Lake Constance 5D-Conference 2013 Develop 5D in Design & Construction of Outstanding Buildings in Nigeria Markus Rambach 29/10/2013 1

Transcript of Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for...

Page 1: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Develop 5D in Design & Construction of Outstanding Buildings in Nigeria

Markus Rambach

29/10/2013 1

Page 2: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Table of Contents

• Nigeria: „One of the Next-11 Emerging Markets“

• Julius Berger: „More than a Construction Company“

• Our 5D Approach to Design & Construction Projects

• Our Projects Performed with 5D Approach

• On the Way Forward with 5D

29/10/2013 2

Page 3: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Nigeria

• Area: 925,000 km² (2.5 x size of Germany)

1300 km

1100 km

Population: • Largest in Africa (160 million)

• Every sixth African is Nigerian

• Very fast growing

29/10/2013 3

Page 4: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Abundance of Resources Oil Resources

0 50 100 150 200 250 300 350

Nigeria

Libya

UAE

Kuwait

Iraq

Iran

Saudi Arabia

Venezuela

billion Barrel

Source: OPEC

29/10/2013 4

Page 5: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Abundance of Resources Gas Resources

0 500 1000 1500 2000

Nigeria

Venezuela

UAE

United States

Saudi Arabia

Qatar

Iran

Russia

billion Barrel

29/10/2013 5

Source: eia Oil & Gas Journal

Page 6: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

„One of the Next-11 Emerging Markets“

• Economical growth: 7% annually (for 6 years)

• Public revenue: 85% from oil and gas industry

Source: http://en.wikipedia.org/wiki/File:Next_Eleven.svg

29/10/2013 6

Page 7: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Julius Berger: „More than a construction company“

29/10/2013 7

JBI, Germany

JBN, Nigeria

Page 8: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Julius Berger Nigeria Plc.

Quick Facts

• Started business in 1965

• Listed on the Nigerian Stock Exchange since 1991

• Shareholders: 60% Nigerian investors; 40% Bilfinger SE, Germany

• Largest construction company in Nigeria

• Annual turnover: € 900 million

• ISO 9001:2008 certified

29/10/2013 8

Page 9: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Highlights | Buildings

• •

National Assembly, Abuja,

Construction & Facility Services

Central Bank of Nigeria, Lagos

Apartment Tower, Lagos

Petroleum Technology Development

Fund Headquarters, Abuja

Economical & Financial Crime

Commission Headquarters, Abuja

Akwa Ibom Stadium, Uyo

29/10/2013 9

Page 10: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Highlights | Infrastructure

Expressway, Lagos - Badagry

Lekki - Ikoyi Link Bridge, Lagos

Southwest Railway, Ajaokuta – Warri

Circle Road in Central Area, Abuja Roads and Flyovers, Uyo

Discharge Drains, Uyo

29/10/2013 10

Page 11: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Highlights | Industries

LNG Plant, Bonny Island

River Terminal Airstrip, Bonny Island

Babycare Production Plant, Lagos

Gas-to-Liquids Facility, Escravos Cement Plant, Edo State

Sugar Refinery, Port Harcourt

29/10/2013 11

Page 12: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Service Facilities

Asphalt & Concrete Mixing Plants

Port of Warri Tire Reconditioning Workshop

Equipment Repair Shops Quarries

Central Store for Spare Parts etc.

29/10/2013 12

Page 13: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Service Facilities

Concrete Pipes

Roofing Tiles

Hollow Blocks Concrete Pavers

Furniture & Upholstery Aluminum Windows, Doors & Facades

29/10/2013 13

Page 14: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Equipment Total new value of 500 million €

• 2 aeroplanes

• 8 asphalt mixing plants

• 9 crushing & screening plants

• 12 asphalt finishers

• 17 concrete mixing plants

• 47 dumpers

• 53 graders

• 81 dozers

• 147 wheel loaders

• 171 forklifts

• 183 excavators

• 1181 trucks

• 1820 cars

29/10/2013 14

Page 15: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Equipment Total new value of 500 million €

• 1 dredger

• 2 jack-up platforms

• 5 pile-driving rigs rigs

• 13 crawler cranes

• 20 tug boats

• 24 crew, speed & work boats

• 33 barges

• 60 tower cranes

• 101 mobile cranes

• 185 rollers

• 425 generators

29/10/2013 15

Page 16: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Julius Berger International GmbH Quick Facts

Engineering & services provider for JBN:

• Design & engineering

• Project management

• Procurement

• Logistics

• HR recruitment & secondment

29/10/2013 16

Page 17: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Julius Berger International GmbH Quick Facts

• Formed out of Bilfinger Berger Nigeria GmbH (2012)

• Engineering expertise for Nigeria since 1965

• 400 employees in Wiesbaden, Germany

• 200 employees in design & engineering

• Construction experts for: buildings, infrastructure, transportation, oil & gas

• Annual turnover: € 300 million

29/10/2013 17

Page 18: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

DATA MANAGEMENT

5D Process Management

29/10/2013 18

EXPERT SYSTEMS

2D

DR

AW

ING

S

OP

ERA

TIV

E D

ATA

Source: http://www.5d-initiative.eu/mission.php

MODELING

VIEWER

MODELING

VIEWER

EXPERT SYSTEMS

Page 19: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Software Tools for 5D Design

29/10/2013 19

Additional

interfaces

BIM Model iTWO

Architecture

Structural

MEP

Infrastructure

Page 20: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 20

Quantities Scheduling

BoQ Estimating

Lists & Drawings

for

Quantity Take-off

Lists & Drawings

for

Quantity Take-off

Quantities

Inquiries

CAD

Arriba

2D Drawings

& Lists

DESIGN DEPARTMENTS WORK PREPARATION DEPARTMENT

ESTIMATING DEPARTMENT

Page 21: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 21

Element

Planning

Quantities

Scheduling

Simulation

Modification / Detailing of

Elements

BIM Model

P+V

TP

Ext

AV

S+R

KALK

TID

HBS

PL

Quantity

Inspector

BoQ

Inquiries

Cost Estimate

Data Transfer /

Data Check

DESIGN QUANTITIES / ESTIMATE / SCHEDULE

Page 22: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Apartment Tower, Lagos

29/10/2013 22

Construction period

2011- 2014

• 14-storey apartment tower

• 36 apartments

• Spa & gym area

• Basement parking

• 4-storey office building

Page 23: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Apartment Tower, Lagos

29/10/2013 23

Pilot Project

• Model-based structural design tests (Revit 2010)

• Basic development of content

• Quantity take-offs at multiple design changes

• Simulations to optimize time schedule

• Updates on site for further tests

• Tests of cost control with iTWO 2013

• Visualization of performed quantities

Page 24: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 24

Akwa Ibom Stadium, Uyo

Construction period

2012 - 2015

• Multifunctional stadium

(31,200 m² | 30,000 seats)

• VIP area

• Sports park facilities

• Parking lot (2,500 cars & buses)

Page 25: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 25

Akwa Ibom Stadium, Uyo Tender Phase

• Structural design with Revit

• Quantity take-offs with iTWO

Execution Phase

• Detailed structural design with Revit

• Cost controlling with iTWO (“3D”)

• Connection of 4th and 5th dimension

• Invoicing to client

Page 26: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 26

Construction period

2012 - 2015

• 15-storey building

• Offices and apartments

• Total GFA: 32,000 m²

• LEED silver certification

Victoria Island Tower, Lagos

Page 27: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 27

Tender Phase

• Architectural and structural design with Revit

• Quantities and estimate with iTWO

Execution Phase

• Structural, architectural and MEP design with Revit

• Testing of procurement with iTWO

• Controlling with iTWO (“2D”)

• Viewer for site management: ceapoint desite MD

Victoria Island Tower, Lagos

Page 28: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 28

The Jasper ***** Hotel, Abuja

Page 29: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

29/10/2013 29

The Jasper ***** Hotel, Abuja

Approval Design Phase

Structural, architectural and MEP design

with customized content and Revit 2013

Tender Phase

Quantity take-offs and estimate

with iTWO 2013

Page 30: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Implementation of 5D Method Paradigm Change

29/10/2013 30

Processes

Communication

Efficiency Added V

alu

e

Page 31: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Construction Project Processes

29/10/2013 31

Source: 5d-initiave

Page 32: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

What are our next steps?

• Integrate more disciplines:

• MEP (analysis, design, collision checks)

• Infrastructural design

• 4th dimension with equipment and site installation

• Controlling of execution of construction

29/10/2013 32

Page 33: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Where are our limits?

• Databases are very big for infrastructural design

• International BIM standards for cooperation with stakeholders

• Company policies have to be established

• Own content has to be developed and tested

• Team has to be trained and needs more time in learning curve

29/10/2013 33

Page 34: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Where are our benefits so far?

• More stakeholders adapt the 5D method

• Quantities

• Change management

• Simulation

• Easier comprehension of visualized structures

• Collision checks

• Big share of entire project life cycle in „one“ hand

29/10/2013 34

Page 35: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Way Forward with 5D at Julius Berger

29/10/2013 35

5D Method

big &

open

BIM

Source: Autodesk

Page 36: Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for infrastructural design • International BIM standards for cooperation with stakeholders •

Lake Constance 5D-Conference 2013

Thank You. Markus Rambach