DISCLAIMER - Champion Iron

39

Transcript of DISCLAIMER - Champion Iron

Page 1: DISCLAIMER - Champion Iron
Page 3: DISCLAIMER - Champion Iron

CORPORATE OVERVIEW

BLOOM LAKE

Page 4: DISCLAIMER - Champion Iron

COVID-19 RESPONSE

TSX: CIA ⎪ ASX: CIA

Page 5: DISCLAIMER - Champion Iron

FY2020 HEALTH & SAFETY

Page 6: DISCLAIMER - Champion Iron

ENVIRONMENTALLY FOCUSED

NewOld

Page 7: DISCLAIMER - Champion Iron

STEEL INDUSTRY GOING GREENDR PELLET FEED IN RISING DEMAND

Source: Champion Iron Limited, Wood Mackenzie data

Page 8: DISCLAIMER - Champion Iron

✓ Champion sells based on Platts 65% Fe premium benchmark

STRUCTURAL SHIFT IN IRON ORE

Source: Champion Iron Limited, Platts, Bloomberg; P62: Platts TSI IODEX 62% Fe CFR China; P65: Platts IO Fines 65% Fe CFR China

Pre

miu

m/D

isco

un

t to

P6

2 In

dex

(%

)

Page 9: DISCLAIMER - Champion Iron

MARKET STATISTICS AS OF Q2/FY21(C$M) SHAREHOLDERS (CIA-TSX; CIA-ASX)

CORPORATE SNAPSHOT

Page 10: DISCLAIMER - Champion Iron

INVESTMENT HISTORY

TIMELINE &

CUMULATIVE

TOTAL

INVESTMENT

Page 11: DISCLAIMER - Champion Iron

BLOOM LAKE TODAY

$

$

Page 12: DISCLAIMER - Champion Iron

P62: Platts TSI IODEX 62% Fe CFR China

COMPETING ON COST CURVE

Page 13: DISCLAIMER - Champion Iron

DIVERSIFIED CUSTOMER BASE

Product sold to 22 different customers since 1st shipment

CHINA – 52.5%

EUROPE – 4%

INDIA – 1.5%

MIDDLE EAST – 12.5%

KOREA – 4.5%

JAPAN – 25%

Page 14: DISCLAIMER - Champion Iron

OPERATIONAL RESULTS

Page 15: DISCLAIMER - Champion Iron

BLOOM LAKE PHASE I (7.4 MTPA)

Page 16: DISCLAIMER - Champion Iron

FINANCIAL RESULTS

Page 17: DISCLAIMER - Champion Iron

PREMIUM PRICING

- $

50.00 $

100.00 $

150.00 $

0

50

100

150

Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Q2/21 Net

Ave

rage

Sel

ling

Pri

ce (

FOB

C

A$

/dm

t))

CA

$ p

er d

mt

Total Cash Cost Total All-in Sustaining Cost

Cash Operating Margin Net Average Selling Price (FOB)

Page 18: DISCLAIMER - Champion Iron

LABRADOR TROUGH =WORLD-CLASS OPPORTUNITY

Page 19: DISCLAIMER - Champion Iron

GROWTH OPPORTUNITIES

Page 20: DISCLAIMER - Champion Iron

BLOOM LAKE PHASE II PROJECTROBUST ECONOMICS

Page 21: DISCLAIMER - Champion Iron

PHASE II – ADVANCED PROJECT

Page 22: DISCLAIMER - Champion Iron

BLOOM LAKE AREAPOTENTIAL OPPORTUNITIES

Page 23: DISCLAIMER - Champion Iron

ACQUISITION OF KAMI PROJECT

Page 24: DISCLAIMER - Champion Iron

REGIONAL OPPORTUNITIES

599

Page 25: DISCLAIMER - Champion Iron

STRONG FINANCIAL POSITION

Page 26: DISCLAIMER - Champion Iron

STRONG LEVERAGETO COMMODITY PRICE

Page 27: DISCLAIMER - Champion Iron
Page 28: DISCLAIMER - Champion Iron

EXPERIENCED TEAM◼

Page 29: DISCLAIMER - Champion Iron

INFRASTRUCTURE AND LOGISTICS

Mining Crushing Concentrating Rail PortCo

Asset Snapshot

Description / Commentary

◼ Typical blast and shovel mining operations

◼ Trucked to near-pit crusher

◼ 3 distinct mining areas

◼ Crushed in near-pit crusher and conveyed 3.45km to the processing facility

◼ Upgrading the ~30% Fe to 66% Fe

◼ Grinding, screening, gravity circuit and magnetic recovery

◼ Transported by rail from loading station at Bloom Lake to Port of Pointe-Noire Sept-Îles

◼ Rail agreement with Quebec North Shore and Labrador Railway Company (QNS&L)

— Cost is variable based on wet tonnage

◼ Agreement with Government of Quebec for unloading and stocking area and service agreement with Port of Sept-Îles for ship loading

◼ Access to state of the artbrand new deep seaberth

◼ One of North America’s largest ore-handling ports with year roundaccess

Key Equipment

◼ 10 CAT Trucks

◼ 3 Shovels

◼ 3 Loaders

◼ 3 Drills

◼ 3.45km conveyor system

◼ 2 fully operational crushers with spare capacity

◼ 2 concentrators

— Phase I concentrator is operational

— Phase II concentrator is approximately 70% complete

◼ “On-site” privately owned 32km railway linking Bloom Lake Mine site to QNS&L

◼ 835 specialized iron ore rail cars

◼ Arnaud rail

◼ Rotary car dumper

◼ Stacker / Reclaimer

◼ 36km of government owned railway

Current Phase I and Potential Phase II

Annual Throughput Capacity

Phase I capacity: 7.4 Mtpa

Phase II capacity: 7.6Mtpa

Total Capacity: 15Mtpa

Phase I capacity: 7.4 Mtpa

Phase II capacity: 7.6Mtpa

Total Capacity: 15Mtpa

Phase I capacity: 7.4 Mtpa

Phase II capacity: 7.6Mtpa

Total Capacity: 15Mtpa

Available excess capacity at QNS&L

Multi-user Port with total capacity of 50M tpa

1 2 3 4 5

Page 30: DISCLAIMER - Champion Iron

TAILINGS MANAGEMENT

Centerline/Downstream Upstream

Water basin required for finer

particles to deposit

Page 31: DISCLAIMER - Champion Iron

UPDATED FEASIBILITY ECONOMICSCOMBINED PHASE I & II (JUNE 2019)

Page 32: DISCLAIMER - Champion Iron

BLOOM LAKERESERVES & RESOURCES

Page 33: DISCLAIMER - Champion Iron

BLOOM LAKE PHASE IIPOSITIONING AS A GLOBAL LEADER

Page 34: DISCLAIMER - Champion Iron

BLOOM LAKEUPDATED RECOVERY FLOWSHEET

>

>

>

>

>

Page 35: DISCLAIMER - Champion Iron

IRON ORE VALUE CHAIN

>

SINTER PELLETS

Page 36: DISCLAIMER - Champion Iron

BLOOM LAKE MINE COMPLEX

Page 37: DISCLAIMER - Champion Iron

MULTI-USER PORT

Page 38: DISCLAIMER - Champion Iron

STRUCTURAL IMPROVEMENTS2018 RECOMMISSIONING

Page 39: DISCLAIMER - Champion Iron