Docket Nos. 50-390, 50-391License Nos. CPPR-91, CPPR-92
Tennessee Valley AuthorityATTN: Dr. Mark 0. Medford
Vice President, Technical Support3B Lookout Place1101 Market StreetChattanooga, TN 37402-2801
Gentlemen:
SUBJECT: MEETING SUMMARY - WATTS BAR UNITS 1 AND 2
This letter refers to the meeting conducted at the Watts Bar site onJanuary 20, 1994. The meeting was at our request to discuss the status ofongoing and planned activities at Watts Bar. Enclosure 1 is a list of theindividuals who attended the meeting and Enclosure 2 is the handout materialsupplied by TVA. It is-our opinion that this meeting was beneficial andprovided a better understanding of TVA's activities.
Should you have any questions concerning this letter, please contact me.
Sincerely,
(Original signed by E. Merschoff)
Ellis W. Merschoff, DirectorDivision of Reactor Projects
Enclosures:1. List of Attendees2. Presentation Summary
cc w/encls: (See page 2)
379 O99402080006 940127PDR ADOCK 05000390A PDR
![Page 2: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/2.jpg)
JAN 2 7 1994
Tennessee Valley Authority
cc w/encls:Mr. Craven Crowell, ChairmanTennessee Valley AuthorityET 12A400 West Summit Hill DriveKnoxville, TN 37902
Mr. W. H. Kennoy, DirectorTennessee Valley AuthorityET 12A400 West Summit Hill DriveKnoxville, TN 37902
Mr. Johnny H. Hayes, DirectorTennessee Valley AuthorityET 12A400 West Summit Hill DriveKnoxville, TN 37402-2801
Mr. D. E. Nunn, Vice PresidentTennessee Valley Authority3B Lookout Place1101 Market StreetChattanooga, TN 37402-2801
Mr. W. J. Museler, Vice PresidentWatts Bar Nuclear PlantTennessee Valley AuthorityRoute 2, P. 0. Box 800Spring City, TN 37381
Mr. B. S. Schofield, ManagerNuclear Licensing and
Regulatory Affairs4G Blue Ridge1101 Market StreetChattanooga, TN 37402-2801
Mr. G. L. PannellSite Licensing ManagerWatts Bar Nuclear PlantTennessee Valley AuthorityRoute 2, P. 0. Box 800Spring City, TN 37381
2
TVA RepresentativeTennessee Valley Authority11921 Rockville PikeSuite 402Rockville, MD 20852
General CounselTennessee Valley AuthorityET IIH400 West Summit Hill DriveKnoxville, TN 37902
The Honorable Robert AikmanCounty ExecutiveRhea County CourthouseDayton, TN 37321
The Honorable Garland LanksfordCounty ExecutiveMeigs County CourthouseDecatur, TN 37322
Mr. M. H. Mobley, DirectorDivision of Radiological Health3rd Floor, L and C Annex401 Church StreetNashville, TN 37243-1532
Danielle DroitschEnergy ProjectThe Foundation for Global
SustainabilityP. 0. Box 1101Knoxville, TN 37901
Mr. Bill HarrisRoute 1, Box 26Ten Mile, TN 37880
bcc w/encls: (See page 3)
0
![Page 3: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/3.jpg)
JAN 2 7 M394
Tennessee Valley Authority
bcc w/encls:E. W. Merschoff, DRP/RIIP. E. Fredrickson, DRP/RIIB. M. Bordenick, OGCM. S. Callahan, GPA/CAA. F. Gibson, DRS/RIIB. S. Mallett, DRSS/RIIP. A. Taylor, DRS/RIIG. C. Lainas, NRRF. J. Hebdon, NRRL. C. Plisco, OEDOP. S. Tam, NRRNRC Document Control Desk
NRC Resident InspectorU. S. Nuclear Regulatory CommissionRoute 2, Box 700Spring City, TN 37381
DRP/RjY
ARu ff:vyg01/;p/94
DRP I I
PF edH ckson01/>t/94
3
DRP I
JC 0 1 1e/i4k
![Page 4: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/4.jpg)
ENCLOSURE 1 -
LIST OF ATTENDEES
TITLENAME
Participants:
NRC
Dr. I. SelinJ. TaylorE. BakerW. BeecherS. EbneterP. FredricksonG. WaltonP. VanDoornK. IveyJ. LaraM. Glasman -K. Clark
ChairmanExecutive Director for OperationsTechnical Assistant to the ChairmanOffice of Public AffairsRegional AdministratorSection ChiefSenior Resident Inspector (Construction)Senior Resident Inspector (Operations)Resident InspectorResident InspectorResident InspectorPublic Affairs Officer
TVA
0.W.D.J.M.W.N.D.G.W.
KingsleyCobeanNunnScal iceMedfordMuselerKazanasMoodyPannellElliott
President, Generating GroupAdvisor to the TVA Board of DirectorsVice President, Nuclear ProjectsVice President, Nuclear OperationsVice President, Technical SupportSite Vice PresidentVice President Completion AssurancePlant ManagerLicensing ManagerEngineering and Modifications
Observers
A. HarrisF. McCuistionT. BirchfieldDr. S. SmithV. MillerR. HigginsR. HawkinsJ. SpragueM. WilliamsJ. Carpenter
TVATVA
Foundation for GlobalChattanooga News FreeChattanooga TimesWMTU Radio, KnoxvilleAthens Post-AthenianThe Associated Press,Dayton Herald-News
SustainabilityPress
Chattanooga
![Page 5: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/5.jpg)
CHAIRM SELIN'S VISIT TO :WBN
Januar y 20, 1994
* .,�4r#T
Er
![Page 6: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/6.jpg)
NRC CHAIRMAN SELIN'S VISIT TO WBN
JANUARY 20, 1994
AGENDA
11:00 a.m. - 11:15 a.m.
11:30 a.m. - 01:00 p.m.
Arrive at WBN NRC Office - Meet Resident(Introductions - Confirm Agenda)
Plant Tour
a
a
U
U
E
Diesel GeneratorsControl RoomAuxiliary Control RoomReactor BuildingAuxiliary Building
StaffMuseler/Scal ice
Muse]er/Scal iceMoody/El Iiott
01:00 p.m. - 01:30 p.m.
01:45 p.m. - 2:45 p.m.
Working Lunch(Conference Room B)
Plant Status(Training Center)* Opening Remarks* Completeness of Construction Work* Employee Concerns* Operational Readiness
Kingsley/NunnM uselerMedfordScal ice
02:45 p.m. - 3:00 p.m.
03:00 p.m.
Chairman's Remarks
Chairman's Press Conference
NRC Attendees:SelinTaylorEbrieterBaker (Tech. Asst.)BeecherRegion II RepresentativesNRR Representatives
TVA Attendees:KingsleyNunnMedfordMuselerScaliceKazanasMoodyElliottPannell
l
![Page 7: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/7.jpg)
9
Plant Status
Opening Rem-arks
2
![Page 8: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/8.jpg)
Plant Status
Completen essnstruction Work
3
Coof
![Page 9: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/9.jpg)
9
WBN Unit
* Base Engineering
1 - Current Status
Complete* Systems Completion Status
- Engineering ........ 135 of 135- Modifications 93 of 135-Startup .... a.......... 47 of 135
* Schedule- Hot functional testing - March 2,- Fuel load
1994
* Finalize schedule after hot functionaltesting
* Limited Remaining Technical Issues
4
![Page 10: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/10.jpg)
<WBN Unit 1Quantity Status(1 1/21/91 thru 1/9/94)
Power & Control Cable
Power & Control Conduit
Large Bore Pipe Supports-New & Mods
'Small Bore Pipe Supports-New & Mod
HVAC Ductwork Mods
Unit ofMeasureLinear Ft
Linear Ft
Linear Ft
Each -
Each
Linear Ft
InstalledTo Date
901,142
111,101
2,482
2,116
10,318
EstimateTo Go
296,697
26,631
968
644
2,525
GrandTotal
1,197,839
137,732
3,450
PercentComplete
75%
81%
72%
M
2,760 77%
12,843 80%
S
0-I-
![Page 11: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/11.jpg)
NOTES: Qumidcmcal x103.32983mofO/18194 17:20 .E HFT wor p, an don woro pVie cite, revtaiis HFr testing or ar in the Containmet
buaMing. Now A -h work i NOT inchldod in tes numbers if the WP doe. NOT restrain ates.
ELECNMT2
![Page 12: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/12.jpg)
Plan Workoff
TOGO Weekly Plan
Actuals -
. )EC DEC DEC JAN JAN JAN JAN JAN FEB FEB FEB
242 194 156 131 109 124 92 75 59 31 3
48 38 25 22 19 32 17 16 28 28 3
46 49 34 26 21 21
FEB
0
MAR
0
HGRHFFr2
HangerS
Mods - HFT TOGO HANGER Finishes 18JAN94Status as of Jan 16, 94
FY1994400
350
300
250
200
12 19 I' zv zn 6 3 u ,20 27 6
NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21HFTrhmpa m dme bhmca (6me or 4mi) wlk cdit raioin HFr tewing or
am I toS C eo~d bufilng.
400
350
300
250
200
150
100
50
0o
total
0
![Page 13: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/13.jpg)
WBN STARTUP & TEST
HFT PREREQUISITESCOMPONENT TESTING SUMMARY .
1118/94
- o
'I. 2118
6,600 -
6.000 -
4.500
4,000
3,600
3,000
2,500 -
2.000 -
1.600 -
1,000 -
S~oo -
500 -
O
'(D,
0-
O-0-
I I I I I III I I I I I I I I I - - ¢
10-24 10-31 11-07 11-14 11-21 11-28 12-05 12-12 12-19 12-26 01-02 01-09 01-16 01-23 01-30 02-06 02-13 02-20 02-27
WEEK END
ACTUAL PLANNED
W4FTOl4
I OF TESTS
6,000 X
-0-
0
--. .13
![Page 14: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/14.jpg)
7 WBN Unit 1Startup ProcedureDevelopment Summary Status
PTI ATI
Totals 149 34
PerformedNaulted 12 18
Startup Manager Approved 12 6
' Drafted/In Review 35 7
No Draft Complete 90 a
Pre-HFT: Required 7 0Approved 1 0
i In Review 6 0
To Be Drafted 0 0
HFT: Required 27 1Approved 0 0
In RVW 20 1
To Be Drafted 7 0
9
![Page 15: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/15.jpg)
Quality
* Construction-Overall has been high since restart
. AQL monitored by senior management
. Qls used down to the working level
-Some problems deal with incomplete work(mainly electrical)* Several management initiatives. Process improvements made/strengthened. Organizational/personnel changesO Senior management watching closely
10
![Page 16: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/16.jpg)
0
Quality - (Continued)
Startup Testing-Some problems seen in
. Documentation
. Procedure adherence
. Procedure adequacy-Improvements made
. New SU management team
. Remaining preop procedures rewritten* Process improvements
Summary
I I
![Page 17: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/17.jpg)
* 0
WBN Unit 1
Project Summary
m Base Engineering Complete* Construction on Schedulea Construction Quality Since Restart Remains
High* Startup Test Program
- Slower start than would have liked
- Midcourse correction made - resultsbeginning to show
- Finding plant/equipment in excellentcondition
-12
![Page 18: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/18.jpg)
0
Plant Status
Employee Concerns
13
![Page 19: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/19.jpg)
CRS and Contractor Issues, Trend
600
500
400
300
200
100
0
117 112z71 /--71
39
1987 1988 1989 1990 1991 1992 1993
FF. CRS M ContractorLJ I Issues Issues
551
333
173rn, --
187
/
1986
,.,
![Page 20: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/20.jpg)
DOL Complaints Trend25
20
15
10
5
0
Watts BarDOLs-M
1985 1986 1987 1988 1989 1990 1991 1992 1993
![Page 21: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/21.jpg)
TRENDS AND PERFORMANCETOTAL COMPLAINTS - ALL REPORTING SYSTEMS
NP Staffing Level (Thousands)
1039 long
851
698
18
14
12
10
a
6
4
22:
13
1986 1987 1988
20
1989
31
1990
35
1991
32
1992
As
r MP Stalling Levels - CRS Issues M SPB. EEO, GRIEV =DC
MSPD, EEO, GRIEV data not available for 1986
Complaints2000
- 150 0
- 1000
500
26 5
0
1993
of 12/31/93
IL
269
0
![Page 22: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/22.jpg)
PROACTIVE APPROACH BEING TAKENAT WATTS BAR
~ Lookback project in progress
~ Communications Plan
~ Supervisor training
~ Employee Concerns Task Force
~ Strengthen CRS ' I
![Page 23: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/23.jpg)
Employee Morale
* Workforce Stabilization - WBN TVAemployees will remain employed until afterFL -(-6 mo.)
X Employee Survey - Improvements shown
X INPO Ops Assist Visit - "Very high degree ofownership in control room and in field"
* NRC Survey of Employees - Positive 1"94%of site employees interviewed would reportconcerns to site management or siteprograms"Very Good Operator Exam Results
18
![Page 24: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/24.jpg)
.
Plant Status
Operational Readiness
19
![Page 25: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk](https://reader036.fdocuments.us/reader036/viewer/2022071002/5fbf3abf8fe32e44744804ea/html5/thumbnails/25.jpg)
Operational Readiness.
* Demonstrate that programs, procedures, and people areready to operate a nuclear facility- Ensure nuclear ethic/operational excellence- Watts Bar Operational Readiness Plan incorporates
* Previous ORR reviews/SQN lessons learned* Industry experience* INPO criteria* NRC inspection criteria
* Vice President of Operations in place early- Startup Test program/plant directly assigned to him
. Programs in place - senior managers assigned* ORR schedule will be finalized January 31, 1994* Highest standards from the start of HFT - 1 st
operational milestone
20