FLUXYS LNG IMPORT TERMINAL ZEEBRUGGE Developing the Zeebrugge LNG terminal into an international hub for large-scale as well as small-scale LNG Gastech, 4-7 April 2017

Transcript of Developing the Zeebrugge LNG terminal into an ... Verhaeghe, Chief Technical Officer...

FLUXYS

LNG IMPORT

TERMINAL

ZEEBRUGGE

Developing the Zeebrugge LNG terminal into an international hub for large-scale as well as small-scale LNG

Gastech, 4-7 April 2017

DISCLAIMER

All data and information published in the present slideshow are for information purposes only and are not legally binding. Each user acknowledges that he/she uses such published data and information at its own risks.

Fluxys points out that these data and/or information may be subject to change.

Fluxys hereby excludes all liability (whether in contract, tort, delict, quasi-delict, statute or strict liability) for any type of damage, direct or indirect, consequential, or of any other nature, resulting from an incorrect understanding or the use of this information and/or data for any reason.

April 2017 Non-binding, for information purpose only2

Terminalling

GNL

Transport

Stockage

FLUXYS: GAS INFRASTRUCTURE COMPANY FOR EUROPE

LNG

Terminalling

Transport

Storage

Fluxys: fully independent

natural gas infrastructure operator

• Pipeline transport

• Underground storage

• LNG Terminalling

Present in 9 countries

Majority shareholder: Belgian municipalities (77%)

BBL

INTERCONNECTOR

TERMINAL GNL

DE DUNKERQUE

NEL

TENP

TRANSITGAS

TAP

SWEDEGAS

20 March 2017 For information purpose only3

4

BELGIAN NETWORK:

KEY CROSSROADS & TRANSIT ROLE IN NW EUROPE…

To other markets

80 bcm/y

exit capacity

Supply in Belgium

16 bcm/y

Belgian

network

129 bcm/y entry capacity

LNG

worldwideNorway UK

The

NetherlandsRussia

20 March 2017 For information purpose only

5

1975LNG SUPPLY

CONTRACTSONATRACH/DISTRIGAS

ZEEBRUGGE FLUXYS LNG TERMINAL – THE BEGINNING

1975 – oil crisis 1978 – works of peninsula

1987 – start-up of operations

• 3 LNG tanks of 80.000 m³

each

•regas train of 900.000 m³(n)/h

4,5 bcm terminal

April 2017 Non-binding, for information purpose only

KEY ROLE OF ZEEBRUGGE AREA

6

INTERCONNECTOR1998

To Zeebrugge : 20 bcm/y

To UK : 25 bcm/y

ZEEBRUGGE BEACH1998

67 bcm/ynet traded 2016

LNG TERMINAL1987

9 bcm/y

ZEEPIPETERMINAL

1993

15 bcm/y

Zeebrugge area : throughput capacity of ~ 57 bcm/y

= over 10% of border capacity needed to supply Europe

Interconnector pipeline

⇆ United Kingdom

Zeepipe from Norwegian gas fields

Dunkirk-Maldegempipeline

CAPACITY FROM FRANCE

2016

8 bcm/y

20 March 2017 For information purpose only

First capacityenhancement

1 additional tank of 140.000 m³

2nd regas train of 900.000 m³(n)/h

+4.5 bcm/year

7

2004-2008

ZEEBRUGGE CAPACITY DOUBLED

April 2017 Non-binding, for information purpose only

CURRENT LONG TERM CONTRACTUAL SITUATION

(*) Full assignment from QP/ExxonMobil to EDFT

ShipperDuration(years)

Quantity (mt) Slots/y As from

Qatar Petroleum / ExxonMobil * 20 3.3 55 01/04/2007

Eni 20 2.0 33 01/04/2007

Engie 15 1.4 22 01/10/2008

TOTAL 6.7 mt 110

3 Long term capacity contracts (ship-or-pay)

8 April 2017 Non-binding, for information purpose only

4 storage tanks

= 380,000 m³ LNG working storage

= almost at atmospheric pressure

= about 3 standard LNG ships

LNG TERMINALLING PROCESS: LNG CYCLING STORAGE

9

Send-out flow rate: 19.67 GWh/h = a standard LNG ship in about 2 days

11 Submerged Combustion Vaporizers

1 CHP plant

1 Open Rack Vaporizer (ORV)

Recondensor + compressors for BOG

April 2017 Non-binding, for information purpose only

2008: FIRST RELOADING OF BIG LNG VESSEL

MAY 2010: A LARGE IMPORT TERMINAL LOADING A SMALL LNG VESSEL, A FIRST IN

EUROPE

Coral Methane: loading capacity of 7,500 m3 LNG

Fluxys 05.201010 April 2017 Non-binding, for information purpose only

FIRST IMPORT TERMINAL TO START SHIP LOADING: 2008

64 5

10

2421

19

1114

1 1

1721

0

10

20

30

2008 2009 2010 2011 2012 2013 2014 2015 2016

Ship loadings

Large loadings Small loadings

11 April 2017 Non-binding, for information purpose only

SINCE 2008: A LNG HUB FOR NW EUROPE

2008

2008

Developing the terminal as a

versatile tool for our clients

Optimum

LNG reception

flexibility Optimum

destination

flexibility

Reload LNG:

ships and

tanker trucks

Pipe gas

throughout

NW Europe

12 April 2017 Non-binding, for information purpose only

LNG TRUCK LOADING:

A PREMIUM SMALL SCALE DESTINATION FOR LNG

• Since 2010, Fluxys loads LNG trucks for third parties (operationsstarted in 1995)

• Currently loading > 100 trucks /month19 active truck loadingcompanies

• Capacity of 4 000 loadings/year

• 24/7, online day-ahead scheduling

• Industrial sites without pipe gas >50%

• LNG refuelling stations <40%

• LNG as fuel for shipping <10%

• Destinations: Belgium, UK, France, Germany, the Netherlands, Poland, Switzerland, Sweden, Norway, Italy

13 April 2017 Non-binding, for information purpose only

APPLICATIONS OF TRUCK LOADING: BUNKERING OF SHIPS,

FEEDING OF LNG TRUCK REFUELLING STATION

14

Bunkering of Argonon in Port of AntwerpBunkering of first LNG-fuelled tugboat M/T

Borgoy in Port of Zeebrugge

FIRST LNG REFUELLING STATION OWNED

AND BUILT BY FLUXYS IN BELGIUM IN 2014

PARTNERSHIP WITH HAULAGE COMPANY

MATTHEEUWS

April 2017 Non-binding, for information purpose only

SINCE 2010: DIVERSIFYING THE ZEEBRUGGE TERMINAL

INTO A HUB FOR SMALL-SCALE LNG

15

Source: European Space Agency – Nitrogen oxide levels over Europe

-

1.0

2.0

3.0

4.0

5.0

2008 2010 2012 2014 2016 2018 2020 2022 2024

Max % sulphur in ship

SECA AREAS FROM 2015+ future ECAs

NOx LEVELS IN EUROPE

2021: NECA area Baltic & North Sea

April 2017 Non-binding, for information purpose only

SMALL SCALE @ ZEEBRUGGE - MARITIME

Engie, NYK, Mitsubishi Corporation and

Fluxys have built an LNG bunkering

vessel:

• 5 000 m³ LNG

• Will be operating in Zeebrugge

2017 – Q2

• Shall bunker UECC United

European Car Carrier 2 dual

fuelled ships in SECA

• 01-07-2014 ENGIE – “Her home

port will be Zeebrugge where

ENGIE has already secured long

term access rights in the Fluxys

LNG terminal.“

• The bunkering vessel will be

operated by Marine LNG

Zeebrugge (Engie, NYK,

Mitsubishi Corporation) and

will supply a range of end-

customers.

Picture: courtesey of Engie, Mitsubishi Corporation, NYK and Fluxys

Picture: courtesey of UECC and NYK

April 2017 Non-binding, for information purpose only

2ND JETTY ABLE TO LOAD SMALL LNG BUNKER

BARGES IN ZEEBRUGGE

17

Second jetty in operation since 01/01/2017

• Reception of LNG carriers with capacity as small as 2 000 m³ LNG up to Q-flex size

• Unloading and loading two ships simultaneously

• Ship-jetty-ship transfers

April 2017 Non-binding, for information purpose only

18

2ND JETTY READY FOR SMALL SHIPS WITH INFRASTRUCTURE

FOR (VERY) BIG AND (VERY) SMALL SHIPS

April 2017 Non-binding, for information purpose only

2ND JETTY : START OF COMMERCIAL OPERATIONS

01/01/2017

19

Coral Energy

(15.600 m³) at

2nd Jetty

Milaha Qatar

(145.000 m³) at

2nd Jetty

April 2017 Non-binding, for information purpose only

20

• Yamal Trade - Fluxys LNG:

20y capacity agreement for up to 8 mt/y LNG

transshipment services at LNG terminal in

Zeebrugge.

ZEEBRUGGE

Winter route

Summer route

South

America

SABETTA

LNG Market

ZEEBRUGGE LT-CONTRACT TRANSSHIPMENTS

YAMAL LNG

April 2017 Non-binding, for information purpose only

ZEEBRUGGE LT-CONTRACT TRANSSHIPMENTS

YAMAL TRADE

• Investment in 5th storage tank and process installations:

» ship-to-ship transshipments (jetties available, battery of compressors

being added for Boil Off Gas management)

» ship-storage-ship transshipments – tank of 180.000 m³, high flow loading

pumps (10.000 m³/h)

21

5th storage tank

Additional process installations

April 2017 Non-binding, for information purpose only

Non-binding, for information purpose only22

CONSTRUCTION OF PIT 2015/2016

Dome plates

assembly

23

April

2017

POSSIBLE FUTURE DEVELOPMENTS

24

Current infrastructure

Possible

new infrastructure

- Small Scale

- Large Scale

OUTSIDE OF ZEEBRUGGE: analysing needs & possibilities to

invest further in LNG infrastructure, small scale or big scale, in

or outside EUROPE

April 2017 Non-binding, for information purpose only

CONCLUSION: NW EUROPE’S RUBIK’S CUBE FOR SMALL

AND LARGE SCALE LNG

2008

2008Further developing the terminal as a

versatile tool for our clients, including

• Polyvalent 2nd Jetty

• Very small scale LNG

• Ship to ship

• Transshipment

Optimum

LNG reception

flexibility

Optimum

destination

flexibility

Reload LNG:

ships and

tanker trucks

Pipe gas

throughout

NW Europe

25

2016

April 2017 Non-binding, for information purpose only

26

Q&A