DISCLAIMER - Champion Iron
Transcript of DISCLAIMER - Champion Iron
DISCLAIMER
CORPORATE OVERVIEW
BLOOM LAKE
COVID-19 RESPONSE
◼
◼
→
TSX: CIA ⎪ ASX: CIA
FY2020 HEALTH & SAFETY
◼
◼
◼
◼
◼
◼
ENVIRONMENTALLY FOCUSED
◼
◼
◼
◼
◼
◼
◼
◼
◼
↓
↓
↓
NewOld
STEEL INDUSTRY GOING GREENDR PELLET FEED IN RISING DEMAND
◼
◼
◼
◼
Source: Champion Iron Limited, Wood Mackenzie data
✓ Champion sells based on Platts 65% Fe premium benchmark
STRUCTURAL SHIFT IN IRON ORE
◼
◼
◼
Source: Champion Iron Limited, Platts, Bloomberg; P62: Platts TSI IODEX 62% Fe CFR China; P65: Platts IO Fines 65% Fe CFR China
Pre
miu
m/D
isco
un
t to
P6
2 In
dex
(%
)
◼
◼
MARKET STATISTICS AS OF Q2/FY21(C$M) SHAREHOLDERS (CIA-TSX; CIA-ASX)
CORPORATE SNAPSHOT
INVESTMENT HISTORY
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
—
—
—
—
◼
◼
—
—
—
—
◼
◼
◼
◼
TIMELINE &
CUMULATIVE
TOTAL
INVESTMENT
BLOOM LAKE TODAY
◼
$
$
◼
P62: Platts TSI IODEX 62% Fe CFR China
COMPETING ON COST CURVE
◼
◼
◼
◼
◼
DIVERSIFIED CUSTOMER BASE
Product sold to 22 different customers since 1st shipment
◼
◼
◼
CHINA – 52.5%
EUROPE – 4%
INDIA – 1.5%
MIDDLE EAST – 12.5%
KOREA – 4.5%
JAPAN – 25%
OPERATIONAL RESULTS
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
BLOOM LAKE PHASE I (7.4 MTPA)
→
FINANCIAL RESULTS
◼
◼
◼
◼
◼
◼
PREMIUM PRICING
◼
◼
- $
50.00 $
100.00 $
150.00 $
0
50
100
150
Q2/19 Q3/19 Q4/19 Q1/20 Q2/20 Q3/20 Q4/20 Q1/21 Q2/21 Net
Ave
rage
Sel
ling
Pri
ce (
FOB
C
A$
/dm
t))
CA
$ p
er d
mt
Total Cash Cost Total All-in Sustaining Cost
Cash Operating Margin Net Average Selling Price (FOB)
LABRADOR TROUGH =WORLD-CLASS OPPORTUNITY
◼
◼
◼
◼
◼
◼
◼
GROWTH OPPORTUNITIES
BLOOM LAKE PHASE II PROJECTROBUST ECONOMICS
◼
◼
◼
◼
◼
◼
◼
PHASE II – ADVANCED PROJECT
◼
◼
◼
BLOOM LAKE AREAPOTENTIAL OPPORTUNITIES
◼
◼
◼
ACQUISITION OF KAMI PROJECT
◼
◼
◼
◼
◼
REGIONAL OPPORTUNITIES
◼
◼
◼
◼
◼
◼
599
STRONG FINANCIAL POSITION
STRONG LEVERAGETO COMMODITY PRICE
◼
◼
EXPERIENCED TEAM◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
◼
INFRASTRUCTURE AND LOGISTICS
Mining Crushing Concentrating Rail PortCo
Asset Snapshot
Description / Commentary
◼ Typical blast and shovel mining operations
◼ Trucked to near-pit crusher
◼ 3 distinct mining areas
◼ Crushed in near-pit crusher and conveyed 3.45km to the processing facility
◼ Upgrading the ~30% Fe to 66% Fe
◼ Grinding, screening, gravity circuit and magnetic recovery
◼ Transported by rail from loading station at Bloom Lake to Port of Pointe-Noire Sept-Îles
◼ Rail agreement with Quebec North Shore and Labrador Railway Company (QNS&L)
— Cost is variable based on wet tonnage
◼ Agreement with Government of Quebec for unloading and stocking area and service agreement with Port of Sept-Îles for ship loading
◼ Access to state of the artbrand new deep seaberth
◼ One of North America’s largest ore-handling ports with year roundaccess
Key Equipment
◼ 10 CAT Trucks
◼ 3 Shovels
◼ 3 Loaders
◼ 3 Drills
◼ 3.45km conveyor system
◼ 2 fully operational crushers with spare capacity
◼ 2 concentrators
— Phase I concentrator is operational
— Phase II concentrator is approximately 70% complete
◼ “On-site” privately owned 32km railway linking Bloom Lake Mine site to QNS&L
◼ 835 specialized iron ore rail cars
◼ Arnaud rail
◼ Rotary car dumper
◼ Stacker / Reclaimer
◼ 36km of government owned railway
Current Phase I and Potential Phase II
Annual Throughput Capacity
Phase I capacity: 7.4 Mtpa
Phase II capacity: 7.6Mtpa
Total Capacity: 15Mtpa
Phase I capacity: 7.4 Mtpa
Phase II capacity: 7.6Mtpa
Total Capacity: 15Mtpa
Phase I capacity: 7.4 Mtpa
Phase II capacity: 7.6Mtpa
Total Capacity: 15Mtpa
Available excess capacity at QNS&L
Multi-user Port with total capacity of 50M tpa
1 2 3 4 5
TAILINGS MANAGEMENT
◼
◼
◼
◼
◼
Centerline/Downstream Upstream
Water basin required for finer
particles to deposit
UPDATED FEASIBILITY ECONOMICSCOMBINED PHASE I & II (JUNE 2019)
BLOOM LAKERESERVES & RESOURCES
BLOOM LAKE PHASE IIPOSITIONING AS A GLOBAL LEADER
◼
◼
◼
◼
BLOOM LAKEUPDATED RECOVERY FLOWSHEET
>
>
>
>
>
IRON ORE VALUE CHAIN
>
SINTER PELLETS
BLOOM LAKE MINE COMPLEX
MULTI-USER PORT
STRUCTURAL IMPROVEMENTS2018 RECOMMISSIONING