Developing an Integrated Urban Model for a Small to Medium Sized MPO Michael J. Clay, Ph.D. &...
-
Upload
godwin-harris -
Category
Documents
-
view
214 -
download
0
Transcript of Developing an Integrated Urban Model for a Small to Medium Sized MPO Michael J. Clay, Ph.D. &...
Developing an Integrated Developing an Integrated Urban Model for a Small Urban Model for a Small to Medium Sized MPOto Medium Sized MPO
Michael J. Clay, Ph.D. &Michael J. Clay, Ph.D. &Kimberly Mullins, Graduate StudentKimberly Mullins, Graduate Student
Community Planning ProgramCommunity Planning ProgramAuburn UniversityAuburn University
22
TransportationTransportationPlanningPlanningProcessProcess
Requires “land use” Requires “land use” forecastforecast
No method is No method is without significant without significant efforteffort
Current method Current method uses information but uses information but does not return any does not return any informationinformation
Image from the ITE’s Transportation Planning Handbook, pg.97
33
Planning ContextPlanning Context
““There is a dynamic relationship between There is a dynamic relationship between transportation and land use, as each transportation and land use, as each influences the other.” influences the other.” (ITE, Transportation Planning (ITE, Transportation Planning Handbook, 2Handbook, 2ndnd Edition, pg. 399) Edition, pg. 399)
44
Planning ContextPlanning Context
55
Integrated Models in Use or Integrated Models in Use or DevelopmentDevelopment
Salt Lake City, UTSalt Lake City, UT
Sacramento, CASacramento, CA
Portland, ORPortland, OR
Seattle, WASeattle, WA
Denver, CODenver, CO
Houston, TXHouston, TX
Dallas, TXDallas, TX
San Antonio, TXSan Antonio, TX
Detroit, MIDetroit, MI
Baltimore, MDBaltimore, MD
Phoenix, AZPhoenix, AZ
Ohio DOTOhio DOT
Oregon DOTOregon DOT
California DOTCalifornia DOT
Montgomery, ALMontgomery, AL
66
Integrated Models: What are they?Integrated Models: What are they?
77
Economic and land use choices of Economic and land use choices of interestinterest
LEVEL 1: Location choice
LEVEL 2: Technology Choice
LEVEL 3: Buying & Selling Exchange Choice
Exchange locations
88
Land Use OutputsLand Use Outputs
99
Case StudyCase Study
Montgomery, Alabama MPOMontgomery, Alabama MPO Montgomery, Autauga, Elmore CountiesMontgomery, Autauga, Elmore Counties
Population: 333,000Population: 333,000 58% White, 42% Black58% White, 42% Black 2.5 Average Household Size2.5 Average Household Size $38,000 Median family income$38,000 Median family income
Metropolitan Planning OrganizationMetropolitan Planning Organization One full-time transportation plannerOne full-time transportation planner Budget: $400,000 annuallyBudget: $400,000 annually Existing, 3-step Travel Demand ModelExisting, 3-step Travel Demand Model Some GIS data already createdSome GIS data already created
*
Study Area
Alabama
1010
Basics of the StudyBasics of the Study
Funding: Funding: MPO has put up $150,000 for the first yearMPO has put up $150,000 for the first year Auburn University has put up $50,000 of “in kind” Auburn University has put up $50,000 of “in kind”
contributioncontribution
ScheduleSchedule Estimated 2 to 3 years to finish the projectEstimated 2 to 3 years to finish the project Year 1 will produce a prototype, demonstration model Year 1 will produce a prototype, demonstration model
calibrated with local datacalibrated with local data Year 2 will further improve the data and model Year 2 will further improve the data and model
calibrationcalibration Year 3 will develop a graphic user interface (GUI) for Year 3 will develop a graphic user interface (GUI) for
the PECAS model the PECAS model
1111
MethodsMethods
Gathered informationGathered information GIS FilesGIS Files
TAZ boundaryTAZ boundary ZoningZoning Land useLand use Transportation NetworkTransportation Network MPO Boundary MPO Boundary Municipal BoundariesMunicipal Boundaries Employment CentersEmployment Centers ParksParks Airport locationsAirport locations Building FootprintsBuilding Footprints Retail EmploymentRetail Employment Rivers/Lakes/StreamsRivers/Lakes/Streams School locationsSchool locations
Data FilesData Files
Census Transportation Census Transportation Planning Package Planning Package (CTPP)(CTPP)
InfoUSA Employment InfoUSA Employment InformationInformation
Building Permit dataBuilding Permit data PUMS dataPUMS data Rent Prices by type by Rent Prices by type by
zonezone
1212
GIS Data Autauga
Elmore
Montgomery
1313
Progress to DateProgress to Date
Currently we have an operational Activity Currently we have an operational Activity Allocation Model integrated with the Space Allocation Model integrated with the Space Development ModelDevelopment Model
Integration with travel demand model is Integration with travel demand model is currently done by hand—soon to be currently done by hand—soon to be automatedautomated
Current model runs from base year of Current model runs from base year of 2000 to 20102000 to 2010
1414
Future StepsFuture Steps
Further calibrate the model with better Further calibrate the model with better data—data improvements are on-goingdata—data improvements are on-goingAutomate integration between PECAS and Automate integration between PECAS and MPO travel demand modelMPO travel demand modelHold developer conference to get actual Hold developer conference to get actual building cost data—currently have decent building cost data—currently have decent estimates from building professionalsestimates from building professionalsCreate a mode share model for the local Create a mode share model for the local travel demand modeltravel demand model
Thank youThank you