Copyright 2009, Toshiba Corporation. 1/19 Development and Global Deployment of ABWR IAEA International Conference on Opportunities and Challenges for Water Cooled Reactors in the 21 st Century Vienna, Austria October 27, 2009 Document No. G3-815 Rev.0 Export Control No. PSN-2009-1032 Takeo Shimizu Senior Fellow Toshiba Corporation

Transcript of Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites,...

Page 1: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

Copyright 2009, Toshiba Corporation. 1/19

Development and Global Deployment of ABWR

IAEA International Conference on Opportunities and Challenges for Water Cooled Reactors in the 21st Century Vienna, Austria

October 27, 2009

Document No. G3-815 Rev.0Export Control No. PSN-2009-1032

Takeo ShimizuSenior Fellow

Toshiba Corporation

Page 2: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

2/19Copyright 2009, Toshiba Corporation.

Development Overview of ABWR

New ABWR Construction in U.S.

ABWR Deployment in Europe

ContentsContents

Page 3: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

3/19Copyright 2009, Toshiba Corporation.

Development Overview of ABWR

New ABWR Construction in U.S.

ABWR Deployment in Europe

ContentsContents

Page 4: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

4/19Copyright 2009, Toshiba Corporation.

Toshiba entered business in 1966,constructed 22 units, including 17 units as prime contractor

HAMAOKA-4ONAGAWA-2

KASHIWAZAKIKARIWA-3

1995 2000 2005 2010

FUKUSHIMAⅠ-1

HAMAOKA-1FUKUSHIMAⅠ-5

FUKUSHIMAⅠ-6HAMAOKA-2

ONAGAWA-1

HAMAOKA-3KASHIWAZAKIKARIWA-2

FUKUSHIMAⅠ-2

TSURUGA-1

FUKUSHIMAⅡ-1KASHIWAZAKIKARIWA-1

FUKUSHIMAⅡ-3

FUKUSHIMAⅠ-3

1970 1975 1980 1985 199019651960

ONAGAWA-3

HAMAOKA-5

KASHIWAZAKIKARIWA-6KASHIWAZAKIKARIWA-7

OHMA-1

Tohoku, HIGASHIDORI-1

BWR is the highest market share in Japan

BWR Construction ExperiencesBWR Construction Experiences

PWR39%

(23 units)

Ratio of Gross OutputAs prime contractor

BWR61%

(32 units) LUNGMEN-1LUNGMEN-2

GE

GEHitachi

M

TOSHIBA34%49315MW

(55 units)

W

Construction Experiencesof Light Water Reactors

in Japan

Reference:Nuclear Power Plants in theWorld 2009,JAIF

2015

Constructed plantsUnder construction

ABWR

First Concrete Fuel Lording

Page 5: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

5/19Copyright 2009, Toshiba Corporation.

‘80s

Commoneng’g

ABWR common design by AET*

Conceptualdesign

Fundamentaldesign

K-7

ABWR FOAKE

‘90s‘70s ‘00s

US ABWR

Japan

USA

EuropeNordic BWR Potential demands in Europe

Latest Proven Plant

WestinghouseBWR90

NRC Design Certification

K-6/7

ASEA ATOMBWR90+

ABWR for STP3/4

TEPCO Higashidori unit 1

J-PowerOhma unit 1

EUEU--ABWR ABWR Latest Generation III+ Reactor

Latest evolutional ABWR in the world

Development history of Development history of AABWRBWR

•AET :TOSHIBA,TEPCO GE, Hitachi, ASEA-ATOM

H-5

TVA DOE study

ABWR in USAABWR in USA

Page 6: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

6/19Copyright 2009, Toshiba Corporation.

Testing for Verification & OptimizationSafety in ABWR

RIP Performance TestCRD Performance Test

Seismic Testof CRD

Hydraulic TestIn Pressure Vessel

In-house Test Facility

Demonstration Test of RCCV (Seismic Test)(by Government)

http://www.iae.or.jp/group/pdf/tadotsu.pdf

High reliability by building test facilities

Page 7: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

7/19Copyright 2009, Toshiba Corporation.

Safety Nuclear Power Plant Safety Nuclear Power Plant ABWRABWRThe latest and Proven BWR to receive Design Certification from the US-NRC

ABWR (Japan)

Thermal PowerThermal Power

Elec. PowerElec. Power

Life timeLife time

AvailabilityAvailability

3926MWt3926MWt

1350MWe1350MWe

60 years60 years

90%90%

Four ABWR in operation in JapanThe first unit started operation in 1996

Tested and Proven Light Water Reactor

Page 8: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

8/19Copyright 2009, Toshiba Corporation.

Kashiwazaki-Kariwa Unit 6/7The first Generation III Reactor in the world( C/O: November 1996 )Short construction period37months (1st concrete – FL)

Built on schedule and budget

Hamaoka Unit 5World’s 3rd ABWR( C/O: January 2005 ) Latest technologies appliedCombined type reactor building for the high seismic condition

ABWR in Japan ABWR in Japan

On time, On budget and High Seismic Safety

Page 9: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

9/19Copyright 2009, Toshiba Corporation.

Development Overview of ABWR

New ABWR Construction in U.S.

ABWR Deployment in Europe

ContentsContents

Page 10: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

10/19Copyright 2009, Toshiba Corporation.

Cost and ScheduleABWR 2 units1350 – 1500 MWe class

PJ Deployment modelABWR EnhancementsFuel Supply Plan

ABWR Cost/Schedule/COL Project at TVA’sBellefonte Site

TVA

Toshiba GE Bechtel USECABWR Team

4 5 6 7 8 9 10 11

Application

2004 2005

Award Contract/Start Study

12 1 2 3 4 5 6 7 8 9

DOE study schedule(2004~2005)ABWR Team

Final report

Draft report

TVA TVA DOE funding study in 2004,2005DOE funding study in 2004,2005

Starting point of Global ABWR Deployment

Page 11: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

11/19Copyright 2009, Toshiba Corporation.

Davie

North AnnaSummer

Vogtle

River Bend

Grand Gulf

W.S.Lee

BellefonteST

P

Oconee Harris

Calvert Cliffs

Levy

Amarillo

Comanche Peak

Callaway

Elmore

Victoria

Susquehanna

Nine

Mile Point

Fermi

Turkey Point

New LWR Construction in U.S.New LWR Construction in U.S.

【COL Status】COL applied COL

in preparation EPC contract

ABWR 1site, 2units - 1site, 2units

AP1000 7sites, 14units 2sites, 2units 3sites, 6units

EPR 4sites, 4units 2sites, 2units LLM (part)ESBWR 5sites, 6units - LLM: 3unitsAPWR 1site, 2units - -

Ready for ConstructionCOL: Combined Construction and Operating Licensing

ABWR in USA

Source: NEI HP (09/05)With TOSHIBA’s assumptions

Construction of ABWR begins the Nuclear Renaissance in USA.

Page 12: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

12/19Copyright 2009, Toshiba Corporation.

STP3/4 project in U.S.STP3/4 project in U.S.

ABWR in USA

EPC contract Feb 9,2009 as TOSHIBA prime contractor

Page 13: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

13/19Copyright 2009, Toshiba Corporation.

Current Status of STP3/4 projectCurrent Status of STP3/4 projectSTP3/4 Project Outlines

Customer: STPNOCABWR 2 units (1380MWe/Gross)

FeaturesActual 1st BWR project as a revival of nuclear industry in U.S. Leading success with maximum application of excellentexperiences for design, construction and operation of ABWRs in Japan.

Current Project StatusCOLA rev.2 provided by STPNOC to NRC with Toshiba technologyEPC contract was established in 2009 as Toshiba prime contractorThe date of Commercial Operation expected in 2016 for Unit No.3.

STP3/4 project is on going in U.S.

Page 14: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

14/19Copyright 2009, Toshiba Corporation.

Development Overview of ABWR

New ABWR Construction in U.S.

ABWR Deployment in Europe

ContentsContents

Page 15: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

15/19Copyright 2009, Toshiba Corporation.

Deployment of ABWR Deployment of ABWR in Europein EuropeEuropean BWR Technologies are applied in European ABWR ABWR is changed to meet European safety requirements

Severe Accident Management

Core Catcher

PCCS Pool

Lower drywell flooder line

PCCS Hx

Steam Suction

Drain Line

Heat Removal by PCCS

Core Catcher

PCCS Pool

Lower drywell flooder line

PCCS Hx

Steam Suction

Drain Line

Heat Removal by PCCS

PCCS Pool

Lower drywell flooder line

PCCS Hx

Steam Suction

Drain Line

Heat Removal by PCCS

- Provisions for Hydrogen Generation

RCCV Armored R/B- Airplane Crash - 72 inch Turbine

1600 MWe out put

- Provisions for Molten Core Cooling

Core Catcher

- 100% x 3 Independent ECCS(N-2 Requirement)ECCS

PCCS- Severe Accident

Management

Design changes are minimum to satisfy safety requirements

Page 16: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

16/19Copyright 2009, Toshiba Corporation.

Plant Main Data of European ABWRPlant Main Data of European ABWR

Plant SpecificationReactor Thermal Power: 4300MWElectrical Output: >1600MWPlant efficiency: >37%

Plant availabilityDesign life: 60 yearsPlant availability: >90% over lifetime

Thermal Power increases from 3926 MW to 4300MW.

Page 17: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

17/19Copyright 2009, Toshiba Corporation.

Global Deployment of Global Deployment of ABWRABWR

STP3/4

USA

http://www.stpnoc.com/New%20Units.htm

Japan

USUS--ABWR ABWR

Europe EUEU--ABWR (ABWRABWR (ABWRⅢⅢ++))Latest Generation III+ Reactor

To be the World Standard LWR

Page 18: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

18/19Copyright 2009, Toshiba Corporation.

Only Generation III Reactor under Operation with excellent operating experience in Japan.High certainty for schedule based on the actual construction experiences in Japan.Implementation for the development of the STP3/4 project is under going in U.S. based on the results of TVA DOE funding study.Specific regulation will be considered for ABWR promotion in Europe as well.

Global Global Deployment of ABWRDeployment of ABWR

Expanding ABWR construction worldwide

Page 19: Development and Global Deployment of ABWR - IAEA · 2009. 11. 3. · 7sites, 14units: 2sites, 2units. 3sites, 6units: EPR . 4sites, 4units: 2sites, 2units. LLM (part) ESBWR. 5sites,

19/19Copyright 2009, Toshiba Corporation.

We provideWe provide the BWR technologiesthe BWR technologiesand contribute toand contribute to

““The The Nuclear RenaissanceNuclear Renaissance””..

SummarySummary

Nuclear Renaissance