DIRFT III ES Appendix C2 - Construction Methodology Statement.pdf
DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No...
Transcript of DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No...
DIRFT III
PLANNING FOR THE FUTURE
THE EXPANSION OF DAVENTRY INTERNATIONAL
RAIL FREIGHT INTERCHANGE
www.DIRFTIII.com
DIRFT III Revised Document ListDocument 1.5E
Marrons Shakespeares13 December 2013
DIRFT III Document List Marrons Shakespeares
13 December 2013
1
DIRFT III Document List Document 1.5E
Document/Plan Status/ Regulation Plan No.
Doc No. Date first submitted to PINS
Application Documents 1.Application Form Application Form
Reg 5(1) 1.1 22.02.13
Letter Accompanying Original Application
1.2 31.10.12
Letter Accompanying Resubmission
1.2A 22.02.13
Newspaper Notices Report (s48)
1.3 31.10.12
Site Notice Information
1.4 31.10.12
DIRFT III Document List
1.5 22.02.13
DIRFT III Revised Document List 1.5A 14.08.13
DIRFT III Revised Document List 1.5B 13.09.13
DIRFT III Revised Document List 1.5C 11.10.13
DIRFT III Revised Document List 1.5D 18.11.13
DIRFT III Revised Document List 1.5E 13.12.13
Applicant’s Original S.55 Checklist
1.6 22.10.12
DIRFT III Pre Acceptance Submission Update
1.7 22.02.13
2. Plans/ Drawings/ Sections Location Plan
Reg 5(2)(o) P001 Rev G
2.1
31.10.12
Overall Scheme Plan
Reg 5(2)(o) 11041/PD/54
2.1A
22.02.13
Ease of Reference Plans Bundle Reg 5 (2)(o) 2.1B 22.02.13
Main Site and Rail Land Plans
Reg 5(2)(i) and 5(2)(n)
DIRFT III Document List Marrons Shakespeares
13 December 2013
2
Main Site and Rail Land Plans – Key Plan Main Site and Rail Land Plans – Sheet 1 Main Site and Rail Land Plans – Sheet 2 Main Site and Rail Land Plans – Sheet 3
L020(Key) Rev E L020(SHEET 1) Rev E L020 (SHEET 2) Rev E L020 (SHEET 3) Rev E
2.2 2.2A 2.2B 2.2C
31.10.12 31.10.12 31.10.12 31.10.12
Main Site and Rail Works Plans Main Site and Rail Works Plans – Key Plan Main Site and Rail Works Plans – Sheet 1 Main Site and Rail Works Plans – Sheet 2 Main Site and Rail Works Plans – Sheet 3
Reg 5(2)(j) A058 (KEY) Rev C A058 (SHEET 1) Rev C A058 (SHEET 2) Rev C A058 (SHEET 3) Rev C
2.3 2.3A 2.3B 2.3C
31.10.12 31.10.12 31.10.12 31.10.12
Highway Mitigation Land and Works Plans (labelled as Highway Works Area Plans) Highway Mitigation Land and Works Plans – Key Plan Highway Mitigation Land and Works Plans – A5/A426 Highway Mitigation Land and Works Plans – M1 Junction 18 Highway Mitigation Land and Works Plans – A5/A428 Halfway House Highway Mitigation Land and Works Plans – Lilbourne Junction
Reg 5(2) (i) (j) and (n) 11041/PD/49 Rev A 110041/PD/23 Rev C 110041/PD/24 Rev C 110041/PD/25 Rev C 110040/PD/27 Rev C
2.4 2.4A 2.4B 2.4C 2.4D
22.02.13 22.02.13 22.02.13 22.02.13 Withdrawn 11.10.13 22.02.13
DIRFT III Document List Marrons Shakespeares
13 December 2013
3
Highway Mitigation Land and Works Plans – Catthorpe Junction Highway Mitigation Land and Works Plans – Clifton upon Dunsmore Highway Mitigation Land and Works Plans – Kilsby Highway Mitigation Land and Works Plans – A5 to A428 at Crick Highway Mitigation Land and Works Plans – DIRFT III to Hilmorton Highway Mitigation Land and Works Plans – DIRFT III to Hilmorton
110041/PD/28 Rev C 110041/PD/29 Rev C 110041/PD/30 Rev C 110041/PD/31 Rev C 110041/PD/32 Rev E 110041/PD/45 Rev C
2.4E 2.4F 2.4G 2.4H 2.4I 2.4J
22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13
Access and Rights of Way Plan
Reg 5(2)(k) 83538/D3-100 Rev H
2.5
31.10.12
Land Ownership Plans Land Ownership Plans
- Key Plan Land Ownership Plans Sheet 1 Land Ownership Plans Sheet 2 Land Ownership Plans Sheet 3
Reg 5(2)(o) L019 (KEY) Rev D L019 (SHEET 1) Rev C L019 (SHEET 2) Rev D L019 (SHEET 3) Rev C
2.6 2.6A 2.6B 2.6C
31.10.12 31.10.12 31.10.12 31.10.12
Main Site and Rail Corridor Framework Plans and Schedule
Reg 5(2)(o)
DIRFT III Document List Marrons Shakespeares
13 December 2013
4
of Parameters Main Site and Rail Corridor Framework - Key Plan Main Site and Rail Corridor Framework Sheet 1 Main Site and Rail Corridor Framework Sheet 2 Main Site and Rail Corridor Framework Sheet 3 Main Site and Rail Corridor Framework Schedule of Parameters
AO39 (KEY) Rev L AO39 (SHEET 1) Rev D AO39 (SHEET 2) Rev E AO39 (SHEET 3) Rev D
2.7 2.7A 2.7B 2.7C 2.7D
31.10.12 31.10.12 31.10.12 31.10.12 31.10.12
Illustrative Masterplan Illustrative Masterplan - Key Plan Illustrative Masterplan - Sheet 1 Illustrative Masterplan - Sheet 2 Illustrative Masterplan - Sheet 3
Reg 5(2)(o) FO14 (KEY) Rev D FO14 (SHEET 1) Rev A FO14 (SHEET 2) Rev B FO14 (SHEET 3) Rev A
2.8 2.8A 2.8B 2.8C
31.10.12 31.10.12 31.10.12 31.10.12
Ecology and Landscape Plans and Assessment
Reg 5(2)(l) In Chapter F and H of the ES
31.10.12
Heritage Plans and Assessment
Reg 5(2)(m) In Chapter G of the ES
31.10.12
Rail Background Information Plans
Reg 5(2)(o)
DIRFT III Document List Marrons Shakespeares
13 December 2013
5
• Existing Rail Layout • Rail Structures Key Plan Illustrative Rail Alignment –
Sheet 1
• Illustrative Rail Alignment – Sheet 2
• Illustrative Rail Alignment – Sheet 3
• Network Rail Maintenance Access
URS 47056898/SLD/03 Rev B URS 47056898/KEY/01 Rev B URS 47067076-SW-PW-0001 Rev A02 URS 47067076-SW-PW-0002 Rev A02 URS 47067076-SW-PW-0003 Rev A02 URS 47067076-ACC-001
2.9A 2.9B 2.9C 2.9D 2.9E 2.9F
31.10.12 31.10.12 18.07.13 18.07.13 (revised 18.11.13) 18.07.13 18.07.13
Rail Framework Plans
• Rail Framework Plan (Single Line Drawing) Sheet 1
• Rail Framework Plan (Single Line Drawing) Sheet 2
• Bridge A (Tunnel) (Replacement of existing tunnel to accommodate twin track
• Bridge over the A428 – in
the alternative:
(a) Bridge B (as permitted)
Reg 5(2)(o) URS 47056898/SLD/01 Rev C URS 47056898/SLD/02 Rev C URS D122659-SW-CV-DRG-1002 Rev E Bridge – URS
2.10A 2.10B 2.10C 2.10D
31.10.12 31.10.12 31.10.12 31.10.12
DIRFT III Document List Marrons Shakespeares
13 December 2013
6
with Bridge B1 (two single track bridges)*
(b) Bridge B Viaduct (as
permitted) with Bridge B1 Viaduct (two single track viaducts)
OR
(c) Bridge B2 (single bridge with double rail track)**
• Bridge D (over the A5)
• Bridge E (over the internal) estate road
*to be used if most eastern alignment of rail track is used **to be used if rail track is on any alignment other than the most eastern
D122659-SW-CV-DRG-1004 Rev D Viaduct - URS D122659-SW-CV-DRG-1003 Rev D URS 47056898-SW-CV-DRG-1005 Rev A URS D122659-SW-CV-DRG-1000 Rev G URS D122659-SW-CV-DRG-1001 Rev E
2.10E 2.10F 2.10G 2.10H
Withdrawn 11.10.13 31.10.12 Withdrawn 11.10.13 31.10.12 31.10.12 31.10.12
Rail Embankments • Rail embankment through
DIRFT II and III in the alternative:
(a) Eastern Embankment Option*
(b) Alternative Embankment Alignment Option **
*to be used if most eastern alignment of rail track is used **to be used if rail track is on any alignment other than the most eastern
Reg 5(2)(o) URS D122659-SW-PW-GEO1 Rev F URS D122659-SW-PW-GE02 Rev C
2.10I 2.10J
31.10.12 Withdrawn 11.10.13 31.10.12
DIRFT III Document List Marrons Shakespeares
13 December 2013
7
Minor Watercourse Bridges and Flow Control Structure • West Footbridge and
Maintenance Access • Bridleway Bridge and
Maintenance Access • Clifton Brook Tributary
Storage Scheme Flow Control Structure
• Clifton Brook Realignment
Access Bridge, General Arrangement
Bridleway Bridges over Rail on Main Site
• Bridleway Details Plan and Longitudinal Section
• Bridleway Details Cross Sections
• Bridleway Bridge West
General Arrangement
• Bridleway Bridge Central General Arrangement
• Bridleway Bridge East general Arrangement
Reg 5(2)(o) PBA 2.11A Rev C PBA 2.11B Rev C PBA 2.11C Rev C PBA 2.11D Rev C 60051619/100 P4 60051619/101 P4 60051619/103 P4 60051619/104 P4 60051619/105 P4
2.11A 2.11B 2.11C 2.11D 2.11E 2.11F 2.11G 2.11H 2.11I
31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12
Flood Alleviation Works
• Long Dole Culvert A5/125.20 Replacement, General Arrangement
Reg 5(2)(o) PBA 2.11J Rev A
2.11J
31.10.12
DIRFT III Document List Marrons Shakespeares
13 December 2013
8
• Danes Way Culvert
Replacement, General Arrangement
PBA 2.11K Rev A
2.11K
31.10.12
Railway Bridging Structures over Clifton Brook
• Western Alignment
• Eastern Alignment
Reg 5(2)(o) PBA 2.11L Rev A PBA 2.11M Rev A
2.11L 2.11M
31.10.12 Withdrawn 11.10.13 31.10.12
Lilbourne Meadows Lilbourne Ridge Proposed Contours and Sections
Reg 5(2)(o) AECOM – 600519/CIV/PD/016 Rev. P3
2.12
31.10.12
Highway Works Framework Plans • General Arrangement Plan
o Key Plan
o Gibbet Roundabout
o M1 J18
o A5/A428 (Halfway
House)
o Lilbourne Junction
o Catthorpe Junction
110041/PD/42 Rev B 110041/PD/08 Rev D 110041/PD/09 Rev D 110041/PD/10 Rev D 110041/PD/12 Rev D 110041/PD/13 Rev C
2.13 2.13A 2.13B 2.13C 2.13D 2.13E
22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13
DIRFT III Document List Marrons Shakespeares
13 December 2013
9
o A5/A428 (Parklands)
110041/PD/53 Rev A
2.13F
22.02.13
Highway Works Illustrative Plans • Indicative Scheme Drawings
o Clifton upon Dunsmore Indicative Traffic Calming Scheme
o Kilsby Indicative Traffic Calming Scheme
o A5 to A428 at Crick Ped/Cycle Improvement Scheme.
o DRIFT III to Hillmorton Ped/Cycle Improvement Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated]
o Key Plan
110041/PD/14 Rev C to 17 Rev C (overview plan and 3 sheets) 110041/PD/18.1 to 18.5 Rev C and 18.6 Rev D and 18.7 Rev C (7 sheets) 110041/PD/19 Rev C to 21 Rev C ( 3 sheets) 110041/PD/22 Rev C 110041/PD/43 Rev B
2.13G 2.13H 2.13I 2.13J 2.13K
22.02.13 22.02.13 22.02.13 22.02.13 22.02.13
Site Access Plans • Southern Access to DIRFT III • Northern Access to DIRFT III
Reg 5(2)(o) 110041/PD/44 Rev A 110041/PD/06A Rev B
2.14A 2.14B
31.10.12 31.10.12
DIRFT III Document List Marrons Shakespeares
13 December 2013
10
Phasing Plan Phasing Plan – Key plan Phasing Plan – Sheet 1 Phasing Plan – Sheet 2 Phasing Plan – Sheet 3
Reg 5(2)(o) A049 Rev D A049 (SHEET 1) Rev B A049 (SHEET 2) Rev B A049 (SHEET 3) Rev B
2.15 2.15A 2.15B 2.15C
31.10.12 31.10.12 31.10.12 31.10.12
3.Draft Development Order and associated plans Draft Proposed Development Consent Order (including requirements) (February 2013)
Reg 5(2)(b) 3.1 22.02.13
Revised Development Consent Order (including requirements) (August 2013)
3.1A 14.08.13
Revised Development Consent Order (including requirements) (October 2013)
3.1B 11.10.13
Revised Development Consent Order (including requirements) (November 2013) (tracked)
3.1C(i) 18.11.13
Revised Development Consent Order (including requirements) (November 2013) (clean)
3.1C(ii) 18.11.13
Revised Final Draft Development Consent Order (including requirements) (December 2013) (tracked)
3.1D(i) 13.12.13
Revised Final Draft Development Consent Order (including requirements) (December 2013)
3.1D(ii) 13.12.13
DIRFT III Document List Marrons Shakespeares
13 December 2013
11
(clean) Explanatory Memorandum to Draft Development Consent Order (February 2013)
Reg 5(2)(c) 3.2 22.02.13
Revised Explanatory Memorandum to Draft Development Consent Order (October 2013)
3.2A 11.10.13
Revised Explanatory Memorandum to Draft Development Consent Order (November 2013)
3.2B 18.11.13
Revised Explanatory Memorandum to Final Draft Development Consent Order (December 2013)
3.2C 13.12.13
Table of Revisions Made to the Development Consent Order (August 2013)
3.3 14.08.13
Revised Table of Revisions Made to the Development Consent Order (October 2013)
3.3A 11.10.13
Revised Table of Revisions Made to the Development Consent Order (November 2013)
3.3B 18.11.13
Revised Table of Revisions Made to the Final Draft Development Consent Order (December 2013)
3.3C 13.12.13
4. Compulsory Acquisition Information Statement of Reasons
Reg 5(2)(h) 4.1 22.02.13
Funding Statement
Reg 5(2)(h) 4.2 31.10.12
Book of Reference
Reg 5(2)(d) 4.3 22.02.13
5. Reports/Statements Consultation Report
S.37 Planning Act 2008 5.1 31.10.12
DIRFT III Document List Marrons Shakespeares
13 December 2013
12
Consultation Report Update
S.37 Planning Act 2008 5.1A 22.02.13
Section 79(1) of Environmental Protection Act 1990 Statement (re statutory nuisance)
Reg 5(2)(f)
5.2 31.10.12
Regulation 48 European Site Statement Reg 5(2)(g))
Reg5(2)(g)
5.3 31.10.12
6. Environmental Impact Assessment & Habitat Regulations Information Environmental Statement (With replacement chapters B & C)
Reg 5(2)(a) FRA Reg 5(2)(e) Heritage Assessment Reg (m) Nature Conservation Reg (l)
6.1 22.02.13
ES Technical Appendices (With replacement appendices C1 & D1)
Reg 5(2)(a) 6.2 22.02.13
ES Non-Technical Summary
Reg 5(2)(a) 6.3 22.02.13
ES Scoping Opinion Reg 5(2)(a)
6.4 31.10.12
7. Other Documents Summary of Proposals Document
Reg 5(2)(q) 7.1
31.10.12
Update on Proposals Document
Reg 5(2)(q) 7.2 31.10.12
Planning Statement
Reg 5(2)(q) 7.3 22.02.13
Need Report
Reg 5(2)(q) 7.4 31.10.12
Assessment of Sites for Rail Freight Development Potential
Reg 5(2)(q) 7.5 31.10.12
Design and Access Statement (including Design Guide and sustainability of buildings)
Reg 5(2)(q) 7.6 31.10.12
Sustainability Report
Reg 5(2)(q) 7.7 31.10.12
Rail Operations Report
Reg 5(2)(q) 7.8 31.10.12
Summary of Draft Development Reg 5(2)(q) 7.9A 22.02.13
DIRFT III Document List Marrons Shakespeares
13 December 2013
13
Consent Obligation – February 2013 Draft Development Consent Obligation – Draft February 2013
Reg 5(2)(q) 7.9B 22.02.13
Revised Draft Development Consent Obligation – Draft August 2013
7.9C 14.08.13
Revised Draft Development Consent Obligation – Draft October 2013
7.9D 11.10.13
Revised Draft Development Consent Obligation – Draft November 2013 (tracked)
7.9E(i) 18.11.13
Revised Draft Development Consent Obligation – Draft November 2013 (clean)
7.9E(ii) 18.11.13
Engrossment Development Consent Obligation – December 2013
7.9F 13.12.13
Additional Information relating to Provision for European Protected Species
Reg 5(2)(q) 7.10 31.10.12
Dirft III – Route Map of Mitigation Controls
Reg 5(2)(q) 7.11 18.07.13
8. Statements of Common Ground and Correspondence M1 Works (Highways Agency)
Reg 5 (2)(q) 8.1 31.10.12
Archaeology/ Heritage (English Heritage)
Reg 5 (2)(q) 8.2A (EH) 8.2B (NCC)
31.10.12
Correspondence from Network Rail
Reg 5 (2)(q) 8.3 31.10.12
Planning (Daventry District Council)
Reg 5(2)(q) 8.4 31.10.12
Flood Risk (Environment Agency) Reg 5(2)(q) 8. 5 31.10.12
DIRFT III Document List Marrons Shakespeares
13 December 2013
14
Bridge A (Highways Agency)
Reg 5 (2)(q) 8.6A 31.10.12
Bridge D (Highways Agency)
Reg 5 (2)(q) 8.6B 31.10.12
New Rail Bridges over A428 (Northamptonshire County Council)
Reg 5 (2)(q) 8.7 22.02.13
Draft EPS Mitigation Licence Application – Letter of Comfort between Natural England and Aviva Investors with regard to Brown Long Eared Bats
Reg 5 (2)(q) 8.8 22.02.13
Flood Management, Drainage and River Diversion Works (Highways Agency)
Reg 5 (2)(q) 8.9 18.07.13
Rail (Network Rail) 8.10 14.08.13
Ecology (Natural England)
8.11 14.08.13
Highways (Northamptonshire County Council and Warwickshire County Council) – (superceded)
8.12 14.08.13
Replacement Highways (Northamptonshire County Council and Warwickshire County Council)
8.12A 11.10.13
Highways (Highways Agency) – (superceded)
8.13 14.08.13
Replacement Highways (Highways Agency)
8.13A 11.10.13
Air Quality (Daventry District Council and Rugby Borough Council)
8.14 14.08.13
Noise (Daventry District Council and Rugby Borough Council)
8.15 14.08.13
Ecology (Northants Wildlife Trust) 8.16 14.08.13
DIRFT III Document List Marrons Shakespeares
13 December 2013
15
Ecology (Environment Agency)
8.17 14.08.13
Correspondence from Natural England
8.18 11.10.13
9. Applicants written responses submitted to PINS Applicants Written Responses to the First Questions of the Examining Authority
9.1A 14.08.13
Appendices to Applicants Written Responses to the First Questions of the Examining Authority
9.1B 14.08.13
Applicant’s response to:- 1. Written Representations of
Interested Parties received by the Examining Authority for 14 August 2013 deadline.
2. Interested Parties Responses to the Examining Authorities First Written Questions.
3. Local Impact Reports received by the Examining Authority for 14 August 2013 deadline.
9.1C 13.09.13
Applicant’s Response to Request for Further Information under Rule 17 Received 3 September 2013
9.1D 27.09.13
Applicant’s Written Responses to the Further Questions of the Examining Authority
9.1E 11.10.13
Applicant’s Appendices to Written Responses to the Further Questions of the Examining Authority
9.1F 11.10.13
Applicant’s Response to Request for Further Information under Rule 17 Received 29 October
9.1G 18.11.13
DIRFT III Document List Marrons Shakespeares
13 December 2013
16
2013 Applicant’s Appendices to Response to Request for Further Information under Rule 17 Received 29 October 2013
9.1H 18.11.13
Additional Justification for Articles 5(2), Article 8(3) and (4).
9.1I 18.11.13
Applicant’s Response to Request for Further Information under Rule 17 Received 8 November 2013
9.1J 18.11.13
10. Additional Documents submitted Letter from NLP on behalf of the Applicants to the Health and Safety Executive dated 14 August 2013
10.1 14.08.13
Letter from NLP on behalf of the Applicants to Public Health England dated 14 August 2013
10.2 14.08.13
Letter to NLP on behalf of the Applicants from North Warwickshire Borough Council dated 16 July 2013
10.3 14.08.13
Statement of Intent – M1 Boundary Slopes
10.4 11.10.13