Dili masterplan

30
Dili – Sanitation and Drainage Masterplan Rod McCoy Manager Network Operations

Transcript of Dili masterplan

Page 1: Dili masterplan

Dili – Sanitation and Drainage Masterplan

Rod McCoyManager Network Operations

Page 2: Dili masterplan

18 April 2023 2Yarra Valley Water Ltd

The Dili Project

Cooperative project between Timor-Leste Govt, MW and YVW

Xanana Gusmao and former Premier Steve Bracks Sanitation and Drainage Master Plan by Nov 2011 Local trials by July 2011

Page 3: Dili masterplan

18 April 2023 3Yarra Valley Water Ltd

Where is Dili?

Dili

Page 4: Dili masterplan

18 April 2023 4Yarra Valley Water Ltd

Page 5: Dili masterplan

18 April 2023 5Yarra Valley Water Ltd

Click next slide….

Page 6: Dili masterplan

18 April 2023 6Yarra Valley Water Ltd

Key Observations & Decisions

1. Aim for press button toilet and anal cleaning drives solution 2. Reticulated sewerage systems with remote or local treatment 3. Integrate with water supply system improvements 4. Could integrate with Housing renewal programs 5. Need in-house improvements/funding for low socio economic group 6. Need an integrated hard rubbish program 7. Social and economic impact of Kankung 8. Education programs to change the way people live and behave 9. Land ownership and legislation10. Integrated drainage system – requires maintenance/upgrade?

Page 7: Dili masterplan

18 April 2023 7Yarra Valley Water Ltd

Taibessi Market

Page 8: Dili masterplan

18 April 2023 8Yarra Valley Water Ltd

Bidau Residential Area

Click next slide….

Page 9: Dili masterplan

18 April 2023 9Yarra Valley Water Ltd

Taibessi Market

Page 10: Dili masterplan

18 April 2023 10Yarra Valley Water Ltd

Click next slide….

Page 11: Dili masterplan

18 April 2023 11Yarra Valley Water Ltd

Comoro Market Public Toilet No 1

Click next slide….

Page 12: Dili masterplan

18 April 2023 12Yarra Valley Water Ltd

Comoro Market Public Toilet No 2

Click next slide….

Page 13: Dili masterplan

18 April 2023 13Yarra Valley Water Ltd

Taibessi Market

Page 14: Dili masterplan

18 April 2023 14Yarra Valley Water Ltd

Caicoli Swamp & Residential Area

Click next slide….

Page 15: Dili masterplan

18 April 2023 15Yarra Valley Water Ltd

Taibessi Market

Page 16: Dili masterplan

18 April 2023 16Yarra Valley Water Ltd

Taibessi Market

Click next slide….

Page 17: Dili masterplan

18 April 2023 17Yarra Valley Water Ltd

Public Toilets and School Sanitation Survey

Public Toilets• Markets• Tourist areas, parks• Community• 14 No.

School Toilets• Private - Muslim, Catholic• Public – resource, filial• 6 No. so far of 40 Schools

Page 18: Dili masterplan

18 April 2023 18Yarra Valley Water Ltd

Management, O&M

Number One Issue: NO WATER!

Toilets never openedToilets not cleaned

Page 19: Dili masterplan

18 April 2023 19Yarra Valley Water Ltd

Contractor hands over to nearest stallholderVerbal request to “look after toilet”

No contract, no training, no manual, no job description, sometimes no key, no payDedicated. Nearly always illiterate

Page 20: Dili masterplan

18 April 2023 20Yarra Valley Water Ltd

Asian pan, pour flush is low maintenance, hard to damage, long lasting (since Indonesian times)

Most cleaning is water only

Page 21: Dili masterplan

18 April 2023 21Yarra Valley Water Ltd

Willingness to pay for useWillingness to chargeSome private operators already chargingBelief that people will value the toilet if they payPrivate operator has financial interest in keeping toilet clean

Page 22: Dili masterplan

18 April 2023 22Yarra Valley Water Ltd

Current Servicing and Treatment Arrangements

1. No reticulated sewerage system 2. Hotels, Restaurants, Government buildings have either

septic/seepage or pump out tanks 3. All educted sewage is carted to lagoons 4. Sludge lagoons are full and overflowing 5. Lagoons are on the site of a new 6 star resort to be

developed 6. A new STP is being built at Tibar further west based on

anaerobic tanks, filtration then aquaculture

Page 23: Dili masterplan

18 April 2023 23Yarra Valley Water Ltd

Sludge Lagoons

Click next slide….

Page 24: Dili masterplan

18 April 2023 24Yarra Valley Water Ltd

New Sewage Treatment Plant Construction

Click next slide….

Page 25: Dili masterplan

18 April 2023 25Yarra Valley Water Ltd

Servicing Options, Pathways

1. Pit toilets collecting faecal and urine waste 2. Urine diverting dehydration toilets. (UDDT)3. Seepage pits – squat toilet waste to pits and sullage to drains (as exists in Dili) 4. Collection tanks/pits for pump out (widely used in Dili) 5. Septic Tanks – for toilet and sullage waste (some of Dili)

• supernatant to drains or seepage• supernatant collected and treated locally i.e. Kinglake

6. Septic tanks for a number of houses with: • filtration and effluent discharge to seepage or open drains• treat with reed beds and reuse for Kankung and final effluent reuse or to drains

7. Local or integrated reticulated sewerage system with gravity, pumps and pressure sewers discharging to: • local plants with possible reuse• remote treatment

Page 26: Dili masterplan

18 April 2023 26Yarra Valley Water Ltd

Sanitation & Drainage Masterplan – Dili Urban Development

Previous work by GHD in 2003

Page 27: Dili masterplan

18 April 2023 27Yarra Valley Water Ltd

Sanitation & Drainage Masterplan – Sewerage Proposal

Previous work by GHD in 2003

Page 28: Dili masterplan

18 April 2023 28Yarra Valley Water Ltd

Sanitation & Drainage Masterplan – Wastewater Management Zoning

Previous work by GHD in 2003

Page 29: Dili masterplan

18 April 2023 29Yarra Valley Water Ltd

Next Steps….

1. Finalise Project Resources in Dili and Works Program2. Community Surveys & Engagement for Pilots3. Data Collection and Finalise Pilot Sites and Concepts4. Steering Committee approvals to proceed5. Tender for Sanitation Master Plan Consultancy Services6. Complete pilots by June/July7. Complete preliminary Masterplan servicing options & costs by

September 2011 8. Complete Master Plan and pathway forward Dec 20119. Melbourne Water drainage modelling and improvements in parallel

Page 30: Dili masterplan

18 April 2023 30Yarra Valley Water Ltd

We have a great opportunity to make a difference for Dili & its kids

Thank You