Product information
Segment : Thickness : 0.57~1.5
Project name : PB-5 PM/PE Ella
Part name :MAIN PCB
FRONT BOXDFM by: Ella
Part No: 405691 Checked by: Simon
DFM report
REV Date Update or added sliders
14 2015-06-28 Update all
Remark:
73.6mm
64.9
mm
26.8mm
OK, Hi-precision responsibility
Tool information: RFQ VS Actual DesignHighlight difference in red
Item DFM Issue Description Pending for ReplyTo be filled by Customer
Approved by Customer Comments
1
Item Customer RFQ Spec HX DFM Match or not
1 Hot Runner supplier: YUDO YUDO Yes
2 No. of Hot Drops 4 4 Yes
3 Gate type : Valve gate Valve gate Yes
4 No. of Gate. (Each part) 1 1 Yes
5 Resin material : PA6/66 PA6/66 Yes
6 Resin Grade:
7 CAD 2d/3d Version: 01 01 Yes
8 Tool type : 2 plate 2 plate Yes
9 No. of Cavity & Cavity ID: 4 (C4) 4 (C4) Yes
10 No. of Slider ( Per Cavity ): nil nil Yes
11 No. of Lifter ( Per Cavity ): 4 4 Yes
12 Cavity steel: 2344 2344 Yes
13 Core steel: 2344 2344 Yes
14 Slider steel: nil nil yes
15 Lifter steel: 2344 2344 Yes
16No. of Variant Inserts
nil nil Yes( Per Cavity ):
17 Automatic: Y Y Yes
18 Tonnage: 175T /155 T 175T /155 T Yes
19 Cycle Time: 40 40 Yes
20 Cosmetic part (Y/N): N N Yes
21 Cosmetic finishing: N N Yes
22 Shrinkage(resin vender): 1.011 1.011 yes
Ella: I make some change in RED
Gate layoutCustomer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Valve gateØ1.5 depth 0.3
\ 2015/06/21
OK for gate point
DFM report
Part Layout
Need to show part layout to avoid customer mis-understood our proposal
Tool top
406
346
489
2015/06/21
OK Hi-precision responsibility
Ella: Ensure mold size fit
on 155 T m/c
DFM report
shrinkage
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Shrinkage with
orientation
X 1.011
Y 1.011
Z 1.011
Y
X
Notes: The shrinkage is based on our experience, we ask for the resin property list as reference
OK, Hi-precision responsibility
Parting line
PL
Cavity
Core
Parting line is defined as edge formed by Core / Cavity / Slider / Lifter parting surfaces.
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
okP/ LINE
2015/06/21
OK
Inserts line
Parting line is defined as edge formed by Core / Cavity / Slider / Lifter parting surfaces.
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Cavity inserts2015/06/21
OK for this insert line
Inserts line
Parting line is defined as edge formed by Core / Cavity / Slider / Lifter parting surfaces.
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Core inserts
2015/06/21
OK, Hi-precision responsibility
Draft angle information
Product is checked in UG as per the direction of tooling release. This will help to evaluate draft angle and propose draft requirements.P\L is decided on the basis of draft direction , if need, propose to reverse the draft angle or increase it for release the product easy.
2015/06/21
OK, Hi-precision responsibility
Thickness and Cosmetic issue
Red area easy cause sink
mark
Cut away
2015/06/21
OK to do. You will have it on new 3D.---
revised OK
Thickness and cosmetic issue
Sink mark
Before after
1.5
1.75
1.50.8
A
A
SECTION
A-A
SECTION
A-A
2015/06/21
OK to do. You will have it on new 3D.—
revised OK
Ejector pin marks
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Take note: only show the preliminary position and size, See layout for detail.
Ejector pin
layout
2015/06/21
OK, Hi-precision responsibility
>P
A6
/66
<
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Engraving
CAVITY No.
1、2、3、4
T2 / T3
:T3/1\2\3\4
:T3/1\2\3\4
:T2/1\2\3\4
:T2/1\2\3\4
2015/06/21
OK, Hi-precision responsibility
I don’t see part number tool and cavity
number?
Cosmetic requirement
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Color Polish
magenta B1
blue B2
2015/06/21
OK
Core cooling
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Ø8
2015/06/21
OK, Hi-precision responsibility
Cavity cooling
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
Ø8
Cooling for hot
tips
Cooling for parts
I 2015/06/21
OK, Hi-precision responsibility
There no space to add separate
cooling for hot tips,so we use
cooling line ,we think it is cooling
enough to the hot tips.
Simon: I agree
this proposal
Customer comment. (please give your approval and comments)
OK or NG remark Approval by: date
ok
Part Analysis and Issue
Has updated.
2015/06/21
OK TO DO. New 3D will come.—revised OK
Here will cause sharp steel
Here is sharp steel on mold
We suggest to
add plastic at
red block area
to avoid sharp
steel on mold.
二.产品分析及问题点( Part Analysis and Issue ))
One YUDO 08 hot valve gate for each part, and the size of valve gate is
Φ2mm.
26mm
32.5mm
2015/06/21
OK, Hi-precision responsibility
二.产品分析及问题点( Part Analysis and Issue ))
The filling time result is shown above.
2015/06/21
OK, Hi-precision responsibility
二.产品分析及问题点( Part Analysis and Issue ))
V/P switchover pressure is 51.13MPa.
2015/06/21
OK, Hi-precision responsibility
二.产品分析及问题点( Part Analysis and Issue ))
The volume shrinkage is shown as fig
above .
2015/06/21
OK, Hi-precision responsibility
二.产品分析及问题点( Part Analysis and Issue ))
Temperature at flow front is shown as
above.
2015/06/21
OK, Hi-precision responsibility
二.产品分析及问题点( Part Analysis and Issue ))
Time to reach ejection temperature is shown as above.
2015/06/21
OK, Hi-precision responsibility
二.产品分析及问题点( Part Analysis and Issue ))
The color line is Weld lines.
2015/06/21
OK, Hi-precision responsibility
二.产品分析及问题点( Part Analysis and Issue ))
At the free state, the max warping of the Z axis is shown as above.
2015/06/21
OK, Hi-precision responsibility