Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation /...

6
Development Plan View Parking Building Int’l Terminal Promenade Domestic Terminal Beach Reclamation / Apron Extended Apron Expansion Apron Expansion Access Road, Toll Gate, etc

Transcript of Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation /...

Page 1: Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation / Apron Extended Apron Expansion Access Road, Toll Gate,

Development Plan View

Parking Building

Int’l Terminal

PromenadeDomestic Terminal

Beach Reclamation /

Apron Extended

Apron Expansion

Apron Expansion

Access Road, Toll Gate, etc

Page 2: Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation / Apron Extended Apron Expansion Access Road, Toll Gate,

NEW LAY OUT PLAN

CARPARK CARPARK BUILDINGBUILDING± 39.000 M± 39.000 M22

(± 1500 VEHICLE)(± 1500 VEHICLE)

INTERNATIONAL INTERNATIONAL TERMINAL TERMINAL BUILDINGBUILDING

± 129.000 M± 129.000 M22

SCHOOL SCHOOL COMPLEXCOMPLEX± 10.500 M± 10.500 M22

ADDITIONALADDITIONALAPRONAPRON

± 87.500 M± 87.500 M22

ACS ACS ± 4.000 M± 4.000 M22

INTERNATIONAL INTERNATIONAL CARGO BUILDINGCARGO BUILDING

± 6.000 M± 6.000 M22

MULTIPURPOSE MULTIPURPOSE OFFICEOFFICE

± 6.000 M± 6.000 M22

DOMESTICDOMESTICTERMINAL TERMINAL BUILDINGBUILDING± 65.800 M± 65.800 M22

TEMPORARY TEMPORARY PARKINGPARKING

± 37.000 M± 37.000 M22

(± 1000 VEHICLE)(± 1000 VEHICLE)

Page 3: Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation / Apron Extended Apron Expansion Access Road, Toll Gate,

To anticipate the needs of the PT. Angkasa Pura I (s) will undertake the Project Development Bali’s Ngurah Rai International Airport to expand the area- an area that is now, so is able to support growth in passenger and aircraft until 2025.

DESCRIPTION EXISTINGTARGET DEVELOPMENT

PHASE I - 2018TARGET DEVELOPMENT

PHASE II - 2025

RUNWAY 3000 m x 45 m 3000 m x 45 m 3000 m x 45 m

APRON 214.500 sqm 309.500 sqm 341.500 sqm

TAXIWAY

3 x (148,5 x 23m) 3 x (148,5 x 23m) 3 x (148,5 x 23m)

600x23m ; 800x23m

600x23m ; 800x23m 600x23m ; 800x23m

2 x (237,62x23m) 2 x (237,62x23m) 4 x (237,62x23m)

TERMINAL

Dom : 13.300 sqmDom : 65.000 sqm (ex. Int'l)

Dom : 65.000 sqm (ex. Int'l)

Int'l : 65.800 sqm Int'l : 129.000 sqm Int'l : 129.000 sqm

CAR PARKING 55.000 sqm

Int'l Parking Buildg 39.000 sqm (1560 cars)

Int'l Parking Buildg 39.000sqm (1560 cars)

Existing parking land + Driving range 16.275 sqm (650 cars)

Domestic Parking Buildg. 63.000 sqm (2520 cars)

55. 275 sqm (2210 cars) 102.000 sqm (4080 cars)

CARGO TERMINAL

Dom : 2.600 sqm Int'l : 3.700 sqm

Dom : 3.545 sqm (39.000 ton) Int'l : 5000 sqm (43.200 ton)

Dom ; 5000 sqm (46.000 ton) Int'l : 6000 sqm (57.000 ton)

Page 4: Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation / Apron Extended Apron Expansion Access Road, Toll Gate,

Scope Of Work

Page 5: Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation / Apron Extended Apron Expansion Access Road, Toll Gate,

NEW PRESPECTIVE IMAGE OF NGURAH RAI AIRPORT

Page 6: Development Plan View Parking Building Intl Terminal Promenade Domestic Terminal Beach Reclamation / Apron Extended Apron Expansion Access Road, Toll Gate,

NEW PRESPECTIVE IMAGE OF NGURAH RAI AIRPORT