Development & Director Maintenance
VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet on a bi-monthly basis to keep all parties up to date on all things maintenance.
Director of Maintenance - Cindy• Development Committee in the F/W session• Budget Inspections• Entire Maintenance Dept Budget • Manage Major Projects• Member of City Housing BoD of Appeals• Work with HDC, City Planning, Building and Housing Departments • Involve Architects & Engineers when necessary• Pay all maintenance bills. You buy something – I know it!• Assess Damn Damage fines as directed by Devo Comm.• Lots of other activities
![Page 2: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/2.jpg)
Budget Inspections ?????
Every 2 years, full inspections are conducted on each and every building documenting the condition (how long is it going to last) on all major systems.
Exterior system covers items like roofs, gutters, windows, siding, foundations, driveways, parking areas etc.
Interior covers electrical, heating, water, piping, walls, ceilings, equipment, kitchens and bathrooms.
![Page 3: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/3.jpg)
Info from these inspections end up in..
A 3, 5 and10 year plan of replacement schedules with corresponding estimated costs and an expected life span.
Each house has it’s own inspection sheet complete with total costs over time.
When budget planning time comes we look at the next fiscal year to determine what needs to be done and how much it will cost. After some discussion and revisions, the Development Committee submits its proposed plan to the Finance Committee.
![Page 4: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/4.jpg)
Total Major Budget for 2009 –‘10
$ 508,000
Total Major Maintenance Money Spent 2004 to 2010
$2,442,757
![Page 5: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/5.jpg)
Annual Maintenance Budget
2004 through 2010 ------$ 1,488,480
Yearly Annual Budget continues to rise,From a low of 220,780 in “04 – ‘05
To $ 304,200 in 2009-10.
The 2008 –’09 Actual Annual was $ 347,716 which was $60,716 over budget.
![Page 6: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/6.jpg)
Why do Costs Increase?
Decreasing member maintenance skills Increasing scholastic demands which leave
less expendable time for members to perform maintenance.
Increasing requirements from City and National codes.
Our Houses aren’t getting any younger. 90% of our houses are centenarians.
The list goes on…..
![Page 7: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/7.jpg)
Projects scheduled for 2009-’10
Ed Center Windows and Structural Repairs Ella Baker Flat Rubber Roof Gregory Windows and new Paint King Siding Replacement Michigan Kitchen Exhaust & Finish Side Porch Roof Minnie’s Boiler/Hot Water Heating Combo Unit Nak Heating Boiler NC Basement Flooring Repl, 3 Landing Window Repl, Siding
Repairs and the last 4 bathrooms receive rehab. Owen Heating Boiler and Make up Air System Repl. Truth first floor front flooring replacement Rochdale Front Porch Repairs.
For a GRAND TOTAL OF…………….. $508,000
![Page 8: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/8.jpg)
![Page 9: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/9.jpg)
Michigan Before
![Page 10: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/10.jpg)
Mich House Side Porch & Stairs to BasementProject started in 2008-09 and will end Winter 2009
![Page 11: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/11.jpg)
Michigan House / Porch Alterations/ Early in the Process
![Page 12: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/12.jpg)
Rear Entrance and Ramp
![Page 13: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/13.jpg)
Post Paint Plus New Side Porch
![Page 14: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/14.jpg)
Ramp Access Required by HDC and City of A2
![Page 15: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/15.jpg)
Had to stop here – ran out of funds! Job continues Summer 09-10
![Page 16: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/16.jpg)
Michigan – “Almost” After
![Page 17: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/17.jpg)
King Before
![Page 18: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/18.jpg)
King After
![Page 19: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/19.jpg)
Linder F/W 2009 Before new WindowsSiding, Roofing, Porch and Water Management
Imagine
what she
will look
like at the
end of next
summer…
Stay Tuned…..
![Page 20: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/20.jpg)
Bathroom Demo
![Page 21: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/21.jpg)
Linder Kitchen - Before & After
![Page 22: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/22.jpg)
Enough of the fun stuff!
The Development Committee has to
Deal with Damn Damage Issues too!
![Page 23: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/23.jpg)
What is “Damn Damage” ?
Damage caused by: Abuse Misuse Neglect
![Page 24: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/24.jpg)
![Page 25: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/25.jpg)
Screens area big problemarea.
Housesneed to knowthat they willbe charged forscreen damage.
![Page 26: Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e9d5503460f94b9dead/html5/thumbnails/26.jpg)
We’ll keep changingWe’ll keep changingwith the demands of time!with the demands of time!
To contact your Devo Vice President To contact your Devo Vice President email Richard Tursky atemail Richard Tursky [email protected]@umich.edu
Your Devo Committee at Your Devo Committee at icc.devoicc.devo
Director of Maint at Director of Maint at [email protected]@umich.edu