DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger...

12
DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Transcript of DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger...

Page 1: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

DESY Lab Talk.

2019 LLRF Workshop, Chicago

Sept. 29 - Oct. 03 2019

Holger Schlarb,

for the DESY LLRF team

Chicago, 09/29/2019

Page 2: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 2

DESY Accelerators & News

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

DESY on a glance

Page 3: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 3

DESY Accelerators & News

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

DESY on a glance

Wim LeemansReinhard Brinkmann

• M-Director has changed:02/2019

• Large conventional accelerator projects:

- FLASH2020+ 2020 (Und/Energy/Adv. FEL/Seeding/Synchr.)

- PETRAIV 2025 (CDR compl.; MBA, x100 brilliance)

- EuXFEL-CW >2030 (CW operation at EuXFEL)

• Plasma Accelerator Group:

~ kHz, ~ J

Class laser

Page 4: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 4

Facility overview

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

LLRF user facility: EuXFEL

784 SRF cavities / 1.3 & 3.9 GHz / 26 RF stations / pulsed / ~ mA; 1 NRF gun; 2 TDS at 3 GHz

LLRF user facility: FLASH

315 m

5 MeV 150 MeV 1250 MeV

Bunch Compressors

450 MeV

Accelerating StructuresRF Stations

LasersRF Gun

Fixed Gap

UndulatorssFLASHPhoton

DiagnosticsTHzFLASH1

FEL Experiments

3.4 km

60 SRF cavities / 1.3 & 3.9 GHz / 5 RF stations / pulsed / ~ mA; 1 NRF gun; 1 TDS/1 NRF 3 GHz; 1 PolariX 12GHz

PolariX

TDS 12 GHz

PSI-CERN-DESY

collaboration

07/2019

Page 5: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 5

Facility overview

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

LLRF for smaller accelerators and test facilities

PITZ REGAE (UED) SINBAD (ARD) AMTF CMTB

LLRF for external accelerator facilities (construction/support/consulting…)

ELBE (HZDR) FLUTE (KIT) TARLA (Uni Ankara) NICA (Dubna) +…

NRF Gun/booster/TDS

1.3 GHz, 1 ms/ 3 GHz

NRF Gun/booster/TDS

3.0 GHz

NRF gun/3xTWS/PolariX

3.0 GHz / 12 GHzSRF Cryo-M./ 3rd / gun

1.3 GHz / 3.9 GHz

SRF Cryo-Module CW

1.3 GHz, IOT

SRF / NRF 6 cav.

1.3 GHz / 260 MHz

NRF gun/booster

3.0 GHz

SRF /NRF 6 cav.

1.3 GHz / 260 MHzNRF, 5 cav.

162 MHz

Poster M. Urbanski;

Poster C. Gümüs;

Page 6: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 6

Developments & upgrades for user facility

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

EuXFEL: LLRF health monitoring Performance tracking Multi-beamline operation

cavitie

s

EuXFEL: Piezo operation Beam loading compensation Klystron lifetime management

Poster L. Butkowski; Talk M. Omet given by Julian; Th

Greatly reduced downtime

Page 7: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 7

Developments & upgrades for user facility

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

EuXFEL: LLRF automation… basic operation advanced operation

Automation for routine operation• Automatic setup / calibration / tuning

Automation for FB and RF operation• Phase modulation/Output Vector Correction

• RF – Cryo operations / Finite State Machine

Automation for fault detection and analysis• Post mortem statistics / Run-time detection / Anomalies

Overview talk J. Branlard; Mo

Talk M. Grecki; Tu

Poster S. Pfeiffer;

EuXFEL: Maximum Gradient Task Force

14.5

14.5

14.7 14.9

14.9

15.1

15.3

15.3

15.3

15.4

15.5

15.5

15.6

15.6

15.7

15.7

15.8

15.8

15.9

15.9

15.9

15.9

15.9

15.9 16.2

17.4

6

17.5

6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

14

14.5

15

15.5

16

16.5

17

17.5

18

18.5

19

E m

ax [G

eV

]

Design energy Max energy possible with 2.4 GeV at BC2

Design energy of 17.5 GeVSystematic study of gradient limits

• Cavity / waveguide / klystron

Tuning to reach max gradients• Cavity detuning / Coupler conditioning etc

Successfully reached design energy

Talk from M. Omet given by Julian; Th

Page 8: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 8

Developments & upgrades for user facility

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

MO Redundancy Controller FLASH: LLRF status & upgrades X-band LLRF PolariX

Talk Ch. Schmidt; Th

Poster Ch. Schmidt;

Drift Calibration Module Maintenance/Inventory Management PS Redundancy/Remote Control

Poster A. Rosner; Poster B. Szczepanski;

XDWC:12 GHz 3 GHz

XUPC: 3 GHz 12 GHz

XLOG: 3 GHZ 9 GHz

< 2 fs add. jitter

Talk & Poster M. Reukauff; Tu/WePoster B. Gasowski;

FB cavity

WG distr.

Oper. Statistics

Performance monitor

MO upgrade

PZT operation

… many more

Planned installation 2020, EuXFEL

Page 9: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 9

Correlate arrival times

1932m

Developments & upgrades for user facility

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

EuXFEL: Hybrid RF-Optical synchronization reference system

Poster H. Schlarb;

Mean free error

12.9 fs rms

Chain: MLO SLO Link BAM < 2.0 fs rms

12 fs

2.1fs

1 min

Resolution

of monitor

Fast FB

With fast beam feedbacks: ~ 4 fs rms feasible

Page 10: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Page 10

Ongoing R&D projects

DESY Lab Talk | LLRF Conf. 2019; Chicago | Holger Schlarb, 29.09.2019

Next generation attosecond RF field receiver: Carrier Suppression Interferometer (CSI)

For CW: drift calibration

Poster U. Mavric;

Smith Predictor for LLRF controls

Talk M. Hoffmann; We Talk/Poster A. Bellandi; We/Tu

For CW: QL//Quench detect.

Pilot tone injection carefully studied

Systematic component study …

Architecture tests … etc

Talk L. Springer; WeSee E. Rubiola, FEMTO-ST Institute

-40 dB

< 100as

10Hz-

1MHz

?

Page 11: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Thank youCredits Accelerator Beam Controls team (MSK)

LLRF Leader

Page 12: DESY Lab Talk. · DESY Lab Talk. 2019 LLRF Workshop, Chicago Sept. 29 - Oct. 03 2019 Holger Schlarb, for the DESY LLRF team Chicago, 09/29/2019

Contact

Deutsches

Elektronen-Synchrotron

www.desy.de

Holger Schlarb

MSK

[email protected]

+49 40 8998 94454