device: WINNER
Transcript of device: WINNER
![Page 1: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/1.jpg)
Orange County Public Schools
DOWNTOWN URBAN PS8, Site 131-PS8-SW-5
40% CONSTRUCTION UPDATESEPTEMBER 21, 2016
WINNERWelcome! Please sign in on your mobile device:
http://communitymeeting.ocps.net/
![Page 2: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/2.jpg)
Orange County Public SchoolsOrange County Public Schools
DOWNTOWN URBAN PS8Meeting AgendaSEPTEMBER 21, 2016, OCPS RBELC, 6:00 PM
•Introductions – Principal
•Welcome – Kat Gordon
•Project Update – Facilities Meeting OrganizerArchitect: Baker Barrios Architects/ HKS ArchitectsConstruction Manager: Williams Company Building Division/ ACY
Contractors, LLC
•Questions and Answers
•Adjournment
2
![Page 3: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/3.jpg)
Orange County Public Schools
3
SITE PLAN
![Page 4: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/4.jpg)
Orange County Public Schools
4
SITE PLAN
![Page 5: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/5.jpg)
Orange County Public SchoolsCLASSROOM BUILDING
5
![Page 6: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/6.jpg)
Orange County Public Schools
West Elevation:
MEDIA CENTER
6
![Page 7: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/7.jpg)
Orange County Public Schools
South Elevation:
MUSIC/ CAFETERIA
7
![Page 8: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/8.jpg)
Orange County Public Schools
East Elevation:
GYMNASIUM
8
![Page 9: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/9.jpg)
Orange County Public Schools
North Elevation:
ROSEN PRESCHOOL
9
![Page 10: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/10.jpg)
Orange County Public Schools
Front Entry:
COMMUNITY CLINIC
10
![Page 11: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/11.jpg)
Orange County Public SchoolsBOYS AND GIRLS CLUB
11
![Page 12: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/12.jpg)
Orange County Public Schools
Construction Update & Milestones:
• All foundations are complete. (except building 500).
• ½ of the 321 tilt panels have been poured.
• ½ of building 100 (Classroom Building) tilt panels have been erected.
• Building 400 (Gym) tilt panels have been erected.
• Slab on grade at buildings 100, 400, 700 and 900 are complete.
• Structural steel is underway at buildings 100, 400 and 600.
12
![Page 13: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/13.jpg)
Orange County Public Schools
• Parking garage is in production and is scheduled to arrive in December.
• Underground storm system has been installed at the soccer field.
• Plumbing and electrical underground is underway at buildings 200, 300 and 800.
Construction Update & Milestones:
13
![Page 14: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/14.jpg)
Orange County Public Schools
Milestone Dates
14
![Page 15: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/15.jpg)
Orange County Public SchoolsSite 131-PS8-SW-5 AERIAL PHOTO- APRIL 2016
15
![Page 16: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/16.jpg)
Orange County Public SchoolsSite 131-PS8-SW-5 AERIAL PHOTO- MAY 2016
16
![Page 17: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/17.jpg)
Orange County Public SchoolsSite 131-PS8-SW-5 AERIAL PHOTO- JUNE 2016
17
![Page 18: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/18.jpg)
Orange County Public SchoolsSite 131-PS8-SW-5 AERIAL PHOTO- JULY 2016
18
![Page 19: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/19.jpg)
Orange County Public SchoolsSite 131-PS8-SW-5 AERIAL PHOTO- AUGUST 2016
19
![Page 20: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/20.jpg)
Orange County Public SchoolsSite 131-PS8-SW-5 AERIAL PHOTO- SEPTEMBER 2016
20
![Page 21: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/21.jpg)
Orange County Public Schools
BUILDING 100• Tilt panels have been erected at half of the building• Structural steel is currently underway
CONSTRUCTION UPDATE PHOTOS
21
![Page 22: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/22.jpg)
Orange County Public SchoolsCONSTRUCTION UPDATE PHOTOS
BUILDING 100• Tilt panels have been
erected at half of the building
• Structural steel is currently underway
22
![Page 23: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/23.jpg)
Orange County Public Schools
BUILDING 400• Tilt panels have been erected
at half of the building• Structural steel is currently
underway
23
CONSTRUCTION UPDATE PHOTOS
![Page 24: device: WINNER](https://reader031.fdocuments.us/reader031/viewer/2022020707/61fe3acd4ae5281b78537663/html5/thumbnails/24.jpg)
Orange County Public SchoolsCONSTRUCTION UPDATE PHOTOS
BUILDING 700• Concrete slab has been
poured• Half of the tilt panels have
been poured