iHK JAN 27 1994 Docket Nos. 50-390, 50-391 License Nos. CPPR-91, CPPR-92 Tennessee Valley Authority ATTN: Dr. Mark 0. Medford Vice President, Technical Support 3B Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen: SUBJECT: MEETING SUMMARY - WATTS BAR UNITS 1 AND 2 This letter refers to the meeting conducted at the Watts Bar site on January 20, 1994. The meeting was at our request to discuss the status of ongoing and planned activities at Watts Bar. Enclosure 1 is a list of the individuals who attended the meeting and Enclosure 2 is the handout material supplied by TVA. It is-our opinion that this meeting was beneficial and provided a better understanding of TVA's activities. Should you have any questions concerning this letter, please contact me. Sincerely, (Original signed by E. Merschoff) Ellis W. Merschoff, Director Division of Reactor Projects Enclosures: 1. List of Attendees 2. Presentation Summary cc w/encls: (See page 2) 379 O9 9402080006 940127 PDR ADOCK 05000390 A PDR

Transcript of Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6...

Page 1: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

iHK

JAN 27 1994

Docket Nos. 50-390, 50-391License Nos. CPPR-91, CPPR-92

Tennessee Valley AuthorityATTN: Dr. Mark 0. Medford

Vice President, Technical Support3B Lookout Place1101 Market StreetChattanooga, TN 37402-2801

Gentlemen:

SUBJECT: MEETING SUMMARY - WATTS BAR UNITS 1 AND 2

This letter refers to the meeting conducted at the Watts Bar site onJanuary 20, 1994. The meeting was at our request to discuss the status ofongoing and planned activities at Watts Bar. Enclosure 1 is a list of theindividuals who attended the meeting and Enclosure 2 is the handout materialsupplied by TVA. It is-our opinion that this meeting was beneficial andprovided a better understanding of TVA's activities.

Should you have any questions concerning this letter, please contact me.

Sincerely,

(Original signed by E. Merschoff)

Ellis W. Merschoff, DirectorDivision of Reactor Projects

Enclosures:1. List of Attendees2. Presentation Summary

cc w/encls: (See page 2)

379 O99402080006 940127PDR ADOCK 05000390A PDR

Page 2: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

JAN 2 7 1994

Tennessee Valley Authority

cc w/encls:Mr. Craven Crowell, ChairmanTennessee Valley AuthorityET 12A400 West Summit Hill DriveKnoxville, TN 37902

Mr. W. H. Kennoy, DirectorTennessee Valley AuthorityET 12A400 West Summit Hill DriveKnoxville, TN 37902

Mr. Johnny H. Hayes, DirectorTennessee Valley AuthorityET 12A400 West Summit Hill DriveKnoxville, TN 37402-2801

Mr. D. E. Nunn, Vice PresidentTennessee Valley Authority3B Lookout Place1101 Market StreetChattanooga, TN 37402-2801

Mr. W. J. Museler, Vice PresidentWatts Bar Nuclear PlantTennessee Valley AuthorityRoute 2, P. 0. Box 800Spring City, TN 37381

Mr. B. S. Schofield, ManagerNuclear Licensing and

Regulatory Affairs4G Blue Ridge1101 Market StreetChattanooga, TN 37402-2801

Mr. G. L. PannellSite Licensing ManagerWatts Bar Nuclear PlantTennessee Valley AuthorityRoute 2, P. 0. Box 800Spring City, TN 37381

2

TVA RepresentativeTennessee Valley Authority11921 Rockville PikeSuite 402Rockville, MD 20852

General CounselTennessee Valley AuthorityET IIH400 West Summit Hill DriveKnoxville, TN 37902

The Honorable Robert AikmanCounty ExecutiveRhea County CourthouseDayton, TN 37321

The Honorable Garland LanksfordCounty ExecutiveMeigs County CourthouseDecatur, TN 37322

Mr. M. H. Mobley, DirectorDivision of Radiological Health3rd Floor, L and C Annex401 Church StreetNashville, TN 37243-1532

Danielle DroitschEnergy ProjectThe Foundation for Global

SustainabilityP. 0. Box 1101Knoxville, TN 37901

Mr. Bill HarrisRoute 1, Box 26Ten Mile, TN 37880

bcc w/encls: (See page 3)

0

Page 3: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

JAN 2 7 M394

Tennessee Valley Authority

bcc w/encls:E. W. Merschoff, DRP/RIIP. E. Fredrickson, DRP/RIIB. M. Bordenick, OGCM. S. Callahan, GPA/CAA. F. Gibson, DRS/RIIB. S. Mallett, DRSS/RIIP. A. Taylor, DRS/RIIG. C. Lainas, NRRF. J. Hebdon, NRRL. C. Plisco, OEDOP. S. Tam, NRRNRC Document Control Desk

NRC Resident InspectorU. S. Nuclear Regulatory CommissionRoute 2, Box 700Spring City, TN 37381

DRP/RjY

ARu ff:vyg01/;p/94

DRP I I

PF edH ckson01/>t/94

3

DRP I

JC 0 1 1e/i4k

Page 4: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

ENCLOSURE 1 -

LIST OF ATTENDEES

TITLENAME

Participants:

NRC

Dr. I. SelinJ. TaylorE. BakerW. BeecherS. EbneterP. FredricksonG. WaltonP. VanDoornK. IveyJ. LaraM. Glasman -K. Clark

ChairmanExecutive Director for OperationsTechnical Assistant to the ChairmanOffice of Public AffairsRegional AdministratorSection ChiefSenior Resident Inspector (Construction)Senior Resident Inspector (Operations)Resident InspectorResident InspectorResident InspectorPublic Affairs Officer

TVA

0.W.D.J.M.W.N.D.G.W.

KingsleyCobeanNunnScal iceMedfordMuselerKazanasMoodyPannellElliott

President, Generating GroupAdvisor to the TVA Board of DirectorsVice President, Nuclear ProjectsVice President, Nuclear OperationsVice President, Technical SupportSite Vice PresidentVice President Completion AssurancePlant ManagerLicensing ManagerEngineering and Modifications

Observers

A. HarrisF. McCuistionT. BirchfieldDr. S. SmithV. MillerR. HigginsR. HawkinsJ. SpragueM. WilliamsJ. Carpenter

TVATVA

Foundation for GlobalChattanooga News FreeChattanooga TimesWMTU Radio, KnoxvilleAthens Post-AthenianThe Associated Press,Dayton Herald-News

SustainabilityPress

Chattanooga

Page 5: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

CHAIRM SELIN'S VISIT TO :WBN

Januar y 20, 1994

* .,�4r#T

Er

Page 6: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

NRC CHAIRMAN SELIN'S VISIT TO WBN

JANUARY 20, 1994

AGENDA

11:00 a.m. - 11:15 a.m.

11:30 a.m. - 01:00 p.m.

Arrive at WBN NRC Office - Meet Resident(Introductions - Confirm Agenda)

Plant Tour

a

a

U

U

E

Diesel GeneratorsControl RoomAuxiliary Control RoomReactor BuildingAuxiliary Building

StaffMuseler/Scal ice

Muse]er/Scal iceMoody/El Iiott

01:00 p.m. - 01:30 p.m.

01:45 p.m. - 2:45 p.m.

Working Lunch(Conference Room B)

Plant Status(Training Center)* Opening Remarks* Completeness of Construction Work* Employee Concerns* Operational Readiness

Kingsley/NunnM uselerMedfordScal ice

02:45 p.m. - 3:00 p.m.

03:00 p.m.

Chairman's Remarks

Chairman's Press Conference

NRC Attendees:SelinTaylorEbrieterBaker (Tech. Asst.)BeecherRegion II RepresentativesNRR Representatives

TVA Attendees:KingsleyNunnMedfordMuselerScaliceKazanasMoodyElliottPannell

l

Page 7: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

9

Plant Status

Opening Rem-arks

2

Page 8: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

Plant Status

Completen essnstruction Work

3

Coof

Page 9: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

9

WBN Unit

* Base Engineering

1 - Current Status

Complete* Systems Completion Status

- Engineering ........ 135 of 135- Modifications 93 of 135-Startup .... a.......... 47 of 135

* Schedule- Hot functional testing - March 2,- Fuel load

1994

* Finalize schedule after hot functionaltesting

* Limited Remaining Technical Issues

4

Page 10: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

<WBN Unit 1Quantity Status(1 1/21/91 thru 1/9/94)

Power & Control Cable

Power & Control Conduit

Large Bore Pipe Supports-New & Mods

'Small Bore Pipe Supports-New & Mod

HVAC Ductwork Mods

Unit ofMeasureLinear Ft

Linear Ft

Linear Ft

Each -

Each

Linear Ft

InstalledTo Date

901,142

111,101

2,482

2,116

10,318

EstimateTo Go

296,697

26,631

968

644

2,525

GrandTotal

1,197,839

137,732

3,450

PercentComplete

75%

81%

72%

M

2,760 77%

12,843 80%

S

0-I-

Page 11: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

NOTES: Qumidcmcal x103.32983mofO/18194 17:20 .E HFT wor p, an don woro pVie cite, revtaiis HFr testing or ar in the Containmet

buaMing. Now A -h work i NOT inchldod in tes numbers if the WP doe. NOT restrain ates.

ELECNMT2

Page 12: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

Plan Workoff

TOGO Weekly Plan

Actuals -

. )EC DEC DEC JAN JAN JAN JAN JAN FEB FEB FEB

242 194 156 131 109 124 92 75 59 31 3

48 38 25 22 19 32 17 16 28 28 3

46 49 34 26 21 21

FEB

0

MAR

0

HGRHFFr2

HangerS

Mods - HFT TOGO HANGER Finishes 18JAN94Status as of Jan 16, 94

FY1994400

350

300

250

200

12 19 I' zv zn 6 3 u ,20 27 6

NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21HFTrhmpa m dme bhmca (6me or 4mi) wlk cdit raioin HFr tewing or

am I toS C eo~d bufilng.

400

350

300

250

200

150

100

50

0o

total

0

Page 13: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

WBN STARTUP & TEST

HFT PREREQUISITESCOMPONENT TESTING SUMMARY .

1118/94

- o

'I. 2118

6,600 -

6.000 -

4.500

4,000

3,600

3,000

2,500 -

2.000 -

1.600 -

1,000 -

S~oo -

500 -

O

'(D,

0-

O-0-

I I I I I III I I I I I I I I I - - ¢

10-24 10-31 11-07 11-14 11-21 11-28 12-05 12-12 12-19 12-26 01-02 01-09 01-16 01-23 01-30 02-06 02-13 02-20 02-27

WEEK END

ACTUAL PLANNED

W4FTOl4

I OF TESTS

6,000 X

-0-

0

--. .13

Page 14: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

7 WBN Unit 1Startup ProcedureDevelopment Summary Status

PTI ATI

Totals 149 34

PerformedNaulted 12 18

Startup Manager Approved 12 6

' Drafted/In Review 35 7

No Draft Complete 90 a

Pre-HFT: Required 7 0Approved 1 0

i In Review 6 0

To Be Drafted 0 0

HFT: Required 27 1Approved 0 0

In RVW 20 1

To Be Drafted 7 0

9

Page 15: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

Quality

* Construction-Overall has been high since restart

. AQL monitored by senior management

. Qls used down to the working level

-Some problems deal with incomplete work(mainly electrical)* Several management initiatives. Process improvements made/strengthened. Organizational/personnel changesO Senior management watching closely

10

Page 16: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

0

Quality - (Continued)

Startup Testing-Some problems seen in

. Documentation

. Procedure adherence

. Procedure adequacy-Improvements made

. New SU management team

. Remaining preop procedures rewritten* Process improvements

Summary

I I

Page 17: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

* 0

WBN Unit 1

Project Summary

m Base Engineering Complete* Construction on Schedulea Construction Quality Since Restart Remains

High* Startup Test Program

- Slower start than would have liked

- Midcourse correction made - resultsbeginning to show

- Finding plant/equipment in excellentcondition

-12

Page 18: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

0

Plant Status

Employee Concerns

13

Page 19: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

CRS and Contractor Issues, Trend

600

500

400

300

200

100

0

117 112z71 /--71

39

1987 1988 1989 1990 1991 1992 1993

FF. CRS M ContractorLJ I Issues Issues

551

333

173rn, --

187

/

1986

,.,

Page 20: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

DOL Complaints Trend25

20

15

10

5

0

Watts BarDOLs-M

1985 1986 1987 1988 1989 1990 1991 1992 1993

Page 21: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

TRENDS AND PERFORMANCETOTAL COMPLAINTS - ALL REPORTING SYSTEMS

NP Staffing Level (Thousands)

1039 long

851

698

18

14

12

10

a

6

4

22:

13

1986 1987 1988

20

1989

31

1990

35

1991

32

1992

As

r MP Stalling Levels - CRS Issues M SPB. EEO, GRIEV =DC

MSPD, EEO, GRIEV data not available for 1986

Complaints2000

- 150 0

- 1000

500

26 5

0

1993

of 12/31/93

IL

269

0

Page 22: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

PROACTIVE APPROACH BEING TAKENAT WATTS BAR

~ Lookback project in progress

~ Communications Plan

~ Supervisor training

~ Employee Concerns Task Force

~ Strengthen CRS ' I

Page 23: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

Employee Morale

* Workforce Stabilization - WBN TVAemployees will remain employed until afterFL -(-6 mo.)

X Employee Survey - Improvements shown

X INPO Ops Assist Visit - "Very high degree ofownership in control room and in field"

* NRC Survey of Employees - Positive 1"94%of site employees interviewed would reportconcerns to site management or siteprograms"Very Good Operator Exam Results

18

Page 24: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

.

Plant Status

Operational Readiness

19

Page 25: Discusses meeting held on 940120 w/util re status …350 300 250 200 12 19 I' zv zn u ,20 6 3 27 6 NOTES: Q4-sam CS i108.3291 mof 01/1194 17:21 HFTrhmpa m dme bhmca (6me or 4mi) wlk

Operational Readiness.

* Demonstrate that programs, procedures, and people areready to operate a nuclear facility- Ensure nuclear ethic/operational excellence- Watts Bar Operational Readiness Plan incorporates

* Previous ORR reviews/SQN lessons learned* Industry experience* INPO criteria* NRC inspection criteria

* Vice President of Operations in place early- Startup Test program/plant directly assigned to him

. Programs in place - senior managers assigned* ORR schedule will be finalized January 31, 1994* Highest standards from the start of HFT - 1 st

operational milestone

20