1 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Directorate of Technical Education,
Gandhinagar
\
MANUAL FOR “RESEARCH PROMOTION
UNDER TECHNICAL EDUCATION”
GOVERNMENT OF GUJARAT
DIRECTORATE OF TECHNICAL EDUCATION
GANDHINAGAR, GUJARAT
August, 2019
2 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
TABLE OF CONTENT
Sr. No. PARTICULARS PAGE
1 How to Apply 4
2 Selection Process 4
3 Procurement of Equipment 5
4 Utilization of Fund in Characterization and Analysis 5
5 Travel Grant 5
6 Living Expenses 6
7 Contingent and Recurring Expenses 6
8 Financial Monthly Report 7
9 Half Yearly Progress Report 7
10 Final Project Completion Report 8
11 Final settlement of the Accounts 8
12 Overhead expenses 8
13 Duration of schemes 9
14 Change of PI 9
15 Eligibility & Criteria 9
16 Intellectual Property Rights 9
17 Publication of Result/Presentation of Papers 10
18 DTE Executive committee & DTE Monitoring Authority 10
19 Expenditure related to DTE Executive Team & DTE
Monitoring Committee’s Authority
10
20 Detailed Application Form for Research Grant 11
Various Annexure and Formats (See Next Page) 12-28
3 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
DETAILS OF VARIOUS ANNEXURE AND FORMATS
ANNEXURE
NUMBER
DESCRIPTION PAGE
1 Cost details of permanent equipment/assets 12
2 Details of Principal Investigator (PI) 13
3 Details of Other Investigator (s)/ Co-Investigator (s) 14
4 Financial Monthly Report 15
5 Format for Half-Yearly Progress Report 16
6 Format for Half-Yearly Statement of Accounts to Accompany
Request for Release of First Installment 17
7 Check list for covering note to accompany Utilization Certificate
of grant for the project for the period ending 31st March, 20__) 18
8 Format for Utilisation Certificate (Half Yearly) 19
9 Format for Final/ Half-Yearly Report 20-21
10 Endorsement from the Head of the Institution 22
11 Format for Final Statement of Expenditure 23
12 Format For Undertaking to be Submitted after Project
Acceptance By DTE 24
13 Utilization Breakdown and Finance Rules 25
14 Information Regarding DTE Executive Team and DTE
Monitoring Committee 26
4 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
1. How to Apply
Institutions /Faculty that are interested in support are invited to submit the proposal
(a short concept note) in English (maximum length of 3 to 4 A4 size pages)
including the following details within mentioned time limit:
1. Title of the project:
2. Domain (Branch and Sub-Branch Details):-
3. Objective(s) :
4. Main activities and beneficiaries :
5. Implementation location : Describe study area and implementation
suitability.
6. Timeline/main milestones: Make suitable Gantt Chart/ Timeline
7. Financial information: Total budget (with main line items) and requested
contribution from DTE
8. Other donors (confirmed or prospective) and self-financing share:
9. Name of the applying organization: Name of Institutes
10. Details of the Project, Principal Investigator and Other Investigators
(As per Annexure 1, 2 and 3): Attach Annexure 1,2 & 3.
If the proposal is in line with criteria set and priorities, will follow up and ask for
further information in due course time by the DTE monitoring committee (See
Annexure 14).
2. Selection Process
All projects proposals are first screened by the DTE executive team (See Annexure
14). Proposals having successfully passed this initial screening are formally
reviewed by the DTE committee. The Board takes into account the relevance of the
project and also assesses the projects’ efficiency and impact. Upon a positive
outcome, the DTE gets in touch with the successful applicant to work out grant
practicalities. All rights of sanctioning and project continuation is with DTE
executive team, no jurisdiction and conflict of interest can be raised as disputes.
5 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
3. Procurement of Equipment
a. The DTE, Gandhinagar would allow to procure equipment(s) for the conduct
of the study. There is upper ceiling (Maximum 80% of allotted grant) on the
amount for purchase of equipment (s). This would vary on the nature, scope
and need of the Project.
b. All equipment should be purchased according to the rules and procedures of
the Institutions where the project is to be carried out i.e. through GeM or as
per Government norms. If the equipment is not available on GeM then it can
be buyed as per government norms.
c. Equipment procured through the DTE grant should bear a label “DTE
funded”. The annexure 10 has to be submit for the conformance of
endorsement of institute to DTE.
d. On completion of the project a list of all equipment procured from the
project funds along with cost, date of purchase, and suggestion for
disposal/utilization of the items should be sent to DTE.
e. Each Individual Equipments costing less than Rs. 20,000 are generally
allowed to be retained by the Institute, while in case of those costing more
than Rs. 20000, DTE will take the final decision after reviewing the request /
suggestions from the PI.
4. Utilization of Fund in Characterization and Analysis
Utilization of fund must be done as per the guidelines of the DTE Gandhinagar
Mentioned in the Annexure 14. The monthly financial report must be submitted
to DTE. The yearly and Final Audited UC must be submitted as per the
guidelines of the DTE Gandhinagar Mentioned in the Annexure 14. The
Expenditure of this audit are to be made from the sanctioned fund.
5. Travel Grant
The grant can be utilized for travel of the PI, co-investigator or of research
fellow/associates working on the scheme for:
6 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
a. Attending seminars/symposia/conferences within the county provided the PI
himself or the Fellow/Associate, is presenting, a research paper based on the
project work (either oral or poster presentation).
b. Taking up field work/travel conneDTEd with the research work with
sanction of TA/DA as per entitlement
c. Visiting the DTE office for meetings related to the project.
d. Registration fee and travelling allowance for attending a training course
relevant to the project (mainly for project staff).
e. Travel grant cannot be used for foreign travel or related expenses for any
reason for the grant of 1 and 2 lac. For the grant of 25 lac he/she may use the
travel grant for foreign travel or related expenses.
f. The audit expenses of the research project after completion shall be
beard under the respective sanctioned grant.
6. Living Expenses (Only for foreign Collaboration)
This is allowed for the grant of 25 Lac. It may be provided in the following
Categories and maximum up to 10 percent of sanctioned amount -
1. Accommodation
2. Food
3. Utilities
4. Clothes and toiletries
7. Contingent and Recurring Expenses
For expenditure amount under contingency grant, the detail is as follows –
1. For grant of @25 lac, contingency grant is 1 lac
2. For grant of @2 lac, contingency grant is 20k
3. For grant of @1 lac, contingency grant is 10k
7.1 Utilizing the contingent grant
This guideline is meant for recurring as well as non-recurring expenditure under
the contingency grant. The contingent grant can be utilized for purposes like,
but not limited to:
a) Acquisition of books and documents of relevance to the research topic in
case these are not available in the library. These would be treated as the
7 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
property of the Institution’s library and after purchase and accession, may be
issued to the concerned Department/PI as per institutional rules.
b) Consumable items required for research work
c) Charges for specialized investigations for which facilities do not exist in the
host institute
d) Publication Charges/reprints/off-prints of research papers published as an
outcome of the research.
e) Data-entry charges
f) Printing of questionnaire/s
g) Computer utilities, charges for analysis of data (computer charges)
h) Typing of research reports
i) Expenses in connection with the preparation of the final report
j) Petrol, oil, lubricants (POL)
k) Communication charges
Note: Grant cannot be used for purchase of furniture items/office equipment
and civil Works.
8. Financial Monthly Report.
Every 4th
day of the Month the Financial Monthly Report (FMR) duly singed by
the PI and Head of the Institute is required to submit as prescribed format.
(format is given as annexure 4).
9. Half Yearly Progress Report
a. Half yearly Report is to be submitted by the PI in the prescribed format. The
Half yearly Progress Report should be submitted after about one month to
the completion of the half year end to enable its evaluation and decisions
regarding subsequent grant release. The subsequent Half yearly Report will
have to be submitted till the end of project period. Annexures 5, 6, 8, 9, 12
Needs to be submit in detail for Half-Yearly clearance of finance & Project..
b. The progress of the project would be evaluated by DTE monitoring
committee (The formulation details of DTE Monitoring committee are
depiDTEd in Annexure 14).
8 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
c. The scheme will not be renewed for the next half year unless the DTE
committee receives the progress report in time. Annexure 7 needs to be
submit for the reflecting the utilization till 31st March in financial year.
d. A delay in receipt of the report in time for consideration by the Committee
may lead to termination of the project.
e. The PI may be asked to present the progress at the meeting of the DTE
monitoring committee, if considered necessary.
f. The suggestion and views of the DTE committee and mid-course correction,
if any, would be conveyed to the PI from time to time for compliance and
effective conduct of the project.
10. Final Project Completion Report
a. At the completion of the project, the final report in the prescribed format
(Annexure 9, 10, 11) will have to be submitted.
b. The report should be submitted not later than three months of the date of
completion of the project.
c. 10% grant would be withheld for release until the receipt of final project
report.
11. Final settlement of the Accounts
The final settlement of the Accounts will be done at DTE only after the receipt of
the following:
a. Final audited statement of expenditure.
b. Final utilization certificate.
c. List of equipment procured from the project mentioning the cost, date of
purchase and suggestions for disposal of all items purchased under
equipment.
d. The unspent grant paid by DTE shall be refunded by the institution as and
when the investigator discontinues a scheme midway or does not follow the
detailed technical programme laid down and approved.
12. Overhead expenses
a. Will be restriDTEd to 5% of the total cost of the project.
9 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
b. Overhead expenditure will not be granted on equipment and travel
allowances.
13. Duration of schemes
Requests for project extension beyond approved duration would not be
entertained routinely.
However, if interesting/important leads are likely to emerge that need to be
followed up, then a valid justification for an extension should be submitted by
the PI three months before the expeDTEd completion of the project clearly
mentioning the period of extension with justification.
14. Change of PI
a. PIs are encouraged to have a co-investigator in the project.
b. In case the PI leaves the project an eligible co-investigator could be considered
as the PI subject to recommendation of the PI, the Head of the Institution and
the approval of DTE. Such a request should be sent well in advance.
c. In case the PI is shifting to any other institution, the co-investigator could be
made PI or the project could be transferred to the new Institutions with prior
approval from DTE.
d. The host institution has an important role to play in the above. The
institute/Principal Investigator will have to inform DTE of any changes and in
consultation with DTE takes steps to ensure successful continuation completion
of the project before relieving the principal investigator.
e. It is responsibility of PI to submit the endorsement letter from the institute
(Annexure 10) & Undertaking of project functioning after project selection
(Annexure 12).
15. Eligibility & Criteria
Regular faculty members in Government Engineering & Government Diploma
Institutes under DTE and presently serving in Government Engineering/
Governmental Polytechnic colleges in Gujarat state.
16. Intellectual Property Rights
All new intellectual property viz. patents, copyright, design, etc. generated as
part of the research supported by the DTE would belong to DTE. All raw data
10 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
(in all forms) should be made available/accessible to DTE at the completion of
the project along with submission of the final report.
17. Publication of Result/Presentation of Papers
The research papers and publications based on the result of the research project
should clearly acknowledge the assistance by the DTE along with ID number.
Copies/ reprints of the papers published should be forwarded to DTE as and
when published.
Research publications as papers in reputed conference/ Journals are supposed to
be made during and before the completion of the research project. The research
guidelines and project methodology may also be published as book with ISBN
number after the project completion and with the permission and
acknowledgement of DTE, Gandhinagar.
18. DTE Executive Team & DTE Monitoring Committee’s Authority
A committee has been formed at Directorate of Technical Education (DTE),
Gandhinagar which will look after the administrative procedure of research
grant and the details are depiDTEd in Annexure 14. The selection guidelines of
project application as mentioned above will be scrutinized by the committee
itself. The body will do audit every year on the utilization of the funds under
this head.
19. Expenditure related to DTE Executive Team & DTE Monitoring
Committee’s Authority
1. Expenditure related to meeting and fund incurred must be taken from the
sanctioned grant and must not exceed to one percent of the overall
sanctioned grant.
2. DTE Gandhinagar shall constitute one Executive committee and one
DTE monitoring committee which will lookafter the sanctioning and
continuation of the research projects. The committee shall review and
audit each project every year.
11 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
20. Detailed Application form for Research Grant
Fill this detailed Application form for seeking research grant through DTE. The
correctness in information is responsibility of the Principal Investigator & Co-
Investigator
1. Title of the project:
2. Domain (Branch and Sub-Branch Details):-
3. Objective(s) :
4. Main activities and beneficiaries :
5. Implementation location : Describe study area and implementation suitability.
6. Timeline/main milestones: Make suitable Gantt Chart/ Timeline and attach below
7. Financial information: Total budget (with main line items) and requested contribution
from DTE in Detail. Also mention in which category you are applying (i.e. 1 or 2 or 25
Lakhs)
8. Other donors (confirmed or prospective) and self-financing share:
9. Name of the applying organization: Name of Institute(s)
10. Details of the Project, Principal Investigator and Other Investigators (As per
Annexure 1, 2 and 3): Attach filled Annexure 1,2 & 3.
Date:
Place:
Signature of the Principal
Investigator
Signature of Other Investigators Signature & Seal of the Principal
Designation of the Principal
Investigator
Designation of Other Investigators Name of the Institute under
responsibility
***Applications shall be invited through portal after the release of circular in addition to that all the
applicants should submit this detailed application form along with all the relevant annexures and
other details in minimum three copies of spiral bind. The application form must reach DTE in hard
copy (In spiral) through speed post/ parcel/ manual submission at DTE within the stipulated time well
before the submission deadline as mentioned in the advertisement. Branches & Sub branches
mentioned in the G.R. No. SCT/102013/616356/GH Dated on 6th July 2019 can be considered.
12 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-1
Cost details of permanent equipment/assets
1. Name of equipment/ asset with model, name etc. and date of procurement
2. Sanctioned amount:
3. Actual expenditure (this should include only the cost of equipment, insurance, delivery
charges and taxes etc.)
4. Other expenses, if any:
(Expenses such Bank charges, agency commission etc., should be avoided through appropriate
negotiations. If unavoidable expenses incurred, the same may be indicated)
5. Utilization rate (%):
Note: Please use a separate sheet for each equipment
13 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-2
Details of Principal Investigator (PI)
1. Name, Designation, Date of Joining & Phone No.:
2. Age as on Date:
3. Name of the Institution:
4. Department:
5. Field of Specialization:
6. Academic Qualifications (Attach Table below):
7. Technical Qualifications (Attach Project/ Consultancy details below in table form):
8. Academic/Research/Professional Experience:
9. Presentations of Principal Investigator at National & International:
10. Awards/ Prizes/ Certificates etc. won by the Principal Investigator:
11. No. of Projects completed/ongoing as Principal Investigator/Co-Investigator.
12. Publications (Attach Table below):
13. Total Projects Completed (UG/ PG) (Attach Table):
14. Other Funded Projects (Attach Table):
Place:
Date:
Signature of the Principal Investigator Head of the Institution
(Signature & Seal)
14 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-3
Details of Other Investigator (s)/ Co-Investigator (s)
1. Name, Designation, Date of Joining & Phone No.:
2. Age as on Date:
3. Name of the Institution:
4. Department:
5. Field of Specialization:
6. Academic Qualifications (Attach Table below):
7. Technical Qualifications (Attach Project/ Consultancy details below in table form):
8. Academic/Research/Professional Experience:
9. Presentations of Principal Investigator at National & International:
10. Awards/ Prizes/ Certificates etc. won by the Principal Investigator:
11. No. of Projects completed/ongoing as Principal Investigator/Co-Investigator.
12. Publications (Attach Table if required):
13. Total Projects Completed (UG/ PG) (Attach Table if required):
14. Other Funded Projects:
Place:
Date:
Signature of the Other Investigator(s) Head of the Institution
(Signature & Seal)
****In case of more than One Other Investigator/ Co-Investigator, Each one has to fill this
annexure separately. Total not more than 3 Other investigators (Including of same/ other
institutes) are allowed.
15 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-4
Financial Monthly Report Month Name with Year:
1. Title of the Project:
2. Unique ID of the Project (provided by DTE):
3. Principal Investigator and Co-Investigators with designation and mobile no.:
4. Implementing Institution and other collaborating Institutions with address
5. Date of commencement:
6. Sanction letter No.:
7. Total project cost: (Sanctioned/revised project cost, if applicable)
8. Date of commencement of project:
9. Date of completion of project:
10. Project Outcomes and Utilization brief:
11. Grant revised in each year (financial):
S.
No.
Sanctioned Heads Funds
Allocated
Funds utilized
till previous
month
Fund Utilized in that
month
Remarks
1 2 3 4 5 6
1 Salaries
2 Equipment
3 Consumables
4 Travel
5 Contingencies
6 Overhead
Expenses
7 Others
(if any)
8 Total
Amount to be refunded / reimbursed (whichever is appropriate): Rs.
Name & Signature
Principal Investigator & Other Investigators
With date
Signature of Competent
Financial/audit authority
With date
16 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-5
FORMAT FOR HALF YEARLY PROGRESS REPORT
1. Project title:
2. PI (name & address):
3. Other Investigator/ Co-Investigator (name & address):
4. Date of start:
5. Duration:
6. Objectives of the proposal:
7. Methodology:
8. Temporary modification of objectives/methodology (with justifications):
9. Detail progress of the work carried out during the period:
10. A summary sheet of not more than two pages under following heads
(Title, Introduction, Rationale, Objectives, Methodology, Results, Translational Potential)
11. Research work which remains to be done under the project:
12. Applied value of the project
13. List of publications (Journals/Conferences):
14. Any patents applied for:
15. If additional budget or staff is required for the remaining part of the research work,
please give justifications and details.
Date : Signature
Designation
17 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-6
Format for Half Yearly Statement of Accounts to Accompany Request for
Release of First Installment
1. Sanction letter No. :....................... ……………
2. Total Project Cost : Rs…………………………
3. Sanction /Revised Project cost (if applicable) :Rs………….......................
4. Date of Commencement of Project :…………….......................
5. Statement of Expenditure :………….…......................
S.
No.
Sanctioned/
Heads
Funds
Allocated
Expenditure Incurred Balance
as on
(Date)
Requirement
of Funds up
to 31st March
Remarks
I Half-
Yearly
II Half-
Yearly
Total
1. Salaries
2. Permanent
Equipments
3. Supplies &
Materials
4. Travel
5. Contingencies
6. Overhead
Expenses
7. Others (if any)
8. Total
Signature of Principal Investigator
with date
Signature of Accounts Officer
With date
18 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-7
Check list for covering note to accompany Utilization Certificate of grant for
the project for the period ending 31st March, 20__)
1) Title of the project
2) Name of the Institutions
3) Principal Investigator’s Detail
4) DTE letter No. and date sanctioning the project.
5) Head of account as given in the original sanction letter
6) Amount received during half year x (Please give No. & Date of DTE's sanction letter for
the amount)
7) Total amount that was available for expenditure (excluding commitments) during the
financial year.
8) Actual expenditure (excluding commitments) incurred during the half year x
9) Balance amount available at the end of the half year x.
10) Amount already committed, if any.
11) Amount to be carried forward to the next half year (if applicable). Indicate the amount
already committed with supporting documents.
19 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-8 FORMAT FOR UTILISATION CERTIFICATE
(HALF YEARLY/FINAL)
Certified that out of Rs................... of grants-in-aid sanctioned during the year ………............
in favour of ............................………. under DTE Letter No………..............................................
and Rs . ................................................................ on account of unspent balance of the
previous half year, a sum of Rs ......................................has been utilized for the purpose of
…………........................... for which it was sanctioned and that the balance of Rs .
................................remaining unutilized at the end of the half year has been surrendered to DTE
(vide cheque No ........................... Dated…............ / will be adjusted towards the grants-in-aid
payable during the next half year i.e............................................
Signature of
Principal Investigator
with date
Signature of Registrar /
of the Institute with date
Signature of Accounts Officer
of the Institute with date
20 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-9
FORMAT FOR FINAL/ HALF YEARLY REPORT
1. Title of the Project:
2. Unique ID of the Project (provided by DTE)
3. Principal Investigator and Co-Investigators with designation and mobile no.
4. Implementing Institution and other collaborating Institutions with address
5. Date of commencement
6. Duration
7. Date of completion
8. Objectives as approved
9. Deviation made from original objectives if any, while implementing the project and
reasons thereof.
10. Field/Experimental work giving full details of summary of methods adopted.
11. Supported by necessary tables, charts, diagrams and photographs.
12. Detailed analysis of results
13. Contributions made towards increasing the state of knowledge in the subject.
14. Conclusions summarizing the achievements and indication of scope for future work.
15. Science and Technology benefits accrued:
i) List of research Publications.
Sl.
No.
Authors
Title of paper Name of
Journal
volume Pages Year
ii) Would you be interested in carrying this work forward Yes / No
If yes, do you have infrastructure facilities for further work.
iii) Patent(s)/ copyright if any
21 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
iv) Manpower trained in the project:
Research Scientists or Research Fellows
No. of Ph.Ds produced
Other Technical Personnel trained
v) Any other comments
16. Procurement/usage of Equipment
a.
S.
No.
Name of
Equipment
Make/Mo
del
Cost
FE/Rs
Date of
Installation
Utilization
rate %
Remarks regarding
maintenance/breakdo
wn
b. Suggestions for disposal of equipment(s)
Name and signature with date
1. __________________________
(Principal Investigator)
2. __________________________
(Co-Investigator(s))
22 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-10
ENDORSEMENT FROM THE HEAD OF THE INSTITUTION
(To be given on Institute Letter Head)
Project Title :
1. Certified that the Institute welcomes the participation of
Shri/Smt…………………….……………………. as the Principal Investigator and
Shri/Smt………………………….…………………… as the other investigator (s) for the project
and that in the unforeseen event of discontinuance by the Principal Investigator, the other
investigator (s) will assume the responsibility of the fruitful completion of the project.
2. Certified that the equipment and other basic facilities as enumerated in the format for half
yearly Statement of Accounts to Accompany Request for Release of First Installment (Also in
Annexure I) and such other administrative facilities as per terms and conditions of the grant, will
be extended to the investigator (s) throughout the duration of the project.
Name and signature of the
Head of the Institution
(Seal of Institute)
Date :
Place :
23 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-11
FORMAT FOR FINAL STATEMENT OF EXPENDITURE
(to accompany the Final Report)
1) Sanction letter No.
2) Total project cost
(Sanctioned/revised project cost, if applicable)
3) Date of commencement of project:
4) Date of completion of project:
5) Grant revised in each year (financial):
S.
No.
Sanctioned
Heads
Funds
Allocate
d
Expenditure Incurred
Financial year-wise
Balance
(if any)
Remarks
Ist
yr
IInd
yr
IIIrd
yr
IVth
yr
Total
1 2 3 4 5 6 7 8 9 10
1 Salaries
2 Equipment
3 Consumables
4 Travel
5 Contingencies
6 Overhead
Expenses
7 Others
(if any)
8 Total
Amount to be refunded / reimbursed (whichever is appropriate): Rs.
Name & Signature
Principal Investigator
With date
Signature of Competent
Financial/audit authority
With date
24 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-12
FORMAT FOR UNDERTAKING TO BE SUBMITTED AFTER PROJECT
ACCEPTANCE BY DTE (To be submitted on Institute Letter head)
To,
DTE, Gandhinagar
Subject: Acceptance the project No____
Dear Sir/Madam,
We are very happy to accept the project proposal entitled “-------------------------------
“having DTE No. ----------- from the --------------.
We hereby provide the fallowing undertaking:
1. We accept the project with its sanctioned budget.
2. We certify that the equipment requested and approved in the project is neither
available nor accessible in our Institute.
3. We understand that our annual project accounts will have to be audited either by a
statutory auditor or a certified Chartered Accountant.
4. We undertake that the staff employed in the project will not be the responsibility of
DTE (we will forward separate undertaking to DTE from each project staff member).
5. We, also, undertake the responsibility to implement the project as per DTE guidelines
issued from the time to time.
6. We agree to submit the half yearly and final reports on time.
7. We assure that the project will be completed on time.
Thanking you
Yours sincerely,
(Name & Sign of PI)
Name, Signature and seal of
Head of the Institute.
25 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-13
Utilization Breakdown and Finance Rules *Subject to the supervision of DTE, Gandhinagar, Gujarat
1. Finance and expenses details to be incurred in the research project subject to the rules
and regulations mentioned and formulated for the “Research Promotion Under
Technical Education”.
26 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
Annexure-14
INFORMATION REGARDING DTE EXECUTIVE TEAM AND DTE
MONITORING COMMITTEE
The Project approval for scrutiny will be done by DTE Executive team and after sanctioning and
continuation after the extensive half yearly evaluation of the DTE Monitoring committee
depends solely on the recommendation of DTE monitoring committee, DTE Gandhinagar,
Gujarat.
The research projects may belong the different disciples of Engineering and Technology, also
they may belong to the certain sub-disciplenes as well. The DTE Monitoring committee will be
constituted by DTE, Gandhinagar Gujarat, based on the following guidelines.
1. DTE Executive Team will recommend the Sanctioning of project and grant.
2. DTE Monitoring committee will recommend the continuation of project after evaluating the
half yearly progress report. They have authority to comment on the satisfactory project progress
and also whether the project may be continued or not.
3. DTE Executive Team &Monitoring committee has right to cancel the project after finding
unsatisfactory progress of the research work.
4. No additional Budget except sanctioned will be given to the Grantee in case of additional
requirements of the project. DTE Monitoring committee may recommend the suggestions, scope
of improvement, weaknesses of the research project.
5. DTE Executive Team & Monitoring committee will evaluate and scrutinize the projects only
belong to the applicants (regular faculty members) of Government Engineering Colleges and
Government Polytechnics under the DTE, Gandhinagar and the Gujarat state only. Applications
of other applicants will get automatically rejeDTEd.
6. There will be no legal jurisdiction on DTE Executive Team & Monitoring Committee
Gandhinagar, Gujarat regarding the sanctioning and continuation of the project as per the terms
and conditions depiDTEd in description. No conflict of action and legal case can be done on the
functioning of DTE Executive Team & Monitoring committee.
7. DTE Executive team has right to constitute the DTE Monitoring committee members
belonging to the project disciplines.
27 Manual for Research Grant: Technology, Directorate of Technical Education, Gandhinagar
8. The assessment criteria provide the basis for assessment of an application for the DTE
Executive team and DTE Monitoring Committee. It is the applicant’s responsibility to provide all
relevant information and documentation as required.
Please note that:
i. Applicants may be asked to provide additional information to clarify any issues raised
during the assessment process at any time based on the half yearly progress report; and
ii. DTE may also seek the applicant’s permission to obtain further advice from third
parties, if appropriate.
Technical Members in DTE Executive Team (Maximum 7 Members)
1. Commissioner of Technical Education, DTE Gandhinagar, Gujarat
2. Joint Director (s), DTE Gandhinagar, Gujarat
3. Officer on Special Duty (OSD), Research & Development cell, DTE Gandhinagar
4. Two Members (Discipline Specific) as Nominated by the DTE after recommendation of Joint
Directors or Officer on Special Duty (OSD) Officer on Special Duty.
Technical Members in DTE Monitoring Committee for Research Projects
(Maximum 5 Members)
1. One of the Joint Director (s), DTE Gandhinagar, Gujarat or Officer on Special Duty (OSD),
Research & Development cell, DTE Gandhinagar
2. One Core committee Member belonging strictly to the Discipline of applicant as Nominated
by the DTE after recommendation of Joint Directors or Officer on Special Duty (OSD) Officer
on Special Duty.
3. Three Subject Experts as members belonging strictly to the sub disciplines of the research
project application for sanctioning and budgeting.
**Experts and Technical members will be paid as per Government policies.
*****