DIGICON 2020 Roundtable Discussion, Leveraging BIM & Other ...
Transcript of DIGICON 2020 Roundtable Discussion, Leveraging BIM & Other ...
DIGICON 2020
Roundtable Discussion,
Leveraging BIM & Other Digital
Technology in a COVID-19 world
7th July 2020
Leveraging BIM & Other Digital
Technology in a Covid-19 World
Gary ComerfordDirector Linesight
Session Outline
A. COVID-19 - Where are we currently
B. Market sentiment key findings
C. COVID-19 expected outcomes
D. Disruption force to the construction industry
E. Disruption opportunities provided by digital technology
F. The digital toolbox
G. Moving things on
H. Key challenges
A - COVID-19 - Where are we currently
February 2020
Pre-COVID-19 Normal
March – May
COVID-19 Shutdown
June – Dec 2020
Post COVID-19 Initial Response
2021 & Beyond
Post COVID-19 Industry
Opportunities
Albert Einstein Approach
“The questions are the same – the answers
required are different”
Albert Einstein Approach
B - Market Sentiment – Key Findings
B - Market Sentiment – Key Findings
Pre-fabrication and
modularization, coupled
with better welfare on
sites will be the new norm
C - Current Expected Outcome of Covid-19
02
03
Reduced Site Workforce
Extended Programmes
Reduction in Productivity
Increased Costs
04
The industry simply cannot simply accept these outcomes
01
• Construction is a very conservative industry
• Disruption usually driven by New Entrants (i-Phone, Netflix, Uber, Dyson.)
• Covid-19 needs to viewed as the disruptor to the mindset
• Things that were unimaginable 6 months are now commonplace.
• Where is the disruptive force going to come from ??
• Impacts on Productivity
• Increased Costs
• Extended Programmes
• Other Industry Reaction to Covid-19 (Data Centre’s / Commercial Developments)
D - Disruption Force to the Construction Industry
KEY POTENTIAL OPPORTUNITIES TO DISRUPT / SUPPORT DISRUPTION IN THE
INDUSTRY
1 – Prefabrication
2 – Modularization
E - Disruption Opportunities Provided by Digital Technology / BIM
KEY POTENTIAL OPPORTUNITIES TO DISRUPT / SUPPORT
DISRUPTION IN THE INDUSTRY
3 – Supply Chain Integration
4 – Just in time logistics
Off site / Near Site Workshops
Off Site Storage Facilities
E - Disruption opportunities provided by digital technology / BIM
BIM
Model
Supply
Chain
Contractor
Design Team
“Can this activity be done off-site”
…if not, why not. ?
We don’t need to wait for new developments in technology.
The tools and the personnel we need are currently available.
1 – Digital Design Technology
Revit
Navisworks
Civil 3D
2 – Digital Construction Technology
Bentley Synchro Pro
Laser Scanners
Drones / Site Cameras
BIM 360 Feild
F - The digital technology toolbox
No 3 – AR / VR Technology
No 4 – Integrated 3D / 4D & 5D Systems
Revit Models
P6
CostX
No 5 – Common Data Environments
F - The digital technology toolbox
1 – Employer / CA’s
In Project Briefs encourage / reward adoption of these technology /
processes
2 – Design Teams
Develop fully coordinated / clash free models prior to handover to
contractors.
Collaborate and engage more with the Supply Chain
3 – Contractors / Key Specialists
Prepare an integrated 3D / 4D / 5D Project Analysis System
Carry out Digital Twin Analysis prior to Start on Site
G - How can we move this on
H - Key challenges
No 1 – Attitude Change
No 2 – Creation of Common Project Goals
No 3 - Focus on Outcomes not Outputs
No 4 - Development of Trust across project teams
No 5 - Appropriate Contracts to Support new ways of working
No 6 - Getting Teams out of their 3D Silo’s
No 7 - Need to Create new Digital Process
No 8 - Design Responsibility
No 9 - Attracting Talent
No 10 - Removal of the Win / Loose Analysis from projects
Questions
Thank you for your attendance