Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop...

15
Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew Keenan Canadian Space Agency 24May2012

Transcript of Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop...

Page 1: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

Dexterous Execution

of RRM on ISS

Satellite Servicing

Workshop Goddard Space Flight Center

Approved for release, distribution unlimited

P. Andrew Keenan

Canadian Space Agency

24May2012

Page 2: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

MSS and GSFC’s RRM

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited2

Page 3: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

Canadian Space Robotics Today

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited3

Page 4: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

External Maintenance and Dextre

Dextre’s “hand” with tool

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited4

Failed Remote Power Control Module (RPCM)

Page 5: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

Maintenance Task List

Main Bus Switching Unit(MBSU)

24-May-2012Dexterous Robotics Servicing Approved for

release, distribution unlimited5

SPARES on ESP-2SPARES in CTC

MDM ORU

Approved for release, distribution unlimited

Page 6: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

Ground Control and MSS

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited6

Page 7: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

RRM Overview

MLI/Wire Cutter Tool

Safety Cap Tool

Imagery courtesy

NASA/GSFC

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited7

EVR Nozzle Tool

Multi-Function Tool

Each RRM Tool has cameras designed to

maximize situation awareness for the ground

operators

Dextre provides camera power and supports

video transfer to ground

Page 8: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

RRM Delivery to ISS on Atlantis

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited8

Page 9: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

ISS Landscape

DEXTRE

CANADARM2

Mobile Base

24-May-2012 9Dexterous Robotics Servicing

Approved for release, distribution unlimited

Page 10: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

RRM Readiness & Challenges

� Required positional and trajectory accuracy requirements

exceed normal dexterous operational requirements

� +/-6mm -> +/-2mm or less

� +/-1deg -> +/- 0.5deg or less

� ISS H/W is designed or “prepared” for dexterous manipulation

whereas existing satellites are “unprepared”

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited10

Page 11: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

Mission Overview

Coolant Valve Manipulation

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited11

Page 12: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

Mission Overview

Refuelling

Imagery courtesy

NASA/GSFC

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited12

Safety wires (not shown) are present on each cap:

Tertiary Cap

Safety Cap NutActuation Nut

and need to be cut using the WCT prior to each cap removal and stowage

Page 13: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

Mission Overview

Electrical Connection Access

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited13

Imagery

courtesy NASA/GSFC

Page 14: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

CSA Involvement with RRMAstronauts Samantha

Cristoforetti (ESA) and David

Saint-Jacques (CSA) with CSA robotics trainer Daniel

Katzman in the MSS

Operations and Training Simulator (MOTS)

MacDonal Dettwiller &

Associate’s (MDA’s) Ground

Testbed (GT) simulator for

Dextrous robotics in Brampton, Ontario – used to perform

operational tests with RRM hardware

24-May-2012Dexterous Robotics Servicing

Approved for release, distribution unlimited14

Page 15: Dexterous Execution of RRM on ISS · Dexterous Execution of RRM on ISS Satellite Servicing Workshop Goddard Space Flight Center Approved for release, distribution unlimited P. Andrew

MSS at Work

24-May-2012Dexterous Robotics Servicing Approved for

release, distribution unlimited15