    THE GOVERNMENTS NORTHERN PROVINCEDEVELOPMENT PROGRAMME AND

    RESETTELEMENT OF IDPs

    Presented byMajor General GA Chandrasiri - Governor, Northern Province

  • 8/8/2019 Development Programme

    3/89

  • 8/8/2019 Development Programme

    4/89

    SCOPE

    1. Key aspects of the development and

    resettlement process in Northern Province.

    2. Development and rehabilitation initiativesundertaken by the Government underVadakkin Vasantham programme.

  • 8/8/2019 Development Programme

    5/89

    CONCEPTUAL FRAMEWORK,

    POLICIES, PRINCIPLES

    OF

    VADDAKIN VASSANTHAM PROGRAMME

  • 8/8/2019 Development Programme

    6/89

    APPOINTMENT OFPRESIDENTIAL TASK FORCE

    Task:prepare strategic plans, programs and projects. Rehabilitate and develop economic and social infrastructure.

    To co-ordinate activities of security agencies of the Government.

    On resettlement, development and security in Northern Region chaired byHon. Basil Rajapaksa, Senior Adviser to H.E. the President.

    ,and projects. To liaise with all organizations in the public and private sectors and civilsociety organizations. To seek, identify and apply innovative solutions to problems andconstraints confronted in the execution of the mandate of the TF. To regularly review the progress of the implementation of the saidprogrammes and projects and to take immediate corrective actions.

  • 8/8/2019 Development Programme

    7/89

    MISSION OF THEPRESIDENTIAL TASK FORCE

    TO FORMULATE A STRATEGIC FRAMEWORK

    FOR REVITALIZATION OF THE NORTHERN PROVINCE

    AND IMPLEMENT A RAPID RESETTLEMENT

    AND RECOVERY PROGRAMME

  • 8/8/2019 Development Programme

    8/89

    KEY ACTORS IN THE NORTHERN SPRING

    PROGRAMME

    Presidential Secretariat & Presidential Task Force Ministry of Nation Building

    Ministry of Resettlement Other line ministries Northern Provincial Council

    District and Divisional administrations International Organizations and NGOs

  • 8/8/2019 Development Programme

    9/89

    Security

    Reconstruction

    Development of infrastructure

    facilities

    CONCEPT OF THEVADAKIN VASANTHAM PROGRAMME

    Resettlement

    Improvement of

    Livelihood

  • 8/8/2019 Development Programme

    10/89

    GOALS & OBJECTIVES OF TASK FORCE

    Immediate clearing of war affected areas by de mining and preparing the

    land for human settlement.

    Resettlement of internally displaced population( IDPs).

    As the apex body directly linked with the prime activity of re-settlement.

    Provision of physical and Socio economic infrastructure.

    Creation of employment opportunities and livelihoods.

    Water resources and environment management .

    Capacity building and institutional development.

    Creation of conducive environment for investment.

  • 8/8/2019 Development Programme

    11/89

    PLANNING PROCESS A HOME GROWN APPROACH

    A. Multi Disciplinary and Participatory Approach.

    B. Consultation & Discussions public sector

    secretaries to the Ministries & Key Officials The Governor & Secretaries to the Provincial councils

    Heads of Department & Key Officials District & divisional secretaries & Ke Officials Professionals

    University staff Sector professionals

    Professionals Parliamentarians & local politicians Representatives from Tamil Diaspora Representatives of the private sector

    UN Agencies

  • 8/8/2019 Development Programme

    12/89

    BROADER STRATEGIES OFVADAKKIN VASANTHAM AT A GLANCE

    Facilitating new breeze that derides fear, terror andviolence that plagued last 30 years

    Restoration of socio economic and personal stability andsafety

    Revitalization of livelihoods and productive sector Infrastructures Roads Electricity Ports Transport

    Housing Water supply and sanitation Rural economy through technological transformation Pro poor growth and reduction of disparities Exploitation of marine resources and mineral resources Information Technology and vocational education Institutional reforms and performance improvement Industrial estates, economic centers and private

    investment

  • 8/8/2019 Development Programme

    13/89

    THE RESETTLEMENT PROGRAMME

  • 8/8/2019 Development Programme

    14/89

    RESETTLEMENT PRINCIPLE AND STAGES UNDERVADAKKIN VASANTHAM PROGRAMME

    1. Resettlement Guiding principles

    First displaced first to resettle (displaced after December 2005)

    2. Resettlement preparatory stage

    Stage I -

    buildings.

    Stage II

    De-mining of locations where building constructions need to be

    attended prior to resettlement. Stage III

    Humanitarian de mining / de mining areas for resettlement andagricultural activities

    Above Stage I completed, Stage II nearing completion, Stage III in

    progress.

  • 8/8/2019 Development Programme

    15/89

    RESETTLEMENT PROCESS

    Rehabilitation of access roads

    Power to the areas Providing drinking water facilities Security establishment of new police stations and police posts for maintain

    of public security, law and order Strengthening of administration Establishment of health service

    Establishment of education institutions Restoration of agrarian services Rehabilitation of fisheries sector infrastructure Rehabilitation of irrigation facilities Establishment of public transport Establishment of financial institutions Establishment of cooperatives Establishment of court houses

    Establishment of postal and telecommunication facilities

  • 8/8/2019 Development Programme

    16/89

    RESETTLEMENT / RETURN PROGRESS OF IDPs

    AS AT 17-12-2009

    Ser Returns From District ( To Place of Origin) Families Persons

    1 Ampara 191 591

    2 Vavuniya 7395 23979

    3 Batticaloa 897 2,5144 Mannar 3034 9870

    Vavuniya,Mannar,Pulmoddai

    5 Jaffna 18948 59830

    6 Trincomalee 2,111 6,700

    7 Mulathivu 3153 10312

    8 Kandy 1 12

    9 Pollonnaruwa 1 1

    10 Killinochhci 3495 12014

    Sub Total 39226 125823

  • 8/8/2019 Development Programme

    17/89

    STATISTICS OF REMAINING IDPsAS AT 17-12-2009 IN RELIEF VILLAGES

    Ser Relief Villages /Camps No of Persons

    1 Kadirkamar 9,243

    2 Anandakumarasawmi (Zone 1) 20,637

    3 Ramanadan (ZoneII) 21,201

    4 Arunachalam (Zone III) 16,043

    5 Zone IV 11,850

    6 Zone V 2699

    7 Zone VI A 3619

    8 Dharamapura 2341

    10 Weerapura 1455

    11Sahanagama Welioya

    349

    12 Chirukkandal 377

    13 Kallimodai 403

    14 Illuppaikulam 420

    15 Jeevanagar 287

    90,924

  • 8/8/2019 Development Programme

    18/89

    AREAS PRESENTLY BEING RESETTLED

    Manthai East Oddusudan,Vavuniya North and Karachchi17000 peoplel are being

    st

    Poonagari,Thunukkai,Mallavi total number tobe resettled 28500

    .

  • 8/8/2019 Development Programme

    19/89

    AREAS OF RESETTLEMENT

    Trincomalee

    Mullaitivu

    KilinochchiJaffna

    Mannar

    Vavuniya

    Amparai

  • 8/8/2019 Development Programme

    20/89

    BREAK DOWN OF OUT FLOW OF IDPsFROM RELIEF VILLAGES

    Resettled/ Releases 155,270Transfers 30,219

    Total 185,489

    Balance in welfare centers 90,924

    * Figures as at 17 th Dec. 2009

  • 8/8/2019 Development Programme

    21/89

    ASSISTANCE PROVIDED TO RESETTLERS

    Initial financial assistance Rs. 5,000 in cash andRs.20,000 in bank ( another Rs. 25000 in pipe line )

    Tin sheets 12 or what is required up to 18 nos. will be

    provided free of charge and Timber in cost ve oo ass s ance p oug ng s. ,

    Seed paddy subsidized fertilizer Implement Kits & utensils- Basket of items

    (Lamp, knife, axe, mamotty, etc.) Permanent housing - 500 Sq.Ft. Rs.350,000 Dry ration- 6 months

  • 8/8/2019 Development Programme

    22/89

    COMPLEMENTARY PROGRAMMES IN SUPPORT OFTHE RESETTLEMENT

    1. De-mining2. Relaxation of A9 restriction3. Inducting machineries & instruments4. Livelihood

    5. Health Facilities 6. E ucation Faci ities

    7. Social Services8. Local Government

    9. Rural Development10. Cooperative Development11. Probation and Child care

  • 8/8/2019 Development Programme

    23/89

    HUMANITARIAN DEMINING

  • 8/8/2019 Development Programme

    24/89

    SECURITY FORCES

    1. Sri Lanka Army

    FOREIGN

    DE MINING ORGANIZATIONS

    1. DANISH DEMINING GROUP (DDG) DENMARK2. HORIZON - INDIA3. MINES ADVISORY GROUP (MAG) UK4. SARVATRA - INDIA5. SWISS FOUNDATION FOR MINE ACTION (FSD) SWITZERLAND6. HALO TRUST - UK

  • 8/8/2019 Development Programme

    25/89

    EQUIPMENTS

    BOZENA 4/MV 4 MINI FLAIL (SL Army) - 27

    BOZENA 4/MV 4 MINI FLAIL NGO - 4

    ASSETS

    TOTAL - 31

    BRUSH CUTTER - 01

    METAL DETECTORS - 354

  • 8/8/2019 Development Programme

    26/89

    ONGOING TASKS

  • 8/8/2019 Development Programme

    27/89

    HDM IN MANTHAI WEST DS DIVISION

    MANTHAI WEST DSD

    Cleared Adea

    Remaining AdeaVellankulam

    Pali aru

    Thevanpiddy

    Illuppakadavai

    Kalliyadi

    Anthiniyarpuram

    Kovilkulam

    Total Area to be cleared - 480 SQKMCleared Area - 21.37 SQKMRemaining Area - 458.62 SKQMRecoveries - 71 x UXO

    82 x AP

    17 GN Divisions to be completed

    Periyamadu East

    Periyamadu Wast

    Kayanagart

    Parappakadaththan East

    Pallamadut

    Koorai

    Wedithalathiv NorthWedithalathiv East

    Wedithalathiv West

  • 8/8/2019 Development Programme

    28/89

    THUNUKKAI AMATHIPURAM GN DIVISION - ON GOING

    THUNUKKAI

    KILINOCHCHI

    Total Area to be cleared - 500,000 SQM

    Cleared Area - 172820 SQM

    Recoveries - 228x Rangan 99

    51 X UXOs

  • 8/8/2019 Development Programme

    29/89

    COMPLETED TASKS IN YEAR 2009

  • 8/8/2019 Development Programme

    30/89

    KARUKKANDAL GN DIVISION - MNR

    TALLADI

    MANTHAI

    MAG

    TOTAL AREA ALLOTTED FORSLA (39 SQKM)

    Total Area - 4.5 SQKMCleared Area - 4.8 SQKM

    FSD

    MAG

    HORIZON

    GIANT TANK

    HORIZON

    SARVATRA

    SARVATRAMAG

    SARVATRA

    MAG - MINE ADVISORY GROUP UK

    HORIZON - INDIA

    SARVATRA - INDIA

    FSD - FOUNDATION FOR SUISSE DEMINAGE

    SWISTZERLAND

    TOTAL AREA - 90.5 SQKM

    Area allotted for INGOs (51.5 sqkm)

  • 8/8/2019 Development Programme

    31/89

    RESTORATION OF RAILWAY TRACK FROM OMT TO TDK(10 KM ) - COMPLETED

    Distance - 10 kms

    Total Area - 144,264 sqm

    OMT RAILWAY STN

    Recoveries- 02 x UXO (81 mm Motor shell)

    (Cleared 15 m either side of the Railway track )

    TDK RAILWAY STN

  • 8/8/2019 Development Programme

    32/89

    MADHU CHURCH

    PUMALARNTTAN HDM SITE

    THEKKAM HDM SITE

    POOMALRUTTAN / THEKKAM HDM SITE AT MADU ROAD - COMPLETED

    PARAIYANALANKULAMJUNCTION

    Total area cleared - 0.54 km 2

    Recoveries - 01 x RPG Bomb

    - 01 x 60 mm Mortar Bomb

    - 01 x 81 mm Mortar Bomb

  • 8/8/2019 Development Programme

    33/89

    HDM AROUND MADHU CHURCH - COMPLETED

    TO MANNAR

    TO PALAMPIDDI

    MAP KEYArea cleared in 2008 - 1.02 sq km

    Area cleared in 2009 1.62 sq km

    Recoveries - 306 x AP- 65 x UXOs- 01 x Mini-ushi wpn- 01 x Mag

    - 29 x Mini-ushi AmmoTo MDW - MNR Rd

    MADHU CHURCH

  • 8/8/2019 Development Programme

    34/89

    KILLINOCHCHI TOWNKILLINOCHCHI TOWNKILLINOCHCHI TOWNKILLINOCHCHI TOWN

    PARANTHANPARANTHANPARANTHANPARANTHAN

    COMPLEATED HDM SITE AT ELECTRICITY BOARD BUILDING COMPLEXKILLINOCHCHI

    TOTAL AREA CLEARED - 61,288 M 2

    RECOVERIES - NIL

    MANKULAMMANKULAMMANKULAMMANKULAM

  • 8/8/2019 Development Programme

    35/89

    TALLADI

    POONARYNRICE BOWL COMPLETED

    MADHU

    MAP KEYArea cleared in 2008 - 37 sq km

    Area cleared in 2009 37 sq km

    Recoveries - 7214 x AP- 1538 x UXOs- 01 x AT- 01 x Mag

  • 8/8/2019 Development Programme

    36/89

  • 8/8/2019 Development Programme

    37/89

    RELAXATION OF A9 TRAVEL PROCEDURE

    Commuters need not obtain security clearance to travel via A9 Daily passenger bus service between Colombo to Jaffna increased

    to 25 nos All lorries can transport goods between Colombo & Jaffna, subject

    to normal security check Internal passenger transport to Kilinochchi & Mullaitivu started. Government Servants are allowed to travel via A9 for their

    o icia uties wit out permission The public is free to travel through Madawachchiya check point by

    vehicles.

  • 8/8/2019 Development Programme

    38/89

    INDUCTING MACHINERY AND INSTRUMENTS

  • 8/8/2019 Development Programme

    39/89

    DISTRIBUTION OF MACHINERY & EQUIPMENT

    FOR NEWLY RESETTLERS

    Heavy Earth Moving Equipments

    Min. of Nation Building - 260 Nos.

    4W Tractors with accessories

    Min. of Agriculture, NP - 37 Nos. (To DOA)

    Min. of Nation Building - 40 Nos. (To ACAD) - .

    Water Pumps

    Samurthi Authority - 250 Nos.

    Min. of Agriculture, NP - 250 Nos.Other Funds PSDG, NP - 50 Nos.

    SprayersMin. of Agriculture & Agrarian Services - 600 Nos.

    Cont

  • 8/8/2019 Development Programme

    40/89

    Mini Rice Grinding Mills

    Min. of Agriculture, NP - 45 Nos.

    Fishing Boats & Nets

    Ministry of Fisheries - 244 Nos.

    Push Bikes

    DISTRIBUTION OF MACHINERY & EQUIPMENT

    FOR NEWLY RESETTLERS

    Ministry of Infrastructure, NP - 110 Nos.Public Administration Secretariat, NP - 100 Nos.

    Motor Bikes

    Northern Provincial Council - 30 Nos.

    Mimi Trucks

    Northern Provincial Council - 08 Nos.

  • 8/8/2019 Development Programme

    41/89

    LIVELIHOOD

  • 8/8/2019 Development Programme

    42/89

    LIVELIHOOD INITIATIVES

    Water pumps provided on subsidized price Tractors are made available at department

    Agriculture & Agrarian service centers for the use offarmers

    Micro credits or non arm activities rovided Agriculture loan for farming activities provided Chicks for backyard poultry issue

    Minor tank & irrigation system restored Boats & nets are issued for fishing

  • 8/8/2019 Development Programme

    43/89

    AGRICULTURE

  • 8/8/2019 Development Programme

    44/89

    ABANDONED PADDY LAND CULTIVATION

    District Asweddumizedextent (Ac.)

    Presentlyunder

    cultivation

    Extent (Ac.)

    AbandonedExtent(Ac.)

    Extent ofabandoned landcultivated Maha

    2009/10 (ac.)

    Total Abandoned paddy land 183,255 ac.

    Abandoned paddy land to be cultivated Maha 2009/10 - 19689 ac.Seed paddy issued - 53292 Bu.

    ,Vavuniya 52900 23480 29,420 4560Mannar 57700 17386 40,314 8610Mullaitivu 41340 0 41340 3100

    Kilinochchi 63454 0 63,454 750Total 248149 64894 183,255 19689

    Land clearing freeRs. 4,000/- for per Acre for Land ploughFree seed paddy

    Subsidized fertilizer at the rate of Rs. 350/-

  • 8/8/2019 Development Programme

    45/89

    ABANDONED HIGH LAND CROPS CULTIVATION

    Total Abandoned high land 134,657 ac.Abandoned high land to be cultivated Maha 2009/10 - 6712 ac.

    OFC seed materials issued - 42955 Kg

    Vegetable seed kits supplied for home gardening 4200 pks.

    s r c o ahigh land

    (ac.)

    resen y un ercultivation

    (ac.)

    an onehigh land

    (ac.)

    an one g ancultivated in Maha

    2009/10 (ac.)

    Mannar 4894 1635 3259 631

    Mullaitivu 34220 0 34220 750Vavuniya 74695 21382 53313 5645

    Jaffna 24028 10963 13065 3456

    Kilinochchi 30800 0 30800 110

    Total 161855 33980 134657 10592

  • 8/8/2019 Development Programme

    46/89

    EDUCATION

  • 8/8/2019 Development Programme

    47/89

    EDUCATION

    All educational activities are ready to resume as and when resettlementtake place. The following schools have already been started:

    Ser Zone No ofResettling

    schools

    No ofTeachers

    No ofStudents

    1 Kilinochchi 9 41 1268

    2 Mullaithivu - - -

    3 Thunukkai 19 58 12584 Mannar 9 74 1117

    5 Madhu 11 133 1858

    6 Vavuniya North 5 20 15

    7 Vavuniya South 10 14 31

    8 Jafna 182 15963

  • 8/8/2019 Development Programme

    48/89

    Damaged school buildings being reconstructed

    Furniture being supplied

    Learning kits being issued

    Coaching books and text books being issued

    Uniform and student kits being issued

    Mid da meal bein rovided

    EDUCATION

  • 8/8/2019 Development Programme

    49/89

    SERVICES TO RESETTLEMENT AREAS

    1. Public Assistance Monthly Allowance (PAMA):

    Beneficiary selection started an 23 rd November 2009 at Thunukkaiand Poonakari Divisional Secretariat areas. Funds alreadyallocated.

    2. Equipments for Person with Disabilities:

    Equipments have been purchased and can be issued on the requestof the beneficiary.

    3. Self Employment Assistances:

    Funds already allocated. Assistance can be given for thebeneficiary recommended by the Divisional Secretary.

    4. Elders Identity Cards:

    Application forms distributed to the Divisional Secretariats,Thunukkai and Poonakari.

  • 8/8/2019 Development Programme

    50/89

    Startup venture programme carried out throughexciting society members

    Women Development Centres established in divisions

    RURAL DEVELOPMENT

    Activities Carried Out In Resettlement Villages

    New RDS & WRDS to be organized & registered Needle work training to be conducted to the youth Start your training business training programme to

    be conducted to the society members for their self-employment

  • 8/8/2019 Development Programme

    51/89

    COOPERATIVEDEVELOPMENT

  • 8/8/2019 Development Programme

    52/89

    CO-OPERATIVE DEVELOPMENT

    Kilinochchi District

    25 branches were opened.

    Thrift & Credit Co-operative Societies activated.

    ACCD office is functionin at Nachchikudah tem oraril .

    Mullaitivu District

    11 branches were opened 04 Thrift & Credit Co-operative Societies activated.

    ACCD office is functioning at Mankulam permanently.

  • 8/8/2019 Development Programme

    53/89

    INDUSTRIES

    Action has been taken to reconstruct Handloom centersand Coir centers

    Need analysis for vocational training programme and isbeing income generation projects is completed.

    Selection of beneficiaries for Masonr , car entr on the job training and supply of equipments for incomegeneration activities is in progress.

  • 8/8/2019 Development Programme

    54/89

    "VADAKKIN VASANTHAM" 180 DAYS PROGRAMME

    THE GUIDING LIGHT

  • 8/8/2019 Development Programme

    55/89

    "VADAKKIN VASANTHAM" IMPLEMENTATION OF180 DAYS PROGRAMME

    BY NPC

    No. of Activities - 3,071 Nos

    Total Estimated Cost in Rs. Million - 4,737 Mn.

    Expenditure as at 4 th December 2009 - 2,039 Mn.

    "VADAKKIN VASANTHAM" IMPLEMENTATION OF180 DAYS PROGRAMME

    BY LINE MINISTRIES & DEPARTMENTS

    Large number of similar programmes are implemented

  • 8/8/2019 Development Programme

    56/89

    MAJOR PROJECTS UNDER THE VADAKKILVASANTHAM 180 DAYS PROGRAMME - 2009

    Sector ImplementingAgency Source ofFund Allocation(Rs. Mn) No ofProjectApproved

    ImprestReleased(Rs.Mn)

    Expenditure(Rs.Mn)

    Education ZDE Mannar,Madhu

    50.00 13 6.28

    Improvement ofPRDA Roads

    RDD 50.00 07 15.92

    Improvement of

    Provincial Roads

    R/ACLG 100.00 43 16.66

    Infrastructure R/ACLG 34.40 16 2.05

    District : Mannar

    GovernmentAgent

    65.00

    Development

    Water Supply &Sanitation relatedProjects

    R/ACLG 18.20 08 -

    Minor Irrigation &Small tankRehabilitation

    ACAD 20.00 12 11.49

    Repairs ofFertilizer Store

    ACAD 0.80 01 -

    Postal DS Postal 2.00 01 -

    MinorImprovement ofMajor IrrigationSystem

    RDI Central RDI Central 10.00 06 7.10

    Total 285.40 107 65.00 59.50

  • 8/8/2019 Development Programme

    57/89

    Sector ImplementingAgency

    Source ofFund

    Allocation(Rs. Mn)

    No ofProjectApproved

    ImprestReleased(Rs.Mn)

    Expenditure(Rs.Mn)

    Add. HSDB

    (WorldBank) RDHS RDHS 57.55 17

    District : Mannar

    MAJOR PROJECTS UNDER THE VADAKKILVASANTHAM 180 DAYS PROGRAMME - 2009

    Health

    Reconst. OfDS/ AGAOffices

    Dist.Adm GovernmentAgent

    11.46 03

    Rounding Upof Cattle

    DVS GovernmentAgent

    0.5 1 0.39

    Cooperative(RAP)

    ACCD DPD, RAP 17.31 10

    Grand Total 372.22 138 65.00 59.89

  • 8/8/2019 Development Programme

    58/89

    District:- MullaithivuSector No of

    WorksSource ofFund

    Allocation No ofWorksCommitted

    Expenditure Balance

    HighWays(Road)

    18 M/HighWays

    20.00 18 - 20.00

    Education 19 M/NB & ED 40.00 19 - 40.00

    MAJOR PROJECTS UNDER THE VADAKKILVASANTHAM 180 DAYS PROGRAMME - 2009

    Total 37 60.00 37 - 60.00

  • 8/8/2019 Development Programme

    59/89

    District:- VavuniyaDescription ofworks

    No ofWorks

    Source ofFund

    Allocation No of WorksCommitted

    Expenditure Balance

    Irrigation Major(V.V 180 days)

    3 MNB 22 3 8.45 13.55

    Minor (V.V 180days)

    48 MMB 60 48 21.63 38.37

    MAJOR PROJECTS UNDER THE VADAKKILVASANTHAM 180 DAYS PROGRAMME - 2009

    Minor (GamaNeguma)

    11 MNB 8.79 11 2.175 6.62

    High Ways RDA 7 M/Line 53.85 7 37.65 16.2

    RDD (V.V 180days) 16 MNB 100 16 58.32 41.68

    Education (GamaNeguma)

    13 MNB 17.675 13 4.45 13.22

    Total98 262.315 98 132.675 129.64

  • 8/8/2019 Development Programme

    60/89

    ser Description of Work No ofWorks Source of FundAllocation

    Mn

    No ofWorks

    CommittedExpenditure Balance

    1 Education 14 M/NB&EID 50.00 14 6.50 43.501 NECORD 18.60 1 6.25 12.352 Cooperative 14 M/NB&EID 20.00 14 2.40 11.60

    3 Irrigation 6 Provincial 24.50 6 10.75 13.751 M/NB&EID 0.75 1 0.15 0.60

    4 Social Welfare 1 PSDG 5.00 1 1.29 3.715 Health 14 Addl.HSDP 60.00 14 9.58 50.42

    District: Kilinochchi

    MAJOR PROJECTS UNDER THE VADAKKILVASANTHAM 180 DAYS PROGRAMME - 2009

    6 Agriculture Research 11 M/NB&EID 30.00 7 0.00 30.007 Agrerian Development 13 M/NB&EID 25.00 11 0.00 25.00

    8 Roads - Provincial 16 M/NB&EID 60.00 15 12.36 47.641 PSDG 15.00 1 11.35 3.659 ACLG -Building 2 PSDG 3.00 2 1.50 1.50

    10 Roads - Rural (ACLG) 80 M/NB&EID 50.00 No 0.00 50.0073 Maganeguma 20.12 No 0.00 20.12

    11District & DivisionalAdministration 14 M/PUB.Admi 80.5 14 10.00 70.50

    12 Electricity 19 CEB 175.00 10 0.00 175.00Total 280 637.47 111 72.13 559.35

  • 8/8/2019 Development Programme

    61/89

    Ser Descriptionof Work

    No. ofWork

    Allocation(Rs in Mn)

    No.ofWorksCommitted

    Expenditure Balance

    1 Irrigation 4 137.74 4 -

    2 WaterSupply 3 3.50 1 3.5

    District :- Jaffna

    MAJOR PROJECTS UNDER THE VADAKKILVASANTHAM 180 DAYS PROGRAMME - 2009

    3 Fisheries 20 331.33 20 43.50 288.03

    4 Health 10 124.03 10 76.09 47.94

    5 Highways 38 199.16 38 82.34 116.82

    6 Education 276 209.28 276 63.14 146.14

    Total 351 1005.24 349 268.57 736.67

  • 8/8/2019 Development Programme

    62/89

    HIGHLIGHTS

    ON-GOING MAJOR PROJECTS

  • 8/8/2019 Development Programme

    63/89

    HIGHLIGHTS OF ONGOING MAJOR PROJECTSIN THE NORTHERN PROVINCE

    UNDER GOVERNMENT GUIDANCE

    Mannar Bridge (JICA) 2,188.0 Mn Giant Tank Mannar (RAP) 385.0 Mn

    Valukkaiaru Driange Scheme, Jaffna (RAP) 200.0 Mn

    In Rs.

    Pavatkulam scheme (RAP) 50.0 Mn Madawachchiya Mannar - Thalai Mannar Rd 358.0 Mn

    (CAARP)

    Jaffna Kandy Road (CAARP) 464.0 Mn Vavuniya Parainalar kulam Road (CAARP) 182.0 Mn Vavuniya Horowpothana Road (CAARP) 382.0 Mn

    Cont

  • 8/8/2019 Development Programme

    64/89

    Oddusuddan - Nedunkeni Road (CAARP) 64.0 Mn Mamaduwa Scheme (PEACE) 50.0 Mn

    Ahathimurippu Kulam (PEACE) 225.0 Mn

    Periyapandiviruchan Kulam (PEACE) 100.0 Mn

    Murunkan Silawaththurai Road (CAARP) 327.0 Mn

    Jaffna Manipay Karainagar Road (CAARP) 458.4 Mn

    Jaffna Point-Pedro Road (CAARP) 203.3 Mn

    Thondamanaru Barrage 130.0 Mn

  • 8/8/2019 Development Programme

    65/89

    ON-GOING MULTI-SECTORAL PROJECTS

    North East Community Restoration and Development Ext. Project.

    220.00 MnNECORD II - Loan 211.32 Mn

    - Grant 19.84 Mn

    Conflict Affected Area Rehabilitation Project. (CAARP) 80.14 Mn

    Tsunami Affected Area Rehabilitation Project. (TAARP) 75.98 MnRe Awaking Project (RAP) 733.30 Mn

    North East Housing Reconstruction Programme. (NEHRP) 5094.00 Mn

    North East Coastline Community Development Project.

    (NECCDEP) Tsunami Affected Area Rehabilitation Project

    (TAARP) Component B 382.00 Mn

    Pro-poor Economic Advance And Community

    Enhancement Project (PEACE) 129.00 Mn

  • 8/8/2019 Development Programme

    66/89

    ROADSThe road construction package financed by EXIM Bank ofChina through a soft loan repayable within a period of 20Yrs with a five year grace period include the followingroads ( 25 ) :

    A9 Kandy Jaffna road from Galkulama to JaffnaA32 Navakkuli Karathivu Mannar roadPuttalam Marichchikade Mannar road

    B75 Chavakachcheri Pulloy roadAB31 Polloly Koddikamam Kaachchai roadAB21 Jaffna Ponnalai Pointpedro roadA35 Paranthan Mulathivu roadB357 Paranthan Poonekary roadA34 Mankulam Mulativu roadB269 Mankulam Vellankulam roadAB20 Jaffna Point pedro roadAB32 Puttur Meessalai road Contd..

  • 8/8/2019 Development Programme

    67/89

    AB16 Jaffna Kankasanthurai roadJaffna Palali roadAB17 Jaffna Manipai Karainagar roadAB19 Jaffna Pannai Kayts roadAB39 Valukkairari Punguduthivu Kuruksdduwan roadA14 Medawachchiya Mannar Thalaimannar roadB325 Nelumkulam Neri akulam road A30 Vavuniya -Parayanalankulam roadB334 Oddusudan - Nedunkerny roadB297 Mulathivu - Kokkilai roadB296 Mulathivu - Puliyankulam roadB371 Point pedro - Maruthankerny roadB402 Soranapattu - Thalayadi road

  • 8/8/2019 Development Programme

    68/89

    Reconstruction of Northern Railway Lines 260 KM

    Thandikulam to Omanthai - Railways DeptOmanthai to Pallai - Indian Railway CompanyPallai to Kankesanthurai Chinese CompanyMadawachchi a to Thalaimannar - Indian Railwa Com an

    RAILWAYS

  • 8/8/2019 Development Programme

    69/89

    ELECTRICITY

    The Ministry of Power and Energy has approved twoprojects to supply electricity coverage to 100% of thepopulation in the Northern Province. The two projectsare

    Vavuniya to Kilinochchi 132 kV JICA fundedKilinochchi to Chunnakam 132 kV KfW funded

  • 8/8/2019 Development Programme

    70/89

    THONDAMANARU BARRAGE

  • 8/8/2019 Development Programme

    71/89

    IRANAMADU TANK

  • 8/8/2019 Development Programme

    72/89

    SITHIVINAYAGAR HINDU COLLEGE MANNAR

  • 8/8/2019 Development Programme

    73/89

    OFFICE BUILDING, NATIONAL YOUTH SERVICE COUNCIL, MANNAR

  • 8/8/2019 Development Programme

    74/89

    REOPENING OF KILINOCHCHI HOSPITAL

  • 8/8/2019 Development Programme

    75/89

    THALVUPADU THARAPURAM ROAD - MANNAR

    VAVUNIYA HOROWPOTHANA ROAD (C 4A)

  • 8/8/2019 Development Programme

    76/89

    VAVUNIYA HOROWPOTHANA ROAD (C 4A)

    VAVUNIYA HOROWPOTHANA ROAD (C 4B)

    MADAWACHCHIYA MANNAR TALAIMANNAR ROAD (C5A)

  • 8/8/2019 Development Programme

    77/89

    MADAWACHCHIYA MANNAR TALAIMANNAR ROAD (C5A)

    JAFFNA POINT PEDRO ROAD (C6C)

  • 8/8/2019 Development Programme

    78/89

    MANNAR BRIDGE/ OLD - NEW

    MANNAR CAUSEWAY

  • 8/8/2019 Development Programme

    79/89

    GIANT TANK

  • 8/8/2019 Development Programme

    80/89

    A 32 ROAD

  • 8/8/2019 Development Programme

    81/89

    VADAKKIN VASANTHAM

    THREE YEAR PLAN

    AND

    PIPELINE

  • 8/8/2019 Development Programme

    82/89

    VADAKKIN VASANTHAM 2009 2011

    PIPELINE

    01. Jathika Saviya Gama Neguma (Community infrastructure) 8,600

    02. Infrastructure improvement 1,824

    03. Child protection and family reintegration 600

    Rs. in Mn.

    04. Economic advancement of war affected women 500

    05. Reactivation of Achchuveli industrial estate 979

    06. Rehabilitation of destitude children, elderly and disabled 990

    07. Strengthening the public administration 900

    Cont

  • 8/8/2019 Development Programme

    83/89

    ATCHUVELI INDUSTRIAL ESTATE

    Total extent of land - 65 AcresFirst developed in 1969

    13 industries were in existence

    Plan for reactivation:

    Infrastructure Phase I at a cost of Rs. 397 Mn

    Infrastructure Phase II at a cost of Rs. 482 Mn

    Peripheral infrastructure Rs. 100 Mn

    STATE INDUSTRIES IN NP

  • 8/8/2019 Development Programme

    84/89

    STATE INDUSTRIES IN NP

    District Industries Product Location Nature

    Jaffna Sri Lanka Cement Factory Cement KKS

    Government hastaken initiativesto reactivate thestate industries inthe Northern

    Province in near

    Jaffna Achchiuveli Industrial Estate Industrial sheds &developed plots for varioussmall & medium industries

    Atchchuveli

    Jaffna Palmyrah distillery industries Arrack Thikkam

    Jaffna Karainagar Boat Yard Boat building Karainagar

    Jaffna Fishing Net Factory Fishing net Kurunagar

    Kilinochchi Paranthan Chemical Industry Caustic soda Paranthan

    Kilinochchi Saltern Salt EPS

    Mullaitivu Oddusuddan Tile Factory Tiles Oddusuddan

    Mannar Pesalai Fish Canning Factory Fish canning Pesalai

    Mannar Pesalai Ice Plant Ice Pesalai

    Vavuniya Poonthoddam Industrial Park Industrial sheds &developed plots for varioussmall & medium industries

    Vavuniya

    Note: Relevant line Ministries are attending to the spade work

  • 8/8/2019 Development Programme

    85/89

    POTENTIALS FOR INVESTMENTS

    POTENTIAL VENTURES

  • 8/8/2019 Development Programme

    86/89

    POTENTIAL VENTURES Ice plants Nylon Fish nets Canning of Fish and Prawns Cold storage plant Fiber glass boat production

    Fish meal production att e ee an ou try ee pro uct on Processed food products Dehydrated Potatoes and onions

    Fruit and vegetables processing Lime from lime stone Roofing tiles Clay bricks

    Mechanized car entrCont

  • 8/8/2019 Development Programme

    87/89

    Coconut oil Gingily oil Bottling of toddy Straw boat production Leather products Agriculture implements

    Engineering workshops Poultry products Ornamental Fish breeding Power Looms

    Aluminum Kitchen utensils Palmyrah products (Fiber, ornamental items, jaggery,toddy and arrack)

    Milk based products

  • 8/8/2019 Development Programme

    88/89

    VISION FOR FUTURE

    People of the Northern Province will feel the breeze

    of the new s rin of eace and tran uil environment

    where there will be no more fear, terror and violence

    that plagued the region

  • 8/8/2019 Development Programme

    89/89