![Page 1: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/1.jpg)
Development of a Cost-Effective EnergyEffective Energy Management Information S tSystem
Presented by Alvaro Rozo on behalf of Katherine van Nes – Hatch Ltd.
© Copyr igh t 2014 OSIso f t , LLC.
![Page 2: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/2.jpg)
ArcelorMittal Hamilton East (AMHE)E M t I f ti S tEnergy Management Information System
Presentation Topics Hamilton EastPresentation Topics• Project Background• Approach
Hamilton East
Approach• Components of an EMIS• Components of the AMHE
Montreal
EMIS
Project Cost Effectiveness Highlights
© Copyr igh t 2014 OSIso f t , LLC.2
![Page 3: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/3.jpg)
Focus on Energygy5%
Sustaining C it l
30%15%CapitalEnergy• Approximated
Operational
20%
Labour
Consummables
Costs (Mining)
30% Other
© Copyr igh t 2014 OSIso f t , LLC. 3
![Page 4: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/4.jpg)
ArcelorMittal Hamilton East
• Part of ArcelorMittal Long Carbon North America
• Produces variety of steelProduces variety of steel wire products
• Renown for cold heading products and oil temperedproducts and oil-tempered wire
© Copyr igh t 2014 OSIso f t , LLC. 4
![Page 5: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/5.jpg)
© Copyr igh t 2014 OSIso f t , LLC. 5
![Page 6: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/6.jpg)
Project Driversj• Small facility• Several million on natural
gas and electricity costs• Natural Gas (including
steam) accounting for 85% ) gof energy consumption (GJ)
• Electricity disproportionately accounting for 50% ofaccounting for 50% of overall cost
Expected savings 5 – 8 %
© Copyr igh t 2014 OSIso f t , LLC. 6
![Page 7: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/7.jpg)
Energy Management Auditgy g• Benchmarked AMHE energy management
practices via ISO50001 gap analysisp g p y• Identified and ranked preliminary energy
savings opportunities• Preliminary energy models createdPreliminary energy models created• Energy drivers determined• Preliminary implementation plan and
architecture (cost assessment)architecture (cost assessment)• Feasibility of EMIS examined• Paid for via OPA Industrial Accelerator
© Copyr igh t 2014 OSIso f t , LLC.
program
7
![Page 8: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/8.jpg)
EMIS Audit Optionsp
© Copyr igh t 2014 OSIso f t , LLC. 8
$ Savings Note
![Page 9: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/9.jpg)
Project Approach
WP 01 - WP02 - WP03 - WP04 -
j pp
WP 01 Foundational Activities•Foundational activities to set basis for implementation of
Stage Gate Review•BudgetS
WP02 Energy Metering•Energy metering specification, procurement and installation
WP03 EMIS Implementation and Testing•Configuration
WP04 EMIS Commissioning and Handover•System o p e e tat o o
EMIS •Schedule•Implementation Resource Reqts (iTi) and RASCI update
installation•Site data collector•Networking to site data collector
•Configuration and testing of tags in C t li d Hi t i
•Internal Testing•User Acceptance Testing
Commissioning•User Training•System Handover
Centralized Historian
© Copyr igh t 2014 OSIso f t , LLC. 9
$ Savings Note
Plan Review Implement
![Page 10: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/10.jpg)
Components of an EMISEMIS• Energy Account Centers• Meters and Inputs• Data Capture and
IntegrationIntegration• Data Analysis and
ReportingReporting• Management Systems,
People and Procedures
© Copyr igh t 2014 OSIso f t , LLC. 10
Source: Natural Resources Canada’s “Energy Management Information Systems Planning Manual and Tool”
![Page 11: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/11.jpg)
Energy Account CentersMetering and InputsMetering and Inputs
© Copyr igh t 2014 OSIso f t , LLC. 11
![Page 12: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/12.jpg)
Energy Account CentersgyEnergy Account Centre (EAC): “The
organization level at which energy performance sho ld be managed”performance should be managed”
EAC Definition Principles:• Combined (i.e. all energy sources)• Process Areas as starting point• General mapping to finance cost centers• General mapping to finance cost centers• Target largest AMHE energy drivers• Maximum information / minimum cost
© Copyr igh t 2014 OSIso f t , LLC. 12
$ Savings Note
![Page 13: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/13.jpg)
Typical Mining EACsyp gPrimary Energy Account Centre
Secondary Energy Account Centre
Primary Energy Account Centre
Secondary Energy Account Centre
1 ‐Mining DrillingBlastingExcavation
3 – Mill Processing GrindingGravity RecoveryScreening & Thickening
/TransportHandling of waste rockDewatering
2 C hi & P i C hi
Leach/Carbon‐in‐LeachCarbon StrippingCyanide DestructionT ili R l i2 – Crushing &
ConveyingPrimary CrushingPebble CrushingConveying
Tailings Reclaim4 – Surface Facilities
Camp Water & HVAC Water Treatment PlantO Pl t
© Copyr igh t 2014 OSIso f t , LLC. 13
Oxygen Plant
![Page 14: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/14.jpg)
A Note on Meteringg
• Meters are expensive
Meter Identifier Location Description
1 Substation 'C'61‐frame East61‐frame West
fMeters are expensive • Strategic planning in
identified derived and needed meters
62‐frame
2 Substation 'C'63,64,65,66 ‐ FramesOil TemperStabilizer Drive / Strander
3 S b i ' ' 23 24 2 26 2 28needed meters 3 Substation 'D' 23,24,25,26,27,28,55‐ Frames
4 Substion 'A'Stabilizer HeatingWire Mill South (30,31,34 ‐ frame)
5 Old Boiler RoomSurface Furnace & Rx GenK C5 Old Boiler Room Kaeser CompressorMain Natural Gas Meter
6 Substation 'B'13‐Frame#1 Cleaning line
7 Substation 'B' 14 F
© Copyr igh t 2014 OSIso f t , LLC. 14
$ Savings Note7 Substation 'B' 14‐Frame8 #2 Cleaning Line #2 Cleaning Line & #3 Crane
![Page 15: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/15.jpg)
Data Capture and Integrationp g
© Copyr igh t 2014 OSIso f t , LLC. 15
![Page 16: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/16.jpg)
AMHE Site Characteristics• 10 separate process areas
O 50 ti• Over 50 active energy consumers• Electricity, natural gas, steam• Minimal plant floor data collection• Minimal plant floor data collection • Equipment independently controlled• PI System infrastructure in AMM/Contrecouer• PI System infrastructure in AMM/Contrecouer
(No PI components in AMHE)• Existing Ekho installation in Contrecouer
© Copyr igh t 2014 OSIso f t , LLC.
g
16
![Page 17: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/17.jpg)
Resultant Architecture
© Copyr igh t 2014 OSIso f t , LLC. 17
$ Savings Note
![Page 18: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/18.jpg)
PI Infrastructure• No additional onsite physical
infrastructure• Connection to sub-metering (no PLCs)• Bring back all available variables• Detailed variable analysis• Calculations
– Derived meters (today and future)Derived meters (today and future)– Totalizations in required contexts (kW to
kWh, flow to scf/lbs)Conversion (steam to natural gas)
© Copyr igh t 2014 OSIso f t , LLC.
– Conversion (steam to natural gas)
18
![Page 19: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/19.jpg)
PI Infrastructure –Future OpportunitiesFuture Opportunities• Leverage Asset Framework and Asset Framework
T l tTemplates• Leverage Enhanced Calculation Engine and Templates
Element Attriutes
© Copyr igh t 2014 OSIso f t , LLC. 19
![Page 20: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/20.jpg)
Data Analysis and Reportingy p g
© Copyr igh t 2014 OSIso f t , LLC. 20
![Page 21: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/21.jpg)
AMHE Key Functionalityy y1. Reduced base load2 R d d i bilit2. Reduced variability
(against energy drivers))
3. Increased efficiency (via
ti loperational opportunities)
© Copyr igh t 2014 OSIso f t , LLC. 21
![Page 22: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/22.jpg)
Specific Functionality Geared to AMHE p y
Phas
e 1
Phase 2
Phase 1
© Copyr igh t 2014 OSIso f t , LLC. 22
$ Savings Note
![Page 23: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/23.jpg)
Ekho Functionality
PERFORMANCE MANAGEMENT, KPI’S, OEE
y
DOWNTIMEPRODUCTION QUALITY• Operational
Management
MAINTENANCEHEALTH & SAFETY
ENERGY MANAGEMENT
and Intelligence Software
FOUNDATION MODULES
SAFETY MANAGEMENTSoftware
© Copyr igh t 2014 OSIso f t , LLC. 23
![Page 24: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/24.jpg)
Management Dashboard
© Copyr igh t 2014 OSIso f t , LLC. 24
![Page 25: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/25.jpg)
Energy Consumption
© Copyr igh t 2014 OSIso f t , LLC. 25
![Page 26: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/26.jpg)
Energy Conservation Measure
© Copyr igh t 2014 OSIso f t , LLC. 26
![Page 27: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/27.jpg)
Energy Intensity and Baseline Calculation
© Copyr igh t 2014 OSIso f t , LLC. 27
![Page 28: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/28.jpg)
CUSUM Analysis
© Copyr igh t 2014 OSIso f t , LLC. 28
![Page 29: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/29.jpg)
Wrap UpCost Effective EMIS DevelopmentCost Effective EMIS Development• Audit • Options analysis Funding• Options analysis• Stage gate review following
planningEAC d fi iti
FundingOntario Power Authority Industrial
Accelerator ProgramA dit fi d• EAC definition
• Meter placements• Meter selection
- Audit financed- Horizon Utilities
80% up to $75,000• Architecture• Functional Requirements
definition geared to need
- Union Gas50% up to $100,000
© Copyr igh t 2014 OSIso f t , LLC.
definition geared to need
29
![Page 30: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/30.jpg)
Katherine van Nes, P.Eng, PMP, g,• [email protected]• Information Management Consultant / Project
Managerg• Hatch Engineering
© Copyr igh t 2014 OSIso f t , LLC. 30
![Page 31: Development of a Cost-Effective Energy Management ... · architecture (cost assessment)architecture (cost assessment) • Feasibility of EMIS examined ... Microsoft PowerPoint - Development](https://reader034.fdocuments.us/reader034/viewer/2022042113/5e8fc8086499cd0569748cea/html5/thumbnails/31.jpg)