Discrete optimization –exact methods
Mikael RönnqvistNorwegian School of Economics and Business Administration
Bergen, [email protected]
eVITA Winter School 2009 - Optimization
![Page 2: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/2.jpg)
Agenda (Wednesday 15-16:30, 16:30-18:30)
Applications – introductionModeling and standard modelsSolution methodsApplications – revisited– Results/Impacts
Case (if time)Concluding comments
![Page 3: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/3.jpg)
ObjectiveUnderstanding of the main solution approaches for discrete optimization and their characteristics.Understanding of modeling and standard discrete optimization models.Insights in some applications and how discrete optimization can be used to solve them.
![Page 4: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/4.jpg)
Seminar based on material from J. Lundgren, M. Rönnqvist and P. Värbrand, Optimeringslära, Studentlitteratur, Sweden, 537 pages, 2008. (English version available during Spring 2009)
– P. Eveborn, M. Rönnqvist, M. Almroth, M. Eklund, H. Einarsdóttir and K. Lidèn, Operations Research (O.R.) Improves Quality and Efficiency in Home Care, to appear in Interfaces
– H. Gunnarsson, M. Rönnqvist and D. Carlsson, A combined terminal location and ship routing problem, Journal of the Operational Research Society, Vol. 57, 928-938, 2006.
– D. Bredström, J. T. Lundgren, M. Rönnqvist, D. Carlsson and A. Mason, Supply chain optimization in the pulp mill industry – IP models, column generation and novel constraint branches, European Journal of Operational Research, Vol 156, pp 2-22, 2004.
– H. Broman, M. Frisk and M. Rönnqvist, Supply chain planning of harvest operations and transportation after the storm Gudrun, to appear in INFOR
![Page 5: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/5.jpg)
Applications
![Page 6: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/6.jpg)
Applications
Paper roll cutting 2D - Board cutting Terminal locationProduction planningRouting/ SchedulingGame
![Page 7: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/7.jpg)
Paper roll cutting
![Page 8: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/8.jpg)
Roll cutting at paper millsLength: 30,000 metersLength: 30,000 metersWidth: 5Width: 5--10 meters10 metersProducts: 0.3Products: 0.3--1.0 m1.0 mRoll: 5,000 metersRoll: 5,000 metersFixed demandFixed demand
![Page 9: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/9.jpg)
2D Board cutting
![Page 10: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/10.jpg)
Defect areas
![Page 11: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/11.jpg)
Products
Weighted area of products determines the board’s quality/value
![Page 12: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/12.jpg)
Terminal location
![Page 13: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/13.jpg)
*cu.m. = cubic meters, solid under bark
Södra Cell in totalCapacity: ~2 million tonsWood: ~9 million cu.m.*
Case: Södra Cell - mills
![Page 14: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/14.jpg)
Customers
GHENTGHENTGHENTGHENTGHENTGHENTGHENTGHENTGHENT
TERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZEN
EMDENEMDENEMDENEMDENEMDENEMDENEMDENEMDENEMDEN
NORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEET
CHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAM
LOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFT
HULLHULLHULLHULLHULLHULLHULLHULLHULL
BOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNE
GENUAGENUAGENUAGENUAGENUAGENUAGENUAGENUAGENUA
LA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICE
PASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJES
GRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTH
CORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACH
INVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESS
AVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIRO
ANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPEN
GRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBY
ABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEEN
BREMENBREMENBREMENBREMENBREMENBREMENBREMENBREMENBREMEN
GANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIA
STETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTIN
WESELWESELWESELWESELWESELWESELWESELWESELWESEL
DUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEE
HALDENHALDENHALDENHALDENHALDENHALDENHALDENHALDENHALDEN
HÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSS
KIELKIELKIELKIELKIELKIELKIELKIELKIEL
SKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGN
SUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLAND
BASELBASELBASELBASELBASELBASELBASELBASELBASEL
Terminaler
Folla (4)Svenska (17)Svenska, Tofte (2)Tofte (7)
Terminals
![Page 15: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/15.jpg)
Production planning
![Page 16: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/16.jpg)
Pulp Logs
Sawmills
Production Plans
Swedish Harbours
Sawdust
Forestry Districts
Söd
ra P
ulp
Mill
s
Pulp Logs
Import
S90Z S90TZ S85Z S85SZ S70Z SBZ S90Z
Domestic Customers
International Customers
Supply chain structure
![Page 17: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/17.jpg)
Production plans
VAS90Z 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3VAS85RZ 3 3 3VAS85TZ 2 2 2 3VAS80TZ 3 3
M ONSBZ 2 2 2 2 2 2 2 3 3 3M ONS90Z 3 3 3 3M ONS85Z 2 2 2 2 2 2M ONS85S 2 3M ONS90S 2 3 3M STOP
M ORSBZ 3 3 3 3 3M ORS90TD 2 2 2 2 2 2 3M ORS70TZ 2 2 2 2 2 2 2 2 2 3 3 3 3M ORS90RD
1 31 61
![Page 18: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/18.jpg)
Home care operations
![Page 19: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/19.jpg)
Headlines in Swedish newspapers
“Anna, 89, found dead after missed home care services.”
“My mother met 57 different persons from the home care services during the last two months.”
“Sick leave among staff members above 30 percent in the elderly care.”
![Page 20: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/20.jpg)
THE CITY OF STOCKHOLM
City of Stockholm: 2 million in the region and 794,000 in town
Long tradition in providing Social Care “Cutting edge”methods and alternatives in Home Care
Growing number of elderly citizens with rising costs
Great need for better and more effective organisation
Quality and Efficiency in Home CareA background
![Page 21: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/21.jpg)
Social Service Assignment
The Elderly Citizen
Home Care Workers
Social Service
Assignment
• Availability• Working hours• Competence/ skills
• Address (location)• Gender• Language
• Service (medical etc..) • Care time• Time windows
VisitAssignment(scheduling & routing)
Daily planning problem
![Page 22: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/22.jpg)
Sudoku
![Page 23: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/23.jpg)
Sudoku
Given initial dataFill digits 1-9 into boxes such thatEvery digit 1-9 appears in every row, column, and 3x3 box
3675674
92641529
9424987617
9328361
![Page 24: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/24.jpg)
Modeling
![Page 25: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/25.jpg)
![Page 26: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/26.jpg)
![Page 27: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/27.jpg)
Integer feasible points
![Page 28: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/28.jpg)
![Page 29: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/29.jpg)
1
2
3
21 3
2x
1x
LP-opt
32*
LP
32*
LP
24
)2(
=
=
z
x T
20
)20(*HP
*HP
=
=
z
x T
IP-opt
integer ,0, 2 632 s.t.
109max
21
1
21
21
≥≤≤+
+=
xxx
xxxxz
problem)(max **HPLP zz ≥
![Page 30: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/30.jpg)
General IP
integer ,,..,1,0
,..,1, s.t.
(min)max
1
1
njx
mibxa
xcz
j
ij
n
jij
j
n
jj
=≥
=≤
=
∑
∑
=
=
All variables integer Pure IPSome variables integer Mixed IP
Binary variables (0 or 1) 0/1 - problem
![Page 31: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/31.jpg)
Total cost
![Page 32: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/32.jpg)
![Page 33: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/33.jpg)
![Page 34: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/34.jpg)
![Page 35: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/35.jpg)
![Page 36: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/36.jpg)
Convex hull
integer
![Page 37: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/37.jpg)
Example strong formulation
}1,0{, 0,
5 s.t.3632min
21
21
22
11
21
2121
∈≥≤≤≥+
+++=
yyxx
MyxMyx
xxyyxxz Optimum:
16
0,10,5
*21
21
=
====
z
yyxx
LP-relaxation
16 ,1,5 5
13 ,,5 10
3.10,,5100
*11
*2
111
*100
511
===⇒=
===⇒=
===⇒=
LP
LP
LP
zyxM
zyxM
zyxM
Choose M as small as possible
Note! M must be largeenough. Otherwise, the Optimum is cut away.
![Page 38: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/38.jpg)
Standard models
![Page 39: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/39.jpg)
Standard IP modelsKnapsack problemGeneralized Assignment Problem (GAP)Facility location problemMixed Integer Programming (MIP)Set partitioning problem (SPP)
![Page 40: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/40.jpg)
Knapsack problem
integer
![Page 41: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/41.jpg)
![Page 42: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/42.jpg)
![Page 43: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/43.jpg)
![Page 44: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/44.jpg)
Model 1
In the following simplified example of GAP we assume that wejust have a fxed cost fi for using the machines that we want to minimize.
![Page 45: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/45.jpg)
Model 2
![Page 46: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/46.jpg)
Model 3
![Page 47: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/47.jpg)
10 instances, 8 machines, 25 jobs, m=8, n=25
![Page 48: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/48.jpg)
Facility location
![Page 49: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/49.jpg)
Facility location
![Page 50: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/50.jpg)
![Page 51: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/51.jpg)
![Page 52: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/52.jpg)
Different values of M gives the following results From solving the LP-relaxation.
Infeas
![Page 53: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/53.jpg)
Two routing modelsNetwork formulationRoute based formulation with set partitioning model
![Page 54: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/54.jpg)
![Page 55: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/55.jpg)
Set partitioning problem
![Page 56: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/56.jpg)
![Page 57: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/57.jpg)
![Page 58: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/58.jpg)
Comparison (10 vehicles, 50 customer)
Network– 25,500 variables– 1070 constraints– ? constraints
(subtours)
+ and -:+ simple formulation + all routes included- solvable?- difficult with capacity constraints
Set-partitioning– ? Variables– 60 constraints
+ and -:+ simple to generate routes (with capacity)+ solvable- not all routes
![Page 59: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/59.jpg)
Methods
![Page 60: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/60.jpg)
![Page 61: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/61.jpg)
![Page 62: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/62.jpg)
![Page 63: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/63.jpg)
![Page 64: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/64.jpg)
![Page 65: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/65.jpg)
![Page 66: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/66.jpg)
Cutting planes
![Page 67: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/67.jpg)
![Page 68: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/68.jpg)
![Page 69: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/69.jpg)
![Page 70: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/70.jpg)
![Page 71: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/71.jpg)
![Page 72: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/72.jpg)
![Page 73: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/73.jpg)
![Page 74: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/74.jpg)
![Page 75: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/75.jpg)
![Page 76: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/76.jpg)
![Page 77: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/77.jpg)
Example
Gomory cut: 221 ≤+ xx
1
2
3
21 3
2x
1x
This cut provides the Convex hull to the integer points
![Page 78: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/78.jpg)
Example
{ } jxxxxxx
xxxxxz
j ,1,0 62235 st
431011max
54321
54321
∀∈≤++++
++++=
Possible valid inequalities
(4) 2 (3) 1(2) 1 (1) 1
43241
3121
≤++≤+≤+≤+
xxxxxxxxx
Solve LP relaxation ( ) 5316,0, 0, 0, 1, 5
3 * ==⇒ zxT
LP
( ) 2115,0, 1, 2
1, 1, 0 * ==⇒ zxT
LPAdd (1)
( ) 15,1, 1, 0, 1, 0 * ==⇒ zx TLP
Add (4)Optimum!
![Page 79: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/79.jpg)
Branch & bound methods
![Page 80: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/80.jpg)
![Page 81: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/81.jpg)
Land-Doig-Dakins
1
2
3
21 3
2x
1x
Optimum: 20,)20( ** == zx T
PO
P4P5
P2P3
P6 P1
( ) 3224z 3
22 ==T
x
12 ≥x02 ≤x
( ) 18z 02 == Tx ( ) 23z 123 ==
Tx
21 ≥x11 ≤x
( ) 22z 341 ==
Tx
( ) 19z 11 == Tx ( ) 20z 20 == Tx
12 ≤x
No solutionstop!
22 ≥x
Stop! zz ≤ Feasible solution.Stop!
stop! zz ≤
integer ,0, 2 632 st
109max
21
1
21
21
≥≤≤+
+=
xxx
xxxxz
![Page 82: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/82.jpg)
PO
P4P5
P3P10
P2 P1
( ) 77z 5,82z 000217 ===
Tx
81 ≥x71 ≤x
( ) 4,82 00537 == zx
T
12 ≥x02 ≤x
( ) 82 0107 == zx T
61 ≤x
No solution, stop!
71 ≥x
stop! zz ≤
( ) 3,82 001326 == zx
T
( ) 2,82z 00596 ==
Tx
No solution, stop!
P7P8
P6P9
22 ≥x12 ≤x
51 ≤x 61 ≥x
( ) 2,82 002655 == zx
T
No solution, stop!
( ) 7,77 03416 == zx
T
( ) 82 0035 == zx T
Feasible solution, stop!
Feasible solution, stop!
integer ,0,,, 452356 st
35911max
4321
4321
4321
≥≤+++
+++=
xxxxxxxx
xxxxz
![Page 83: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/83.jpg)
Knapsack 0/1
P2P3
P1P4
P0
( ) 11 2,18 00541 === zzx
T
12 =x02 =x
( ) 5,17 21101 == zx
T
No solution, stop!
11 =x
( ) 2,18 00165 == zx
T
( ) 17z 1110 == TxStop, integer coefficientsMeans that z must be integer.Z can not be better than 17.
{ }10,,, 102356 st
35911max
4321
4321
4321
∈≤+++
+++=
xxxxxxxx
xxxxz
01 =x
Feasible solution, stop!
Many knapsack problems can be formulated and solved efficiently by dynamic programming.
![Page 84: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/84.jpg)
2
5
1
2 3
4 6 7
8 9
1
3
45
67
8
910
11
Search strategiesDepth-first Breadth first
![Page 85: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/85.jpg)
Example B&BFive jobs on one machine. Set up timedependent on sequence, se table. Decide sequence of jobs in order to minimize total time.
−−
−−
−
16891271587
10121110111410691012749854
Previous
none
1
5
5
4
3
2
4321Job
B&B: relax the ordering. Solve by chosing cheapest costin column. Fix one job and resolve.
Variables:
⎩⎨⎧
=otherwise ,0
number as done is job if ,1 jixij
![Page 86: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/86.jpg)
Example, B&B
−−
−−
−
16891271587
10121110111410691012749854
Prev
None
1
5
5
4
3
2
4321
30 ,0 =zP
−−
−−
−
16891271587
10121110111410691012749854
Prev
None
1
5
5
4
3
2
4321
36z ,2 =P
Feasible solution2-1-4-5-3
0
4321 5
111 =x121 =x
151 =x131 =x 141 =x
36=z 38=z36=z
35=z
30=z
37=zfeasibleworse worseworse
Furthersearch
−−
−−
−
16891271587
10121110111410691012749854
prev
none
1
5
5
4
3
2
4321
35 ,5 =zP
![Page 87: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/87.jpg)
5
9876
112 =x122 =x 132 =x 142 =x
43=z35=z
39=z
35=z
43=zworseworse worse
−−
−−
−
16891271587
10121110111410691012749854
prev
none
1
5
5
4
3
2
4321
35 ,8 =zP
−−
−−
−
16891271587
10121110111410691012749854
prev
none
1
5
5
4
3
2
4321
39 ,10 =zP 121110
113 =x 143 =x123 =x
sequence: 5-3-?
sequence: 5-3-1-?
39=zworse
39=zworse
37=zworse
Optimum in node 2
3-5-4-1-2 :sequence ,36* =z
![Page 88: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/88.jpg)
−−
−−
−
16891271587
10121110111410691012749854
prev
none
1
5
5
4
3
2
4321
40=z
−−
−−
−
16891271587
10121110111410691012749854
prev
none
1
5
5
4
3
2
4321
43=z
We were lucky to find a feasible solution fast.
In order cheapest
![Page 89: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/89.jpg)
Branch & CutCombination of B&B and cutting planes
Add cuts
branching
Idea: Add cuts so that the LP-relaxationbecomes strongerbefore branching
![Page 90: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/90.jpg)
An important extension is to make the LP-relaxation stronger byadding valid inequalities. This is the idea behind Branch & Cut. In each node in the search tree we add, if possible, one orseveral valid inequalities. We study a simple knapsack problem toillustrate the idea.
![Page 91: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/91.jpg)
Normal branching
![Page 92: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/92.jpg)
Branch & Cut
![Page 93: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/93.jpg)
![Page 94: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/94.jpg)
The standard approach is to branch on variables with fractionalvalues. For some applications (e.g. set-partitioning models)this is very weak and gives a large search tree. In someset-partitioning models where a variable is set to one, manyvariables are set to 0. If the variable is set to 0, essentiallynothing happens. To get at better balance we can choose to do aso-called constraint branching.
We will illustrate the technique with a set-partitioning model.Constraint branching means that two new subproblem is created byrequiring that a set of variables should sum to 0 or 1 instead ofa single variable. In a LP-solution to a set-partitioning modeleach constraint or object (to be partitioned) will be covered byone or several variables/columns (representing alternatives).
![Page 95: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/95.jpg)
![Page 96: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/96.jpg)
![Page 97: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/97.jpg)
![Page 98: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/98.jpg)
Normal fractional branching
![Page 99: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/99.jpg)
![Page 100: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/100.jpg)
![Page 101: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/101.jpg)
![Page 102: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/102.jpg)
![Page 103: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/103.jpg)
Branch & PriceIn many applications (e.g. Set partitioning type models) it is not possible to generate all variables explicitColumn generation – a method to solve large scale LP problems can be used in each of the B&B nodes
![Page 104: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/104.jpg)
A has many columnsas compared to thenumber of constraints
![Page 105: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/105.jpg)
Application dependent
![Page 106: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/106.jpg)
Cases & Results
![Page 107: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/107.jpg)
Paper roll cutting
![Page 108: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/108.jpg)
Roll cutting at paper millsLength: 30,000 metersLength: 30,000 metersWidth: 5Width: 5--10 meters10 metersProducts: 0.3Products: 0.3--1.0 m1.0 mRoll: 5,000 metersRoll: 5,000 metersFixed demandFixed demand
![Page 109: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/109.jpg)
Tactical problem: Cutting stock problem
:Demand of roll .Number of times roll appears in pattern .
:Number of times pattern is used.
i
ij
j
Coefficientsb ia i j
Variablesx j
==
=
[ ]
,...,nj,x
,...,m, ibxa
xw
j
n
jijij
n
jj
1 integer ,0
1 s.t.
min P1
1
1
=≥
=≥
=
∑
∑
=
=
![Page 110: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/110.jpg)
Standard solution approachClassical Gilmore & Gomory: Column generation and B&B
1
1
min
. . , 1,...,
0, integer
n
jj
n
ij j i ij
j
x
s t a x s b i m
x
=
=
− = =
≥
∑
∑1
1
min rc=1-
. .
0, integer, 1,...,
n
i ij
m
i ii
i
v w
s t d w L
w i m
=
=
≤
≥ =
∑
∑
dualsduals
new patternnew pattern
Data:width of product .width of main roll.dual variable f
Variables:=number of pr
or constraint
oduct in new pattern.
i
i
iw i
d iLv i
===
![Page 111: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/111.jpg)
Practical considerationsThe number of rolls in a pattern is limited. The number of different rolls in a pattern is limited. Some rolls are not allowed to be in the same pattern. Some rolls must be included in the same pattern. There is a maximum allowed trim loss.Demand is given as a target value with bounds on under- and overproduction.
![Page 112: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/112.jpg)
![Page 113: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/113.jpg)
2D Board cutting
![Page 114: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/114.jpg)
![Page 115: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/115.jpg)
![Page 116: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/116.jpg)
![Page 117: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/117.jpg)
Upper part: optimal placement of max 4 products. Middle part: optimal placement of max 4 products. Lower part: Allocation areas (defined through defects)
![Page 118: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/118.jpg)
Upper part: optimal placement (max 100 products)Middle part: current heuristic solution Lower part: Allocation areas (defined through defects)
![Page 119: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/119.jpg)
Upper part: optimal placement (max 100 products)Middle part: current heuristic solution Lower part: Allocation areas (defined through defects)
![Page 120: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/120.jpg)
Upper part: heuristic solution (note non-guilliotine solution)Middle part: optimal placement
![Page 121: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/121.jpg)
Terminal location
![Page 122: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/122.jpg)
*cu.m. = cubic meters, solid under bark
Södra Cell in totalCapacity: ~2 million tonsWood: ~9 million cu.m.*
Case: Södra Cell - mills
![Page 123: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/123.jpg)
Customers
GHENTGHENTGHENTGHENTGHENTGHENTGHENTGHENTGHENT
TERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZEN
EMDENEMDENEMDENEMDENEMDENEMDENEMDENEMDENEMDEN
NORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEET
CHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAM
LOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFT
HULLHULLHULLHULLHULLHULLHULLHULLHULL
BOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNE
GENUAGENUAGENUAGENUAGENUAGENUAGENUAGENUAGENUA
LA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICE
PASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJES
GRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTH
CORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACH
INVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESS
AVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIRO
ANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPEN
GRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBY
ABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEEN
BREMENBREMENBREMENBREMENBREMENBREMENBREMENBREMENBREMEN
GANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIA
STETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTIN
WESELWESELWESELWESELWESELWESELWESELWESELWESEL
DUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEE
HALDENHALDENHALDENHALDENHALDENHALDENHALDENHALDENHALDEN
HÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSS
KIELKIELKIELKIELKIELKIELKIELKIELKIEL
SKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGN
SUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLAND
BASELBASELBASELBASELBASELBASELBASELBASELBASEL
Terminaler
Folla (4)Svenska (17)Svenska, Tofte (2)Tofte (7)
Terminals
![Page 124: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/124.jpg)
>15% of volume => 320 000 tonnes€ 150 million
Storage cost (20%)€ 30 million
Storage cost (20%)€ 30 million
30 60
Inventories / Lead times …
![Page 125: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/125.jpg)
Södra Cell responsibilityCustomer responsibility
Security stock(5-10 days)
PulpSMI:Supplier Managed Inventory
![Page 126: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/126.jpg)
GHENT
TERNEUZEN
EMDEN
NORTHFLEET
CHATHAM
LOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFT
HULLHULLHULLHULLHULLHULLHULLHULLHULL
ANTWERPEN
GRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBY
BREMEN
STETTIN
WESEL
HALDEN
KIEL
Värö
TofteDistribution - Complexity
Three vessels on long term contract
Additional vessels on spot market
Train and truck transports
Several different products
Supply ≈ Demand
Alternative shipment ports
Alternative terminals
![Page 127: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/127.jpg)
Mathematical model: objective
min ( )
( )
( )
A H
B H
H
H L
A MP Ak i kijp
k R i I j J p P
B MP Bk i kijp
k R i I j J p P
S MP S R Rij i ijp ji ji
i I j J p P j J i I
T totj j j j
j J j J
T T Q Qhl hlp jq jqp
h J l J p P j J q Q p P
trainiq iqp
c c x
c c x
c c x c x
c y f z
c y c y
c y
∈ ∈ ∈ ∈
∈ ∈ ∈ ∈
∈ ∈ ∈ ∈ ∈
∈ ∈
∈ ∈ ∈ ∈ ∈ ∈
+ +
+ +
+ + +
+ +
+ +
∑∑ ∑ ∑
∑∑∑ ∑
∑∑ ∑ ∑∑
∑ ∑
∑ ∑∑ ∑∑∑
train truck truckiq iqp
i I q Q p P i I q Q p P
c y∈ ∈ ∈ ∈ ∈ ∈
+∑∑∑ ∑∑∑
AA--routes routes
BB--routes routes
Spot + return trips Spot + return trips
Terminal costs Terminal costs
Distribution from terminals Distribution from terminals
Train + truck Train + truck
![Page 128: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/128.jpg)
Mathematical model: constraints
, A B
A B S T Qkijp kijp ijp jlp jqp H
k R i I k R i I i I l L q Qx x x y y j J p P
∈ ∈ ∈ ∈ ∈ ∈ ∈
+ + = + ∀ ∈ ∈∑∑ ∑∑ ∑ ∑ ∑
, H
T Qhjp jqp L
h J q Qy y j J p P
∈ ∈
= ∀ ∈ ∈∑ ∑, Q train truck
jqp iqp iqp qpj J i I i I
y y y D q Q p P∈ ∈ ∈
+ + = ∀ ∈ ∈∑ ∑ ∑
A H B H H
A A B B Rk kijp k kijp ji
k R i I j J p P k R i I j J p P j J i It x t x x r
∈ ∈ ∈ ∈ ∈ ∈ ∈ ∈ ∈ ∈
+ + ≤∑∑∑ ∑ ∑∑∑ ∑ ∑∑
A B
A B Rkijp kijp ji
k R i I p P k R i I p P i Ix x x j J
∈ ∈ ∈ ∈ ∈ ∈ ∈
+ = ∀ ∈∑∑∑ ∑∑∑ ∑
A
A Tkijp l l jl H
k R i I p P l Lx p w j Jα
∈ ∈ ∈ ∈
≤ ∀ ∈∑∑∑ ∑
j jll L
z w j J∈
≥ ∀ ∈∑
A H B H H
A B Rkijp kijp ji
k R j J p P k R j J p P j Jx x x i I
∈ ∈ ∈ ∈ ∈ ∈ ∈
+ = ∀ ∈∑ ∑ ∑ ∑ ∑ ∑ ∑
Proportion AProportion A--routesroutes
Flow conservationFlow conservation
Customer demandCustomer demand
Ship capacityShip capacity
Return flowReturn flow
Return flowReturn flow
Flow conservationFlow conservation
Return flowReturn flow
![Page 129: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/129.jpg)
Number of:Customers 262Pulpmills 4Harbor-terminals 21Land-terminals 3 Ships 3Products 30A-routes 84B-routes 1,873Spot-routes 84
Problem size
![Page 130: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/130.jpg)
GHENTGHENTGHENTGHENTGHENTGHENTGHENTGHENTGHENT
TERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZENTERNEUZEN
EMDENEMDENEMDENEMDENEMDENEMDENEMDENEMDENEMDEN
NORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEETNORTHFLEET
CHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAMCHATHAM
LOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFTLOWESTOFT
HULLHULLHULLHULLHULLHULLHULLHULLHULL
BOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNEBOULOGNE
GENUAGENUAGENUAGENUAGENUAGENUAGENUAGENUAGENUA
LA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICELA PALLICE
PASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJESPASAJES
GRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTHGRANGEMOUTH
CORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACHCORPACH
INVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESSINVERNESS
AVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIROAVEIRO
ANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPENANTWERPEN
GRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBYGRIMSBY
ABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEENABERDEEN
BREMENBREMENBREMENBREMENBREMENBREMENBREMENBREMENBREMEN
GANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIAGANDIA
STETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTINSTETTIN
WESELWESELWESELWESELWESELWESELWESELWESELWESEL
DUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEEDUNDEE
HALDENHALDENHALDENHALDENHALDENHALDENHALDENHALDENHALDEN
HÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSSHÖNEFOSS
KIELKIELKIELKIELKIELKIELKIELKIELKIEL
SKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGNSKOGN
SUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLAND
BASELBASELBASELBASELBASELBASELBASELBASELBASEL
Terminaler
Folla (4)Svenska (17)Svenska, Tofte (2)Tofte (7)
Terminals
Problem P2: Terminal i Terneuzen isaccessible for all customers in Italy.
Problem P3: Terminals inSunderland and Grimsby become available for all customers in UK
Problem P4: Problem P3 + only one of the terminals in Sunderland and Grimsby can be used
Problem P5: Terminals in KielGhent, Boulogne and La Pallice are removed.
Scenarios
Problem P6: Alternative to the Kielcanal is tested.
![Page 131: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/131.jpg)
Production planning
![Page 132: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/132.jpg)
Pulp Logs
Sawmills
Production Plans
Swedish Harbours
Sawdust
Forestry Districts
Söd
ra P
ulp
Mill
s
Pulp Logs
Import
S90Z S90TZ S85Z S85SZ S70Z SBZ S90Z
Domestic Customers
International Customers
Supply chain structure
![Page 133: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/133.jpg)
0 ,0
1 0 ,0
2 0 ,0
3 0 ,0
4 0 ,0
5 0 ,0
6 0 ,0
7 0 ,0
8 0 ,0
9 0 ,0
0 ,0
1 ,0
2 ,0
3 ,0
4 ,0
5 ,0
6 ,0
7 ,0
8 ,0
9 ,0
January 1st to June 30th 2000
Stockat mill
(0-90 000)
Usagein mill
(0-8 000)
Deliveriesto mill
(0-9 000)
Daily variation due to campaign production
Södra Cell, Supply Chain - conditions
![Page 134: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/134.jpg)
SBZ 1 1 2 2 2 2 2 2 2 3 3
S90Z 1 1 3 3
S85Z 1 1 1 1 1 1 2 2 2 2 2 2
S85Z/TZ 1 1 1 1 1 1 1 1 1 1 1 1 1 2
S90Z/TZ 1 1 1 1 1 1 1 2 3 3
S90Z S90TZ S85Z S85SZ S70Z SBZ S90ZProduction schedule (campaigns)
Solution method - column generation
Each campaign has a minimum and maximum length in time
There is a fixed cost to change campaigns i.e. recipies
![Page 135: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/135.jpg)
, 1
, 1
, ,
, ,
0.9 1.1 , ,
,
, ,
,
F Fia t iat ijat iat
j M
H Hjp t jpt jpt jpt
Mja j
a A
ja ijat jai F
Dijat i
j M a A
Djdpt dpt
j M
Ejpt pt
j M
l H x l i a t
l w v l j p t
f T j
f x f j a t
x T i t
y D d p t
v D p t
−∈
−
∈
∈
∈ ∈
∈
∈
+ − = ∀
+ − = ∀
≤ ∀
≥ ≤ ∀
≤ ∀
= ∀
= ∀
∑
∑
∑
∑∑
∑
∑
Storage in forests
Storage at domestic harbours
Inflow levels
Inflow levels
Capacity levels in forests
Domestic demand
International demand
Model: Constraints
![Page 136: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/136.jpg)
, 1
, 1
0 , ,
0 , ,
j
j j
j
outjrp jqrt jq
q Q
A Aja t ijat jat
i F
P Pjp t jpt jdp
injra jqrt jq
q Q r R
t jptd Dr R
l x l j a t
l R z
R
w y l j p
z
tδ
δ−∈
−∈∈
∈
∈
∈
+ − − = ∀
+ − − − = ∀∑
∑
∑
∑
∑
∑
1 j
jqq Q
z j∈
= ∀∑
Model: constraints cont.
amount of assortment used in one time period when running
recipe at pulp mill amount of product produced in one time period when running
recipe at pulp mill
injra
outjrp
R a
r jR p
r
=
=
1 if recipe runs in production plan during time period
at pulp mill , 0 otherwisejqrt
jr q t
j
δ =
dual: jatα
dual: jptβ
dual: jγ
Storage of pulp logs
Storage of pulp products
![Page 137: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/137.jpg)
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7
Solution method - Subproblem
Find best reduced cost production plan
Subproblem: a shortest path problemArcs represent campaignsArc costs reflect dual prices on log / pulp inventory constraint and production / changeover costs
, , , ,jat jpt j
Z in outjq jq jqrt jra jqrt jrp
a t r p t rc C R Rδ δα β γ= + − −∑ ∑
![Page 138: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/138.jpg)
Restricted master Problem
Subproblem,pulpmill 1
Dua
l var
iabl
es
Pro
duct
ion
plan
Subproblem,pulpmill 2
Dua
l var
iabl
es
Pro
duct
ion
plan
Subproblem,pulpmill n
Dua
l var
iabl
es
Pro
duct
ion
plan
Solution method - column generation
![Page 139: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/139.jpg)
Normal variable branching is not effective– There are very few 0/1-variables with value 1 (out of a
very large number of possible)– The 1-branch is too strong (most often creating
infeasible solutions)– The 0-branch is too weak (there are many similar
production plans)– Procedure creates a huge Branch and Bound tree
Branch and Bound procedures
![Page 140: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/140.jpg)
Constraint branching enables a moreefficient strategyGiven a fractional LP-solution:– Sum the fractional usage of each receipe for each time
period and pulp mill– choose the usage closest to 1.0 and branch on this
• for example: use receipe S90Z at day 14 in mill Mönsterås
– the branch is easy to implement in the subproblem i.e. simply remove certain arcs
Constraint branching heuristic
![Page 141: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/141.jpg)
Production plansComparison with manual plans (campaign changes 3 5 million SEK, total 120 110 million SEK)Strategic implications regarding campaign scheduling
VARO VAS90Z 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3VARO VAS85RZ 3 3 3VARO VAS85TZ 2 2 2 3VARO VAS80TZ 3 3
M ONSTERAS M ONSBZ 2 2 2 2 2 2 2 3 3 3M ONSTERAS M ONS90Z 3 3 3 3M ONSTERAS M ONS85Z 2 2 2 2 2 2M ONSTERAS M ONS85S 2 3M ONSTERAS M ONS90S 2 3 3M ONSTERAS M STOP
M ORRUM M ORSBZ 3 3 3 3 3M ORRUM M ORS90TD 2 2 2 2 2 2 3M ORRUM M ORS70TZ 2 2 2 2 2 2 2 2 2 3 3 3 3M ORRUM M ORS90RD
1 31 61
![Page 142: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/142.jpg)
Home care operations
![Page 143: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/143.jpg)
Social Service Assignment
The Elderly Citizen
Home Care Workers
Social Service
Assignment
• Availability• Working hours• Competence/ skills
• Address (location)• Gender• Language
• Service (medical etc..) • Care time• Time windows
VisitAssignment(scheduling & routing)
Daily planning problem
![Page 144: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/144.jpg)
Problem in OR termsDecisions– Allocation of visits to home care workers– Routing of workers
Constraints– Skills– Time windows (short and wide time windows)– Time relations (precedence and synchronization)– Working hours, travel time/ breaks
Objective– Short and long term continuity– Route cost/ time– Fairness– Preferences
![Page 145: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/145.jpg)
OR challenges
Synchronisation of visits– Synchronized visits (double staffing)– Precedence relations of visits (at the same elderly)
Translation between OR and practice– OR Real life (planners have no OR background)
Multiple transport modes: Car, bike, walkingLast minute planning
– Many simulations require short solution times– Sometimes cannot assign all tasks– May require re-prioritization
Evaluation of quality
![Page 146: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/146.jpg)
OR ModelingSet partitioning model, extended with– Synchronization and precedence constraints– Fairness measurement
![Page 147: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/147.jpg)
THE CITY OF STOCKHOLM
In practice locally since 2003
Full scale implementation 2008– 800 Planning Officers are involved
– All Home Care Units, about 15000 workers participate
– 40 000 Elderly Clients enjoy the benefit
Large scale solutions– E-learning programs
– Centralized database
– Interconnected systems to ensure information flow
Approach
![Page 148: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/148.jpg)
Quantifiable benefits (i)Increased Efficiency – The efficiency improvement, which is calculated as more contact
hours to less cost and with increased service quality, was 12 percent. For example, the ordinary staff could make 12 percent more visits in the same working time while having a better competence match and visiting the same clients.
– Morning meeting times have decreased by two-thirds;– In the City of Stockholm, the time spent for developing schedules
for each of the 15,000 care workers in the city’s home-help units can be lowered by an average of 10-12 minutes every day. On an annual basis, this corresponds to 310-375 full-time annual equivalents.
![Page 149: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/149.jpg)
Quantifiable benefits (ii)Transportation In Bengtsfors the driving distance is 20 percent lower than previously
Sick Leave In Jakobsberg, the annual short-term sick leave fell from 563 days to 166.
Quality and Safety – In Jakobsberg, the number of missed visits (forgotten, delayed, or
rebooked) fell from 91 to 4. – In Bengtsfors, where staff had previously had many discussions about
which staff member should perform which visit, these discussions almost ceased because the system is totally objective.
– Aurskog-Høland employs highly qualified nurses; better skill matching allows 22 percent of the nurses to be used for work requiring their specific skills.
![Page 150: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/150.jpg)
Unquantifiable benefits (i)Clients – The risk of forgetting visits is reduced significantly. – Easier to control the continuity among member of staff visiting a client. – The reporting makes it possible to follow up, e.g., to review the overall care
hours.
Staff – Work in the home-care sector can be stressful. The removal of the often-
turbulent last-minute morning meetings has removed one stress factor. – Creating routes that such that work is distributed fairly among the staff
members, and that allow for realistic travel times between visits has also alleviated stress.
– The system can also schedule work tasks, such as meetings, documentation, and administration.
– Better usage of employee skills could also raise the status of the home-care profession.
![Page 151: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/151.jpg)
Laps Care
System Overview
Daily planning
Healthcare
Back End system
System
Integration
Mobile communication
Social Care
Back End system
Human Resource
Back End system
Laps CareActivity and
time reporting
![Page 152: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/152.jpg)
Laps Care: Usage
– 2007 Laps Care daily scheduled 4.000 staff in 200 units
– 2008 : 20.000 staff in 250+800 units
– 2009 : 30.000 staff in 1500 units
– Sweden has 120.000 employed in Home Care
– Northern Europe has one million Care workers
![Page 153: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/153.jpg)
Laps Care: Business CaseCase study proves 10% improved efficiency in cost savings and 5% in initial needed investment
– Laps Care clients saved 2007: $US 30 million
– Savings 2008: $US 75 million
– Savings 2009: $US 125 million
– Potential annual benefits in Sweden: $US 700 million
– Potential annual benefits in N. Europe: $US 6 billion
![Page 154: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/154.jpg)
Sudoku
![Page 155: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/155.jpg)
Sudoku
Given initial dataFill digits 1-9 into boxes such thatEvery digit 1-9 appears in every row, column, and 3x3 box
3675674
92641529
9424987617
9328361
![Page 156: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/156.jpg)
SolutionSolver: CPLEXTime: 0Nodes: 0
… AMPL presolve
3429167859567821431784359264815276397398614522653498176172583945 94173268823694571
![Page 157: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/157.jpg)
Case: Logistics planning after the storm Gudrun at Sveaskog
![Page 158: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/158.jpg)
The storm GudrunDuring the weekend of January 8-9 2005 the storm Gudrun (hurricane winds) hit southern part of Sweden.More than 70 million m3 was blowned down; this corresponds to one full annual harvest for Sweden. Damage often at ”difficult” locations.Important function in the infrastructure was out of order: electricity, phones, transportation etc.The value of wood alone is 30 billion SEK approx. 3.2 billion Euros.Worst forest damages in Sweden for the last 100 years.
![Page 159: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/159.jpg)
![Page 160: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/160.jpg)
![Page 161: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/161.jpg)
Dangerous and slow operations
![Page 162: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/162.jpg)
Storageterminals
Industrialterminals
Storageroad
harvesting
![Page 163: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/163.jpg)
Sveaskog’s logistics
• 2,5 – 3 million m3 own forest
+ external volumes
• not close to harbours
• Customer essentially north of the area
• Signed contracts to befollowed
Supply
Demand
![Page 164: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/164.jpg)
Transportation modes
![Page 165: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/165.jpg)
Terminals
![Page 166: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/166.jpg)
![Page 167: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/167.jpg)
StormOpt – new decisions and restrictions
Resource limitations– Trucks (ton*km)– Harvest capacity (different machine types)
New decisions: harvesting, storage – binary variables needed
Wood value– Current and new industrial orders– Roadside storage of logs– Terminal storage of logs– Trees not harvested
Costs for harvesting and storage
![Page 168: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/168.jpg)
Situation27 aggregated harvest areas4 harvesting classes5 assortment per class2,5 - 3 million m3
![Page 169: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/169.jpg)
Situation27 aggregated harvest areas4 harvesting classes5 assortment per class2,5 - 3 million m3
92 customers
![Page 170: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/170.jpg)
Situation27 aggregated harvest areas4 harvesting classes5 assortment per class2,5 - 3 million m3
92 customers9 train terminals5 harbours20 train system100 ship routes
![Page 171: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/171.jpg)
Situation27 aggregated harvest areas4 harvesting classes5 assortment per class2,5 - 3 million m3
92 customers9 train terminals5 harbours20 train system100 ship routes
![Page 172: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/172.jpg)
Some important factors:
The storm felled forest for Sveaskog was not “harbour close”.The logistics costs associated with deliveries to/from harbours were relatively high.Truck and transportation capacities were the most limiting factors.Model size:– 4,500 constraints– 195,000 variables
![Page 173: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/173.jpg)
Experiences and what happened The weather conditions with deep snow made the operations difficult. When the snow depths was less, the harvest level increased rapidly.More medium and large units than expected arrived. Instead of 54-59-32 (large-medium-small harvest units) there were 64-74-14 units. Increase in the number of trucks was slower and it was not until the middle of April when there was a balance between truck and harvesting capacities (84 trucks were in operation).
![Page 174: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/174.jpg)
Experiences and what happenedDelivery planning
0
500
1000
1500
2000
2500
Feb Mar Apr Maj Jun
KM3F
UB HarvestingDeliveryStorage
![Page 175: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/175.jpg)
Experiences and what happenedThe storm felled volumes were less than the estimations (measured 2,45 against estimated 3,1 million m3). The volume carried by train was planned to be at 369,000 m3 and this was the level in practice. The average distance for the trucks was 83 km (2004: 97 km). The total volume carried on trucks were 1,73 million m3. The transportation work on train was 47% of the total work with an average distance of 340 km. This transportation work on train represented 64 trucks.The volume carried by ship was smaller than planned (23,000 against 52,000 m3). One reason for this was a Finish strike.
![Page 176: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/176.jpg)
Summary of operations
![Page 177: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/177.jpg)
Concluding remarksQuick and efficient change of logistic system not possible without OR support.OR models easy to solve, modelling relatively easy due to ”similar” model and cost structures difficult to compute.Project possible with dedicated manager at Sveaskog.Increased acceptance of OR for non-OR persons at Sveaskog.
![Page 178: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/178.jpg)
Concluding remarks
![Page 179: Discrete optimization – exact methods · Capacity: ~2 million tons Wood: ~9 million cu.m.* Case: Södra Cell - mills. Customers GHENT TERNEUZEN EMDEN NORTHFLEET CHATHAM LOWESTOFT](https://reader034.fdocuments.us/reader034/viewer/2022050401/5f7f546809f91466a6735f96/html5/thumbnails/179.jpg)
Concluding remarksThere are many general and advanced solvers and modeling languages available (CPLEX, XPRESS, COIN-OR, AMPL, EXCEL, MPL, GAMS, etc) for discrete optimization.There are many specific solvers available for particular applications/ models (TSP, VRP, GAP, Facility location, Knapsack, etc.)Actual implementations require knowledge in both modeling and solution methods.Data is available through databases. But, care needs to be taken for error in data.Trends: Robustness, uncertainty, real-time, coordination, even larger and detailed models