DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by...

146

Transcript of DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by...

Page 1: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course
Page 2: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

1

DETAILED PROJECT REPORT ON

PROPOSED DRINKING WATER GRID IN NIZAMABAD DISTRICT

1. BACKGROUND

Water is life sustaining and life giving and Water is one of the basic requirements of life.

For a healthy living, pure potable water is a must. The water, though a “priceless” commodity.

But, it is scarce. The total volume of usable water in the whole world is fixed and is less than half

percent of the total volume of water. The newly formed State of Telangana is one of the States

severely affected with Fluorosis. In some areas the fluoride level is nearer to 10 ppm.

According to the surveys conducted, it was observed that the Fluorosis is prevalent in all most all

the districts in Telangana. The severely affected districts are Nalgonda, Mahabubnagar,

Karimnagar, Warangal, Nizamabad, Ranga Reddy. The Telangana is also one of the effected

states with Brackishness in water. The brackishness of the drinking water is prevails in many

habitations of the state.

It has been established that, if the fluoride level exceeds the level of 1.5 ppm, it damages

the teeth resulting in Dental Fluorosis. Concentration above 3 ppm leads to skeletal Fluorosis. It

has also been observed that due to consumption of excess fluoride content water over a longer

period, premature old age occurs in younger age.

2. INTRODUCTION

The Government of Telangana is desired to improve the drinking water supply level to all

the habitations in the state in the context of newly formation of its statehood. Accordingly,

Hon’ble Chief Minister of Telangana State has instructed to construct a Water Supply Grid in the

State of Telangana to upgrade the present water supply level from the existing 40 LPCD to 100

LPCD in rural habitations and to 135 LPCD in urban habitations. And also the Honorable Chief

Minister intended to make provisions in the proposed Water Grid for Industrial Water

Requirement and Water requirement for Municipalities and Corporations in the entire state. So

that the entire water grid will become economically viable and self sustainable to meet Operation

and maintenance cost by getting water user tariff from the Industries, Municipalities and

Corporations along with other users. In this context, a Detailed Preliminary Report is prepared

after conducting reconnaissance survey in the district. The Nizamabad District Profile at a

Glance.

Page 3: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

2

3. DEMOGRAPHY:

A. Geographical Area : 7,956 Sq. Kms.

a) No. of Revenue Divisions : 3

b) No. of Mandals : 36

c) Total No. of Villages : 1645

d) Un-inhabited Villages : 64

e) Total No. of Gram Panchayath : 718

f) Municipal Corporation : Nizamabad

g) Municipalities : 1. Bodhan 2.Kamareddy 3.Armoor

h) Details of Revenue Divisions and Mandals

NIZAMABAD DIVISION

1.Nizamabad 4. Bheemgal 7. Jakranpally 10.Morthad 13.Sirikonda

2. Armoor 5. Dharpally 8.Kammarpally 11.Nandipet 14.Vailpoor

3. Balkonda 6. Dichpally 9. Makloor 13.Navipet

BODHAN DIVISION

1. Bodhan 4. Birkoor 7. Madnoor 10.Renjal

2. Banswada 5. Jukkal 8.Nizamsagar 11.Varni

3. Bichkunda 6. Kotagir 9.Pitlam 13.Yedapally

KAMAREDDY DIVISION

1.Kamareddy 3.Domakonda 5.Lingampet 7.Nagireddypet 9.Tadwai

2.Bhiknoor 4.Gandhari 6.Machareddy 8.Sadasivnagar 10.Yellareddy

B. POPULATION - 2011 Census - in Lakhs

Total Population : 25.52

Male : 13.52

Female : 13.00

Sex Ratio per 1000 male persons

: 1038

Population density per Sq. Km

: 321

Page 4: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

3

C. Road Connectivity:

National High Way7 (Hyderabad. to Nagpur)

- 114 Kms

National High Way 16 - 55 Kms

State High Way - 246 Kms

Major District roads - 615 Kms

Z.P.taken over Roads by R&B - 1093 Kms

P.R. Roads - 2304 Kms

Total

4427 Kms

D. EDUCATION:.Various education facilities available in the district are given below.

1. P.G.Colleges 6

2. Engineering 5

3. Medical College 1

4. Degree Colleges 24

5. Junior Colleges 100

6. MBA Colleges 3

7. MCA Colleges 3

8. High Schools 680

9. Upper Primary High Schools

510

10. Primary Schools 1846

11. Teacher Training Colleges 1

13. Polytechnic Colleges (Govt.)

2

13. Industrial Training Institutions

11

14. B.Ed.Colleges 6

15. Nursing Training Schools 11

The Demand for Colleges are not considered in the Telangana drinking Water Project

E. INDUSTRIES (2009-10) ( Large & Medium Scale Industries ) :

The Telangana Drinking Water Project is also aiming to supply the water to households in

addition to the industrial requirements. Industrial requirement of Segment-11 (0.188 TMC) is

considered as 10% to the total Drinking water and Industrial requirement of Segment-13 (0.05

TMC) is considered as 5% to the total Drinking water.

Page 5: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

4

Name of the industry Line of Activity

Unit Production,

2009-10 Employment

Nizam Deccan Sugar Factory, Bodhan

Sugar MTs 31005 256

Nizam Co.op.Sugar Factory,Sarangapoor.

Sugar MTs Presently

not working 344

NCS Gayathri Sugars Ltd. Adlooryellareddy SSNagar(M)

Sugar MTs -- 313

Sukhjith Starch Mill, Mubarak nagar, Nzb.

Maize starch

MTs 54417 246

Vajra Granite, Baswapoor. Polished Granite slabs

Sq. Mts -- 140

Indur Green Power Home Pvt. Ltd, Renjal

Power Generation

M.Watts -- 64

GSR Sugars, Magi (V), Pitlam (M)

Sugar MTs -- 230

Sri Gajanan Agro Mills (India) Pvt. Ltd. Gundaram (V), Nizamabad Mandal

Paddy MTs 36400 74

3. PRESENT STATUS OF RWS & S NIZAMABAD DISTRICT:

In the Nizamabad district, there are 18 No’s CPWS Schemes, 2182 No’s of PWS

Schemes, 2485 No’s of MPWS Schemes and 11,570 Hand Pumps are available for Water Supply

to the habitants. There are 401 Habitations covered with 18 No’s of MVS Schemes which are

already commissioned in the district. Out of the 18 CPWS Schemes, only 5 CPWS Schemes are

conserved in the Segment 13 for upgrading the CPWS Schemes to Grid Standards i.e., from 40

LPCD to 100 LPCD.

There are 139 NSS habitations out of which 76 are fluoride affected habitations and the

balance habitations are Brackish affected. And the supply level of Dirking Water to habitations

of the district is as follows ( as per 55 LPCD ).

FC PC4 PC3 PC2 PC1 554 280 478 94 100

Though there are 554 fully covered habitations due to different seasonal conditions, the

supply level is reduced to around 30 to 40 LPCD only.

EXISTING IRRIGATION PROJECTS:

DAILY GAUGE REPORT OF VARIOUS PROJECTS UNDER IRRIGATION CIRCLE : NIZAMABAD

Page 6: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

5

NIZAMSAGAR (MEDIUM ) PROJECT - Ayacut 2,31,339 acres

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 1405.00 Ft 17802.68 Mcft

2 M.D.D.L 1376.00 Ft 786.71 Mcft

3 Sill Level 1364.00 Ft 0.724 Mcft

Guage Report

1 To-days Level 1392.76 Ft 5.407 TMC

2 Yestadays Level 1392.92 Ft 5.407 TMC

3 Difference in Capacity

4 Last Year Level 1400.61 Ft 13.053 TMC

POCHARAM (MEDIUM ) PROJECT - Ayacut 10,500 acres

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 1464.0 Ft 1820 Mcft

2 M.D.D.L 1451.0 Ft 318 Mcft

3 Sill Level 1443.0 Ft -

Guage Report

1 To-days Level 1455.9 Ft 724.778 TMC

2 Yestadays Level 1456.0 Ft 737.26 TMC

Inflow = NIL C/s & Out flow - NIL

KOULASNALA (MEDIUM ) PROJECT - Ayacut 9,000 acres

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 458.00 Mtrs 1338 Mcft

2 M.D.D.L 458.00 Mtrs 413.13 Mcft

3 Sill Level - -

Guage Report

1 To-days Level 456.20 Mtrs 840 Mcft

2 Yestadays Level 456.20 Mtrs 840 Mcft

Inflow = NIL C/s & Out flow - 10 C/S leakage

RAMADUGU (MEDIUM ) PROJECT - Ayacut 7,000 acres

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 1378.50 Ft 966 Mcft

2 M.D.D.L 1358.00 Ft 113.551 Mcft

3 Sill Level 1354.00 Ft 62.576 Mcft

Guage Report

1 To-days Level 1365.00 Ft 290.67 Mcft

2 Yestadays Level 1365.50 Ft 290.67 Mcft

Inflow = NIL C/s & Out flow - NIL

Page 7: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

6

ALISAGAR Balancing Tank

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 1399.50 Ft 304 Mcft

2 M.D.D.L 1387.00 Ft 84.29 Mcft

3 Sill Level 1370.00 Ft -

Guage Report

1 To-days Level 1390.00 Ft 133.13 Mcft

2 Yestadays Level 1391.70 Ft 130 Mcft

Inflow = Kothapet bridge main canal 2'-10" & Out flow - NIL

SRI RAM SAGAR (MAJOR) PROJECT - Ayacut

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 1091.00 Ft 90.313 TMC

2 M.D.D.L 1060.00 Ft 13.590 TMC

3 Sill Level 1058.00 Ft 11.500 TMC

Guage Report

1 To-days Level 1070.70 Ft 30.63 Mcft

2 Yestadays Level 1070.70 Ft 30.36 Mcft

Inflow = 1437 C/s & Out flow - 1437 C/s

SINGEETHAM ANICUT

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 416.20 Mtrs - TMC

2 M.D.D.L 414.20 Mtrs - TMC

Guage Report

2 Yestadays Level 414.00 Ft 0.2 TMC

KALYANI VAGU PROJECT

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 409.50 Mtrs - Mcft

2 M.D.D.L 407.50 Mtrs - Mcft

A thorough study have been done to utilize the avove Projects for the Water Grid Net Work,

but after consideration of its present usage to irrigation purpose, there is no availability of water

exists in the above projects for the Water Grid requirement except in Two Reservoirs i.e., 1. Sri

Ram Sagar Project (SRSP) and 2. Nizamsagar Project (NSP). Even, Out of These two reservoirs the

NSP is having the Standardized Ayacut around 2.31 Lakhs of Acres for the available 17.80 TMC.

During the draught season the 17.80 TMC is not an assured quantity. Hence, in the review meeting

Page 8: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

7

the Hon’ble Chief Minister has advised to take up the required Water i.e., 1.68 TMC from the

Singoor Reservoir which has No standardized Ayacut.

The details of the Singoor Reservoir is as follows.

SINGOOR (MEDIUM ) PROJECT - Ayacut 40,000 acres

Sl. No Standards Level Unit Capacities Unit

1 F .R. L 523.500 Mtrs 30.00 TMC

2 M.D.D.L 517.800 Mtrs 8.863 TMC

3 Sill Level 510.000 Mtrs 0.704 TMC

Inflow = 1351 C/s & Out flow - 296 C/s

Accordingly a Preliminary Design Report is prepared by considering the Source for the Grid 13. 3. PROJECT AREA:

i) Introduction

Nizamabad District is one of the fluoride affected districts in Telangana for drinking

water. The Project envisages covering all the habitations with supply level of 100 LPCD in rural

habitations and 135 LPCD in urban habitations with a Tap to every house hold along with a 5%

additional provision to meet Industrial requirement.

ii) Geology:

Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline

rocks. They comprise of pink and grey granites with course to medium texture. The granites are

sheared at places. The main jointing trends are NE - SW, NW - SE and ENE - WEW.

Dolerite dykes varying in width from few meters to hundreds of meters traverse the area.

These dykes are hard and compact and stand out prominently in the granite rocks. Quartz and

Pegmatite intrusion are also found in the area.

iii) Hydrogeological Conditions:

The ground water in this area is limited to secondary porosity developed through

fracturing and subsequent weathering. The granites in this area lack primary porosity. The

movement of ground water is controlled by the degree of inter - connection of these secondary

pores. The average depth of weathering varies from 8 to 130 m. The fissures and joints extend

Page 9: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

8

upto a depth of 20 - 45 m. The ground water occurs in unconfined conditions in shallow

weathered zone and under semi-confined conditions in joints, fissures and fractures. The depth

of well ranges from 6 - 18 m and the yield varies from 20 to 60 cum/day and in some wells upto

200 cum/day.

4. NECESSITY

Nizamabad is one of the 9 Telangana districts in the State. The ground water in the

project area of the district contains high concentration of fluorides and brackish in the ground

water. Due to frequent failure of monsoons in the project area the ground water table is

depleting and the Fluoride and brackish level in the ground water is increasing. As a result of

this, a habitation that is provided with a bore well fitted with hand pump as source of drinking

water in the past is yielding unacceptable quality of water. Many habitations that are partially

covered earlier are again looking for relief as the source infrastructure provided is in need of

either augmentation (or) replacement. The main problem is excess fluoride and brackish in

drinking water due to which people are suffering with knee pains, joint pains, dental Fluorosis

and skeletal Fluorosis.

The provision of safe drinking water deserves top priority to improve the health and economic

development of the people in the Nizamabad District.

5. OBJECTIVE:

As part of the Mission on control of Fluorosis and Brackishness, the present project is

prepared to provide safe drinking water to fluoride and Saline affected habitations and also for

providing house hold tap to each and every house hold with assured supply at the rate of

100LPCD for Rural and 135 LPCD. And an additional 5% is provisioned for Industrial

requirement.

6. RATIONALE:

In Nizamabad District it is extremely difficult to obtain potable drinking water especially

in the project area. The bore wells fitted with hand pumps are yielding water very low and

proved a failure in many places as the water table depleted very fast due to insufficient rains. To

mitigate this problem, this project is prepared.

7. METHODOLOGY:

The RWS & S Department has conducted a preliminary investigation for providing water

grid. Various options are explored in which the ground water sources are not considered since

Page 10: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

9

they are not potable and can’t dependable due to excess salts and rapid depletion of ground

water. As an alternate, the provision of surface water is examined by duly reviewing the

available 8 No’s of Major and Minor irrigation Projects in the Nizambad District along with

Singoor Project from Nizamabad District. Out of all these Projects, Singoor Project is opted for

taking up the source for Grid 13 after thorough examination of the various factors which effects

the Sustainability of the Source. The Singoor Project is having 30.00TMC of Water from which

1.843 (2048 Year) TMC Water can be allocated for Drinking Water Grid 13 to cover 16 Mandals

out of 36 Mandals of Nizamabad District.

The Segment – 13 is designed for 4 Assembly Segments, the Four assembly Segments

are 1.Jukkal (5 Mandals) 2. Banswada (4 Mandals ) 3, Yellareddy (3 Mandals) and 4. Bodhan

(4Mandals) of Nizamabad District. For this segment 13, the Raw Water will be pumped from

Singoor Intake Well i.e., +513.00 FVL to Head Works at Peddareddypet, 145MLD Treatment

Plant at GL +524.50, Pulkal Mandalof Medak District, the Treated Water will be Pumped to

OHBR at +560.00M at Thadmanur village of Andhol Mandal, Medak District. From the OHBR

at Thadmanur the Filtered Water Flows by Gravity to certain habitations and some habitations

through pumping from sumps.

8. SALIENT FEATURES OF SEGMENT - 13

The Segment 13 covers 4 Assembly Segments, 785 habitations spread over 16 Mandals

and One (1) Bodhan Municipality. The 4 assembly segments are1. Banswada 2. Jukkal 3.

Bodhan and 4. Yellareddy Assembly Segment (only 3 Mandal’s). The Raw Water will be

Pumped from the common Intake Well (Medak Segment has been proposed in the same Intake

Well) at Singoor Reservoir.

Head Works are proposed at Peddareddypet, Pulkal Mandal, Medak District with

145MLD Treatment Plant at GL+524.50M , the Treated Water will be Pumped again to 2 No;s

of 1350 KL OHBR at +560.00M. The Clear Water flows by Gravity to all the designed 785

Habitations in the Four assembly Segments i.e., 1.Jukkal (5 Mandals) 2. Banswada (4 Mandals )

3, Yellareddy (3 Mandals) and 4. Bodhan (4Mandals) of Nizamabad District

SILIENT FEATURES OF THE GRID - 13, NIZAMABAD DISTRICT

1 Name of the Grid: Grid - 13, Nizamabad

2 No of Habitations Covered 785 No's ( List attached )

3 No of Mandals 16 No's

4 No of Muncipalities 1 ( Bodhan Muncipality )

5 No of Assembly Segments 4 ( Jukkal + Banswada + Bodhan + 3 Mandals from Yellareddy )

Page 11: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

10

6 Total Estimated Cost ( Incl Taxes ) Rs.1300.00 Cr.

Population :

7 As per 2011 Census Rural Population of 785 Habs. 838975 ( List attached )

8 Urban - Designed Population of One Municipality 30013

9 Total Population as per 2011 Census 868988

10 Total Population as Projected to Base Year 2018 921576

11 Projected Population for the Prospective Year 2033 1046135

13 Projected Population for the Ultimate Year 2048 1215983

13 Annual Raw Water Requirement (Rural) 1.44 TMC After Considering the Existing and ongoing Schemes

14 Annual Raw Water Requirement (Urban) 0.154 TMC After Considering the Existing and ongoing Schemes

15 Annual Raw Water Requirement for Industries @ the rate of 5%

0.093 TMC

16 Total Requirement 1.687 TMC

KEY COMPONENTS OF THE GRID - 13

S.No. Description Qty Location

1 Intake Well – 13 x 32M Dia 1 No Singoor Project (30.00 TMC) at FRL +523.50 Mtrs

2 Raw Water Pump Sets 4 x 225 HP Intake Well at Singoor Project, Medak District

3 Raw Water Pumping Main - MS - 1300 MM Ø 0.50KM From Intake Well to Head Works at Peddareddypet

4 Clear Water Pumping Main - MS - 1300 MM Ø 6.00KM From Head Works to OHBR at Tadmanoor +560M

5 Clear Water Gravity Main - MS - 1500 MM Ø: 53.00KM From Tadmanoor OHBR to Nizamsagar Jn.

6 Treatment Plant 145MLD At Peddareedipet Village +560.00M

9 Total Length of Trunk Main 262 KM

10 Total Length of Sub Tunk 1370.00 KM

10 Cost of Tunk Main 335.66 Cr

11 Cost of Sub Trunk 213.30 Cr

13 Intra village pipe line Length with new Pipe and with replacement of Old Pipe

1019.07

KM

13 Intra village Pipe Line without replacement of Old Pipe 784.98 KM

14 Cost of Intra village Pipe Line with new Pipe and with replacement of Old Pipe

36.97 Cr.

15 Cost of Intra village Pipe Line with out replacement of Old Pipe

28.47 Cr

Page 12: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

11

16 Intra Village OHSR's requirement with Two Filling 613 No's - 32854 KL Volume

17 Intra Village OHSR's requirement with SIngle Flling 562 No's - 20320KL Volume

18 Cost of Intra Village OHSR's requirement with Two Filling 93.71 Cr

19 Cost Intra Village OHSR's requirement with Sngle Flling 135.86 Cr

20 Total Intra village Cost 188.78 Cr

8.a. Coverage to the Industries : There are many Industries existing and proposed in

the Project Area. The Industrial requirement in the Project Area is 1.50 TMC as indicated by

TSIIC Vide Lr. No. 07/CE/TSIIC/TDW/GRID/2014-'15 Dated: 22/10/2014 of CHIEF

ENGINEER, TSIIC LTD HYDERABAD. After careful examination of the water requirement to

Industries, It is decided to consider 10% additional quantity to the designed demand. So that it

comes around 0.11 TMC of Water for Industries from the present Water Grid. And it is also

decided to lay separate lines to meet the additional Industrial Demand in future if required

directly from Manjeera River which will cost around Rs. 50.00 Cr.

b. Existing Infrastructure : There are 11 No’s of CPWS Schemes functioning /

Ongoing in the Project Area covering a population of 4,49,436 in 213 Habitations of 10 Mandals

in Grid - 13 Project Area. The details are as follows.

S.No Name of the

CPWS Scheme Source

No of Habitations

Covered Population

Annual Water

Requirement in KL

Remarks

1 2 3 4 5 6 7

1 CPWS Scheme to Banswada

Intake Well in River

Manjeera 7 37465 533314 Commissioned

2 CPWS Scheme to

Damarancha

Infiltration Well in River

Manjeera 34 56708 807238 Commissioned

Page 13: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

12

3 CPWS Scheme

to Kotagiri

Infiltration Well in River

Manjeera 26 59995 854028 Commissioned

4 CPWS Scheme to Mandarna

Infiltration Well in River

Manjeera 20 47117 670710 Commissioned

5 CPWS Scheme to Tagilepally

Nizam Sagar Canal

7 19976 284358 Commissioned

6 CPWS Scheme to Bichkunda

Infiltration Well in River

Manjeera 10 37662 536118 Commissioned

7 CPWS Scheme to

Nagireddypet

Infiltration Well in River

Manjeera 41 49107 670568 Trial run done

8 CPWS Scheme

to Madnur

Infiltration Well in River

Manjeera 13 23832 339248 Ongoing

9 CPWS Scheme

to Yamcha

Intake Well in River

Godavari 34 89600 1308160 Commissioned

10 CPWS Scheme to

Chinamavandi

Infiltration Well in River

Manjeera 16 21954 320528 Commissioned

11 CPWS Scheme

to Kandgam

Infiltration Well in River

Manjeera 5 6020 87892 Commissioned

Present Water Drawl Quantity ( Annual ) 0.226 TMC

In the design of Segment 13, the above schemes are not considered as there is no

information submitted by the concerned sub divisions such as Designs of the Scheme, Key Plans,

Present rate of water supply and present status of the Scheme all these details are very much

essential to Integrate the Schemes with the Segment 13. The same has been explained in Design

Criteria.

C. Coverage to Municipalities: In the Grid – 13 Project Area, there is only one Municipality

that is Bodhan Municipality in Bodhan Assembly Segment. The water supply by Public Health

Department to this municipality is presently being done from Bellal Reservoir which is being fed

by Nizam Sagar Canal.The Clear Water demand for the Bodhan Municipality is considered in

this water grid @ 135 LPCD as per the Public Health Department Chief Engineer, AC Guards,

Hyderabad Lr.No. 5/T1/Telangana Water Grid/2014-15 Dated 14.11.2014, the requirement for

the Bodhan Municipality is 6.96MLD by year 2033 and 13.44MLD for the year 2048 The same

has been considered in the design of Water Grid – 13.

Page 14: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

13

8. PROJECT DESIGN CRITERIA: The design parameters adopted for this project component are detailed below: i) Design Period: The year 2018 is taken as the proposed year for commissioning and considered as the base year.

The ultimate design period of the project is considered as 30 years over the base year i.e., 2048.

ii) Design Population: Population Forecast The base year population is worked out by adding the population increase @ 0.8% growth rate

for rural population from 2011and 2% growth rate for urban population.

iii) Design Parameters: Established parameters are followed in the system design.

1. Sources and transmission main lines are designed for ultimate population.

2. Sumps, balancing and service reservoirs, pumping machinery are designed for

Prospective population.

iv) Service Level: The service level of 100 lpcd for rural population and 135 lpcd for urban population is considered. v) System Design Criteria: 1. Operation Period of Pumping Machinery : 22 hours 2. Treatment Rapid Sand Filters 3. Clear Water Sump : 2 ½ hours capacity @ head works 4. Service Storage : Capacity required for 50% Of Prospective daily demand. 5. Balancing Reservoir 30 minutes storage capacity 6. Pumping Machinery a)Design Period 15 Years b) Selection - Preliminary Design As per discharge and head c) Detailed design As per system curves 7. Distribution System As per the actual necessity in the habitation. vi) The hydraulic statements and designs are prepared based on the available data such as

LS and Key Plans which were not signed by the concerned subdivisions engineers, those

who have conducted Detailed Survey with the help of professional Survey firms must be

Page 15: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

14

signed on each and everydocument. Hence, the Project Executing Team ( i.e., Project

Division ) must take care of the levels by taking working levels before grounding the work

and they must be ensured that the hydraulic statement are correct, if working levels are not

matched they must prepare revised Hydraulic Statements and Designs as per the working

levels.

vii) Further, 11 No’s of existing and ongoing CPWS Schemes are there in the Segment 11,

but the required information ( i.e., Design and Key Plans and present status of the Existing

/ Ongoing CPWS Schemes) is not available for consideration in the Design of Segment 13.

Hence, in the design of Grid 13, the existing and ongoing schemes are not considered. The

Project Executing Team (i.e., Project Division) must review each and every CPWS Scheme

and connectivity shall be proposed to bring the existing and ongoing schemes to Grid

Standard by thoroughly utilizing the structures and pipe lines.

9. DETAILS OF THE PROJECT:

The project is administratively sanctioned for Rs. 1300 Crores vide PR&RD GO RT No.

336 Dated 1.06.2015. The DPR is prepared for Rs 1300 Crores and submitted to the

WAPCOS Limited. The DPR is vetted by WAPCOS Limited vide Project Director Letter

No. WAP/HYD/TDWSP/DPR/2015/2361 Dated 3.08.2015.

i) Source: It is proposed to cover 785 habitations through this segment 13, Source at Singoor,

Peddareddypet, Pulkal Mandal, Medak District. The raw water will be pumped from Intake Well

to Peddareddypet 145 MLD Treatment Plant, Head Works. The Treated water will be Pumped

again from Head Works to OHBR at Raipahad +560.00. From OHBR the water flows by gravity

to all the proposed 785 habitations exect 24 habitations which are situated over +540.00M and

those habitations will be covered by Pumping.

1) Intake well at Singur Resevoir, Near Peddareddypet, Pulkal Mandal, Medak Dist.

2) Rapid Sand Filters of capacity of 145 MLD near Peddareddypet village.

3) Clear Water Sump 13300 Kl Capacity at Peddareddypet.

4) OHBR of Capacity 2 x 1350 KL Capacity with 30.00M Staing at Thadmanur of Andhol

(M).

Page 16: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

15

Name of the Scheme No of Assembly

Segments No of Habitations

Population as per 2011

Census

Water Grid - 13 4 785

8,68,988

10. PROJECT COST: The cost of the project is Rs. 1300.00 Crores (Consists 145MLD Treatment Plant at

Peddareddypet &, Clear Water Sumps, OHBR, OHSRs and Pipelines etc,

11. PROJECT PERIOD

The completion period is tentatively proposed as two years after obtaining administrative

clearance from the Government.

13. INSTITUTIONAL SUPPORT:

The RWS&S Department is implementing all developmental activities in rural areas including

rural water supply. The department has sufficient experience in implementing large water supply

projects including projects with bilateral assistance in rural areas. With all the experience gained

in executing the projects already sanctioned, the Department is sufficiently equipped for

implementing this project.

13. CONCLUSION: By implementing this project it can be ensured the availability of adequate quantity of drinking

water of acceptable quality on long-term basis. The long-term objective of improvement of

health of the people in the project area results in the overall development.

The project deserves to be considered on priority to save the people from Fluorosis that is

crippling the abilities of the people in the project area. This project would especially cater to the

health needs of the women and children who are the most essential target groups for any

development to be meaningful and permanent and as well as the socio economic growth of the

district.

The DPR is prepared with current SSR of 2015-16 and early technical sanction is solicited sir.

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Page 17: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

16

Page 18: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Estt cost Rs in Lakhs 130000.00

Sl.

NoDescription of the work Quantity Unit Rate Per

Amount

(in Lakhs))

1Pumping Main from Intake well to Aerator & Clear water Sump to OHBR

Sub Estimate

3300.00

2145 MLD Treatment Plant at Pedhareddipet of Pulkal (M)

1 NosSub

Estimate4952.00

313500 KL Clear water sump at Head works at Pedhareddipet of pulkal (M)

Sub Estimate

501.00

4 Pump sets 4918 HPSub

Estimate1469.00

5 Provision for power supply 4918 0.300 HP 1475.40

6Design & Construction of 2X1350 KL 30 m stg OHBR at Thadmanur of Andhol (M).

2 Nos 463.00Sub

Estimate926.00

7 TrunkmainSub

Estimate34550.00

8 Gravity lines to Jukkal ConstituencySub

Estimate23127.00

9 Gravity lines to Yellareddy Const.Sub

Estimate8000.00

10 Gravity lines to Banswada Const.Sub

Estimate20510.00

11 Gravity lines to Bodhan ConstituencySub

Estimate12000.00

12

a)Construction of 100 KL BPT at Aredu (30 m stg) of Nizamsagar (M).

Sub Estimate

141.00

b)Construction of 180 KL BPT at Ch. Kodapgal(10 ms tg) of Pitlam(M).

Sub Estimate

56.00

c)Construction of 30 KL BPT at Chillargi(25 m Stg) of Pitlam(M).

Sub Estimate

87.00

d)Construction of 160 KL BPT at Awalgaon (20m Stg) of Madnoor (M).

Sub Estimate

147.00

e)Construction of 50 KL BPT near Mansuram T Jn (15 m Stg) of bichkunda (M).

Sub Estimate

24.00

f)Construction of 60 KL BPT near Kandebhallur (20 m Stg) of jukkal (M).

Sub Estimate

102.00

g)Construction of 110 KL BPT near Mailar (25 m Stg) of jukkal (M).

Sub Estimate

121.00

h)Construction of 90 KL BPT near Dosthapally (20 m Stg) of jukkal (M).

Sub Estimate

114.00

i)Construction of 30KL Sump at Tadgur Small of Madnoor (M).

Sub Estimate

8.00

j)Construction of 170 KL sump At Gulla Small of Jukkal (M).

Sub Estimate

20.00

k)Construction of 160 KL BPT at Dowlthapur (20 m Stg) of Bichkunda (M).

Sub Estimate

147.00

13

a)Construction of 130 KL BPT At Timmareddy X road (30 m Stg) of Yellareddy (M)

Sub Estimate

155.00

c)Construction of 200 KL sump At Mumbojipet JN Of Lingampet (M)

Sub Estimate

41.00

ABSTRACT ESTIMATE

PROVIDING DRINKING WATER SUPPLY IN NIZAMABAD DIST

Segment 13-Singur,Jukkal,Bodhan,Banswda & Yellareddy

Structures of Jukkal Constituency

Structures of Yellareddy Constituency

Page 19: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Sl.

NoDescription of the work Quantity Unit Rate Per

Amount

(in Lakhs))

d)Construction of 40 KL sump At Bayampalli Jn Of Lingampet (M)

Sub Estimate

9.50

e)Construction of 150 KL Sump At Karpole Of Lingampet (M)

Sub Estimate

18.50

f)Construction of 100 KL sump At Musthapur Of Lingampet (M)

Sub Estimate

15.00

g)Construction of 20 KL Yellaram GLBR Of Yellareddy (M)

Sub Estimate

4.00

h)Construction of 130 KL BPT at Hajeepur 30 M stg Of Yellareddy (M)

Sub Estimate

155.00

14)

a)Construction of 1500 KL BPT near Santosh Nagar 20 M stg Of Banswada (M)

Sub Estimate

471.00

b)Construction of 300 KL Sump near Krishna Nagar T Of Banswada (M)

Sub Estimate

48.50

c)Construction of 50 KL Krishna Nagar T 20 m Staging Of Banswada (M)

Sub Estimate

100.00

d)Construction of 150 KL Sump Near Jalalpur Of Varni (M)

Sub Estimate

18.60

e)Construction of 30 KL Sump at Raitunagar Of Birkur (M)

Sub Estimate

8.00

f)Construction of 90 KL Sump @ Suddalam Of Kotagiri (M)

Sub Estimate

13.00

g)Construction of 10 KL 12 m stg Suddalam OHBR Of Kotagiri (M)

Sub Estimate

10.00

h)Construction of 130 KL BPT at Mirzapur (GLBR) 12 m stg Of Kotagiri (M)

Sub Estimate

46.00

i)Construction of 20KL BPT at Birkur X rd 20 m stg Of Birkur (M)

Sub Estimate

84.00

k)Construction of 10KL BPT at Boppaspally 12 m stg Of Birkur (M)

Sub Estimate

10.00

l)Construction of 60 KL BPT at B0mmandevpally 20 m stg(Near Nasrullabad Hillock) Of Birkur (M)

Sub Estimate

102.00

m)Construction of 180 KL BPT at Sevalal t 12 m stg Of Varni (M)

Sub Estimate

54.50

15)

a)Construction of 700 KL BPT at Akbar Nagar nearby Hillock (12m) Of Varni (M).

Sub Estimate

129.00

b)Construction of 40 KL 30 m stg BPT at Fakeerabad Of Navipet (M).

Sub Estimate

107.00

c)Construction of 90 KL 30 m stgBPT at Navipet Y Jn Of Navipet (M).

Sub Estimate

128.00

16Provision for C/o of Compound walls for Head Works and for all the Intermediate Pumping Stations and Structures

Sub Estimate

48.00

17Construction of Pump room(60 x 15m) at Peddareddipet Head Works of Pulkal (M).

Sub Estimate

115.00

18Construction of Pump room(45 x 10m) at Raipahad

Sub Estimate

62.00

19

Construction of Pump room(4 x 3m) at Sudddulam,Raitunagar,Jalalpur,Karpole,Mumbojipet,Bayanpally, Mustafur, Thadgur Small And Gulla Small.

9 6.00Sub

Estimate54.00

20Construction of Pump room(14 x 10m) at Krishnanagar T of Banswada (M).

Sub Estimate

25.00

Structures of Banswada Constituency

Structures of Bodhan Constituency

Page 20: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Sl.

NoDescription of the work Quantity Unit Rate Per

Amount

(in Lakhs))

21Construction of watchmen Quaters and Operator Quaters at Peddaredipet of Pulkal (M).

Sub Estimate

14.00

22Construction of watchmen Quaters and Operator Quaters atThadmanur of Andhol (M).

Sub Estimate

14.00

23Construction of watchmen Quaters and Operator Quaters at Krishna Nagar T of Banswada (M).

Sub Estimate

14.00

24Provision for Land Scaping at Head works located near Nizamsagar

100.00

25Provision for road crossings, railway crossings and NH Crossings with trenchless technology and canal crossings

Sub Estimate

1745.00

Sub Total 115696.00

26 Provision for Construction of Central Monitaring Building, Division Level

LS 125.00

27 Provision for Land Aquisition (20 acres @ 6 120.0028 Provision for R&B Permissions 100.0029 Provision for NHAI Permissions & Forest

Permissions500.00

30 Provision for O&M for one year 1000.0031 Provision for VAT@5% 4000.0032 Provision for CED 3500.0033 Provision for Labourcess@1% 1156.9634 Provision for price variation of Steel and

Cement800.00

35 Provision for NAC 115.7036 Provision for laying of OFC cable for a length

of Pipe Line all along the pipelines at Rs.400000/- per KM

1680.00 400000 871.34

37 Provision for Providing Automated Operation systems( like SCADA) and providing Flow metres)

1000.00

38 Q.C 0.5% 578.0039 Ls for unforeseen items 437.00

Sub Total 14304.00

130000.00

Asst. Executive Engineer Dy. Executive Engineer TDWSP Banswada/ TDWSP Sub division Yellareddy Banswada/ Yellareddy

Executive Engineer Superintending Engineer TDWSP Division Circle, TDWSP Banswada Nirmal

Grand Total (In Lakhs)

Page 21: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

20510.00 Lakhs

SL

NoQty Unit Rate per Amount Rs.

1

6 kg/cm2

63mm dia 6 kg/cm2 Pipes 52478 Rm 257.38 Rm 13506768.14

75mm dia 6 kg/cm2 Pipes 24615 Rm 312.16 Rm 7683873.385

90mm dia 6 kg/cm2 Pipes 17417 Rm 389.78 Rm 6788702.158

110mm dia 6 kg/cm2 Pipes 7847 Rm 518.77 Rm 4070892.387

125mm dia 6 kg/cm2 Pipes 7025 Rm 631.74 Rm 4438007.543

140mm dia 6 kg/cm2 Pipes 7025 Rm 753.90 Rm 5296173.45

160mm dia 6 kg/cm2 Pipes 891 Rm 963.38 Rm 858372.7831

180mm dia 6 kg/cm2 Pipes 5549 Rm 1,168.87 Rm 6486034.322

200mm dia 6 kg/cm2 Pipes 3722 Rm 1,402.90 Rm 5221597.439

225mm dia 6 kg/cm2 Pipes Rm 1,774.71 Rm

250mm dia 6 kg/cm2 Pipes 1711 Rm 2,142.60 Rm 3665983.665

280mm dia 6 kg/cm2 Pipes 1711 Rm 2,630.10 Rm 4500104.588

8 kg /cm2

63 mm dia 8 kg/cm2 Pipes 19459 Rm 290.49 Rm 5652731.689

75 mm dia 8 kg/cm2 Pipes 4737 Rm 358.98 Rm 1700404.26

90 mm dia 8 kg/cm2 Pipes 13146 Rm 457.15 Rm 6009654.393

110 mm dia 8 kg/cm2 Pipes 9954 Rm 616.96 Rm 6141119.907

125 mm dia 8 kg/cm2 Pipes 7611 Rm 763.06 Rm 5807453.51

140 mm dia 8 kg/cm2 Pipes 966 Rm 916.04 Rm 885223.3715

160 mm dia 8 kg/cm2 Pipes 5654 Rm 1171.19 Rm 6621933.967

180 mm dia 8 kg/cm2 Pipes 4245 Rm 1437.20 Rm 6101009.139

200 mm dia 8 kg/cm2 Pipes 4032 Rm 1734.03 Rm 6991616.602

225 mm dia 8 kg/cm2 Pipes 3396 Rm 2200.61 Rm 7473287.235

250 mm dia 8 kg/cm2 Pipes 4720 Rm 2676.97 Rm 12635191.02

280 mm dia 8 kg/cm2 Pipes 8308 Rm 3295.79 Rm 27381714.67

10 kg/cm2

63 mm dia 10 kg/cm2 Pipes 18632 Rm 322.46 Rm 6008127.583

75 mm dia 10 kg/cm2 Pipes 7703 Rm 403.51 Rm 3108147.811

90 mm dia 10 kg/cm2 Pipes 11674 Rm 518.81 Rm 6056419.71

110 mm dia 10 kg/cm2 Pipes 5380 Rm 706.03 Rm 3798245.165

125 mm dia 10 kg/cm2 Pipes 3091 Rm 882.95 Rm 2728791.973

140 mm dia 10 kg/cm2 Pipes 2992 Rm 1066.77 Rm 3191367.133

160 mm dia 10 kg/cm2 Pipes 352 Rm 1367.59 Rm 481391.4814

180 mm dia 10 kg/cm2 Pipes 2090 Rm 1687.26 Rm 3526367.981

200 mm dia 10 kg/cm2 Pipes Rm 2038.90 Rm

225 mm dia 10 kg/cm2 Pipes 10410 Rm 2597.97 Rm 27045166.15

250 mm dia 10 kg/cm2 Pipes 456 Rm 3165.68 Rm 1444014.28

280 mm dia 10 kg/cm2 Pipes 6825 Rm 3903.24 Rm 26640283.63

12.5 kg/cm2

63 mm dia 12.5 kg/cm2 Pipes 8046 Rm 611.55 Rm 4920563.896

75 mm dia 12.5 kg/cm2 Pipes 6332 Rm 869.15 Rm 5503447.896

90 mm dia 12.5 kg/cm2 Pipes 1704 Rm 1234.31 Rm 2103262.374

110 mm dia 12.5 kg/cm2 Pipes Rm 1848.24 Rm

125 mm dia 12.5 kg/cm2 Pipes Rm 2378.84 Rm

140 mm dia 12.5 kg/cm2 Pipes Rm 2989.87 Rm

160 mm dia 12.5 kg/cm2 Pipes Rm 3894.33 Rm

180 mm dia 12.5 kg/cm2 Pipes Rm 4921.22 Rm

200 mm dia 12.5 kg/cm2 Pipes Rm 6085.91 Rm

TELANGANA DRINKING WATER SUPPLY PROJECT

Segment 13Detailed Sub Estimate for Gravity Mains - Banswada Segment

Description of Item

Construction of pipelines for water supply with HDPE pipes as per IS specifications, with its amendments and revisions thereon

including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe lines true to

alignment and gradient, trench excavation for pipelines in all soils except rock requring blasting and refilling trenches with

excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and

filling the pipeline with water and testing etc., complete as specified in Technical specifications (PartB - Volume I) and as per

drawing (Part C - Volume 1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of

pipeline work, but excluding CED and other taxes.

Est. cost.Rs.

Page 22: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

225 mm dia 12.5 kg/cm2 PipesRm

7733.36Rm

250 mm dia 12.5 kg/cm2 Pipes Rm 9546.44 Rm

280 mm dia 12.5 kg/cm2 Pipes Rm 11976.97 Rm

2

DI K7 Pipeline

100 mm dia DI K7 Pipes Rm 1375.38 Rm

150 mm dia DI K7 Pipes Rm 1873.72 Rm

200 mm dia DI K7 Pipes 1840 Rm 2476.72 Rm 4557157.639

250 mm dia DI K7 Pipes Rm 3253.45 Rm

300 mm dia DI K7 Pipes 5281 Rm 4200.39 Rm 22182240.13

350 mm dia DI K7 Pipes 5783 Rm 5236.24 Rm 30281191.38

400 mm dia DI K7 Pipes Rm 6266.56 Rm

450 mm dia DI K7 Pipes 400 Rm 7512.77 Rm 3005107.661

500 mm dia DI K7 Pipes Rm 8981.86 Rm

600 mm dia DI K7 Pipes 1630 Rm 11954.89 Rm 19486477.39

700 mm dia DI K7 Pipes Rm 15630.58 Rm

750 mm dia DI K7 Pipes Rm Rm

800 mm dia DI K7 Pipes Rm 20757.08 Rm

900 mm dia DI K7 Pipes Rm 24505.97 Rm

DI K9 Pipeline

100 mm dia DI K9 Pipes 6946 Rm 1571.42 Rm 10915029.71

150 mm dia DI K9 Pipes 464 Rm 2258.89 Rm 1048123.916

200 mm dia DI K9 Pipes 11804 Rm 2906.86 Rm 34312427.41

250 mm dia DI K9 Pipes Rm 3828.43 Rm

300 mm dia DI K9 Pipes 1338 Rm 4794.28 Rm 6414747.074

350 mm dia DI K9 Pipes 5783 Rm 6003.81 Rm 34720057.82

400 mm dia DI K9 Pipes 5490 Rm 7143.69 Rm 39218831.44

450 mm dia DI K9 Pipes Rm 8514.44 Rm

500 mm dia DI K9 Pipes Rm 9957.00 Rm

600 mm dia DI K9 Pipes Rm 13061.96 Rm

700 mm dia DI K9 Pipes Rm 17050.16 Rm

750 mm dia DI K9 Pipes Rm 19263.84 Rm

800 mm dia DI K9 Pipes Rm 22515.70 Rm

900 mm dia DI K9 Pipes Rm 26643.99 Rm

3

14 mm thick

1000 mm dia MS pipes 16011 Rm 30687.08 491330837.9

16 mm thick

1100 mm dia MS pipes 14100 Rm 37040.94 522277254

16 mm thick

1200 mm dia MS pipes 8400 Rm 40140.72 337182048

4

on HDPE

50 mm Airvalve on 63 mm 155 each 89866 Each 13929253.88

50 mm Airvalve on 75 mm 82 each 89916 Each 7373123.861

50 mm Airvalve on 90 mm 83 each 90000 Each 7470018.239

50 mm Airvalve on 110 mm 41 each 92348 Each 3786270.836

Construction of pipelines for water supply with MS as per IS:2062-1992 Seemless Pipe with Polyruthen Coating

inside and outside Cement Motor (1:3) lining with required thickness as per design including with all its

amendments and revisions thereon including , mechanical joints and as per Technical specifications as per

requirements, lowering, laying and jointing of pipes true to alignment and gradient, trench excavation of pipelines as

per standard (1.8x2.8M) in all soils except rock requiring blasting and refilling trenches with excavated earth (other

than rocky soils and boulders) with watering and tamping and removing surplus earth from site of work and filling

pipeline with water and testing etc., complete. The rates are inclusive of cost & conveyance of all materials, and

labour charges, but excluding CED and taxes for finished pipeline work.

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per

I.S.3896-part2-1985 and subsequent revisions along with construction of Valve chamber

Construction of pipelines for water supply with Centrifugally Ductile Iron S/S pipes as per IS:12288 :1987 with its amendments

and revisions thereon including supply of pipes with rubber gaskets as per IS:8329-2000 including inside cement mortar lining and

outside zinc coating, mechanical joints as per IS:13382-1992 and jiffy joints and as per Technical specifications as per

requirements, lowering, laying and jointing of pipes true to alignment and gradient, trench excavation of pipelines as per standard

in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with

watering and tamping and removing surplus earth from site of work and filling pipeline with water and testing etc., complete. The

rates are inclusive of cost & conveyance of all materials, and labour charges, but excluding CED and taxes for finished pipeline

work.

Page 23: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

50 mm Airvalve on 125 mm 41 each 95146 Each 3901005.141

50 mm Airvalve on 140 mm 21 each 98261 Each 2063488.24

50 mm Airvalve on 160 mm 13 each 98639 Each 1282301.105

50 mm Airvalve on 180 mm 23 each 99193 Each 2281438.719

50 mm Airvalve on 200 mm 16 each 106190 Each 1699047.188

50 mm Airvalve on 225 mm 28 each 106547 Each 2983321.611

80 mm Airvalve on 250 mm 33 each 130858 Each 4318317.94

80 mm Airvalve on 280 mm 33 each 131542 Each 4340888.696

5

On DI

50 mm Airvalve on 100 mm 14 each 85755.55 Each 1200577.632

50 mm Airvalve on 150 mm 1 each 86666.21 Each 86666.21484

50 mm Airvalve on 200 mm 27 each 87866.35 Each 2372391.526

80 mm Airvalve on 250 mm each 104420.13 Each

80 mm Airvalve on 300 mm 18 each 106040.03 Each 1908720.476

100 mm Airvalve on 350 mm 12 each 119984.65 Each 1439815.852

100 mm Airvalve on 400 mm 12 each 121568.22 Each 1458818.643

100 mm Airvalve on 450 mm 2 each 123834.91 Each 247669.8153

150 mm Airvalve on 500 mm each 153846.22 Each

150 mm Airvalve on 600 mm 2 each 162232.28 Each 324464.566

150 mm Airvalve on 700 mm each 169737.83 Each

200 mm Airvalve on 800 mm each 206385.75 Each

200 mm Airvalve on 900 mm each 217188.53 Each

6

On MS

150 mm Airvalve on 1000 mm 32 each 133739.17 Each 4279653.44

150 mm Airvalve on 1100 mm 25 each 133739.17 Each 3343479.25

150 mm Airvalve on 1200 mm 16 each 133739.17 Each 2139826.72

7

on HDPE

80 mm Sluice valve on 63 mm 192 each 36300.90 Each 6969773.211

80 mm Sluice valve on 75 mm 43 each 36350.89 Each 1563088.388

80 mm Sluice valve on 90 mm 43 each 36434.97 Each 1566703.617

100 mm Sluice valve on 110 mm 22 each 48358.51 Each 1063887.235

125 mm Sluice valve on 125 mm 17 each 50125.80 Each 852138.6183

150 mm Sluice valve on 140 mm 10 each 64602.39 Each 646023.9487

150 mm Sluice valve on 160 mm 7 each 64979.60 Each 454857.1767

150 mm Sluice valve on 180 mm 10 each 65534.04 Each 655340.3787

200 mm Sluice valve on 200 mm 6 each 90954.35 Each 545726.1204

200 mm Sluice valve on 225 mm 7 each 91311.10 Each 639177.7316

250 mm Sluice valve on 250 mm 12 each 124655.69 Each 1495868.333

250 mm Sluice valve on 280 mm 12 each 125339.66 Each 1504075.881

7

100 mm Sluice valve on 100 mm 4 each 45489.97 Each 181959.8729

150 mm Sluice valve on 150 mm 1 each 59650.82 Each 59650.8214

200 mm Sluice valve on 200 mm 8 each 82589.42 Each 660715.3741

250 mm Sluice valve on 250 mm each 112923.34 Each

300 mm Sluice valve on 300 mm 6 each 155814.97 Each 934889.8306

350 mm Sluice valve on 350 mm 6 each 374765.07 Each 2248590.39

400 mm Sluice valve on 400 mm 4 each 403360.47 Each 1613441.898

450 mm Sluice valve on 450 mm 4 each 617395.16 Each 2469580.64

500 mm Sluice valve on 500 mm each 670300.29 Each

600 mm Sluice valve on 600 mm 4 each 886154.72 Each 3544618.87

600 mm Sluice valve on 700 mm each 969591.01 Each

600 mm Sluice valve on 800 mm each 1095515.40 Each

600 mm Sluice valve on 900 mm each 1131054.83 Each

7 each

800 mm Sluice valve on 1000 mm 6 each 1098225.00 6589350

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS 13095-

1991. With hand lever below 150 mm, with Worm gear for 200 mm and above

along with construction of valve chamber

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per

I.S.3896-part2-1985 and subsequent revisions along with construction of Valve chamber

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per

I.S.3896-part2-1985 and subsequent revisions along with construction of Valve chamber

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS 13095-

1991. With hand lever below 150 mm, with Worm gear for 200 mm and above

along with construction of valve chamber

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS 13095-

1991. With hand lever below 150 mm, with Worm gear for 200 mm and above

along with construction of valve chamber

Page 24: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

800 mm Sluice valve on 1100 mm 15 each 1210314.00 18154710

900 mm Sluice valve on 1200 mm 7 each 1405150.00 9836050

8

on HDPE

80 mm dia 63-125mm dia line 54 each 41210.69 Each 2225377.092

100 mm dia >125-180mm dia line 4 each 54171.99 Each 216687.9701

150 mm dia >180-225mm dia line 9 each 74315.39 Each 668838.5414

150 mm dia >225-350mm dia line 17 each 74315.39 Each 1263361.689

200 mm dia >350-400mm dia line each 103216.94 Each

300 mm dia >400-600mm dia line each 194678.09 Each

on DI

80 mm dia 63-125mm dia line 4 each 41210.69 Each 164842.7475

100 mm dia >125-180mm dia line 1 each 54171.99 Each 54171.99252

150 mm dia >180-225mm dia line 1 each 74315.39 Each 74315.39348

150 mm dia >225-350mm dia line 10 each 74315.39 Each 743153.9348

200 mm dia >350-400mm dia line 10 each 103216.94 Each 1032169.431

300 mm dia >400-600mm dia line each 194678.09 Each

500 mm dia 600-1000mm dia line 1 each 730299.22 Each 730299.2197

on MS

80 mm dia 63-125mm dia line each 41210.69 Each

100 mm dia >125-180mm dia line each 54171.99 Each

150 mm dia >180-225mm dia line each 74315.39 Each

150 mm dia >225-350mm dia line each 74315.39 Each

200 mm dia >350-400mm dia line each 103216.94 Each

300 mm dia >400-600mm dia line each 194678.09 Each

500 mm dia 600-1000mm dia line 7 each 730299.22 Each 5112094.538

700 mm dia 1100-1600mm dia line 4 each 2274982.00 9099928

9 1890 M3 443.92 M3 839008.8

10 154870.1876

196.9270997

11 8.17

205.10

cr

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Executive Engineer Superintending Engineer

TDWSP Division TDWSP Circle

Banswada Nirmal

Earth work excavation in hard rock size more than 3.0cum in size

which required blasting including cost and converyance of all

material and labour charges etc., including stacking of the hard

rock after blasting as per the department direction and APDSS

etc., complete for finished item of work

LS for unforceen items

Total Rs.

Fixing of Scou valves usin DI Wafer Butterfly valves conforming to IS 13095-

1991. With hand lever below 150 mm, with Worm gear for 200 mm and above

along with construction of valve chambers

Sub Total

Provision for Anchor blocks, Thrust Blocks on Line at required places and road crossings etc., @ 5 %

Page 25: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. cost.Rs. 11999.51 lakhsSL

NoQty Unit Rate per Amount Rs.

1

6 kg/cm2

63mm dia 6 kg/cm2 Pipes 8643 Rm 257.38 Rm 22,24,516

75mm dia 6 kg/cm2 Pipes 6546 Rm 312.16 Rm 20,43,418

90mm dia 6 kg/cm2 Pipes 5287 Rm 389.78 Rm 20,60,761

110mm dia 6 kg/cm2 Pipes 9553 Rm 518.77 Rm 49,55,772

125mm dia 6 kg/cm2 Pipes 13944 Rm 631.74 Rm 88,09,050

140mm dia 6 kg/cm2 Pipes 6662 Rm 753.90 Rm 50,22,506

160mm dia 6 kg/cm2 Pipes 10322 Rm 963.38 Rm 99,44,022

180mm dia 6 kg/cm2 Pipes 6493 Rm 1,168.87 Rm 75,89,443

200mm dia 6 kg/cm2 Pipes 6356 Rm 1,402.90 Rm 89,16,839

225mm dia 6 kg/cm2 Pipes 6043 Rm 1,774.71 Rm 107,24,583

250mm dia 6 kg/cm2 Pipes 7400 Rm 2,142.60 Rm 158,55,219

280mm dia 6 kg/cm2 Pipes Rm 2,630.10 Rm

8 kg /cm2

63 mm dia 8 kg/cm2 Pipes 9631 Rm 290.49 Rm 27,97,717

75 mm dia 8 kg/cm2 Pipes 5092 Rm 358.98 Rm 18,27,916

90 mm dia 8 kg/cm2 Pipes 9555 Rm 457.15 Rm 43,68,040

110 mm dia 8 kg/cm2 Pipes 12173 Rm 616.96 Rm 75,10,297

125 mm dia 8 kg/cm2 Pipes 3991 Rm 763.06 Rm 30,45,354

140 mm dia 8 kg/cm2 Pipes 2960 Rm 916.04 Rm 27,11,489

160 mm dia 8 kg/cm2 Pipes 2677 Rm 1171.19 Rm 31,35,288

180 mm dia 8 kg/cm2 Pipes 6890 Rm 1437.20 Rm 99,02,278

200 mm dia 8 kg/cm2 Pipes 1262 Rm 1734.03 Rm 21,88,348

225 mm dia 8 kg/cm2 Pipes Rm 2200.61 Rm

250 mm dia 8 kg/cm2 Pipes 11718 Rm 2676.97 Rm 313,68,780

280 mm dia 8 kg/cm2 Pipes Rm 3295.79 Rm

10 kg/cm2

63 mm dia 10 kg/cm2 Pipes 4965 Rm 322.46 Rm 16,01,024

75 mm dia 10 kg/cm2 Pipes 4506 Rm 403.51 Rm 18,18,213

90 mm dia 10 kg/cm2 Pipes 9569 Rm 518.81 Rm 49,64,453

110 mm dia 10 kg/cm2 Pipes 3826 Rm 706.03 Rm 27,01,257

125 mm dia 10 kg/cm2 Pipes 6527 Rm 882.95 Rm 57,62,999

140 mm dia 10 kg/cm2 Pipes 4041 Rm 1066.77 Rm 43,10,799

160 mm dia 10 kg/cm2 Pipes 12801 Rm 1367.59 Rm 175,06,512

180 mm dia 10 kg/cm2 Pipes 3052 Rm 1687.26 Rm 51,49,507

200 mm dia 10 kg/cm2 Pipes 5328 Rm 2038.90 Rm 108,63,263

225 mm dia 10 kg/cm2 Pipes 6541 Rm 2597.97 Rm 169,93,333

250 mm dia 10 kg/cm2 Pipes 6238 Rm 3165.68 Rm 197,47,496

280 mm dia 10 kg/cm2 Pipes Rm 3903.24 Rm

TELANGANA DRINKING WATER SUPPLY PROJECT

Segment 13

Detailed and Abstract Estimate of Gravity Mains - BODHAN SEGMENT

Description of Item

Construction of pipelines for water supply with HDPE pipes as per IS specifications, with its amendments

and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering,

laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils

except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and

boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline

with water and testing etc., complete as specified in Technical specifications (PartB - Volume I) and as per

drawing (Part C - Volume 1). The rates are inclusive of cost and conveyance of all materials and labour

charges for finished item of pipeline work, but excluding CED and other taxes.

Page 26: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

SL

NoQty Unit Rate per Amount Rs.Description of Item

2

DI K7 Pipe Line

100 mm dia DI K7 Pipes Rm 1375.38 Rm

150 mm dia DI K7 Pipes Rm 1873.72 Rm

200 mm dia DI K7 Pipes Rm 2476.72 Rm

250 mm dia DI K7 Pipes Rm 3253.45 Rm

300 mm dia DI K7 Pipes 11133 Rm 4200.39 Rm 467,62,901

350 mm dia DI K7 Pipes 8017 Rm 5236.24 Rm 419,78,958

400 mm dia DI K7 Pipes 2743 Rm 6266.56 Rm 171,89,175

450 mm dia DI K7 Pipes 1151 Rm 7512.77 Rm 86,47,197

500 mm dia DI K7 Pipes Rm 8981.86 Rm

600 mm dia DI K7 Pipes 4938 Rm 11954.89 Rm 590,33,267

700 mm dia DI K7 Pipes 1681 Rm 15630.58 Rm 262,75,002

800 mm dia DI K7 Pipes 1681 Rm 20757.08 Rm 348,92,651

900 mm dia DI K7 Pipes

DI K9 Pipe Line

100 mm dia DI K9 Pipes 1799 Rm 1571.42 Rm 28,26,985

150 mm dia DI K9 Pipes 5267 Rm 2258.89 Rm 118,97,562

200 mm dia DI K9 Pipes Rm 2906.86 Rm

250 mm dia DI K9 Pipes 1275 Rm 3828.43 Rm 48,81,253

300 mm dia DI K9 Pipes 1762 Rm 4794.28 Rm 84,47,522

350 mm dia DI K9 Pipes 214 Rm 6003.81 Rm 12,84,816

400 mm dia DI K9 Pipes 2429 Rm 7143.69 Rm 173,52,011

450 mm dia DI K9 Pipes 8787 Rm 8514.44 Rm 748,16,373

500 mm dia DI K9 Pipes Rm 9957.00 Rm

600 mm dia DI K9 Pipes 10506 Rm 13061.96 Rm 1372,28,938

700 mm dia DI K9 Pipes Rm 17050.16 Rm

800 mm dia DI K9 Pipes Rm 22515.70 Rm

900 mm dia DI K9 Pipes Rm 26643.99 Rm

3

1000 mm dia PCCP 14 KG / CM2 2804 Rm 20076.28 562,93,889

1000 mm dia PCCP 14 KG / CM2 11560 Rm 20076.28 2320,81,797

4

on HDPE

Construction of pipelines for water supply with PCCP as per IS:2062-1992 Seemless Pipe with

Polyruthen Coating inside and outside Cement Motor (1:3) lining with required thickness as

per design including with all its amendments and revisions thereon including , mechanical

joints and as per Technical specifications as per requirements, lowering, laying and jointing of

pipes true to alignment and gradient, trench excavation of pipelines as per standard (1.8x2.8M)

in all soils except rock requiring blasting and refilling trenches with excavated earth (other than

rocky soils and boulders) with watering and tamping and removing surplus earth from site of

work and filling pipeline with water and testing etc., complete. The rates are inclusive of cost &

conveyance of all materials, and labour charges, but excluding CED and taxes for finished

pipeline work.

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or

equivalent grade as per I.S.3896-part2-1985 and subsequent revisions along with construction

of Valve chamber

Construction of pipelines for water supply with Centrifugally Ductile Iron S/S pipes as per IS:12288 :1987

with its amendments and revisions thereon including supply of pipes with rubber gaskets as per IS:8329-

2000 including inside cement mortar lining and outside zinc coating, mechanical joints as per IS:13382-

1992 and jiffy joints and as per Technical specifications as per requirements, lowering, laying and jointing

of pipes true to alignment and gradient, trench excavation of pipelines as per standard in all soils except

rock requiring blasting and refilling trenches with excavated earth (other than rocky soils and boulders)

with watering and tamping and removing surplus earth from site of work and filling pipeline with water and

testing etc., complete. The rates are inclusive of cost & conveyance of all materials, and labour charges,

but excluding CED and taxes for finished pipeline work.

Page 27: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

SL

NoQty Unit Rate per Amount Rs.Description of Item

50 mm Airvalve on 63 mm 42 each 89866.15 Each 37,74,37850 mm Airvalve on 75 mm 34 each 89916.14 Each 30,57,14950 mm Airvalve on 90 mm 53 each 90000.22 Each 47,70,01250 mm Airvalve on 110 mm 52 each 92348.07 Each 48,02,10050 mm Airvalve on 125 mm 55 each 95146.47 Each 52,33,05650 mm Airvalve on 140 mm 40 each 98261.34 Each 39,30,45450 mm Airvalve on 160 mm 55 each 98638.55 Each 54,25,12050 mm Airvalve on 180 mm 38 each 99192.99 Each 37,69,33450 mm Airvalve on 200 mm 29 each 106190.45 Each 30,79,52350 mm Airvalve on 225 mm 29 each 106547.20 Each 30,89,86980 mm Airvalve on 250 mm 57 each 130858.12 Each 74,58,91380 mm Airvalve on 280 mm each 131542.08 Each

5

On DI

50 mm Airvalve on 100 mm 4 each 85755.55 Each 3,43,02250 mm Airvalve on 150 mm 12 each 86666.21 Each 10,39,99550 mm Airvalve on 200 mm each 87866.35 Each80 mm Airvalve on 250 mm 3 each 104420.13 Each 3,13,26080 mm Airvalve on 300 mm 30 each 106040.03 Each 31,81,201100 mm Airvalve on 350 mm 17 each 119984.65 Each 20,39,739100 mm Airvalve on 400 mm 11 each 121568.22 Each 13,37,250100 mm Airvalve on 450 mm 22 each 123834.91 Each 27,24,368150 mm Airvalve on 500 mm each 153846.22 Each150 mm Airvalve on 600 mm 22 each 162232.28 Each 35,69,110150 mm Airvalve on 700 mm 4 each 169737.83 Each 6,78,951200 mm Airvalve on 800 mm each 206385.75 Each200 mm Airvalve on 900 mm each 217188.53 Each

6

On PCCP

150 mm Airvalve on 1000 mm 30 each 133739.31 Each 40,12,179

7

on HDPE

80 mm Sluice valve on 63 mm 45 each 36300.90 Each 16,33,54180 mm Sluice valve on 75 mm 25 each 36350.89 Each 9,08,77280 mm Sluice valve on 90 mm 25 each 36434.97 Each 9,10,874

100 mm Sluice valve on 110 mm 28 each 48358.51 Each 13,54,038125 mm Sluice valve on 125 mm 19 each 50125.80 Each 9,52,390150 mm Sluice valve on 140 mm 14 each 64602.39 Each 9,04,434150 mm Sluice valve on 160 mm 12 each 64979.60 Each 7,79,755150 mm Sluice valve on 180 mm 12 each 65534.04 Each 7,86,408200 mm Sluice valve on 200 mm 10 each 90954.35 Each 9,09,544200 mm Sluice valve on 225 mm 7 each 91311.10 Each 6,39,178250 mm Sluice valve on 250 mm 17 each 124655.69 Each 21,19,147250 mm Sluice valve on 280 mm each Each

8

On DI Pipe Line

100 mm Sluice valve on 100 mm 1 each 45489.97 Each 45,490

150 mm Sluice valve on 150 mm 2 each 59650.82 Each 1,19,302

200 mm Sluice valve on 200 mm each 82589.42 Each

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or

equivalent grade as per I.S.3896-part2-1985 and subsequent revisions along with construction

of Valve chamber

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or

equivalent grade as per I.S.3896-part2-1985 and subsequent revisions along with construction

of Valve chamber

Fixing of Gate valves with DI Wafer Butterfly valves

conforming to IS 13095-1991. With hand lever below 150

mm, with Worm gear for 200 mm and above along with

construction of valve chamber

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS 13095-1991. With

hand lever below 150 mm, with Worm gear for 200 mm and above along with

construction of valve chamber

Page 28: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

SL

NoQty Unit Rate per Amount Rs.Description of Item

250 mm Sluice valve on 250 mm 8 each 112923.34 Each 9,03,387

300 mm Sluice valve on 300 mm 8 each 155814.97 Each 12,46,520

350 mm Sluice valve on 350 mm 12 each 374765.07 Each 44,97,181

400 mm Sluice valve on 400 mm 3 each 403360.47 Each 12,10,081

450 mm Sluice valve on 450 mm 7 each 617395.16 Each 43,21,766

500 mm Sluice valve on 500 mm each 670300.29 Each

600 mm Sluice valve on 600 mm 5 each 886154.72 Each 44,30,774

700 mm Sluice valve on 700 mm 1 each 969591.01 Each 9,69,591

800 mm Sluice valve on 800 mm 1 each 1095515.40 Each 10,95,515

800 mm Sluice valve on 900 mm each 1131054.83 Each

9

On PCCP Pipes

800 mm Sluice valve on 1000 mm 3 each 1098225.00 Each 32,94,675

10

on HDPE

80 mm dia 63-125mm dia line 23 each 41210.69 Each 9,47,846

100 mm dia >125-180mm dia line 34 each 54171.99 Each 18,41,848

150 mm dia >180-225mm dia line 10 each 74315.39 Each 7,43,154

150 mm dia>225-350mm dia

line19 each 74315.39 Each 14,11,992

200 mm dia>350-400mm dia

lineeach 103216.94 Each

300 mm dia>400-600mm dia

lineeach 194678.09 Each

on DI

80 mm dia 63-125mm dia line 1 each 41210.69 Each 41,211

100 mm dia >125-180mm dia line 4 each 54171.99 Each 2,16,688

150 mm dia >180-225mm dia line each 74315.39 Each

150 mm dia>225-350mm dia

line4 each 74315.39 Each 2,97,262

200 mm dia>350-400mm dia

line4 each 103216.94 Each 4,12,868

300 mm dia>400-600mm dia

line11 each 194678.09 Each 21,41,459

500 mm dia600-1000mm dia

line2 each 730299.22 Each 14,60,598

On PCCP

80 mm dia 63-125mm dia line each Each

100 mm dia >125-180mm dia line each Each

125 mm dia >180-225mm dia line each Each

Fixing of Gate valves with DI Wafer Butterfly valves

conforming to IS 13095-1991. With hand lever below 150

mm, with Worm gear for 200 mm and above along with

construction of valve chamber

Fixing of Scou valves usin DI Wafer Butterfly valves

conforming to IS 13095-1991. With hand lever below 150

mm, with Worm gear for 200 mm and above along with

construction of valve chambers

Page 29: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

SL

NoQty Unit Rate per Amount Rs.Description of Item

150 mm dia>225-350mm dia

lineeach Each

200 mm dia>350-400mm dia

lineeach Each

300 mm dia>400-600mm dia

lineeach Each

500 mm dia600-1000mm dia

line8 each 730299.22 Each 58,42,394

11

1400 M3 443.92 6,21,488

12 1,19,600

114

13 6

120.00

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Executive Engineer Superintending Engineer

TDWSP Division TDWSP Circle

Banswada Nirmal

Sub Total

Provision for Anchor blocks, Thrust Blocks on Line at required places and Road Crossing and

Canal Crossings ectc., @ 5 %

Earth work excavation in Hard Rock of Boulders size more

than 3.0cum requires blsting including cost and converyance

of all charges etc., complete for finished item of work

L.S Unforceen Items

Page 30: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. cost.Rs. 23127.00 lakhsSL

NoQty Unit Rate per Amount Rs.

1

6 kg/cm2

63mm dia 6 kg/cm2 Pipes 35270.4 Rm 257.38 Rm 90,77,816

75mm dia 6 kg/cm2 Pipes 10155.409 Rm 312.16 Rm 31,70,142

90mm dia 6 kg/cm2 Pipes 23685.053 Rm 389.78 Rm 92,31,936

110mm dia 6 kg/cm2 Pipes 31202.767 Rm 518.77 Rm 161,86,937

125mm dia 6 kg/cm2 Pipes 13948.781 Rm 631.74 Rm 88,12,071

140mm dia 6 kg/cm2 Pipes 5245.282 Rm 753.90 Rm 39,54,437

160mm dia 6 kg/cm2 Pipes 13066.436 Rm 963.38 Rm 125,87,961

180mm dia 6 kg/cm2 Pipes 21865.398Rm 1,168.87 Rm 255,57,708

200mm dia 6 kg/cm2 Pipes 5834.03 Rm 1,402.90 Rm 81,84,566

225mm dia 6 kg/cm2 Pipes 11366.034 Rm 1,774.71 Rm 201,71,434

250mm dia 6 kg/cm2 Pipes 2011.94 Rm 2,142.60 Rm 43,10,777

8 kg /cm2

63 mm dia 8 kg/cm2 Pipes 40243.946 Rm 290.49 Rm 116,90,497

75 mm dia 8 kg/cm2 Pipes 13980.394 Rm 358.98 Rm 50,18,653

90 mm dia 8 kg/cm2 Pipes 28625.634 Rm 457.15 Rm 130,86,123

110 mm dia 8 kg/cm2 Pipes 17943.371 Rm 616.96 Rm 110,70,406

125 mm dia 8 kg/cm2 Pipes 22074.049 Rm 763.06 Rm 168,43,722

140 mm dia 8 kg/cm2 Pipes 6547.13 Rm 916.04 Rm 59,97,457

160 mm dia 8 kg/cm2 Pipes 15773.435 Rm 1171.19 Rm 184,73,761

180 mm dia 8 kg/cm2 Pipes 16375.602 Rm 1437.20 Rm 235,34,944

200 mm dia 8 kg/cm2 Pipes 13681.33 Rm 1734.03 Rm 237,23,863

225 mm dia 8 kg/cm2 Pipes 1225.404 Rm 2200.61 Rm 26,96,642

250 mm dia 8 kg/cm2 Pipes 18070.623 Rm 2676.97 Rm 483,74,586

280 mm dia 8 kg/cm2 Pipes 1985.27 Rm 3295.79 Rm 65,43,032

12.5 kg/cm2

63 mm dia 12.5 kg/cm2 Pipes 11722.252 Rm 379.55 Rm 44,49,181

75 mm dia 12.5 kg/cm2 Pipes 11570.025 Rm 486.86 Rm 56,32,982

90 mm dia 12.5 kg/cm2 Pipes 6668.932 Rm 657.55 Rm 43,85,156

400138.927

2

DI K7 Pipeline

300 mm dia DI K7 Pipes 15577.778 Rm 4200.39 Rm 654,32,686

350 mm dia DI K7 Pipes 14137.433 Rm 5236.24 Rm 740,27,030

400 mm dia DI K7 Pipes 1050 Rm 6266.56 Rm 65,79,888

DI K9 Pipeline

100 mm dia DI K9 Pipes 20870.789 Rm 1571.42 Rm 327,96,784

TELANGANA DRINKING WATER SUPPLY PROJECTSegment 13

Detailed and Abstract Estimate of Gravity Mains - JUKKAL

Description of Item

Construction of pipelines for water supply with HDPE pipes as per IS specifications, with its amendments and revisions

thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering, laying and jointing of pipe

lines true to alignment and gradient, trench excavation for pipelines in all soils except rock requring blasting and

refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing

surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical

specifications (PartB - Volume I) and as per drawing (Part C - Volume 1). The rates are inclusive of cost and

conveyance of all materials and labour charges for finished item of pipeline work, but excluding CED and other taxes.

Construction of pipelines for water supply with Centrifugally Ductile Iron S/S pipes as per IS:12288 :1987 with its

amendments and revisions thereon including supply of pipes with rubber gaskets as per IS:8329-2000 including inside

cement mortar lining and outside zinc coating, mechanical joints as per IS:13382-1992 and jiffy joints and as per

Technical specifications as per requirements, lowering, laying and jointing of pipes true to alignment and gradient,

trench excavation of pipelines as per standard in all soils except rock requiring blasting and refilling trenches with

excavated earth (other than rocky soils and boulders) with watering and tamping and removing surplus earth from site of

work and filling pipeline with water and testing etc., complete. The rates are inclusive of cost & conveyance of all

materials, and labour charges, but excluding CED and taxes for finished pipeline work.

Page 31: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. cost.Rs. 23127.00 lakhsSL

NoQty Unit Rate per Amount Rs.

TELANGANA DRINKING WATER SUPPLY PROJECTSegment 13

Detailed and Abstract Estimate of Gravity Mains - JUKKAL

Description of Item

150 mm dia DI K9 Pipes 17465.151 Rm 2258.89 Rm 394,51,816

200 mm dia DI K9 Pipes 28592.399 Rm 2906.86 Rm 831,14,010

250 mm dia DI K9 Pipes 8721.87 Rm 3828.43 Rm 333,91,100

300 mm dia DI K9 Pipes 19959.265 Rm 4794.28 Rm 956,90,311

350 mm dia DI K9 Pipes 29952.237 Rm 6003.81 Rm 1798,27,667

400 mm dia DI K9 Pipes 5710.256 Rm 7143.69 Rm 407,92,271

500 mm dia DI K9 Pipes 6217.364 Rm 9957.00 Rm 619,06,310

600 mm dia DI K9 Pipes 8780.128 Rm 13061.96 Rm 1146,85,669

700 mm dia DI K9 Pipes 7281.733 Rm 17050.16 Rm 1241,54,695

800 mm dia DI K9 Pipes 17751.034 Rm 22515.70 Rm 3996,76,922

202067.437

4

on HDPE50 mm Airvalve on 63 mm 181 each 89866.15 Each 162,65,77450 mm Airvalve on 75 mm 79 each 89916.14 Each 71,03,37550 mm Airvalve on 90 mm 126 each 90000.22 Each 113,40,02850 mm Airvalve on 110 mm 106 each 92348.07 Each 97,88,89550 mm Airvalve on 125 mm 72 each 95146.47 Each 68,50,54650 mm Airvalve on 140 mm 28 each 98261.34 Each 27,51,31850 mm Airvalve on 160 mm 64 each 98638.55 Each 63,12,86750 mm Airvalve on 180 mm 83 each 99192.99 Each 82,33,01850 mm Airvalve on 200 mm 44 each 106190.45 Each 46,72,38050 mm Airvalve on 225 mm 28 each 106547.20 Each 29,83,32280 mm Airvalve on 250 mm 44 each 130858.12 Each 57,57,75780 mm Airvalve on 280 mm 5 each 131542.08 Each 6,57,710

5

On DI

40 mm Airvalve on 100 mm43

each 85755.55 Each 36,87,488

50 mm Airvalve on 150 mm 39 each 86666.21 Each 33,79,98250 mm Airvalve on 200 mm 60 each 87866.35 Each 52,71,98180 mm Airvalve on 250 mm 19 each 104420.13 Each 19,83,982

80 mm Airvalve on 300 mm76

each 106040.03 Each 80,59,042

100 mm Airvalve on 350 mm 92 each 119984.65 Each 110,38,588100 mm Airvalve on 400 mm 16 each 121568.22 Each 19,45,092100 mm Airvalve on 500 mm 13 each 153846.22 Each 20,00,001150 mm Airvalve on 600 mm 18 each 162232.28 Each 29,20,181150 mm Airvalve on 700 mm 15 each 169737.83 Each 25,46,067150 mm Airvalve on 800 mm 37 each 206385.75 Each 76,36,273

6on HDPE

80 mm Sluice valve on 63 mm 16 each 36300.90 Each 5,80,814

80 mm Sluice valve on 75 mm 14 each 36350.89 Each 5,08,912

80 mm Sluice valve on 90 mm 18 each 36434.97 Each 6,55,829

100 mm Sluice valve on 110 mm 21 each 48358.51 Each 10,15,529

125 mm Sluice valve on 125 mm 16 each 50125.80 Each 8,02,013

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade

as per I.S.3896-part2-1985 and subsequent revisions along with construction of Valve chamber

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade

as per I.S.3896-part2-1985 and subsequent revisions along with construction of Valve chamber

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS 13095-1991. With hand lever below 150 mm,

Page 32: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. cost.Rs. 23127.00 lakhsSL

NoQty Unit Rate per Amount Rs.

TELANGANA DRINKING WATER SUPPLY PROJECTSegment 13

Detailed and Abstract Estimate of Gravity Mains - JUKKAL

Description of Item

150 mm Sluice valve on 140 mm 4 each 64602.39 Each 2,58,410

150 mm Sluice valve on 160 mm 12 each 64979.60 Each 7,79,755

150 mm Sluice valve on 180 mm 18 each 65534.04 Each 11,79,613

200 mm Sluice valve on 200 mm 4 each 90954.35 Each 3,63,817

200 mm Sluice valve on 225 mm 4 each 91311.10 Each 3,65,244

250 mm Sluice valve on 250 mm 6 each 124655.69 Each 7,47,934

250 mm Sluice valve on 280 mm 6 each 125339.66 Each 7,52,038

7on DI

100 mm Sluice valve on 100 mm 9 each 45489.97 Each 4,09,410150 mm Sluice valve on 150 mm 12 each 59650.82 Each 7,15,810200 mm Sluice valve on 200 mm 16 each 82589.42 Each 13,21,431250 mm Sluice valve on 250 mm 4 each 112923.34 Each 4,51,693

300 mm Sluice valve on 300 mm16

each 155814.97 Each 24,93,040

350 mm Sluice valve on 350 mm 19 each 374765.07 Each 71,20,536400 mm Sluice valve on 400 mm 3 each 403360.47 Each 12,10,081450 mm Sluice valve on 500 mm 4 each 617395.16 Each 24,69,581500 mm Sluice valve on 600 mm 5 each 670300.29 Each 33,51,501600 mm Sluice valve on 700 mm 4 each 886154.72 Each 35,44,619700 mm Sluice valve on 800 mm 10 each 969591.01 Each 96,95,910

8on HDPE

80 mm dia 63-125mm dia line 285 each 41210.69 Each 117,45,046

100 mm dia >125-180mm dia line 51 each 54171.99 Each 27,62,772

125 mm dia >180-225mm dia line 27 each 74315.39 Each 20,06,516

150 mm dia >225-350mm dia line 15 each 74315.39 Each 11,14,731

on DI80 mm dia 63-125mm dia line 15 each 41210.69 Each 6,18,160

100 mm dia >125-180mm dia line 8 each 54171.99 Each 4,33,376

125 mm dia >180-225mm dia line 16 each 74315.39 Each 11,89,046

150 mm dia >225-350mm dia line 47 each 74315.39 Each 34,92,823

200 mm dia >350-400mm dia line 3 each 103216.94 Each 3,09,651

300 mm dia >400-600mm dia line 2 each 194678.09 Each 3,89,356

500 mm dia 600-1000mm dia line 3 each 730299.22 Each 21,90,898

8 2000 M3 443.92 M3 8,87,840

9 2252,02,329

230.08

10 1.19231.27

cr

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Executive Engineer Superintending Engineer

TDWSP Division TDWSP Circle

Banswada Nirmal

Provision for Anchor blocks, Thrust Blocks on Line at required places, Valves & Specials @ 5 %

Earth work excavation in Hard Rock which require Blasting of

Builders up to 3.00Cum including cost of all blasting materials and

all labour charges etc., complete for finished item of work

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS 13095-1991. With hand lever below 150 mm,

Fixing of Scou valves usin DI Wafer Butterfly valves conforming to IS 13095-1991. With hand lever below 150 mm,

L.S Unforceen Items

Page 33: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

8000.00 LakhsSL

NoQty Unit Rate per Amount Rs.

1

6 kg/cm2

63mm dia 6 kg/cm2 Pipes 10336.26 Rm 257.38 Rm 26,60,323

75mm dia 6 kg/cm2 Pipes 5399.71 Rm 312.16 Rm 16,85,589

90mm dia 6 kg/cm2 Pipes 2906.03 Rm 389.78 Rm 11,32,709

110mm dia 6 kg/cm2 Pipes 4351.98 Rm 518.77 Rm 22,57,660

125mm dia 6 kg/cm2 Pipes 322 Rm 631.74 Rm 2,03,422

140mm dia 6 kg/cm2 Pipes 1700 Rm 753.90 Rm 12,81,636

160mm dia 6 kg/cm2 Pipes 1800 Rm 963.38 Rm 17,34,086

180mm dia 6 kg/cm2 Pipes Rm 1,168.87 Rm

200mm dia 6 kg/cm2 Pipes 5425 Rm 1,402.90 Rm 76,10,738

225mm dia 6 kg/cm2 Pipes 1900 Rm 1,774.71 Rm 33,71,952

250mm dia 6 kg/cm2 Pipes 650 Rm 2,142.60 Rm 13,92,688

280mm dia 6 kg/cm2 Pipes Rm 2,630.10 Rm

8 kg /cm2

63 mm dia 8 kg/cm2 Pipes 33178.66 Rm 290.49 Rm 96,38,097

75 mm dia 8 kg/cm2 Pipes 2560 Rm 358.98 Rm 9,18,984

90 mm dia 8 kg/cm2 Pipes 4119.41 Rm 457.15 Rm 18,83,176

110 mm dia 8 kg/cm2 Pipes 10257.35 Rm 616.96 Rm 63,28,411

125 mm dia 8 kg/cm2 Pipes 7606.73 Rm 763.06 Rm 58,04,356

140 mm dia 8 kg/cm2 Pipes 2096 Rm 916.04 Rm 19,20,028

160 mm dia 8 kg/cm2 Pipes 11541.73 Rm 1171.19 Rm 135,17,611

180 mm dia 8 kg/cm2 Pipes 7599 Rm 1437.20 Rm 109,21,250

200 mm dia 8 kg/cm2 Pipes 2950.8 Rm 1734.03 Rm 51,16,781

225 mm dia 8 kg/cm2 Pipes 1176.29 Rm 2200.61 Rm 25,88,561

250 mm dia 8 kg/cm2 Pipes 8450 Rm 2676.97 Rm 226,20,430

280 mm dia 8 kg/cm2 Pipes 2212 Rm 3295.79 Rm 72,90,286

10 kg/cm2

63 mm dia 10 kg/cm2 Pipes 26002.81 Rm 322.46 Rm 83,84,921

75 mm dia 10 kg/cm2 Pipes 7353.77 Rm 403.51 Rm 29,67,315

90 mm dia 10 kg/cm2 Pipes 8864.44 Rm 518.81 Rm 45,98,923

110 mm dia 10 kg/cm2 Pipes 9199.16 Rm 706.03 Rm 64,94,849

125 mm dia 10 kg/cm2 Pipes 3082.78 Rm 882.95 Rm 27,21,933

140 mm dia 10 kg/cm2 Pipes 5326 Rm 1066.77 Rm 56,81,592

160 mm dia 10 kg/cm2 Pipes 732 Rm 1367.59 Rm 10,01,075

180 mm dia 10 kg/cm2 Pipes 13039.37 Rm 1687.26 Rm 220,00,763

200 mm dia 10 kg/cm2 Pipes 8571.19 Rm 2038.90 Rm 174,75,805

225 mm dia 10 kg/cm2 Pipes 1883.99 Rm 2597.97 Rm 48,94,553

250 mm dia 10 kg/cm2 Pipes 682.9 Rm 3165.68 Rm 21,61,841

280 mm dia 10 kg/cm2 Pipes 7061 Rm 3903.24 Rm 275,60,801

TELANGANA DRINKING WATER SUPPLY PROJECTSegment 13

Detailed Sub Estimate for Gravity Mains of Yellareddy Segment

Description of Item

Construction of pipelines for water supply with HDPE pipes as per IS specifications, with its amendments

and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc. lowering,

laying and jointing of pipe lines true to alignment and gradient, trench excavation for pipelines in all soils

except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and

boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with

water and testing etc., complete as specified in Technical specifications (PartB - Volume I) and as per

drawing (Part C - Volume 1). The rates are inclusive of cost and conveyance of all materials and labour

charges for finished item of pipeline work, but excluding CED and other taxes.

Est. cost.Rs.

Page 34: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

SL

NoQty Unit Rate per Amount Rs.Description of Item

2

DI K7 Pipeline

100 mm dia DI K7 Pipes Rm 1375.38 Rm

150 mm dia DI K7 Pipes Rm 1873.72 Rm

200 mm dia DI K7 Pipes Rm 2476.72 Rm

250 mm dia DI K7 Pipes Rm 3253.45 Rm

300 mm dia DI K7 Pipes 2650 Rm 4200.39 Rm 111,31,024

350 mm dia DI K7 Pipes 700 Rm 5236.24 Rm 36,65,370

400 mm dia DI K7 Pipes Rm 6266.56 Rm

450 mm dia DI K7 Pipes Rm 7512.77 Rm

500 mm dia DI K7 Pipes Rm 8981.86 Rm

600 mm dia DI K7 Pipes Rm 11954.89 Rm

700 mm dia DI K7 Pipes Rm 15630.58 Rm

750 mm dia DI K7 Pipes Rm Rm

800 mm dia DI K7 Pipes Rm 20757.08 Rm

900 mm dia DI K7 Pipes Rm 24505.97 Rm

DI K9 Pipeline

100 mm dia DI K9 Pipes 25866.44 Rm 1571.42 Rm 406,47,052

150 mm dia DI K9 Pipes 9139.97 Rm 2258.89 Rm 206,46,166

200 mm dia DI K9 Pipes 2054.5 Rm 2906.86 Rm 59,72,137

250 mm dia DI K9 Pipes Rm 3828.43 Rm

300 mm dia DI K9 Pipes 5643 Rm 4794.28 Rm 270,54,124

350 mm dia DI K9 Pipes 22919.06 Rm 6003.81 Rm 1376,01,779

400 mm dia DI K9 Pipes Rm 7143.69 Rm

450 mm dia DI K9 Pipes 1710 Rm 8514.44 Rm 145,59,690

500 mm dia DI K9 Pipes 8995 Rm 9957.00 Rm 895,63,240

600 mm dia DI K9 Pipes 3127 Rm 13061.96 Rm 408,44,745

700 mm dia DI K9 Pipes Rm 17050.16 Rm

750 mm dia DI K9 Pipes Rm 19263.84 Rm

800 mm dia DI K9 Pipes Rm 22515.70 Rm

900 mm dia DI K9 Pipes Rm 26643.99 Rm

3

on HDPE50 mm Airvalve on 63 mm 140 each 89866.15 Each 125,81,26250 mm Airvalve on 75 mm 31 each 89916.14 Each 27,87,40050 mm Airvalve on 90 mm 32 each 90000.22 Each 28,80,00750 mm Airvalve on 110 mm 48 each 92348.07 Each 44,32,70750 mm Airvalve on 125 mm 23 each 95146.47 Each 21,88,36950 mm Airvalve on 140 mm 19 each 98261.34 Each 18,66,96650 mm Airvalve on 160 mm 27 each 98638.55 Each 26,63,24150 mm Airvalve on 180 mm 42 each 99192.99 Each 41,66,10550 mm Airvalve on 200 mm 34 each 106190.45 Each 36,10,47550 mm Airvalve on 225 mm 10 each 106547.20 Each 10,65,47280 mm Airvalve on 250 mm 20 each 130858.12 Each 26,17,16280 mm Airvalve on 280 mm 19 each 131542.08 Each 24,99,300

Construction of pipelines for water supply with Centrifugally Ductile Iron S/S pipes as per IS:12288 :1987

with its amendments and revisions thereon including supply of pipes with rubber gaskets as per IS:8329-2000

including inside cement mortar lining and outside zinc coating, mechanical joints as per IS:13382-1992 and

jiffy joints and as per Technical specifications as per requirements, lowering, laying and jointing of pipes true

to alignment and gradient, trench excavation of pipelines as per standard in all soils except rock requiring

blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering and

tamping and removing surplus earth from site of work and filling pipeline with water and testing etc.,

complete. The rates are inclusive of cost & conveyance of all materials, and labour charges, but excluding

CED and taxes for finished pipeline work.

Single Chamber DI Air Valve pn 1.6 with Body and cover in Ductile Iron of grade SG 400/12 or

equivalent grade as per I.S.3896-part2-1985 and subsequent revisions along with construction of

Valve chamber

Page 35: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

SL

NoQty Unit Rate per Amount Rs.Description of Item

4

On DI50 mm Airvalve on 100 mm 52 each 85755.55 Each 44,59,28850 mm Airvalve on 150 mm 19 each 86666.21 Each 16,46,65850 mm Airvalve on 200 mm 34 each 87866.35 Each 29,87,45680 mm Airvalve on 250 mm each 104420.13 Each80 mm Airvalve on 300 mm 17 each 106040.03 Each 18,02,680100 mm Airvalve on 350 mm 48 each 119984.65 Each 57,59,263100 mm Airvalve on 400 mm each 121568.22 Each100 mm Airvalve on 450 mm 4 each 123834.91 Each 4,95,340150 mm Airvalve on 500 mm 18 each 153846.22 Each 27,69,232150 mm Airvalve on 600 mm 7 each 162232.28 Each 11,35,626150 mm Airvalve on 700 mm each Each200 mm Airvalve on 800 mm each Each200 mm Airvalve on 900 mm each Each

5

on HDPE80 mm Sluice valve on 63 mm 149 each 36300.90 Each 54,08,83480 mm Sluice valve on 75 mm 24 each 36350.89 Each 8,72,42180 mm Sluice valve on 90 mm 22 each 36434.97 Each 8,01,569100 mm Sluice valve on 110 mm 25 each 48358.51 Each 12,08,963125 mm Sluice valve on 125 mm 12 each 50125.80 Each 6,01,510150 mm Sluice valve on 140 mm 12 each 64602.39 Each 7,75,229150 mm Sluice valve on 160 mm 16 each 64979.60 Each 10,39,674150 mm Sluice valve on 180 mm 19 each 65534.04 Each 12,45,147200 mm Sluice valve on 200 mm 15 each 90954.35 Each 13,64,315200 mm Sluice valve on 225 mm 7 each 91311.10 Each 6,39,178250 mm Sluice valve on 250 mm 8 each 124655.69 Each 9,97,246250 mm Sluice valve on 280 mm 10 each 125339.66 Each 12,53,397

6

100 mm Sluice valve on 100 mm 33 each 45489.97 Each 15,01,169150 mm Sluice valve on 150 mm 3 each 59650.82 Each 1,78,952200 mm Sluice valve on 200 mm 3 each 82589.42 Each 2,47,768250 mm Sluice valve on 250 mm each 112923.34 Each300 mm Sluice valve on 300 mm 9 each 155814.97 Each 14,02,335350 mm Sluice valve on 350 mm 20 each 374765.07 Each 74,95,301400 mm Sluice valve on 400 mm each 403360.47 Each450 mm Sluice valve on 450 mm 3 each 617395.16 Each 18,52,185500 mm Sluice valve on 500 mm 4 each 670300.29 Each 26,81,201600 mm Sluice valve on 600 mm 3 each 886154.72 Each 26,58,464700 mm Sluice valve on 700 mm each 969591.01 Each800 mm Sluice valve on 800 mm each 1095515.40 Each900 mm Sluice valve on 900 mm each 1131054.83 Each

Fixing of Gate valves with DI Wafer Butterfly valves

conforming to IS 13095-1991. With hand lever below

150 mm, with Worm gear for 200 mm and above along

with construction of valve chamber

Fixing of Gate valves with DI Wafer Butterfly valves

conforming to IS 13095-1991. With hand lever below

150 mm, with Worm gear for 200 mm and above along

with construction of valve chamber

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or

equivalent grade as per I.S.3896-part2-1985 and subsequent revisions along with construction of

Valve chamber

Page 36: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

SL

NoQty Unit Rate per Amount Rs.Description of Item

7

on HDPE80 mm dia 63-125mm dia

line

69 each 41210.69 Each 28,43,537

100 mm dia >125-180mm dia

line

23 each 54171.99 Each 12,45,956

150 mm dia >180-225mm dia

line

12 each 74315.39 Each 8,91,785

150 mm dia >225-350mm dia

line

15 each 74315.39 Each 11,14,731

200 mm dia >350-400mm dia

line

20 each 103216.94 Each 20,64,339

300 mm dia >400-600mm dia

line

each 194678.09 Each

on DI80 mm dia 63-125mm dia

line

20 each 41210.69 Each 8,24,214

100 mm dia >125-180mm dia

line

15 each 54171.99 Each 8,12,580

150 mm dia >180-225mm dia

line

each 74315.39 Each

150 mm dia >225-350mm dia

line

17 each 74315.39 Each 12,63,362

200 mm dia >350-400mm dia

line

13 each 103216.94 Each 13,41,820

300 mm dia >400-600mm dia

line

7 each 194678.09 Each 13,62,747

500 mm dia 600-1000mm dia

line

each 730299.22 Each

8 2000 M3 443.92 M3 8,87,840.00

9 L.S Unforceen Items 1,21,257.33

72.19

10 7.81

80.00

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Executive Engineer Superintending Engineer

TDWSP Division TDWSP Circle

Banswada Nirmal

Provision for Anchor blocks, Thrust Blocks on Line at

required places, Valves & Specials @ 10 %

Earth work excavation in Hard Rock which require

Blasting of Builders up to 3.00Cum including cost of all

blasting materials and all labour charges etc., complete

for finished item of work

Total Rs

Fixing of Scou valves usin DI Wafer Butterfly valves

conforming to IS 13095-1991. With hand lever below

150 mm, with Worm gear for 200 mm and above along

with construction of valve chambers

Sub Total

Page 37: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. Cost Rs. 33.00 Cr.

SL No Qty Unit Rate per Amount Rs.

1

MS Pipe LINE From Intake well to Aerator

1300 mm dia MS pipe 12 mm thick 500 Rm 34890.76 Rm 17445378.74From Clear Water sump at Head works to OHBR at Rai Pahad

1300 mm dia MS Pipe 14 mm thick 6000 Rm 39041.11 Rm 234246680.62

2

ON MS Pipe

200MM Air Valve 1300 mm dia MS pipe 14 each 158905.76 Rm 2224680.62

3

ON MS Pipe

900MM Sluice

Valve

1300 mm dia MS pipe 4 each 1407652.00 Rm 5630608.00

4

ON MS Pipe

700MM Scour

Valve

1300 mm dia MS pipe 4 each 2274982.00 Rm 9099928.00

5 LS 30000000.00

6 2400 M3 443.92 M

3 1065408.00

7 25169205.94

8 5118110.09

33.00 Cr.

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Executive Engineer Superintending EngineerTDWSP Division TDWSP CircleBanswada Nirmal

Provision for Anchor blocks, Thrust Blocks on Line at required places, Valves & Specials @ 2 %

LS for Unforseen Items

Total. Amount in Lakhs

TELANGANA DRIKINING WATER SUPPLY PROJECT

S/D and errection of Surge Equipment including cost and conveyance of all materials and labour

charges etc., complete for finished item of work

E/W excavation in Hard Rock of size more than 3.00 cum in size including cost and converyance

of all materials and labour charges etc., complete for finished item of work

Fixing of Scou valves usin DI Wafer Butterfly valves conforming to IS 13095-1991. With hand

lever below 150 mm, with Worm gear for 200 mm and above along with construction of valve

chambers

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS 13095-1991. With hand

lever below 150 mm, with Worm gear for 200 mm and above along with construction of valve

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent

grade as per I.S.3896-part2-1985 and subsequent revisions along with construction of Valve

DETAILED SUB-ESTIMATE FOR PUMPING MAIN OF SEGMENT - 13 OF NIZAMABAD DISTRICT

Description of Item

Construction of pipelines for water supply with MS as per IS:2062-1992 Seemless Pipe with Polyruthen Coating inside and outside

Cement Motor (1:3) lining with required thickness as per design including with all its amendments and revisions thereon including

, mechanical joints and as per Technical specifications as per requirements, lowering, laying and jointing of pipes true to alignment

and gradient, trench excavation of pipelines as per standard (1.8x2.8M) in all soils except rock requiring blasting and refilling

trenches with excavated earth (other than rocky soils and boulders) with watering and tamping and removing surplus earth from

site of work and filling pipeline with water and testing etc., complete. The rates are inclusive of cost & conveyance of all materials,

and labour charges, but excluding CED and taxes for finished pipeline work.

Page 38: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

34,550

SL No Qty Unit Rate per Amount Rs.

S&D of MS pipes

1

PCCP Pipe Line From Rai Pahad to Aredu X road

From Ch. 0.00M to 2400.00M

PCCP Pipe Line 1500MM Dia 10 KG/CM2 2100 Rm 34680.48 72829008.00

From Ch.2400.00M to 3900.00M

PCCP Pipe Line 1500MM Dia 12KG/CM2 1500 Rm 36275.35 54413025.00

From Ch.3900.00M to 7140.00M

PCCP Pipe Line 1500MM Dia 14KG/CM2 3240 Rm 37151.77 120371735.00

From Ch.7140.00M to 10500.00M

PCCP Pipe Line 1500MM Dia 12KG/CM2 3360 Rm 36275.35 121885176.00

From Ch.10500.00M to 26100.00

PCCP Pipe Line 1500MM Dia 10KG/CM2 15600 Rm 34680.48 541015488.00

From Ch.26100.00 to 33300.00 0.00

PCCP Pipe Line 1500MM Dia 8KG/CM2 7200 Rm 33921.68 244236096.00

MS Pipe Line From Ch. 33300.00 to 37140.00

MS 14 MM Thick 1500MM Dia 3840 44823.96 172124006.00

From Ch.37140.00 to 58856.00

MS 14 MM Thick 1500MM Dia 21716 44823.96 973397115.00

From Aredu X Road to Narsinga Rao pally Jn

MS 14MM Thick & 1200MM Dia 7076 Rm 36277.81 Rm 256701792.00

From Narsinga Rao Pally Jn to Boggu Gudise Thanda jn

1200 mm dia MS Pipe 14 mm thick 10472 Rm 36277.81 Rm 379901239.00

Boggu Gudise Thanda Jn to BPT near Santosh Nagar

1000 mm dia MS Pipe 12 mm thick 14323 Rm 27487.65 Rm 393705682.00

2150MM Air

Valve1000 mm dia MS/PCCP Pipe

29each 120786.07 Rm 3502796.00

150MM Air

Valve1200 mm dia MS/PCCP Pipe

35each 120786.07 Rm 4227512.00

200MM Air

Valve1500 mm dia MS/PCCP Pipe

106each 158905.76 Rm 16844010.00

3800 MM Sluice

Valve1000 mm dia MS/PCCP Pipe 2 each 1098225.00 Rm 2196450.00

900 MM Sluice

Valve1200 mm dia MS/PCCP Pipe 3 each 1405150.00 Rm 4215450.00

1000 MM

Sluice Valve1500 mm dia MS/PCCP Pipe 2 each 1675621.00 Rm 3351242.00

TELANGANA DRINKING WATER PROJECT

Est. Cost in Lakhs

DETAILED SUB-ESTIMATE FOR GRAVITY MAIN OF SEGMENT-13 OF NIZAMABAD DISTRICT

Description of Item

Construction of pipelines for water supply with MS as per IS:2062-1992 Seemless Pipe with Polyruthen Coating

inside and outside Cement Motor (1:3) lining with required thickness as per design including with all its

amendments and revisions thereon including , mechanical joints and as per Technical specifications as per

requirements, lowering, laying and jointing of pipes true to alignment and gradient, trench excavation of

pipelines as per standard (1.8x2.8M) in all soils except rock requiring blasting and refilling trenches with

excavated earth (other than rocky soils and boulders) with watering and tamping and removing surplus earth

from site of work and filling pipeline with water and testing etc., complete. The rates are inclusive of cost &

conveyance of all materials, and labour charges, but excluding CED and taxes for finished pipeline work.

Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per

I.S.3896-part2-1985 and subsequent revisions along with construction of Valve chamber

Fixing of Gate valves with DI Wafer Butterfly valves conforming to IS

13095-1991. With hand lever below 150 mm, with Worm gear for 200

mm and above along with construction of valve chamber

Page 39: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

4500 MM Scour

Valve1000 mm dia MS/PCCP Pipe

6 each 730299.22 Rm4381795.00

700 MM Scour

Valve1200 mm dia MS/PCCP Pipe

8 each 2274982.00 Rm18199856.00

700 MM Scour

Valve1500 mm dia MS/PCCP Pipe

25 each 2274982.00 Rm56874550.00

5

3000 M3 443.92 M3

1331760.00

39294217

34,550

Asst. Executive Engineer Dy. Executive Engineer TDWSP Banswada TDWSP Sub division Yellareddy Banswada/ Yellareddy

Executive Engineer Superintending Engineer TDWSP Division Circle, TDWSP

Banswada Nirmal

Fixing of Scou valves usin DI Wafer Butterfly valves conforming to IS

13095-1991. With hand lever below 150 mm, with Worm gear for 200

mm and above along with construction of valve chambers

E/W Excavation in Hard Rock of size more than 3.0 cum in size which

requires blasting with initial lead and lift inluding cost and conveyance of

all materials and labour charges etc., complete for finished item of work

Total. Amount Rs

Provision for Anchor blocks, Thrust Blocks on Line at required places, Valves &

Specials @ 2 %

Page 40: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

The components of the filtration plant are as per SSR 2015-16

Capacity: 145.00

Description Amount

Basic Rate Rs.2.5 per litre *145000000 362500000

Increase/Decrese for cement

Basic Rate*(RC-6300)*0.00007 -2537500

Increase/Decrese for Steel

Basic Rate*(Rs-40000)*0.00002 0

(With 10% Rural area allowence) 36250000

Sub Total 396212500

Add Contractor's Profit 53944332

450156832

Unforeseen items 45043168

Total � 4952,00,000

Asst executive Engineer Deputy Executive Enginer

Rws&sBanswada/ Yellareddy RWS&S Banswada/

Yellareddy

Executive Enginer Superintending Engineer

RWS&S Banswada RWS&S Circle Nirmal

TELANGANA DRINKING WATER SUPPLY PROJECT - SEGMENT 13

Construction of Rapid Gravity Filteration plant including civil, mechanical and

electrical trial running etc. complete-M30 Grade concrete).

RAPID SAND FILTER AT PEDDAREDDYPET

Page 41: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Wind Velocity 158.4 KMPH Velocity 44 Pressure 116.16

Construction of 10000 Lts capacity OHSR with 12.00 Mts staging

Est.Cost Rs 1000000

A) Basic cost 10000 X 60.35 : Rs 603500

B) (With 10% Rural area allowence) 0

C) Add for increse in price of cement

6200 6300 0.7 603500 : Rs -4225

( 100 X 100)

D) Add for increase/ Decrease in price of Steel

J) Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4) of post ofsize 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR

Construction of 10000 Lts Capacity OHSR with 12 m staging with raft foundation

plastering with CM(1:3) 2 coats of Weather proof emulsion painting for external surfaces, and 3 coats

of epoxy paint to inner surface of the reservoir including roof dome, lettering as per Dept Direction,

S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and drawigns supplied by the Dept.,

including the cost and conveyance of the all materials , Bends , Specials Etc complete including the

following.- M30 Grade Concreteb)D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty)

c) DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh

d)RCC Phinial with copper or Stainless stell flyproof mesh

e)RCC or Aluminium ladder inside of 0.60 mts width

CONSTRUCTION OF 10,000 Liters Capacity OHBR Stg:12 Mt at Boppaspally

f)RCC spiral stair case with handrailing upto 200kl

for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt g)Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No.

h)Lightening arrestor of approved pattern 1 No complete including conductor earthing

D) Add for increase/ Decrease in price of Steel

40000 40000 2.0 603500 : Rs 0

( 1000 X 100)

E) Add for staging above 10Mts by .10 paise per Lts. : Rs 0

F) Add or deduct for Wind Pressure

116.16 250 5 603500 : Rs -40386

( 100 X 100)

G) Cost of DI Specials : Rs 212175

H) Cost of D.I valves 2 Nos : Rs

17 Valve Chambers Inlet 100 mm dia 1 18694 18694.00

Valve Chambers Outlet 100 mm dia 1 18694 18694.00

Valve Chambers Scour 100 mm dia 1 18694 18694.00

I) Cost of valve chambers 2 Nos : Rs 0

Total 827146

J) Add Contractor's Profit 13.615% 104980

K) Provision for unforceen items : Rs 67874

Total cost � 10,00,000

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Superintending Engineer

TDWSP Circle

Nirmal

Executive Engineer

TDWSP Division

Banswada

Page 42: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Wind Velocity 158.4 KMPH Velocity 44 Pressure 116.16

Construction of 10000 Lts capacity OHSR with 12.00 Mts staging

Est.Cost Rs 1000000

A) Basic cost 10000 X 60.35 : Rs 603500

B) (With 10% Rural area allowence) 0

C) Add for increse in price of cement

6200 6300 0.7 603500 : Rs -4225

( 100 X 100)

D) Add for increase/ Decrease in price of Steel

f)RCC spiral stair case with handrailing upto 200kl

for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt g)Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No.

h)Lightening arrestor of approved pattern 1 No complete including conductor earthing

J) Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4) ofpost of size 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR

Construction of 10000 Lts Capacity OHSR with 12 m staging with raft foundation

plastering with CM(1:3) 2 coats of Weather proof emulsion painting for external surfaces, and

3 coats of epoxy paint to inner surface of the reservoir including roof dome, lettering as per

Dept Direction, S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and

drawigns supplied by the Dept., including the cost and conveyance of the all materials ,

Bends , Specials Etc complete including the following.- M30 Grade Concrete

CONSTRUCTION OF 10,000 Liters Capacity OHBR Stg:12 Mt at Suddulam

b)D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty)

c) DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh

d)RCC Phinial with copper or Stainless stell flyproof mesh

e)RCC or Aluminium ladder inside of 0.60 mts width

D) Add for increase/ Decrease in price of Steel

40000 40000 2.0 603500 : Rs 0

( 1000 X 100)

E) Add for staging above 10Mts by .10 paise per Lts. : Rs 0

F) Add or deduct for Wind Pressure

116.16 250 5 603500 : Rs -40386

( 100 X 100)

G) Cost of DI Specials : Rs 212175

H) Cost of D.I valves 2 Nos : Rs

17 Valve Chambers Inlet 100 mm dia 1 18694 18694.00

Valve Chambers Outlet 100 mm dia 1 18694 18694.00

Valve Chambers Scour 100 mm dia 1 18694 18694.00

I) Cost of valve chambers 2 Nos : Rs 0

Total 827146

J) Add Contractor's Profit 13.615% 104980

K) Provision for unforceen items : Rs 67874

Total cost � 10,00,000

Rate per lt � 93.21

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Superintending Engineer

TDWSP Circle

Nirmal

Executive Engineer

TDWSP Division

Banswada

Page 43: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs. 84.00 Lacks

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 101)

0-3 m Depth 1xπ/4 13.10 13.10 3.00 404.35 Cum 128.20 51838.00

2)

1xπ/4 14.40 14.40 0.30 48.83 Cum 4511.29 220301.00

3)

1xπ/4 14.00 14.00 1.20 184.63 Cum 8951.13 1652665.00

4)

Sub Estimate for Construction of 20 KL OHBR Shaft Type 20 Mtrs Staging at BIRKUR X RD

SUB-ESTIMATE

Earth work excavation in ordinary Gravelly soils except in hard rock whichrequires blasting with initial lead and lift including cost and conveyance ofall materials and labour charges etc., complete for finished item of work asper SS of APDSS for foundation

PCC(1:4:8) prop using 40mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curing

charges etc., complete for finished item of work as per SS of APDSS for

Raft Levelling Course

VRCC(M30) using 20mm HBG Metal including cost and conveyance of allmaterials and labour charges and strutting , centring and curing charges

etc., complete for finished item of work as per SS of APDSS for Raft Slab

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curing

charges etc., complete for finished item of work as per SS of APDSS for

Raft ring beam excluding cost of steel

1xπ 2.70 0.35 1.20 3.56 Cum 10731.39 38204.00

5)

for Raft Ring Beam Portion 0.785 2.40 2.40 1.80 8.14 Cum

8.14 Cum 1560.60 12702.00

6)

0.785 11.8 11.8 1.8 109.30 Cum 183.15 20019.007)

Below G.L 1xπ 2.70 0.30 3.00 7.63 Cum 12647.91 96504.00

0 - 3 Mts

Shaft Side Wall 1xπ 2.70 0.30 3.00 7.63 Cum

Deduct Oppening 1x1 1.20 0.30 2.10 -0.76 Cum

6.87 Cum 17753.01 122034.00

Landing Slab 1x1 3.14 1.20 0.20 0.75 9046.48 6817.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8099.02 4373.00

Risers 1x20 1.20 0.15 0.075 0.27 8099.02 2187.00

3 - 6 Mts Shaft Side Wall 1xπ 2.70 0.30 3.00 7.63 17905.26 136617.00

Landing Slab 1x1 3.14 1.20 0.20 0.75 9198.73 6932.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8251.26 4456.00

Risers 1x20 1.20 0.15 0.075 0.27 8251.26 2228.00

6 - 9 Mts Shaft Side Wall 1xπ 2.70 0.30 3.00 7.63 18057.50 137779.00

Raft ring beam excluding cost of steel

Filling the foundation the with sand including cost and conveyance of allmaterials and labour charges etc., complete for relling of foundation

Filling the foundation the with excavated earth including cost andconveyance of all materials and labour charges etc., complete for relling offoundation

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and shuttering , centring and curingcharges etc., complete for finished item of work as per SS of APDSS

excluding cost of steel for Shaft Side Wall

Shaft Structures 20.8.15(rev).xlsx

Page 44: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

Landing Slab 1x1 3.14 1.20 0.20 0.75 9350.97 7047.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8403.51 4538.00

Risers 1x20 1.20 0.15 0.075 0.27 8403.51 2269.00

9 - 12 Mts Shaft Side Wall 1xπ 2.70 0.30 3.00 7.63 22873.64 174526.00

Landing Slab 1x1 3.14 1.20 0.20 0.75 9503.21 7162.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8555.75 4620.00

Risers 1x20 1.20 0.15 0.075 0.27 8555.75 2310.00

12 - 15 Mts Shaft Side Wall 1xπ 2.70 0.20 3.00 5.09 23025.88 117202.00

Landing Slab 1x1 3.14 1.20 0.20 0.75 9655.46 7276.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8708.00 4702.00

Risers 1x20 1.20 0.15 0.075 0.27 8708.00 2351.00

15 - 18 Mts Shaft Side Wall 1xπ 2.70 0.20 3.00 5.09 24437.38 124386.00

Landing Slab 1x1 3.14 1.20 0.20 0.75 10006.59 7541.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8860.24 4785.00

Risers 1x20 1.20 0.15 0.075 0.27 8860.24 2392.00

18 - 20 Mts Shaft Side Wall 1xπ 2.70 0.20 3.00 5.09 25429.12 129434.0018 - 20 Mts Shaft Side Wall 1xπ 2.70 0.20 3.00 5.09 25429.12 129434.00

Landing Slab 1x1 2.00 2.00 0.20 0.80 10291.42 8233.00

Steps (Treads) 1x14 1.20 0.30 0.075 0.38 9012.48 3407.00

Risers 1x14 1.20 0.15 0.075 0.19 9012.48 1703.00

8)

(20.00 - 20.60 LVL) 1xπ 2.70 0.45 0.60 2.29 Cum 16891.12 38681.009)

Bottom Dome (@ 21.80 LVL) 2xπ 2.50 1.00 0.25 3.93 Cum

Deduct Oppening 1xπ/4 1.20 1.20 0.25 -0.28 Cum

3.65 Cum 26143.53 95356.00

10)

at 20.6 m LVL 1xπ 6.45 0.75 0.20 3.04 Cum 25429.12 77305.00

11)

at 21.35 LVL 1xπ 4.00 0.45 0.45 2.54 Cum 18803.06 47760.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Middle Ring Beam

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Bottom Ring Beam

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Bottom Slab(Dome)

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Conical portion

Shaft Structures 20.8.15(rev).xlsx

Page 45: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 1012)

for Tank side wall @ 21.80 LVL 1xπ 4.00 0.20 3.00 7.54 Cum 26420.87 199213.00

Top Ring Beam @ 24.20 1xπ 4.00 0.30 0.45 1.70 Cum 21436.88 36443.00

Internal shaft @ 22.80 LVL 1xπ 1.20 0.20 3.00 2.26 Cum 26420.87 59711.00

13)

Top Dome @ 24.20 LVL 2xπ 2.500 1.00 0.20 3.14 Cum

Deduct Oppening 1xπ/4 1.20 1.20 0.20 -0.23 Cum

Deduct Manhole openning and Ventilator 1x2 0.60 0.60 0.10 -0.07

2.84 Cum 27165.23 77201.00

14)

Top slab out side 2xπ 2.500 1.20 18.84 M2

Side wall inside 1xπ 3.80 3.00 35.81 M2

Bottom slab 2xπ 2.500 1.00 15.70 M2

Internal shaft out side 1xπ 1.40 3.00 13.19 M2

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Side Wall

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Top Slab (Dome)

Impervous coat with Plastering with CM(1:3) prop. 12 mm thick includingcost and conveyance of all materials and labour charges etc., complete asper SS of APDSS for Finished item of work

Internal shaft out side 1xπ 1.40 3.00 13.19 M2

83.54 M2 1623.98 13566.00

15)

for side wall out 1xπ 4.20 3.00 39.58 M2

Ring girder O/s 1xπ 6.71 0.60 12.65 M2

Ring girder I/s 1xπ 5.91 0.60 11.14 M2

Shaft O/s 1xπ 4.9 34.71 534.32 M2

Shaft I/s 1xπ 4.5 34.71 4998.24 M2

Bottom slab 2xπ 2.500 1.00 15.71 M2

Steps of stair case 1x200 1.20 0.45 52.92 M2

5664.56 M2

852.38 482836.00

16)

5664.56 M21029.89 583387.00

17)

40.01 MT's 51392.61 2056218.00

18) Lightning arrester 1x1 1.00 No's 15000.00 15000.00

19) RCC ladder inside the tank 1x1 1.00 No's 15000.00 15000.00

20) Water level indicater 1x1 1.00 No's 5000.00 5000.00

21)Painting of name board 1x1 1.00 No's 1000.00 1000.00

22)

Hand railing on top slab 1x1 1.00 No's 10000.00 10000.00

23)Phenial & fly proof ventilator 1x1 1.00 No's 1500.00 1500.00

24)Manhole cover and frame (0.6x0.6) 1x2 2.00 No's 2000.00 4000.00

Cement Plastering with CM(1:3) prop. 12 mm thick including cost andconveyance of all materials and labour charges etc., complete for finisheditem of work as per IS Specifications etc., complete

Snowcem Paint with approved colour including cost and conveyance of allmaterials and labour charges etc., complete for finished item of work asper SS of APDSSCost, supply and delivery of Tor Steel including fabrication andconveyance and all labour charges etc., complete for finished item of workas per SS of APDSS

Shaft Structures 20.8.15(rev).xlsx

Page 46: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 1025)

CI specials and Valves as per Data 627805.00

26)Provision for RCC Valve Chambers (I&O) 1x2 2.00 No's 30000.00 60000.00

27)Provision for RCC Valve Chambers (scour) 1x1 1.00 No's 10000.00 10000.00

28)MS ladder 1x2 2.00 No's 10000.00 20000.00

29)Cost, supply and delivery of MS SheetedDoor with Angled Frame including fabricationand conveyance and all labour charges etc.,complete for finished item of work as per SSof APDSS 1x1 1.00 No's 10000.00 10000.00

30)

Unforeseen items 721478.00

8400000.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending EngineerTDWSP Banswada TDWSP Sub division TDWSP Division TDWSP CircleYellareddy Banswada/ Yellareddy Banswada Nirmal

Total

Shaft Structures 20.8.15(rev).xlsx

Page 47: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Wind Velocity 158.4 KMPH Velocity 44 Pressure 116.16

Construction of 50000 Lts capacity OHSR with 15.00 Mts staging

Est.Cost Rs 2400000

A) Basic cost 50000 X 31.76 : Rs 1587750

B) (With 10% Rural area allowence) 0

C) Add for increse in price of cement

6200 6300 0.7 1587750 : Rs -11114

( 100 X 100)

D) Add for increase/ Decrease in price of Steel

f)RCC spiral stair case with handrailing upto 200kl

for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt g)Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No.

h)Lightening arrestor of approved pattern 1 No complete including conductor earthing

J) Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4) ofpost of size 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR

Construction of 50000 Lts Capacity OHSR with 15 m staging with raft foundation

plastering with CM(1:3) 2 coats of Weather proof emulsion painting for external surfaces, and

3 coats of epoxy paint to inner surface of the reservoir including roof dome, lettering as per

Dept Direction, S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and drawigns

supplied by the Dept., including the cost and conveyance of the all materials , Bends , Specials

Etc complete including the following.- M30 Grade Concrete

CONSTRUCTION OF 50,000 Liters Capacity OHBR Stg:15 Mt at Mansuram T

b)D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty)

c) DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh

d)RCC Phinial with copper or Stainless stell flyproof mesh

e)RCC or Aluminium ladder inside of 0.60 mts width

40000 40000 2.0 1587750 : Rs 0

( 1000 X 100)

E) Add for staging above 10Mts by .10 paise per Lts. : Rs 15000

F) Add or deduct for Wind Pressure

116.16 250 5 1587750 : Rs -106252

( 100 X 100)

G) Cost of DI Specials : Rs 550025

H) Cost of D.I valves 2 Nos : Rs

17 Valve Chambers Inlet 250 mm dia 1 27715 27715.00

Valve Chambers Outlet 250 mm dia 1 27715 27715.00

Valve Chambers Scour 100 mm dia 1 18694 18694.00

I) Cost of valve chambers 2 Nos : Rs 0

Total 2109533

J) Add Contractor's Profit 13.615% 277121

K) Provision for unforceen items : Rs 13346

Total cost � 24,00,000

Rate per lt � 47.73

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Superintending Engineer

TDWSP Circle

Nirmal

Executive Engineer

TDWSP Division

Banswada

Page 48: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs. 102.00 Lacks

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 101)

0-3 m Depth 1xπ/4 14.80 14.80 3.00 516.10 Cum 128.20 66164.00

2)

1xπ/4 14.40 14.40 0.30 48.83 Cum 4511.29 220301.00

3)

1xπ/4 14.00 14.00 1.20 184.63 Cum 8951.13 1652665.00

4)

SUB-ESTIMATE

Sub Estimate for Construction of 60 KL OHBR Shaft Type 20 Mtrs Staging at BOMMANDEVPALLY

Earth work excavation in ordinary Gravelly soils except in hard rock whichrequires blasting with initial lead and lift including cost and conveyance ofall materials and labour charges etc., complete for finished item of work asper SS of APDSS for foundation

PCC(1:4:8) prop using 40mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curing

charges etc., complete for finished item of work as per SS of APDSS for

Raft Levelling Course

VRCC(M30) using 20mm HBG Metal including cost and conveyance of allmaterials and labour charges and strutting , centring and curing charges

etc., complete for finished item of work as per SS of APDSS for Raft Slab

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curing

charges etc., complete for finished item of work as per SS of APDSS for

Raft ring beam excluding cost of steel

1xπ 4.40 0.35 1.20 5.81 Cum 10731.39 62349.00

5)

for Raft Ring Beam Portion 0.785 4.10 4.10 1.80 23.75 Cum

23.75 Cum 1560.60 37068.00

6)

0.785 10.1 10.1 1.8 340.57 Cum 183.15 62375.007)

Below G.L 1xπ 4.40 0.30 3.00 12.44 Cum 12647.91 157340.00

0 - 3 Mts

Shaft Side Wall 1xπ 4.40 0.30 3.00 12.44 Cum

Deduct Oppening 1x1 1.20 0.30 2.10 -0.76 Cum

11.68 Cum 17753.01 207426.00

Landing Slab 1x1 4.92 1.20 0.20 1.18 9046.48 10681.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8099.02 4373.00

Risers 1x20 1.20 0.15 0.075 0.27 8099.02 2187.00

3 - 6 Mts Shaft Side Wall 1xπ 4.40 0.30 3.00 12.44 17905.26 222741.00

Landing Slab 1x1 4.92 1.20 0.20 1.18 9198.73 10860.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8251.26 4456.00

Risers 1x20 1.20 0.15 0.075 0.27 8251.26 2228.00

6 - 9 Mts Shaft Side Wall 1xπ 4.40 0.30 3.00 12.44 18057.50 224635.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and shuttering , centring and curingcharges etc., complete for finished item of work as per SS of APDSS

excluding cost of steel for Shaft Side Wall

Raft ring beam excluding cost of steel

Filling the foundation the with sand including cost and conveyance of allmaterials and labour charges etc., complete for relling of foundation

Filling the foundation the with excavated earth including cost andconveyance of all materials and labour charges etc., complete for relling offoundation

Shaft Structures 20.8.15(rev).xlsx

Page 49: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

Landing Slab 1x1 4.92 1.20 0.20 1.18 9350.97 11040.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8403.51 4538.00

Risers 1x20 1.20 0.15 0.075 0.27 8403.51 2269.00

9 - 12 Mts Shaft Side Wall 1xπ 4.40 0.30 3.00 12.44 22873.64 284548.00

Landing Slab 1x1 4.92 1.20 0.20 1.18 9503.21 11220.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8555.75 4620.00

Risers 1x20 1.20 0.15 0.075 0.27 8555.75 2310.00

12 - 15 Mts Shaft Side Wall 1xπ 4.40 0.20 3.00 8.29 23025.88 190885.00

Landing Slab 1x1 4.92 1.20 0.20 1.18 9655.46 11400.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8708.00 4702.00

Risers 1x20 1.20 0.15 0.075 0.27 8708.00 2351.00

15 - 18 Mts Shaft Side Wall 1xπ 4.40 0.20 3.00 8.29 24437.38 202586.00

Landing Slab 1x1 4.92 1.20 0.20 1.18 10006.59 11814.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8860.24 4785.00

Risers 1x20 1.20 0.15 0.075 0.27 8860.24 2392.00

18 - 20 Mts Shaft Side Wall 1xπ 4.40 0.20 3.00 8.29 25429.12 210807.0018 - 20 Mts Shaft Side Wall 1xπ 4.40 0.20 3.00 8.29 25429.12 210807.00

Landing Slab 1x1 2.00 2.00 0.20 0.80 10291.42 8233.00

Steps (Treads) 1x14 1.20 0.30 0.075 0.38 9012.48 3407.00

Risers 1x14 1.20 0.15 0.075 0.19 9012.48 1703.00

8)

(20.00 - 20.60 LVL) 1xπ 4.40 0.45 0.60 3.73 Cum 16891.12 63004.009)

Bottom Dome (@ 21.80 LVL) 2xπ 4.56 1.00 0.25 7.16 Cum

Deduct Oppening 1xπ/4 1.20 1.20 0.25 -0.28 Cum

6.88 Cum 26143.53 179800.00

10)

at 20.6 m LVL 1xπ 6.45 0.75 0.20 3.04 Cum 25429.12 77305.00

11)

at 21.35 LVL 1xπ 5.70 0.45 0.45 3.63 Cum 18803.06 68255.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Bottom Ring Beam

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Bottom Slab(Dome)

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Conical portion

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Middle Ring Beam

Shaft Structures 20.8.15(rev).xlsx

Page 50: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 1012)

for Tank side wall @ 21.80 LVL 1xπ 5.70 0.20 2.80 10.03 Cum 26420.87 265001.00

Top Ring Beam @ 24.60 1xπ 5.70 0.30 0.45 2.42 Cum 21436.88 51877.00

Internal shaft @ 22.80 LVL 1xπ 1.20 0.20 3.00 2.26 Cum 26420.87 59711.00

13)

Top Dome @ 24.60 LVL 2xπ 4.561 1.00 0.20 5.73 Cum

Deduct Oppening 1xπ/4 1.20 1.20 0.20 -0.23 Cum

Deduct Manhole openning and Ventilator 1x2 0.60 0.60 0.10 -0.07

5.43 Cum 27165.23 147559.00

14)

Top slab out side 2xπ 4.561 1.20 34.37 M2

Side wall inside 1xπ 5.50 2.80 48.38 M2

Bottom slab 2xπ 4.561 1.00 28.64 M2

Internal shaft out side 1xπ 1.40 3.00 13.19 M2

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Side Wall

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Top Slab (Dome)

Impervous coat with Plastering with CM(1:3) prop. 12 mm thick includingcost and conveyance of all materials and labour charges etc., complete asper SS of APDSS for Finished item of work

Internal shaft out side 1xπ 1.40 3.00 13.19 M2

124.59 M2 1623.98 20233.00

15)

for side wall out 1xπ 5.90 2.80 51.90 M2

Ring girder O/s 1xπ 6.71 0.60 12.65 M2

Ring girder I/s 1xπ 5.91 0.60 11.14 M2

Shaft O/s 1xπ 4.9 34.71 534.32 M2

Shaft I/s 1xπ 4.5 34.71 4998.24 M2

Bottom slab 2xπ 4.561 1.00 28.66 M2

Steps of stair case 1x200 1.20 0.45 52.92 M2

5689.83 M2

852.38 484990.00

16)

5689.83 M21029.89 585990.00

17)

47.13 MT's 51392.61 2422134.00

18) Lightning arrester 1x1 1.00 No's 15000.00 15000.00

19) RCC ladder inside the tank 1x1 1.00 No's 15000.00 15000.00

20) Water level indicater 1x1 1.00 No's 5000.00 5000.00

21)Painting of name board 1x1 1.00 No's 1000.00 1000.00

22)

Hand railing on top slab 1x1 1.00 No's 10000.00 10000.00

23)Phenial & fly proof ventilator 1x1 1.00 No's 1500.00 1500.00

24)Manhole cover and frame (0.6x0.6) 1x2 2.00 No's 2000.00 4000.00

Cement Plastering with CM(1:3) prop. 12 mm thick including cost andconveyance of all materials and labour charges etc., complete for finisheditem of work as per IS Specifications etc., complete

Snowcem Paint with approved colour including cost and conveyance of allmaterials and labour charges etc., complete for finished item of work asper SS of APDSSCost, supply and delivery of Tor Steel including fabrication andconveyance and all labour charges etc., complete for finished item of workas per SS of APDSS

Shaft Structures 20.8.15(rev).xlsx

Page 51: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 1025)

DI specials and Valves as per Data 798458.00

26)Provision for RCC Valve Chambers (I&O) 1x2 2.00 No's 30000.00 60000.00

27)Provision for RCC Valve Chambers (scour) 1x1 1.00 No's 10000.00 10000.00

28)MS ladder 1x2 2.00 No's 10000.00 20000.00

29)Cost, supply and delivery of MS SheetedDoor with Angled Frame including fabricationand conveyance and all labour charges etc.,complete for finished item of work as per SSof APDSS 1x1 1.00 No's 10000.00 10000.00

30)

Provision for unforseen items 900724.00

10200000.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending EngineerTDWSP Banswada TDWSP Sub division TDWSP Division TDWSP CircleYellareddy Banswada/ Yellareddy Banswada Nirmal

Total

Shaft Structures 20.8.15(rev).xlsx

Page 52: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs. 141.00 Lacks

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 101)

0-3 m Depth 1xπ/4 14.80 14.80 3.00 516.10 Cum 128.20 66164.00

2)

1xπ/4 14.40 14.40 0.30 48.83 Cum 4511.29 220301.00

3)

1xπ/4 14.00 14.00 1.20 184.63 Cum 8951.13 1652665.00

4)

SUB-ESTIMATE

Sub Estimate for Construction of 100 KL OHBR Shaft Type 30 Mtrs Staging at AREDU

Earth work excavation in ordinary Gravelly soils except in hard rock whichrequires blasting with initial lead and lift including cost and conveyance ofall materials and labour charges etc., complete for finished item of work asper SS of APDSS for foundation

PCC(1:4:8) prop using 40mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curing

charges etc., complete for finished item of work as per SS of APDSS for

Raft Levelling Course

VRCC(M30) using 20mm HBG Metal including cost and conveyance of allmaterials and labour charges and strutting , centring and curing charges

etc., complete for finished item of work as per SS of APDSS for Raft Slab

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curing

charges etc., complete for finished item of work as per SS of APDSS for

Raft ring beam excluding cost of steel

1xπ 5.80 0.35 1.20 7.65 Cum 10731.39 82095.00

5)

for Raft Ring Beam Portion 0.785 5.50 5.50 1.80 42.74 Cum

42.74 Cum 1560.60 66705.00

6)

0.785 10.1 10.1 1.8 144.14 Cum 183.15 26399.007)

Below G.L 1xπ 5.80 0.30 3.00 16.40 Cum 12647.91 207426.00

0 - 3 Mts

Shaft Side Wall 1xπ 5.80 0.30 3.00 16.40 Cum

Deduct Oppening 1x1 1.20 0.30 2.10 -0.76 Cum

15.64 Cum 17753.01 277728.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 9046.48 13862.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8099.02 4373.00

Risers 1x20 1.20 0.15 0.075 0.27 8099.02 2187.00

3 - 6 Mts Shaft Side Wall 1xπ 5.80 0.30 3.00 16.40 17905.26 293646.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 9198.73 14095.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8251.26 4456.00

Risers 1x20 1.20 0.15 0.075 0.27 8251.26 2228.00

6 - 9 Mts Shaft Side Wall 1xπ 5.80 0.30 3.00 16.40 18057.50 296143.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and shuttering , centring and curingcharges etc., complete for finished item of work as per SS of APDSS

excluding cost of steel for Shaft Side Wall

Raft ring beam excluding cost of steel

Filling the foundation the with sand including cost and conveyance of allmaterials and labour charges etc., complete for relling of foundation

Filling the foundation the with excavated earth including cost andconveyance of all materials and labour charges etc., complete for relling offoundation

Shaft Structures 20.8.15(rev).xlsx

Page 53: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

Landing Slab 1x1 6.38 1.20 0.20 1.53 9350.97 14329.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8403.51 4538.00

Risers 1x20 1.20 0.15 0.075 0.27 8403.51 2269.00

9 - 12 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 22873.64 250009.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 9503.21 14562.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8555.75 4620.00

Risers 1x20 1.20 0.15 0.075 0.27 8555.75 2310.00

12 - 15 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 23025.88 251673.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 9655.46 14795.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8708.00 4702.00

Risers 1x20 1.20 0.15 0.075 0.27 8708.00 2351.00

15 - 18 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 24437.38 267101.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 10006.59 15333.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 8860.24 4785.00

Risers 1x20 1.20 0.15 0.075 0.27 8860.24 2392.00

18 - 21 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 25429.12 277940.0018 - 21 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 25429.12 277940.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 10291.42 15770.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 9012.48 4867.00

Risers 1x20 1.20 0.15 0.075 0.27 9012.48 2433.00

21 - 24 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 26420.87 288780.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 10576.25 16206.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 9164.73 4949.00

Risers 1x20 1.20 0.15 0.075 0.27 9164.73 2474.00

24 - 27 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 27412.62 299620.00

Landing Slab 1x1 6.38 1.20 0.20 1.53 10861.08 16643.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 9316.97 5031.00

Risers 1x20 1.20 0.15 0.075 0.27 9316.97 2516.00

27 - 30 Mts Shaft Side Wall 1xπ 5.80 0.20 3.00 10.93 27984.61 305872.00

Landing Slab 1x1 2.00 2.00 0.20 0.80 11079.62 8864.00

Steps (Treads) 1x20 1.20 0.30 0.075 0.54 9469.22 5113.00

Risers 1x20 1.20 0.15 0.075 0.27 9469.22 2557.00

8)

(30.00 - 30.60 LVL) 1xπ 5.80 0.45 0.60 4.92 Cum 18597.53 91500.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Bottom Ring Beam

Shaft Structures 20.8.15(rev).xlsx

Page 54: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 109)

Bottom Dome (@ 31.80 LVL) 2xπ 6.80 1.00 0.25 10.68 Cum

Deduct Oppening 1xπ/4 1.20 1.20 0.25 -0.28 Cum

10.40 Cum 27975.50 290872.00

10)

at 30.6 m LVL 1xπ 6.45 0.75 0.20 3.04 Cum 28136.85 85536.00

11)

at 31.35 LVL 1xπ 7.10 0.45 0.45 4.52 Cum 20132.65 91000.00

12)

π

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Bottom Slab(Dome)

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Conical portion

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Middle Ring Beam

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Side Wall

for Tank side wall @ 31.80 LVL 1xπ 7.10 0.20 3.00 13.38 Cum 28136.85 376471.00

Top Ring Beam @ 34.20 LVL 1xπ 7.10 0.30 0.45 3.01 Cum 22274.22 67045.00

Internal shaft @ 31.80 LVL 1xπ 1.20 0.20 3.00 2.26 Cum 28136.85 63589.00

13)

Top Dome @ 34.20 LVL 2xπ 6.801 1.00 0.20 8.55 Cum

Deduct Oppening 1xπ/4 1.20 1.20 0.20 -0.23 Cum

Deduct Manhole openning and Ventilator 1x2 0.60 0.60 0.10 -0.07

8.25 Cum 28137.89 232192.00

14)

Top slab out side 2xπ 6.801 1.20 51.25 M2

Side wall inside 1xπ 6.90 3.00 65.03 M2

Bottom slab 2xπ 6.801 1.00 42.71 M2

Internal shaft out side 1xπ 1.40 3.00 13.19 M2

172.18 M2 1623.98 27962.00

15)

for side wall out 1xπ 7.30 3.00 68.80 M2

Ring girder O/s 1xπ 6.71 0.60 12.65 M2

Ring girder I/s 1xπ 5.91 0.60 11.14 M2

Shaft O/s 1xπ 4.9 34.71 534.32 M2

Shaft I/s 1xπ 4.5 34.71 4998.24 M2

VRCC(M30) prop using 20mm HBG Metal including cost and conveyanceof all materials and labour charges and strutting , centring and curingcharges etc., complete for finished item of work as per SS of APDSS,

excluding cost of steel for Top Slab (Dome)

Impervous coat with Plastering with CM(1:3) prop. 12 mm thick includingcost and conveyance of all materials and labour charges etc., complete asper SS of APDSS for Finished item of work

Cement Plastering with CM(1:3) prop. 12 mm thick including cost andconveyance of all materials and labour charges etc., complete for finisheditem of work as per IS Specifications etc., complete

Shaft Structures 20.8.15(rev).xlsx

Page 55: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

Bottom slab 2xπ 6.801 1.00 42.73 M2

Steps of stair case 1x200 1.20 0.45 52.92 M2

5720.80 M2 852.38 487630.00

16)

5720.80 M21029.89 589179.00

17)

57.51 MT's 51392.61 2955589.00

18) Lightning arrester 1x1 1.00 No's 15000.00 15000.00

19) RCC ladder inside the tank 1x1 1.00 No's 15000.00 15000.00

20) Water level indicater 1x1 1.00 No's 5000.00 5000.00

21)Painting of name board 1x1 1.00 No's 1000.00 1000.00

22)

Hand railing on top slab 1x1 1.00 No's 10000.00 10000.00

23)Phenial & fly proof ventilator 1x1 1.00 No's 1500.00 1500.00

24)Manhole cover and frame (0.6x0.6) 1x2 2.00 No's 2000.00 4000.00

25)DI specials and Valves as per Data 2008288.00

26)Provision for RCC Valve Chambers (I&O) 1x2 2.00 No's 30000.00 60000.00

27)Provision for RCC Valve Chambers (scour) 1x1 1.00 No's 10000.00 10000.00

28)

Snowcem Paint with approved colour including cost and conveyance of allmaterials and labour charges etc., complete for finished item of work asper SS of APDSSCost, supply and delivery of Tor Steel including fabrication andconveyance and all labour charges etc., complete for finished item of workas per SS of APDSS

28)MS ladder 1x2 2.00 No's 10000.00 20000.00

29)Cost, supply and delivery of MS SheetedDoor with Angled Frame including fabricationand conveyance and all labour charges etc.,complete for finished item of work as per SSof APDSS 1x1 1.00 No's 10000.00 10000.00

30)

Unforeseen items 1235770.00

14100000.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending EngineerTDWSP Banswada TDWSP Sub division TDWSP Division TDWSP CircleYellareddy Banswada/ Yellareddy Banswada Nirmal

Total

Shaft Structures 20.8.15(rev).xlsx

Page 56: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Wind Velocity 158.4 KMPH Velocity 44 Pressure 116.16

Construction of 130000 Lts capacity OHSR with 12.00 Mts staging

Est.Cost Rs 4600000

A) Basic cost 130000 X 24.35 : Rs 3164850

B) (With 10% Rural area allowence) 0

C) Add for increse in price of cement

6200 6300 0.7 3164850 : Rs -22154

( 100 X 100)

D) Add for increase/ Decrease in price of Steel

40000 40000 2.0 3164850 : Rs 0

( 1000 X 100)

f)RCC spiral stair case with handrailing upto 200kl

for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt g)Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No.

h)Lightening arrestor of approved pattern 1 No complete including conductor earthing

J) Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4) ofpost of size 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR

Construction of 130000 Lts Capacity OHSR with 12 m staging with raft foundation

plastering with CM(1:3) 2 coats of Weather proof emulsion painting for external surfaces, and 3

coats of epoxy paint to inner surface of the reservoir including roof dome, lettering as per Dept

Direction, S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and drawigns

supplied by the Dept., including the cost and conveyance of the all materials , Bends , Specials

Etc complete including the following.- M30 Grade Concreteb)D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty)

c) DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh

d)RCC Phinial with copper or Stainless stell flyproof mesh

e)RCC or Aluminium ladder inside of 0.60 mts width

CONSTRUCTION OF 130,000 Liters Capacity OHBR Stg:12 Mt at Mirzapur

( 1000 X 100)

E) Add for staging above 10Mts by .10 paise per Lts. : Rs 0

F) Add or deduct for Wind Pressure

116.16 250 5 3164850 : Rs -211792

( 100 X 100)

G) Cost of DI Specials : Rs 1010169

H) Cost of D.I valves 2 Nos : Rs

17 Valve Chambers Inlet 400 mm dia 1 27715 27715.00

Valve Chambers Outlet 400 mm dia 1 27715 27715.00

Valve Chambers Scour 100 mm dia 1 18694 18694.00

I) Cost of valve chambers 2 Nos : Rs 0

Total 4015197

J) Add Contractor's Profit 13.615% 536577

K) Provision for unforceen items : Rs 48226

Total cost � 46,00,000

Rate per lt � 35.01

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Superintending Engineer

TDWSP Circle

Nirmal

Executive Engineer

TDWSP Division

Banswada

Page 57: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Wind Velocity 158.4 KMPH Velocity 44 Pressure 116.16

Construction of 180000 Lts capacity OHSR with 12.00 Mts staging

Est.Cost Rs 5450000

A) Basic cost 180000 X 22.77 : Rs 4098600

B) (With 10% Rural area allowence) 0

C) Add for increse in price of cement

6200 6300 0.7 4098600 : Rs -28690

( 100 X 100)

D) Add for increase/ Decrease in price of Steel

J) Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4) of post ofsize 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR

Construction of 180000 Lts Capacity OHSR with 12 m staging with raft foundation

plastering with CM(1:3) 2 coats of Weather proof emulsion painting for external surfaces, and 3 coats

of epoxy paint to inner surface of the reservoir including roof dome, lettering as per Dept Direction,

S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and drawigns supplied by the Dept.,

including the cost and conveyance of the all materials , Bends , Specials Etc complete including the

following.- M30 Grade Concreteb)D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty)

c) DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh

d)RCC Phinial with copper or Stainless stell flyproof mesh

e)RCC or Aluminium ladder inside of 0.60 mts width

CONSTRUCTION OF 180,000 Liters Capacity OHBR Stg:12 Mt at Sevlal T

f)RCC spiral stair case with handrailing upto 200kl

for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt g)Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No.

h)Lightening arrestor of approved pattern 1 No complete including conductor earthing

D) Add for increase/ Decrease in price of Steel

40000 40000 2.0 4098600 : Rs 0

( 1000 X 100)

E) Add for staging above 10Mts by .10 paise per Lts. : Rs 0

F) Add or deduct for Wind Pressure

116.16 250 5 4098600 : Rs -274278

( 100 X 100)

G) Cost of DI Specials : Rs 889116

H) Cost of D.I valves 2 Nos : Rs

17 Valve Chambers Inlet 400 mm dia 1 27715 27715.00

Valve Chambers Outlet 400 mm dia 1 27715 27715.00

Valve Chambers Scour 100 mm dia 1 18694 18694.00

Total 4758872

J) Add Contractor's Profit 13.615% 637828

K) Provision for unforceen items : Rs 53300

Total cost � 54,50,000

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Superintending Engineer

TDWSP Circle

Nirmal

Executive Engineer

TDWSP Division

Banswada

Page 58: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Wind Velocity 158.4 KMPH Velocity 44 Pressure 116.16

Construction of 180000 Lts capacity OHSR with 12 Mts staging

Est.Cost Rs 5600000

A) Basic cost 180000 X 22.77 : Rs 4098600

B) (With 10% Rural area allowence) 0

C) Add for increse in price of cement

6200 6300 0.7 4098600 : Rs -28690

( 100 X 100)

D) Add for increase/ Decrease in price of Steel

Construction of 180000 Lts Capacity OHSR with 12 m staging with raft foundation

plastering with CM(1:3) 2 coats of Weather proof emulsion painting for external surfaces,

and 3 coats of epoxy paint to inner surface of the reservoir including roof dome, lettering as

per Dept Direction, S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and

drawigns supplied by the Dept., including the cost and conveyance of the all materials ,

Bends , Specials Etc complete including the following.- M30 Grade Concrete

b)D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty)

CONSTRUCTION OF 180,000 Liters Capacity OHBR Stg:12 Mt at Ch kodapgal

J) Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4)of post of size 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR

c) DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh

d)RCC Phinial with copper or Stainless stell flyproof mesh

e)RCC or Aluminium ladder inside of 0.60 mts width

f)RCC spiral stair case with handrailing upto 200kl

for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt g)Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No.

h)Lightening arrestor of approved pattern 1 No complete including conductor earthing

D) Add for increase/ Decrease in price of Steel

40000 40000 2.0 4098600 : Rs 0

( 1000 X 100)

E) Add for staging above 10Mts by .10 paise per Lts. : Rs 0

F) Add or deduct for Wind Pressure

116.16 250 5 4098600 : Rs -274278

( 100 X 100)

G) Cost of DI Specials : Rs 1010169

H) Cost of D.I valves 2 Nos : Rs

17 Valve Chambers Inlet 400 mm dia 1 27715 27715.00

Valve Chambers Outlet 400 mm dia 1 27715 27715.00

Valve Chambers Scour 100 mm dia 1 18694 18694.00

I) Cost of valve chambers 2 Nos : Rs 0

Total 4879925

J) Add Contractor's Profit 13.615% 654310

K) Provision for unforceen items : Rs 65765

Total cost � 56,00,000

Rate per lt � 30.75

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Superintending Engineer Executive Engineer Superintending Engineer

TDWSP Circle

Nirmal

TDWSP Division

Banswada

Page 59: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Wind Velocity 158.4 KMPH Velocity 44 Pressure 116.16

Construction of 700000 Lts capacity OHSR with 12.00 Mts staging

Est.Cost Rs 12900000

A) Basic cost 700000 X 15.45 : Rs 10816400

B) (With 10% Rural area allowence) 0

C) Add for increse in price of cement

6200 6300 0.7 10816400 : Rs -75715

( 100 X 100)

CONSTRUCTION OF 700000 Liters Capacity OHBR Stg:12 Mt at Akbar Nagar T

Construction of 700000 Lts Capacity OHSR with 12 m staging with raft foundation

plastering with CM(1:3) 2 coats of Weather proof emulsion painting for external surfaces,

and 3 coats of epoxy paint to inner surface of the reservoir including roof dome, lettering as

per Dept Direction, S/Fof the CI D/F Pipes verticals, vlaves, Execution as per Design and

drawigns supplied by the Dept., including the cost and conveyance of the all materials ,

Bends , Specials Etc complete including the following.- M30 Grade Concrete

b)D.I man hole covers with frame of size 0.60 X 0.60 mts -2 Nos (light duty)

c) DI Swan Neck ventilators shall be provided in Top dome/slab with flyproof mesh

d)RCC Phinial with copper or Stainless stell flyproof mesh

e)RCC or Aluminium ladder inside of 0.60 mts width

f)RCC spiral stair case with handrailing upto 200kl

for above 200kl capacity Doglegged staircase with flight width of 1mt and landing of 1.2mts and SS Handrailing upto 1mt g)Waterlevel indicator of good quality with ebonite/copper float approved pattern - 1 No.

h)Lightening arrestor of approved pattern 1 No complete including conductor earthing

J) Railling with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4)of post of size 100x75x75mm with 1.5m m itervals around the pheriphary on top of OHSR

D) Add for increase/ Decrease in price of Steel

40000 40000 2.0 10816400 : Rs 0

( 1000 X 100)

E) Add for staging above 10Mts by .10 paise per Lts. : Rs 0

F) Add or deduct for Wind Pressure

116.16 250 5 10816400 : Rs -723833

( 100 X 100)

G) Cost of DI Specials : Rs 1010169

H) Cost of D.I valves 2 Nos : Rs

17 Valve Chambers Inlet 1000 mm dia 1 168790 168790.00

Valve Chambers Outlet 1000 mm dia 1 168790 168790.00

Valve Chambers Scour 100 mm dia 1 18694 18694.00

I) Cost of valve chambers 2 Nos : Rs 0

Total 11383295

J) Add Contractor's Profit 13.615% 1501329

K) Provision for unforceen items : Rs 15376

Total cost � 129,00,000

Asst. Executive Engineer Dy. Executive Engineer

TDWSP Banswada / TDWSP Sub division

Yellareddy Banswada/ Yellareddy

Superintending Engineer

TDWSP Circle

Nirmal

Executive Engineer

TDWSP Division

Banswada

Page 60: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs. 463.00 Lakhs

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 101)

0-3 m Depth 1.00 xπ/4

23.55 23.55 3.55 1546.32 Cum 128.20 198238.00

For Stair Case 1 x 2 5.30 6.56 3.00 208.61 Cum 128.20 26744.00

3)

1 x π 16.075 6.275 0.20 63.39 Cum 5031.04 318903.00

For Stair Case 1 x 2 4.10 5.36 0.10 4.40 Cum 5031.04 22112.00

4)

For Raft Slab 1 x π 16.075 5.975 0.60 181.07 Cum 9413.13 1704435.00

For Stair Case 1 x 2 3.90 5.36 0.10 4.18 Cum 9413.13 39354.00

5)

Outer Ring Beam 1 x π 19.50 0.50 0.40 12.25 Cum 11193.33 137118.00

Inner Ring Beam 1 x π 12.00 0.50 0.40 7.54 Cum 11193.33 84398.00

8)

Sub Estimate for Construction of 1350KL(30M Staging) at Tadmanoor of Andhol Mandal

SUB-ESTIMATE

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

Earth work excavation in ordinary Gravelly soils except in hard rock which requires blasting with

initial lead and lift including cost and conveyance of all materials and labour charges etc.,

complete for finished item of work as per SS of APDSS for foundation

PCC(1:4:8) prop using 40mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS for Raft Levelling Course

VRCC(M30) using 20mm HBG Metal including cost and conveyance of all materials and labour

charges and strutting , centring and curing charges etc., complete for finished item of work as per

SS of APDSS for Raft Slab

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS for Raft ring beam excluding cost of steel

Below G.L 0-3 M 2 x 20 0.50 0.50 1.30 13.00 Cum 18876.25 245391.00

For Stair Case 2 x 20 0.30 0.30 2.70 9.72 Cum 25535.60 248206.00

9

For Outer Tie Beam 1 x 20 3.06 0.30 0.50 9.19 11193.33 102871.00

For Inner Tie Beam 1 x 20 1.89 0.30 0.50 5.66 11193.33 63305.00

Radial Brace Beam 1 x 20 3.98 0.30 0.50 11.93 11193.33 133480.00

7)

1481.87 Cum 973.10 1442010.00

0 - 3 Mts

For Column 2 x 20 0.50 0.50 3.00 30.00 Cum18876.25

566288.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.0825535.60

27578.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 9508.42 3803.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8561.02 2889.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 23946.99 13578.00

Beam 1 x 1 3.16 0.300 0.300 0.28 23946.99 6811.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Column

Filling the foundation with excavated earth including cost and conveyance of all materials and

labour charges etc., complete for relling of foundation

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Column

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Tie Beams

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Radial Brace Beam

1350KL Tadmanoor19082015(rev).xlsx

Page 61: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

3 - 6 Mts

For Column 2 x 20 0.50 0.50 2.50 25.00 19028.49 475712.00

For Outer Tie Beam 1 x 20 3.06 0.30 0.50 9.19 23700.23 217813.00

For Inner Tie Beam 1 x 20 1.89 0.30 0.50 5.66 23700.23 134039.00

Radial Brace beam 1 x 20 3.98 0.30 0.50 11.93 23700.23 282625.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.08 25687.84 27743.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10309.00 4124.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8713.26 2941.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 24099.23 13664.00

Beam 1 x 1 3.16 0.300 0.300 0.28 24099.23 6854.00

6 - 9 Mts

For Column 2 x 20 0.50 0.50 3.00 30.00 19180.74 575422.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.08 25840.09 27907.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10461.24 4184.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8865.51 2992.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 24251.48 13751.00

Beam 1 x 1 3.16 0.300 0.300 0.28 24251.48 6897.00

9 - 12 Mts

For Column 2 x 20 0.50 0.50 2.50 25.00 19332.98 483325.00

1 x 20For Outer Tie Beam 1 x 20 3.06 0.30 0.50 9.19 24004.71 220612.00

For Inner Tie Beam 1 x 20 1.89 0.30 0.50 5.66 24004.71 135761.00

Radial Brace beam 1 x 20 3.98 0.30 0.50 11.93 24004.71 286256.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.08 25992.33 28072.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10613.48 4245.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9017.75 3043.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 24403.72 13837.00

Beam 1 x 1 3.16 0.300 0.300 0.28 24403.72 6940.00

12 - 15 Mts

For Column 2 x 20 0.50 0.50 2.50 25.00 19485.23 487131.00

For Outer Tie Beam 1 x 20 3.06 0.30 0.50 9.19 24156.96 222011.00

For Inner Tie Beam 1 x 20 1.89 0.30 0.50 5.66 24156.96 136622.00

Radial Brace beam 1 x 20 3.98 0.30 0.50 11.93 24156.96 288072.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 26144.58 28236.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10765.73 4306.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9170.00 3095.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 24555.97 13923.00

Beam 1 x 1 3.16 0.300 0.300 0.28 24555.97 6984.00

15 - 18 Mts

For Column 2 x 20 0.50 0.50 3.00 30.00 20536.48 616094.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 27795.18 30019.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 11116.86 4447.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9322.24 3146.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 26206.57 14859.00

Beam 1 x 1 3.16 0.300 0.300 0.28 26206.57 7453.00

1350KL Tadmanoor19082015(rev).xlsx

Page 62: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

18 - 21 Mts

For Column 2 x 20 0.50 0.50 2.50 25.00 21288.07 532202.00

For Outer Tie Beam 1 x 20 3.06 0.30 0.50 9.19 26459.25 243170.00

For Inner Tie Beam 1 x 20 1.89 0.30 0.50 5.66 26459.25 149643.00

Radial Brace beam 1 x 20 3.98 0.30 0.50 11.93 26459.25 315527.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 28946.32 31262.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 11401.69 4561.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9474.48 3198.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 27357.71 15512.00

Beam 1 x 1 3.16 0.300 0.300 0.28 27357.71 7781.00

21 - 24 Mts

For Column 2 x 20 0.50 0.50 3.00 30.00 22039.66 661190.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 30097.47 32505.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 11686.52 4675.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9626.73 3249.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 28508.86 16165.00

Beam 1 x 1 3.16 0.300 0.300 0.28 28508.86 8108.00

24 - 27 Mts

For Column 2 x 20 0.50 0.50 2.50 25.00 22791.24 569781.00

1 x 20For Outer Tie Beam 1 x 20 3.06 0.30 0.50 9.19 28361.99 260657.00

For Inner Tie Beam 1 x 20 1.89 0.30 0.50 5.66 28361.99 160404.00

Radial Brace beam 1 x 20 3.98 0.30 0.50 11.93 28361.99 338217.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 31248.62 33749.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 11971.35 4789.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9778.97 3300.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 29660.01 16817.00

Beam 1 x 1 3.16 0.300 0.300 0.28 29660.01 8435.00

27- 30 Mts

For Column 2 x 20 0.50 0.50 2.25 22.50 23243.16 522971.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 31900.31 34452.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 12189.89 4876.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9931.22 3352.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 30311.70 17187.00

Beam 1 x 1 3.16 0.300 0.300 0.28 30311.70 8621.00

Outer Bottom Ring Beam 1 x π 19.50 0.50 0.75 22.98 16205.76 372342.00

Inner Bottom Ring Beam 1 x π 12.00 0.50 0.75 14.14 16205.76 229133.00

Bottom Flat Slab 1 x π 16.08 3.975 0.325 65.24 16135.58 1052685.00

30- 33 Mts

For Column 1 x 20 0.30 0.30 3.00 5.40 26690.68 144130.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel For Bottom Ring Beam @ 29.25Mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel Bottom Flat Slab @ 30.00mts

1350KL Tadmanoor19082015(rev).xlsx

Page 63: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

Bottom Dome 2 x π 12.04 1.75 0.275 72.79 21814.06 1587845.00

Side Walls 1 x π 19.50 0.30 3.00 55.13 22535.79 1242398.00

33- 36 Mts

For Column 1 x 20 0.30 0.30 2.00 3.60 27342.37 98433.00

Side Walls 1 x π 19.50 0.30 2.20 40.43 28751.10 1162407.00

Top Dome2 x π

9.81 2.25 0.10 27.72 35213.06 976106.00

Top Flat Slab 1 x π 16.08 3.975 0.12 24.09 28336.17 682618.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Bottom Dome @30.00mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Side Wall @30 to 33Mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Top Flat Slab @ 35 Mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Top Slab(Dome) @35 Mts

Top Ring Beam 1 x π 12.00 0.30 0.30 3.39 26735.11 90632.00

12

Top Dome out side 2 x π 16.075 2.25 454.51 M2

Top Flat Slab 1 x π 16.08 3.975 200.74 M2

Side Wall In side 1 x π 19.50 5.08 311.21

Bottom Dome out side 2 x π 12.240 1.75 269.17 M2

Bottom Flat Slab 1 x π 16.08 3.975 200.74 M2

1436.37 M2 1739.78 249897.00

13

for side wall out 1 xπ

19.50 5.20 318.56 M2

Ring Beam O/s 1 xπ

19.50 0.75 45.95 M2

Ring Beam I/s 1 xπ

12.00 0.75 28.27 M2

392.78 M2 869.75 34162.00

14

392.78 M21029.89 40452.00

15

152.62 MTN 51392.61 7843645.00

Lightning arrester 1 x 1 1.00 No's 7000.00 7000.00

RCC ladder inside the tank 1 x 1 1.00 No's 2000.00 2000.00

Water level indicater 1 x 1 1.00 No's 2500.00 2500.00

16Painting of name board 1 x 1 1.00 No's 3000.00 3000.00

17Hand railing on top slab 1 x 1 1.00 No's 5000.00 5000.00

19Phenial & fly proof ventilator 1 x 1 1.00 No's 3000.00 3000.00

20Manhole cover and frame (0.6x0.6) 1 x 2 2.00 No's 600.00 1200.00

21CI specials and Valves as per Data 11911690.00

23Provision for RCC Valve Chambers (I&O) 1 x 2 2.00 No's 30000.00 60000.00

24Provision for RCC Valve Chambers (scour) 1 x 1 1.00 No's 10000.00 10000.00

25MS ladder 1 x 2 2.00 No's 10000.00 20000.00

Impervous coat with Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of

all materials and labour charges etc., complete as per SS of APDSS for Finished item of work

Cement Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete for finished item of work as per IS Specifications

etc., complete

Snowcem Paint with approved colour including cost and conveyance of all materials and labour

charges etc., complete for finished item of work as per SS of APDSS

Cost, supply and delivery of Tor Steel including fabrication and conveyance and all labour

charges etc., complete for finished item of work as per SS of APDSS

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel For Top Ring Beam

1350KL Tadmanoor19082015(rev).xlsx

Page 64: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 1026 Door with Angled Frame including fabrication

and conveyance and all labour charges etc.,

complete for finished item of work as per SS

of APDSS 1 x 1 1.00 No's 10000.00 10000.00

27 Unforeseen items such as fixing of verticals

and Hard Rock Anchoring for Foundation

etc., if any 4208700.00

46300000.00

Assistant Executive Engineer Dy Executive Engineer Executive Engineer Superingtending Engineer

TDWSP Banswada/yellareddy TDWSP Banswada TDWSP Div Banswada TDWSP Circle Nirmal

Total

1350KL Tadmanoor19082015(rev).xlsx

Page 65: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs. 471.00 Lakhs

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 101)

0-3 m Depth 1.00 xπ/4

24.65 24.65 3.55 1694.15 Cum 128.20 217190.00

For Stair Case 1 x 2 5.30 6.56 3.00 208.61 Cum 128.20 26744.00

3)

1 x π 17.175 6.275 0.20 67.72 Cum 4511.29 305525.00

For Stair Case 1 x 2 4.10 5.36 0.10 4.40 Cum 4511.29 19828.00

4)

For Raft Slab 1 x π 17.175 5.975 0.60 193.46 Cum 8951.13 1731689.00

For Stair Case 1 x 2 3.90 5.36 0.10 4.18 Cum 8951.13 37423.00

5)

Outer Ring Beam 1 x π 20.60 0.50 0.40 12.94 Cum 10731.39 138864.00

Inner Ring Beam 1 x π 13.10 0.50 0.40 8.23 Cum 10731.39 88319.00

8)

Below G.L 0-3 M 2 x 21 0.50 0.50 1.30 13.65 Cum 18414.25 251355.00

Sub Estimate for Construction of 1500 at Santhosh nagar of Banswada Mandal

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Column

Earth work excavation in ordinary Gravelly soils except in hard rock which requires blasting with

initial lead and lift including cost and conveyance of all materials and labour charges etc., complete

for finished item of work as per SS of APDSS for foundation

PCC(1:4:8) prop using 40mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS for Raft Levelling Course

VRCC(M30) using 20mm HBG Metal including cost and conveyance of all materials and labour

charges and strutting , centring and curing charges etc., complete for finished item of work as per

SS of APDSS for Raft Slab

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS for Raft ring beam excluding cost of steel

Below G.L 0-3 M 2 x 21 0.50 0.50 1.30 13.65 Cum 18414.25 251355.00

For Stair Case 2 x 21 0.30 0.30 2.70 10.21 Cum 25073.60 255901.00

9

For Outer Tie Beam 1 x 21 3.08 0.30 0.50 9.71 10731.39 104189.00

For Inner Tie Beam 1 x 21 1.96 0.30 0.50 6.17 10731.39 66256.00

Radial Brace Beam 1 x 21 3.98 0.30 0.50 12.52 10731.39 134370.00

7)

1632.21 Cum 1560.60 2547228.00

0 - 3 Mts

For Column 2 x 21 0.50 0.50 3.00 31.50 Cum18414.25

580049.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.0825073.60

27079.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 9046.48 3619.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8099.02 2733.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 23485.05 13316.00

Beam 1 x 1 3.16 0.300 0.300 0.28 23485.05 6679.00

3 - 6 Mts

For Column 2 x 21 0.50 0.50 2.50 26.25 18566.49 487370.00

For Outer Tie Beam 1 x 21 3.08 0.30 0.50 9.71 23238.29 225615.00

For Inner Tie Beam 1 x 21 1.96 0.30 0.50 6.17 23238.29 143474.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Column

Filling the foundation with excavated earth including cost and conveyance of all materials and

labour charges etc., complete for relling of foundation

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Tie Beams

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and shuttering , centring and curing charges etc., complete for finished item of

work as per SS of APDSS excluding cost of steel for Radial Brace Beam

Radial Brace beam 1 x 21 3.98 0.30 0.50 12.52 23238.29 290972.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.08 25225.84 27244.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 9847.06 3939.00

1500KL Santhoshnagar19082015(rev).xlsx

Page 66: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8251.26 2785.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 23637.29 13402.00

Beam 1 x 1 3.16 0.300 0.300 0.28 23637.29 6722.00

6 - 9 Mts

For Column 2 x 21 0.50 0.50 3.00 31.50 18718.74 589640.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.08 25378.09 27408.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 9999.30 4000.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8403.51 2836.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 23789.54 13489.00

Beam 1 x 1 3.16 0.300 0.300 0.28 23789.54 6766.00

9 - 12 Mts

For Column 2 x 21 0.50 0.50 2.50 26.25 18870.98 495363.00

For Outer Tie Beam 1 x 21 3.08 0.30 0.50 9.71 23542.77 228572.00

For Inner Tie Beam 1 x 21 1.96 0.30 0.50 6.17 23542.77 145354.00

Radial Brace beam 1 x 21 3.98 0.30 0.50 12.52 23542.77 294785.00

For Staircase

Columns 1 x 4 0.30 0.30 3.00 1.08 25530.33 27573.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10151.54 4061.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8555.75 2888.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 23941.78 13575.00

Beam 1 x 1 3.16 0.300 0.300 0.28 23941.78 6809.00

12 - 15 Mts

For Column 2 x 21 0.50 0.50 2.50 26.25 19023.23 499360.00

For Outer Tie Beam 1 x 21 3.08 0.30 0.50 9.71 23695.02 230050.00

For Inner Tie Beam 1 x 21 1.96 0.30 0.50 6.17 23695.02 146294.00

Radial Brace beam 1 x 21 3.98 0.30 0.50 12.52 23695.02 296691.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 25682.58 27737.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10303.79 4122.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8708.00 2939.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 24094.03 13661.00

Beam 1 x 1 3.16 0.300 0.300 0.28 24094.03 6852.00

15 - 18 Mts

For Column 2 x 21 0.50 0.50 3.00 31.50 20074.48 632346.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 27333.18 29520.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10654.92 4262.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 8860.24 2990.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 25744.63 14597.00

Beam 1 x 1 3.16 0.300 0.300 0.28 25744.63 7322.00

18 - 21 Mts

For Column 2 x 21 0.50 0.50 2.50 26.25 20826.07 546684.00

For Outer Tie Beam 1 x 21 3.08 0.30 0.50 9.71 25997.31 252402.00

For Inner Tie Beam 1 x 21 1.96 0.30 0.50 6.17 25997.31 160508.00

Radial Brace beam 1 x 21 3.98 0.30 0.50 12.52 25997.31 325519.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 28484.32 30763.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 10939.75 4376.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9012.48 3042.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 26895.77 15250.00

Beam 1 x 1 3.16 0.300 0.300 0.28 26895.77 7649.00

1500KL Santhoshnagar19082015(rev).xlsx

Page 67: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

21 - 24 Mts

For Column 2 x 21 0.50 0.50 3.00 31.50 21577.66 679696.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 29635.47 32006.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 11224.58 4490.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9164.73 3093.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 28046.92 15903.00

Beam 1 x 1 3.16 0.300 0.300 0.28 28046.92 7977.00

24 - 27 Mts

For Column 2 x 21 0.50 0.50 2.50 26.25 22329.24 586143.00

For Outer Tie Beam 1 x 21 3.08 0.30 0.50 9.71 27900.05 270875.00

For Inner Tie Beam 1 x 21 1.96 0.30 0.50 6.17 27900.05 172256.00

Radial Brace beam 1 x 21 3.98 0.30 0.50 12.52 27900.05 349344.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 30786.62 33250.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 11509.41 4604.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9316.97 3144.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 29198.07 16555.00

Beam 1 x 1 3.16 0.300 0.300 0.28 29198.07 8304.00

27- 30 Mts

For Column 2 x 21 0.50 0.50 2.25 23.63 22781.16 538205.00

For Stair Case

Columns 1 x 4 0.30 0.30 3.00 1.08 31438.31 33953.00

Landing Slab 1 x 2 1.00 1.00 0.20 0.40 11727.95 4691.00

Steps (1/2) x 20 1.00 0.225 0.150 0.34 9469.22 3196.00

Beam at Landing 1 x 3 2.10 0.300 0.300 0.57 29849.76 16925.00

Beam 1 x 1 3.16 0.300 0.300 0.28 29849.76 8489.00

Outer Bottom Ring Beam 1 x π 20.60 0.50 0.75 24.27 15743.82 382133.00

Inner Bottom Ring Beam 1 x π 13.10 0.50 0.75 15.44 15743.82 243007.00

Bottom Flat Slab 1 x π 17.18 3.975 0.325 69.71 15673.64 1092609.00

30- 33 Mts

For Column 1 x 21 0.30 0.30 3.00 5.67 26228.68 148717.00

Bottom Dome 2 x π 14.09 1.75 0.275 85.19 21352.12 1818987.00

Side Walls 1 x π 20.60 0.30 3.00 58.25 22073.79 1285798.00

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Bottom Dome @30.00mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Side Wall @30 to 33Mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel For Bottom Ring Beam @ 29.25Mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel Bottom Flat Slab @ 30.00mts

33- 36 Mts

For Column 1 x 21 0.30 0.30 2.00 3.60 26880.37 96769.00

Side Walls 1 x π 20.60 0.30 2.20 42.71 28289.10 1208227.00

1500KL Santhoshnagar19082015(rev).xlsx

Page 68: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description No's L B D Quantity Rate Per Amount

1 2 3 4 5 6 7 8 9 10

Top Dome2 x π

11.40 2.25 0.10 32.23 34751.12 1120029.00

Top Flat Slab 1 x π 17.18 3.975 0.12 25.74 27874.23 717483.00

Top Ring Beam 1 x π 13.10 0.30 0.30 3.70 26273.17 97211.00

12

Top Dome out side 2 x π 17.175 2.25 485.61 M2

Top Flat Slab 1 x π 17.18 3.975 214.48 M2

Side Wall In side 1 x π 20.60 5.08 328.76

Bottom Dome out side 2 x π 12.240 1.75 269.17 M2

Bottom Flat Slab 1 x π 17.18 3.975 214.48 M2

1512.50 M2 1623.98 245627.00

13

for side wall out 1 xπ

20.60 5.20 336.53 M2

Impervous coat with Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of

all materials and labour charges etc., complete as per SS of APDSS for Finished item of work

Cement Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all materials

and labour charges etc., complete for finished item of work as per IS Specifications etc., complete

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Top Flat Slab @ 35 Mts

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel For Top Ring Beam

VRCC(M30) prop using 20mm HBG Metal including cost and conveyance of all materials and

labour charges and strutting , centring and curing charges etc., complete for finished item of work

as per SS of APDSS, excluding cost of steel for Top Slab(Dome) @35 Mts

for side wall out 1 xπ

20.60 5.20 336.53 M2

Ring Beam O/s 1 xπ

20.60 0.75 48.54 M2

Ring Beam I/s 1 xπ

13.10 0.75 30.87 M2

415.94 M2852.38 35454.00

14

415.94 M21029.89 42837.00

15

163.07 MTN 51392.61 8380818.00

Lightning arrester 1 x 1 1.00 No's 7000.00 7000.00

RCC ladder inside the tank 1 x 1 1.00 No's 2000.00 2000.00

Water level indicater 1 x 1 1.00 No's 2500.00 2500.00

16Painting of name board 1 x 1 1.00 No's 3000.00 3000.00

17

Hand railing on top slab 1 x 1 1.00 No's 5000.00 5000.00

19Phenial & fly proof ventilator 1 x 1 1.00 No's 3000.00 3000.00

20Manhole cover and frame (0.6x0.6) 1 x 2 2.00 No's 600.00 1200.00

21DI specials and Valves as per Sub estimate 10159931.00

23Provision for RCC Valve Chambers (I&O) 1 x 2 2.00 No's 30000.00 60000.00

24Provision for RCC Valve Chambers (scour) 1 x 1 1.00 No's 10000.00 10000.00

25MS ladder 1 x 2 2.00 No's 10000.00 20000.00

26 Door with Angled Frame including fabrication

and conveyance and all labour charges etc.,

complete for finished item of work as per SS

of APDSS 1 x 1 1.00 No's 10000.00 10000.00

27 Unforeseen items such as fixing of verticals

and Hard Rock Anchoring for Foundation

etc., if any 4219630.00

47100000.00

Assistant Executive Engineer Dy Executive Engineer Executive Engineer Superingtending Engineer

Total

Snowcem Paint with approved colour including cost and conveyance of all materials and labour

charges etc., complete for finished item of work as per SS of APDSS

Cost, supply and delivery of Tor Steel including fabrication and conveyance and all labour charges

etc., complete for finished item of work as per SS of APDSS

Assistant Executive Engineer Dy Executive Engineer Executive Engineer Superingtending Engineer

TDWSP Banswada/Yellareddy TDWSP Banswada TDWSP Div Banswada TDWSP Circle Nirmal

1500KL Santhoshnagar19082015(rev).xlsx

Page 69: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Telangana Drinking Water Supply Project

Est.Cost Rs

S.No Description Quantity Rate Amount

1

1xp/4 4.80 4.80 1.15 20.82 128.20 267

2

1xp/4 4.80 4.80 0.30 5.43 4251.40 23089

3

1xp/4 4.80 4.80 0.25 4.53 8720.10 39465

Haunch 1xp 3.50 0.30 0.30 0.99 8720.10 8633

4

1 p 4.00 0.30 0.30 1.13 10498.00 11878

Name of the Sub work: Construction of 20KL GLBR at Yellaram

Earth work excavation in all type of soils

with intial lead and lift etc complete

CC(1:4:8)using 40 mm HBG metal icluding

Cost and conveyance of the all materials etc

complete.

M30 Grade concrete using 20 mm HBG metal

including cost and conveyance of all the

materials,but excluding the cost of the steel

etc complete for bottom raft

M30 grade concrete using 20 mm HBG metal

including cost and conveyance of all the

materials,but excluding the cost of the steel

etc complete for Top Ring Beams

M30 grade concrete using 20 mm HBG metal

5

p 4.00 2.20 0.20 5.53 11361.20 62844

6

1xp/4 4.80 4.80 0.15 2.71 16639.60 4517

7

B-Slab 1xp/4 3.80 3.80 11.35

Slab 1xp/4 4.80 4.80 18.10

Inside walls p 3.80 2.50 29.86

59.31 2184.00 12952

8

p 4.20 2.50 33.00 4794.40 15822

9

Side wall p 4.20 2.50 33.00

Top Slab 1xp/4 4.80 4.80 18.10

51.10 1029.90 5262

Cement plastering with CM(1:3),12mm

thick including cost and conveyance of all the

materials ect complete.

Snowcem painting including cost and

conveyance of all the materials ect complete.

M30 grade concrete using 20 mm HBG metal

including cost and conveyance of all the

materials,but excluding the cost of the steel

etc complete for Side walls

M30 grade concrete using 20 mm HBG metal

including cost and conveyance of all the

materials,but excluding the cost of the steel

etc complete for Top Slab with- 0.15 m

Thckness

Accoproof plastering with CM(1:3),12mm

thick including cost and conveyance of all the

materials ect complete.

51.10 1029.90 5262

Page 70: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

S.No Description Quantity Rate Amount

11

2.23 51392.60 114808

13 80mm dia DI Scour Valve including chamber 41211

14 DI Pipe for Overflow 1 LS 11140

13 Man hole covers 1 3000 3000

14 1 2000 2000

16 Unforceen items 43111

Total � 4,00,000

Supply and placing of the HYSD bars,

fabrication including cost and conveyance of

all the materials etc complete.

Central Phenials

Page 71: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Capacity of Tank required : 30.00

Size of sump well: :

Internal Dia of the sump : 3.50

: 35.60

Side wall height with 0.250 m thick 4.20 m 4.30

Side wall height above GL 0.60 m

Side wall height below GL 3.60 m

Top ring beam( Bredth, Web ) 0.30 0.30

Top Dome thickness 0.125 m

Top Dome Projection 0.000 m

Bottom slab projection 0.15 m

Thickness of bottom slab 0.40 m

Size of bottom slab:

Outer Dia : 4.30 m

Size of Top Dome: Suction pit size

Outer Dia : 4.00 m L 2.5

Thickness of CC bed 0.30 m B 1

Radius of the Dome 2.92 m D 0.5

Rise of the dome 0.58 m

Thickness of the dome 0.13 m

Dead storage 0.30 m

Free board 0.20 m

Abstract cum detailed estimate for Construction of 30 KL Sump at Raithu Nagar Est Cost in Rs Lakhs: 8.00

L B D

1

a For sump Fdn. Up to 3m Depth 1xπ/4 4.30 4.30 3.00 43.57 Cum 128.20 1 Cum 5,586

b 3-6 m depth

Sump Portion 1xπ/4 4.00 4.00 1.30 16.34

Suction pit 1 3.00 1.50 0.80 3.60

19.94 Cum 164.83 1 Cum 593

2

1xπ/4 4.30 4.30 0.30 4.36 Cum 4511.29 1 Cum 19,669

3

a) Floor slab 1xπ/4 4.300 4.300 0.400 5.81 Cum 8951.13 1 Cum 52,006

b) Side wall 250 mm Thick 1xπ 3.750 0.250 4.200 12.37

Suction Pit Walls 1 4.000 0.250 1.000 1.00

13.37 Cum 13492.45 1 Cum 1,80,394

c) Haunch portion 1xπ 3.350 0.150 0.075 0.12 Cum 8951.13 1 Cum 1,074

d) Top ring beam 1xπ 3.800 0.300 0.300 1.07 Cum 12372.82 1 Cum 13,239

e) Dome 2xπ 2.917 0.583 0.125 1.34 Cum 31104.83 1 Cum 41,680

Abstract cum detailed estimate for Construction of 30 KL Sump at Raithu Nagar

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

Earthwork in excavation for structures as per drawing and technical

specifications Clause 305.1 including setting out, construction of shoring and

bracing, removal of stumps and other deleterious material and disposal upto a

lead of 50 m, dressing of sides and bottom and backfilling in trenches with

excavated suitable material as per Technical Specification 305 MORD / 304

MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

foundation levelling course

RCC M30 Grade including cost and conveyence of all materials and labour

charges but excluding cost of steel and its fabrication charges etc., complete as

per standard specifications for

Page 72: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B D

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

4

Bottom of the sump 1xπ/4 3.500 3.500 - 9.62

Side walls inside 1xπ 3.500 - 4.200 46.18

Top dome ceiling 2xπ 2.917 0.583 - 10.69

66.49 Sqm 1542.40 10 Sqm 10,255

5

Side walls Outside 1xπ 4.000 - 0.600 7.54

Over dome 2xπ 2.917 0.583 - 10.69

Total 18.23 Sqm 852.38 10 Sqm 1,554

6

Side wall Outside above GL 1xπ 4.000 - 0.600 7.54

Over top dome 2xπ 2.917 0.583 - 10.69

Total 18.23 Sqm 1029.89 10 Sqm 1,877

7 10,000

8 5.26 MT

51392.61

1 MT 2,70,428

9 1 Job 1500.0 1 Job 1,500

10 1 Job 300.0 1 Job 300

11 1 No 4000.0 1 Each 4,000

12 1 Job 75000.0 1 Job 75,000

13 1 No 2130.0 1 each 2,130

14 Vertical connections 69,129

15 L.S.39586

Total Rs. � 8,00,000

In Rs lakhs 8.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

Provision for RCC central phenial as per standard specifications

Providing mesh to phenials including all charges

Provision for RCC inside ladder as per the standard specifications

Provision for CI Specials

Supply and fixing of CI light type man hole cover with frame of size

0.6 x 0.6m as per standard specification

Provision for unforeseen items such as refilling the foundation with

excavated earth and rock cutting, etc.

Snowcem painting with 2 coats over a primary coat including cost and

conveyance of all materials and labour charges etc., complete as per standard

specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of

all materials and labour charges etc., complete

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not

welded

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof

powder including cost and conveyance of all materials and labour charges etc.,

complete as per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

sump well

Page 73: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Capacity of Tank required : 30.00

Size of sump well: :

Internal Dia of the sump : 3.50

: 35.60

Side wall height with 0.250 m thick 4.20 m 4.30

Side wall height above GL 0.60 m

Side wall height below GL 3.60 m

Top ring beam( Bredth, Web ) 0.30 0.30

Top Dome thickness 0.125 m

Top Dome Projection 0.000 m

Bottom slab projection 0.15 m

Thickness of bottom slab 0.40 m

Size of bottom slab:

Outer Dia : 4.30 m

Size of Top Dome: Suction pit size

Outer Dia : 4.00 m L 2.5

Thickness of CC bed 0.30 m B 1

Radius of the Dome 2.92 m D 0.5

Rise of the dome 0.58 m

Thickness of the dome 0.13 m

Dead storage 0.30 m

Free board 0.20 m

Abstract cum detailed estimate for Construction of 30 KL Sump at Tadgur Small X rd Est Cost in Rs Lakhs: 8.00

L B D

1

a For sump Fdn. Up to 3m Depth 1xπ/4 4.30 4.30 3.00 43.57 Cum 128.20 1 Cum 5,586

b 3-6 m depth

Sump Portion 1xπ/4 4.00 4.00 1.30 16.34

Suction pit 1 3.00 1.50 0.80 3.60

19.94 Cum 164.83 1 Cum 593

2

1xπ/4 4.30 4.30 0.30 4.36 Cum 4511.29 1 Cum 19,669

3

a) Floor slab 1xπ/4 4.300 4.300 0.400 5.81 Cum 8951.13 1 Cum 52,006

b) Side wall 250 mm Thick 1xπ 3.750 0.250 4.200 12.37

Suction Pit Walls 1 4.000 0.250 1.000 1.00

13.37 Cum 13492.45 1 Cum 1,80,394

c) Haunch portion 1xπ 3.350 0.150 0.075 0.12 Cum 8951.13 1 Cum 1,074

d) Top ring beam 1xπ 3.800 0.300 0.300 1.07 Cum 12372.82 1 Cum 13,239

e) Dome 2xπ 2.917 0.583 0.125 1.34 Cum 31104.83 1 Cum 41,680

Abstract cum detailed estimate for Construction of 30 KL Sump at Tadgur Small X rd

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

Earthwork in excavation for structures as per drawing and technical

specifications Clause 305.1 including setting out, construction of shoring and

bracing, removal of stumps and other deleterious material and disposal upto a

lead of 50 m, dressing of sides and bottom and backfilling in trenches with

excavated suitable material as per Technical Specification 305 MORD / 304

MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

foundation levelling course

RCC M30 Grade including cost and conveyence of all materials and labour

charges but excluding cost of steel and its fabrication charges etc., complete as

per standard specifications for

Page 74: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B D

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

4

Bottom of the sump 1xπ/4 3.500 3.500 - 9.62

Side walls inside 1xπ 3.500 - 4.200 46.18

Top dome ceiling 2xπ 2.917 0.583 - 10.69

66.49 Sqm 1542.40 10 Sqm 10,255

5

Side walls Outside 1xπ 4.000 - 0.600 7.54

Over dome 2xπ 2.917 0.583 - 10.69

Total 18.23 Sqm 852.38 10 Sqm 1,554

6

Side wall Outside above GL 1xπ 4.000 - 0.600 7.54

Over top dome 2xπ 2.917 0.583 - 10.69

Total 18.23 Sqm 1029.89 10 Sqm 1,877

7 Ls 10,000

8 5.26 MT

51392.61

1 MT 2,70,428

9 1 Job 1500.0 1 Job 1,500

10 1 Job 300.0 1 Job 300

11 1 No 4000.0 1 Each 4,000

12 1 Job 75000.0 1 Job 75,000

13 1 No 2130.0 1 each 2,130

14 Vertical connections 69,129

15 L.S.39586

Total Rs. � 8,00,000

In Rs lakhs 8.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

Provision for RCC central phenial as per standard specifications

Providing mesh to phenials including all charges

Provision for RCC inside ladder as per the standard specifications

Provision for CI Specials

Supply and fixing of CI light type man hole cover with frame of size

0.6 x 0.6m as per standard specification

Provision for unforeseen items such as refilling the foundation with

excavated earth and rock cutting, etc.

Snowcem painting with 2 coats over a primary coat including cost and

conveyance of all materials and labour charges etc., complete as per standard

specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of

all materials and labour charges etc., complete

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not

welded

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof

powder including cost and conveyance of all materials and labour charges etc.,

complete as per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

sump well

Page 75: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Capacity of Tank required : 40.00

Size of sump well: :

Internal Dia of the sump : 4.20

: 51.26

Side wall height with 0.250 m thick 4.20 m 4.30

Side wall height above GL 0.60 m

Side wall height below GL 3.60 m

Top ring beam( Bredth, Web ) 0.30 0.30

Top Dome thickness 0.125 m

Top Dome Projection 0.000 m

Bottom slab projection 0.15 m

Thickness of bottom slab 0.40 m

Size of bottom slab:

Outer Dia : 5.00 m

Size of Top Dome: Suction pit size

Outer Dia : 4.70 m L 3

Thickness of CC bed 0.30 m B 1

Radius of the Dome 3.50 m D 0.5

Rise of the dome 0.70 m

Thickness of the dome 0.13 m

Dead storage 0.30 m

Free board 0.20 m

Abstract cum detailed estimate for Construction of 40 KL Sump at Bayanpally Est Cost in Rs Lakhs: 9.50

L B D

1

a For sump Fdn. Up to 3m Depth 1xπ/4 5.00 5.00 3.00 58.90 Cum 128.20 1 Cum 7,551

b 3-6 m depth

Sump Portion 1xπ/4 4.70 4.70 1.30 22.55

Suction pit 1 3.50 1.50 0.80 4.20

26.75 Cum 164.83 1 Cum 692

2

1xπ/4 5.00 5.00 0.30 5.89 Cum 4511.29 1 Cum 26,571

3

a) Floor slab 1xπ/4 5.000 5.000 0.400 7.85 Cum 8951.13 1 Cum 70,266

b) Side wall 250 mm Thick 1xπ 4.450 0.250 4.200 14.68

Suction Pit Walls 1 4.500 0.250 1.000 1.13

15.81 Cum 13492.45 1 Cum 2,13,316

c) Haunch portion 1xπ 4.050 0.150 0.075 0.14 Cum 8951.13 1 Cum 1,253

d) Top ring beam 1xπ 4.500 0.300 0.300 1.27 Cum 12372.82 1 Cum 15,713

e) Dome 2xπ 3.500 0.700 0.125 1.92 Cum 31104.83 1 Cum 59,721

Abstract cum detailed estimate for Construction of 40 KL Sump at Bayanpally

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

Earthwork in excavation for structures as per drawing and technical

specifications Clause 305.1 including setting out, construction of shoring and

bracing, removal of stumps and other deleterious material and disposal upto a

lead of 50 m, dressing of sides and bottom and backfilling in trenches with

excavated suitable material as per Technical Specification 305 MORD / 304

MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

foundation levelling course

RCC M30 Grade including cost and conveyence of all materials and labour

charges but excluding cost of steel and its fabrication charges etc., complete as

per standard specifications for

Page 76: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B D

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

4

Bottom of the sump 1xπ/4 4.200 4.200 - 13.85

Side walls inside 1xπ 4.200 - 4.200 55.42

Top dome ceiling 2xπ 3.500 0.700 - 15.39

84.66 Sqm 1542.40 10 Sqm 13,058

5

Side walls Outside 1xπ 4.700 - 0.600 8.86

Over dome 2xπ 3.500 0.700 - 15.39

Total 24.25 Sqm 852.38 10 Sqm 2,067

6

Side wall Outside above GL 1xπ 4.700 - 0.600 8.86

Over top dome 2xπ 3.500 0.700 - 15.39

Total 24.25 Sqm 1029.89 10 Sqm 2,497

7 10,000

8 6.42 MT

51392.61

1 MT 3,29,941

9 1 Job 1500.0 1 Job 1,500

10 1 Job 300.0 1 Job 300

11 1 No 4000.0 1 Each 4,000

12 Provision for CI Specials 1 Job 75000.0 1 Job 75,000

13 1 No 2130.0 1 each 2,130

14 Vertical connections 83,558

15 L.S.30866

Total Rs. � 9,50,000

In Rs lakhs 9.50

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

Provision for RCC central phenial as per standard specifications

Providing mesh to phenials including all charges

Provision for RCC inside ladder as per the standard specifications

Supply and fixing of CI light type man hole cover with frame of size

0.6 x 0.6m as per standard specification

Provision for unforeseen items such as refilling the foundation with

excavated earth and rock cutting, etc.

Snowcem painting with 2 coats over a primary coat including cost and

conveyance of all materials and labour charges etc., complete as per standard

specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of

all materials and labour charges etc., complete

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not

welded

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof

powder including cost and conveyance of all materials and labour charges etc.,

complete as per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

sump well

Page 77: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Capacity of Tank required : 90.00

Size of sump well: :

Internal Dia of the sump : 5.60

: 91.13

Side wall height with 0.250 m thick 4.20 m 4.30

Side wall height above GL 0.60 m

Side wall height below GL 3.60 m

Top ring beam( Bredth, Web ) 0.30 0.30

Top Dome thickness 0.125 m

Top Dome Projection 0.000 m

Bottom slab projection 0.15 m

Thickness of bottom slab 0.40 m

Size of bottom slab:

Outer Dia : 6.40 m

Size of Top Dome: Suction pit size

Outer Dia : 6.10 m L 3.5

Thickness of CC bed 0.30 m B 1.2

Radius of the Dome 4.67 m D 1

Rise of the dome 0.93 m

Thickness of the dome 0.13 m

Dead storage 0.30 m

Free board 0.20 m

Abstract cum detailed estimate for Construction of 90 KL Sump at Suddulum Est Cost in Rs Lakhs: 13.00

L B D

Abstract cum detailed estimate for Construction of 90 KL Sump at Suddulum

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

1

a For sump Fdn. Up to 3m Depth 1xπ/4 6.40 6.40 3.00 96.51 Cum 128.20 1 Cum 12,373

b 3-6 m depth

Sump Portion 1xπ/4 6.10 6.10 1.30 37.99

Suction pit 1 4.00 1.70 1.30 8.84

46.83 Cum 164.83 1 Cum 1,457

2

1xπ/4 6.40 6.40 0.30 9.65 Cum 4511.29 1 Cum 43,534

3

a) Floor slab 1xπ/4 6.400 6.400 0.400 12.87 Cum 8951.13 1 Cum 1,15,201

b) Side wall 250 mm Thick 1xπ 5.850 0.250 4.200 19.30

Suction Pit Walls 1 5.200 0.250 1.000 1.30

20.60 Cum 13492.45 1 Cum 2,77,944

c) Haunch portion 1xπ 5.450 0.150 0.075 0.19 Cum 8951.13 1 Cum 1,701

d) Top ring beam 1xπ 5.900 0.300 0.300 1.67 Cum 12372.82 1 Cum 20,663

e) Dome 2xπ 4.667 0.933 0.125 3.42 Cum 31104.83 1 Cum 1,06,379

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing of

sides and bottom and backfilling in trenches with excavated suitable material as per

Technical Specification 305 MORD / 304 MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all materials

and labour charges etc., complete as per standard specifications for foundation

levelling course

RCC M30 Grade including cost and conveyence of all materials and labour charges

but excluding cost of steel and its fabrication charges etc., complete as per standard

specifications for

Page 78: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

4

Bottom of the sump 1xπ/4 5.600 5.600 - 24.63

Side walls inside 1xπ 5.600 - 4.200 73.89

Top dome ceiling 2xπ 4.667 0.933 - 27.37

125.89 Sqm 1542.40 10 Sqm 19,417

5

Side walls Outside 1xπ 6.100 - 0.600 11.50

Over dome 2xπ 4.667 0.933 - 27.37

Total 38.87 Sqm 852.38 10 Sqm 3,313

6

Side wall Outside above GL 1xπ 6.100 - 0.600 11.50

Over top dome 2xπ 4.667 0.933 - 27.37

Total 38.87 Sqm 1029.89 10 Sqm 4,003

7 10,000

8 8.90 MT

51392.61

1 MT 4,57,523

Snowcem painting with 2 coats over a primary coat including cost and conveyance

of all materials and labour charges etc., complete as per standard specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of all

materials and labour charges etc., complete

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not welded

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof powder

including cost and conveyance of all materials and labour charges etc., complete as

per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for sump

well

9Provision for RCC central phenial as per

standard specifications1 Job 1500.0 1 Job 1,500

10Providing mesh to phenials including

all charges1 Job 300.0 1 Job 300

11Provision for RCC inside ladder as per

the standard specifications1 No 4000.0 1 Each 4,000

12 Provision for CI Specials 1 Job 75000.0 1 Job 75,000

13

Supply and fixing of CI light type man

hole cover with frame of size 0.6 x

0.6m as per standard specification

1 No 2130.0 1 each 2,130

14 Vertical connections 1,15,644

15

Provision for unforeseen items such as

refilling the foundation with excavated

earth and rock cutting, etc.

L.S.

27918

Total Rs. � 13,00,000

In Rs lakhs 13.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

36 mm dia including over laps and wastage, where they are not welded

Page 79: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Abstract cum detailed estimate for Construction of 100 KL Sump at Musthapur Est Cost in Rs Lakhs: 15.00

L B D

1

a For sump Fdn. Up to 3m Depth 1xπ/4 7.00 7.00 3.00 115.45 Cum 128.20 1 Cum 14,801

b 3-6 m depth

Sump Portion 1xπ/4 6.70 6.70 1.30 45.83

Suction pit 1 5.50 1.70 0.80 7.48

53.31 Cum 164.83 1 Cum 1,233

2

1xπ/4 7.00 7.00 0.30 11.55 Cum 4511.29 1 Cum 52,105

3

a) Floor slab 1xπ/4 7.000 7.000 0.400 15.39 Cum 8951.13 1 Cum 1,37,758

b) Side wall 250 mm Thick 1xπ 6.450 0.250 4.200 21.28

Suction Pit Walls 1 6.700 0.250 1.000 1.68

22.96 Cum 13492.45 1 Cum 3,09,787

c) Haunch portion 1xπ 6.050 0.150 0.075 0.21 Cum 8951.13 1 Cum 1,880

d) Top ring beam 1xπ 6.500 0.300 0.300 1.84 Cum 12372.82 1 Cum 22,766

e) Dome 2xπ 5.167 1.033 0.125 4.19 Cum 31104.83 1 Cum 1,30,329

4

Bottom of the sump 1xπ/4 6.200 6.200 - 30.19

Side walls inside 1xπ 6.200 - 4.200 81.81

Top dome ceiling 2xπ 5.167 1.033 - 33.55

145.55 Sqm 1542.40 10 Sqm 22,450

5

Side walls Outside 1xπ 6.700 - 0.600 12.63

Over dome 2xπ 5.167 1.033 - 33.55

Total 46.18 Sqm 852.38 10 Sqm 3,936

6

Side wall Outside above GL 1xπ 6.700 - 0.600 12.63

Over top dome 2xπ 5.167 1.033 - 33.55

Total 46.18 Sqm 1029.89 10 Sqm 4,756

7 10,000

Snowcem painting with 2 coats over a primary coat including cost and

conveyance of all materials and labour charges etc., complete as per standard

specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of

all materials and labour charges etc., complete

Amount (Rs)

Earthwork in excavation for structures as per drawing and technical

specifications Clause 305.1 including setting out, construction of shoring and

bracing, removal of stumps and other deleterious material and disposal upto a

lead of 50 m, dressing of sides and bottom and backfilling in trenches with

excavated suitable material as per Technical Specification 305 MORD / 304

MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

foundation levelling course

RCC M30 Grade including cost and conveyence of all materials and labour

charges but excluding cost of steel and its fabrication charges etc., complete as

per standard specifications for

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof

powder including cost and conveyance of all materials and labour charges etc.,

complete as per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

sump well

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

Page 80: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

8 10.13 MT

51392.61

1 MT 5,20,736

9Provision for RCC central phenial as

per standard specifications1 Job 1500.0 1 Job 1,500

10Providing mesh to phenials including

all charges1 Job 300.0 1 Job 300

11Provision for RCC inside ladder as per

the standard specifications1 No 4000.0 1 Each 4,000

12 Provision for CI Specials 1 Job 75000.0 1 Job 75,000

13

Supply and fixing of CI light type man

hole cover with frame of size 0.6 x

0.6m as per standard specification

1 No 2130.0 1 each 2,130

14 Vertical connections 1,31,547

15

Provision for unforeseen items such

as refilling the foundation with

excavated earth and rock cutting, etc.

L.S.

52986

Total Rs. � 15,00,000

In Rs lakhs 15.00

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not

welded

Page 81: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Abstract cum detailed estimate for Construction of 150 KL Sump at Jalalpur Est Cost in Rs Lakhs: 18.60

L B D

1

a For sump Fdn. Up to 3m Depth 1xπ/4 8.30 8.30 3.00 162.32 Cum 128.20 1 Cum 20,809

b 3-6 m depth

Sump Portion 1xπ/4 8.00 8.00 1.30 65.35

Suction pit 1 5.50 1.70 1.30 12.16

77.51 Cum 164.83 1 Cum 2,004

2

1xπ/4 8.30 8.30 0.30 16.23 Cum 4511.29 1 Cum 73,218

3

a) Floor slab 1xπ/4 8.300 8.300 0.400 21.64 Cum 8951.13 1 Cum 1,93,702

b) Side wall 250 mm Thick 1xπ 7.750 0.250 4.200 25.56

Suction Pit Walls 1 6.700 0.250 1.000 1.68

27.24 Cum 13492.45 1 Cum 3,67,534

c) Haunch portion 1xπ 7.350 0.150 0.075 0.26 Cum 8951.13 1 Cum 2,327

d) Top ring beam 1xπ 7.800 0.300 0.300 2.21 Cum 12372.82 1 Cum 27,344

e) Dome 2xπ 6.250 1.250 0.125 6.14 Cum 31104.83 1 Cum 1,90,984

4

Bottom of the sump 1xπ/4 7.500 7.500 - 44.18

Side walls inside 1xπ 7.500 - 4.200 98.96

Top dome ceiling 2xπ 6.250 1.250 - 49.09

192.23 Sqm 1542.40 10 Sqm 29,650

5

Side walls Outside 1xπ 8.000 - 0.600 15.08

Over dome 2xπ 6.250 1.250 - 49.09

Total 64.17 Sqm 852.38 10 Sqm 5,470

6

Side wall Outside above GL 1xπ 8.000 - 0.600 15.08

Over top dome 2xπ 6.250 1.250 - 49.09

Total 64.17 Sqm 1029.89 10 Sqm 6,609

7 10,000

Snowcem painting with 2 coats over a primary coat including cost and

conveyance of all materials and labour charges etc., complete as per standard

specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of

all materials and labour charges etc., complete

Amount (Rs)

Earthwork in excavation for structures as per drawing and technical

specifications Clause 305.1 including setting out, construction of shoring and

bracing, removal of stumps and other deleterious material and disposal upto a

lead of 50 m, dressing of sides and bottom and backfilling in trenches with

excavated suitable material as per Technical Specification 305 MORD / 304

MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

foundation levelling course

RCC M30 Grade including cost and conveyence of all materials and labour

charges but excluding cost of steel and its fabrication charges etc., complete as

per standard specifications for

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof

powder including cost and conveyance of all materials and labour charges etc.,

complete as per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

sump well

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

Page 82: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

8 12.71 MT

51392.61

1 MT 6,53,174

9Provision for RCC central phenial as

per standard specifications1 Job 1500.0 1 Job 1,500

10Providing mesh to phenials including

all charges1 Job 300.0 1 Job 300

11Provision for RCC inside ladder as per

the standard specifications1 No 4000.0 1 Each 4,000

12 Provision for CI Specials 1 Job 75000.0 1 Job 75,000

13

Supply and fixing of CI light type man

hole cover with frame of size 0.6 x

0.6m as per standard specification

1 No 2130.0 1 each 2,130

14 Vertical connections 1,66,576

15

Provision for unforeseen items such

as refilling the foundation with

excavated earth and rock cutting, etc.

L.S.

27669

Total Rs. � 18,60,000

In Rs lakhs 18.60

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not

welded

Page 83: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Abstract cum detailed estimate for Construction of 150 KL Sump at Karpole Est Cost in Rs Lakhs: 18.50

L B D

1

a For sump Fdn. Up to 3m Depth 1xπ/4 8.30 8.30 3.00 162.32 Cum 128.20 1 Cum 20,809

b 3-6 m depth

Sump Portion 1xπ/4 8.00 8.00 1.30 65.35

Suction pit 1 5.50 1.70 1.30 12.16

77.51 Cum 164.83 1 Cum 2,004

2

1xπ/4 8.30 8.30 0.30 16.23 Cum 4511.29 1 Cum 73,218

3

a) Floor slab 1xπ/4 8.300 8.300 0.400 21.64 Cum 8951.13 1 Cum 1,93,702

b) Side wall 250 mm Thick 1xπ 7.750 0.250 4.200 25.56

Suction Pit Walls 1 6.700 0.250 1.000 1.68

27.24 Cum 13492.45 1 Cum 3,67,534

c) Haunch portion 1xπ 7.350 0.150 0.075 0.26 Cum 8951.13 1 Cum 2,327

d) Top ring beam 1xπ 7.800 0.300 0.300 2.21 Cum 12372.82 1 Cum 27,344

e) Dome 2xπ 6.250 1.250 0.125 6.14 Cum 31104.83 1 Cum 1,90,984

4

Bottom of the sump 1xπ/4 7.500 7.500 - 44.18

Side walls inside 1xπ 7.500 - 4.200 98.96

Top dome ceiling 2xπ 6.250 1.250 - 49.09

192.23 Sqm 1542.40 10 Sqm 29,650

5

Side walls Outside 1xπ 8.000 - 0.600 15.08

Over dome 2xπ 6.250 1.250 - 49.09

Total 64.17 Sqm 852.38 10 Sqm 5,470

6

Side wall Outside above GL 1xπ 8.000 - 0.600 15.08

Over top dome 2xπ 6.250 1.250 - 49.09

Total 64.17 Sqm 1029.89 10 Sqm 6,609

7 10,000

Snowcem painting with 2 coats over a primary coat including cost and

conveyance of all materials and labour charges etc., complete as per standard

specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of

all materials and labour charges etc., complete

Amount (Rs)

Earthwork in excavation for structures as per drawing and technical

specifications Clause 305.1 including setting out, construction of shoring and

bracing, removal of stumps and other deleterious material and disposal upto a

lead of 50 m, dressing of sides and bottom and backfilling in trenches with

excavated suitable material as per Technical Specification 305 MORD / 304

MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

foundation levelling course

RCC M30 Grade including cost and conveyence of all materials and labour

charges but excluding cost of steel and its fabrication charges etc., complete as

per standard specifications for

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof

powder including cost and conveyance of all materials and labour charges etc.,

complete as per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

sump well

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

Page 84: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B DAmount (Rs)

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

8 12.71 MT 51392.60 1 MT 6,53,174

9Provision for RCC central phenial as

per standard specifications1 Job 1500.0 1 Job 1,500

10Providing mesh to phenials including

all charges1 Job 300.0 1 Job 300

11Provision for RCC inside ladder as per

the standard specifications1 No 4000.0 1 Each 4,000

12 Provision for CI Specials 1 Job 75000.0 1 Job 75,000

13

Supply and fixing of CI light type man

hole cover with frame of size 0.6 x

0.6m as per standard specification

1 No 2130.0 1 each 2,130

14 Vertical connections 1,66,576

15

Provision for unforeseen items such

as refilling the foundation with

excavated earth and rock cutting, etc.

L.S.

17669

Total Rs. � 18,50,000

In Rs lakhs 18.50

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not

welded

Page 85: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Capacity of Tank required : 170.00

Size of sump well: :

Internal Dia of the sump : 7.70

: 172.30

Side wall height with 0.250 m thick 4.20 m 4.30

Side wall height above GL 0.60 m

Side wall height below GL 3.60 m

Top ring beam( Bredth, Web ) 0.30 0.30

Top Dome thickness 0.125 m

Top Dome Projection 0.000 m

Bottom slab projection 0.15 m

Thickness of bottom slab 0.40 m

Size of bottom slab:

Outer Dia : 8.50 m

Size of Top Dome: Suction pit size

Outer Dia : 8.20 m L 6

Thickness of CC bed 0.30 m B 1.5

Radius of the Dome 6.42 m D 1

Rise of the dome 1.28 m

Thickness of the dome 0.13 m

Dead storage 0.30 m

Free board 0.20 m

Abstract cum detailed estimate for Construction of 170 KL Sump at Gulla small Est Cost in Rs Lakhs: 20.00

L B D

1

a For sump Fdn. Up to 3m Depth 1xπ/4 8.50 8.50 3.00 170.24 Cum 128.20 1 Cum 21,825

b 3-6 m depth

Sump Portion 1xπ/4 8.20 8.20 1.30 68.65

Suction pit 1 6.50 2.00 1.30 16.90

85.55 Cum 164.83 1 Cum 2,786

2

1xπ/4 8.50 8.50 0.30 17.02 Cum 4511.29 1 Cum 76,782

3

a) Floor slab 1xπ/4 8.500 8.500 0.400 22.70 Cum 8951.13 1 Cum 2,03,191

b) Side wall 250 mm Thick 1xπ 7.950 0.250 4.200 26.22

Suction Pit Walls 1 8.000 0.250 1.000 2.00

28.22 Cum 13492.45 1 Cum 3,80,757

c) Haunch portion 1xπ 7.550 0.150 0.075 0.27 Cum 8951.13 1 Cum 2,417

d) Top ring beam 1xπ 8.000 0.300 0.300 2.26 Cum 12372.82 1 Cum 27,963

e) Dome 2xπ 6.417 1.283 0.125 6.47 Cum 31104.83 1 Cum 2,01,248

Amount (Rs)

Earthwork in excavation for structures as per drawing and technical

specifications Clause 305.1 including setting out, construction of shoring and

bracing, removal of stumps and other deleterious material and disposal upto a lead

of 50 m, dressing of sides and bottom and backfilling in trenches with excavated

suitable material as per Technical Specification 305 MORD / 304 MORTH

PCC (1:4:8) using 40 mm HBG metal including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for

foundation levelling course

RCC M30 Grade including cost and conveyence of all materials and labour

charges but excluding cost of steel and its fabrication charges etc., complete as per

standard specifications for

Abstract cum detailed estimate for Construction of 170 KL Sump at Gulla small

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

Page 86: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B DAmount (Rs)

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

4

Bottom of the sump 1xπ/4 7.700 7.700 - 46.57

Side walls inside 1xπ 7.700 - 4.200 101.60

Top dome ceiling 2xπ 6.417 1.283 - 51.74

199.91 Sqm 1542.40 10 Sqm 30,834

5

Side walls Outside 1xπ 8.200 - 0.600 15.46

Over dome 2xπ 6.417 1.283 - 51.74

Total 67.20 Sqm 852.38 10 Sqm 5,728

6

Side wall Outside above GL 1xπ 8.200 - 0.600 15.46

Over top dome 2xπ 6.417 1.283 - 51.74

Total 67.20 Sqm 1029.89 10 Sqm 6,921

7 10,000

8 13.22 MT

51392.61

1 MT 6,79,462

9 1 Job 1500.0 1 Job 1,500

10 1 Job 300.0 1 Job 300

11 1 No 4000.0 1 Each 4,000

12 1 Job 75000.0 1 Job 75,000

13 1 No 2130.0 1 each 2,130

14 Vertical connections 86,642

15 L.S.180514

Total Rs. � 20,00,000

In Rs lakhs 20.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

Supply and fixing of CI light type man hole cover with frame of size 0.6

x 0.6m as per standard specification

Provision for unforeseen items such as refilling the foundation with

excavated earth and rock cutting, etc.

Provision for RCC central phenial as per standard specifications

Providing mesh to phenials including all charges

Provision for RCC inside ladder as per the standard specifications

Provision for CI Specials

Snowcem painting with 2 coats over a primary coat including cost and conveyance

of all materials and labour charges etc., complete as per standard specifications

Providing of RCC Design railing of 65mm Thick including cost and conveyance of all

materials and labour charges etc., complete

Supplying, fitting and placing HYSD bar reinforcement in foundation

complete as per drawings and technical specifications for Bars below

36 mm dia including over laps and wastage, where they are not welded

Acco-proof Plastering with CM(1:3) prop. 12 mm thick with 2% acco-proof

powder including cost and conveyance of all materials and labour charges etc.,

complete as per standard specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications for sump

well

Page 87: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. cost in Rs lakhs 41.00

L B D

Capacity 202.16 cum

Length of sump 7.6 m

Width of sump 7.6 m

Depth of sump 4.05 m

Above GL 0.9 m

Raft 0.3 m

PCC 0.3 m

Top slab 0.15 m

Side wall width upto 2m 0.35 m

Side wall width above 2m 0.25 m

Dead Storage 0.15 Free Board 0.4

1

For sump Fdn. Up to 2m Depth 1 10.10 10.10 2.00 204.02

2m -3.00 m Depth 1 9.70 9.70 1.00 94.09

298.11 128.20 1 Cum 38,218

3 m -3.25 m Depth 1 9.70 9.70 1.05 98.79

For Suction Channel 2.5 Mts below

raft

1 7.60 6.35 2.50 120.65

219.44 164.83 1 Cum 36,170

2

For Total 1 9.40 9.40 0.30 26.51

26.51 5179.12 1 Cum 1,37,298

3

a) Raft slab 1 9.10 9.10 0.30 24.84

24.84 8951.13 1 Cum 2,22,346

b) Side wall 450 mm Thick L/W 2 6.15 0.45 1.900 10.52

Side wall 450 mm Thick at suction

side 2.5 Mts

2 4.90 0.45 1.900 8.38

18.90 10636.93 1 Cum 2,01,038

Amount (Rs)

Excavation in all kinds of soil including boulders upto 0.3m diameter for canal,seating of

embankment, filter drains / catch water drains etc., including dressingbed and sides to

required level and profile, cost of all materials, machinery,labour, placing the excavated soil

neatly in dump area or for the formation ofservice road / embankment as directed etc.,

complete with initial lead upto 1 km and all lifts.Labour Component (including contractor's

profit and Overheads) cum

Cement concrete (1:3:6) prop using 40 mm 60% and 20mm 40% gauge HG metalincluding cost &conveyance like cement, sand, coarse aggregate water etc., to site ,cost of seigniorage charges on all materials, all taxes, labour charges , for mixing ,laying, concrete in foundation ramming in 15 cm layers, finishing top surface to therequired level curing etc., complete for finished item of work as per (S.S. No. 402)

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGHBATCHER / MIXER with 20mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of allmaterials like cement, fine aggregate (sand) coarse aggregate, water etc., to site andincluding Seigniorage charges, sales & other taxes on all materials including alloperational, incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc.,complete but excluding cost of steel and its fabricationcharges for finished item of work (APSS No. 402)with minimum cement content asper IS code from standard suppliers approved by the department including pumping,centering, shuttering, laying concrete, vibrating, curing etc. complete but excludingcost of steel and its fabrication charges for finished item of work.

Sub estimate for Construction of 200 KL Sump at Mumbojipet

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

Page 88: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B DAmount (Rs)

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

c) Side wall 350 mm Thick L/W 2 8.30 0.35 2.00 11.62

Side wall 350 mm Thick C/W 2 7.60 0.35 2.00 10.64

22.26 11268.84 1 Cum 2,50,844

d) Side wall 250 mm Thick L/W 2 8.10 0.25 2.05 8.30

Side wall 250 mm Thick C/W 2 7.60 0.25 2.05 7.79

16.09 12406.29 1 Cum 1,99,617

e) Haunch portion all round 1 30.50 0.30 0.15 1.37 8951.13 1 Cum 12,263

f) Columns 1 0.30 0.30 4.05 0.36

Additional Height at suction

Channel

1 0.30 0.30 1.90 0.17

0.53 10744.10 1 Cum 5,694

g) Beam at Roof level 1 8.10 0.23 0.30 0.56

1 7.60 0.23 0.30 0.52

Deduct Column Junctions 1 0.30 0.23 0.30 -0.02

1.06 6836.67 1 Cum 7,247

h) Roof Slab 1 8.70 8.70 0.15 11.35

Deduct Man Holes 8 0.60 0.60 0.15 -0.43

Central Phenial 0.5 0.30 0.30 0.15 -0.01

Air Vents 0.5 0.18 0.18 0.15 0.00

10.91 9783.09 1 Cum 1,06,734

4

Bottom of the sump 1 7.60 7.60 - 57.76

Side walls inside 2 7.60 - 4.05 61.56

2 7.60 - 4.05 61.56

Additional Height at suction Channel 2 5.70 - 1.90 21.66

2 4.45 1.90 16.91

Deduct Column Junctions (Bootom,

ceiling)

1 0.30 0.30 -0.09

Beam At column 8 0.30 0.23 -0.55

218.81 1542.40 10 Sqm 33,749

5

Side walls O/S all round above GL 4 8.10 - 0.90 29.16

Top slab ceiling 1 8.70 8.70 - 75.69

Beam sides 4 7.60 - 0.30 9.12

Roof slab projection (All round) 1 31.40 0.30 - 9.42

Salb Vertical face (All round) 4 8.70 - 0.15 5.22

Deduct Beam junctions at columns 2 0.30 - 0.30 -0.18

Man Holes 8 0.60 0.60 - -17.28

Central Phenial 0.5 0.30 0.30 - -0.27

Air Vents 0.5 0.18 0.18 - -0.10

Total 110.78 852.38 10 Sqm 9,443

6

Side wall Outside above GL 4 8.10 - 0.90 7.29

Roof slab projection 1 31.40 0.30 - 9.42

Salb Vertical face (All round) 4 8.70 - 0.15 5.22

Deduct Man Holes 8 0.60 0.60 - -17.28

Central Phenial 0.5 0.30 0.30 - -0.27

Air Vents 0.5 0.18 0.18 - -0.10

Total 4.28 1029.89 10 Sqm 441

Snowcem painting with 2 coats over a primary coat including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications

Acco-proof Plastering with CM(1:3) prop12mm thick with 2% acco-proof powder including

cost and conveyance of all materials and labour charges etc., complete as per standard

specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all materials

and labour charges etc., complete as per standard specifications for sump well

Page 89: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B DAmount (Rs)

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

7 LS2,00,000

8 20.00 51392.61 1 MT 10,27,852

9 Bailing out water from channel with

oil engine driven and wages of driver

and helper etc., complete as per

standard specification

1 10.00 60.00 12.00 7200 56.81 1 4,09,032

10 Job 4,00,000

11 Job 3,00,000

12 Each 2,00,000

13 each 2,00,000

14 each 30,000

15 L.S.

72014

Total Rs. � 41,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

Supply and fixing of CI light type man hole cover with frame of size 0.6 x 0.6m as per

standard specification

Cost supply and fixing of Water level indicator inclusive of all charges

Provision for unforeseen items such as refilling the foundation with excavated

earth and rock cutting, bailing out water etc.

Providing of RCC Design railing of 65mm Thick including cost and conveyance of all

materials and labour charges etc., complete

Supply and delivery of Steel Reinforcement H.Y.S.D. confirming to

I.S.S. including cost & conveyance of all materials , cost of binding

wire and its fabrication charges, placing in position tying grills etc.,

complete.

Provision for RCC central phenial as per standard specifications

Providing mesh to phenials including all charges

Provision for RCC inside ladder as per the standard specifications

Page 90: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. cost in Rs lakhs 48.50

L B D

Capacity 302.72 cum

Length of sump 9.3 m

Width of sump 9.3 m

Depth of sump 4.05 m

Above GL 0.9 m

Raft 0.3 m

PCC 0.3 m

Top slab 0.15 m

Side wall width upto 2m 0.35 m

Side wall width above 2m 0.25 m

Dead Storage 0.15 Free Board 0.4

1

For sump Fdn. Up to 2m Depth 1 11.80 11.80 2.00 278.48

2m -3.00 m Depth 1 11.40 11.40 1.00 129.96

408.44 128.20 1 Cum 52,362

3 m -3.25 m Depth 1 11.40 11.40 1.05 136.46

For Suction Channel 2.5 Mts below

raft

1 9.30 6.35 2.50 147.64

284.10 164.83 1 Cum 46,828

2

For Total 1 11.10 11.10 0.30 36.96

36.96 5132.54 1 Cum 1,89,699

3

a) Raft slab 1 10.80 10.80 0.30 34.99

34.99 8951.13 1 Cum 3,13,200

b) Side wall 450 mm Thick L/W 2 7.85 0.45 1.900 13.42

Side wall 450 mm Thick at suction

side 2.5 Mts

2 4.90 0.45 1.900 8.38

21.80 10636.93 1 Cum 2,31,885

Amount (Rs)

Excavation in all kinds of soil including boulders upto 0.3m diameter for canal,seating of

embankment, filter drains / catch water drains etc., including dressingbed and sides to

required level and profile, cost of all materials, machinery,labour, placing the excavated soil

neatly in dump area or for the formation ofservice road / embankment as directed etc.,

complete with initial lead upto 1 km and all lifts.Labour Component (including contractor's

profit and Overheads) cum

Cement concrete (1:3:6) prop using 40 mm 60% and 20mm 40% gauge HG metalincluding cost &conveyance like cement, sand, coarse aggregate water etc., to site ,cost of seigniorage charges on all materials, all taxes, labour charges , for mixing ,laying, concrete in foundation ramming in 15 cm layers, finishing top surface to therequired level curing etc., complete for finished item of work as per (S.S. No. 402)

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGHBATCHER / MIXER with 20mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of allmaterials like cement, fine aggregate (sand) coarse aggregate, water etc., to site andincluding Seigniorage charges, sales & other taxes on all materials including alloperational, incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc.,complete but excluding cost of steel and its fabricationcharges for finished item of work (APSS No. 402)with minimum cement content asper IS code from standard suppliers approved by the department including pumping,centering, shuttering, laying concrete, vibrating, curing etc. complete but excludingcost of steel and its fabrication charges for finished item of work.

Sub estimate for Construction of 300 KL Sump at Krishnanagar T

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

Page 91: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B DAmount (Rs)

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

c) Side wall 350 mm Thick L/W 2 10.00 0.35 2.00 14.00

Side wall 350 mm Thick C/W 2 9.30 0.35 2.00 13.02

27.02 11268.84 1 Cum 3,04,484

d) Side wall 250 mm Thick L/W 2 9.80 0.25 2.05 10.05

Side wall 250 mm Thick C/W 2 9.30 0.25 2.05 9.53

19.58 12406.29 1 Cum 2,42,915

e) Haunch portion all round 1 37.30 0.30 0.15 1.68 8951.13 1 Cum 15,038

f) Columns 4 0.30 0.30 4.05 1.46

Additional Height at suction

Channel

2 0.30 0.30 1.90 0.34

1.80 10744.10 1 Cum 19,339

g) Beam at Roof level 2 9.80 0.23 0.30 1.35

2 9.30 0.23 0.30 1.28

Deduct Column Junctions 4 0.30 0.23 0.30 -0.08

2.55 6836.67 1 Cum 17,434

h) Roof Slab 1 10.40 10.40 0.15 16.22

Deduct Man Holes 8 0.60 0.60 0.15 -0.43

Central Phenial 2 0.30 0.30 0.15 -0.03

Air Vents 2 0.18 0.18 0.15 -0.01

15.75 9783.09 1 Cum 1,54,084

4

Bottom of the sump 1 9.30 9.30 - 86.49

Side walls inside 2 9.30 - 4.05 75.33

2 9.30 - 4.05 75.33

Additional Height at suction Channel 2 7.40 - 1.90 28.12

2 4.45 1.90 16.91

Deduct Column Junctions (Bootom,

ceiling)

4 0.30 0.30 -0.36

Beam At column 16 0.30 0.23 -1.10

280.72 1542.40 10 Sqm 43,298

5

Side walls O/S all round above GL 4 9.80 - 0.90 35.28

Top slab ceiling 1 10.40 10.40 - 108.16

Beam sides 8 9.30 - 0.30 22.32

Roof slab projection (All round) 1 38.20 0.30 - 11.46

Salb Vertical face (All round) 4 10.40 - 0.15 6.24

Deduct Beam junctions at columns 8 0.30 - 0.30 -0.72

Man Holes 8 0.60 0.60 - -17.28

Central Phenial 2 0.30 0.30 - -1.08

Air Vents 2 0.18 0.18 - -0.39

Total 163.99 852.38 10 Sqm 13,978

6

Side wall Outside above GL 4 9.80 - 0.90 8.82

Roof slab projection 1 38.20 0.30 - 11.46

Salb Vertical face (All round) 4 10.40 - 0.15 6.24

Deduct Man Holes 8 0.60 0.60 - -17.28

Central Phenial 2 0.30 0.30 - -1.08

Air Vents 2 0.18 0.18 - -0.39

Total 7.77 1029.89 10 Sqm 800

Snowcem painting with 2 coats over a primary coat including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications

Acco-proof Plastering with CM(1:3) prop12mm thick with 2% acco-proof powder including

cost and conveyance of all materials and labour charges etc., complete as per standard

specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all materials

and labour charges etc., complete as per standard specifications for sump well

Page 92: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B DAmount (Rs)

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per

7 LS2,00,000

8 20.00 51392.61 1 MT 10,27,852

9 Bailing out water from channel with

oil engine driven and wages of driver

and helper etc., complete as per

standard specification

1 10.00 60.00 12.00 7200 56.81 1 4,09,032

10 Job 4,00,000

11 Job 3,00,000

12 Each 2,00,000

13 each 2,00,000

14 each 30,000

15 L.S.

437772

Total Rs. � 48,50,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada Banswada Nirmal

Supply and fixing of CI light type man hole cover with frame of size 0.6 x 0.6m as per

standard specification

Cost supply and fixing of Water level indicator inclusive of all charges

Provision for unforeseen items such as refilling the foundation with excavated

earth and rock cutting, bailing out water etc.

Providing of RCC Design railing of 65mm Thick including cost and conveyance of all

materials and labour charges etc., complete

Supply and delivery of Steel Reinforcement H.Y.S.D. confirming to

I.S.S. including cost & conveyance of all materials , cost of binding

wire and its fabrication charges, placing in position tying grills etc.,

complete.

Provision for RCC central phenial as per standard specifications

Providing mesh to phenials including all charges

Provision for RCC inside ladder as per the standard specifications

Page 93: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est. cost in Rs lakhs 501.00

L B D

Capacity 13585 cum

Length of sump 62.3 m

Width of sump 62.3 m

Depth of sump 4.05 m

Above GL 0.9 m

Raft 0.3 m

PCC 0.3 m

Top slab 0.15 m

Side wall width upto 2m 0.35 m

Side wall width above 2m 0.25 m

Dead Storage 0.15 Free Board 0.4

1

For sump Fdn. Up to 2m Depth 1 64.80 64.80 2.00 8398.08

2m -3.00 m Depth 1 64.40 64.40 1.00 4147.36

12545.44 128.20 1 Cum 16,08,325

3 m -3.25 m Depth 1 64.40 64.40 1.05 4354.73

For Suction Channel 2.5 Mts below

raft

1 21.47 6.35 2.50 340.78

4695.51 164.83 1 Cum 7,73,961

2

For Total 1 64.10 64.10 0.30 1232.64

1232.64 5652.29 1 Cum 69,67,239

3

a) Raft slab 1 63.80 63.80 0.30 1221.13

1221.13 9413.13 1 Cum 114,94,655

b) Side wall 450 mm Thick L/W 2 20.02 0.45 1.900 34.23

Side wall 450 mm Thick at suction

side 2.5 Mts

2 4.90 0.45 1.900 8.38

42.61 11098.93 1 Cum 4,72,925

Sub estimate for Construction of 13500 KL Clear Water Sump at Peddareddipet of Pulkal Mandal

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

Excavation in all kinds of soil including boulders upto 0.3m diameter for canal,seating of

embankment, filter drains / catch water drains etc., including dressingbed and sides to

required level and profile, cost of all materials, machinery,labour, placing the excavated soil

neatly in dump area or for the formation ofservice road / embankment as directed etc.,

complete with initial lead upto 1 km and all lifts.Labour Component (including contractor's

profit and Overheads) cum

Cement concrete (1:3:6) prop using 40 mm 60% and 20mm 40% gauge HG metalincluding cost &conveyance like cement, sand, coarse aggregate water etc., to site ,cost of seigniorage charges on all materials, all taxes, labour charges , for mixing ,laying, concrete in foundation ramming in 15 cm layers, finishing top surface to therequired level curing etc., complete for finished item of work as per (S.S. No. 402)

Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGHBATCHER / MIXER with 20mm size graded machine crushed hard granite metal(coarse aggregate) from approved quarry including cost and conveyance of allmaterials like cement, fine aggregate (sand) coarse aggregate, water etc., to site andincluding Seigniorage charges, sales & other taxes on all materials including alloperational, incidental and labour charges such as weigh batching, machine mixing,laying concrete, curing etc.,complete but excluding cost of steel and its fabricationcharges for finished item of work (APSS No. 402)with minimum cement content asper IS code from standard suppliers approved by the department including pumping,centering, shuttering, laying concrete, vibrating, curing etc. complete but excludingcost of steel and its fabrication charges for finished item of work.

Page 94: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B D

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

c) Side wall 350 mm Thick L/W 2 63.00 0.35 2.00 88.20

Side wall 350 mm Thick C/W 2 62.30 0.35 2.00 87.22

175.42 11730.84 1 Cum 20,57,824

d) Side wall 250 mm Thick L/W 2 62.80 0.25 2.05 64.37

Side wall 250 mm Thick C/W 2 62.30 0.25 2.05 63.86

128.23 12868.29 1 Cum 16,50,101

e) Haunch portion all round 1 249.30 0.30 0.15 11.22 9413.13 1 Cum 1,05,615

f) Columns 256 0.30 0.30 4.05 93.31

Additional Height at suction

Channel

16 0.30 0.30 1.90 2.74

96.05 11206.10 1 Cum 10,76,346

g) Beam at Roof level 16 62.80 0.23 0.30 69.33

16 62.30 0.23 0.30 68.78

Deduct Column Junctions 256 0.30 0.23 0.30 -5.30

132.81 11193.33 1 Cum 14,86,586

h) Roof Slab 1 63.40 63.40 0.15 602.93

Deduct Man Holes 8 0.60 0.60 0.15 -0.43

Central Phenial 128 0.30 0.30 0.15 -1.73

Air Vents 128 0.18 0.18 0.15 -0.62

600.15 10245.03 1 Cum 61,48,555

4

Bottom of the sump 1 62.30 62.30 - 3881.29

Side walls inside 2 62.30 - 4.05 504.63

2 62.30 - 4.05 504.63

Additional Height at suction Channel 2 19.57 - 1.90 74.35

2 4.45 1.90 16.91

Deduct Column Junctions (Bootom,

ceiling)

256 0.30 0.30 -23.04

Beam At column 128 0.30 0.23 -8.83

4949.94 1658.20 10 Sqm 8,20,799

5

Side walls O/S all round above GL 4 62.80 - 0.90 226.08

Top slab ceiling 1 63.40 63.40 - 4019.56

Beam sides 64 62.30 - 0.30 1196.16

Roof slab projection (All round) 1 250.20 0.30 - 75.06

Salb Vertical face (All round) 4 63.40 - 0.15 38.04

Deduct Beam junctions at columns 512 0.30 - 0.30 -46.08

Man Holes 8 0.60 0.60 - -17.28

Central Phenial 128 0.30 0.30 - -69.12

Air Vents 128 0.18 0.18 - -24.88

Total 5397.54 869.75 10 Sqm 4,69,451

6

Side wall Outside above GL 4 62.80 - 0.90 56.52

Roof slab projection 1 250.20 0.30 - 75.06

Salb Vertical face (All round) 4 63.40 - 0.15 38.04

Deduct Man Holes 8 0.60 0.60 - -17.28

Central Phenial 128 0.30 0.30 - -69.12

Air Vents 128 0.18 0.18 - -24.88

Total 58.34 1029.89 10 Sqm 6,008

Acco-proof Plastering with CM(1:3) prop12mm thick with 2% acco-proof powder including

cost and conveyance of all materials and labour charges etc., complete as per standard

specifications for sump well

Plastering with CM(1:3) prop. 12 mm thick including cost and conveyance of all materials

and labour charges etc., complete as per standard specifications for sump well

Snowcem painting with 2 coats over a primary coat including cost and conveyance of all

materials and labour charges etc., complete as per standard specifications

Page 95: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

L B D

Sl.N

o.Description No.

MeasurementsQty. Rate (Rs) per Amount (Rs)

7 LS3,00,000

8 250.00 50915.43 1 MT 127,28,858

9 Bailing out water from channel with

oil engine driven and wages of driver

and helper etc., complete as per

standard specification

1 10.00 60.00 12.00 7200 56.81 1 LS 4,00,000

10 Job 4,00,000

11 Job 3,00,000

12 Each 3,00,000

13 Each 2,00,000

14 Each 30,000

15 L.S.

302752

Total Rs. � 501,00,000

Supply and fixing of CI light type man hole cover with frame of size 0.6 x 0.6m as per

standard specification

Cost supply and fixing of Water level indicator inclusive of all charges

Provision for unforeseen items such as refilling the foundation with excavated

earth and rock cutting, bailing out water etc.

Providing of RCC Design railing of 65mm Thick including cost and conveyance of all materials

and labour charges etc., complete

Supply and delivery of Steel Reinforcement H.Y.S.D. confirming to

I.S.S. including cost & conveyance of all materials , cost of binding

wire and its fabrication charges, placing in position tying grills etc.,

complete.

Provision for RCC central phenial as per standard specifications

Providing mesh to phenials including all charges

Provision for RCC inside ladder as per the standard specifications

Page 96: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

45.0 10.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 110.92 0.6 0.75 49.9 Ext-columns 32 1.5 1.5 1.50 108.0 Steps 2 10.0 1.2 0.60 14.4 Deduction 32 0.6 1.5 0.75 -21.6

Total 150.71 128.20 19322.00

2

c-footings 32 1.5 1.5 0.30 21.6 All round 1 110.9 0.6 0.15 10.0 Deductions 32 0.6 1.5 0.15 -4.3

Total 27.26 1560.60 42546.00

3

footings 32 1.5 1.5 0.30 21.6 All round 1 110.9 0.6 0.15 10.0 Steps 2 10.0 1.2 0.30 7.2 Deductions 32 1.5 0.6 0.15 -4.3

Name of the work: Construction of the Pump house of size 45mx10m at Rahapahad

Name of the work: Construction of the Pump house of size ESTIMATED COST: 62.0 Lakhs

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Total 34.5 4511.29 155472.00

4

footings 32 1.5 1.5 0.25 18.0 C-Raft 32 0.85 0.85 0.40 9.2

Total 27.2 8537.99 232643.00

5

32 0.3 0.45 3.00 13.0 10300.63 133496.00

32 0.3 0.45 3.70 16.0 10365.20 165677.00

6

Short beams 16 10.30 0.3 0.45 22.2 Long beams 2 45.45 0.3 0.45 12.3

Total 34.5 10757.93 371358.00

7

1st footing 1 110.92 0.6 0.6 39.93 2nd footings 1 110.92 0.45 0.6 29.95

Steps 1st

2 10.0 1.2 0.30 7.20

Step 2nd

2 10.0 0.9 0.30 5.40Deduct: Column portion 32 0.3 0.45 0.60 -2.59

Total 79.9 3722.90 297414.00

8

Over door 2 0.3 0.23 0.10 0.01

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

Over door 2 0.3 0.23 0.10 0.01 Over windows 30 0.3 0.23 0.10 0.21

Total 0.22 8032.41 1774.00

Page 97: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

9

Lintel : Over door 1 112 0.23 0.30 7.69 Deductions 32 0.30 0.45 0.30 -1.3

Total 6.40 10644.89 68101.00Beam for Gantry Girder 2 10.0 0.30 0.45 2.70

2 45.0 0.30 0.45 12.15Add for projection 28 0.75 0.3 0.45 2.84

Deductions 32 0.30 0.45 0.30 -1.3Total 16.39 10757.93 176312.00

Roof Beams 16 10.0 0.3 0.45 21.602 45.0 0.3 0.45 12.15

Total 33.75 11137.01 375874.00

10

Over door 1 112 0.6 - 66.90 SqmTotal 66.90 10644.53 71212.00

11

1 11.06 46.06 - 509.42 12998.64 662181.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm1 11.06 46.06 - 509.42 12998.64 662181.00

12

All round upto 3m 1 110.92 0.23 3.00 76.53DeductionsWindows 30 1.5 1.20 0.23 -12.42Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -6.40Beam for Gantry Girder Same quantity as above -16.39 Ventilators 34 0.9 0.23 0.3 -2.11

Total 34.24 5054.37 173079.00All round above 3m 1 110.92 0.23 2.55 65.05 5763.33 374905.00

13

Alround Basement 1 112.12 0.60 - 67.27 624.80 4203.00

14

Out side all round upto 3m 1 111.84 3.00 - 335.52In side all round 1 110.00 3.00 - 330.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 30 1.50 1.20 - -54.00Ventilators 34 0.30 0.90 - -9.18

Total 580.74 2933.41 170355.00Out side all round above 3m 1 111.84 3.00 - 335.52In side all round 1 110.00 3.00 - 330.00Ceiling 1 10.00 45.00 - 450.00

1115.52 3014.99 336329.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 46.06 11.06 - 509.42 1542.40 78574.00

Page 98: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

17

1 10.00 45.00 - 450.00 6580.99 296145.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 30 2.75 1.50 1.20 148.50

Total 197.10 2136.60 42113.00

20

Inside & Out Side Same quantity as above 1696.26 1029.89 174697.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

2230 LS 300000.00

23

34 LS 170000.00

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

24 21.71 51392.61 1115928.00

25 Provision towards Electricity 50000.00

6147468

26 52532Total � 62,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 99: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Name of the work: Construction of the Pump house of size 4mx3m at Mumbojipet

Name of the work: Construction of the Pump house of size ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Deductions 4 1.5 0.6 0.15 -0.5Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

Over door 2 0.3 0.23 0.10 0.01

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 100: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 101: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 102: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Name of the work: Construction of the Pump house of size 4mx3m at Bayanpalli

Name of the work: Construction of the Pump house of size ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Deductions 4 1.5 0.6 0.15 -0.5Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

Over door 2 0.3 0.23 0.10 0.01

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 103: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 104: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 105: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Name of the work: Construction of the Pump house of size 4mx3m at Gulla Small

Name of the work: Construction of the Pump house of size

ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 106: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm1 4.06 5.06 - 20.54 12998.64 26704.00

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 107: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 108: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Total 5.7 4511.29 25547.00

Name of the work: Construction of the Pump house of size 4mx3m at Jalalpur

Name of the work: Construction of the Pump house of size ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

Over windows 2 0.3 0.23 0.10 0.01Total 0.03 8032.41 222.00

Page 109: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 110: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 111: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2

Name of the work: Construction of the Pump house of size 4mx3m at Karpole

Name of the work: Construction of the Pump house of size

ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 112: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 113: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 114: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Name of the work: Construction of the Pump house of size 4mx3m at Mustafur

Name of the work: Construction of the Pump house of size

ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 115: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm1 4.06 5.06 - 20.54 12998.64 26704.00

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 116: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 117: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2

Name of the work: Construction of the Pump house of size 4mx3m at Raitu Nagar

Name of the work: Construction of the Pump house of size ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 118: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 119: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 120: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Total 5.7 4511.29 25547.00

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Name of the work: Construction of the Pump house of size 4mx3m at Suddulum

Name of the work: Construction of the Pump house of size ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

Over door 2 0.3 0.23 0.10 0.01

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 121: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm1 4.06 5.06 - 20.54 12998.64 26704.00

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 122: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 123: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

4.0 3.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 14.92 0.6 0.75 6.7 Ext-columns 4 1.5 1.5 1.50 13.5 Steps 2 3.0 1.2 0.60 4.3 Deduction 4 0.6 1.5 0.75 -2.7

Total 21.83 128.20 2799.00

2

c-footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Deductions 4 0.6 1.5 0.15 -0.5

Total 3.50 1560.60 5466.00

3

footings 4 1.5 1.5 0.30 2.7 All round 1 14.9 0.6 0.15 1.3 Steps 2 3.0 1.2 0.30 2.2 Deductions 4 1.5 0.6 0.15 -0.5

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Name of the work: Construction of the Pump house of size 4mx3m at Thadgur Small

Name of the work: Construction of the Pump house of size ESTIMATED COST: 6.0 Lakhs

Description Dimensions

Deductions 4 1.5 0.6 0.15 -0.5Total 5.7 4511.29 25547.00

4

footings 4 1.5 1.5 0.25 2.3 C-Raft 4 0.85 0.85 0.40 1.2

Total 3.4 8537.99 29080.00

5

4 0.3 0.30 3.00 1.1 10300.63 11125.00

4 0.3 0.3 0.85 0.3 10365.20 3172.00

6

Short beams 2 3.30 0.3 0.30 0.6 Long beams 2 4.3 0.3 0.30 0.8

Total 1.4 10757.93 14717.00

7

1st footing 1 14.92 0.6 0.6 5.37 2nd footings 1 14.92 0.45 0.6 4.03

Steps 1st

2 3.0 1.2 0.30 2.16

Step 2nd

2 3.0 0.9 0.30 1.62Deduct: Column portion 4 0.3 0.3 0.60 -0.22

Total 13.0 3722.90 48262.00

8

Over door 2 0.3 0.23 0.10 0.01

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

Over door 2 0.3 0.23 0.10 0.01 Over windows 2 0.3 0.23 0.10 0.01

Total 0.03 8032.41 222.00

Page 124: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

9

Lintel : Over door 1 15 0.23 0.30 1.05 Deductions 4 0.30 0.30 0.30 -0.1

Total 0.94 10644.89 10015.00Beam for Gantry Girder 2 3.0 0.30 0.30 0.54

2 4.0 0.30 0.30 0.72Add for projection 0 0.75 0.3 0.30 0.00

Deductions 4 0.30 0.30 0.30 -0.1Total 1.15 10757.93 12393.00

Roof Beams 2 3.0 0.3 0.30 0.542 4.0 0.3 0.30 0.72

Total 1.26 11137.01 14033.00

10

Over door 1 15 0.6 - 9.12 SqmTotal 9.12 10644.53 9708.00

11

1 4.06 5.06 - 20.54 12998.64 26704.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm1 4.06 5.06 - 20.54 12998.64 26704.00

12

All round upto 3m 1 14.92 0.23 3.00 10.29DeductionsWindows 2 1.5 1.20 0.23 -0.83Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -0.94Beam for Gantry Girder Same quantity as above -1.15 Ventilators 6 0.9 0.23 0.3 -0.37

Total 2.03 5054.37 10246.00All round above 3m 1 14.92 0.23 -0.30 -1.03 5763.33 -5936.00

13

Alround Basement 1 16.12 0.60 - 9.67 624.80 604.00

14

Out side all round upto 3m 1 15.84 3.00 - 47.52In side all round 1 14.00 3.00 - 42.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 2 1.50 1.20 - -3.60Ventilators 6 0.30 0.90 - -1.62

Total 62.70 2933.41 18393.00Out side all round above 3m 1 15.84 0.00 - 0.00In side all round 1 14.00 0.00 - 0.00Ceiling 1 3.00 4.00 - 12.00

12.00 3014.99 3618.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 5.06 4.06 - 20.54 1542.40 3169.00

Page 125: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

17

1 3.00 4.00 - 12.00 6580.99 7898.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 2 2.75 1.50 1.20 9.90

Total 58.50 2136.60 12500.00

20

Inside & Out Side Same quantity as above 74.70 1029.89 7694.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

222 LS 20000.00

23

6 LS 30000.00

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

24 1.18 51392.61 60444.00

25 Provision towards Electricity 50000.00

519631

26 80369Total � 6,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 126: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

14.0 10.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 48.92 0.6 0.75 22.0 Ext-columns 12 1.5 1.5 1.50 40.5 Steps 2 10.0 1.2 0.60 14.4 Deduction 12 0.6 1.5 0.75 -8.1

Total 68.81 128.20 8822.00

2

c-footings 12 1.5 1.5 0.30 8.1 All round 1 48.9 0.6 0.15 4.4 Deductions 12 0.6 1.5 0.15 -1.6

Total 10.88 1560.60 16984.00

3

footings 12 1.5 1.5 0.30 8.1 All round 1 48.9 0.6 0.15 4.4 Steps 2 10.0 1.2 0.30 7.2 Deductions 12 1.5 0.6 0.15 -1.6

Name of the work: Construction of the Pump house of size 14mx10m at Krishna Nagar T

Name of the work: Construction of the Pump house of size ESTIMATED COST: 25.0 Lakhs

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Deductions 12 1.5 0.6 0.15 -1.6Total 18.1 4511.29 81577.00

4

footings 12 1.5 1.5 0.25 6.8 C-Raft 12 0.85 0.85 0.40 3.5

Total 10.2 8537.99 87241.00

5

12 0.3 0.45 3.00 4.9 10300.63 50061.00

12 0.3 0.45 3.70 6.0 10365.20 62129.00

6

Short beams 6 10.30 0.3 0.45 8.3 Long beams 2 14.45 0.3 0.45 3.9

Total 12.2 10757.93 131725.00

7

1st footing 1 48.92 0.6 0.6 17.61 2nd footings 1 48.92 0.45 0.6 13.21

Steps 1st

2 10.0 1.2 0.30 7.20

Step 2nd

2 10.0 0.9 0.30 5.40Deduct: Column portion 12 0.3 0.45 0.60 -0.97

Total 42.4 3722.90 158028.00

8

Over door 2 0.3 0.23 0.10 0.01

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

Over door 2 0.3 0.23 0.10 0.01 Over windows 10 0.3 0.23 0.10 0.07

Total 0.08 8032.41 665.00

Page 127: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

9

Lintel : Over door 1 50 0.23 0.30 3.42 Deductions 12 0.30 0.45 0.30 -0.5

Total 2.93 10644.89 31184.00Beam for Gantry Girder 2 10.0 0.30 0.45 2.70

2 14.0 0.30 0.45 3.78Add for projection 8 0.75 0.3 0.45 0.81

Deductions 12 0.30 0.45 0.30 -0.5Total 6.80 10757.93 73197.00

Roof Beams 6 10.0 0.3 0.45 8.102 14.0 0.3 0.45 3.78

Total 11.88 11137.01 132308.00

10

Over door 1 50 0.6 - 29.70 SqmTotal 29.70 10644.53 31614.00

11

1 11.06 15.06 - 166.56 12998.64 216510.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm1 11.06 15.06 - 166.56 12998.64 216510.00

12

All round upto 3m 1 48.92 0.23 3.00 33.75DeductionsWindows 10 1.5 1.20 0.23 -4.14Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -2.93Beam for Gantry Girder Same quantity as above -6.80 Ventilators 14 0.9 0.23 0.3 -0.87

Total 14.04 5054.37 70946.00All round above 3m 1 48.92 0.23 2.55 28.69 5763.33 165350.00

13

Alround Basement 1 50.12 0.60 - 30.07 624.80 1879.00

14

Out side all round upto 3m 1 49.84 3.00 - 149.52In side all round 1 48.00 3.00 - 144.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 10 1.50 1.20 - -18.00Ventilators 14 0.30 0.90 - -3.78

Total 250.14 2933.41 73377.00Out side all round above 3m 1 49.84 3.00 - 149.52In side all round 1 48.00 3.00 - 144.00Ceiling 1 10.00 14.00 - 140.00

433.52 3014.99 130706.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 15.06 11.06 - 166.56 1542.40 25691.00

Page 128: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Description Dimensions

Earthwork in excavation for structures as per drawing and technical specifications

17

1 10.00 14.00 - 140.00 6580.99 92134.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 10 2.75 1.50 1.20 49.50

Total 98.10 2136.60 20961.00

20

Inside & Out Side Same quantity as above 683.66 1029.89 70410.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

2210 LS 100000.00

23

14 LS 70000.00

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

24 7.54 51392.61 387413.00

25 Provision towards Electricity 50000.00

2428670

26 71330Total � 25,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 129: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Detailed cum Abstract Estimate

60.0 15.0

Quantity Rate AmountSl No. No. L B D

1

All round 1 150.92 0.6 0.75 67.9 Ext-columns 42 1.5 1.5 1.50 141.8 Steps 2 15.0 1.2 0.60 21.6 Deduction 42 0.6 1.5 0.75 -28.4

Total 202.91 128.20 26014.00

2

c-footings 42 1.5 1.5 0.30 28.4 All round 1 150.9 0.6 0.15 13.6 Deductions 42 0.6 1.5 0.15 -5.7

Total 36.26 1560.60 56592.00

3

footings 42 1.5 1.5 0.30 28.4 All round 1 150.9 0.6 0.15 13.6 Steps 2 15.0 1.2 0.30 10.8

Earthwork in excavation for structures as per drawing and technical specifications

Clause 305.1 including setting out, construction of shoring and bracing, removal of

stumps and other deleterious material and disposal upto a lead of 50 m, dressing

of sides and bottom and backfilling in trenches with excavated suitable material as

per Technical Specification 305 MORD / 304 MORTH

Filling the Foundation with sand including cost,

conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

Name of the work: Construction of the Pump house of size 60mx15m at Peddareddipet (Head Works)

Name of the work: Construction of the Pump house of size

ESTIMATED COST: 115.0 Lakhs

Description Dimensions

Steps 2 15.0 1.2 0.30 10.8 Deductions 42 1.5 0.6 0.15 -5.7

Total 47.1 4511.29 212314.00

4

footings 42 1.5 1.5 0.25 23.6 C-Raft 42 0.85 0.85 0.40 12.1

Total 35.8 8537.99 305344.00

5

42 0.45 0.60 3.00 34.0 10300.63 350427.00

42 0.45 0.6 3.55 40.3 10365.20 417272.00

6

Short beams 21 15.45 0.45 0.60 87.6 Long beams 2 60.45 0.45 0.60 32.6

Total 120.2 10757.93 1293582.00

7

1st footing 1 150.92 0.6 0.6 54.33 2nd footings 1 150.92 0.45 0.6 40.75

Steps 1st

2 15.0 1.2 0.30 10.80

Step 2nd

2 15.0 0.9 0.30 8.10Deduct: Column portion 42 0.45 0.6 0.60 -6.80

Total 107.2 3722.90 399004.00

8

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Beams (plinth)

RR Masonary with CM(1:6) using rough stone (HBG) including

cost and conveyance of all the materials etc complete

VCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials etc complete for Bed Blocks

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Columns

Over door 2 0.3 0.23 0.10 0.01 Over windows 40 0.3 0.23 0.10 0.28

Total 0.29 8032.41 2328.00

Page 130: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

9

Lintel : Over door 1 152 0.23 0.30 10.47 Deductions 42 0.45 0.60 0.30 -3.4

Total 7.07 10644.89 75283.00Beam for Gantry Girder 2 15.0 0.45 0.60 8.10

2 60.0 0.45 0.60 32.40Add for projection 38 0.75 0.5 0.60 7.70

Deductions 42 0.45 0.60 0.30 -3.4Total 44.79 10757.93 481880.00

Roof Beams 21 15.0 0.5 0.45 63.792 60.0 0.5 0.45 24.30

Total 88.09 11137.01 981031.00

10

Over door 1 152 0.6 - 91.08 SqmTotal 91.08 10644.53 96950.00

11

1 16.06 61.06 - 980.62 12998.64 1274677.00

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Lintel /Tie Beams / roof Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades of

Size 75 mm thick at one end 50mm other end and 600mm

width ,including cost and conveyance of all the materials, but

excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost and

conveyance of all the materials,but excluding the cost of the

steel etc complete for Roof Slab with125 mm Thick Per 10

Sqm1 16.06 61.06 - 980.62 12998.64 1274677.00

12

All round upto 3m 1 150.92 0.23 3.00 104.13DeductionsWindows 40 1.5 1.20 0.23 -16.56Shutters 2 3.6 3.00 0.23 -4.97 Lintels Same quantity as above -7.07Beam for Gantry Girder Same quantity as above -44.79 Ventilators 44 0.9 0.23 0.3 -2.73

Total 28.00 5054.37 141547.00All round above 3m 1 150.92 0.23 2.40 83.31 5763.33 480143.00

13

Alround Basement 1 152.12 0.60 - 91.27 624.80 5703.00

14

Out side all round upto 3m 1 151.84 3.00 - 455.52In side all round 1 150.00 3.00 - 450.00Deductions

Doors 2 3.60 3.00 - -21.60Windows 40 1.50 1.20 - -72.00Ventilators 44 0.30 0.90 - -11.88

Total 800.04 2933.41 234685.00Out side all round above 3m 1 151.84 3.00 - 455.52In side all round 1 150.00 3.00 - 450.00Ceiling 1 15.00 60.00 - 900.00

1805.52 3014.99 544363.00

15

Brick Masonary with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Flush Pointing with CM(1:3) including cost and conveyance of

all the materials etc complete

Cement plastering with CM(1:5),8mm thick and CM (1:3)

4mm thick including cost and conveyance of all the materials

ect complete.

Accoproof plastering with CM(1:5),12mm thick including

cost and conveyance of all the materials ect complete.

1 61.06 16.06 - 980.62 1542.40 151252.00

Page 131: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Quantity Rate AmountSl No. No. L B D

Earthwork in excavation for structures as per drawing and technical specifications

Description Dimensions

17

1 15.00 60.00 - 900.00 6580.99 592290.00

18

Doors 2 2.25 3.60 3.00 48.60Windows 40 2.75 1.50 1.20 198.00

Total 246.60 2136.60 52689.00

20

Inside & Out Side Same quantity as above 2605.56 1029.89 268345.00

21

2 3.60 3.00 - 21.60 4062.87 87758.00

2240 LS 400000.00

23

44 LS 220000.00

Snowcem painting including cost and conveyance of all the

materials ect complete.

Supply and fixing of Rolling Shutter Size 3.60 X 3.00m With

angular frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour charges

ect complete.

Supply and fixing of the MS windows

Supply and fixing of the Ready made Ventilators of Size

0.9x0.30 including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC (1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm thick

including cost and conveyance of all the materials ect

complete.

Synthetic Enamel painting over primary coat and Enamel

painting in two caots including cost and conveyance of all the

materials etc., complete

24 43.27 51392.61 2223600.00

25 Provision towards Electricity 50000.00

11425073

26 74927Total � 115,00,000

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication including

cost and conveyance of all the materials etc complete.

Sub Total

Unforcein items

Page 132: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs 14.00 lakhs

Nos L B D

1

column footings 12.0 1.2 1.2 1.50 25.92

alround 1.0 31.72 0.9 0.60 17.13

long wall 1.0 9.53 0.9 0.60 5.15

cross walls 4.0 2.27 0.9 0.60 4.90

platform 1.0 7 0.6 0.60 2.52

deduction 12.0 1.2 1.2 0.60 -10.37

Total 45.25 128.20 5801.00

2

column footings 12.0 1.2 1.2 0.20 3.46

alround 1.0 31.72 0.9 0.20 5.71

long wall 1.0 9.53 0.9 0.20 1.72

cross walls 4.0 2.27 0.9 0.20 1.63

platform 1.0 7 0.6 0.20 0.84

deduction 12.0 1.2 1.2 0.20 -3.46

Total 9.90 1560.60 15450.00

3

column footings 12.0 1.2 1.2 0.30 5.18

alround 1.0 31.72 0.9 0.30 8.56

long wall 1.0 9.53 0.9 0.30 2.57

cross walls 4.0 2.27 0.9 0.30 2.45

platform 1.0 7 0.6 0.15 0.63

deduction 12.0 1.2 1.2 0.30 -5.18

14.21 4605.79 65448.00

4

first footing 1.0 28.96 0.6 0.60 10.43

second footing 1.0 28.96 0.45 0.45 5.86

third footing 1.0 28.96 0.3 0.30 2.61

long wall first footing 1.0 8.84 0.6 0.60 3.18

long wall second footing 1.0 8.84 0.45 0.45 1.79

long wall third footing 1.0 8.84 0.3 0.30 0.80

cross walls first footing 4.0 2.04 0.6 0.60 2.94

cross walls second footing 4.0 2.04 0.45 0.45 1.65

cross walls third footing 4.0 2.04 0.3 0.30 0.73

platform 7.0 0.6 0.6 0.45 1.13

platform 7.0 0.3 0.45 0.30 0.28

31.40 3838.39 120525.00

5

12 0.4305 5.166 8632.50 44595.00

Amount

Earth work excavation in all type of soils with intial lead

and lift etc complete

Filling the Foundation with sand including

cost,conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

RR Masonary with CM(1:6) using rough stone (HBG)

including cost and conveyance of all the materials etc

complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Columns footing

TELANGANA DRINKING WATER SUPPLY PROJECT -

SEGMENT-12 IN NIZAMABAD DISTRICT

Detailed cum abstract Estimate

Name of the Sub work : Construction of Watch man and Operator Quarter at Rahapahad Pump House

Sl.N

o DescriptionDimensions

Qty Rate

Page 133: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B DAmount

Earth work excavation in all type of soils with intial lead

Sl.N

o DescriptionDimensions

Qty Rate

6

Door 1 2.0 2.25 0.23 0.23 0.24

Door 2 4.0 2.1 0.23 0.23 0.44

Door 3 2.0 1.65 0.23 0.23 0.17

Window 1 2.0 2.1 0.23 0.23 0.22

Window 2 2.0 1.8 0.23 0.23 0.19

ventilator 2.0 1 0.23 0.23 0.11

1.37 10739.38 14713.00

7

Columns 12.0 0.23 0.23 5.03 3.19 10395.12 33160.00

8

Beams(F) 1.0 27.515 0.23 0.30 1.90

Beams(R) 1.0 27.515 0.23 0.30 1.90

3.80 10852.43 41239.00

8

Beams(F) 1.0 27.515 0.23 0.30 1.90

Beams(R) 1.0 27.515 0.23 0.30 1.90

3.80 10852.43 41239.00

9

Door 1 2.0 1.05 0.6 0.0625 0.08

Window 1 2.0 1.2 0.6 0.0625 0.09

Window 2 2.0 0.9 0.6 0.0625 0.07

0.24 10715.40 2572.00

10

1.0 9.76 6.56 64.03 13116.76 83987.00

11

out side 1.0 50.78 0.23 3.15 36.79

inside 2.0 6 0.1 3.15 3.78

inside 2.0 2.5 0.1 3.15 1.58

Deductions

Door 1 2.0 1.05 2 0.23 -0.97

Door 2 4.0 0.9 2 0.10 -0.72

Door 3 2.0 0.75 2 0.10 -0.30

Window 1 2.0 1.2 1.2 0.23 -0.66

Window 2 2.0 0.9 1.2 0.23 -0.50

out side Coulmns 10.0 0.23 0.23 3.00 -1.59

Ventilators 2.0 0.6 0.23 0.23 -0.06

37.35 5054.37 188781.00

Brick Masonry with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Lintel Beams

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Plinth Beams

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades

of Size 75 mm thick at one end 50mm other end and

600mm width ,including cost and conveyance of all the

materials,but excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Roof Slab with

125mm Thick

Page 134: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B DAmount

Earth work excavation in all type of soils with intial lead

Sl.N

o DescriptionDimensions

Qty Rate

12

Door 1 of 2.00 x 1.05 mts 2 LS 10000.00

Door 2 of 2.00 x 0.90 mts 4 LS 14000.00

Door 3 of 2.00 x 0.75 mts 2 LS 6000.00

13

Window 1 of size 1.20 X 1.20 mts2 LS 6000.00

Window 2 of size 0.90 X 1.20 mts2 LS 4000.00

14

Hall 2 2.94 2.94 17.29

bed room 2 3.47 2.94 20.40

Kitchen 2 2.44 1.57 7.66

Toilets 2 2.44 1.14 5.56

Platform 1 7.00 0.6 4.20

55.11 6675.49 36789.00

15

Inside & out side A/R 1 114.64 3.15 361.12

Deductions

Door 1 2 1.05 2 -4.20

Door 2 4 0.90 2 -7.20

Door 3 2 0.75 2 -3.00

Window 1 2 1.20 1.2 -2.88

Window 2 2 0.90 1.2 -2.16

Ventilators 2 0.60 0.23 -0.28

341.40 2933.41 100147.00

16

Roof slab 1 9.76 6.56 64.03 1542.40 9876.00

18

341.40 1029.89 35160.00

Snowcem painting including cost and conveyance of all

the materials ect complete.

Supply and fixing of the Sal Wood Door With angular

frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour

charges ect complete.

Supply and fixing of the Sal Wood Windows of Size 0.9 X

1.20m With angular frame CR Sheet including fixtures ,

fasteners including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC(1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm

thick including cost and conveyance of all the materials

ect complete.

Cement plastering with CM(1:5),8mm thick and CM

(1:3) 4mm thick including cost and conveyance of all the

materials ect complete.

Accoproof plastering with CM(1:5),12mm thick

including cost and conveyance of all the materials ect

complete.

Page 135: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B DAmount

Earth work excavation in all type of soils with intial lead

Sl.N

o DescriptionDimensions

Qty Rate

19

Door 1 2 1.05 2 4.20

Door 2 4 0.90 2 7.20

Door 3 2 0.75 2 3.00

Window 1 2 1.20 1.2 2.88

Window 2 2 0.90 1.2 2.16

19.44 2136.60 4154.00

20

3.60 51392.61 184774.00

Provision towards Electricity 100000.00

Provision towards Water supply and Sanitation 100000.00

21

2 LS 10000.00

1278410.00

22

121590.00

TOTAL 1400000.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Synthatic Enamel painting over primary coat and Enamel

painting in two caots including csot and conveyance of all

the materials ect complete

Supply and placing of the HYSD bars, fabrication

including cost and conveyance of all the materials etc

complete.

Supply and fixing of the Ready made Ventilaters of Size

0.9x0.23including csot and conveyance of the all the

materials , labour charges ect complete.

Unforeseen items

Page 136: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs 14.00 lakhs

Nos L B D

1

column footings 12.0 1.2 1.2 1.50 25.92

alround 1.0 31.72 0.9 0.60 17.13

long wall 1.0 9.53 0.9 0.60 5.15

cross walls 4.0 2.27 0.9 0.60 4.90

platform 1.0 7 0.6 0.60 2.52

deduction 12.0 1.2 1.2 0.60 -10.37

Total 45.25 128.20 5801.00

2

column footings 12.0 1.2 1.2 0.20 3.46

alround 1.0 31.72 0.9 0.20 5.71

long wall 1.0 9.53 0.9 0.20 1.72

cross walls 4.0 2.27 0.9 0.20 1.63

platform 1.0 7 0.6 0.20 0.84

deduction 12.0 1.2 1.2 0.20 -3.46

Total 9.90 1560.60 15450.00

3

column footings 12.0 1.2 1.2 0.30 5.18

alround 1.0 31.72 0.9 0.30 8.56

long wall 1.0 9.53 0.9 0.30 2.57

cross walls 4.0 2.27 0.9 0.30 2.45

platform 1.0 7 0.6 0.15 0.63

deduction 12.0 1.2 1.2 0.30 -5.18

14.21 4605.79 65448.00

4

first footing 1.0 28.96 0.6 0.60 10.43

second footing 1.0 28.96 0.45 0.45 5.86

third footing 1.0 28.96 0.3 0.30 2.61

long wall first footing 1.0 8.84 0.6 0.60 3.18

long wall second footing 1.0 8.84 0.45 0.45 1.79

long wall third footing 1.0 8.84 0.3 0.30 0.80

cross walls first footing 4.0 2.04 0.6 0.60 2.94

cross walls second footing 4.0 2.04 0.45 0.45 1.65

cross walls third footing 4.0 2.04 0.3 0.30 0.73

platform 7.0 0.6 0.6 0.45 1.13

platform 7.0 0.3 0.45 0.30 0.28

31.40 3838.39 120525.00

5

12 0.4305 5.166 8632.50 44595.00

Amount

Earth work excavation in all type of soils with intial lead

and lift etc complete

Filling the Foundation with sand including

cost,conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

RR Masonary with CM(1:6) using rough stone (HBG)

including cost and conveyance of all the materials etc

complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Columns footing

TELANGANA DRINKING WATER SUPPLY PROJECT -

SEGMENT-12 IN NIZAMABAD DISTRICT

Detailed cum abstract Estimate

Name of the Sub work : Construction of Watch man and Operator Quarter at Krishna Nagar T Pump House

Sl.N

o DescriptionDimensions

Qty Rate

Page 137: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B DAmount

Earth work excavation in all type of soils with intial lead

Sl.N

o DescriptionDimensions

Qty Rate

6

Door 1 2.0 2.25 0.23 0.23 0.24

Door 2 4.0 2.1 0.23 0.23 0.44

Door 3 2.0 1.65 0.23 0.23 0.17

Window 1 2.0 2.1 0.23 0.23 0.22

Window 2 2.0 1.8 0.23 0.23 0.19

ventilator 2.0 1 0.23 0.23 0.11

1.37 10739.38 14713.00

7

Columns 12.0 0.23 0.23 5.03 3.19 10395.12 33160.00

8

Beams(F) 1.0 27.515 0.23 0.30 1.90

Beams(R) 1.0 27.515 0.23 0.30 1.90

3.80 10852.43 41239.00

8

Beams(F) 1.0 27.515 0.23 0.30 1.90

Beams(R) 1.0 27.515 0.23 0.30 1.90

3.80 10852.43 41239.00

9

Door 1 2.0 1.05 0.6 0.0625 0.08

Window 1 2.0 1.2 0.6 0.0625 0.09

Window 2 2.0 0.9 0.6 0.0625 0.07

0.24 10715.40 2572.00

10

1.0 9.76 6.56 64.03 13116.76 83987.00

11

out side 1.0 50.78 0.23 3.15 36.79

inside 2.0 6 0.1 3.15 3.78

inside 2.0 2.5 0.1 3.15 1.58

Deductions

Door 1 2.0 1.05 2 0.23 -0.97

Door 2 4.0 0.9 2 0.10 -0.72

Door 3 2.0 0.75 2 0.10 -0.30

Window 1 2.0 1.2 1.2 0.23 -0.66

Window 2 2.0 0.9 1.2 0.23 -0.50

out side Coulmns 10.0 0.23 0.23 3.00 -1.59

Ventilators 2.0 0.6 0.23 0.23 -0.06

37.35 5054.37 188781.00

Brick Masonry with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Lintel Beams

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Plinth Beams

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades

of Size 75 mm thick at one end 50mm other end and

600mm width ,including cost and conveyance of all the

materials,but excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Roof Slab with

125mm Thick

Page 138: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B DAmount

Earth work excavation in all type of soils with intial lead

Sl.N

o DescriptionDimensions

Qty Rate

12

Door 1 of 2.00 x 1.05 mts 2 LS 10000.00

Door 2 of 2.00 x 0.90 mts 4 LS 14000.00

Door 3 of 2.00 x 0.75 mts 2 LS 6000.00

13

Window 1 of size 1.20 X 1.20 mts2 LS 6000.00

Window 2 of size 0.90 X 1.20 mts2 LS 4000.00

14

Hall 2 2.94 2.94 17.29

bed room 2 3.47 2.94 20.40

Kitchen 2 2.44 1.57 7.66

Toilets 2 2.44 1.14 5.56

Platform 1 7.00 0.6 4.20

55.11 6675.49 36789.00

15

Inside & out side A/R 1 114.64 3.15 361.12

Deductions

Door 1 2 1.05 2 -4.20

Door 2 4 0.90 2 -7.20

Door 3 2 0.75 2 -3.00

Window 1 2 1.20 1.2 -2.88

Window 2 2 0.90 1.2 -2.16

Ventilators 2 0.60 0.23 -0.28

341.40 2933.41 100147.00

16

Roof slab 1 9.76 6.56 64.03 1542.40 9876.00

18

341.40 1029.89 35160.00

Snowcem painting including cost and conveyance of

all the materials ect complete.

Supply and fixing of the Sal Wood Door With angular

frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour

charges ect complete.

Supply and fixing of the Sal Wood Windows of Size 0.9 X

1.20m With angular frame CR Sheet including fixtures ,

fasteners including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC(1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm

thick including cost and conveyance of all the materials

ect complete.

Cement plastering with CM(1:5),8mm thick and CM

(1:3) 4mm thick including cost and conveyance of all the

materials ect complete.

Accoproof plastering with CM(1:5),12mm thick

including cost and conveyance of all the materials ect

complete.

Page 139: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B DAmount

Earth work excavation in all type of soils with intial lead

Sl.N

o DescriptionDimensions

Qty Rate

19

Door 1 2 1.05 2 4.20

Door 2 4 0.90 2 7.20

Door 3 2 0.75 2 3.00

Window 1 2 1.20 1.2 2.88

Window 2 2 0.90 1.2 2.16

19.44 2136.60 4154.00

20

3.60 51392.61 184774.00

Provision towards Electricity 100000.00

Provision towards Water supply and Sanitation 100000.00

21

2 LS 10000.00

1278410.00

22

121590.00

TOTAL 1400000.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Synthatic Enamel painting over primary coat and Enamel

painting in two caots including csot and conveyance of all

the materials ect complete

Supply and placing of the HYSD bars, fabrication

including cost and conveyance of all the materials etc

complete.

Supply and fixing of the Ready made Ventilaters of Size

0.9x0.23including csot and conveyance of the all the

materials , labour charges ect complete.

Unforeseen items

Page 140: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs 14.00 lakhs

Nos L B D

1

column footings 12.0 1.2 1.2 1.50 25.92

alround 1.0 31.72 0.9 0.60 17.13

long wall 1.0 9.53 0.9 0.60 5.15

cross walls 4.0 2.27 0.9 0.60 4.90

platform 1.0 7 0.6 0.60 2.52

deduction 12.0 1.2 1.2 0.60 -10.37

Total 45.25 128.20 5801.00

2

column footings 12.0 1.2 1.2 0.20 3.46

alround 1.0 31.72 0.9 0.20 5.71

long wall 1.0 9.53 0.9 0.20 1.72

cross walls 4.0 2.27 0.9 0.20 1.63

platform 1.0 7 0.6 0.20 0.84

deduction 12.0 1.2 1.2 0.20 -3.46

Total 9.90 1560.60 15450.00

3

column footings 12.0 1.2 1.2 0.30 5.18

alround 1.0 31.72 0.9 0.30 8.56

long wall 1.0 9.53 0.9 0.30 2.57

cross walls 4.0 2.27 0.9 0.30 2.45

platform 1.0 7 0.6 0.15 0.63

deduction 12.0 1.2 1.2 0.30 -5.18

14.21 4605.79 65448.00

4

first footing 1.0 28.96 0.6 0.60 10.43

second footing 1.0 28.96 0.45 0.45 5.86

third footing 1.0 28.96 0.3 0.30 2.61

long wall first footing 1.0 8.84 0.6 0.60 3.18

long wall second footing 1.0 8.84 0.45 0.45 1.79

long wall third footing 1.0 8.84 0.3 0.30 0.80

cross walls first footing 4.0 2.04 0.6 0.60 2.94

cross walls second footing 4.0 2.04 0.45 0.45 1.65

cross walls third footing 4.0 2.04 0.3 0.30 0.73

platform 7.0 0.6 0.6 0.45 1.13

platform 7.0 0.3 0.45 0.30 0.28

31.40 3838.39 120525.00

5

12 0.4305 5.166 8632.50 44595.00

TELANGANA DRINKING WATER SUPPLY PROJECT -

SEGMENT-12 IN NIZAMABAD DISTRICT

Detailed cum abstract Estimate

Name of the Sub work : Construction of Watch man and Operator Quarter at Pedhareddipet

Sl.N

o DescriptionDimensions

Qty Rate Amount

Earth work excavation in all type of soils with intial lead

and lift etc complete

Filling the Foundation with sand including

cost,conveyance ,watering and ramming etc complete.

CC(1:4:8)using 40 mm HBG metal icluding Cost and

conveyance of the all materials etc complete.

RR Masonary with CM(1:6) using rough stone (HBG)

including cost and conveyance of all the materials etc

complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Columns footing

Page 141: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B D

Sl.N

o DescriptionDimensions

Qty Rate Amount

Earth work excavation in all type of soils with intial lead6

Door 1 2.0 2.25 0.23 0.23 0.24

Door 2 4.0 2.1 0.23 0.23 0.44

Door 3 2.0 1.65 0.23 0.23 0.17

Window 1 2.0 2.1 0.23 0.23 0.22

Window 2 2.0 1.8 0.23 0.23 0.19

ventilator 2.0 1 0.23 0.23 0.11

1.37 10739.38 14713.00

7

Columns 12.0 0.23 0.23 5.03 3.19 10395.12 33160.00

8

Beams(F) 1.0 27.515 0.23 0.30 1.90

Beams(R) 1.0 27.515 0.23 0.30 1.90

3.80 10852.43 41239.00

8

Beams(F) 1.0 27.515 0.23 0.30 1.90

Beams(R) 1.0 27.515 0.23 0.30 1.90

3.80 10852.43 41239.00

9

Door 1 2.0 1.05 0.6 0.0625 0.08

Window 1 2.0 1.2 0.6 0.0625 0.09

Window 2 2.0 0.9 0.6 0.0625 0.07

0.24 10715.40 2572.00

10

1.0 9.76 6.56 64.03 13116.76 83987.00

11

out side 1.0 50.78 0.23 3.15 36.79

inside 2.0 6 0.1 3.15 3.78

inside 2.0 2.5 0.1 3.15 1.58

Deductions

Door 1 2.0 1.05 2 0.23 -0.97

Door 2 4.0 0.9 2 0.10 -0.72

Door 3 2.0 0.75 2 0.10 -0.30

Window 1 2.0 1.2 1.2 0.23 -0.66

Window 2 2.0 0.9 1.2 0.23 -0.50

out side Coulmns 10.0 0.23 0.23 3.00 -1.59

Ventilators 2.0 0.6 0.23 0.23 -0.06

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Lintel Beams

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Columns

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Plinth Beams

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Beams

VRCC(1:1.5:3) using 20 mm HBG metal for Sun Shades

of Size 75 mm thick at one end 50mm other end and

600mm width ,including cost and conveyance of all the

materials,but excluding the cost of the steel etc complete

VRCC(1:1.5:3) using 20 mm HBG metal including cost

and conveyance of all the materials,but excluding the

cost of the steel etc complete for Roof Slab with

125mm Thick

Brick Masonry with CM(1:6) using Second Class Bricks

including cost and conveyance of all the materials etc

complete

Page 142: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B D

Sl.N

o DescriptionDimensions

Qty Rate Amount

Earth work excavation in all type of soils with intial lead 37.35 5054.37 188781.00

12

Door 1 of 2.00 x 1.05 mts 2 LS 10000.00

Door 2 of 2.00 x 0.90 mts 4 LS 14000.00

Door 3 of 2.00 x 0.75 mts 2 LS 6000.00

13

Window 1 of size 1.20 X 1.20 mts2 LS 6000.00

Window 2 of size 0.90 X 1.20 mts2 LS 4000.00

14

Hall 2 2.94 2.94 17.29

bed room 2 3.47 2.94 20.40

Kitchen 2 2.44 1.57 7.66

Toilets 2 2.44 1.14 5.56

Platform 1 7.00 0.6 4.20

55.11 6675.49 36789.00

15

Inside & out side A/R 1 114.64 3.15 361.12

Deductions

Door 1 2 1.05 2 -4.20

Door 2 4 0.90 2 -7.20

Door 3 2 0.75 2 -3.00

Window 1 2 1.20 1.2 -2.88

Window 2 2 0.90 1.2 -2.16

Ventilators 2 0.60 0.23 -0.28

341.40 2933.41 100147.00

16

Roof slab 1 9.76 6.56 64.03 1542.40 9876.00

18

341.40 1029.89 35160.00

19

Door 1 2 1.05 2 4.20

Door 2 4 0.90 2 7.20

Door 3 2 0.75 2 3.00

Window 1 2 1.20 1.2 2.88

Window 2 2 0.90 1.2 2.16

19.44 2136.60 4154.00

Supply and fixing of the Sal Wood Door With angular

frame CR Sheet including fixtures , fasteners including

csot and conveyance of the all the materials , labour

charges ect complete.

Supply and fixing of the Sal Wood Windows of Size 0.9 X

1.20m With angular frame CR Sheet including fixtures ,

fasteners including csot and conveyance of the all the

materials , labour charges ect complete.

Flooring with CC(1:4:8) using 40mm HBG metal for

100mm thick and Top plastering with CM(1:3) ,20mm

thick including cost and conveyance of all the materials

ect complete.

Cement plastering with CM(1:5),8mm thick and CM

(1:3) 4mm thick including cost and conveyance of all

the materials ect complete.

Accoproof plastering with CM(1:5),12mm thick

including cost and conveyance of all the materials ect

complete.

Snowcem painting including cost and conveyance of

all the materials ect complete.

Synthatic Enamel painting over primary coat and Enamel

painting in two caots including csot and conveyance of all

the materials ect complete

Page 143: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Nos L B D

Sl.N

o DescriptionDimensions

Qty Rate Amount

Earth work excavation in all type of soils with intial lead20

3.60 51392.61 184774.00

Provision towards Electricity 100000.00

Provision towards Water supply and Sanitation 100000.00

21

2 LS 10000.00

1278410.00

22

121590.00

TOTAL 1400000.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer

TDWSP Banswada / TDWSP Sub division TDWSP Division TDWSP Circle

Yellareddy Banswada/ Yellareddy Banswada Nirmal

Supply and placing of the HYSD bars, fabrication

including cost and conveyance of all the materials etc

complete.

Supply and fixing of the Ready made Ventilaters of Size

0.9x0.23including csot and conveyance of the all the

materials , labour charges ect complete.

Unforeseen items

Page 144: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

Est.Cost Rs 48.00 lakhs

Nos L B D

1

column footings 16.0 1.2 1.2 1.50 34.56

long wall 1.0 340 0.9 0.75 229.50

Total 264.06 128.20 33852

2

column footings 16.0 1.2 1.2 0.30 6.91

long wall 1.0 340 0.9 0.30 91.80

98.71 4605.79 454638

3

first footing 1.0 340 0.6 0.75 153.00

second footing 1.0 340 0.45 0.45 68.85

third footing 1.0 340 0.3 0.30 30.60

Earth work excavation in all type of soils

with intial lead and lift etc complete

CC(1:4:8)using 40 mm HBG metal icluding

Cost and conveyance of the all materials etc

complete.

RR Masonary with CM(1:6) using rough stone

(HBG) including cost and conveyance of all

the materials etc complete

TELANGANA WATER GRID - SEGMENT 13 IN NIZAMABAD DISTRICT

Detailed cum abstract Estimate

Name of the Sub work : Construction of Compound wall at Peddareddipet Head Works, Krishna Nagar T

Pump House, Mumbojipet Pump House, Mustapur Pump House,

Sl.

NoDescription

DimensionsQty Rate Amount

third footing 1.0 340 0.3 0.30 30.60

252.45 3838.39 969002

4

16.0 0.4305 6.888 8632.50 59461

5

Columns 16.0 0.35 0.35 5.03 9.86 10395.12 102496

6

out side 1.0 340 0.23 1.80 140.76

Pillarsters 226.7 0.12 0.35 1.80 17.14

157.90 5054.37 798085

7

Inside & out side

A/R 1 680.92 1.80 1225.66

1 340.46 0.23 78.31

227 0.94 1.80 383.52

1687.49 2933.41 495010

Cement plastering with CM(1:5),12mm

thick including cost and conveyance of all the

materials ect complete.

VRCC(1:1.5:3) using 20 mm HBG metal

including cost and conveyance of all the

materials,but excluding the cost of the steel

etc complete for Columns footing

VRCC(1:1.5:3) using 20 mm HBG metal

including cost and conveyance of all the

materials,but excluding the cost of the steel

etc complete for Columns

Brick Msaonary with CM(1:6) using Second

Class Bricks including cost and conveyance of

all the materials etc complete

Page 145: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

8

Same quantity as above 1687.49

1687.49 1029.89 173793

9

Gate 2 6.00 3 36.00

36.00 2136.60 7692

10

5.00 51392.61 256963

11 LS 400000

Levelling the ground with morrum soils & Land scaping etc., 1000000

4750992

1249008

� 48,00,000

Unforeseen items

TOTAL

Snowcem painting including cost and

conveyance of all the materials ect complete.

Synthatic Enamel painting over primary coat

and Enamel painting in two caots including

csot and conveyance of all the materials ect

complete

Supply and placing of the HYSD bars,

fabrication including cost and conveyance of

all the materials etc complete.

Supply and fixing of GATE

� 48,00,000

Asst. Executive Engineer Deputy Executive Engineer

TDWSP TDWSP Sub Division

Executive Engineer Superintending Engineer

TDWSP Division, Armoor TDWSP Circle Nirmal

TOTAL

Page 146: DETAILED PROJECT REPORT ON · Nizamabad area is a part of Nizamabad district and it is underlain by Archean Crystalline rocks. They comprise of pink and grey granites with course

FLOW DIAGRAM OF GRID 13 (SINGOOR- JUKKAL) NIZAMABAD DISTRICT

NAME OF THE GRID - GRID 13 (SINGOOR-JUKKAL)

NO OF HABS - 785

NO OF MANDALS - 16

NO OF MUNCIPALITIES - 1

NO OF ASSEMBLY SEGMENMTS - 4

(JUKKAL, BANSWADA, BODHAN, YELLAREDDY)

POPULATION - AS PER 2011 CENSUS --8,68,988

ULTIMATE POPULATION -- 12,15,983

NAME OF THE SOURCE - SINGUR PROJECT

REQUIRED RAW WATER QTY (2018)- 1.397 TMC

LENGTH OF PUMPING MAIN - 6.5 KMS

LENGTH OF TRUNK MAIN - 262 KMS

ESTIMATED COST - Rs: 1300.00 CRORES

LENGTH OF SUB TRUNK - 1309.55 KMS

GRAVITY MAINS

OHBR

SUMPS

HABITATIONS

PUMPING CLEAR WATER

PUMPING RAW WATER

NIZAMABAD

AutoCAD SHX Text
50KL
AutoCAD SHX Text
60KL
AutoCAD SHX Text
90KL
AutoCAD SHX Text
160KL
AutoCAD SHX Text
160KL
AutoCAD SHX Text
130KL
AutoCAD SHX Text
130KL
AutoCAD SHX Text
40KL
AutoCAD SHX Text
90KL
AutoCAD SHX Text
1350KL
AutoCAD SHX Text
100KL
AutoCAD SHX Text
30KL
AutoCAD SHX Text
110KL
AutoCAD SHX Text
1500KL
AutoCAD SHX Text
130KL
AutoCAD SHX Text
50KL
AutoCAD SHX Text
100KL
AutoCAD SHX Text
180KL
AutoCAD SHX Text
20KL
AutoCAD SHX Text
60KL
AutoCAD SHX Text
20KL
AutoCAD SHX Text
20 KL
AutoCAD SHX Text
41 HABITATIONS
AutoCAD SHX Text
70 HABS OF YELLAREDDY, NAGIREDDPET & LINGAMPET
AutoCAD SHX Text
180KL
AutoCAD SHX Text
EKLASPUR X RD
AutoCAD SHX Text
10 KL
AutoCAD SHX Text
700KL
AutoCAD SHX Text
1350KL
AutoCAD SHX Text
SINGUR RESERVOIR
AutoCAD SHX Text
NAGIREDDYPET
AutoCAD SHX Text
(44 HABS)
AutoCAD SHX Text
PITLAM JN
AutoCAD SHX Text
GL +430.130 M
AutoCAD SHX Text
YEDAPALLY (17 HABS)
AutoCAD SHX Text
BIRKOOR MANDAL (41 HABS)
AutoCAD SHX Text
BANSWADA (M)
AutoCAD SHX Text
TREATMENT PLANT
AutoCAD SHX Text
CLEAR WATER SUMP @
AutoCAD SHX Text
PEDDEREDDIPET OF PULKAL (M)
AutoCAD SHX Text
VARNI (M)
AutoCAD SHX Text
NARSINGRAOPALLI JN
AutoCAD SHX Text
145 MLD -GL+ 560.00
AutoCAD SHX Text
13300 KL
AutoCAD SHX Text
1300 MM Dia
AutoCAD SHX Text
MS PIPE
AutoCAD SHX Text
L = 0.50 KM
AutoCAD SHX Text
INTAKE WELL
AutoCAD SHX Text
30 TMC
AutoCAD SHX Text
F V L - +513.00
AutoCAD SHX Text
Dia - 350-63 MM
AutoCAD SHX Text
L - 45.37 KM
AutoCAD SHX Text
6 X 225 H.P VT PUMPSETS
AutoCAD SHX Text
+424.040 M
AutoCAD SHX Text
GL +426.610 M
AutoCAD SHX Text
+369.37
AutoCAD SHX Text
KANDARPALLY JN
AutoCAD SHX Text
JUKKAL X ROADS
AutoCAD SHX Text
GL +389.120 M
AutoCAD SHX Text
BODHAN
AutoCAD SHX Text
BYPASS JN
AutoCAD SHX Text
+368.00
AutoCAD SHX Text
MAX G.L = +401.00 MTS
AutoCAD SHX Text
MWL = +414.00 MTS @
AutoCAD SHX Text
TANAKALAN (V)
AutoCAD SHX Text
BALAJI T RD
AutoCAD SHX Text
MAX G.L = +465.00 MTS
AutoCAD SHX Text
MWL = +478.00 MTS @
AutoCAD SHX Text
WADALAPARTHI (V)
AutoCAD SHX Text
MAX G.L = +535.00 MTS
AutoCAD SHX Text
MWL = +548.00 MTS @ BOMLINAIK(T)
AutoCAD SHX Text
MAX G.L = +363.00 mts
AutoCAD SHX Text
MWL = +475.00 MTS @
AutoCAD SHX Text
DANIYA NAYAK (T)
AutoCAD SHX Text
MAX G.L = +554.230 MTS
AutoCAD SHX Text
DI/HDPE PIPE
AutoCAD SHX Text
AT PEDDEREDDIPET OF PULKAL (M)
AutoCAD SHX Text
MWL - +556.00
AutoCAD SHX Text
BPT AT CH.KODAPGAL JN
AutoCAD SHX Text
PITLAM (M)
AutoCAD SHX Text
MWL+483.00
AutoCAD SHX Text
BPT AT CHILLARGI
AutoCAD SHX Text
PITLAM (M)
AutoCAD SHX Text
MWL+429.00
AutoCAD SHX Text
BPT AT MANSURAM T BICHUKUNDA (M)
AutoCAD SHX Text
MWL+538.00
AutoCAD SHX Text
BPT AT KANDEBALLUR
AutoCAD SHX Text
JUKKAL (M) FOR
AutoCAD SHX Text
MWL+438.00
AutoCAD SHX Text
MWL+518.00
AutoCAD SHX Text
MWL+473.00
AutoCAD SHX Text
BPT AT DOWLATHAPUR
AutoCAD SHX Text
FOR 36 HABITAIONS IN BICHKUNDA (M)
AutoCAD SHX Text
MWL+443.00
AutoCAD SHX Text
BPT AT THADGUR SMALL / AWALGOAN OF MADNOOR (M)
AutoCAD SHX Text
TO 36 HABITATIONS IN MADNOOR (M)
AutoCAD SHX Text
MWL+455.00
AutoCAD SHX Text
MWL+423.00
AutoCAD SHX Text
BPT AT THIMMAREDDY X-RD
AutoCAD SHX Text
YELLAREDDY (M) OF YELLAREDDY&NAGIREDDYPET (M)
AutoCAD SHX Text
MWL+498.00
AutoCAD SHX Text
BPT AT HAJIPUR HILLOCK OF YELLAREDDY (M)
AutoCAD SHX Text
MWL+533.00
AutoCAD SHX Text
GL+465.00
AutoCAD SHX Text
GL+500.00
AutoCAD SHX Text
1 HABS
AutoCAD SHX Text
GL+410.00
AutoCAD SHX Text
GL+401.00
AutoCAD SHX Text
MWL+470.00
AutoCAD SHX Text
GL+520.00
AutoCAD SHX Text
GL+415.00
AutoCAD SHX Text
GL+490.00
AutoCAD SHX Text
GL+450.00
AutoCAD SHX Text
GL+420.00
AutoCAD SHX Text
GL+432.00
AutoCAD SHX Text
BPT AT FAKEERABAD T OF NAVIPET (M) 15 HABS
AutoCAD SHX Text
MWL+382.100
AutoCAD SHX Text
GL+349.500
AutoCAD SHX Text
BPT AT NAVIPET (M) OF NAVIPET (M)
AutoCAD SHX Text
MWL+369.600
AutoCAD SHX Text
GL+367.100
AutoCAD SHX Text
GL+512.00
AutoCAD SHX Text
OHBR'S AT THADMANUR
AutoCAD SHX Text
OF ANDHOL (M) STAGING 30 Mts
AutoCAD SHX Text
MWL+590.00
AutoCAD SHX Text
GL+560.00
AutoCAD SHX Text
BOGGUGUDA JN.
AutoCAD SHX Text
+420.00
AutoCAD SHX Text
BPT AT DOSTPALLI OF JUKKAL (M)
AutoCAD SHX Text
21 HABS IN JUKKAL&MADNOOR (M)
AutoCAD SHX Text
CHINNA DEVAR SINGH T X ROADS
AutoCAD SHX Text
BPT AT SANTOSHNAGAR OF BANSWADA (M)
AutoCAD SHX Text
78 HABS IN BANSWADA (M)
AutoCAD SHX Text
MWL+483.00
AutoCAD SHX Text
GL+460.00
AutoCAD SHX Text
BPT AT AREDU OF
AutoCAD SHX Text
NIZAMSAGAR (M) 39 HABS
AutoCAD SHX Text
MWL+475.00
AutoCAD SHX Text
GL+445.00
AutoCAD SHX Text
GLBR AT KRISHNAGAR (T) OF BANSWADA (M)
AutoCAD SHX Text
MWL +563.00
AutoCAD SHX Text
200 KL
AutoCAD SHX Text
SUMP AT MUMBOJIPET (T)
AutoCAD SHX Text
G.L +503.99 MTS
AutoCAD SHX Text
100 KL SUMP AT
AutoCAD SHX Text
MUSTAFUR (T)
AutoCAD SHX Text
GLBR NEAR YELLARAM OF
AutoCAD SHX Text
GL+620.00
AutoCAD SHX Text
LINGAMPET (M) 7 HABS
AutoCAD SHX Text
GL+560.00
AutoCAD SHX Text
BPT AT BIRKUR X RD OF BIRKUR (M)
AutoCAD SHX Text
3 HABS OF BIRKUR (M)
AutoCAD SHX Text
GL+ 385
AutoCAD SHX Text
MWL+408.00
AutoCAD SHX Text
300 KL
AutoCAD SHX Text
SUMP AT
AutoCAD SHX Text
KRISHNA
AutoCAD SHX Text
NAGAR(T) OF BANSWADA (M)
AutoCAD SHX Text
GL+414.00
AutoCAD SHX Text
GL+410.513
AutoCAD SHX Text
70 KL SUMP AT RAITU NAGAR
AutoCAD SHX Text
OF BIRKUR (M) 1 HAB OF BIRKUR (M)
AutoCAD SHX Text
BPT AT BOMMANDEVPALLY OF
AutoCAD SHX Text
BIRKUR (M) OF HABS 12 OF BIRKUR (M)
AutoCAD SHX Text
MWL+443.00
AutoCAD SHX Text
GL+420.00
AutoCAD SHX Text
BPT AT BOPPASPALLY OF
AutoCAD SHX Text
BIRKUR (M) OF 4 HABS OF BIRKUR (M)
AutoCAD SHX Text
MWL+433.00
AutoCAD SHX Text
GL+420.00
AutoCAD SHX Text
GL+431.641
AutoCAD SHX Text
15 KL SUMP AT JALALPUR OF VARNI (M)
AutoCAD SHX Text
1 HAB IN VARNI (M)
AutoCAD SHX Text
1300 MM Dia
AutoCAD SHX Text
MS PIPE
AutoCAD SHX Text
L = 6.0 KM
AutoCAD SHX Text
1500 MM Dia
AutoCAD SHX Text
MS PIPE
AutoCAD SHX Text
L = 53 KM
AutoCAD SHX Text
AREDU JN
AutoCAD SHX Text
1200 MM Dia
AutoCAD SHX Text
MS PIPE
AutoCAD SHX Text
L = 7.076 KM
AutoCAD SHX Text
CH.KODAPGAL JN
AutoCAD SHX Text
GL +435.570 M
AutoCAD SHX Text
750 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 10.675 KM
AutoCAD SHX Text
400 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 1.05 KM
AutoCAD SHX Text
SUB TRUNK LENGHT
AutoCAD SHX Text
= 79.93 KM
AutoCAD SHX Text
700 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 7.281 KM
AutoCAD SHX Text
300 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 6.657 KM
AutoCAD SHX Text
600 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 8.78 KM
AutoCAD SHX Text
400 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 4.60 KM
AutoCAD SHX Text
KANDEBALLUR BPT JN
AutoCAD SHX Text
GL + 408.720 M
AutoCAD SHX Text
BPT AT MAILAR
AutoCAD SHX Text
JUKKAL (M)
AutoCAD SHX Text
DOSTPALLI X RD
AutoCAD SHX Text
GL + 480.65
AutoCAD SHX Text
500 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 6.217 KM
AutoCAD SHX Text
350 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 3.22 KM
AutoCAD SHX Text
350 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 6.079 KM
AutoCAD SHX Text
+384.00
AutoCAD SHX Text
MADNOOR X RD
AutoCAD SHX Text
350 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 13.80 KM
AutoCAD SHX Text
350 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L = 4.848 KM
AutoCAD SHX Text
THIMMAREDDY X-RD JN
AutoCAD SHX Text
GL +419.60 M
AutoCAD SHX Text
600 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L - 3.060 KM
AutoCAD SHX Text
500 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L - 8.985 KM
AutoCAD SHX Text
450 MM Dia
AutoCAD SHX Text
DI K9 PIPE
AutoCAD SHX Text
L - 1.682 KM
AutoCAD SHX Text
GL +440.230 M
AutoCAD SHX Text
HAJIPUR JN
AutoCAD SHX Text
GL +440.230 M
AutoCAD SHX Text
KOTALA X RD
AutoCAD SHX Text
GL +504.66 M
AutoCAD SHX Text
NAGARAM JN
AutoCAD SHX Text
70 KL
AutoCAD SHX Text
SUMP AT KARPOLE IN
AutoCAD SHX Text
GL+506.800
AutoCAD SHX Text
GL +482.62 M
AutoCAD SHX Text
MANGARAM X RD
AutoCAD SHX Text
BPT AT SEVALAL T OF VARNI (M)
AutoCAD SHX Text
43 HABS IN VARNI (M)
AutoCAD SHX Text
GL+ 440
AutoCAD SHX Text
MWL+452
AutoCAD SHX Text
GL+404.00
AutoCAD SHX Text
45KL SUMP AT SUDDULAM
AutoCAD SHX Text
OF KOTAGIRI (M)
AutoCAD SHX Text
MWL+438
AutoCAD SHX Text
GL+425.00
AutoCAD SHX Text
BPT AT MIRZAPUR OF KOTAGIRI (M)
AutoCAD SHX Text
39 HABS OF KOTAGIRI (M)
AutoCAD SHX Text
BPT AT AKBAR NAGAR OF BODHAN (M)
AutoCAD SHX Text
OF 98 HABS BODHAN (M)
AutoCAD SHX Text
MWL+433.00
AutoCAD SHX Text
GL+420.00
AutoCAD SHX Text
FAKEERABAD RD
AutoCAD SHX Text
MWL+590.00
AutoCAD SHX Text
GL+560.00
AutoCAD SHX Text
OHBR AT SUDDULAM
AutoCAD SHX Text
OF KOTAGIRI (M)
AutoCAD SHX Text
MWL +623.00
AutoCAD SHX Text
GL+410.00
AutoCAD SHX Text
BANSWADA
AutoCAD SHX Text
CONSTITUENCY TRUNK MAIN
AutoCAD SHX Text
TOTAL LENGTH 53 KMS
AutoCAD SHX Text
BODHAN
AutoCAD SHX Text
CONSTITUENCY TRUNK MAIN
AutoCAD SHX Text
TOTAL LENGTH 48 KMS
AutoCAD SHX Text
13 HABS IN JUKKAL & MADNOOR(M)
AutoCAD SHX Text
GL +530.640 M
AutoCAD SHX Text
98 HABS
AutoCAD SHX Text
14 HABS IN PITLAM (M)
AutoCAD SHX Text
56 HABS IN PITLAM (M)
AutoCAD SHX Text
20 KL
AutoCAD SHX Text
SUMP AT BAYANPALLI
AutoCAD SHX Text
1 HABITATION
AutoCAD SHX Text
GL+514.67
AutoCAD SHX Text
11 HABS IN JUKKAL&MADNOOR(M)
AutoCAD SHX Text
OF LINGAMPET (M)
AutoCAD SHX Text
OF LINGAMPET (M) 1 HABITATION
AutoCAD SHX Text
LINGAMPET (M) 5 HABITATIONS
AutoCAD SHX Text
LINGAMPET (M) 5 HABS
AutoCAD SHX Text
OF 22 HABS IN NAVIPET
AutoCAD SHX Text
23 HABS IN BNW
AutoCAD SHX Text
27 HABS IN BICHUKUNDA& JUKKAL (M)
AutoCAD SHX Text
6 HABS OF KOTAGIRI (M)
AutoCAD SHX Text
OF ANDHOL (M) STAGING 30 Mts
AutoCAD SHX Text
STAGING 30 Mts
AutoCAD SHX Text
STAGING 10 Mts
AutoCAD SHX Text
STAGING 25 Mts
AutoCAD SHX Text
STAGING 20 Mts
AutoCAD SHX Text
STAGING 15 Mts
AutoCAD SHX Text
STAGING 20 Mts
AutoCAD SHX Text
STAGING 25 Mts
AutoCAD SHX Text
STAGING 20 Mts
AutoCAD SHX Text
STAGING 20 Mts
AutoCAD SHX Text
STAGING 30 Mts
AutoCAD SHX Text
STAGING 30 Mts
AutoCAD SHX Text
STAGING 20 Mts
AutoCAD SHX Text
STAGING 10 Mts
AutoCAD SHX Text
STAGING 10 Mts
AutoCAD SHX Text
STAGING 20 Mts
AutoCAD SHX Text
STAGING 10 Mts
AutoCAD SHX Text
STAGING 20 Mts
AutoCAD SHX Text
STAGING 9Mts
AutoCAD SHX Text
STAGING 10 Mts
AutoCAD SHX Text
STAGING 30 Mts