DISTRIBUTION OF QUANTITIES
Index: 1
820.0110 CONCRETE SURFACE TREATMENT (PROTECTIVE COATING) 41819.0800 DRILL AND GROUT REINFORCING DOWELS 41
818.9901 PORTLAND CEMENT CONCRETE DECK REPAIRS (PARTIAL DEPTH REMOVAL)
41
817.9902 REPAIRS TO STRUCTURAL CONCRETE MASONRY (FORM AND CAST IN PLACE)
41817.9901 REPAIRS TO STRUCTURAL CONCRETE MASONRY (PATCHING MORTAR) 41813.9910 PREFABRICATED WATERPROOFING SHEET MEMBRANE 40810.9911 GALVANIZED MECHANICAL BAR SPLICERS 40810.0210 GALVANIZED BAR REINFORCEMENT GRADE 60 40808.1810 CONCRETE SURFACE FINISHING RUBBED REGULAR 40808.1675 POLYURETHANE ELASTOMERIC JOINT SEALANT 39808.1642 PREFORMED POLYETHYLENE FOAM JOINT FILLER 1'' 39808.1640 PREFORMED POLYETHYLENE FOAM JOINT FILLER 1/2'' 39808.1502 CONCRETE SUPERSTRUCTURE CLASS HP 3/4'' BRIDGE SIDEWALKS 38808.1501 CONCRETE SUPERSTRUCTURE CLASS HP 3/4'' BRIDGE DECKS 38808.0602 CONCRETE SUBSTRUCTURE CLASS HP 3/4'' BACKWALLS 38808.0508 CONCRETE SUBSTRUCTURE CLASS XX 3/4'' APPROACH SLABS 38
803.9920 REMOVE AND DISPOSE PORTIONS OF EXISTING CONCRETE SUPERSTRUCTURE
37
803.9910 REMOVE AND DISPOSE PORTIONS OF EXISTING CONCRETE SUBSTRUCTURE
37803.0500 TEMPORARY DECK UNDERSIDE AND SIDE PROTECTIVE SHIELDING 37709.9903 INSPECTION, GPS AND DOCUMENTATION - OUTFALL 35709.9902 INSPECTION, GPS AND DOCUMENTATION - STRUCTURE 34709.9901 INSPECTION, GPS AND DOCUMENTATION - PIPE 34708.9902 CLEANING AND FLUSHING PIPE ALL SIZES 24708.9901 CLEAN SPECIAL DRAINAGE INLET 24708.9042 CLEANING MANHOLES ALL TYPES AND SIZES 21708.9041 CLEANING CATCH BASINS ALL TYPES AND SIZES 12707.1100 ADJUST CATCH BASINS 12707.0900 ADJUST MANHOLES TO GRADE 11704.0400 RECONSTRUCT MANHOLE/VERTICAL WALLS 11704.0300 RECONSTRUCT CATCH BASIN/VERTICAL WALLS 11704.0200 RECONSTRUCT MANHOLE/CORBEL CONES 11704.0100 RECONSTRUCT CATCH BASIN/CORBEL CONES 11601.0300 CLASS A PORTLAND CEMENT CONCRETE 10415.9901 INTELLIGENT COMPACTION FOR HMA 10403.0300 ASPHALT EMULSION TACK COAT 10402.9901 FRICTION COURSE 9401.9910 MODIFIED CLASS 9.5 HMA FOR BRIDGE DECKS 9401.4000 CLASS 4.75 HMA 8213.0100 PLACEMENT OF MILLINGS BENEATH GUARDRAIL 8212.2000 CLEANING AND MAINTENANCE OF EROSION CONTROLS 8206.0312 COMPOST FILTER SOCK 12 INCH DIAMETER 5204.0100 TRIMMING AND FINE GRADING 5203.0700 PERVIOUS FILL 5203.0650 CRUSHED STONE FILL UNDER STRUCTURES 5203.0100 STRUCTURAL EXCAVATION EARTH 4
201.0610 REMOVE AND DISPOSE DIRECTIONAL, WARNING, REGULATORY, SERVICE, AND STREET SIGNS
3201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 2201.0409 REMOVE AND DISPOSE FLEXIBLE PAVEMENT 2201.0407 REMOVE AND DISPOSE PAVEMENT AND RIGID BASE 2201.0403 REMOVE AND DISPOSE SIDEWALKS 1201.0402 REMOVE AND DISPOSE CONCRETE CURB 1
Table of Contents - Distribution of QuantitiesProject Name - I-95 Corridor Bridge Preservation & Resurfacing
Estimate Name - Current Advertising EstimateR.I. Contract No. - 2015-CB-021
FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)ItemCode Description Page
Index: 2
906.0211 CEMENT CONCRETE CURB PRECAST CIRCULAR STANDARD 7.1.0 55905.0140 BITUMINOUS SIDEWALK STANDARD 43.2.0 55905.0110 PORTLAND CEMENT SIDEWALK MONOLITHIC STANDARD 43.1.0 54901.9901 GUARDRAIL END TREATMENT - ENERGY ABSORBING TERMINAL 54
901.0197 GUARDRAIL CONNECTION TO EXISTING ENDPOST APPROACH END SECTION, STANDARD 34.3.5
53
901.0196 GUARDRAIL CONNECTION TO EXISTING ENDPOST TRAILING END SECTION, STANDARD 34.3.6
53
901.0191 GUARDRAIL STEEL BEAM ANCHORAGE TRAILING END SECTION STANDARD 34.3.4
53901.0101 GUARDRAIL STEEL BEAM SINGLE FACE EARTH AND ASPHALT 52
839.0200 FULL DEPTH REMOVAL AND DISPOSAL OF BITUMINOUS PAVEMENT FROM CONCRETE BRIDGE DECKS
52
839.0100 PARTIAL-DEPTH REMOVAL AND DISPOSAL OF BITUMINOUS PAVEMENT FROM CONCRETE BRIDGE DECKS
52834.0131 VERTICAL FACE GRANITE CURB STRAIGHT 7'' REVEAL 51829.9910 BRIDGE SCUPPER & DOWNSPOUT REPAIRS 51825.9906 REPAINTING EXISTING STRUCTURAL STEEL - BRIDGE NO. 682 51825.9905 REPAINTING EXISTING STRUCTURAL STEEL - BRIDGE NO. 678 51825.9904 REPAINTING EXISTING STRUCTURAL STEEL - BRIDGE NO. 677 51825.9903 REPAINTING EXISTING STRUCTURAL STEEL - BRIDGE NO. 676 51825.9902 REPAINTING EXISTING STRUCTURAL STEEL - BRIDGE NO. 633 50825.9901 REPAINTING EXISTING STRUCTURAL STEEL - BRIDGE NO. 632 50824.9910 STEEL UTILITY POLE 50824.9903 TEMPORARY STEEL TRAFFIC PLATE - BRIDGE NO. 678 50824.9902 TEMPORARY STEEL TRAFFIC PLATE - BRIDGE NO. 677 50824.9901 TEMPORARY STEEL TRAFFIC PLATE - BRIDGE NO. 676 50823.1750 ASPHALTIC EXPANSION JOINT SYSTEM 49821.1690 SAW & SEALING JOINTS IN BITUMINOUS CONCRETE PAVEMENT 49820.9926 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 719 49820.9925 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 686 48820.9924 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 685 48820.9923 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 684 48820.9922 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 683 48820.9921 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 682 48820.9920 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 681 48820.9919 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 680 47820.9918 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 678 47820.9917 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 677 47820.9916 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 676 47820.9915 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 665 47820.9914 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 661 46820.9913 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 659 46820.9912 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 658 46820.9911 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 657 46820.9910 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 656 46820.9909 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 655 46820.9908 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 653 45820.9907 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 652 45820.9906 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 651 45820.9905 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 639 45820.9904 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 633 45820.9903 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 632 44820.9902 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 619 44820.9901 HIGH PRESSURE WATER CLEANING - BRIDGE NO. 618 44
Table of Contents - Distribution of QuantitiesProject Name - I-95 Corridor Bridge Preservation & Resurfacing
Estimate Name - Current Advertising EstimateR.I. Contract No. - 2015-CB-021
FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)ItemCode Description Page
Index: 3
T20.2016 6 INCH EPOXY RESIN PAVEMENT MARKINGS YELLOW 79T20.2012 12 INCH EPOXY RESIN PAVEMENT MARKINGS WHITE 78T20.2006 6 INCH EPOXY RESIN PAVEMENT MARKINGS WHITE 76T20.0900 BI-DIRECTIONAL CONTROL DEVICE STANDARD 20.2.0 76
T20.0106 6 INCH YELLOW FAST - DRYING WATERBORNE PAVEMENT MARKING PAINT
76
T20.0012 12 INCH WHITE FAST - DRYING WATERBORNE PAVEMENT MARKING PAINT
75
T20.0006 6 INCH WHITE FAST - DRYING WATERBORNE PAVEMENT MARKING PAINT
75T15.0100 DIRECTIONAL REGULATORY AND WARNING SIGNS 73T13.9902 TRAFFIC DETECTOR - LOOP (DRY CUT) 73T13.9901 CLASS I PIEZOELECTRIC SENSORS 73T13.1000 TRAFFIC DETECTORS-LOOP, STANDARD 19.6.0 72T06.9903 1" FLEXIBLE PVC CONDUIT 72T06.9902 1 1/2" FLEXIBLE METALLIC LIQUID TIGHT CONDUIT 72
T06.5120 2 INCH SCHEDULE 40 POLYVINYL CHLORIDE PLASTIC CONDUIT - UNDERGROUND
71T05.1030 ADJUST HANDHOLE TO GRADE 71T05.0400 BREAK INTO EXISTING HANDHOLE 71
T03.9901 4-LANE PERMANENT AUTOMATIC VEHICLE CLASSIFICATION/WEIGH-IN-MOTION (AVC/WIM) EQUIPMENT
70L11.0104 DRIP-LINE TREE PROTECTION DEVICE STANDARD 51.1.1 70L11.0103 SHRUB PLANT PROTECTION DEVICE STANDARD 51.2.0 70L11.0102 TREE PLANT PROTECTION DEVICE STANDARD 51.1.0 70L02.0101 GENERAL HIGHWAY SEEDING (TYPE 1) 70L01.0104 PLANTABLE SOIL 4 INCHES DEEP 69943.0200 TRAINEE MAN-HOURS 69942.0200 DETECTABLE WARNING PANEL STANDARD 48.1.0 69937.0200 MAINTENANCE AND MOVEMENT TRAFFIC PROTECTION 69936.0100 MOBILIZATION AND DEMOBILIZATION 68935.0400 REMOVING BITUMINOUS PAVEMENT BY MICRO MILLING 67
932.0230 FULL DEPTH SAWCUT OF PORTLAND CEMENT CONCRETE SIDEWALK/DRIVEWAY
66932.0200 FULL-DEPTH SAWCUT OF BITUMINOUS PAVEMENT 66932.0100 CUTTING AND MATCHING ASPHALT 64931.0110 CLEANING AND SWEEPING PAVEMENT 64929.0110 FIELD OFFICE 64
928.0800 TRUCK MOUNTED ATTENUATOR WITH TRUCK MOUNTED FLASHING ARROW BOARD
63925.0112 PORTABLE CHANGEABLE MESSAGE SIGN 62924.0113 ADVANCE WARNING ARROW PANEL 61923.0200 FLUORESCENT TRAFFIC CONES STANDARD 26.1.0 61923.0120 PLASTIC PIPE BARRICADE STANDARD 26.3.0 61923.0105 DRUM BARRICADE STANDARD 26.2.0 60922.0100 TEMPORARY CONSTRUCTION SIGNS STANDARD 29.1.0 AND 27.1.1 57914.5020 FLAGPERSONS - OVERTIME 57914.5010 FLAGPERSONS 57
906.0700 REMOVE, HANDLE, HAUL TRIM RESET CURB EDGING, STRAIGHT, CIRCULAR ALL TYPES
56
906.0263 PRECAST CONCRETE RAMP STONE 18-INCH CIRCULAR STANDARD 7.1.9
56
906.0260 PRECAST CONCRETE RAMP STONE 12-INCH STRAIGHT STANDARD 7.1.9
56
906.0250 PRECAST CONCRETE WHEELCHAIR RAMP CURB STANDARDS 7.1.3, 43.3.0 AND 43.3.1
55
Table of Contents - Distribution of QuantitiesProject Name - I-95 Corridor Bridge Preservation & Resurfacing
Estimate Name - Current Advertising EstimateR.I. Contract No. - 2015-CB-021
FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)ItemCode Description Page
JEFFERSON BLVD RAMP K
027+35 LT 10.00 0005 02
JEFFERSON BLVD RAMP L
016+65 RT 41.00 0005 02
BRIDGE NO. 678 4.00 0014 01
JEFFERSON BLVD RAMP J
016+65 LT 33.00 0005 02
006+90 RT 34.00 0005 02
007+15 LT 22.00 0005 02
Item 201.0403 Total: 187.00
JEFFERSON BLVD RAMP O
025+45 LT 10.00 0005 02
025+60 RT 10.00 0005 02
025+65 LT 14.00 0005 02
JEFFERSON BLVD RAMP L
027+35 LT 16.00 0005 02
025+60 RT 16.00 0005 02
025+45 LT 16.00 0005 02
JEFFERSON BLVD RAMP K
JEFFERSON BLVD RAMP J
001 201.0402 REMOVE AND DISPOSE CONCRETE CURB LF
016+65 RT 28.00 0005 02
016+65 LT 22.00 0005 02
025+65 LT 22.00 0005 02
002 201.0403 REMOVE AND DISPOSE SIDEWALKS SY
BRIDGES
BRIDGE NO. 677 4.00 0014 01
BRIDGE NO. 676 5.00 0014 01
007+15 LT 16.00 0005 02
006+90 RT 28.00 0005 02
JEFFERSON BLVD RAMP O
Item 201.0402 Total: 164.00
Distribution of QuantitiesPage 1 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item 201.0409 Total: 19.00
005 201.0415 REMOVE AND DISPOSE GUARDRAIL AND LF
007+15 LT 2.00 0005 02
025+65 LT 3.00 0005 02
JEFFERSON BLVD RAMP O
006+90 RT 3.00 0005 02
POST ALL TYPES
ROUTE 37 CD ROAD
514+65 - 524+40 RT 960.00 0021 03
523+27 - 525+00 RT 173.00 0021 03
018+55 - 022+00 LT 385.00 0021 03
JEFFERSON BLVD RAMP K
028+08 - 030+92 LT 284.00 0021 03
JEFFERSON BLVD RAMP L
025+60 RT 2.00 0005 02
Item 201.0407 Total: 24.00
BRIDGE NO. 666 7.00 0014 01
004 201.0409 REMOVE AND DISPOSE FLEXIBLE SY
RIGID BASE
003 201.0407 REMOVE AND DISPOSE PAVEMENT AND SY
BRIDGE NO. 664 17.00 0014 01
BRIDGES
027+35 LT 2.00 0005 02
JEFFERSON BLVD RAMP K
025+45 LT 2.00 0005 02
JEFFERSON BLVD RAMP L
JEFFERSON BLVD RAMP J
PAVEMENT
016+65 RT 3.00 0005 02
016+65 LT 2.00 0005 02
Distribution of QuantitiesPage 2 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
016+45 RT 1.00 0021 03
016+45 LT 1.00 0021 03
027+30 LT 1.00 0021 03
JEFFERSON BLVD RAMP K
JEFFERSON BLVD RAMP J
107+40 LT 1.00 0021 03
015+60 RT 1.00 0021 03
015+60 LT 1.00 0021 03
025+00 RT 1.00 0021 03
JEFFERSON BLVD RAMP L
488+45 RT 1.00 0021 03
JEFFERSON BLVD/ROUTE 37 CD ROAD
029+70 LT 1.00 0021 03
027+55 RT 1.00 0021 03
031+45 RT 1.00 0021 03
030+75 LT 1.00 0021 03
WARNING, REGULATORY, SERVICE, AND
006 201.0610 REMOVE AND DISPOSE DIRECTIONAL, EACH
I-95 MAINLINE A
STREET SIGNS
527+80 - 530+85 RT 305.00 0021 03
005 201.0415 Cont. 525+00 - 526+35 RT 135.00 0021 03
Item 201.0415 Total: 2,242.00
530+75 LT 1.00 0021 03
054+40 RT 1.00 0021 03
035+25 RT 1.00 0021 03
089+65 RT 1.00 0021 03
083+80 RT 1.00 0021 03
I-95 MAINLINE B
535+65 LT 1.00 0021 03
028+90 RT 1.00 0021 03
012+75 RT 1.00 0021 03
Distribution of QuantitiesPage 3 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
ROUTE 10 ROAD E
044+60 RT 1.00 0021 03
088+50 LT 1.00 0021 03
087+10 LT 1.00 0021 03
ROUTE 10 RAMP D-B
049+70 LT 1.00 0021 03
ROUTE 10 RAMP D-E
049+80 RT 1.00 0021 03
007 203.0100 STRUCTURAL EXCAVATION EARTH CY
BRIDGE NO. 664 3.00 0014 01
BRIDGES
097+15 LT 1.00 0021 03
092+65 LT 1.00 0021 03
Item 201.0610 Total: 41.00
098+45 LT 1.00 0021 03
518+60 RT 1.00 0021 03
514+45 RT 1.00 0021 03
ROUTE 10 RAMP B-C
532+25 RT 1.00 0021 03
496+50 RT 1.00 0021 03
006 201.0610 Cont. 493+35 RT 1.00 0021 03
511+85 RT 1.00 0021 03
507+10 RT 1.00 0021 03
103+15 RT 1.00 0021 03
055+80 LT 1.00 0021 03
ROUTE 10 RAMP C-B
ROUTE 10 RAMP C-E
063+90 LT 1.00 0021 03
ROUTE 10 RAMP B-EL
104+00 LT 1.00 0021 03
100+40 RT 1.00 0021 03
099+02 LT 1.00 0021 03
Distribution of QuantitiesPage 4 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
027+35 LT 10.00 0005 02
JEFFERSON BLVD RAMP K
025+45 LT 10.00 0005 02
JEFFERSON BLVD RAMP L
JEFFERSON BLVD RAMP J
010 204.0100 TRIMMING AND FINE GRADING SY
016+65 RT 10.00 0005 02
016+65 LT 10.00 0005 02
Item 204.0100 Total: 85.00
007+15 LT 10.00 0005 02
011 206.0312 COMPOST FILTER SOCK 12 INCH LF
025+65 LT 10.00 0005 02
025+60 RT 10.00 0005 02
006+90 RT 15.00 0005 02
JEFFERSON BLVD RAMP O
008 203.0650 CRUSHED STONE FILL UNDER STRUCTURES CY
BRIDGE NO. 664 4.00 0014 01
BRIDGES
BRIDGE NO. 677 12.50 0014 01
007 203.0100 Cont. BRIDGE NO. 676 15.00 0014 01
Item 203.0100 Total: 43.00
BRIDGE NO. 678 12.50 0014 01
Item 203.0650 Total: 4.00
BRIDGE NO. 678 14.00 0014 01
BRIDGE NO. 677 14.00 0014 01
Item 203.0700 Total: 45.00
009 203.0700 PERVIOUS FILL CY
BRIDGE NO. 676 17.00 0014 01
BRIDGES
Distribution of QuantitiesPage 5 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
506+43 LT 22.00 0005 02
502+50 LT 22.00 0005 02
514+00 LT 22.00 0005 02
511+52 LT 22.00 0005 02
484+48 LT 22.00 0005 02
481+48 LT 22.00 0005 02
487+00 LT 22.00 0005 02
484+48 RT 22.00 0005 02
010+80 LT 22.00 0005 02
010+00 RT 22.00 0005 02
014+80 LT 22.00 0005 02
012+80 LT 22.00 0005 02
519+03 LT 22.00 0005 02
516+55 LT 22.00 0005 02
I-95 MAIN LINE B
521+43 LT 22.00 0005 02
466+40 RT 22.00 0005 02
464+55 RT 22.00 0005 02
469+50 LT 22.00 0005 02
467+30 RT 22.00 0005 02
I-95 MAIN LINE A
011 206.0312 Cont. DIAMETER
462+00 LT 22.00 0005 02
460+60 RT 22.00 0005 02
469+50 RT 22.00 0005 02
477+02 RT 22.00 0005 02
477+02 LT 22.00 0005 02
479+50 RT 22.00 0005 02
479+50 LT 22.00 0005 02
472+00 RT 22.00 0005 02
472+00 LT 22.00 0005 02
474+50 RT 22.00 0005 02
474+50 LT 22.00 0005 02
Distribution of QuantitiesPage 6 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
022+00 RT 22.00 0005 02
JEFFERSON BLVD RAMP L
023+50 LT 22.00 0005 02
022+05 LT 22.00 0005 02
013+50 RT 22.00 0005 02
JEFFERSON BLVD RAMP J
031+15 RT 22.00 0005 02
JEFFERSON BLVD RAMP K
049+35 LT 22.00 0005 02
047+90 LT 22.00 0005 02
086+20 LT 22.00 0005 02
ROUTE 10 RAMP E-D
108+00 RT 22.00 0005 02
ROUTE 10 RAMP A-C
046+05 LT 22.00 0005 02
ROUTE 10 RAMP C-E
027+70 RT 22.00 0005 02
027+20 RT 22.00 0005 02
032+30 RT 22.00 0005 02
029+75 RT 22.00 0005 02
019+80 RT 22.00 0005 02
011 206.0312 Cont. 017+30 RT 22.00 0005 02
024+75 RT 22.00 0005 02
022+30 RT 22.00 0005 02
JEFFERSON BLVD CD ROAD
501+40 22.00 0005 02
498+90 22.00 0005 02
503+50 22.00 0005 02
502+50 22.00 0005 02
489+48 22.00 0005 02
486+96 22.00 0005 02
494+52 22.00 0005 02
490+62 22.00 0005 02
Distribution of QuantitiesPage 7 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
514+65 - 524+40 RT 960.00 0014 01
ROUTE 37 CD ROAD
525+00 - 526+35 RT 135.00 0014 01
523+27 - 525+00 RT 173.00 0014 01
028+08 - 030+92 LT 284.00 0014 01
JEFFERSON BLVD RAMP K
018+15 - 022+00 LT 385.00 0005 02
JEFFERSON BLVD RAMP L
MISCELLANEOUS 0.60 0005 02
I-95 CONTRACT 6
016+65 LT 0.30 0005 02
JEFFERSON BLVD RAMP J
Item 213.0100 Total: 2,476.00
527+82 - 530+85 RT 305.00 0014 01
014 401.4000 CLASS 4.75 HMA TON
Item 206.0312 Total: 1,320.00
096+60 LT 22.00 0005 02
012 212.2000 CLEANING AND MAINTENANCE OF LS
091+45 LT 22.00 0005 02
011 206.0312 Cont. 087+95 LT 22.00 0005 02
096+10 LT 22.00 0005 02
ROUTE 10 ROAD E
EROSION CONTROLS
GUARDRAIL
013 213.0100 PLACEMENT OF MILLINGS BENEATH LF
531+03 - 533+37 LT 234.00 0005 02
I-95 MAIN LINE A
PROJECT WIDE 1.00 0005 02
I-95 CONTRACT 6
Item 212.2000 Total: 1.00
Distribution of QuantitiesPage 8 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 662 (750 SY X 71.50 0005 02
0.09516 TON/SY)
BRIDGE NO. 663 (900 SY X 86.50 0005 02
0.09516 TON/SY)
BRIDGE NO. 678 12.50 0014 01
BRIDGE NO. 677 12.50 0014 01
BRIDGE NO. 661 (2600 SY X 247.50 0005 02
I-95 CONTRACT 6
016 402.9901 FRICTION COURSE TON
FROM ITEM CODE 935.0400 15,068.00 0005 02
I-95 CONTRACT 6
BRIDGE NO. 680 (1350 SY X 128.50 0005 02
0.09516 TON/SY)
Item 401.9910 Total: 1,099.00
0.09516 TON/SY)
027+60 RT 0.25 0005 02
027+45 LT 0.25 0005 02
JEFFERSON BLVD RAMP O
027+65 LT 0.30 0005 02
JEFFERSON BLVD RAMP K
014 401.4000 Cont. 016+65 RT 0.40 0005 02
JEFFERSON BLVD RAMP L
027+35 LT 0.25 0005 02
006+90 RT 0.40 0005 02
BRIDGES
DECKS
BRIDGE NO. 676 15.00 0014 01
BRIDGE NO. 660 525.00 0014 01
Item 401.4000 Total: 3.00
007+15 LT 0.25 0005 02
015 401.9910 MODIFIED CLASS 9.5 HMA FOR BRIDGE TON
Distribution of QuantitiesPage 9 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
JEFFERSON BLVD RAMP J
019 601.0300 CLASS A PORTLAND CEMENT CONCRETE CY
016+65 RT 0.90 0005 02
016+65 LT 0.70 0005 02
PROJECT WIDE 1.00 0005 02
I-95 CONTRACT 6
Item 415.9901 Total: 1.00
025+65 LT 0.70 0005 02
025+60 RT 0.50 0005 02
006+90 RT 1.00 0005 02
JEFFERSON BLVD RAMP O
027+35 LT 0.50 0005 02
JEFFERSON BLVD RAMP K
025+45 LT 0.50 0005 02
JEFFERSON BLVD RAMP L
BRIDGE NO. 660 5,000.00 0014 01
BRIDGES
BRIDGE NO. 666 660.00 0014 01
BRIDGE NO. 664 720.00 0014 01
Item 402.9901 Total: 15,068.00
016 402.9901 Cont. (174,776 SY X 0.08621 TON/SY)
017 403.0300 ASPHALT EMULSION TACK COAT SY
I-95 CONTRACT 6
Item 403.0300 Total: 187,820.00
VERTICAL PAVEMENT FACES 1,064.00 0005 02
018 415.9901 INTELLIGENT COMPACTION FOR HMA LS
(5600 SY)
FROM ITEM CODE 839.0100 5,600.00 0005 02
(174,776 SY)
FROM ITEM CODE 935.0400 174,776.00 0005 02
Distribution of QuantitiesPage 10 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
023 704.0400 RECONSTRUCT MANHOLE/VERTICAL WALLS VLF
AS DIRECTED BY ENGINEER 10.00 0005 02
I-95 CONTRACT 6
I-95 CONTRACT 6
WALLS
Item 704.0300 Total: 30.00
AS DIRECTED BY ENGINEER 30.00 0005 02
080+75 LT 2.00 0005 02
080+48 LT 2.00 0005 02
083+96 LT 2.00 0005 02
083+35 LT 2.00 0005 02
Item 704.0400 Total: 10.00
I-95 MAIN LINE B
024 707.0900 ADJUST MANHOLES TO GRADE EACH
020 704.0100 RECONSTRUCT CATCH BASIN/CORBEL EACH
I-95 CONTRACT 6
CONES
Z: MISCELLANEOUS
019 601.0300 Cont. 007+15 LT 0.50 0005 02
Item 601.0300 Total: 6.00
MISCELLANEOUS 0.70 0005 02
AS DIRECTED BY THE ENGINEER 25.00 0005 02
Item 704.0200 Total: 6.00
AS DIRECTED BY THE ENGINEER 6.00 0005 02
022 704.0300 RECONSTRUCT CATCH BASIN/VERTICAL VLF
Item 704.0100 Total: 25.00
I-95 CONTRACT 6
021 704.0200 RECONSTRUCT MANHOLE/CORBEL CONES EACH
Distribution of QuantitiesPage 11 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
100+90 LT 2.00 0005 02
099+01 LT 2.00 0005 02
Item 707.1100 Total: 68.00
110+73 RT 2.00 0005 02
104+51 RT 2.00 0005 02
ROUTE 10 ROAD E
110+88 LT 2.00 0005 02
460+05 RT 2.00 0005 02
457+60 RT 2.00 0005 02
462+02 RT 1.00 0005 02
462+02 LT 1.00 0005 02
AND SIZES
026 708.9041 CLEANING CATCH BASINS ALL TYPES EACH
457+60 LT 1.00 0005 02
I-95 MAIN LINE A
ROUTE 10 RAMP B-EL
024+95 LT 2.00 0005 02
Item 707.0900 Total: 18.00
089+00 RT 2.00 0005 02
088+83 LT 2.00 0005 02
024 707.0900 Cont. 086+33 LT 2.00 0005 02
JEFFERSON BLVD RAMP L
099+02 RT 2.00 0005 02
083+49 LT 2.00 0005 02
082+04 LT 2.00 0005 02
089+00 LT 2.00 0005 02
085+00 LT 2.00 0005 02
I-95 CONTRACT 6
025 707.1100 ADJUST CATCH BASINS EACH
I-95 MAIN LINE B
AS DIRECTED BY THE ENGINEER 50.00 0005 02
Distribution of QuantitiesPage 12 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
489+48 RT 3.00 0005 02
489+48 LT 2.00 0005 02
494+43 LT 1.00 0005 02
492+00 RT 3.00 0005 02
484+48 RT 2.00 0005 02
484+48 LT 2.00 0005 02
487+00 RT 3.00 0005 02
487+00 LT 2.00 0005 02
500+97 RT 1.00 0005 02
499+40 RT 3.00 0005 02
502+42 LT 1.00 0005 02
501+90 LT 1.00 0005 02
496+90 LT 1.00 0005 02
494+50 RT 2.00 0005 02
499+33 LT 1.00 0005 02
496+95 RT 2.00 0005 02
467+15 RT 1.00 0005 02
467+02 RT 1.00 0005 02
469+50 RT 2.00 0005 02
469+50 LT 2.00 0005 02
464+55 LT 1.00 0005 02
026 708.9041 Cont. 462+15 RT 1.00 0005 02
467+02 LT 1.00 0005 02
464+55 RT 2.00 0005 02
472+00 LT 2.00 0005 02
479+48 LT 2.00 0005 02
477+02 RT 2.00 0005 02
481+48 LT 1.00 0005 02
479+48 RT 2.00 0005 02
474+50 LT 2.00 0005 02
472+00 RT 2.00 0005 02
477+02 LT 2.00 0005 02
474+50 RT 2.00 0005 02
Distribution of QuantitiesPage 13 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
516+55 LT 1.00 0005 02
514+06 RT 1.00 0005 02
516+64 LT 1.00 0005 02
516+55 RT 2.00 0005 02
511+60 RT 2.00 0005 02
511+50 RT 1.00 0005 02
514+00 RT 2.00 0005 02
514+00 LT 1.00 0005 02
521+40 LT 1.00 0005 02
519+09 LT 1.00 0005 02
521+52 RT 1.00 0005 02
521+40 RT 1.00 0005 02
519+02 LT 1.00 0005 02
516+64 RT 1.00 0005 02
519+06 RT 1.00 0005 02
519+02 RT 2.00 0005 02
503+00 LT 1.00 0005 02
502+70 RT 1.00 0005 02
503+48 RT 2.00 0005 02
503+07 LT 1.00 0005 02
502+50 RT 2.00 0005 02
026 708.9041 Cont. 502+50 LT 2.00 0005 02
502+58 RT 1.00 0005 02
502+57 LT 1.00 0005 02
506+35 RT 1.00 0005 02
509+00 RT 1.00 0005 02
509+00 LT 1.00 0005 02
511+50 LT 2.00 0005 02
509+06 RT 2.00 0005 02
506+42 RT 1.00 0005 02
506+42 LT 2.00 0005 02
508+90 LT 1.00 0005 02
506+50 RT 1.00 0005 02
Distribution of QuantitiesPage 14 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
536+26 LT 2.00 0005 02
536+16 RT 1.00 0005 02
539+53 LT 1.00 0005 02
536+26 RT 1.00 0005 02
534+75 LT 1.00 0005 02
534+62 RT 1.00 0005 02
536+08 RT 1.00 0005 02
534+75 RT 1.00 0005 02
I-95 MAIN LINE B
546+98 RT 2.00 0005 02
011+02 LT 1.00 0005 02
010+90 LT 1.00 0005 02
541+50 LT 1.00 0005 02
539+53 RT 2.00 0005 02
543+92 RT 2.00 0005 02
541+50 RT 3.00 0005 02
524+10 RT 1.00 0005 02
524+04 RT 1.00 0005 02
526+23 LT 1.00 0005 02
526+12 LT 1.00 0005 02
521+58 RT 1.00 0005 02
026 708.9041 Cont. 521+58 LT 1.00 0005 02
524+04 LT 1.00 0005 02
523+92 RT 1.00 0005 02
526+23 RT 1.00 0005 02
533+02 RT 1.00 0005 02
532+90 RT 1.00 0005 02
533+65 LT 1.00 0005 02
533+53 RT 2.00 0005 02
530+90 RT 1.00 0005 02
526+34 RT 2.00 0005 02
531+00 RT 1.00 0005 02
531+00 LT 2.00 0005 02
Distribution of QuantitiesPage 15 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
030+00 LT 1.00 0005 02
027+63 RT 1.00 0005 02
032+52 LT 1.00 0005 02
030+00 RT 2.00 0005 02
027+54 LT 1.00 0005 02
027+47 RT 1.00 0005 02
027+58 LT 1.00 0005 02
027+54 RT 1.00 0005 02
040+00 LT 1.00 0005 02
037+73 RT 1.00 0005 02
040+37 RT 1.00 0005 02
040+10 2.00 0005 02
035+00 LT 1.00 0005 02
032+52 RT 1.00 0005 02
037+50 LT 1.00 0005 02
035+00 RT 1.00 0005 02
015+00 LT 3.00 0005 02
013+13 RT 1.00 0005 02
015+10 RT 2.00 0005 02
015+00 RT 1.00 0005 02
011+14 RT 1.00 0005 02
026 708.9041 Cont. 011+03 LT 1.00 0005 02
013+00 LT 2.00 0005 02
012+88 LT 1.00 0005 02
017+50 LT 1.00 0005 02
025+00 LT 1.00 0005 02
022+52 RT 1.00 0005 02
027+35 RT 1.00 0005 02
027+35 LT 2.00 0005 02
020+00 LT 1.00 0005 02
017+50 RT 1.00 0005 02
022+48 LT 1.00 0005 02
020+02 RT 1.00 0005 02
Distribution of QuantitiesPage 16 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
075+70 LT/RT 2.00 0005 02
073+43 LT/RT 2.00 0005 02
075+82 LT/RT 2.00 0005 02
075+75 LT/RT 2.00 0005 02
063+00 LT/RT 4.00 0005 02
060+80 LT/RT 2.00 0005 02
071+00 LT/RT 2.00 0005 02
065+50 LT/RT 2.00 0005 02
085+00 LT/RT 3.00 0005 02
083+49 LT/RT 4.00 0005 02
086+50 LT 1.00 0005 02
086+33 LT 1.00 0005 02
078+50 LT/RT 4.00 0005 02
075+86 LT/RT 2.00 0005 02
082+04 LT 1.00 0005 02
080+97 RT 1.00 0005 02
047+84 RT 1.00 0005 02
047+84 LT 1.00 0005 02
053+25 RT 1.00 0005 02
053+25 LT 1.00 0005 02
042+64 RT 1.00 0005 02
026 708.9041 Cont. 042+50 LT 1.00 0005 02
045+25 RT 1.00 0005 02
045+15 LT 1.00 0005 02
055+85 LT 1.00 0005 02
060+52 RT 1.00 0005 02
060+43 LT 1.00 0005 02
060+60 LT/RT 2.00 0005 02
060+54 RT 1.00 0005 02
058+25 LT 1.00 0005 02
055+85 RT 1.00 0005 02
060+42 RT 1.00 0005 02
058+25 RT 1.00 0005 02
Distribution of QuantitiesPage 17 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
107+38 LT 1.00 0005 02
106+85 LT/RT 2.00 0005 02
108+95 LT/RT 2.00 0005 02
108+25 RT 1.00 0005 02
104+58 RT 1.00 0005 02
104+51 RT 2.00 0005 02
105+33 LT 1.00 0005 02
104+77 RT 1.00 0005 02
110+98 LT 1.00 0005 02
110+88 LT 1.00 0005 02
JEFFERSON BLVD CD ROAD
111+63 LT 1.00 0005 02
109+82 LT 1.00 0005 02
109+73 RT 1.00 0005 02
110+73 RT 1.00 0005 02
110+62 RT 1.00 0005 02
091+61 RT 1.00 0005 02
091+53 LT/RT 3.00 0005 02
093+73 RT 1.00 0005 02
092+38 RT 1.00 0005 02
087+26 RT 1.00 0005 02
026 708.9041 Cont. 086+98 RT 1.00 0005 02
090+45 RT 1.00 0005 02
089+00 LT/RT 3.00 0005 02
094+00 LT/RT 3.00 0005 02
102+07 LT 1.00 0005 02
101+67 LT 1.00 0005 02
104+35 LT 1.00 0005 02
102+07 RT 1.00 0005 02
098+48 RT 1.00 0005 02
096+52 LT/RT 4.00 0005 02
101+54 RT 1.00 0005 02
099+02 LT/RT 3.00 0005 02
Distribution of QuantitiesPage 18 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
015+25 RT 1.00 0005 02
013+50 RT 1.00 0005 02
JEFFERSON BLVD RAMP K
016+03 LT 1.00 0005 02
531+00 1.00 0005 02
526+25 1.00 0005 02
JEFFERSON BLVD RAMP J
532+35 1.00 0005 02
022+07 LT 1.00 0005 02
JEFFERSON BLVD RAMP L
025+50 LT 1.00 0005 02
025+25 LT 1.00 0005 02
029+37 RT 1.00 0005 02
027+50 RT 1.00 0005 02
032+93 LT 1.00 0005 02
031+20 LT 1.00 0005 02
498+90 1.00 0005 02
496+62 1.00 0005 02
502+50 1.00 0005 02
500+96 1.00 0005 02
489+48 1.00 0005 02
026 708.9041 Cont. 486+96 1.00 0005 02
494+52 1.00 0005 02
490+97 1.00 0005 02
503+50 1.00 0005 02
522+10 1.00 0005 02
519+00 1.00 0005 02
524+02 1.00 0005 02
522+70 1.00 0005 02
509+30 1.00 0005 02
506+45 1.00 0005 02
516+55 1.00 0005 02
511+48 1.00 0005 02
Distribution of QuantitiesPage 19 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
043+60 RT 1.00 0005 02
ROUTE 10 RAMP C-E
046+07 LT 1.00 0005 02
044+03 LT 1.00 0005 02
090+85 RT 1.00 0005 02
089+00 RT 1.00 0005 02
099+55 RT 1.00 0005 02
093+05 RT 1.00 0005 02
055+00 LT 1.00 0005 02
050+93 LT 1.00 0005 02
060+00 RT 1.00 0005 02
057+00 LT 1.00 0005 02
049+34 LT 1.00 0005 02
047+92 LT 1.00 0005 02
048+75 LT 1.00 0005 02
ROUTE 10 RAMP D-B
010+48 RT 2.00 0005 02
008+00 RT 2.00 0005 02
101+27 RT 1.00 0005 02
ROUTE 10 RAMP A-C
JEFFERSON BLVD RAMP O
026 708.9041 Cont. 026+60 LT 1.00 0005 02
007+63 LT 1.00 0005 02
007+58 LT 1.00 0005 02
106+55 LT 1.00 0005 02
097+52 LT 1.00 0005 02
095+71 LT 1.00 0005 02
ROUTE 10 RAMP B-EL
099+03 LT 1.00 0005 02
ROUTE 10 RAMP B-C
108+02 RT 1.00 0005 02
093+75 LT 1.00 0005 02
091+83 RT 1.00 0005 02
Distribution of QuantitiesPage 20 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
100+12 LT 1.00 0005 02
099+01 LT 1.00 0005 02
Item 708.9041 Total: 368.00
100+90 LT 1.00 0005 02
094+00 LT 1.00 0005 02
086+33 LT 1.00 0005 02
097+13 LT 1.00 0005 02
096+02 LT 1.00 0005 02
467+02 RT 2.00 0005 02
458+30 RT 1.00 0005 02
524+04 RT 1.00 0005 02
521+52 RT 1.00 0005 02
027 708.9042 CLEANING MANHOLES ALL TYPES AND EACH
I-95 MAIN LINE A
SIZES
093+03 LT 1.00 0005 02
092+95 LT 2.00 0005 02
ROUTE 10 RAMP D-EL
094+60 LT 1.00 0005 02
ROUTE 10 RAMP D-E
026 708.9041 Cont. 062+53 RT 1.00 0005 02
089+00 LT 1.00 0005 02
087+45 LT 1.00 0005 02
060+28 RT 1.00 0005 02
091+17 LT 1.00 0005 02
089+40 LT 1.00 0005 02
ROUTE 10 ROAD E
091+38 RT 1.00 0005 02
ROUTE 10 RAMP E-D
062+30 RT 1.00 0005 02
087+97 LT 1.00 0005 02
086+17 LT 1.00 0005 02
Distribution of QuantitiesPage 21 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
032+52 RT 1.00 0005 02
032+50 LT 1.00 0005 02
037+63 RT 1.00 0005 02
034+90 RT 1.00 0005 02
029+87 RT 1.00 0005 02
028+00 RT 1.00 0005 02
032+46 RT 1.00 0005 02
030+00 LT 1.00 0005 02
053+02 LT 1.00 0005 02
047+62 LT 1.00 0005 02
060+70 LT/RT 4.00 0005 02
055+63 LT 1.00 0005 02
040+22 RT 1.00 0005 02
040+22 LT 1.00 0005 02
044+93 LT 1.00 0005 02
042+28 LT 1.00 0005 02
I-95 MAIN LINE B
546+98 RT 1.00 0005 02
012+90 LT 1.00 0005 02
010+93 LT 1.00 0005 02
531+00 RT 1.00 0005 02
027 708.9042 Cont. 526+23 RT 1.00 0005 02
539+40 RT 2.00 0005 02
536+08 RT 1.00 0005 02
014+87 LT 1.00 0005 02
027+47 LT 1.00 0005 02
027+35 RT 1.00 0005 02
027+77 RT 1.00 0005 02
027+47 RT 1.00 0005 02
019+91 RT 1.00 0005 02
017+40 RT 1.00 0005 02
024+90 RT 1.00 0005 02
022+39 RT 1.00 0005 02
Distribution of QuantitiesPage 22 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
047+56 LT/RT 2.00 0005 02
ROUTE 10 RAMP D-B
ROUTE 10 RAMP D-E
056+85 LT 1.00 0005 02
091+30 LT 1.00 0005 02
089+00 RT 1.00 0005 02
099+45 RT 1.00 0005 02
098+48 LT 1.00 0005 02
091+55 RT 1.00 0005 02
ROUTE 10 RAMP E-D
087+50 LT 1.00 0005 02
ROUTE 10 ROAD E
ROUTE 10 RAMP D-EL
094+10 LT 1.00 0005 02
061+18 RT 1.00 0005 02
059+08 LT 1.00 0005 02
093+88 LT/RT 2.00 0005 02
090+00 RT 1.00 0005 02
096+64 LT/RT 2.00 0005 02
093+95 LT 1.00 0005 02
075+63 RT 1.00 0005 02
027 708.9042 Cont. 075+58 LT 1.00 0005 02
086+53 RT 1.00 0005 02
086+33 LT 1.00 0005 02
099+02 RT 1.00 0005 02
500+96 1.00 0005 02
JEFFERSON BLVD CD ROAD
ROUTE 10 RAMP B-EL
501+40 1.00 0005 02
104+35 LT 1.00 0005 02
101+67 RT 1.00 0005 02
108+36 RT 1.00 0005 02
106+85 LT 1.00 0005 02
Distribution of QuantitiesPage 23 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
065+50 1.00 0005 02
058+25 1.00 0005 02
073+43 1.00 0005 02
071+00 1.00 0005 02
047+84 1.00 0005 02
045+15 1.00 0005 02
055+85 1.00 0005 02
053+25 1.00 0005 02
Item 708.9901 Total: 20.00
SIZES
029 708.9902 CLEANING AND FLUSHING PIPE ALL LF
083+42 1.00 0005 02
081+00 1.00 0005 02
088+83 1.00 0005 02
086+42 1.00 0005 02
Item 708.9042 Total: 75.00
101+08 LT 1.00 0005 02
028 708.9901 CLEAN SPECIAL DRAINAGE INLET EACH
091+37 RT 1.00 0005 02
027 708.9042 Cont. 091+02 LT 1.00 0005 02
100+02 LT 1.00 0005 02
098+75 LT 1.00 0005 02
I-95 MAIN LINE B
035+00 1.00 0005 02
032+62 1.00 0005 02
042+50 1.00 0005 02
037+50 1.00 0005 02
020+00 1.00 0005 02
017+50 1.00 0005 02
025+00 1.00 0005 02
022+48 1.00 0005 02
Distribution of QuantitiesPage 24 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
479+48 RT 114.00 0005 02
479+48 LT 58.00 0005 02
484+48 LT 112.00 0005 02
481+48 LT 60.00 0005 02
474+50 RT 104.00 0005 02
474+50 LT 60.00 0005 02
477+02 RT 104.00 0005 02
477+02 LT 62.00 0005 02
492+00 RT 56.00 0005 02
489+48 RT 56.00 0005 02
494+50 RT 58.00 0005 02
494+43 LT - 494+50 RT 10.00 0005 02
487+00 LT 112.00 0005 02
484+48 RT 46.00 0005 02
489+48 LT 56.00 0005 02
487+00 RT 28.00 0005 02
460+05 RT 56.00 0005 02
460+05 - 460+60 RT 62.00 0005 02
462+02 LT 102.00 0005 02
462+02 - 462+12 RT 10.00 0005 02
457+60 - 458+30 RT 76.00 0005 02
029 708.9902 Cont. I-95 MAIN LINE A
458+30 - 460+05 RT 172.00 0005 02
457+60 RT 90.00 0005 02
464+55 RT 90.00 0005 02
469+50 RT 104.00 0005 02
469+50 LT 50.00 0005 02
472+00 RT 108.00 0005 02
472+00 LT 56.00 0005 02
467+02 - 467+15 RT 10.00 0005 02
466+40 - 467+02 RT 60.00 0005 02
467+02 RT 104.00 0005 02
467+02 - 467+20 RT 14.00 0005 02
Distribution of QuantitiesPage 25 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
514+00 LT 104.00 0005 02
511+50 RT 82.00 0005 02
516+55 LT 112.00 0005 02
514+00 RT 60.00 0005 02
508+90 - 509+00 LT 56.00 0005 02
506+42 RT 74.00 0005 02
511+50 LT 90.00 0005 02
509+00 RT 80.00 0005 02
521+54 RT 70.00 0005 02
521+54 - 523+90 RT 236.00 0005 02
524+04 RT 64.00 0005 02
524+04 LT 74.00 0005 02
519+02 LT 112.00 0005 02
516+55 RT 64.00 0005 02
521+52 LT 116.00 0005 02
519+02 RT 64.00 0005 02
502+00 - 502+50 LT 46.00 0005 02
501+90 - 502+00 LT 6.00 0005 02
502+50 - 502+56 LT 4.00 0005 02
502+42 - 502+50 LT 6.00 0005 02
496+95 RT 58.00 0005 02
029 708.9902 Cont. 496+90 LT - 496+95 RT 10.00 0005 02
499+40 RT 54.00 0005 02
499+32 LT - 499+40 RT 8.00 0005 02
502+50 - 503+00 LT 46.00 0005 02
503+48 RT 4.00 0005 02
503+00 - 503+08 LT 6.00 0005 02
506+42 LT 134.00 0005 02
506+42 - 506+50 RT 6.00 0005 02
502+50 LT - 502+60 RT 8.00 0005 02
502+50 LT 84.00 0005 02
502+60 - 502+66 RT 4.00 0005 02
502+52 RT 4.00 0005 02
Distribution of QuantitiesPage 26 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
539+53 LT 95.00 0005 02
539+53 - 541+50 RT 192.00 0005 02
541+50 LT 82.00 0005 02
541+50 - 543+92 RT 236.00 0005 02
536+26 LT/RT 4.00 0005 02
536+26 LT 82.00 0005 02
539+46 RT 40.00 0005 02
539+40 RT 44.00 0005 02
I-95 MAIN LINE B
546+98 RT 92.00 0005 02
010+95 RT 8.00 0005 02
010+93 - 011+02 64.00 0005 02
543+92 - 546+98 RT 300.00 0005 02
541+50 RT 74.00 0005 02
546+98 - 10+00 RT 220.00 0005 02
543+92 RT 90.00 0005 02
531+00 - 533+55 RT 250.00 0005 02
530+95 RT 6.00 0005 02
531+00 RT 96.00 0005 02
531+00 LT 58.00 0005 02
526+23 - 526+34 RT 18.00 0005 02
029 708.9902 Cont. 526+12 LT - 526+23 RT 8.00 0005 02
526+23 RT 58.00 0005 02
526+23 LT 72.00 0005 02
532+36 - 533+55 RT 132.00 0005 02
536+12 RT 40.00 0005 02
534+75 LT/RT 74.00 0005 02
536+26 - 539+52 RT 316.00 0005 02
536+22 RT 46.00 0005 02
533+53 - 534+75 RT 116.00 0005 02
533+02 - 534+62 RT 154.00 0005 02
533+60 LT 8.00 0005 02
533+53 RT 4.00 0005 02
Distribution of QuantitiesPage 27 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
027+35 - 027+47 LT 8.00 0005 02
027+20 - 027+36 RT 22.00 0005 02
027+35 LT 6.00 0005 02
027+35 - 027+47 RT 8.00 0005 02
024+77 - 024+90 RT 22.00 0005 02
022+48 LT 56.00 0005 02
025+00 LT 56.00 0005 02
024+90 - 025+00 RT 64.00 0005 02
027+70 - 027+77 RT 18.00 0005 02
027+47 LT 64.00 0005 02
027+85 - 028+00 LT 76.00 0005 02
027+77 - 028+00 RT 64.00 0005 02
027+47 - 027+54 8.00 0005 02
027+36 - 027+47 RT 74.00 0005 02
027+47 - 027+60 RT 8.00 0005 02
027+47 - 027+54 LT 8.00 0005 02
015+00 LT - 015+10 RT 12.00 0005 02
014+87 - 015+00 LT 68.00 0005 02
017+32 - 017+39 RT 30.00 0005 02
015+00 RT 80.00 0005 02
012+83 - 012+90 LT 40.00 0005 02
029 708.9902 Cont. 011+02 LT 8.00 0005 02
014+77 - 014+87 LT 40.00 0005 02
012+90 - 15+00 LT 76.00 0005 02
017+39 - 017+50 RT 76.00 0005 02
022+30 - 022+39 RT 28.00 0005 02
020+00 LT 56.00 0005 02
022+39 - 022+52 RT 8.00 0005 02
022+39 - 022+48 RT 64.00 0005 02
019+78 - 019+91 RT 30.00 0005 02
017+50 LT 58.00 0005 02
019+91 - 20+02 RT 8.00 0005 02
019+91 - 20+00 RT 68.00 0005 02
Distribution of QuantitiesPage 28 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
045+15 LT 54.00 0005 02
045+15 - 045+25 RT 56.00 0005 02
047+84 LT 56.00 0005 02
047+62 - 047+84 LT 16.00 0005 02
042+50 - 042+64 RT 56.00 0005 02
042+28 - 042+50 LT 18.00 0005 02
044+93 - 045+15 LT 18.00 0005 02
042+50 LT 56.00 0005 02
055+85 LT 56.00 0005 02
055+63 - 055+85 LT 18.00 0005 02
058+03 - 058+25 LT 18.00 0005 02
055+85 RT 56.00 0005 02
053+02 - 053+25 LT 18.00 0005 02
047+84 RT 56.00 0005 02
053+25 RT 56.00 0005 02
053+25 LT 56.00 0005 02
032+40 - 032+52 RT 72.00 0005 02
032+30 - 032+40 RT 16.00 0005 02
032+52 LT 72.00 0005 02
032+52 - 032+62 RT 8.00 0005 02
029+77 - 029+87 RT 24.00 0005 02
029 708.9902 Cont. 028+00 - 029+00 LT 128.00 0005 02
030+00 LT 62.00 0005 02
029+87 - 030+00 RT 64.00 0005 02
034+90 - 035+00 RT 68.00 0005 02
040+12 - 040+22 12.00 0005 02
040+00 - 040+22 LT 16.00 0005 02
040+22 LT 114.00 0005 02
040+22 - 040+37 RT 52.00 0005 02
037+50 - 037+67 RT 12.00 0005 02
035+00 LT 56.00 0005 02
037+67 - 037+73 RT 56.00 0005 02
037+50 LT 56.00 0005 02
Distribution of QuantitiesPage 29 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
075+70 LT/RT 6.00 0005 02
075+63 - 075+85 RT 12.00 0005 02
078+35 - 078+50 RT 10.00 0005 02
075+75 - 075+87 LT 6.00 0005 02
075+58 - 075+75 LT 8.00 0005 02
073+43 LT 56.00 0005 02
075+58 LT 56.00 0005 02
075+58 - 075+83 LT/RT 32.00 0005 02
083+49 - 085+00 LT 146.00 0005 02
083+23 - 083+49 LT/RT 94.00 0005 02
086+22 - 086+50 LT/RT 104.00 0005 02
083+49 - 085+00 RT 146.00 0005 02
080+75 - 081+00 LT 32.00 0005 02
078+50 LT/RT 62.00 0005 02
081+00 - 081+23 LT 22.00 0005 02
080+90 - 082+04 LT 118.00 0005 02
060+60 - 060+70 LT 4.00 0005 02
060+54 - 060+70 RT 12.00 0005 02
060+70 - 060+80 LT 6.00 0005 02
060+60 - 060+70 RT 4.00 0005 02
060+42 - 060+48 RT 4.00 0005 02
029 708.9902 Cont. 058+25 LT 56.00 0005 02
060+54 - 060+70 LT 12.00 0005 02
060+43 - 060+54 LT 6.00 0005 02
060+70 - 060+80 RT 6.00 0005 02
070+77 - 071+00 LT 18.00 0005 02
065+50 LT/RT 112.00 0005 02
073+25 - 073+43 RT 16.00 0005 02
071+00 LT/RT 112.00 0005 02
060+78 - 063+00 LT 18.00 0005 02
060+70 LT/RT 70.00 0005 02
065+26 - 065+50 LT 18.00 0005 02
063+00 LT/RT 62.00 0005 02
Distribution of QuantitiesPage 30 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
109+33 - 111+63 LT/RT 232.00 0005 02
108+25 - 109+80 LT/RT 358.00 0005 02
486+96 66.00 0005 02
JEFFERSON BLVD CD ROAD
101+67 - 104+35 LT 270.00 0005 02
101+54 - 102+07 LT/RT 188.00 0005 02
106+85 - 107+38 LT 116.00 0005 02
104+35 - 105+33 LT/RT 252.00 0005 02
496+92 - 496+80 48.00 0005 02
496+62 - 496+96 42.00 0005 02
498+90 - 499+36 56.00 0005 02
498+90 24.00 0005 02
490+62 - 490+96 70.00 0005 02
489+48 66.00 0005 02
494+52 66.00 0005 02
490+96 - 491+98 100.00 0005 02
091+61 - 092+35 RT 60.00 0005 02
091+35 - 093+95 LT 260.00 0005 02
093+88 - 094+63 RT 144.00 0005 02
093+73 - 093+88 RT 10.00 0005 02
090+03 LT/RT 162.00 0005 02
029 708.9902 Cont. 088+83 - 089+00 LT/RT 188.00 0005 02
091+35 - 091+61 LT/RT 112.00 0005 02
090+45 - 091+61 RT 120.00 0005 02
093+88 LT/RT 122.00 0005 02
096+64 - 097+65 RT 108.00 0005 02
096+52 LT/RT 110.00 0005 02
098+48 - 099+02 LT/RT 162.00 0005 02
096+64 LT/RT 122.00 0005 02
094+00 - 096+64 LT 250.00 0005 02
093+95 - 094+00 LT 4.00 0005 02
096+52 - 096+64 RT 8.00 0005 02
094+00 LT 56.00 0005 02
Distribution of QuantitiesPage 31 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
023+60 LT/RT 50.00 0005 02
022+07 LT 34.00 0005 02
025+15 LT/RT 64.00 0005 02
025+02 LT/RT 22.00 0005 02
008+00 RT 8.00 0005 02
008+00 - 010+48 RT 244.00 0005 02
022+05 LT/RT 40.00 0005 02
010+48 RT 8.00 0005 02
ROUTE 10 RAMP B-C
108+02 RT 22.00 0005 02
095+71 - 097+52 LT 174.00 0005 02
093+75 - 095+71 LT 188.00 0005 02
031+20 - 032+90 LT 168.00 0005 02
025+60 - 026+54 LT 80.00 0005 02
ROUTE 10 RAMP A-C
031+20 LT/RT 34.00 0005 02
506+45 34.00 0005 02
503+50 92.00 0005 02
511+48 34.00 0005 02
509+00 - 509+25 130.00 0005 02
501+00 - 501+40 42.00 0005 02
029 708.9902 Cont. 500+96 62.00 0005 02
502+50 92.00 0005 02
501+40 32.00 0005 02
516+55 36.00 0005 02
JEFFERSON BLVD RAMP O
526+25 40.00 0005 02
007+63 LT - 008+00 RT 24.00 0005 02
007+58 - 007+63 LT 60.00 0005 02
521+55 - 522+10 66.00 0005 02
519+00 34.00 0005 02
524+00 36.00 0005 02
522+10 - 522+70 56.00 0005 02
Distribution of QuantitiesPage 32 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
063+80 LT/RT 80.00 0005 02
060+00 - 062+53 RT 250.00 0005 02
087+48 LT 32.00 0005 02
ROUTE 10 RAMP D-E
055+00 - 057+00 LT 328.00 0005 02
047+56 - 048+75 LT 114.00 0005 02
059+22 LT - 060+00 RT 108.00 0005 02
056+84 LT - 057+45 RT 132.00 0005 02
061+18 - 062+30 RT 120.00 0005 02
060+28 - 061+18 RT 84.00 0005 02
086+17 LT 28.00 0005 02
ROUTE 10 RAMP E-D
092+95 60.00 0005 02
089+00 LT/RT 108.00 0005 02
059+15 40.00 0005 02
ROUTE 10 RAMP D-EL
098+50 - 090+45 108.00 0005 02
091+30 - 091+80 LT 46.00 0005 02
099+45 - 099+75 RT 46.00 0005 02
099+45 16.00 0005 02
ROUTE 10 RAMP B-EL
029 708.9902 Cont. 097+52 - 099+03 LT 146.00 0005 02
090+85 RT - 091+30 LT 48.00 0005 02
089+80 LT/RT 136.00 0005 02
ROUTE 10 RAMP C-E
049+34 LT 38.00 0005 02
047+92 LT 26.00 0005 02
047+56 26.00 0005 02
ROUTE 10 RAMP D-B
043+60 RT - 044+03 LT 50.00 0005 02
043+03 - 043+60 RT 60.00 0005 02
047+30 RT - 047+92 LT 92.00 0005 02
046+07 LT 22.00 0005 02
Distribution of QuantitiesPage 33 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item 708.9902 Total: 21,095.00
101+08 - 101+80 RT 78.00 0005 02
S030 709.9901 INSPECTION, GPS AND DOCUMENTATION LF
100+12 - 101+08 LT 96.00 0005 02
100+02 - 100+12 LT 6.00 0005 02
101+08 - 101+50 LT 84.00 0005 02
100+90 - 101+08 LT 22.00 0005 02
Item 709.9901 Total: 21,095.00
- STRUCTURE
S031 709.9902 INSPECTION, GPS AND DOCUMENTATION EACH
I-95 CONTRACT 6
- PIPE
708.9902 (/2)
FROM ITEM CODE ITEM CODE 21,095.00 0005 02
086+33 LT - 086+50 RT 26.00 0005 02
ROUTE 10 ROAD E
091+02 - 091+56 LT 58.00 0005 02
086+50 RT - 087+50 LT 102.00 0005 02
091+17 LT - 091+38 RT 26.00 0005 02
029 708.9902 Cont. 087+97 LT 26.00 0005 02
091+53 LT/RT 52.00 0005 02
091+38 - 091+55 RT 14.00 0005 02
091+02 LT - 091+37 RT 44.00 0005 02
098+75 - 099+01 LT 28.00 0005 02
096+72 RT - 098+75 LT 204.00 0005 02
099+01 - 100+02 LT 128.00 0005 02
098+75 LT - 098+98 RT 42.00 0005 02
096+02 - 096+13 LT 26.00 0005 02
093+97 34.00 0005 02
096+72 RT - 097+13 LT 48.00 0005 02
096+60 LT - 096+72 RT 54.00 0005 02
Distribution of QuantitiesPage 34 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
479+50 LT 1.00 0005 02
477+02 RT 1.00 0005 02
481+48 LT 1.00 0005 02
479+50 RT 1.00 0005 02
474+50 LT 1.00 0005 02
472+00 RT 1.00 0005 02
477+02 LT 1.00 0005 02
474+50 RT 1.00 0005 02
511+52 LT 1.00 0005 02
506+43 LT 1.00 0005 02
516+55 LT 1.00 0005 02
514+00 LT 1.00 0005 02
484+48 RT 1.00 0005 02
484+48 LT 1.00 0005 02
502+50 LT 1.00 0005 02
487+00 LT 1.00 0005 02
Item 709.9902 Total: 463.00
- OUTFALL
S032 709.9903 INSPECTION, GPS AND DOCUMENTATION EACH
FROM ITEM CODE 708.9041 368.00 0005 02
S031 709.9902 Cont. I-95 CONTRACT 6
FROM ITEM CODE 708.9901 20.00 0005 02
FROM ITEM CODE 708.9042 75.00 0005 02
I-95 MAIN LINE A
469+50 LT 1.00 0005 02
467+30 RT 1.00 0005 02
472+00 LT 1.00 0005 02
469+50 RT 1.00 0005 02
462+00 LT 1.00 0005 02
460+60 RT 1.00 0005 02
466+40 RT 1.00 0005 02
464+55 RT 1.00 0005 02
Distribution of QuantitiesPage 35 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
502+50 1.00 0005 02
501+40 1.00 0005 02
JEFFERSON BLVD RAMP J
503+50 1.00 0005 02
490+62 1.00 0005 02
489+48 1.00 0005 02
498+90 1.00 0005 02
494+52 1.00 0005 02
022+05 LT 1.00 0005 02
022+00 RT 1.00 0005 02
ROUTE 10 RAMP A-C
023+50 LT 1.00 0005 02
JEFFERSON BLVD RAMP K
013+50 RT 1.00 0005 02
JEFFERSON BLVD RAMP L
031+15 RT 1.00 0005 02
012+80 LT 1.00 0005 02
010+80 LT 1.00 0005 02
017+30 RT 1.00 0005 02
014+80 LT 1.00 0005 02
521+43 LT 1.00 0005 02
S032 709.9903 Cont. 519+03 LT 1.00 0005 02
010+00 RT 1.00 0005 02
I-95 MAIN LINE B
019+80 RT 1.00 0005 02
032+30 RT 1.00 0005 02
029+75 RT 1.00 0005 02
486+96 1.00 0005 02
JEFFERSON BLVD CD ROAD
024+75 RT 1.00 0005 02
022+30 RT 1.00 0005 02
027+70 RT 1.00 0005 02
027+20 RT 1.00 0005 02
Distribution of QuantitiesPage 36 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
034 803.9910 REMOVE AND DISPOSE PORTIONS OF CY
BRIDGES
EXISTING CONCRETE SUBSTRUCTURE
BRIDGE NO. 677 500.00 0014 01
BRIDGE NO. 676 600.00 0014 01
Item 803.0500 Total: 1,600.00
BRIDGE NO. 678 500.00 0014 01
035 803.9920 REMOVE AND DISPOSE PORTIONS OF CY
BRIDGES
EXISTING CONCRETE SUPERSTRUCTURE
BRIDGE NO. 677 12.25 0014 01
BRIDGE NO. 676 15.50 0014 01
Item 803.9910 Total: 40.00
BRIDGE NO. 678 12.25 0014 01
ROUTE 10 RAMP E-D
049+35 LT 1.00 0005 02
087+95 LT 1.00 0005 02
086+20 LT 1.00 0005 02
ROUTE 10 RAMP C-E
S032 709.9903 Cont. 108+00 RT 1.00 0005 02
047+90 LT 1.00 0005 02
046+05 LT 1.00 0005 02
091+45 LT 1.00 0005 02
033 803.0500 TEMPORARY DECK UNDERSIDE AND SIDE SF
BRIDGES
PROTECTIVE SHIELDING
096+10 LT 1.00 0005 02
ROUTE 10 ROAD E
Item 709.9903 Total: 60.00
096+60 LT 1.00 0005 02
Distribution of QuantitiesPage 37 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
3/4'' BRIDGE DECKS
038 808.1501 CONCRETE SUPERSTRUCTURE CLASS HP CY
BRIDGE NO. 676 16.00 0014 01
BRIDGES
BRIDGE NO. 678 2.25 0014 01
BRIDGE NO. 677 2.25 0014 01
Item 808.0602 Total: 7.00
3/4'' BRIDGE SIDEWALKS
039 808.1502 CONCRETE SUPERSTRUCTURE CLASS HP CY
BRIDGE NO. 676 2.00 0014 01
BRIDGES
BRIDGE NO. 678 13.00 0014 01
BRIDGE NO. 677 13.00 0014 01
Item 808.1501 Total: 42.00
036 808.0508 CONCRETE SUBSTRUCTURE CLASS XX CY
BRIDGES
3/4'' APPROACH SLABS
BRIDGE NO. 677 8.50 0014 01
035 803.9920 Cont. BRIDGE NO. 676 10.00 0014 01
Item 803.9920 Total: 27.00
BRIDGE NO. 678 8.50 0014 01
BRIDGE NO. 676 9.00 0014 01
3/4'' BACKWALLS
037 808.0602 CONCRETE SUBSTRUCTURE CLASS HP CY
BRIDGE NO. 676 2.50 0014 01
BRIDGES
BRIDGE NO. 678 7.00 0014 01
BRIDGE NO. 677 7.00 0014 01
Item 808.0508 Total: 23.00
Distribution of QuantitiesPage 38 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGES
SEALANT
BRIDGE NO. 661 590.00 0005 02
BRIDGE NO. 660 800.00 0014 01
Item 808.1642 Total: 780.00
BRIDGE NO. 678 245.00 0014 01
042 808.1675 POLYURETHANE ELASTOMERIC JOINT CI
BRIDGE NO. 680 280.00 0005 02
BRIDGE NO. 678 1,300.00 0014 01
Item 808.1675 Total: 6,600.00
BRIDGE NO. 663 460.00 0005 02
BRIDGE NO. 662 370.00 0005 02
BRIDGE NO. 677 1,300.00 0014 01
BRIDGE NO. 676 1,500.00 0014 01
FILLER 1/2''
040 808.1640 PREFORMED POLYETHYLENE FOAM JOINT SF
BRIDGE NO. 676 5.00 0014 01
BRIDGES
BRIDGE NO. 678 2.00 0014 01
039 808.1502 Cont. BRIDGE NO. 677 2.00 0014 01
Item 808.1502 Total: 6.00
BRIDGE NO. 677 30.00 0014 01
BRIDGES
FILLER 1''
BRIDGE NO. 677 245.00 0014 01
BRIDGE NO. 676 290.00 0014 01
Item 808.1640 Total: 65.00
BRIDGE NO. 678 30.00 0014 01
041 808.1642 PREFORMED POLYETHYLENE FOAM JOINT SF
Distribution of QuantitiesPage 39 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item 810.9911 Total: 120.00
MEMBRANE
S046 813.9910 PREFABRICATED WATERPROOFING SHEET SY
BRIDGE NO. 676 40.00 0014 01
BRIDGES
BRIDGE NO. 678 40.00 0014 01
BRIDGE NO. 677 40.00 0014 01
BRIDGE NO. 676 65.00 0014 01
BRIDGE NO. 663 22.00 0005 02
BRIDGE NO. 678 50.00 0014 01
BRIDGE NO. 677 50.00 0014 01
BRIDGE NO. 660 325.00 0014 01
BRIDGES
BRIDGE NO. 662 13.00 0005 02
BRIDGE NO. 661 115.00 0005 02
BRIDGE NO. 678 60.00 0014 01
BRIDGE NO. 677 215.00 0014 01
Item 808.1810 Total: 435.00
REGULAR
043 808.1810 CONCRETE SURFACE FINISHING RUBBED SF
BRIDGE NO. 676 160.00 0014 01
BRIDGES
044 810.0210 GALVANIZED BAR REINFORCEMENT GRADE LBS
Item 810.0210 Total: 14,500.00
BRIDGE NO. 678 4,500.00 0014 01
045 810.9911 GALVANIZED MECHANICAL BAR SPLICERS EACH
BRIDGES
60
BRIDGE NO. 677 4,500.00 0014 01
BRIDGE NO. 676 5,500.00 0014 01
Distribution of QuantitiesPage 40 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item 818.9901 Total: 100,000.00
AS DIRECTED BY THE ENGINEER 100,000.00 0014 01
050 819.0800 DRILL AND GROUT REINFORCING DOWELS EACH
049 818.9901 PORTLAND CEMENT CONCRETE DECK EACH
BRIDGE NO. 660
REPAIRS (PARTIAL DEPTH REMOVAL)
Item 819.0800 Total: 485.00
(PROTECTIVE COATING)
051 820.0110 CONCRETE SURFACE TREATMENT SF
BRIDGE NO. 676 185.00 0014 01
BRIDGES
BRIDGE NO. 678 150.00 0014 01
BRIDGE NO. 677 150.00 0014 01
BRIDGE NO. 676 40.00 0014 01
BRIDGES
BRIDGE NO. 678 15.00 0014 01
BRIDGE NO. 677 55.00 0014 01
S046 813.9910 Cont. Item 813.9910 Total: 640.00
MASONRY (PATCHING MORTAR)
047 817.9901 REPAIRS TO STRUCTURAL CONCRETE SF
Item 817.9901 Total: 110.00
BRIDGE NO. 677 160.00 0014 01
BRIDGE NO. 676 120.00 0014 01
Item 817.9902 Total: 325.00
BRIDGE NO. 678 45.00 0014 01
048 817.9902 REPAIRS TO STRUCTURAL CONCRETE SF
BRIDGES
MASONRY (FORM AND CAST IN PLACE)
Distribution of QuantitiesPage 41 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
536+00 - 548+00 RT 3,971.00 0005 02
536+00 - 548+00 LT 3,968.00 0005 02
539+49 - 543+02 RT 1,202.00 0005 02
536+00 - 548+00 TOP SLAB 2,392.00 0005 02
525+00 - 536+00 LT 3,652.00 0005 02
513+00 - 525+00 RT 3,984.00 0005 02
527+80 - 536+00 TOP SLAB 1,640.00 0005 02
525+00 - 536+00 RT 3,652.00 0005 02
020+00 - 032+00 RT 4,011.00 0005 02
020+00 - 032+00 LT 4,011.00 0005 02
032+00 - 044+00 LT 3,984.00 0005 02
026+60 - 030+80 TOP SLAB 2,758.00 0005 02
548+00 - 020+00 RT 3,732.00 0005 02
548+00 - 020+00 LT 3,729.00 0005 02
I-95 MAIN LINE B
548+00 - 020+00 TOP SLAB 2,248.00 0005 02
457+00 - 465+00 LT 2,656.00 0005 02
I-95 MAIN LINE A
465+00 - 477+00 LT 3,984.00 0005 02
457+00 - 465+00 RT 2,656.00 0005 02
BRIDGE NO. 676 2,200.00 0014 01
051 820.0110 Cont. BRIDGES
BRIDGE NO. 678 1,900.00 0014 01
BRIDGE NO. 677 1,900.00 0014 01
465+00 - 477+00 RT 3,984.00 0005 02
501+00 - 513+00 RT 3,984.00 0005 02
501+00 - 513+00 LT 3,984.00 0005 02
513+00 - 525+00 LT 3,984.00 0005 02
513+00 - 516+20 (TOP SLAB) 1,600.00 0005 02
477+00 - 489+00 RT 3,984.00 0005 02
477+00 - 489+00 LT 3,984.00 0005 02
489+00 - 501+00 RT 3,984.00 0005 02
489+00 - 501+00 LT 3,984.00 0005 02
Distribution of QuantitiesPage 42 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
098+45 - 104+00 RT 1,956.00 0005 02
092+00 - 104+00 RT 4,044.00 0005 02
104+00 - 106+32 LT 781.00 0005 02
104+00 - 105+43 RT 482.00 0005 02
092+00 - 092+31 RT 103.00 0005 02
090+41 - 092+00 RT 522.00 0005 02
092+00 - 104+00 LT 8,111.00 0005 02
092+00 - 100+30 TOP SLAB 3,690.00 0005 02
045+70 - 047+50 RT 681.00 0005 02
ROUTE 10 RAMP C-E
045+22 - 048+88 RT 1,209.00 0005 02
ROUTE 10 RAMP D-B
104+00 - 111+26 RT 2,431.00 0005 02
104+00 - 111+26 LT 2,431.00 0005 02
098+98 - 107+30 RT 2,809.00 0005 02
ROUTE 10 RAMP A-C
056+00 - 068+00 LT 3,984.00 0005 02
044+00 - 056+00 TOP SLAB 2,400.00 0005 02
056+00 - 068+00 TOP SLAB 2,700.00 0005 02
056+00 - 068+00 RT 3,984.00 0005 02
032+00 - 044+00 TOP SLAB 1,552.00 0005 02
051 820.0110 Cont. 032+00 - 044+00 RT 3,984.00 0005 02
044+00 - 056+00 RT 3,984.00 0005 02
044+00 - 056+00 LT 3,984.00 0005 02
068+00 - 080+00 LT 3,984.00 0005 02
080+00 - 092+00 RT 3,988.00 0005 02
080+00 - 092+00 LT 3,988.00 0005 02
090+30 - 092+00 TOP SLAB 714.00 0005 02
085+70 - 092+00 LT 2,102.00 0005 02
068+00 - 080+00 TOP SLAB 2,372.00 0005 02
068+00 - 080+00 RT 3,984.00 0005 02
080+00 - 085+70 LT 1,906.00 0005 02
077+17 - 080+00 LT 937.00 0005 02
Distribution of QuantitiesPage 43 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 618 1.00 0014 01
BRIDGE NO. 618
Item 820.9901 Total: 1.00
Item 820.0110 Total: 237,368.00
BRIDGE NO. 618
052 820.9901 HIGH PRESSURE WATER CLEANING - LS
Item 820.9902 Total: 1.00
BRIDGE NO. 632
054 820.9903 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 619
053 820.9902 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 619 1.00 0014 01
BRIDGE NO. 619
085+70 - 092+05 RT 2,102.00 0005 02
ROUTE 10 ROAD E
092+05 - 104+15 RT 4,067.00 0005 02
085+70 - 092+05 TOP SLAB 2,430.00 0005 02
060+77 - 068+68 TOP SLAB 3,238.00 0005 02
051 820.0110 Cont. 060+77 - 068+68 LT 2,334.00 0005 02
085+70 - 088+05 LT 800.00 0005 02
ROUTE 10 RAMP D-E
092+05 - 104+15 TOP SLAB 4,340.00 0005 02
501+00 - 513+00 9,600.00 0005 02
489+00 - 501+00 9,600.00 0005 02
525+00 - 534+67 7,763.00 0005 02
513+00 - 525+00 9,600.00 0005 02
104+15 - 106+48 TOP SLAB 495.00 0005 02
104+15 - 106+48 RT 780.00 0005 02
485+60 - 489+00 2,720.00 0005 02
ROUTE 37 CD ROAD
Distribution of QuantitiesPage 44 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
058 820.9907 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 652
BRIDGE NO. 652
BRIDGE NO. 651
BRIDGE NO. 651
Item 820.9906 Total: 1.00
BRIDGE NO. 651 1.00 0014 01
BRIDGE NO. 653
BRIDGE NO. 653
Item 820.9908 Total: 1.00
BRIDGE NO. 653 1.00 0014 01
Item 820.9907 Total: 1.00
BRIDGE NO. 652 1.00 0014 01
059 820.9908 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 633
055 820.9904 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 633 1.00 0014 01
BRIDGE NO. 633
BRIDGE NO. 632 1.00 0014 01
054 820.9903 Cont. BRIDGE NO. 632
Item 820.9903 Total: 1.00
Item 820.9904 Total: 1.00
Item 820.9905 Total: 1.00
BRIDGE NO. 639 1.00 0014 01
057 820.9906 HIGH PRESSURE WATER CLEANING - LS
056 820.9905 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 639
BRIDGE NO. 639
Distribution of QuantitiesPage 45 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 658 1.00 0014 01
Item 820.9912 Total: 1.00
BRIDGE NO. 658
063 820.9912 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 658
064 820.9913 HIGH PRESSURE WATER CLEANING - LS
065 820.9914 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 661
Item 820.9913 Total: 1.00
BRIDGE NO. 659
BRIDGE NO. 659
BRIDGE NO. 659 1.00 0014 01
Item 820.9911 Total: 1.00
Item 820.9909 Total: 1.00
BRIDGE NO. 656
061 820.9910 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 655
060 820.9909 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 655 1.00 0014 01
BRIDGE NO. 655
BRIDGE NO. 657
062 820.9911 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 657 1.00 0014 01
BRIDGE NO. 657
BRIDGE NO. 656 1.00 0014 01
BRIDGE NO. 656
Item 820.9910 Total: 1.00
Distribution of QuantitiesPage 46 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
069 820.9918 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 678
BRIDGE NO. 678
BRIDGE NO. 677
BRIDGE NO. 677
Item 820.9917 Total: 1.00
BRIDGE NO. 677 1.00 0014 01
BRIDGE NO. 680
BRIDGE NO. 680
Item 820.9919 Total: 1.00
BRIDGE NO. 680 1.00 0014 01
Item 820.9918 Total: 1.00
BRIDGE NO. 678 1.00 0014 01
070 820.9919 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 665
066 820.9915 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 665 1.00 0014 01
BRIDGE NO. 665
BRIDGE NO. 661 1.00 0014 01
065 820.9914 Cont. BRIDGE NO. 661
Item 820.9914 Total: 1.00
Item 820.9915 Total: 1.00
Item 820.9916 Total: 1.00
BRIDGE NO. 676 1.00 0014 01
068 820.9917 HIGH PRESSURE WATER CLEANING - LS
067 820.9916 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 676
BRIDGE NO. 676
Distribution of QuantitiesPage 47 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 684 1.00 0014 01
Item 820.9923 Total: 1.00
BRIDGE NO. 684
074 820.9923 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 684
075 820.9924 HIGH PRESSURE WATER CLEANING - LS
076 820.9925 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 686
Item 820.9924 Total: 1.00
BRIDGE NO. 685
BRIDGE NO. 685
BRIDGE NO. 685 1.00 0014 01
Item 820.9922 Total: 1.00
Item 820.9920 Total: 1.00
BRIDGE NO. 682
072 820.9921 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 681
071 820.9920 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 681 1.00 0014 01
BRIDGE NO. 681
BRIDGE NO. 683
073 820.9922 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 683 1.00 0014 01
BRIDGE NO. 683
BRIDGE NO. 682 1.00 0014 01
BRIDGE NO. 682
Item 820.9921 Total: 1.00
Distribution of QuantitiesPage 48 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGES
S079 823.1750 ASPHALTIC EXPANSION JOINT SYSTEM LF
BRIDGE NO. 661 440.00 0005 02
BRIDGE NO. 660 1,150.00 0014 01
BRIDGE NO. 678 30.00 0014 01
BRIDGE NO. 677 30.00 0014 01
Item 821.1690 Total: 643.00
BRIDGE NO. 680 310.00 0005 02
BRIDGE NO. 678 60.00 0014 01
Item 823.1750 Total: 2,221.00
BRIDGE NO. 663 80.00 0005 02
BRIDGE NO. 662 45.00 0005 02
BRIDGE NO. 677 60.00 0014 01
BRIDGE NO. 676 76.00 0014 01
BRIDGE NO. 719
077 820.9926 HIGH PRESSURE WATER CLEANING - LS
BRIDGE NO. 719 1.00 0014 01
BRIDGE NO. 719
BRIDGE NO. 686 1.00 0014 01
076 820.9925 Cont. BRIDGE NO. 686
Item 820.9925 Total: 1.00
Item 820.9926 Total: 1.00
BRIDGE NO. 662 48.00 0005 02
BRIDGE NO. 661 437.00 0005 02
BRIDGE NO. 676 38.00 0014 01
BRIDGE NO. 663 60.00 0005 02
078 821.1690 SAW & SEALING JOINTS IN BITUMINOUS LF
BRIDGES
CONCRETE PAVEMENT
Distribution of QuantitiesPage 49 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item 824.9910 Total: 1.00
STEEL - BRIDGE NO. 632
084 825.9901 REPAINTING EXISTING STRUCTURAL LS
083 824.9910 STEEL UTILITY POLE EACH
BRIDGE NO. 676 1.00 0014 01
BRIDGE NO. 676
STEEL - BRIDGE NO. 633
085 825.9902 REPAINTING EXISTING STRUCTURAL LS
BRIDGE NO. 633 1.00 0014 01
BRIDGE NO. 633
BRIDGE NO. 632 1.00 0014 01
BRIDGE NO. 632
Item 825.9901 Total: 1.00
Item 824.9901 Total: 1.00
BRIDGE NO. 677
081 824.9902 TEMPORARY STEEL TRAFFIC PLATE - LS
BRIDGE NO. 676
080 824.9901 TEMPORARY STEEL TRAFFIC PLATE - LS
BRIDGE NO. 676 1.00 0014 01
BRIDGE NO. 676
BRIDGE NO. 677
BRIDGE NO. 678
BRIDGE NO. 678
Item 824.9903 Total: 1.00
BRIDGE NO. 678 1.00 0014 01
Item 824.9902 Total: 1.00
BRIDGE NO. 677 1.00 0014 01
082 824.9903 TEMPORARY STEEL TRAFFIC PLATE - LS
Distribution of QuantitiesPage 50 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 682
STEEL - BRIDGE NO. 682
Item 825.9906 Total: 1.00
BRIDGE NO. 682 1.00 0014 01
Item 825.9905 Total: 1.00
BRIDGE NO. 678 1.00 0014 01
089 825.9906 REPAINTING EXISTING STRUCTURAL LS
Item 829.9910 Total: 50,000.00
STRAIGHT 7'' REVEAL
091 834.0131 VERTICAL FACE GRANITE CURB LF
090 829.9910 BRIDGE SCUPPER & DOWNSPOUT REPAIRS EACH
ALL BRIDGES 50,000.00 0014 01
BRIDGES
BRIDGE NO. 676 1.00 0014 01
BRIDGE NO. 676
Item 825.9903 Total: 1.00
085 825.9902 Cont. Item 825.9902 Total: 1.00
STEEL - BRIDGE NO. 676
086 825.9903 REPAINTING EXISTING STRUCTURAL LS
087 825.9904 REPAINTING EXISTING STRUCTURAL LS
088 825.9905 REPAINTING EXISTING STRUCTURAL LS
BRIDGE NO. 678
STEEL - BRIDGE NO. 678
BRIDGE NO. 677
STEEL - BRIDGE NO. 677
Item 825.9904 Total: 1.00
BRIDGE NO. 677 1.00 0014 01
Distribution of QuantitiesPage 51 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 661 200.00 0005 02
BRIDGE NO. 660 535.00 0014 01
BRIDGE NO. 663 30.00 0005 02
BRIDGE NO. 662 22.00 0005 02
BITUMINOUS PAVEMENT FROM CONCRETE
093 839.0200 FULL DEPTH REMOVAL AND DISPOSAL OF SY
BRIDGES
BRIDGE DECKS
S094 901.0101 GUARDRAIL STEEL BEAM SINGLE FACE LF
I-95 MAINLINE A
EARTH AND ASPHALT
BRIDGE NO. 677 70.00 0014 01
BRIDGE NO. 676 90.00 0014 01
Item 839.0200 Total: 1,017.00
BRIDGE NO. 678 70.00 0014 01
Item 834.0131 Total: 48.00
OF BITUMINOUS PAVEMENT FROM
092 839.0100 PARTIAL-DEPTH REMOVAL AND DISPOSAL SY
BRIDGE NO. 676 16.00 0014 01
091 834.0131 Cont. BRIDGES
BRIDGE NO. 678 16.00 0014 01
BRIDGE NO. 677 16.00 0014 01
CONCRETE BRIDGE DECKS
BRIDGE NO. 680 1,350.00 0005 02
BRIDGE NO. 663 900.00 0005 02
Item 839.0100 Total: 10,600.00
BRIDGE NO. 660 5,000.00 0014 01
BRIDGES
BRIDGE NO. 662 750.00 0005 02
BRIDGE NO. 661 2,600.00 0005 02
Distribution of QuantitiesPage 52 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item 901.0191 Total: 4.00
028+08 - 028+15 1.00 0021 03
S096 901.0196 GUARDRAIL CONNECTION TO EXISTING EACH
524+30 - 524+36 RT 1.00 0021 03
JEFFERSON BLVD CD ROAD
JEFFERSON BLVD RAMP K
530+85 - 530+91 RT 1.00 0021 03
Item 901.0196 Total: 1.00
ENDPOST APPROACH END SECTION,
S097 901.0197 GUARDRAIL CONNECTION TO EXISTING EACH
STANDARD 34.3.6
ENDPOST TRAILING END SECTION,
527+80 RT 1.00 0021 03
JEFFERSON BLVD CD ROAD
527+80 - 530+85 RT 305.00 0021 03
525+00 - 526+35 RT 135.00 0021 03
028+15 - 030+55 240.00 0021 03
JEFFERSON BLVD RAMP K
JEFFERSON BLVD CD ROAD
S094 901.0101 Cont. 531+10 - 533+00 LT 190.00 0021 03
523+27 - 525+00 RT 173.00 0021 03
514+70 - 524+30 RT 960.00 0021 03
JEFFERSON BLVD RAMP L
34.3.4
TRAILING END SECTION STANDARD
531+03 - 531+10 LT 1.00 0021 03
I-95 MAINLINE A
Item 901.0101 Total: 2,351.00
018+15 - 021+63 LT 348.00 0021 03
S095 901.0191 GUARDRAIL STEEL BEAM ANCHORAGE EACH
Distribution of QuantitiesPage 53 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 676 0.40 0014 01
BRIDGES
BRIDGE NO. 678 0.20 0014 01
BRIDGE NO. 677 0.20 0014 01
Item 901.9901 Total: 4.00
MONOLITHIC STANDARD 43.1.0
099 905.0110 PORTLAND CEMENT SIDEWALK CY
JEFFERSON BLVD RAMP L
027+35 LT 1.10 0005 02
025+60 RT 1.00 0005 02
025+45 LT 0.90 0005 02
016+65 LT 1.50 0005 02
JEFFERSON BLVD RAMP J
JEFFERSON BLVD RAMP K
016+65 RT 1.90 0005 02
Item 901.0197 Total: 2.00
018+13 LT 1.00 0021 03
S098 901.9901 GUARDRAIL END TREATMENT - ENERGY EACH
JEFFERSON BLVD CD ROAD
S097 901.0197 Cont. STANDARD 34.3.5
JEFFERSON BLVD RAMP L
526+35 RT 1.00 0021 03
ABSORBING TERMINAL
030+55 - 030+92 1.00 0021 03
JEFFERSON BLVD RAMP K
021+63 - 022+00 LT 1.00 0021 03
JEFFERSON BLVD RAMP L
533+00 - 533+37 LT 1.00 0021 03
I-95 MAINLINE A
522+90 - 523+27 RT 1.00 0021 03
JEFFERSON BLVD CD ROAD
Distribution of QuantitiesPage 54 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
025+65 LT 6.00 0005 02
JEFFERSON BLVD RAMP L
006+90 RT 12.00 0005 02
JEFFERSON BLVD RAMP O
JEFFERSON BLVD RAMP J
CIRCULAR STANDARD 7.1.0
016+65 RT 12.00 0005 02
016+65 LT 4.00 0005 02
JEFFERSON BLVD RAMP J
43.3.1
016+65 RT 2.00 0005 02
016+65 LT 2.00 0005 02
Item 906.0211 Total: 34.00
CURB STANDARDS 7.1.3, 43.3.0 AND
102 906.0250 PRECAST CONCRETE WHEELCHAIR RAMP EACH
062+85 RT 1.00 0005 02
ROUTE 10 RAMP D-EL
MISCELLANEOUS 0.40 0005 02
Z: MISCELLANEOUS
JEFFERSON BLVD RAMP O
099 905.0110 Cont. 025+65 LT 1.40 0005 02
007+15 LT 1.10 0005 02
006+90 RT 1.90 0005 02
Item 905.0110 Total: 13.00
Item 905.0140 Total: 0.70
BRIDGE NO. 678 0.35 0014 01
101 906.0211 CEMENT CONCRETE CURB PRECAST LF
100 905.0140 BITUMINOUS SIDEWALK STANDARD 43.2.0 TON
BRIDGE NO. 677 0.35 0014 01
BRIDGES
Distribution of QuantitiesPage 55 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
18-INCH CIRCULAR STANDARD 7.1.9
104 906.0263 PRECAST CONCRETE RAMP STONE EACH
016+65 LT 1.00 0005 02
JEFFERSON BLVD RAMP J
025+65 LT 1.00 0005 02
025+60 RT 1.00 0005 02
Item 906.0260 Total: 4.00
Item 906.0263 Total: 4.00
CURB EDGING, STRAIGHT, CIRCULAR
105 906.0700 REMOVE, HANDLE, HAUL TRIM RESET LF
JEFFERSON BLVD RAMP O
016+65 RT 1.00 0005 02
007+15 LT 1.00 0005 02
006+90 RT 1.00 0005 02
025+65 LT 2.00 0005 02
025+60 RT 2.00 0005 02
006+90 RT 2.00 0005 02
JEFFERSON BLVD RAMP O
027+35 LT 2.00 0005 02
102 906.0250 Cont. JEFFERSON BLVD RAMP K
025+45 LT 2.00 0005 02
JEFFERSON BLVD RAMP L
007+15 LT 2.00 0005 02
027+35 LT 1.00 0005 02
JEFFERSON BLVD RAMP K
025+45 LT 1.00 0005 02
JEFFERSON BLVD RAMP L
Item 906.0250 Total: 16.00
12-INCH STRAIGHT STANDARD 7.1.9
103 906.0260 PRECAST CONCRETE RAMP STONE EACH
Distribution of QuantitiesPage 56 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item 914.5020 Total: 346.00
STANDARD 29.1.0 AND 27.1.1
108 922.0100 TEMPORARY CONSTRUCTION SIGNS SF
FROM ITEM CODE 914.5010 X 10% 246.00 0005 02
I-95 CONTRACT 6
AS DRIECTED BY THE ENGINEER 100.00 0014 01
SURFACE STREETS
M4-2R/48"X48"/4 EA 64.00 0021 03
M4-2L/48"X48"/4 EA 64.00 0021 03
M4-9R/36"X48"/7 EA 84.00 0021 03
M4-9L/36"X48"/1 EA 12.00 0021 03
(STAY IN LANE)/48"X48"/4 EA 64.00 0021 03
I-95 CONTRACT 6
AHEAD)/48"X48"/4 EA
(UNEVEN PAVT. 64.00 0021 03
Item 906.0700 Total: 96.00
BRIDGE NO. 678 32.00 0014 01
106 914.5010 FLAGPERSONS MHRS
BRIDGES
105 906.0700 Cont. ALL TYPES
BRIDGE NO. 677 32.00 0014 01
BRIDGE NO. 676 32.00 0014 01
I-95 CONTRACT 6
Item 914.5010 Total: 3,464.00
AS DIRECTED BY THE ENGINEER 1,000.00 0014 01
107 914.5020 FLAGPERSONS - OVERTIME MHRS
MONTHS (2 X 7 MOS. X 22 DAYS
TWO FLAGGERS REQUIRED FOR 7 2,464.00 0005 02
SURFACE STREETS
X 8 HRS/DAY)
Distribution of QuantitiesPage 57 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
M3-4 (24 X 24) 8.00 0021 03
M3-3 (24 X 12 ) 6.00 0021 03
M4-10R (36 X 18) 9.00 0021 03
M4-10L (36 X 18) 9.00 0021 03
M1-5 (24 X 24) 16.00 0021 03
M1-1 (36 X 36) 27.00 0021 03
M3-1 (24 X 12) 10.00 0021 03
M1-5L (21 X 15) 2.25 0021 03
M6-1L (21 X 15) 4.50 0021 03
M5-1R (21 X 15) 2.25 0021 03
M6-2R 2.00 0021 03
M6-1R (21 X 15) 4.50 0021 03
M4-8A 3.00 0021 03
M4-8 (24 X 12) 20.00 0021 03
M5-1L 2.00 0021 03
M4-9U (30 X 24) 5.00 0021 03
SP-6/48"X48"/2 EA 32.00 0021 03
SP-5/48"X48"/2 EA 32.00 0021 03
W13-1/30"X30"/2 EA 12.50 0021 03
SP-7/48"X48"/2 EA 32.00 0021 03
SP-2/48"X48"/2 EA 32.00 0021 03
108 922.0100 Cont. SP-1/48"X48"/2 EA 32.00 0021 03
SP-4/48"X48"/2 EA 32.00 0021 03
SP-3/48"X48"/2 EA 32.00 0021 03
W20-1/48"X48"/6 EA 96.00 0021 03
E5-2 (48 X 36) 48.00 0021 03
E5-1 (72 X 60) 84.00 0021 03
G20-2 (36 X 18) 9.00 0021 03
E5-2A 12.00 0021 03
Z:MISCELLANEOUS 179.50 0021 03
W21-5A/48"X48"/4 EA 64.00 0021 03
AS DIRECTED BY THE ENGINEER 137.50 0021 03
PROJECTWIDE
Distribution of QuantitiesPage 58 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
W20-5R (36 X 36) 18.00 0021 03
W20-5L (48 X 48) 64.00 0021 03
W3-1 (48 X 48) 32.00 0021 03
W20-5R (48 X 48) 64.00 0021 03
W20-5AL (48 X 48) 64.00 0021 03
W20-5 (48 X 48) 32.00 0021 03
W20-5L (36 X 36) 18.00 0021 03
W20-5AR (48 X 48) 64.00 0021 03
W4-5P (24 X 30) 20.00 0021 03
W4-3 (48 X 48) 32.00 0021 03
W5-4 (48 X 48) 64.00 0021 03
W5-1 16.00 0021 03
W4-1 (48 X 48) 32.00 0021 03
W3-2 (48 X 48) 32.00 0021 03
W4-2R (48 X 48) 128.00 0021 03
W4-2L (48 X 48) 128.00 0021 03
R9-9 (24 X 12) 4.00 0021 03
R4-9 (36 X 48) 24.00 0021 03
RI STD. 27.1.1 (48 X 72) 192.00 0021 03
RI STD. 27.1.1 (36 X 54) 54.00 0021 03
R1-1 (48 X 48) 64.00 0021 03
108 922.0100 Cont. M6-3 4.00 0021 03
R1-2 (48 X 48 X 48) 18.00 0021 03
R11-2 (48 X 30) 20.00 0021 03
W13-1P 6.00 0021 03
W20-1 (36 X 36) 54.00 0021 03
W20-1 (1/2 MILE) 16.00 0021 03
W20-5 (36 X 36) 18.00 0021 03
W20-1 (48 X 48) 128.00 0021 03
W13-4P (36 X 36) 18.00 0021 03
W13-4P 6.00 0021 03
W1-4R (48 X 48) 32.00 0021 03
W1-4L (48 X 48) 80.00 0021 03
Distribution of QuantitiesPage 59 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
VOL. 2 DETOUR PLAN NO. 4
SIGNS/36"X48"/1 EA
ROUTE 10 SIGNS/36"X36"/4 EA 36.00 0021 03
M3-1 "NORTH"/12"X24"/4 EA 8.00 0021 03
ELMWOOD AVE SIGNS/36"X48"/6 72.00 0021 03
VOL. 2 DETOUR PLAN NO. 3
JEFFERSON BLVD 12.00 0021 03
EA
Item 922.0100 Total: 3,391.00
PROJECT WIDE
109 923.0105 DRUM BARRICADE STANDARD 26.2.0 BDAY
M1-1 "I-95"/36"X36"/5 EA 45.00 0021 03
VOL. 2 DETOUR PLAN NOS. 6 & 7
M3-2 "SOUTH"/12"X24"/5 EA 10.00 0021 03
M3-1 "NORTH"/12"X24"/5 EA 10.00 0021 03
M4-9 "DETOUR"/36"X48"/7 EA 84.00 0021 03
DETOURS
EA
W4-8A "END DETOUR"/36"X48"/2 12.00 0021 03
W9-9L (36 X 36) 18.00 0021 03
108 922.0100 Cont. W9-2 (48 X 48) 16.00 0021 03
VOL. 2 ADDITIONAL SIGNS FOR
W9-9R (36 X 36) 18.00 0021 03
VOL. 2 DETOUR PLAN NO. 1
AHEAD"/48"X48"/1 EA
W20-1 "ROAD WORK 16.00 0021 03
EA
W4-8A "END DETOUR"/36"X48"/1 12.00 0021 03
SIGNS/36"X36"/5 EA
JEFFERSON BLVD 45.00 0021 03
M4-9 "DETOUR"/36"X48"/6 EA 72.00 0021 03
M4-13 "TO"/12"X24"/5 EA 10.00 0021 03
Distribution of QuantitiesPage 60 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
112 924.0113 ADVANCE WARNING ARROW PANEL PDAY
ADDITIONAL BOARD LANE 100.00 0021 03
2ND ARROW BOARD
Z:ADDITIONAL 300% FOR 450.00 0021 03
I-95 MAIN LINE 150.00 0021 03
Item 923.0200 Total: 1,100.00
DAMAGED CONES
BRIDGE NO. 632 45.00 0021 03
BRIDGE NO. 619 5.00 0021 03
BRIDGE NO. 639 5.00 0021 03
BRIDGE NO. 633 45.00 0021 03
AS DIRECTED BY THE ENGINEER 76.00 0021 03
CLOSURES - WASHING
BRIDGE NO. 618 5.00 0021 03
BRIDGES (1ST ARROW BOARD)
PROJECTWIDE
26.3.0
SURFACE STREETS 10.00 0021 03
RAMPS/BRIDGES 20.00 0021 03
Item 923.0105 Total: 5,000.00
109 923.0105 Cont. AS DIRECTED BY THE ENGINEER 5,000.00 0021 03
110 923.0120 PLASTIC PIPE BARRICADE STANDARD EACH
Item 923.0120 Total: 30.00
PAVING WORK 200.00 0021 03
BRIDGE WORK/PAINTING 200.00 0021 03
I-95 CONTRACT 6
SURFACE STREETS 100.00 0021 03
111 923.0200 FLUORESCENT TRAFFIC CONES STANDARD EACH
BRIDGES
26.1.0
Distribution of QuantitiesPage 61 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
DEVICES
INSTAL/REMOVE SIGNING - TTC 20.00 0021 03
2 MONTHS (2 REQUIRED) 88.00 0021 03
I-95 MAIN LINE
BRIDGE NO. 685 5.00 0021 03
BRIDGE NO. 684 5.00 0021 03
BRIDGE NO. 719 5.00 0021 03
BRIDGE NO. 686 5.00 0021 03
AS DIRECTED BY THE ENGINEER 280.00 0021 03
BRIDGES
LOCATIONS VARY 12 MONTHS
PROJECT WIDE - 2 PCMS - 720.00 0021 03
Item 924.0113 Total: 918.00
5 MONTHS (1 REQUIRED) 110.00 0021 03
113 925.0112 PORTABLE CHANGEABLE MESSAGE SIGN PDAY
BRIDGE NO. 657 5.00 0021 03
BRIDGE NO. 656 5.00 0021 03
BRIDGE NO. 659 5.00 0021 03
BRIDGE NO. 658 5.00 0021 03
BRIDGE NO. 652 5.00 0021 03
112 924.0113 Cont. BRIDGE NO. 651 5.00 0021 03
BRIDGE NO. 655 5.00 0021 03
BRIDGE NO. 653 5.00 0021 03
BRIDGE NO. 661 5.00 0021 03
BRIDGE NO. 681 5.00 0021 03
BRIDGE NO. 680 7.00 0021 03
BRIDGE NO. 683 45.00 0021 03
BRIDGE NO. 682 45.00 0021 03
BRIDGE NO. 676 78.00 0021 03
BRIDGE NO. 665 8.00 0021 03
BRIDGE NO. 678 83.00 0021 03
BRIDGE NO. 677 83.00 0021 03
Distribution of QuantitiesPage 62 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 658 5.00 0021 03
BRIDGE NO. 657 5.00 0021 03
BRIDGE NO. 661 5.00 0021 03
BRIDGE NO. 659 5.00 0021 03
BRIDGE NO. 653 5.00 0021 03
BRIDGE NO. 652 5.00 0021 03
BRIDGE NO. 656 5.00 0021 03
BRIDGE NO. 655 5.00 0021 03
BRIDGE NO. 681 5.00 0021 03
BRIDGE NO. 680 7.00 0021 03
BRIDGE NO. 683 45.00 0021 03
BRIDGE NO. 682 45.00 0021 03
BRIDGE NO. 676 78.00 0021 03
BRIDGE NO. 665 8.00 0021 03
BRIDGE NO. 678 83.00 0021 03
BRIDGE NO. 677 83.00 0021 03
TRUCK MOUNTED FLASHING ARROW BOARD
114 928.0800 TRUCK MOUNTED ATTENUATOR WITH PDAY
ADDITIONAL TRUCK FOR LANE 100.00 0014 01
2ND TRUCK
7 MONTHS (1 REQUIRED) 154.00 0021 03
113 925.0112 Cont. I-95 MAIN LINE
Item 925.0112 Total: 1,154.00
CLOSURES - WASHING
BRIDGE NO. 633 45.00 0021 03
BRIDGE NO. 632 45.00 0021 03
BRIDGE NO. 651 5.00 0021 03
BRIDGE NO. 639 5.00 0021 03
BRIDGES (1ST TRUCK)
AS DIRECTED BY THE ENGINEER 356.00 0014 01
BRIDGE NO. 619 5.00 0021 03
BRIDGE NO. 618 5.00 0021 03
Distribution of QuantitiesPage 63 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
BRIDGE NO. 666 7.00 0014 01
BRIDGE NO. 666
FROM ITEM CODE 839.0100 56.00 0005 02
I-95 CONTRACT 6
BRIDGE NO. 660 50.00 0014 01
BRIDGE NO. 660
BRIDGE NO. 664 8.00 0014 01
BRIDGE NO. 664
117 932.0100 CUTTING AND MATCHING ASPHALT LF
457+00 RT 66.00 0005 02
I-95 MAIN LINE A
FROM ITEM CODE 935.0400 1,748.00 0005 02
(5600 SY/100)
Item 931.0110 Total: 1,869.00
(174,776 SY/100)
DEVICES
INSTAL/REMOVE SIGNING - TTC 20.00 0021 03
2 MONTHS (2 REQUIRED) 88.00 0021 03
I-95 MAIN LINE
BRIDGE NO. 685 5.00 0021 03
114 928.0800 Cont. BRIDGE NO. 684 5.00 0021 03
BRIDGE NO. 719 5.00 0021 03
BRIDGE NO. 686 5.00 0021 03
5 MONTHS (1 REQUIRED) 110.00 0021 03
Item 929.0110 Total: 24.00
PROJECT WIDE 24.00 0014 01
116 931.0110 CLEANING AND SWEEPING PAVEMENT HSY
Item 928.0800 Total: 1,198.00
PROJECT WIDE
115 929.0110 FIELD OFFICE PMO
Distribution of QuantitiesPage 64 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
056+39 28.00 0005 02
ROUTE 10 RAMP C-B
049+60 29.00 0005 02
ROUTE 10 RAMP C-E
012+43 20.00 0005 02
006+92 80.00 0005 02
110+40 24.00 0005 02
ROUTE 10 RAMP A-C
ROUTE 10 RAMP E-D
063+68 24.00 0005 02
Item 932.0100 Total: 1,048.00
085+90 18.00 0005 02
043+93 31.00 0005 02
ROUTE 10 RAMP D-B
058+43 25.00 0005 02
ROUTE 10 RAMP D-EL
110+25 - 111+25 RT 122.00 0005 02
064+00 RT 66.00 0005 02
JEFFERSON BLVD RAMP J
111+25 - 112+20 RT 122.00 0005 02
525+00 RT 66.00 0005 02
117 932.0100 Cont. 489+25 RT 30.00 0005 02
041+00 LT 66.00 0005 02
I-95 MAIN LINE B
012+50 22.00 0005 02
019+44 20.00 0005 02
JEFFERSON BLVD RAMP L
JEFFERSON BLVD RAMP O
026+60 32.00 0005 02
JEFFERSON BLVD RAMP K
016+75 72.00 0005 02
034+75 22.00 0005 02
027+21 63.00 0005 02
Distribution of QuantitiesPage 65 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
119 932.0230 FULL DEPTH SAWCUT OF PORTLAND LF
CEMENT CONCRETE SIDEWALK/DRIVEWAY
BRIDGES
006+90 RT 30.00 0005 02
007+15 LT 18.00 0005 02
Item 932.0200 Total: 193.00
BRIDGE NO. 676 - APPROACH 15.00 0014 01
APPROACH SIDEWALKS
JEFFERSON BLVD RAMP J
016+65 LT 6.00 0005 02
BRIDGE NO. 678 - EAST 7.50 0014 01
SIDEWALKS
BRIDGE NO. 677 - EAST 7.50 0014 01
APPROACH SIDEWALKS
JEFFERSON BLVD RAMP O
BRIDGE NO. 678 - WEST 7.50 0014 01
APPROACH SIDEWALK
JEFFERSON BLVD RAMP J
APPROACH SIDEWALK
PAVEMENT
118 932.0200 FULL-DEPTH SAWCUT OF BITUMINOUS LF
BRIDGE NO. 677 - WEST 7.50 0014 01
BRIDGES
025+45 LT 18.00 0005 02
JEFFERSON BLVD RAMP L
025+65 LT 24.00 0005 02
025+60 RT 18.00 0005 02
016+75 RT 30.00 0005 02
016+75 LT 22.00 0005 02
027+35 LT 18.00 0005 02
JEFFERSON BLVD RAMP K
Distribution of QuantitiesPage 66 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
041+00 - 044+00 LT 2,200.00 0005 02
I-95 MAIN LINE B
056+00 - 068+00 LT 8,835.00 0005 02
044+00 - 056+00 LT 8,849.00 0005 02
489+00 - 501+00 RT 9,333.00 0005 02
477+00 - 489+00 RT 10,769.00 0005 02
513+00 - 525+00 9,067.00 0005 02
501+00 - 513+00 9,067.00 0005 02
092+00 - 104+00 LT 8,172.00 0005 02
080+00 - 092+00 RT 9,298.00 0005 02
104+00 - 111+26 LT 5,326.00 0005 02
092+00 - 104+00 RT 8,726.00 0005 02
068+00 - 080+00 LT 9,106.00 0005 02
064+00 - 068+00 RT 2,933.00 0005 02
080+00 - 092+00 LT 9,789.00 0005 02
068+00 - 080+00 RT 8,703.00 0005 02
025+60 RT 21.00 0005 02
025+45 LT 21.00 0005 02
JEFFERSON BLVD RAMP O
025+65 LT 6.00 0005 02
JEFFERSON BLVD RAMP K
119 932.0230 Cont. 016+65 RT 6.00 0005 02
JEFFERSON BLVD RAMP L
027+35 LT 6.00 0005 02
006+90 RT 12.00 0005 02
I-95 MAIN LINE A
MICRO MILLING
465+00 - 477+00 RT 8,800.00 0005 02
457+00 - 465+00 RT 5,867.00 0005 02
Item 932.0230 Total: 120.00
007+15 LT 12.00 0005 02
120 935.0400 REMOVING BITUMINOUS PAVEMENT BY SY
Distribution of QuantitiesPage 67 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
086+38 - 091+53 1,269.00 0005 02
ROUTE 10 RAMP D-E
058+43 - 063+68 1,384.00 0005 02
ROUTE 10 RAMP D-EL
042+98 - 049+60 1,742.00 0005 02
ROUTE 10 RAMP C-E
043+93 - 064+79 5,498.00 0005 02
ROUTE 10 RAMP D-B
Item 935.0400 Total: 174,776.00
PROJECT WIDE
121 936.0100 MOBILIZATION AND DEMOBILIZATION LS
085+90 - 092+10 1,652.00 0005 02
ROUTE 10 RAMP E-D
085+71 - 106+75 6,907.00 0005 02
ROUTE 10 ROAD E
JEFFERSON BLVD RAMP L
027+21 - 034+78 1,684.00 0005 02
JEFFERSON BLVD RAMP O
019+45 - 025+60 1,858.00 0005 02
JEFFERSON BLVD RAMP J
120 935.0400 Cont. 104+00 - 111+26 RT 4,563.00 0005 02
JEFFERSON BLVD RAMP K
012+50 - 016+75 1,395.00 0005 02
006+92 - 012+40 1,295.00 0005 02
091+67 - 099+62 976.00 0005 02
ROUTE 10 RAMP B-EL
056+39 - 067+73 2,152.00 0005 02
ROUTE 10 RAMP C-B
100+33 - 110+40 3,421.00 0005 02
ROUTE 10 RAMP A-C
087+24 - 103+98 4,140.00 0005 02
ROUTE 10 RAMP B-C
Distribution of QuantitiesPage 68 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
007+15 LT 8.00 0005 02
006+90 RT 8.00 0005 02
Item 942.0200 Total: 64.00
025+60 RT 8.00 0005 02
025+45 LT 8.00 0005 02
JEFFERSON BLVD RAMP O
025+65 LT 8.00 0005 02
125 L01.0104 PLANTABLE SOIL 4 INCHES DEEP SY
016+28 - 016+58 LT 23.00 0005 02
JEFFERSON BLVD RAMP J
PROJECT WIDE
124 943.0200 TRAINEE MAN-HOURS MHRS
Item 943.0200 Total: 6,000.00
PROJECT WIDE 6,000.00 0014 01
PROJECT WIDE
PROTECTION
Item 937.0200 Total: 1.00
AS DIRECTED BY THE ENGINEER 1.00 0014 01
Item 936.0100 Total: 1.00
121 936.0100 Cont. PROJECT WIDE 1.00 0014 01
122 937.0200 MAINTENANCE AND MOVEMENT TRAFFIC LS
JEFFERSON BLVD RAMP K
016+65 RT 8.00 0005 02
JEFFERSON BLVD RAMP L
027+35 LT 8.00 0005 02
48.1.0
123 942.0200 DETECTABLE WARNING PANEL STANDARD SF
016+65 LT 8.00 0005 02
JEFFERSON BLVD RAMP J
Distribution of QuantitiesPage 69 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
Item L11.0103 Total: 10.00
STANDARD 51.1.1
129 L11.0104 DRIP-LINE TREE PROTECTION DEVICE LF
STANDARD 51.2.0
128 L11.0103 SHRUB PLANT PROTECTION DEVICE LF
AS DIRECTED BY THE ENGINEER 10.00 0014 01
PROJECT WIDE
CLASSIFICATION/WEIGH-IN-MOTION
S130 T03.9901 4-LANE PERMANENT AUTOMATIC VEHICLE EACH
I-95 CONTRACT 6
(AVC/WIM) EQUIPMENT
AS DIRECTED BY THE ENGINEER 450.00 0014 01
PROJECT WIDE
Item L11.0104 Total: 450.00
Item L01.0104 Total: 84.00
I-95 CONTRACT 6
S126 L02.0101 GENERAL HIGHWAY SEEDING (TYPE 1) SY
JEFFERSON BLVD RAMP O
125 L01.0104 Cont. 016+28 - 016+58 RT 27.00 0005 02
007+15 - 007+35 LT 14.00 0005 02
007+00 - 007+30 RT 20.00 0005 02
FROM ITEM CODE L01.0104 84.00 0005 02
AS DIRECTED BY THE ENGINEER 20.00 0014 01
PROJECT WIDE
Item L11.0102 Total: 20.00
Item L02.0101 Total: 84.00
STANDARD 51.1.0
127 L11.0102 TREE PLANT PROTECTION DEVICE EACH
Distribution of QuantitiesPage 70 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
105+34 LT 2.00 0005 02
103+83 RT 2.00 0005 02
106+97 LT 2.00 0005 02
105+53 RT 2.00 0005 02
098+31 RT 2.00 0005 02
096+38 RT 2.00 0005 02
101+92 RT 2.00 0005 02
100+22 RT 2.00 0005 02
Item T05.1030 Total: 37.00
029+85 RT 1.00 0005 02
S133 T06.5120 2 INCH SCHEDULE 40 POLYVINYL LF
109+12 LT 2.00 0005 02
107+67 LT 2.00 0005 02
JEFFERSON BLVD RAMP K
109+17 RT 2.00 0005 02
"AVC/WIM EQUIPMENT" 1.00 0005 02
I-95 CONTRACT 6
Item T05.0400 Total: 1.00
Item T03.9901 Total: 2.00
S130 T03.9901 Cont. "AVC/WIM EQUIPMENT" 2.00 0005 02
131 T05.0400 BREAK INTO EXISTING HANDHOLE EACH
132 T05.1030 ADJUST HANDHOLE TO GRADE EACH
089+22 LT 2.00 0005 02
086+92 LT 2.00 0005 02
094+28 RT 2.00 0005 02
090+56 LT 2.00 0005 02
080+02 LT 2.00 0005 02
I-95 MAIN LINE B
084+62 LT 2.00 0005 02
082+32 LT 2.00 0005 02
Distribution of QuantitiesPage 71 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
JEFFERSON BLVD RAMP K
COUNTING LOOPS 34.00 0005 02
COUNTING LOOPS 34.00 0005 02
027+63 - 028+03 220.00 0005 02
19.6.0
S136 T13.1000 TRAFFIC DETECTORS-LOOP, STANDARD LF
016+50 172.00 0005 02
JEFFERSON BLVD RAMP J
COUNTING LOOPS 34.00 0005 02
ROUTE 10 RAMP A-C
COUNTING LOOPS 34.00 0005 02
ROUTE 10 RAMP B-C
COUNTING LOOPS 34.00 0005 02
JEFFERSON BLVD RAMP L
COUNTING LOOPS 34.00 0005 02
JEFFERSON BLVD RAMP O
Item T06.5120 Total: 15.00
TIGHT CONDUIT
S134 T06.9902 1 1/2" FLEXIBLE METALLIC LIQUID LF
UNDERGROUND
S133 T06.5120 Cont. CHLORIDE PLASTIC CONDUIT -
"AVC/WIM EQUIPMENT" 15.00 0005 02
I-95 CONTRACT 6
I-95 CONTRACT 6
"AVC/WIM EQUIPMENT" 20.00 0005 02
I-95 CONTRACT 6
Item T06.9903 Total: 20.00
Item T06.9902 Total: 55.00
"AVC/WIM EQUIPMENT" 55.00 0005 02
S135 T06.9903 1" FLEXIBLE PVC CONDUIT LF
Distribution of QuantitiesPage 72 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
I-95 CONTRACT 6
S138 T13.9902 TRAFFIC DETECTOR - LOOP (DRY CUT) LF
Item T13.9902 Total: 370.00
"AVC/WIM EQUIPMENT" 370.00 0005 02
"AVC/WIM EQUIPMENT" 8.00 0005 02
I-95 CONTRACT 6
Item T13.9901 Total: 8.00
04-01/W4-3/48"X48" 16.00 0021 03
03-01/W13-2/48"X60" 20.00 0021 03
05-01/W13-2/48"X60" 20.00 0021 03
04-02/R3-3/48"X48" 16.00 0021 03
S139 T15.0100 DIRECTIONAL REGULATORY AND WARNING SF
I-95 CONTRACT 6
SIGNS
COUNTING LOOPS 34.00 0005 02
ROUTE 10 RAMP C-E
COUNTING LOOPS 34.00 0005 02
ROUTE 10 RAMP D-B
COUNTING LOOPS 34.00 0005 02
S136 T13.1000 Cont. ROUTE 10 RAMP B-EL
COUNTING LOOPS 34.00 0005 02
ROUTE 10 RAMP C-B
ROUTE 10 RAMP D-E
Item T13.1000 Total: 868.00
COUNTING LOOPS 34.00 0005 02
S137 T13.9901 CLASS I PIEZOELECTRIC SENSORS EACH
ROUTE 10 RAMP D-EL
COUNTING LOOPS 34.00 0005 02
ROUTE 10 RAMP E-D
061+70 68.00 0005 02
Distribution of QuantitiesPage 73 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
10-01/R2-1/48"X60" 20.00 0021 03
09-01/W4-2/48"X48" 16.00 0021 03
12-01/W12-2/48"X48" 16.00 0021 03
11-01/R2-1/48"X60" 20.00 0021 03
07-12/W4-2/48"X48"/ 16.00 0021 03
07-11C/R5-1/30"X30"/2 EA. 12.50 0021 03
08-01/R3-3/48"X48" 16.00 0021 03
07-13/R3-3/48"X48" 16.00 0021 03
16-02/R3-3/48"X48" 16.00 0021 03
16-01/W13-2/48"X48" 16.00 0021 03
16-04/R3-3/48"X48" 16.00 0021 03
16-03/W4-1/48"X48" 16.00 0021 03
15-02/R3-3/48"X48" 16.00 0021 03
15-01/W13-2/48"X60" 20.00 0021 03
15-04/R2-1/48"X60" 20.00 0021 03
15-03/W4-1/48"X48" 16.00 0021 03
07-01C/R5-1/30"X30" 6.25 0021 03
07-01B/R6-1R/12"X36" 3.00 0021 03
07-03/W4-1/30"X30" 6.25 0021 03
07-02/R4-7/24"X30" 5.00 0021 03
06-01/R3-3/48"X48" 16.00 0021 03
S139 T15.0100 Cont. 05-02/W4-3/48"X48" 16.00 0021 03
07-01A/R6-1L/12"X36" 3.00 0021 03
06-02/W13-2/48"X60" 20.00 0021 03
07-04/R5-1A/36"X24" 6.00 0021 03
07-10/R5-1A/36"X24" 6.00 0021 03
07-09/R5-1A/36"X24" 6.00 0021 03
07-11B/R6-1R/12"X36"/2 EA. 6.00 0021 03
07-11A/R6-1L/12"X36"/2 EA. 6.00 0021 03
07-06/R5-1A/36"X24" 6.00 0021 03
07-05/W3-3/36"X36" 9.00 0021 03
07-08/R3-3/48"X48" 16.00 0021 03
07-07/W4-3/48"X48" 16.00 0021 03
Distribution of QuantitiesPage 74 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
APPLICATIONS (47,147 LF)
FROM ITEM CODE T20.2006 X 2 94,294.00 0021 03
Item T20.0006 Total: 96,694.00
FROM ITEM CODE T20.2006 X 2 2,400.00 0021 03
BRIDGES
I-95 CONTRACT 6
APPLICATIONS (1200 LF)
086+00 RT 1,000.00 0021 03
083+00 LT 2,400.00 0021 03
108+00 LT 1,420.00 0021 03
107+00 RT 1,720.00 0021 03
WATERBORNE PAVEMENT MARKING PAINT
S141 T20.0012 12 INCH WHITE FAST - DRYING LF
079+00 LT 960.00 0021 03
GORE EDGES - 2 APPLICATIONS
19-03/R3-3/48"X48" 16.00 0021 03
19-02/R3-3/48"X48" 16.00 0021 03
20-01/W13-2/48"X60" 20.00 0021 03
19-04/SP-8/36"X42" 10.50 0021 03
17-01/W13-2/48"X60" 20.00 0021 03
S139 T15.0100 Cont. 16-05/W4-1/48"X48" 16.00 0021 03
19-01/W13-2/48"X60" 20.00 0021 03
18-01/W13-3/48"X60" 20.00 0021 03
20-02/W4-1/48"X48" 16.00 0021 03
Item T15.0100 Total: 704.00
WATERBORNE PAVEMENT MARKING PAINT
S140 T20.0006 6 INCH WHITE FAST - DRYING LF
21-02/R3-3/48"X48" 16.00 0021 03
21-01/W13-3/48"X60" 20.00 0021 03
Z:MISCELLANEOUS 0.50 0021 03
21-03/W13-2/48"X60" 20.00 0021 03
Distribution of QuantitiesPage 75 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
014+60 2.00 0021 03
JEFFERSON BLVD RAMP J
029+20 2.00 0021 03
JEFFERSON BLVD RAMP K
Item T20.0106 Total: 65,430.00
STANDARD 20.2.0
S143 T20.0900 BI-DIRECTIONAL CONTROL DEVICE EACH
MARKINGS WHITE
S144 T20.2006 6 INCH EPOXY RESIN PAVEMENT LF
BRIDGE NO. 660 1,200.00 0021 03
BRIDGES
063+50 2.00 0021 03
ROUTE 10 RAMP D-EL
Item T20.0900 Total: 6.00
RAMP D-E 280.00 0021 03
RAMP B-C/B-EL 1,160.00 0021 03
Item T20.0012 Total: 14,660.00
RAMP D-E/D-B 1,700.00 0021 03
COLLECTOR ROAD E 340.00 0021 03
S141 T20.0012 Cont. 483+00 RT 1,920.00 0021 03
RAMP B-C/A-C 1,200.00 0021 03
RAMP A-C 560.00 0021 03
I-95 CONTRACT 6
APPLICATIONS (650 LF)
APPLICATIONS (32,065 LF)
FROM ITEM CODE T20.2016 X 2 64,130.00 0021 03
WATERBORNE PAVEMENT MARKING PAINT
S142 T20.0106 6 INCH YELLOW FAST - DRYING LF
FROM ITEM CODE T20.2016 X 2 1,300.00 0021 03
BRIDGES
Distribution of QuantitiesPage 76 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
JEFFERSON BLVD RAMP K
012+50 - 016+60 RT 410.00 0021 03
JEFFERSON BLVD RAMP L
027+60 - 036+00 LT 840.00 0021 03
104+00-111+20 RT 1,255.00 0021 03
092+00-104+00 RT 2,100.00 0021 03
JEFFERSON BLVD RAMP J
104+00-112+40 LT 1,670.00 0021 03
100+33 - 110+40 1,015.00 0021 03
ROUTE 10 RAMP A-C
087+24 - 103+98 1,195.00 0021 03
ROUTE 10 RAMP B-C
024+80 - 025+20 LT 40.00 0021 03
017+90 - 025+70 LT 780.00 0021 03
006+80 - 016+00 RT 920.00 0021 03
JEFFERSON BLVD RAMP O
501+00-513+00 RT 2,100.00 0021 03
489+00-501+00 RT 2,100.00 0021 03
I-95 MAIN LINE B
513+00-525+00 RT 2,100.00 0021 03
457+00-465+00 RT 1,400.00 0021 03
S144 T20.2006 Cont. I-95 MAIN LINE A
477+00-489+00 RT 2,790.00 0021 03
465+00-477+00 RT 2,100.00 0021 03
041+00-044+00 LT 525.00 0021 03
080+00-092+00 LT 2,100.00 0021 03
068+00-080+00 RT 2,100.00 0021 03
092+00-104+00 LT 2,100.00 0021 03
080+00-092+00 RT 2,100.00 0021 03
056+00-068+00 LT 2,100.00 0021 03
044+00-056+00 LT 2,100.00 0021 03
068+00-080+00 LT 2,150.00 0021 03
064+00-068+00 RT 700.00 0021 03
Distribution of QuantitiesPage 77 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
I-95 MAIN LINE B
480+37 - 485+30 RT 1,234.00 0021 03
080+00 - 085+70 LT 1,140.00 0021 03
077+60 - 080+00 LT 480.00 0021 03
S145 T20.2012 12 INCH EPOXY RESIN PAVEMENT LF
I-95 MAIN LINE A
MARKINGS WHITE
JEFFERSON BLVD RAMP K
016+65 205.00 0021 03
JEFFERSON BLVD RAMP L
027+45 185.00 0021 03
105+40 - 109+20 RT 860.00 0021 03
084+95 - 087+25 RT 608.00 0021 03
JEFFERSON BLVD RAMP J
106+60 - 110+10 LT 864.00 0021 03
042+98 - 049+60 630.00 0021 03
ROUTE 10 RAMP C-E
043+93 - 064+79 2,100.00 0021 03
ROUTE 10 RAMP D-B
091+67 - 099+62 1,230.00 0021 03
S144 T20.2006 Cont. ROUTE 10 RAMP B-EL
056+39 - 067+73 1,125.00 0021 03
ROUTE 10 RAMP C-B
ROUTE 10 RAMP D-E
ROUTE 10 ROAD E
085+90 - 092+10 590.00 0021 03
Item T20.2006 Total: 48,347.00
086+38 - 102+25 1,587.00 0021 03
ROUTE 10 RAMP D-EL
086+38 - 091+53 575.00 0021 03
ROUTE 10 RAMP E-D
058+43 - 063+68 520.00 0021 03
Distribution of QuantitiesPage 78 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
501+00-513+00 RT 1,200.00 0021 03
489+00-501+00 RT 1,200.00 0021 03
I-95 MAIN LINE B
513+00-525+00 RT 1,200.00 0021 03
457+00-465+00 RT 800.00 0021 03
I-95 MAIN LINE A
477+00-489+00 RT 1,200.00 0021 03
465+00-477+00 RT 1,200.00 0021 03
068+00-080+00 RT 1,200.00 0021 03
068+00-080+00 LT 1,200.00 0021 03
080+00-092+00 RT 1,200.00 0021 03
080+00-092+00 LT 1,200.00 0021 03
044+00-056+00 LT 1,200.00 0021 03
041+00-044+00 LT 300.00 0021 03
064+00-068+00 RT 400.00 0021 03
056+00-068+00 LT 1,200.00 0021 03
ROUTE 10 RAMP B-EL
100+33 - 110+40 600.00 0021 03
ROUTE 10 RAMP D-B
091+67 - 099+62 648.00 0021 03
JEFFERSON BLVD RAMP O
S145 T20.2012 Cont. 025+60 100.00 0021 03
ROUTE 10 RAMP A-C
007+00 180.00 0021 03
043+93 - 064+79 1,012.00 0021 03
MARKINGS YELLOW
S146 T20.2016 6 INCH EPOXY RESIN PAVEMENT LF
BRIDGE NO. 660 650.00 0021 03
BRIDGES
085+71 - 106+75 537.00 0021 03
ROUTE 10 ROAD E
Item T20.2012 Total: 8,653.00
Distribution of QuantitiesPage 79 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
042+98 - 049+60 705.00 0021 03
ROUTE 10 RAMP D-B
043+93 - 064+79 2,070.00 0021 03
ROUTE 10 RAMP C-E
091+67 - 099+62 1,250.00 0021 03
ROUTE 10 RAMP C-B
056+39 - 067+73 1,150.00 0021 03
ROUTE 10 RAMP D-E
085+90 - 092+10 655.00 0021 03
ROUTE 10 ROAD E
085+71 - 106+75 1,855.00 0021 03
ROUTE 10 RAMP E-D
086+38 - 091+53 520.00 0021 03
ROUTE 10 RAMP D-EL
058+43 - 063+68 525.00 0021 03
ROUTE 10 RAMP B-EL
012+50 - 016+60 LT 410.00 0021 03
JEFFERSON BLVD RAMP J
027+60 - 034+75 RT 715.00 0021 03
JEFFERSON BLVD RAMP K
092+00-104+00 RT 1,200.00 0021 03
S146 T20.2016 Cont. 092+00-104+00 LT 1,200.00 0021 03
104+00-111+30 LT 990.00 0021 03
104+00-111+15 RT 855.00 0021 03
JEFFERSON BLVD RAMP L
100+33 - 110+40 900.00 0021 03
ROUTE 10 RAMP A-C
ROUTE 10 RAMP B-C
087+24 - 103+98 1,150.00 0021 03
024+80 - 025+75 RT 100.00 0021 03
019+45 - 025+20 RT 575.00 0021 03
007+05 - 012+40 LT 540.00 0021 03
JEFFERSON BLVD RAMP O
Distribution of QuantitiesPage 80 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Project Name - I-95 Corridor Bridge Preservation & ResurfacingEstimate Name - Current Advertising Estimate
R.I. Contract No. - 2015-CB-021FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)
S146 T20.2016 Cont. Item T20.2016 Total: 32,715.00
Page 81 of 81
Item No.
Item Code Description UM Qty. Pay Code
Seq. No.
Distribution of QuantitiesProject Name - I-95 Corridor Bridge Preservation & Resurfacing
Estimate Name - Current Advertising EstimateR.I. Contract No. - 2015-CB-021
FAP Nos: BHO-0955(102), IM-0955(100), IMG-0955(101)