicycle Crashes
CAPACITY• Reduces Delays• 30% Increase in Vehicle
Accommodation
• Increased Traffic Flow
• Click HERE for Roundabout Video
Back to Agenda
Upcoming Programs
• Rural Commercial Routes Program
– Low volume route improvements
– Pavement treatments
• Recycled asphalt
• Flexible base
• Warm mix asphalt with higher recycled asphalt percentage
• Municipal Bridge Improvement Program
– Component of Road MaP
– Bundling for cost savings
– Partnering with local government agencies
Back to Agenda
Resources - Alerts
• Incidents
• Construction
• Winter road conditions
• Weather forecasts
• Weather alerts
• Plow truck locations
• Zoom to your region
Back to Agenda
Resources – Customer Surveys
www.penndot.govRegional Offices, D10
Customer Service Surveys
Winter Survey – live during the winter
storm season.
Construction Survey – live between mid-
November and the end of December.
Back to Agenda