© Laing O’Rourke 2012, all rights reserved
COBie for the supply chain
Speakers
Adam Lamping – Laing O’Rourke
Tim Bowes - Whitecroft Lighting
Chris Pack - Eaton Electric
Jamie Dupree - Edocuments
Simon Gilbert – AEC BIM Solutions
© Laing O’Rourke 2012, all rights reserved
Why is this trial important? ...For Laing O’Rourke
COBie for the supply chain
© Laing O’Rourke 2012, all rights reserved
“the near absence of any spontaneous mention of BIM…No other form of information
technology was mentioned during interviews”
http://bit.ly/1isXDv7 BIS - Supply Chain Analysis into the Cconstruction Industry
On most single projects above £15m, in competitive tender…
COBie for the supply chain....Don’t forget the Subbies
Most of the value accounted for by Tier 2 & Tier 1
Most work delivered at T3 = 2 layers of Management & Coordination
50-70 Tier 2’s is not uncommon
25% of contracts are for less than £10,000
NSSC has 15,125 members… Not Designing...Not Specifying...Not Manufacturing
But Installing things which is required in COBie
Whitecroft Lighting BIM Implimentation
Introduction
Building
Information
Modelling
The ‘I’ is more important than the ‘B’ and the ‘M’
Whitecroft Lighting BIM Implimentation
What content should be included behind a light fitting?
• 2 Years ago we began our BIM Implementation plan
• No definitive template for luminaires
• Working in collaboration with Consultants/Architects/Contractors, we tried to determine: -
• Preferred Model Creation Software
• Required content
• What information needed to be extracted from a model?
?
Whitecroft Lighting BIM Implimentation
What content should be included behind a light fitting?
Whitecroft Lighting Revit model content
Luminaire
Performance Data
- LOR
- IES File
- Lamp Colour
- Part L Data
- Circuit Watts
- llm/w
- Lamp & Gear Type
Luminaire
Characteristics
- Ceiling Integration
- Dimensions
- Geometry
- Weight
- Part Number
- Description
- Link to Website
Whitecroft Lighting BIM Implimentation
Revit 3D Intelligent Model Creation – Our current & future capabilities
• We have invested in a number of full Autodesk Design Suite licences
• Ongoing In-house model creation & development
• Model creation is now an integral part of New Product Development
• Models are editable for additional COBie or SPie data for extraction
Whitecroft Lighting BIM Implimentation
BIM Models & Content – Conclusion
• Top 60 best selling product ranges now available to download as fully intelligent 3D Revit families
• All available to download from our website www.whitecroftlighting.com or available on request from
• Establishment of ‘standardisation’ of information important to our model development
• COBie trial project enables us to be part of this.
• We are not experts, but we aim to be...
© 2013 Eaton, All Rights Reserved.
BIM – An Overview of Eaton Electric’s Current and Planned Capability Chris Pack
14 © 2013 Eaton, All Rights Reserved.
Power distribution
and circuit
protection
Backup
power
protection
Control
and
automation
Solutions for harsh
and hazardous
environments
Engineering
services
• IT and data centers
• Oil and gas,
mining, industrial
• Electric utility
• Commercial
• Institutional
• Government
• Alternative energy
• Residential
• Machinery OEMs
Electrical Sector overview Solutions for the entire power system
Lighting
and
security
Structural
and
wiring devices
15 © 2013 Eaton, All Rights Reserved.
Power distribution and circuit protection Delivers reliable, efficient and safe power
where it is needed
Panelboards and
switchboards
LV/MV
switchgear Transformers Fuses
Circuit
breakers
16 © 2013 Eaton, All Rights Reserved.
Uninterruptible power systems
Surge protection and power factor
correction
Power distribution units (PDUs)
Backup power protection Maximizes reliability and continuous
uptime to prevent business interruptions
Transfer Switches
Paralleling switchgear
17 © 2013 Eaton, All Rights Reserved.
Eaton’s Commitment to BIM
• Eaton have for some time provided Revit data for
switchgear in North America. In addition we have
BIM directly connected to our quotation software
package in the US.
• We now have BIM on many switchgear and
lighting products in the UK and we are also
working on this for other areas in Europe
• We are currently handling requests for BIM data.
• Priorities
• Comply with forthcoming legislation.
• Position ourselves to expand on basic BIM data
18 © 2013 Eaton, All Rights Reserved.
Current Status (Electrical Distribution Equipment)
• Eaton can now supply Revit files for the following
products:-
• Memshield 3 MCB Distribution Boards
• Memshield 3 MCCB PanelBoards
• Exel & Glasgow Fuse Switches & Disconnectors
• HRC Fuseboards and Busbar Chambers
• Switchboards, Busbar Trunking & Factory Built
assemblies (By specific request)
• Consumer units
• Wiring accessories (Work in Progress)
19 © 2013 Eaton, All Rights Reserved.
Current Status (Lighting & Safety)
• Revit files are also available for the following
Eaton Lighting & Safety products:-
Complete
21 © 2013 Eaton, All Rights Reserved.
Customer Engagement
• Prior to development - Initial discussions were held with customers.
• Following initial file development - Gained customer feedback.
• Growing portfolio of files available.
• Encouraging further customer feedback
Leading to Planned Developments
Level 2 - 5D cost / Bill of material / estimating capability
22 © 2013 Eaton, All Rights Reserved.
Planned Activities
• Continue to expand portfolio of Revit files
• Develop integration with 5D - Cost / Bill of material /
Estimating capability.
Integrate with Eaton’s Bid Manager Quotation Package
Customer access to Bid Manager
• Engage with customers to discuss / validate our
actions in providing 5 D data.
24 © 2013 Eaton, All Rights Reserved.
Contact Details
Eaton Electric would welcome the opportunity to
support the ongoing industry development of
BIM to ensure that we adapt our tools in the
correct manner to support the transition in
supplying 5D information in the appropriate
format.
Chris Pack
07803 661840
Edocuments Dr Jamie Dupée.
Digital O&M Manuals, Health & Safety Files, Log Books, User guides.
Built on COBie, connected to 3D CAD models.
Faster and easier document production, construct documents using Edocuments
software tools and managed service directly online.
Content in context.
import
CAFM export
connect
CAD
import
COBIE export
Edocuments Statistics : Sep 2013 14,991 Registered on-line users
15,314 Suppliers & manufacturers
131,309 Items of literature
1,306 Projects in 2013
BMS
Flooring
Fire
Alarm
connect
supply chain
Security
Data collection & level of detail.
Simple online form, easy
to use and understand.
Access from anywhere.
Works in web browser.
3D CAD optional.
Built on COBie.
Describe it
Check it
Assure it
Architecture
Structural
Electrical
Plumbing
Design Construct Operate
Delivering COBie Data to CAFM Systems
AEC BIM
Solutions
Describe it
Check it
Assure it
Create Work Packages
Work Package 1
Work Package 2
Work Package 3
Work Package 4
Work Package n
Work Packages contain only the components for that package and
define what data and documents are required for a component
Describe it
Check it
Assure it
A Cloud Database of Work Packages
Work Package 1
Work Package 2
Work Package 3
Work Package 4
Work Package n
WP-DB
Work Packages are identified with a sub-contractor(s)
AEC BIM
Solutions
Describe it
Check it
Assure it
Sub-contractors Access only their WPs
1. Update components in WP-DB
- Add data, documents and
pictures to existing WP
components
2. Add new components to WP-DB
- Create a new component with its
data, documents and pictures
where none currently exists in
WP-DB
3. Delete components from WP-DB
- Tag a WP component as no
longer required and therefore not
installed
WP-DB
AEC BIM
Solutions
Can be simple responses and/or many related documents