EvaporatorEvaporator

• An Evaporator System was required to remove the organic solids from the waste stream generated by Porcine Heparin batch production process. The objective is to vaporize the water and separating from the concentrated solids (~ 45% solids) stream that will be sent for landfill. The evaporated water must be condensed and will be sent for further downstream on-site waste treatment prior to discharge to the Sabesb sewer.

• Each digestion sub batch consists of 36,000 kgs of Mucosa. The site currently produces six batches per week with batches completing digestion from Monday night through to Thursday. The maximum number of batches per week is currently six, but may be increased to 8 batches per week when about 20 % of ribbons are added to the mucosa. Processing of ribbons in Mucosa will increase the peptone volume by 25%.

• If required, then vendor to include a CIP skid with holding tank.• The Evaporator and associated equipment shall be in continuous operation 365 days

per year except when cleaning and maintenance is required.• The Supplier should therefore consider the following supply as a minimum:• Complete engineering design; lay out of the system, specifications and process

responsibility for the complete evaporator system package. Civil and structural design with will be done by a third part. Vendor should include design review man hours.

• Supply of the major equipment and critical items.• Control system and software.• Any proprietary or custom equipment as part of the evaporator package.

Project Scope

Page 3: Diosynth Evaporator

Project Functional Chart

GESManagercorporate

Procurement

SafetySupervisor

DocumentControl

MechanicalTechnician

Cost ControlCash Flow

PlanningEngineer

JJEngineeringConsulting

SHEDirectorcorporate

SHEManager

E&I Technician

SafetyTechnician

CivilEngineer

Construction-Assembly

Team

GES ProjectSupport

corporate

UtilitiesOperator

EvaporatorEvaporator

Page 4: Diosynth Evaporator

Conceptual Design, 1rst draft

EvaporatorEvaporator

Page 5: Diosynth Evaporator

Civil Works

EvaporatorEvaporator

Page 6: Diosynth Evaporator

Follow-Up at Supplier

EvaporatorEvaporator

Page 7: Diosynth Evaporator

Follow-Up at Supplier

EvaporatorEvaporator

Page 8: Diosynth Evaporator

Unloading and Positioning Equipment

EvaporatorEvaporator

Page 9: Diosynth Evaporator

Unloading and Positioning Equipment

EvaporatorEvaporator

Page 10: Diosynth Evaporator

Unloading and Positioning Equipment

EvaporatorEvaporator

Page 11: Diosynth Evaporator

Equipment Assembly

EvaporatorEvaporator

Page 12: Diosynth Evaporator

Equipment Assembly

EvaporatorEvaporator

Page 13: Diosynth Evaporator

Equipment Assembly

EvaporatorEvaporator

Page 14: Diosynth Evaporator

Equipment Assembly

EvaporatorEvaporator

Page 15: Diosynth Evaporator

Equipment Assembly

EvaporatorEvaporator

Page 16: Diosynth Evaporator

Control System

EvaporatorEvaporator

Page 17: Diosynth Evaporator

EvaporatorEvaporatorSite Master Plan

Initial LayoutInitial Layout

Final LayoutFinal Layout

LPG TanksLPG Tanks

Chemical Storage TanksChemical Storage Tanks

Contractor ShopContractor Shop

Covered ParkingCovered Parking

Control RoomControl Room

Production BuildingProduction Building

Temp Solvent TanksTemp Solvent Tanks

WarehouseWarehouse

New New SubstationSubstation

EvaporatorEvaporatorBiological Biological

UnitUnit

Covered ParkingCovered Parking

GuardhouseGuardhouse

Fire PumpFire Pump

Truck Truck ParkingParking

Boiler HouseBoiler House

Page 18: Diosynth Evaporator

Total Investment: US$ 1,5 Millions

Project Overall Schedule

Start up Quotation

Negotiation

Order

Kick-Off

Construction - Assembly

Commissioning

EvaporatorEvaporator