Distribution List - ER:

1. Sh. Aditya Pyasi Head Regulatory Vedanta Limited (erstwhile Sterlite Energy Ltd.) 3

rd Floor, Core 6,

Scope Complex, Lodhi Road, Delhi Distt : Jharsuguda (Odisha)-768202 Email: [email protected]

Ph: 9999313479

2. Principal Chief Engineer cum Secretary Power Department Government of Sikkim Kazi Road, Gangtok, Sikkim

Email: [email protected] Mob: 9733032266

3. Sh. Subhash Thakur, AGM (PE-Electrical) NTPC(Darlipalli, North KaranPura, Nabinagar-II) EOC Complex, A-8A, Sec-24, Noida, UP-201301 Email: [email protected] [email protected] Ph: 9650991067

4. Shri M. S. Pal Addl. Chief Engineer & In-charge of PTR WBSEDCL Bidyut Bhawan, 7

th Floor,

B Block, DJ Block, Sector II, Salt Lake City, Kolkata – 700 091 Email : [email protected]

5. Sh Neeraj Jain General Manager Monnet Ispat & Energy Limited 11, Monnet House, Masjid Moth, Grater Kailash, Part-II, New Delhi – 110 048 Email : [email protected]

Mobile : +91 9560509283

6. Shri Harish Sharan Executive Director PTC India Limited, 2

nd Floor; NBCC Tower,

15 Bhikaji Cama Place New Delhi – 110 066 Phone : 011-41659136, Email : [email protected]

7. Shri Sudheer Kothapalli Director & SPV Head Lanco Babandh Power Pvt. Ltd. Plot No. 397, Phase-III Udyog Vihar, Gurgaon-122 016 Phone : 0124-4691101 Mobile : 8800090621 Email : [email protected]

[email protected]

8. Shri M. K. Sharma Chief Executive Officer Jal Power Corporation Limited A-102, Sector-65 Noida – 201 307 Phone : 0120-4397444 Email : [email protected]

9. Shri J. Mohapatra Director-Technical Ind-Bharat Energy (Utkal) Limited Plot No. 30-A. Road No:1, Film Nagar Jubilee Hills, Hyderabad-500 033 Mobile: 9717212999 Email : [email protected]

10. Shri P.S. Dutta Gupta Whole Time Director, Madhya Bharat Power Corporation Ltd 1

st Floor, Vanijya Bhawan,

Devendra Nagar Square, Jail Road, Raipur-492001 Mobile: 9810432623

Phone : 0771- 2214210 Email : [email protected] [email protected]

[email protected]

11. Shri Deepesh Roy Essar Power (Jharkhand) Ltd. 2

nd Floor, Essar House Mahalaxmi

Mumbai-400034 Email: [email protected];

[email protected]

12. Shri Sanjeev Upadhyay President, Hydro Gati Infrastructure Limited 14/19/2 Old Delhi Gurgaon Road, Opp. Heera Public School, Samalkha, New Delhi - 110037. Email: [email protected]

13. Shri Madan Gopal Gupta CEO Essar Power (Jharkhand) Ltd. 2

nd Floor, Essar House,

Mahalaxmi, Mumbai - 400034 Email : [email protected]

14. Shri Sanjeev Upadhyay President, Hydro Gati Bhasmey Power Pvt. Ltd. 14/19/2 Old Delhi Gurgaon Road, Opp. Heera Public School, Samalkha, New Delhi - 110037. Email: [email protected]

15. Shri K. C. Samantray Sr. Manager (Electrical) Orissa Power Generation Corporation Ltd. (OPGC) Zone-A, 7th Floor, Fortune Towers

16. Sh. Hemant Chandil Director, Sikkim Hydro Power Ventures Ltd, 5th Floor, Orbit Plaza, New Prabhadevi Road, Prabhadevi,

Chandrasekharpur, Bhubaneswar – 751023 Odisha Ph : 0674-2303765- 66, 09338715428 Fax : 0674-2303755-56 Email : [email protected]; [email protected]

Mumbai- 400025 Email: [email protected] Mob: 7709042956

17. Shri Ajay Kumar Nathani Head, Transmission GMR Kamalanga Energy Ltd. Building no. 302, First Floor, New Shakti Bhawan, New Udaan Bhawan Complex, IGI Airport, Delhi-110037 Email: [email protected]

18. Shri Yogendra Kumar, Teesta Urja Limited, 2

nd Floor, Vijaya Building,

17, Barakhambha Road, Cannaught Place, New Delhi – 110001 Phone : 011-46529744 Email: [email protected]

Mob: 9910413388

Ph: 01146529749

19. Sh. Chandrasekhar Bobade Vice President Jindal India Thermal Power Limited Plot No: 12, Local Shopping Complex, Sector B-1, Vasant Kunj, New Delhi – 110070 Mob: 8130613563 Email:[email protected]; [email protected]

20. Shri Jatinder Singh, SPV Head, LANCO Teesta Ltd. Plot No. 397, Udyog Vihar – Phase III, Gurgaon – 122016 Email : [email protected] Phone : 0124-4741475 Mobile : 9599934386

21. Shri T. Nagendra Rao Managing Director, Shiga Energy Pvt. Ltd. 5

th Floor, DLF Building No. 8

Tower-C, DLF Cyber City, Phase-II Gurgaon – 122002 Phone : 0124-4696300, 4100393, Email : [email protected]

22. Shri T. Nagendra Rao Managing Director Dans Energy Pvt. Ltd 5th Floor, DLF Building No. 8 Tower-C, DLF Cyber City, Phase-II Gurgaon – 122002 Phone : 0124-4696300/9873574939 Email : [email protected]

[email protected]

23. Shri Vijay Kumar Atluri CEO Sneha Kinetic Power Projects Pvt. Ltd. Sonam Complex, Jeevan Theng Marg Development Area, Near Little Pixel International School, Gangtok, Sikkim-737 101 Email : [email protected]

Mob: 9958355966

24. Shri Sunder Prasad, KVK Energy & Infrastructure Pvt. Ltd. Plot No. 484/A, Road No 36, Jubilee Hills, Hyderabad – 500033 Email : [email protected] Phone: 9810257484

25. Sh. S K Bhowmick Sr. Vice President Teestavalley Power Transmission Ltd 2nd Floor, Vijaya Building 17, Barakhamba Road, New Delhi-110001 Email: [email protected] Mob: 9958008265

26. Shri P.K. Ghosh Head, T&D Planning and Power Purchase, India Power Corporation Ltd (Formerly DPSC Ltd) Plot no. X-1,2 & 3 Block-EP, Sector-V, Salt Lake Kolkata-700091 Ph: 033-23574309, 09836376548 Email: [email protected]

27. Shri K. Anil, Business Head M. Sunder Prasad, Chief Operating Officer KVK Nilachal Power Pvt Limited 6-3-1109/3, 3

rd Floor, Navabharath Chambers,

Raj Bhavan Road, Somajiguda Hyderabad: 500 082 Contact No: 040 66225111 Email:[email protected]; [email protected] Mob: 8790944466

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 1 of 24

Minutes of 10th Joint Co-ordination Committee meeting of Generation Projects granted Connectivity/LTA

in Eastern Region (ER) held on 30.09.2016 at POWERGRID, Gurgaon

1. The 10th Joint Co-ordination Committee meeting of generation projects in Eastern Region was held at POWERGRID Office, Gurgaon on 30th September, 2016. The list of participants of the meeting is enclosed at Annexure-I.

2. After welcoming the participants, it was informed that Minutes of the 9th Meeting of the Joint Co-ordination Committee of generation projects which were granted LTA in Eastern Region held on 10.06.2016, were issued vide letter ref. no. C/CTU/ER/OA/9JCC dated 30.06.2016. As no observations/comments were received on the minutes, the minutes were confirmed as circulated.

3. It was clarified that JCC forum has been created for co-ordination purposes to attempt matching of generation schedules with the

associated transmission system and accordingly, the information given by generation developers/applicants is being taken into

cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic

schedule & other status of generation project /dedicated line. However, for any substantial issue, it may be kindly submitted

through official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory

framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not

clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions

(Regulation 18) specifically regarding notice, mentioning the relinquishment quantum, date of relinquishment and consent for

payment of applicable relinquishment charges.

4. CTU emphasized that generation developers should ensure completion of their dedicated transmission lines to match with the

commissioning of transmission network in order to prevent bottling up of power. It was further stated that interim arrangements

through LILO of existing lines were provided only as a contingency measure and the generation developers need to implement

the final dedicated transmission system as the matter has been very seriously looked into by Hon’ble CERC in Petition no.

112/TT/2013.

5. All the LTA customers were advised to clear the consultancy payment liabilities at the earliest towards implementation of bays for termination of dedicated/connectivity lines for timely implementation of the same. In case of failure, the generation developers/applicants shall alone be responsible towards any delay in implementation of the bays.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 2 of 24

6. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and

Detailed procedure made therein.

7. It is noted that some of the generation developers/ applicants have been repetitively not attending the JCC Meetings. All such

generation developers/ applicants were requested to attend the future meetings so as to have a better co-ordination.

8. All those generation projects that have achieved COD and their respective dedicated transmission lines have also been

commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being

called for further JCC meetings (Details of all such generation projects as per Table T1 (i) & T1 (ii)).

9. As per the 9th JCC meeting, a no. of LTA customers were requested to sign the Transmission Service Agreement (TSA) at the earliest in accordance with CERC Sharing Regulations. However, none of them have signed TSA till date. It is once again advised that the LTA customers shall sign the TSA at the earliest. List of the generation developers who are yet to sign the TSA is enclosed herewith at Annexure- II.

10. The LTA Customers were requested to update the progress of their generation projects and the discussion are summarised below:

Status of the Generation Projects ����

HIGH CAPACITY TRANSMISSION CORRIDOR – I (Phase-I IPPs in Odisha & associated Transmission System)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule

(as per 10th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1. Sterlite Energy

Ltd (4x600 MW)

400 0

200 0

200 0

0 0

U1, U2, U3- commissioned

U4- Commissione

d in Apr’12

U1, U2, U3 & U4-

Commissioned progressively

by Apr’12

400kV Sterlite-Jharsuguda Pool D/c line: Nov’16

Petition filed in CERC for relinquishment of entire LTA quantum.

The generation developer was once again advised to

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 3 of 24

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule

(as per 10th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

implement the dedicated line and remove the interim arrangement at the earliest.

2. Monnet Power Company Ltd (2x525 MW)

900 300 225 225 150 400MW-

West Bengal

U1: Aug’17 U2: Nov’17

Not attended (project in abeyance)

400kV Monet TPS-Angul Pool D/c

line- Dec’16

Status submitted through email wherein it has been informed that project is in abeyance stage and updated status will be submitted in December 2016.

LTA Customer is yet to open LC and sign TSA.

It was advised to submit fresh application for change in Region to supply power to West Bengal.

3.

Lanco Babandh

Power Pvt Ltd (2x660 MW)

800 325 650

475 150

0 0

UP: 424MW Rajasthan: 350 MW

(total-774MW)

Uncertain Uncertain

400kV Lanco TPS-Angul Pool D/c line + 3x500MVA ICT at

Angul Pool: Commissioning matching with

generation project.

Representative confirmed that they are not able to provide the schedule and hence the project status is uncertain.

LTA Customer is yet to open LC. Dedicated transmission line has not yet been awarded.

Consultancy for terminal bays at Angul Substation (POWERGRID) has not been awarded as yet.

Generation developer has filed Petition No.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 4 of 24

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule

(as per 10th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

38/MP/2016 in Hon’ble CERC for keeping its LTA on abeyance on account of alleged force majeure condition.

Applicant was advised to apply for change in region through a fresh application, if it desires to supply additional 124MW to NR (774MW-650MW) and shall be liable for payment of applicable relinquishment charges as decided by CERC in the petition no. 92/MP/2015.

4.

Ind Barath Energy(Utkal)

Ltd (2x350 MW)

616 266

116

350

0 0

0 500

Tamil Nadu : 500 MW GRIDCO :

81 MW

U1: Jul’16 U2: Dec’16

U1: COD (20.07.16)

(through LILO)

U2: March’17 (Synchronization)

400kV Ind barath-Jharsuguda Pool D/c line: Completed on 28.09.16 (Construction completed, commissioning expected by Oct’16)

The generation developer was advised to commission the dedicated line and remove the interim arrangement at the earliest Fresh application required for GRIDCO share on account of change in region.

Confirmation regarding payment of relinquishment charges for 35 MW awaited from the applicant.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 5 of 24

HIGH CAPACITY TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm beneficiary

Comm. schedule

(as per 9th

JCC)

Comm. schedule (as per 10

th JCC)

Dedicated / Connectivity line

& Status Remarks

NR WR ER

1.

Essar Power (Jharkhand) Ltd. (2x600 MW)

1100 400 400 300

Bihar: 750 MW

Jharkhand: 12% (127

MW)

U-1 : July ‘18

U-2 : Oct’18

U-1 : Nov’18

U-2 : Jan’19

400kV Essar

TPS-Jharkhand Pooling Station

D/c line (Quad) : Commissioning matching with

generation projects

Applicant was advised once again to submit fresh application for change in Region to supply power to Bihar.

Project on hold - Awaiting coal block auction.

Lenders have stopped funding the project.

Dedicated Line not yet awarded.

Developer to open LC & sign TSA at the earliest.

Applicant has filed Petition before CERC for relinquishment of 350 MW and another petition filed for abeyance of LTA of 750 MW.

2. WBSEDCL (1000 MW State surplus)

1000 600 400 0 Not attended Not attended -

Representative consistently not attending JCC meeting; status of progress not submitted since 5

th JCC;

In view of consistent absence of WBSEDCL, a separate meeting to be convened by CEA to discuss the matter.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 6 of 24

HIGH CAPACITY TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule (as per 10

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER

1

Teesta Urja Ltd. / PTC (Teesta-III) (6x200 MW)

1200 840 0 144

Punjab: 340 MW

Haryana: 200 MW

UP: 200 MW Rajasthan: 100 MW

Sikkim: 144 MW

U1: Dec’16 U2 & U3: Jan’17

U4: Feb’17 U5 & U6: Mar’17

U1: Dec’16 U2: Jan’17 U3:Jan’17 U4: Feb’17 U5 & U6: Mar’17

400kV Teesta III - Kishanganj D/c (Quad) line (being implemented by TPTL): ISTS line upto Rangpo expected to be commissioned by 31.10.16 and balance portion upto Kishanganj expected to be commissioned by 31.03.17.

2

Lanco Teesta Hydro Power

Ltd, (Teesta-VI) (4x125 MW)

500 0 500 0 MSEDCL-500 MW

U1 – July’19 U2 - Aug’19 U3- Sep’19 U4- Oct’19

Not attended

220 kV Teesta VI- Rangpo D/c Twin Moose Conductor line : Dec’17; bay work yet to be awarded

Applicant was advised to sign TSA at the earliest.

3

DANS Energy Pvt.

Ltd. (Jorethang)

(2x48)

96 48 48 0 U-1 & 2:

Commissioned in Sep’15

Commissioned 220kV Jorethang - New Melli D/c line- expected by Oct’16;

Interim arrangement to be removed after commission of dedicated line.;

Matter regarding crossing of transmission line of DANS & TPTL to be resolved in the meeting to be convened by CEA.

4 JAL Power Corporation

120 16 16 88 WBSEDCL-

72MW U1: Nov’18

Not attended U1: Nov’18

220kV Rangit IV - New Melli

Status submitted through email wherein commissioning

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 7 of 24

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule (as per 10

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER

(Rangit-IV) (3x40 MW)

U2&3: Dec’18 U2&3: Dec’18

D/c line: expected by Sep’17

schedule has been informed.

Applicant was advised to sign TSA at the earliest.

POWERGRID reiterated that contract for bays with Alstom has been closed and so, a revised agreement needs to be signed by JAL Power with revised costs & schedule.

5

Madhya Bharat Power

Corpn Ltd. (Rongnichu) (2x48 MW)

96 56 40 0 Nil U1: Jun’18

U2: July’18 Not attended

220kV Rongnichu-Rangpo D/c Zebra conductor line: Matching with generation

Applicant was advised to sign TSA at the earliest.

Applicant to confirm firm timeline for completion of bays at Rangpo S/S & submit status of NIT/Award.

6

Gati Infrastructure

Ltd (Chuzachen) (2x49.5 MW)

99 99 0 0 Commissioned Commissioned

132kV Chuzachen-Rangpo D/c Zebra Conductor line – Expected by Dec’17

Interim arrangement made through connection of 132 kV Rangpo- Gangtok S/c line at Chuzachen;

The generation developer was advised once again to implement the dedicated line and remove the interim arrangement at the earliest.

Applicant informed that construction of bays at Rangpo end is pending and to be implemented by Govt. of Sikkim (as per arrangement agreed between applicant & Govt. of Sikkim)

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 8 of 24

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule (as per 10

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER

CTU reiterated that the responsibility for arrangement of early commissioning of GIS bays at Rangpo end of dedicated line lies with the Generation developer in terms of the intimation for grant of LTA dated 29.06.2012 and also as in terms of Regulations & Procedures.

CEA to convene a meeting for coordination of transmission works among CEA, CTU, Govt. of Sikkim and generation project developer.

7

Gati Infrastructure

Bhasmey Power Pvt.

Ltd. (Bhasmey)

(2x25.5 MW)

51 36 15 0 West Bengal

: 30 MW U1: Mar’18 U2: Mar’18

U1: Mar’18 U2: Mar’18

132 kV Bhasmey- Rangpo D/c line – matching with generation project

Applicant was once again advised to submit fresh application for change in Region to supply power to West Bengal.

Supplementary BPTA and TSA to be signed at the earliest.

CEA to convene a meeting for coordination of transmission works among CEA, CTU, Govt. of Sikkim and generation project developer.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 9 of 24

Other Generation Projects – Granted Connectivity & LTA (Phase-II IPPs in Odisha)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule (as per 10

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1.

GMR Kamalanga Energy Ltd

(1x350 MW)

220 0 220 0 0 Uncertain Uncertain

400kV GMR TPS-Angul Pool D/c (Quad) line with

bays at both ends: Commissioned

Applicant confirmed that recently Petition has been filed before CERC for relinquishment of entire quantum.

Confirmation regarding payment of relinquishment charges for entire LTA quantum awaited from the applicant.

2. NTPC Ltd. (Darlipalli)

(2x800 MW) 793.5 0 0 793.5 0 Nil

U1:

Jun’18 U2:

Dec’18

U-1:Jun’18 U-2: Dec’18

765 kV Darlipalli-Jharsuguda D/c line- expected by Jun’18

Best efforts shall be made by POWERGRID for early commissioning as per the indemnification agreement by POWERGRID for early commissioning.

3.

Orissa Power Generation Company

Ltd. (2x660 MW)

600 200 200 0 200 Nil

Synchronisation:

U1: July’17

U2: Nov’17

Not attended:

U1: July’17

U2: Nov’17

400 kV OPGC-Jharsuguda D/c line with Triple snowbird conductor : Under

TBCB, scheduled by Jul’17

Status submitted through email wherein commissioning schedule of generation has been informed.

Applicant was advised to sign TSA at the earliest

4.

K V K Nilachal

Power Pvt. Ltd

(3x350 MW)

560 140 140 140 140 GRIDCO: 25% (263 MW app)

U1: Mar’18

U2: Mar’19

U3: Jul’19

Uncertain

LILO of one ckt of 400kV Baripada-

Mendhasal D/c line – matching with

PIL has been disposed of in favor of Generation developer. However, work could not be taken up on account of tying up of

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 10 of 24

Gen. Proj finances.

Applicant was once again advised to sign TSA at the earliest.

5. Sterlite

Energy Ltd (4x600 MW)

1000 400 400 200 0 Commissi

oned Commissioned

400kV Strelite-Jharsuguda Pool

2nd

D/c line: Requirement to be

reviewed in the next ER Connectivity /LTA meeting.

Petition filed in CERC for relinquishment of entire LTA quantum

The generation developer was advised to implement the 1

st 400kV D/C

dedicated line and remove the interim arrangement at the earliest

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 11 of 24

(Phase-II IPPs in Sikkim)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 9

th

JCC)

Comm. schedule (as per 10

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1.

Shiga Energy Pvt. Ltd.

(Tashiding) 2x48.5 MW

97 48.5 48.5 0 0 NIL U-1 & 2: Dec’16

U-1 & 2: Dec’16

220kV Tashiding -Legship D/c line – expected by Oct’16

Legship- New Melli and bays at New Melli (under scope of Govt. of Sikkim) to be expedited.

2.

Sneha Kinetic Power Projects Ltd

(Dikchu) (2x48 MW)

96 0

48 0

48 0

0 0

0 0

Nil Not

Attended U1&2: Nov’16

132 kV Dikchu- Dikchu Pool D/c

Moose conductor/ HTLS line :

400kV Interim arrangement

through LILO of one ckt of Teesta-III to Rangpo D/c line at

Dikchu (being implemented by M/s

Sneha Kinetic) -Nov’16

132 kV Dikchu- Dikchu Pool D/c line (under scope of Govt. of Sikkim) to be expedited.

Granted LTA was withdrawn/ revoked as the applicant failed to sign LTAA.

3.

Sikkim Hydro Power

Ventures Ltd- 2x33 MW

66 40 26 0 0 NIL Dec’18 Not attended:

Dec’18

132 kV Rangit II – Legship Pool D/c line (along with 2

nos. of 132 kV line bays at legship

pool): Matching with generation project

Status submitted through email wherein applicant requested Govt of Sikkim to permit site investigations for fixing alignment of the dedicated line.

Applicant to submit Construction BG of Rs. 3.30 Crore.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 12 of 24

Applicant granted only Connectivity

Sl No

Generation Developer/ Open Access Applicant

Connectivity Quantum (MW)

Comm. Schedule

(TA/Intimation)

Comm. schedule (as per 8

th

JCC)

Comm. schedule (as per 10

th JCC)

Dedicated / Connectivity line &

Status Remarks

1 India Power Corporation Ltd (Bulk consumer) (Erstwhile

DPSC Ltd.) 500 Jul'14 Abandoned

Applicant requested for

change in point of connectivity from 400/220 kV Chabalpur substation to

220 kV Debipur substation

LILO of 400kV Mejia-Maithon line at Chalbalpur 400kV S/s of DPSC:

Applicant was advised to submit fresh application for change in location of point

of connectivity.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 13 of 24

List of Generation Projects for which coordination not required in view of commissioning of projects along with the dedicated lines, or relinquishment of LTA

HIGH CAPACITY TRANSMISSION CORRIDOR – I

(Phase-I IPPs in Odisha & associated Transmission System) Table T 1 (i)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum (MW)

Target Beneficiaries Firm beneficiary

Last updated schedule

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1.

GMR Kamalanga Energy Ltd (3x350 MW)

800

647

600

540

387

0

0

260

200 0

300-Haryana 260 - Bihar

8th JCC:

Project and dedicated line commissioned

400kV GMR TPS-Angul Pool D/c (Quad) line-commissioned in Dec’14;

GMR TPS- Meramundali 400 kV S/c - commissioned in Mar’15

Petition for relinquishment filed before CERC & the matter is under adjudication.

Meanwhile, GMR had applied for fresh LTA for change in region of 260 MW, which has been granted subject to payment of relinquishment charges for change in region.

LTA quantum reduced from 800 MW to 647 MW on account of relinquishment by GMR as per letter dated 21.06.2016 with consent for payment of relinquishment charges as per CERC decision in Petition No. 92/MP/2015.

2.

Navabharat Power Pvt.

Ltd

(3x350 MW)

720 465 255 0 0 8

th JCC:

Project Abandoned

400kV Navbharat

TPS-Angul Pool D/c line: Abandoned

Developer has applied for relinquishment and the case is pending in CERC. Order is reserved.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 14 of 24

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum (MW)

Target Beneficiaries Firm beneficiary

Last updated schedule

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

Applicant was advised to sign TSA at the earliest

3.

Jindal India Thermal

Power Ltd (2x600 MW)

1044

0

834

0

210 0

0 0 Commissioned

400kV Jindal TPS-Angul Pool D/c line

1st Ckt)- Commissioned

Monthly progress

report regarding 2nd dedicated line to be

submitted by the developer.

Gen. developer confirmed that survey activities for the 2

nd dedicated line are

being arranged.

Petition filed in CERC for relinquishment of entire LTA quantum. Order is reserved.

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 15 of 24

HIGH CAPACITY TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)

Table T 1 (ii)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm beneficiary

Last updated schedule

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1.

Adhunik Power & Natural

Resources Limited

(2x270 MW)

450

200

50 200

100

0

100

Tamil Nadu: 100 MW &

West Bengal: 100 MW;

(Operational)

8th JCC:

Project and dedicated line commissioned

400kV Adhunik TPS-Jamshedpur D/c line-

Commissioned

Applicant has filed a petition before CERC for relinquishment for 250 MW (NR: 200 MW, WR: 50 MW) of LTA and return of BG for 450 MW. LTA for 100 MW to Tamil Nadu & 100 MW to West Bengal operational

2.

Corporate Power Limited

Ph-I (2x270 MW)

480 240 240 0 0 Special JCC: Project

uncertain

400kV Corporate TPS-Jharkhand Pooling Station D/c line: Not taken up

Developer confirmed in the Special JCC that project is uncertain due to de-allocation of Coal Blocks and requested for relinquishment of LTA.

Matter is sub-judice. 3.

Corporate Power Limited

Ph-II (2x270 MW)

480 240 240 0

0

Special JCC: Project

uncertain

400kV Corporate TPS -Ranchi D/c line: Not taken up

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 16 of 24

Status of the Associated Transmission System ����

HIGH CAPACITY TRANSMISSION CORRIDOR – I (Phase-I IPPs in Odisha & associated Transmission System)

Transmission System under the Scope of POWERGRID:

• Transmission System for Phase-1 generation projects in Odisha - Part-A

Sl. No.

Scope of Transmission System Status (as per 9

th JCC)

Status (as per 10

th JCC)

Remarks

1 765kV Angul Pooling Station – Jharsuguda Pooling Station 2xS/c line

Commissioned

Commissioned

2 LILO of 400kV Rourkela – Raigarh D/c at Jharsuguda Pooling station Commissioned Commissioned

3 LILO of 400kV Meramundali – Jeypore S/c line at Angul pooling station Commissioned Commissioned

4 LILO of 400kV one ckt of Talcher - Meramundali D/c line at Angul pooling station

Commissioned Commissioned

5 Establishment of 2x1500 MVA, 765/400kV Pooling Station at Jharsuguda Commissioned Commissioned

6 Establishment of 4x1500MVA, 765/400kV Pooling Station at Angul Commissioned Commissioned

• Transmission System for Phase-1 generation projects in Odisha - Part-B

Sl. No.

Scope of Transmission System Status (as per 9

th JCC)

Status (as per 10

th JCC)

Remarks

1 Establishment of 765kV switching station at Dharamjaygarh / near Korba Commissioned Commissioned

2 LILO of 765kV Ranchi – WR Pooling near Sipat S/c line at Dharamjaygarh / near Korba

Commissioned Commissioned

3 765kV Jharsuguda Pooling Station – Dharamjaygarh / near Korba (WR) D/c Commissioned Commissioned

4 Establishment of 765/400kV Pooling Station at Jabalpur Commissioned Commissioned

5 765kV Dharamjaygarh / near Korba – Jabalpur Pooling Station D/c line Commissioned Commissioned

6 400 kV Jabalpur Pooling Station – Jabalpur D/c (high capacity) line Commissioned Commissioned

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 17 of 24

• Transmission System for Phase-1 generation projects in Odisha - Part-C

Sl. No.

Scope of Transmission System Status (as per 9

th JCC)

Status (as per 10

th JCC)

Remarks

1 765kV Jabalpur Pooling Station – Bina D/c line Commissioned Commissioned

2 765kV Bina – Gwalior S/c (3rd circuit) Commissioned Commissioned

3 765kV Gwalior - Jaipur S/c line (2nd circuit) Commissioned Commissioned

4 765kV Jaipur - Bhiwani S/c line (1st circuit) Commissioned Commissioned

Transmission System under the Scope of Private Sector:

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 Establishment of 2x1500MVA, 765/400kV Bhopal Pooling Station Commissioned Commissioned

2 765kV Jabalpur Pool – Bhopal – Indore S/c Commissioned Commissioned

3 400kV Bhopal New substation – Bhopal (M.P.) D/c (high capacity) Commissioned Commissioned

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 18 of 24

HIGH CAPACITY TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)

Transmission System under the Scope of POWERGRID:

• Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-1

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 Establishment of 400kV GIS Pooling Station (Jharkhand Pool) near Essar and Corporate generation projects.

June’16 Commissioned

2 400 kV Ranchi - Gaya D/c (Quad) line via pooling station proposed near Essar / Corporate generation projects

June’16 Commissioned

• Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-2

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 Ranchi New (765/400kV S/s) - Dharamjaygarh / near Korba 765kV S/c Commissioned Commissioned

2 2x1500 MVA, 765/400 kV New GIS substation at Varanasi Commissioned in

Apr’16 Commissioned

3 Gaya - Varanasi 765kV S/c Commissioned in

Apr’16 Commissioned

4 Varanasi - Balia 765 kV S/c line Commissioned in

Apr’16 Commissioned

• Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-B

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 New 2x1500 MVA, 765/400 kV substation at Kanpur Jun’16 Commissioned

2 Varanasi – Kanpur 765 kV D/c Jun’16 Commissioned

3 Kanpur – Jhatikra 765 kV S/c Jun’16 Commissioned

4 Kanpur (765/400kV) – Kanpur (Existing) 400kV D/C (Quad) Jun’16 Commissioned

5

400kV connectivity for new 765/400kV S/s at Varanasi

• Varanasi – Sarnath (UPPCL) 400kV D/c (quad)

• LILO of Sasaram – Allahabad 400kV line at Varanasi

• Opening of LILO of one ckt of Sasaram – Allahabad 400kV D/c line at Sarnath

Jun’16

Oct’16

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 19 of 24

Transmission System under the Scope of Private Sector:

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 Dharamjaygarh – Jabalpur 765kV D/C line (2nd

line) Commissioned Commissioned

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 20 of 24

HIGH CAPACITY TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)

Transmission System under the Scope of POWERGRID:

• Transfer of power from generation projects in Sikkim to NR/WR (Part-A)

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 Establishment of New 2x315 MVA, 400kV sub-station at Kishanganj Commissioned in

Mar’16 Commissioned

2 LILO of Siliguri (Existing) – Purnea 400kV D/c line(quad) at new pooling station Kishanganj

Commissioned in Mar’16

Commissioned

3 LILO of Siliguri (Existing) – Purnea 400kV D/c line (on which reconductoring is being carried out) at Kishanganj with higher capacity (quad) conductor

Commissioned in Mar’16

Commissioned

4 LILO of Siliguri – Dalkhola 220kV D/c line at new pooling station Kishanganj Commissioned in

Mar’16 Commissioned

5 LILO of Gangtok-Melli 132kV S/c line upto Rangpo, where Chuzachen-Rangpo 132kV D/c would be connected so as to form Chuzachen-Gangtok and Chuzachen-Melli 132kV S/c lines.

Commissioned Commissioned

• Transfer of power from generation projects in Sikkim to NR/WR (Part-B)

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 Establishment of 400/220/132kV (400/220kV, 16x105 MVA, Single Phase transformers and 220/132kV, 3x100MVA) Gas Insulated Substation at Rangpo

Commissioned Commissioned

2 Establishment of 220kV Gas Insulated switching station at New Melli Commissioned Commissioned

3 LILO of Teesta III – Kishanganj 400kV D/c line (HTLS, Teesta III – Kishanganj 400kV D/c line to be constructed through JV route) at Rangpo

Sep’16 Oct’16 (1st LILO)

One ckt. LILO completed and likely to be commissioned by Oct’16.

2nd

LILO is being taken up as a separate project under part B1 of the scheme.

4 Rangpo – New Melli 220kV D/c line (with twin Moose conductor) Commissioned Commissioned

5 LILO of Gangtok-Rangit 132kV S/c line at Rangpo and termination of Gangtok-Rangpo/Chujachen and Melli – Rangpo/Chujachen 132kV lines (constructed under part-A through LILO of Gangtok-Melli 132kV S/c line upto

Commissioned Commissioned

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 21 of 24

Rangpo) at Rangpo sub-station

6 LILO of Teesta V – Siliguri 400kV D/c line at Rangpo Commissioned Commissioned

7 Kishanganj- Patna 400 kV D/c (quad) line Commissioned in

Mar’16 Commissioned

Transmission System under the Scope of TPTL (ISTS licensee):

Sl. No.

Scope of Transmission System Status (as per 9th JCC)

Status (as per 10

th JCC)

Remarks

1 Teesta III – Kishanganj 400kV D/c (Quad) line

Line upto Rangpo S/S – June’16 Balance portion upto Kishanganj S/S – Mar’17

Line upto Rangpo S/S – Oct ‘16 Balance portion upto Kishanganj S/S- Mar’17

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 22 of 24

Annexure-I List of Participants in the 10th Joint Co-ordination committee Meeting of IPPs granted LTA in ER held on 30.09.2016

Sl. No. Name Designation Organization Email

1 Rishika Sharan Director Central Electricity Authority [email protected]

2 Shivani Sharma Dy Director Central Electricity Authority [email protected]

3 Kanchan Chauhan Asst Director Central Electricity Authority [email protected]

4 Subir Sen COO (CTU-Plg) POWERGRID [email protected]

5 Avinash M Pavgi GM (Commercial) POWERGRID [email protected]

6 Ashok Pal GM (CTU-Plg) POWERGRID [email protected]

7 D N Rozekar AGM (CTU-Plg) POWERGRID [email protected]

8 Jyoti Prasad DGM (CTU-Plg-Law) POWERGRID [email protected]

9 Sangeeta Saxena DGM (CMG) POWERGRID [email protected]

10 Anil K Meena CM (CTU-Plg) POWERGRID [email protected]

11 Rajesh Verma CM (CTU-Plg) POWERGRID [email protected]

12 Laxmikant Manager (CTU-Plg) POWERGRID [email protected]

13 Manish Pareta Sr.Engineer (CTU-Plg) POWERGRID [email protected]

14 Swapnil Verma Officer (CTU-Plg-Law) POWERGRID [email protected]

15 Ankush Patel Engineer (CTU-Plg) POWERGRID [email protected]

16 Manish Ranjan Keshari

Engineer (CTU-Plg) POWERGRID [email protected]

17 Dwaipayan Sen Engineer (CTU-Plg) POWERGRID [email protected]

18 Ravi Roshan Kumar Engineer (BDD) POWERGRID [email protected]

19 Vineet Sarawagi Manager Adhunik Power & Natural Resources Ltd [email protected]

20 P C Sharma President DANS Group [email protected]

21 Risabh Roshan Dy Manger Essar Power Jharkhand Ltd [email protected]

22 Anshuman Gothwal Manager Gati Infrastructure Private Limited [email protected]

23 Rajesh Sharma AGM Gati Infrastructure Private Limited [email protected]

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 23 of 24

Sl. No. Name Designation Organization Email

24 R G Yadav Consultant Gati Infrastructure Private Limited -

25 G. Saraswat AVP (Trans) GMR Energy Limited [email protected]

26 Ajaya Kumar Nathani Head Trans GMR Energy Ltd [email protected]

27 Manoj Tanwar AVP Greenko Group [email protected]

28 J. Mahapatra Director Ind-Barath Energy (Utkal) Ltd [email protected]

29 P K Ghosh Advisor (T&D) India Power Corporation Ltd (IPCL) [email protected]

30 D. Sarkar UP (Tech) India Power Corporation Ltd (IPCL) [email protected]

31 Ravinder Singh Asst Manager (Admn) KVK Nilachal Power Private Limited [email protected]

32 Ratnesh Saxena AGM (P&A) KVK Nilachal Power Private Limited [email protected]

33 Mahavirsinh Jhala GM (Commercial) Lanco Babandh Power Limited [email protected]

34 Pradipta Majumder DGM Planning& Monitoring

Lanco Babandh Power Limited [email protected]

35 Suveen Vyas DGM-PP&M NTPC Ltd [email protected]

36 Ravi Shankar Manager PTC India Ltd [email protected]

37 Nukala Kishore Manager Shiga Energy Pvt Ltd [email protected]

38 Jaideep Lakhtakia GM Teesta Urja Ltd [email protected]

39 Atchibabu Manager Teesta Urja Ltd [email protected]

40 Jaipal Singh Dir (Proj) Teesta Valley Power Transmission Ltd [email protected]

41 S K Bhowmick Sr VP Teesta Valley Power Transmission Ltd [email protected]

42 Aditya Pyasi Head Regulatory Vedanta Limited (Erstwhile Sterlite Energy)

[email protected]

Minutes of 10th

JCC of Eastern Region held on 30.09.2016

Page 24 of 24

Annexure-II

The following applicants are requested to sign the Transmission Service Agreement

Sl. No. LTOA / LTA Applicant

LTOA/ LTA Quantum

(MW)

Target Beneficiaries

NR WR ER SR

1. Essar Power (Jharkhand) Ltd.

(2x600 MW) 1100 400 400 300 0

2. Lanco Teesta Hydro Power Ltd,

(Teesta-VI) (4x125 MW) 500 0 500 0 0

3. Madhya Bharat Power Corpn Ltd.

(Rongnichu) (2x48 MW) 96 56 40 0 0

4. Orissa Power Generation Company

Ltd. 600 200 200 0 200

5. Monnet Power Company Ltd 900 300 225 225 150

6. KVK Nilachal Power Pvt. Ltd 560 140 140 140 140

7. Navbharat Power Pvt. Ltd 720 465 255 0 0

8. Sterlite Energy Ltd 400 200 200 0 0

9. Gati Infrastructure Ltd (Bhasmey) 51 36 15 0 0