Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for...
Transcript of Develop 5D in Design & Construction of Outstanding ... · • Databases are very big for...
Lake Constance 5D-Conference 2013
Develop 5D in Design & Construction of Outstanding Buildings in Nigeria
Markus Rambach
29/10/2013 1
Lake Constance 5D-Conference 2013
Table of Contents
• Nigeria: „One of the Next-11 Emerging Markets“
• Julius Berger: „More than a Construction Company“
• Our 5D Approach to Design & Construction Projects
• Our Projects Performed with 5D Approach
• On the Way Forward with 5D
29/10/2013 2
Lake Constance 5D-Conference 2013
Nigeria
• Area: 925,000 km² (2.5 x size of Germany)
1300 km
1100 km
Population: • Largest in Africa (160 million)
• Every sixth African is Nigerian
• Very fast growing
29/10/2013 3
Lake Constance 5D-Conference 2013
Abundance of Resources Oil Resources
0 50 100 150 200 250 300 350
Nigeria
Libya
UAE
Kuwait
Iraq
Iran
Saudi Arabia
Venezuela
billion Barrel
Source: OPEC
29/10/2013 4
Lake Constance 5D-Conference 2013
Abundance of Resources Gas Resources
0 500 1000 1500 2000
Nigeria
Venezuela
UAE
United States
Saudi Arabia
Qatar
Iran
Russia
billion Barrel
29/10/2013 5
Source: eia Oil & Gas Journal
Lake Constance 5D-Conference 2013
„One of the Next-11 Emerging Markets“
• Economical growth: 7% annually (for 6 years)
• Public revenue: 85% from oil and gas industry
Source: http://en.wikipedia.org/wiki/File:Next_Eleven.svg
29/10/2013 6
Lake Constance 5D-Conference 2013
Julius Berger: „More than a construction company“
29/10/2013 7
JBI, Germany
JBN, Nigeria
Lake Constance 5D-Conference 2013
Julius Berger Nigeria Plc.
Quick Facts
• Started business in 1965
• Listed on the Nigerian Stock Exchange since 1991
• Shareholders: 60% Nigerian investors; 40% Bilfinger SE, Germany
• Largest construction company in Nigeria
• Annual turnover: € 900 million
• ISO 9001:2008 certified
29/10/2013 8
Lake Constance 5D-Conference 2013
Highlights | Buildings
• •
National Assembly, Abuja,
Construction & Facility Services
Central Bank of Nigeria, Lagos
Apartment Tower, Lagos
Petroleum Technology Development
Fund Headquarters, Abuja
Economical & Financial Crime
Commission Headquarters, Abuja
Akwa Ibom Stadium, Uyo
29/10/2013 9
Lake Constance 5D-Conference 2013
Highlights | Infrastructure
Expressway, Lagos - Badagry
Lekki - Ikoyi Link Bridge, Lagos
Southwest Railway, Ajaokuta – Warri
Circle Road in Central Area, Abuja Roads and Flyovers, Uyo
Discharge Drains, Uyo
29/10/2013 10
Lake Constance 5D-Conference 2013
Highlights | Industries
LNG Plant, Bonny Island
River Terminal Airstrip, Bonny Island
Babycare Production Plant, Lagos
Gas-to-Liquids Facility, Escravos Cement Plant, Edo State
Sugar Refinery, Port Harcourt
29/10/2013 11
Lake Constance 5D-Conference 2013
Service Facilities
Asphalt & Concrete Mixing Plants
Port of Warri Tire Reconditioning Workshop
Equipment Repair Shops Quarries
Central Store for Spare Parts etc.
29/10/2013 12
Lake Constance 5D-Conference 2013
Service Facilities
Concrete Pipes
Roofing Tiles
Hollow Blocks Concrete Pavers
Furniture & Upholstery Aluminum Windows, Doors & Facades
29/10/2013 13
Lake Constance 5D-Conference 2013
Equipment Total new value of 500 million €
• 2 aeroplanes
• 8 asphalt mixing plants
• 9 crushing & screening plants
• 12 asphalt finishers
• 17 concrete mixing plants
• 47 dumpers
• 53 graders
• 81 dozers
• 147 wheel loaders
• 171 forklifts
• 183 excavators
• 1181 trucks
• 1820 cars
29/10/2013 14
Lake Constance 5D-Conference 2013
Equipment Total new value of 500 million €
• 1 dredger
• 2 jack-up platforms
• 5 pile-driving rigs rigs
• 13 crawler cranes
• 20 tug boats
• 24 crew, speed & work boats
• 33 barges
• 60 tower cranes
• 101 mobile cranes
• 185 rollers
• 425 generators
29/10/2013 15
Lake Constance 5D-Conference 2013
Julius Berger International GmbH Quick Facts
Engineering & services provider for JBN:
• Design & engineering
• Project management
• Procurement
• Logistics
• HR recruitment & secondment
29/10/2013 16
Lake Constance 5D-Conference 2013
Julius Berger International GmbH Quick Facts
• Formed out of Bilfinger Berger Nigeria GmbH (2012)
• Engineering expertise for Nigeria since 1965
• 400 employees in Wiesbaden, Germany
• 200 employees in design & engineering
• Construction experts for: buildings, infrastructure, transportation, oil & gas
• Annual turnover: € 300 million
29/10/2013 17
Lake Constance 5D-Conference 2013
DATA MANAGEMENT
5D Process Management
29/10/2013 18
EXPERT SYSTEMS
2D
DR
AW
ING
S
OP
ERA
TIV
E D
ATA
Source: http://www.5d-initiative.eu/mission.php
MODELING
VIEWER
MODELING
VIEWER
EXPERT SYSTEMS
Lake Constance 5D-Conference 2013
Software Tools for 5D Design
29/10/2013 19
Additional
interfaces
BIM Model iTWO
Architecture
Structural
MEP
Infrastructure
Lake Constance 5D-Conference 2013
29/10/2013 20
Quantities Scheduling
BoQ Estimating
Lists & Drawings
for
Quantity Take-off
Lists & Drawings
for
Quantity Take-off
Quantities
Inquiries
CAD
Arriba
2D Drawings
& Lists
DESIGN DEPARTMENTS WORK PREPARATION DEPARTMENT
ESTIMATING DEPARTMENT
Lake Constance 5D-Conference 2013
29/10/2013 21
Element
Planning
Quantities
Scheduling
Simulation
Modification / Detailing of
Elements
BIM Model
P+V
TP
Ext
AV
S+R
KALK
TID
HBS
PL
Quantity
Inspector
BoQ
Inquiries
Cost Estimate
Data Transfer /
Data Check
DESIGN QUANTITIES / ESTIMATE / SCHEDULE
Lake Constance 5D-Conference 2013
Apartment Tower, Lagos
29/10/2013 22
Construction period
2011- 2014
• 14-storey apartment tower
• 36 apartments
• Spa & gym area
• Basement parking
• 4-storey office building
Lake Constance 5D-Conference 2013
Apartment Tower, Lagos
29/10/2013 23
Pilot Project
• Model-based structural design tests (Revit 2010)
• Basic development of content
• Quantity take-offs at multiple design changes
• Simulations to optimize time schedule
• Updates on site for further tests
• Tests of cost control with iTWO 2013
• Visualization of performed quantities
Lake Constance 5D-Conference 2013
29/10/2013 24
Akwa Ibom Stadium, Uyo
Construction period
2012 - 2015
• Multifunctional stadium
(31,200 m² | 30,000 seats)
• VIP area
• Sports park facilities
• Parking lot (2,500 cars & buses)
Lake Constance 5D-Conference 2013
29/10/2013 25
Akwa Ibom Stadium, Uyo Tender Phase
• Structural design with Revit
• Quantity take-offs with iTWO
Execution Phase
• Detailed structural design with Revit
• Cost controlling with iTWO (“3D”)
• Connection of 4th and 5th dimension
• Invoicing to client
Lake Constance 5D-Conference 2013
29/10/2013 26
Construction period
2012 - 2015
• 15-storey building
• Offices and apartments
• Total GFA: 32,000 m²
• LEED silver certification
Victoria Island Tower, Lagos
Lake Constance 5D-Conference 2013
29/10/2013 27
Tender Phase
• Architectural and structural design with Revit
• Quantities and estimate with iTWO
Execution Phase
• Structural, architectural and MEP design with Revit
• Testing of procurement with iTWO
• Controlling with iTWO (“2D”)
• Viewer for site management: ceapoint desite MD
Victoria Island Tower, Lagos
Lake Constance 5D-Conference 2013
29/10/2013 28
The Jasper ***** Hotel, Abuja
Lake Constance 5D-Conference 2013
29/10/2013 29
The Jasper ***** Hotel, Abuja
Approval Design Phase
Structural, architectural and MEP design
with customized content and Revit 2013
Tender Phase
Quantity take-offs and estimate
with iTWO 2013
Lake Constance 5D-Conference 2013
Implementation of 5D Method Paradigm Change
29/10/2013 30
Processes
Communication
Efficiency Added V
alu
e
Lake Constance 5D-Conference 2013
Construction Project Processes
29/10/2013 31
Source: 5d-initiave
Lake Constance 5D-Conference 2013
What are our next steps?
• Integrate more disciplines:
• MEP (analysis, design, collision checks)
• Infrastructural design
• 4th dimension with equipment and site installation
• Controlling of execution of construction
29/10/2013 32
Lake Constance 5D-Conference 2013
Where are our limits?
• Databases are very big for infrastructural design
• International BIM standards for cooperation with stakeholders
• Company policies have to be established
• Own content has to be developed and tested
• Team has to be trained and needs more time in learning curve
29/10/2013 33
Lake Constance 5D-Conference 2013
Where are our benefits so far?
• More stakeholders adapt the 5D method
• Quantities
• Change management
• Simulation
• Easier comprehension of visualized structures
• Collision checks
• Big share of entire project life cycle in „one“ hand
29/10/2013 34
Lake Constance 5D-Conference 2013
Way Forward with 5D at Julius Berger
29/10/2013 35
5D Method
big &
open
BIM
Source: Autodesk
Lake Constance 5D-Conference 2013
Thank You. Markus Rambach
29/10/2013 36