DEVELOPER APPLICABLE CODES MAVREK …chicago47.org/.../2322-W-Lawrence-4805...plan-8-16.pdf ·...
Transcript of DEVELOPER APPLICABLE CODES MAVREK …chicago47.org/.../2322-W-Lawrence-4805...plan-8-16.pdf ·...
DRAWING INDEXA0.1 CODE MATRIX AND DRAWING INDEX
GROUND FLOOR PLANA1.1
SITE PLAN AND DETAILSA0.2
SECOND FLOOR PLANA1.2CODE MATRIXISSUEITEM
N/A
REQUIREMENT
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
REQUIREMENT
ORDINANCE
B3-2
22,651 SQ.FT.
50'-0"
ARTICLE
CHAPTER/
CZO TITLE 17
2.2
9
0
ACTUAL
22,646 SQ FT
13
SEE SITE PLAN
4 FLOORS/44'-10"
2.95
0
N/A
NA
AGENCY/
TEST NO.
LOCATION/
SHEET NO.
REMARKS
A1.0-A1.5
A1.0
A1.0-A1.5
A1.0
A0.2
A1.1-A1.4
A0.2
A0.2
A0.2
A0.2
A0.2
GUARANTEE THE ACCURACY AND COMPLETENESS OF THE WORK
OR RECOMMENDATIONS, SHALL BECOME THE RESPONSIBILITY OF THE PARTIESOF THE ARCHITECT, OR IN CONTRADICTION TO THE ARCHITECT'S WORK
ARCHITECT'S STATEMENT & SEAL
RESPONSIBLE FOR TAKEN ACTION NOT THE ARCHITECT
OF SUCH FAILURES. ACTIONS TAKEN WITHOUT KNOWLEDGE AND CONSENTTHE ARCHITECT FROM ANY RESPONSIBILITY FOR THE CONSEQUENCESNOTIFY THE ARCHITECT OF SUCH CONDITIONS SHALL ABSOLVETO STEPS NECESSARY TO RESOLVE THEM. FAILURE TO PROMPTLYPROMPTLY NOTIFIED SO THAT HE MAY HAVE THE OPPORTUNITYTO EXIST WITHIN THE WORK PRODUCT, THE ARCHITECT SHALL BEIF ANY MISTAKES, OMISSIONS, OR DISCREPANCIES ARE FOUNDPRODUCT THEREIN BEYOND A REASONABLE DILIGENCE.
THE ARCHITECT AND HIS CONSULTANTS DO NOT WARRANT OR
ARCHITECTS WORK PRODUCTLIMITATION OF WARRANTY OF
EXTERIOR ELEVATIONS
EXTERIOR ELEVATIONS
A2.1
A2.2
WALL SECTIONS AND DETAILS
10,296.25 SQ.FT.
A3.1 WALL SECTIONS AND DETAILS
B3-2
2016 CHICAGO BUILDING CODE
ENERGY CONSERVATION STATEMENT
APPLICABLE CODES
2016 CHICAGO BUILDING CODE
2016 CHICAGO ZONING ORDINANCE
2016 CHICAGO BUILDING CODE
MECHANICAL
ELECTRICAL
ZONING
BUILDINGLANDSCAPE
2016 CHICAGO BUILDING CODE
ACCESSIBILITY
2016 CHICAGO BUILDING CODEPLUMBING
CBC CH. 18-11 & ICC/ANSI 117.1 (2003)
THIRD FLOOR PLANA1.3
B3-2
A1.0-A1.5
A1.0-A1.5
A1.0-A1.5
A1.0-A1.5, A3.4A1.1-A1.5,A3.4
A1.0-A1.5
A1.4 FOURTH FLOOR PLAN
EXTERIOR ELEVATIONSA2.3
EXTERIOR ELEVATIONSA2.4
A1.5 ROOF PLAN
NOTES AND DETAILSA1.0
A3.2 WALL SECTIONS AND DETAILS
ACCESSIBILITY NOTES AND DIAGRAMSA0.3
A0.4 ACCESSIBILITY NOTES AND DIAGRAMS
A0.5
A0.6
A4.1 PARTITION DETAILS AND FIRE RATING DETAILS
S1.0 STRUCTURAL NOTES & SCHEDULES
S1.1
S1.2
S1.3
S1.4
S1.5
S1.6
S1.7
S1.8
S1.9
S1.10
FOUNDATION PLAN
FOUNDATION DETAILS
FRAMING PLANS
FRAMING PLANS
FRAMING PLANS
FRAMING PLANS
FRAMING PLANS
FRAMING PLANS
FRAMING SECTIONS
MASONRY FRAME ELEVATIONS AND FRAMING SECTIONS
E0.1 ELECTRICAL STANDARD NOTES, SPECIFICATIONS AND LEGEND
E0.2 ELECTRICAL RISER DIAGRAMS
E0.3 ELECTRICAL PANEL SCHEDULES, LOAD CALCULATIONS AND DETAILS
E1.0 GROUND FLOOR ELECTRICAL PLAN
E2.0 SECOND FLOOR ELECTRICAL PLAN
E3.0 THIRD FLOOR ELECTRICAL PLAN
E4.0 FOURTH FLOOR ELECTRICAL PLAN
E5.0 ROOF ELECTRICAL PLAN
M0.1 MECHANICAL STANDARD NOTES, SPECIFICATIONS AND LEGEND
M0.2 MECHANICAL SCHEDULES
M1.0 GROUND FLOOR MECHANICAL PLAN
M1.1 GROUND FLOOR IN SLAB MECHANICAL PLAN
M2.0 SECOND FLOOR MECHANICAL PLAN
M3.0 THIRD FLOOR MECHANICAL PLAN
M4.0 FOURTH FLOOR MECHANICAL PLAN
M5.0 ROOF MECHANICAL PLAN
P0.1 PLUMBING STANDARD NOTES, SPECIFICATIONS AND LEGEND
P1.0 UNDERGROUND PLUMBING PLAN
P1.1 ABOVE FLOOR PLUMBING PLAN
P2.0 SECOND FLOOR PLUMBING PLAN
P3.0 THIRD FLOOR PLUMBING PLAN
P4.0 FOURTH FLOOR PLUMBING PLAN
P5.0 ROOF PLUMBING PLAN
P6.0 PLUMBING RISER DIAGRAMS
824 W. SUPERIOR STREET, SUITE 203CHICAGO, IL 60642PH. 312-624-9820
NLP CONCEPTS, LLC
STRUCTURAL ENGINEER
FAX: [email protected]
A3.3 WALL SECTIONS AND DETAILS
A3.4 STAIR SECTIONS AND DETAILS
A1.1-A1.4, A2.1-A3.3
A1.1-A1.4, A2.1-A3.3
A1.1-A1.4, A2.1-A3.3, A4.1
A1.1, A4.1
A1.1-A1.4, A2.1-A3.3, A4.1
A1.1-A1.4, A2.1-A3.3, A4.1
A1.1-A1.4, A2.1-A3.3, A4.1
A1.1-A1.4, A2.1-A3.3, A4.1
A1.1-A1.4, A2.1-A3.3, A4.1
A1.1-A1.4, A2.1-A3.3, A4.1
UL- X528, X790,X661, U305
UL- X528, X790,X661, U305
UL- L563, N791
UL- L563, N791
UL- U902
UL- U902
UL- L556, L563
UL- P922
UL- U902
UL- U905/ U906
WP 5520
N/A
N/A
A1.0-A1.5
1349 W. BELMONT, SUITE 1ECHICAGO, IL 60657PH. 773-633-6665
MAVREK DEVELOPMENT
DEVELOPER
FAX: 773-681-7018
A1.6 EXIT/TRAVEL DISTANCE PLAN & AREA SEPARATION PLAN
A0.6 FHAA NOTES AND DIAGRAMS
ACCESSIBILITY NOTES AND DIAGRAMS
ACCESSIBILITY NOTES AND DIAGRAMS
A0.2
10,296.25 SQ.FT.
CHRISTOPHER G.BOEHM
001-010130
CHRISTOPHER G.BOEHM
001-010130
design studio
IIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIII
IIIIII
CHRISTOPHER G.BOEHM
001-010130
NEW 9 UNIT MASONRYBUILDING W/ GROUND FLOOR
COMMERCIAL ANDATTACHED PARKING
4805 N. CLAREMONT (RESIDENTIAL)2322,2324,2318 W. LAWRENCE
(COMMERCIAL)CHICAGO, IL
ABOVE
BELOW
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
DUMPSTER
DUMPSTER
UTILITY
ABOVE
ABOVE
ABOVEABOVE
CON
C.W
HEEL
STOP
CON
C.W
HEEL
STOP
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
6'-0" HIGH TREATED WD. FENCE
6'-0" HIGH TREATED WD. GATE 6'-0" HIGH TREATED WD. GATE
PITCHDOWN
PITC
HDO
WN
PITCHDOWN
PITC
HDO
WN
UL#
U902
4HR
UL#U902 4HR
UL#U902 4HR
UL#U902 4HR
UL#U902 4HR
UL#U902 4HR
FODM2B
M4B
M4B
M4B
M4B
M4B
FODM2B
FOA
FOAFOA
FOA
FOA
FOA
FOAFOA
M4B
D2
D2
D2
G1A
FODM2B
FODM2B
FOBM2B
FOAM4B
UL#
U902
4HR
ABOVE
G1A
61'-0
"
8'-0"
UP22
R
UP24
R
21'-0
"16
'-0"
21'-8
"2'
-4"
4'-4
"11
'-0"
5'-0
"14
'-0"
5'-0
"11
'-0"
2'-0
"
2'-4
"15
'-0"
2'-4
"15
'-4"
2'-4
"15
'-0"
2'-4
"2'
-0"
2'-0
"1'
-4"
1'-4
"8'
-513 16
"1'
-4"
4'-2
3 16"
2'-0
"
4'-8
"10
'-63 16
"52
'-4"
5'-0"6'-0"3'-4"6'-0"38'-0"20'-0"34'-0"
3'-8
"6'
-4"
10'-0
"
4'-4
"1'
-8"
6'-0
"
29'-8"28'-8"
34'-0"
58'-4"54'-0"
1'-4"
23'-2 316" 2'-4" 8'-91316" 2'-4" 25'-6 3
16" 2'-4"
2'-6" 6'-4" 2'-6"
2'-4" 2'-0" 10'-8" 1'-4" 10'-8" 2'-0" 2'-4" 1'-4" 2'-0" 1'-4" 8'-51316" 1'-4"
4'-8"2'-4"26'-8"2'-4"11'-4"2'-4"62'-2 316"
33'-0"
2'-10
"
6'-4"
2'-10
"
9'-91316"
9'-9
13 16"
8'-0" 8'-6" 8'-6" 8'-0" 1'-0" 11" 8'-2" 5'-7" 5" 3'-10" 8"
4'-2" 10" 5'-2" 8" 32'-9" 1'-3" 9'-4"
4"
9'-6" 9'-0" 9'-6"
8'-6" 8'-0" 8'-0" 8'-6" 1'-0" 11'-0" 5'-0" 5'-0" 7'-0"
5'-0
"8"
5'-4
"8"
18'-0
"23
'-0"
18'-0
"
18'-4
1 8"22
'-73 4"
18'-0
1 8"
8"8'
-7"
1'-0
"
8'-0" 8" 10'-8" 8" 3'-10" 10" 47'-3"
6'-8" 8"
18'-0
"23
'-0"
18'-0
"
1'-0
"1'
-0"
8"5'
-8"
8'-0
"1'
-0"
4'-4" 8" 7'-0" 10"
3'-4
"1'
-3"
4'-3
"5"
4'-8
"10
"3'
-11"
10"
5'-0
"
10"
8'-6
"10
"
10" 6'-4"
9'-0
"8"
STAIR 1
STAIR 2
ELEVATOR
A
B
C
D
E
A.7
A.4
E
A
1 2 3 4 5 6 7 8 9
RAM
PDN
1:12
1'-0
"8'
-0"
1'-0
"6"
6.75.6
4'-7
"4'
-10"
4" 3'-10"
6'-0
"
10'-1
"4'
-0"
3'-10"
3'-5
"6"6"
10'-9
"
1'-4
"
1'-4
"
2'-7" 5" 4'-414"
RESTROOM
11 CAR GARAGE
ENTRY VESTIBULE
GARAGE VESTIBULE
COORIDOOR 100
RETAIL SPACEUNIT 101
ELECTRICAL ROOM
RAM
PUP
1:12
1'-6
"2'
-0"
1'-0
"1'
-0"
5'-9" 7"
7'-2
"5"
3 BIKE RACK
TRASH ENCLOSURE
1 2 3 4
5 6 7 8 9 10 11
PARKING
18'-4" 8" 7'-0" 8" 9'-4
"4'
-0"
2'-0
"
14'-8
"8"
ELECTRICAL METERS
PHONE/CABLE
DSDS
DS
DS
DS
DS
DS
DSDS
DS
DS DS
35'-8"
LANDSCAPE STONE
SEE A0.5
PITCH
ABOVETHROUGHOUT GARAGE
BELOW
SEE A0.4
THROUGHOUT RETAILTHROUGHOUT COORIDOOR
SEE SHEETS A0.3, A0.4, A0.5 FOR ACCESSIBILITY DIAGRAMS
KEY NOTES01 STUD PARTITION / DEMISING WALL RE: WALL TYPES SHEET A4.102 CMU PARTITION. RE: WALL TYPES SHEET A4.103 MASONRY TRASH ENCLOSURE W/ 48" OPAQUE LOCKABLE GATE
RE: 6/A3.2, 1/A0.204 RECESSED FIRE RATED CABINET AND EXTINGUISHER05 NON-COMBUSTIBLE METAL STAIRS W/ 36" HAND RAILS/ 42" HIGH
GUARDRAILS (PICKETS 4" O.C. MAX)TO RESIST A SIMULTANEOUSVERT. AND HORIZ.THRUST OF 50 PLF LOAD OR 200#CONCENTRATED LOAD AT TOP RAIL, WHICHEVER IS GREATER RE:STAIR SHEET A3.4 & A0.4
06 STEEL DECK W/ TREATED WOOD DECKING RE: FRAMING PLANS07 LOWER CEILING FOR MECHANICALS08 BUILT UP CANT, PITCH 1/4" PER FT.09 THRU WALL ALUMINUM SCUPPER AND DOWN SPOUT10 STONE COPING, RAKE AND CAULK ALL JOINTS11 ALUMINUM. STOREFRONT W/ 1" INSUL. AND TEMP. GLAZING12 ALL GARAGE STRIPING TO BE TRAFFIC YELLOW CONCRETE PAINT 4"
WIDE13 FRAMED PLATFORM WITH 3/4" PLYWOOD ABOVE SEE 6 & 7 ON A3.314 3x3x5/16x 48" HIGH ANGLE BOLTED TO MASONRY- PAINT YELLOW
15 EJECTOR IN ELEVATOR PIT. VERIFY LOCATION W/ ELEVATORMANUFACTURER RE: PLUMBING SHEETS
16 PROVIDE FLOOR MOUNTED RACK FOR BIKE PARKING17 FLOOR DRAIN. RE: PLUMBING SHEETS18 RESERVED HANDICAPPED PARKING SIGN CENTERED ON 11'-0"
PARKING SPACE SEE A0.319 MOP BASIN WITH HOT WATER HEATER MOUNTED ABOVE RE:
PLUMBING SHEETS20 TELEPHONE EQUIPMENT MOUNTED TO PLYWOOD RE: ELECTRICAL21 TRIPLE GREASE SEPARATOR. RE: PLUMBING SHEETS22 GARAGE OIL INTERCEPTION BASIN. RE: PLUMBING SHEETS23 FROST PROOF HOSE BIB, SHUT OFF VALVE MUST BE LOCATED OUT
PAST WALL FINISH RE: PLUMBING SHEETS24 GAS METERS RE: MECHANICAL SHEETS25 ELECTRICAL PANELS/EQUIPMENT RE: ELECTRICAL SHEETS26 WATER BOOSTER PUMP WITH METER RE:PLUMBING SHEETS27 FRONT LOADED MAIL BOXES RE:A0.3 FOR MOUNTING HEIGHT28 ROUND CONC. AT BASE OF COLUMN29 ELEVATOR SERVICE LADDER TO PIT, VERIFY LOCATION W/
MANUFACTURER
30 42" HIGH METAL GUARDRAILS (PICKETS 4" O.C. MAX) TO RESIST ASIMULTANEOUS VERT. AND HORIZ. THRUST OF 50 PLF LOAD OR200# CONCENTRATED LOAD AT TOP RAIL, WHICHEVER IS GREATER
31 STEEL COLUMN RE: STRUCTURAL DRAWINGS3233 SHINDLER MRL 3300 ELEVATOR, S.S. CAB WALLS, S.S. CAB
RETURNS AND TRANSOM, S.S. 1 1/2 HOUR RATED 'B' LABEL DOOR,ALUM THRESHOLD, PAINTED SILVER CAB CEILING W/ CFL LIGHTINGG.C. TO VERIFY ALL ELEVATOR REQUIREMENTS- HOISTWAY AND PITSIZE, OVERRUN HEIGHT, HEATERS VENTS, OPENINGS, ETC.
34 ROD AND SHELF35 LINE UPPER CABINETS PROVIDE BLOCKING IN WALL36 RECESSED GREY BOX FOR WASHER PROVIDE FIRE RATED BOX TO
MATCH WALL RATING IT IS INSTALLED IN RE: PLUMBING SHEETS37 FURNACE/UNIT HEATER SUSPENDED RE: MECHANICAL SHEETS38 DRIP PAN UNDER HOT WATER HEATER39 CLEAR SPACE REQUIRED RE: SHEETS A0.2, A0.640 12" GRANITE COUNTER OVERHANG41 MECHANICAL / PLUMBING CHASE. RE: MECHANICAL/PLUMBING
SHEETS42 PROVIDE WASHER DRIP PAN
43 AIR CONDENSERS ON LEVEL PADS RE: MECHANICAL SHEETS44 CONCRETE SLAB RE: STRUCTURAL45 ALUMINUM COPING46 TENANT TELEPHONE ENTRY BUZZER SYSTEM (SURFACE MOUNT)
TIE TO ELECTRIC STRIKE AT MAIN DOOR & EACH UNIT47 1 HR GYPSUM BOARD CEILING RE: 1/A4.1 & 3/A4.1, A3.1,A3.2,A3.348 4 HR SPRAY COLUMN COLUMN ENCLOSURE RE: 7/A4.149 1 HR SPRAY COLUMN COLUMN ENCLOSURE RE: 6/A4.150 1 HR GYPSUM BOARD COLUMN ENCLOSURE RE: 8/A4.151 4 HR SPRAY BEAM ENCLOSURE RE: 5/A4.152 1 HR SPRAY BEAM ENCLOSURE RE: 4/A4.153 4 HR CEILING RE:4/A4.1 & 5/A4.1M, 1/A3.4, 2/A3.4, 4/A3.454 2 HR GYPSUM BOARD CEILING RE: 2/A4.155 5/4" FIRE RETARDANT TREATED EXTERIOR WOOD DECKING
MEETING ASTM D-2898 OVER FIRE RETARDANT TREATED TAPEREDSLEEPERS ALL DECK LUMBER MUST MEET ASTM E-84 EXTENDED 30MINUTE TEST AND ASTM D-2898 (15-12-040-F). ALL TREATMENTSMUST BE PRESSURE IMPREGNATED OR MANUFACTURED INTO THEPRODUCT HOMOGENEOUSLY THROUGHOUT THE PRODUCT, NOSURFACE OR FIELD APPLIED TREATMENTS PERMITTED
56 42" HIGH FIRE RETARDANT TREATED WOOD GUARDRAIL(PICKETS 4" O.C. MAX), 4x4 POSTS @ 5'-0" O.C. TO RESIST ASIMULTANEOUS VERT. AND HORIZ. THRUST OF 50 PLF LOAD OR200# CONCENTRATED LOAD AT TOP RAIL, WHICHEVER IS GREATER
57 PARAPET WALL TO ACT AS DECK GUARDRAIL58 CONCRETE RAMP (1:12 SLOPE) W/ 36" RAILING BOTH SIDES OF
RAMP RE: SHEETS A0.359 BUILT UP WOOD RAMP (1:12 SLOPE) W/ 36" RAILING BOTH SIDES
OF RAMP RE: SHEETS A0.360 LINE OF DROPPED CEILING/SOFFIT RE: MECHANICAL SHEETS61 PROVIDE SOLID BLOCKING AND BACKING FOR WALL MOUNTED
EQUIPMENT62 STEAM UNIT WITH FLOOR DRAIN RE: PLUMBING SHEETS63 30"X48" AREA OF RESCUE ASSISTANCE64 1/2" MAX DIFFERENCE IN LEVEL CHANGE SEE A0.365 HARDWOOD THRESHOLD 2:1 BEVEL SEE A0.366 MODIFIED BITUMEN CLASS 'A' ROOFING MEMBRANE67 STEEL CANOPY PAINTED BLACK RE: 3/A3.368 CAST IN PLACE CONCRETE BALCONY69 FRAMELESS SHOWER ENCLOSURE
70 FEATHER CONCRETE TO MAINTAIN 1/2" MAX LEVEL CHANGE ATDOOR
71 ALUMINUM SOFFIT PANEL ABOVE -COLOR TO MATCH STOREFRONT72 GRANITE COUNTER WITH 6" SIDE/BACK SPLASH AT LAUNDRY73 GRANITE COUNTER WITH FULL HEIGHT MIRROR AT BATH74 GRANITE COUNTER WITH TILE BACK SPLASH AT KITCHEN75 PAINT CMU76 SOFFIT ABOVE77 TILE SURROUND UP TO CEILING78 TILE SURROUND AND CEILING ON WATERPROOF MEMBRANE
SHOWER FLOOR TO HAVE 2% CROSS SLOPE MAX79 MECHANICAL/PLUMBING PENETRATIONS RE: MECHANICAL &
PLUMBING PLANS80 ELEVATOR OVERRUN WITH CLASS 'A' ROOFING MEMBRANE81 CARPENTER BUILD STAIR AND LANDING W/ 36" HIGH WOOD RAILING
42" HIGH WOOD GUARDRAIL (PICKETS 4" O.C. MAX), 4X4 POSTS @5'-0" O.C. TO RESIST A SIMULTANEOUS VERT. AND HORIZ. THRUST OF50 PLF LOAD OR 200# CONCENTRATED LOAD AT TOP RAIL,WHICHEVER IS GREATER.ALL MATERIAL TO BE FIRE RETARDANT TREATED WOOD
design studio
IIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIII
IIIIII
CHRISTOPHER G.BOEHM
001-010130
NEW 9 UNIT MASONRYBUILDING W/ GROUND FLOOR
COMMERCIAL ANDATTACHED PARKING
4805 N. CLAREMONT (RESIDENTIAL)2322,2324,2318 W. LAWRENCE
(COMMERCIAL)CHICAGO, IL
A1.1
GROUND FLOOR PLAN
EL. + 24'-6"
EL. 0'-0"
GRADE LEVEL
THIRD LEVEL
EL. + 35'-6"
FOURTH LEVEL
T/COPING
EL. +52'-0"
B/ CEILING
T/COPING
EL. +59'-8"
11'-4"
B/CA
NOPY
3'-7
"3'
-7"
3'-7
"
8'-2
"
3'-2
"
8'-2
"
3'-2
"
8'-2
"
3'-2
"
10'-0
"
2'-4
"
8'-2
"
2'-2
"
8'-2
"
2'-2
"
EL. + 44'-10"
TEMPGLAZING
TEMPGLAZING
TEMPGLAZING
TEMPGLAZING
1
2
75 COURSES
4
72 COURSES
3
17
5
7
1
3
3
13
3
5
16
11
7
1
28
28
167 8
8
10
20
21
21
14
23
3
2
4
7
231
5 5
21
20
9
12
8
19
20
9
12
8
20
9
12
8
17
8
7
4
8
7
16
1
1
1
1
2
23
26
2626
2631
10
8
10
8
TYP17'-0" TO C.J. 17'-0" TO C.J. 18'-4" TO C.J.
JUNCTION BOX FOR LIGHT FIXTURE, VERIFY LOCATION W/ OWNER, SEE ELECTRICAL.
MASONRY CONTROL JOINT W/ ELASTOMERIC EXT. GRADE SEALANT TO MATCH BRICK
STAINLESS STEEL ADDRESS NUMBERS
ALUMINUM COPING- COLOR TO MATCH WINDOWS
4" STONE COPING, RAKE & CAULK ALL JOINTS
8" HIGH CHAMFERED CAP STONE
UTLITY BRICK
ELEVATION KEYNOTES
ALUMINUM CLAD FASCIA
STONE SILL, PROJECT OUT 1/2", RAKE AND CAULK ALL JOINTS
4" HIGH STONE BAND, RECESS IN 1/2"
16" HIGH STONE
UTILITY BRICK SOLDIER COURSE PROJECT OUT 1/2"
UTILITY BRICK STACK BOND, PROJECT OUT 1/2"
UTILITY BRICK HEADER COURSE PROJECT OUT 1/2"
12x12 STONE MEDALLION
42" HIGH O.I. RAILINGS W/ 3/4" VERT PICKETS @ 4" O.C. TO RESIST 200LB CONCENTRATED LOAD INANY DIRECTION OR RAILINGS TO RESIST 50PLF VERTICAL AND HORIZONTAL LOADING ALONG TOP RAIL
WALL LOUVER SEE MECHANICAL
STONE BASE, (1) 12", (1) 8" AND 4" SILL
12" HIGH STONE HEADER, PROJECT OUT 1"
8" HIGH CHAMFERED STONE BAND/SILL, PROJECT OUT 1", RAKE AND CAULL ALL JOINTS AT SILL
ALUMINUM CLAD COLUMN TO MATCH WINDOW COLOR
12" HIGH STONE
STEEL CANOPY, PAINTED TO MATCH WINDOW COLOR
4" STONE CAP, PROJECT OUT 1"
CAST IN PLACE CONCRETE BALCONY
ALUMINUM SCUPPER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
8" HIGH STONE
ALUMINUM GUTTER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
STEEL FRAMED BALCONY- PAINT BLACK
GAS METER BANK
FROST PROOF SILL COCK
design studio
IIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIII
IIIIII
CHRISTOPHER G.BOEHM
001-010130
NEW 9 UNIT MASONRYBUILDING W/ GROUND FLOOR
COMMERCIAL ANDATTACHED PARKING
4805 N. CLAREMONT (RESIDENTIAL)2322,2324,2318 W. LAWRENCE
(COMMERCIAL)CHICAGO, IL
EL. + 24'-6"
EL. 0'-0"
GRADE LEVEL
THIRD LEVEL
EL. + 35'-6"
FOURTH LEVEL
T/COPING
EL. +52'-0"
B/ CEILING
T/COPING
EL. +17'-0"
T/COPING
EL. +59'-8"
8'-2
"2'
-2"
8'-2
"2'
-2"
11'-4"
B/CA
NOPY
2'-4
"
10'-0
"
3'-6
"3'
-6"
7'-4
"3'
-8"
4'-8
"3'
-8"
T/COPING
EL. +39'-8"
4'-2
"
8'-2
"
4'-2
"
8'-2
"
4'-2
" 8'-2
"
EL. + 44'-10"
TEMPGLAZING
1
2
75 COURSES
4
72 COURSES
3
18
5
7
1
3
3
13
10
8
3
5
10
8
11
1
1
9 181
2
5
7
8 15
4
1
1
8
5
15
20
2
8
20
17
13
7
9
7
4
716
12
1
1
24
22 22 22 22
138 8
10
14
23232323
15
7
1
1 2 3 4
25
26
2626
26
26
26
2631
20'-8" TO C.J. 20'-8" TO C.J. 11'-4" TO C.J. 16'-4" TO C.J.
8
15'-0" TO C.J.
TYP TYP
JUNCTION BOX FOR LIGHT FIXTURE, VERIFY LOCATION W/ OWNER, SEE ELECTRICAL.
MASONRY CONTROL JOINT W/ ELASTOMERIC EXT. GRADE SEALANT TO MATCH BRICK
STAINLESS STEEL ADDRESS NUMBERS
ALUMINUM COPING- COLOR TO MATCH WINDOWS
4" STONE COPING, RAKE & CAULK ALL JOINTS
8" HIGH CHAMFERED CAP STONE
UTLITY BRICK
ELEVATION KEYNOTES
ALUMINUM CLAD FASCIA
STONE SILL, PROJECT OUT 1/2", RAKE AND CAULK ALL JOINTS
4" HIGH STONE BAND, RECESS IN 1/2"
16" HIGH STONE
UTILITY BRICK SOLDIER COURSE PROJECT OUT 1/2"
UTILITY BRICK STACK BOND, PROJECT OUT 1/2"
UTILITY BRICK HEADER COURSE PROJECT OUT 1/2"
12x12 STONE MEDALLION
42" HIGH O.I. RAILINGS W/ 3/4" VERT PICKETS @ 4" O.C. TO RESIST 200LB CONCENTRATED LOAD INANY DIRECTION OR RAILINGS TO RESIST 50PLF VERTICAL AND HORIZONTAL LOADING ALONG TOP RAIL
WALL LOUVER SEE MECHANICAL
STONE BASE, (1) 12", (1) 8" AND 4" SILL
12" HIGH STONE HEADER, PROJECT OUT 1"
8" HIGH CHAMFERED STONE BAND/SILL, PROJECT OUT 1", RAKE AND CAULL ALL JOINTS AT SILL
ALUMINUM CLAD COLUMN TO MATCH WINDOW COLOR
12" HIGH STONE
STEEL CANOPY, PAINTED TO MATCH WINDOW COLOR
4" STONE CAP, PROJECT OUT 1"
CAST IN PLACE CONCRETE BALCONY
ALUMINUM SCUPPER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
8" HIGH STONE
ALUMINUM GUTTER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
STEEL FRAMED BALCONY- PAINT BLACK
GAS METER BANK
FROST PROOF SILL COCK
design studio
IIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIII
IIIIII
CHRISTOPHER G.BOEHM
001-010130
NEW 9 UNIT MASONRYBUILDING W/ GROUND FLOOR
COMMERCIAL ANDATTACHED PARKING
4805 N. CLAREMONT (RESIDENTIAL)2322,2324,2318 W. LAWRENCE
(COMMERCIAL)CHICAGO, IL
EL. + 24'-6"
EL. 0'-0"
GRADE LEVEL
THIRD LEVEL
EL. + 35'-6"
FOURTH LEVEL
T/COPING
EL. +52'-0"
EL. + 44'-10"
B/ CEILING
T/COPING
EL. +39'-0"
T/COPING
EL. +17'-0"
T/COPING
EL. +59'-4"
3'-2
"
8'-2
"
3'-2
"
8'-2
"
3'-2
"
8'-2
"
11'-4
"3'
-0"
8'-0
"3'
-0"
8'-0
"3'
-0"
3'-7
"
7'-0
"
10'-0
"
26 1
8
15
15
1
23 23
8
10
14
8
10
14
8
10
14
14
1
1
222222227
7
4
7
2626
5
2
8
1
817
15
20
15
8
1
5
15
7
11
2
7
16 16
16
1
8
30
27
20'-0" TO C.J. 18'-4" TO C.J. 20'-0" TO C.J.
8
JUNCTION BOX FOR LIGHT FIXTURE, VERIFY LOCATION W/ OWNER, SEE ELECTRICAL.
MASONRY CONTROL JOINT W/ ELASTOMERIC EXT. GRADE SEALANT TO MATCH BRICK
STAINLESS STEEL ADDRESS NUMBERS
ALUMINUM COPING- COLOR TO MATCH WINDOWS
4" STONE COPING, RAKE & CAULK ALL JOINTS
8" HIGH CHAMFERED CAP STONE
UTLITY BRICK
ELEVATION KEYNOTES
ALUMINUM CLAD FASCIA
STONE SILL, PROJECT OUT 1/2", RAKE AND CAULK ALL JOINTS
4" HIGH STONE BAND, RECESS IN 1/2"
16" HIGH STONE
UTILITY BRICK SOLDIER COURSE PROJECT OUT 1/2"
UTILITY BRICK STACK BOND, PROJECT OUT 1/2"
UTILITY BRICK HEADER COURSE PROJECT OUT 1/2"
12x12 STONE MEDALLION
42" HIGH O.I. RAILINGS W/ 3/4" VERT PICKETS @ 4" O.C. TO RESIST 200LB CONCENTRATED LOAD INANY DIRECTION OR RAILINGS TO RESIST 50PLF VERTICAL AND HORIZONTAL LOADING ALONG TOP RAIL
WALL LOUVER SEE MECHANICAL
STONE BASE, (1) 12", (1) 8" AND 4" SILL
12" HIGH STONE HEADER, PROJECT OUT 1"
8" HIGH CHAMFERED STONE BAND/SILL, PROJECT OUT 1", RAKE AND CAULL ALL JOINTS AT SILL
ALUMINUM CLAD COLUMN TO MATCH WINDOW COLOR
12" HIGH STONE
STEEL CANOPY, PAINTED TO MATCH WINDOW COLOR
4" STONE CAP, PROJECT OUT 1"
CAST IN PLACE CONCRETE BALCONY
ALUMINUM SCUPPER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
8" HIGH STONE
ALUMINUM GUTTER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
STEEL FRAMED BALCONY- PAINT BLACK
GAS METER BANK
FROST PROOF SILL COCK
design studio
IIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIII
IIIIII
CHRISTOPHER G.BOEHM
001-010130
NEW 9 UNIT MASONRYBUILDING W/ GROUND FLOOR
COMMERCIAL ANDATTACHED PARKING
4805 N. CLAREMONT (RESIDENTIAL)2322,2324,2318 W. LAWRENCE
(COMMERCIAL)CHICAGO, IL
EL. + 24'-6"
EL. 0'-0"
GRADE LEVEL
THIRD LEVEL
EL. + 35'-6"
FOURTH LEVEL
T/COPING
EL. +52'-0"
B/ CEILING
T/COPING
EL. +6'-0"
T/COPING
EL. +59'-8"
8'-2
"
EL. + 44'-10"
4
7
22
1
2
8
15
222222
15
8
8
1
23
1
1
1
1
8
10
14
8'-2
"
3'-2
"
8'-2
"
3'-2
"
8'-2
"
3'-2
"
26 26 26
128
9
1
20'-0" TO C.J.23'-4" TO C.J.18'-4" TO C.J.
JUNCTION BOX FOR LIGHT FIXTURE, VERIFY LOCATION W/ OWNER, SEE ELECTRICAL.
MASONRY CONTROL JOINT W/ ELASTOMERIC EXT. GRADE SEALANT TO MATCH BRICK
STAINLESS STEEL ADDRESS NUMBERS
ALUMINUM COPING- COLOR TO MATCH WINDOWS
4" STONE COPING, RAKE & CAULK ALL JOINTS
8" HIGH CHAMFERED CAP STONE
UTLITY BRICK
ELEVATION KEYNOTES
ALUMINUM CLAD FASCIA
STONE SILL, PROJECT OUT 1/2", RAKE AND CAULK ALL JOINTS
4" HIGH STONE BAND, RECESS IN 1/2"
16" HIGH STONE
UTILITY BRICK SOLDIER COURSE PROJECT OUT 1/2"
UTILITY BRICK STACK BOND, PROJECT OUT 1/2"
UTILITY BRICK HEADER COURSE PROJECT OUT 1/2"
12x12 STONE MEDALLION
42" HIGH O.I. RAILINGS W/ 3/4" VERT PICKETS @ 4" O.C. TO RESIST 200LB CONCENTRATED LOAD INANY DIRECTION OR RAILINGS TO RESIST 50PLF VERTICAL AND HORIZONTAL LOADING ALONG TOP RAIL
WALL LOUVER SEE MECHANICAL
STONE BASE, (1) 12", (1) 8" AND 4" SILL
12" HIGH STONE HEADER, PROJECT OUT 1"
8" HIGH CHAMFERED STONE BAND/SILL, PROJECT OUT 1", RAKE AND CAULL ALL JOINTS AT SILL
ALUMINUM CLAD COLUMN TO MATCH WINDOW COLOR
12" HIGH STONE
STEEL CANOPY, PAINTED TO MATCH WINDOW COLOR
4" STONE CAP, PROJECT OUT 1"
CAST IN PLACE CONCRETE BALCONY
ALUMINUM SCUPPER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
8" HIGH STONE
ALUMINUM GUTTER AND DOWN SPOUT- COLOR TO MATCH WINDOWS
STEEL FRAMED BALCONY- PAINT BLACK
GAS METER BANK
FROST PROOF SILL COCK
design studio
IIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIII
IIIIII
CHRISTOPHER G.BOEHM
001-010130
NEW 9 UNIT MASONRYBUILDING W/ GROUND FLOOR
COMMERCIAL ANDATTACHED PARKING
4805 N. CLAREMONT (RESIDENTIAL)2322,2324,2318 W. LAWRENCE
(COMMERCIAL)CHICAGO, IL