APPENDIX H Detention Basin Design Utilizing the Rational Method of Runoff Determination The following procedure utilizing the Rational Method of Design has been adopted from the Erosion Control Manual of Oakland County, Michigan. This method has been revised to include the particular requirements of the Washtenaw County Drain Commissioner. A. Determine the acreage tributary to the detention basin and the composite runoff coefficient. The runoff coefficient must be based on the area and surface types tributary to the basin. Example Extended Detention Pond Volume Calculations and Outlet Design The following is an example for one method of extended detention pond design that meets the minimum standards of the Washtenaw County Drain Commissioner. More complex systems are preferred and shall be provided where feasible. The example is based on a 7.3 acre site with a runoff coefficient of 0.75. The release rate specified in the example is based on a pond which outlets to an existing watercourse that is adequate to effectively handle a concentrated flow of water from the proposed development. C= 0.75 A= 7.3 Ac. The allowable release rate is 0.15 cfs/ac: ( ( ( ( cfs ac a ac cfs a ac cfs a Q Q A Q 10 . 1 3 . 7 15 . 0 15 . 0 = = = 100-Year Flood Volume Required ( ( imp ac cfs o o a o Q Q AC Q Q ac cfs - = = = 20 . 0 75 . 0 3 . 7 10 . 1 min 1 . 202 2 . 0 5 . 10312 25 5 . 10312 25 = - = - = - T T Q T imp ac cfs o

description

Calculatıon for basins

Transcript of Detention Basin Design Example

Page 1: Detention Basin Design Example

APPENDIX H

Detention Basin Design Utilizing the Rational Method of Runoff Determination The following procedure utilizing the Rational Method of Design has been adopted from the Erosion Control Manual of Oakland County, Michigan. This method has been revised to include the particular requirements of the Washtenaw County Drain Commissioner.

A. Determine the acreage tributary to the detention basin and the composite runoff coefficient. The runoff coefficient must be based on the area and surface types tributary to the basin.

Example Extended Detention Pond Volume Calculations and Outlet Design The following is an example for one method of extended detention pond design that meets the minimum standards of the Washtenaw County Drain Commissioner. More complex systems are preferred and shall be provided where feasible. The example is based on a 7.3 acre site with a runoff coefficient of 0.75. The release rate specified in the example is based on a pond which outlets to an existing watercourse that is adequate to effectively handle a concentrated flow of water from the proposed development. C= 0.75 A= 7.3 Ac. The allowable release rate is 0.15 cfs/ac:

( )( )( )( )

cfs

ac

a

accfs

a

accfs

a

Q

Q

AQ

10.1

3.715.0

15.0

=

=

=

100-Year Flood Volume Required

( )( )impac

cfso

o

ao

Q

Q

ACQ

Q

ac

cfs

−=

=

=

20.0

75.03.710.1

min1.202

2.05.10312

25

5.1031225

=

+−=

+−=

T

T

QT

impaccfs

o

Page 2: Detention Basin Design Example

( )( ) ( )( )( )

impaccf

s

impaccfs

s

os

V

V

TQT

TV

=

−+

=

−+

=

8.13066

1.2022.040251.2021.20216500

4025

16500

minmin

min

( )( )( )cf

ac

t

impaccf

t

st

V

V

ACVV

71541

75.03.78.13066

=

=

=

Bankfull Flood Volume The bankfull storm is defined as the 24 hour, 1.5-year storm event:

( )( )( )( )( )( )[ ]( )( ) ( )( )( )

cf

ac

bf

acft

bf

acft

bf

V

V

ACV

44731

75.03.7817075.03.7"25.2

"25.2

143560

"12'1

143560

"12'1

2

2

=

==

=

First Flush Volume The first flush storm is defined as the first 0.5” of rain over the entire watershed:

( )( )( )( )( )( )[ ]( )( ) ( )( )( )

cfV

V

ACV

ff

acft

ff

acft

ff

ac

9937

75.03.7181575.03.7"5.0

"5.0

143560

"12'1

143560

"12'1

2

2

=

==

=

Storage Provided Elevation Area (sf) Depth (ft) Volume (cf) Total Volume (cf) 94.0 28,960 1 26,640 80,080 93.0 24,320 1 22,240 53,440 92.0 20,160 1 18,000 31,200 91.0 15,840 1 13,200 13,200 90.0 10,560 1 0 0 Storage Elevations First flush: Bankfull: 100 year:

( )6.92.61.923120044731

0.92

31200534400.920.93

approxbf

bf

x

x

=−

−=

−−

( )8.90.75.9009937

0.90

0132000.900.91

approxff

ff

x

x

=−

−=

−−

( )7.93.68.935344071541

0.935344080080

0.930.94

100

100

approxx

x

=−−

=−−

Page 3: Detention Basin Design Example

Outlet Control Structure

First flush of runoff: The average allowable release rate for runoff resulting from 0.5” of rain over watershed area in 24 hours:

Place openings in standpipe at bottom of basin (90.0): To determine the appropriate size orifice to release the first flush volume, an average head value can be used in the orifice equation. If the basin is designed to be trapezoidal in shape, 2/3 of the total head is an acceptable approximation for the average head.

The number and size of orifices to meet the area requirements is variable. In general larger holes are preferable, although multiple outlets should be used if possible. For this example, we will choose a 1.25” diameter orifice (which has an area of 0.0085 sf).

76.3#0085.0032.0

#

=

=sf

sf

Therefore, use 3 – 1.25” diameter holes @ elev. 90.0 The detention time for 3 – 1.25” diameter holes is:

( )( )cfs

hr

cf

ff

hrff

ff

Q

Q

TV

Q

115.0

249937

1sec3600

24

=

=

=

( )( )

ft

elevelev

ave

ave

botffave

h

h

h

53.0

0.908.90

..

32

32

=

−=

−=

( )( )sf

cfs

A

ftA

gh

QA

ft

ave

ff

032.0

53.02.32262.0

115.0

262.0

2sec

=

=

=

( )( )( )( ) ( )( )

cfs

sf

newff

ftnewff

avenewff

newff

Q

ftQ

ghAQ

092.0

53.02.32262.00085.03

262.0

2sec

=

=

=

Page 4: Detention Basin Design Example

Bankfull flood: The bankfull flood must be detained 36-48 hours; check the discharge through the first flush orifice to see if additional holes are necessary:

( )( )73.1

0.906.92

..

32

32

=

−=

−=

ave

ave

botbfave

h

h

h elevelev

Because the holding time exceeds 48 hours, additional orifices in the standpipe are required. The release rate may be considered occurring in two phases; the release rate when both the ff and bf orifices are contributing, and the release rate when the water elevation is below the bf orifice (ff elevation). The time for the ff volume to release was calculated above, so the remaining volume (bf volume – ff volume) must be released so the total detention time does not exceed 36 – 48 hours. A target detention time of 44 hours was chosen for this example.

( )( )( ) ( )( )( )

( )( )hr

cfs

cf

cfs

sf

T

T

Q

VT

Q

ftQ

ghAQ

hr

bf

ft

aveff

1.73

17.044731

17.0

73.12.3220085.0362.0

262.0

1sec3600

sec2

=

=

=

=

=

=

( )( )hr

cfs

cf

newff

hr

newff

newff

ffnewff

T

T

Q

VT

0.30

092.09937

1sec3600

=

=

=

newfftotrem

rem

rem

ffbfrem

TTT

VV

VVV

cf

cfcf

−=

=−=

−=

34794993744731

Page 5: Detention Basin Design Example

hr

hrhr

rem

rem

TT

0.140.3044

=−=

Volume through 3 – 1.25” diameter holes in 14.0 hours:

Q1will be defined as the discharge through the ff orifices when both the ff and bf holes are contributing.

( )( )( ) ( )( )

( )( )( )cf

cfshr

cfs

fsf

V

V

QTV

Q

tQ

ghAQ

hr

rem

ft

ffaveff

9072

18.00.14

18.0

22.3220085.0362.0

262.0

1

1sec3600

1

11

1

sec1

1

2

=

=

==

=

=

The leftover volume will be released by the bankfull orifice. V2 will be defined as the amount of water to be discharged by the bf orifices in 14.0 hours.

( )( )

( )( )

( )( )sf

f

cfs

ft

ftft

elevelev

cfs

hr

cf

cf

cfcf

A

tA

gh

QA

h

h

h

Q

Q

TV

Q

VV

VVV

ft

bfave

bfave

bfave

ffbfbfave

hr

rem

rem

094.0

2.12.32262.0

51.0

262.0

2.1

8.906.92

..

51.0

0.1425722

25722907234794

2

sec

2

22

32

32

2

1sec36002

22

2

2

12

2

=

=

=

=

−=

−=

=

=

=

=−=

−=

( ) ( )( ) ( )fth

h

h

ffave

ffave

botffffbfff

ave elevelevelevelev

2

0.908.908.906.92

....

32

32

=

−+−=

−+−=

Page 6: Detention Basin Design Example

A 2” diameter orifice has an area of 0.022 sf

27.4#022.0094.0

#

=

=sfsf

Therefore, use 4 – 2” diameter holes @ elev. 90.8 100-year flood: Qa = 1.10 cfs Qa is a peak or maximum flow. Calculate the maximum flow passing through first flush and bankfull orifices, using the total head, and subtract from Qa to determine the orifice size to release the 100-year storm volume:

( )( )( ) ( )( ) ( )( )( ) ( )( )

( )

( )( )sf

cfs

cfs

cfscfs

cfs

sfsf

A

A

gh

QA

QQ

QQQQ

QQ

QQ

ghAghAQQ

ft

bfffa

bfff

ftftbfff

bftotbftotffbfff

021.0

6.927.932.32262.0

11.0

262.0

11.099.010.1

99.0

8.907.932.322022.0462.00.907.932.3220085.0362.0

262.0262.0

100

sec

100

100

100100

100

100

100

secsec

2

22

=

−=

=

=−=

−−=

=+

−+−=+

+=+

A 1” diameter orifice has an area of 0.0055 sf

82.3#0055.0021.0

#

=

=sf

sf

Therefore, use 3 - 1” diameter holes @ elev. 92.6