FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
DESOTO
Page 1 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HIGHWAYS
Project: ARCADIA TRAFFIC SIGNALS REIMBURSEMENT
FPN: 4136281
Work: TRAFFIC SIGNALS
Length: 0.855
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$239,633 $43,168 $65,736 $46,727 $48,129 $49,573 $51,060DDROPS $544,026
$239,633 $43,168 $65,736 $46,727 $48,129 $49,573 $51,060PROJECT TOTAL: $544,026
Project: BRIDGE REPLACEMENT ON SR 70 OVER DCI
CANAL IN DESOTO COUNTY
FPN: 4361921
Work: PD&E/EMO STUDY
Length: 0.005
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$10,916 $9,084 $0 $0 $0 $0 $0DIHPDE $20,000
$10,916 $9,084 $0 $0 $0 $0 $0PROJECT TOTAL: $20,000
Project: CR 661
FROM SR 70 TO HARDEE COUNTY LINE
FPN: 4318841
Work: RESURFACING
Length: 7.576
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $4,048,269 $0 $0 $0 $0GRSCCST $4,048,269
$0 $0 $4,048,269 $0 $0 $0 $0PROJECT TOTAL: $4,048,269
Project: CR 763
FROM SR 31 TO SR 31
FPN: 4318921
Work: RESURFACING
Length: 9.800
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $122,525 $0 $0 $0 $0GRSCCST $122,525
$0 $0 $601,389 $0 $0 $0 $0SCOPCST $601,389
$0 $0 $4,687,500 $0 $0 $0 $0SCRACST $4,687,500
$0 $0 $5,411,414 $0 $0 $0 $0PROJECT TOTAL: $5,411,414
Project: CR 769 (KINGS HWY)
AT CHARLOTTE COUNTY LINE
FPN: 4301171
Work: MISCELLANEOUS CONSTRUCTION
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $162,916 $0 $0 $0 $0 $0SNCST $162,916
$0 $162,916 $0 $0 $0 $0 $0PROJECT TOTAL: $162,916
Page 2 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: CR 769 (KINGS HWY)
FROM CHARLOTTE CNTY LINE TO PEACE
RIVER STR
FPN: 4312971
Work: PD&E/EMO STUDY
Length: 2.237
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$757,930 $95,068 $0 $0 $0 $0 $0ACSLPDE $852,998
$247,002 $0 $0 $0 $0 $0 $0SLPDE $247,002
$1,004,932 $95,068 $0 $0 $0 $0 $0PROJECT TOTAL: $1,100,000
Project: DESOTO COUNTY
AT VARIOUS LOCATIONS
FPN: 4046791
Work: SIDEWALK
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$126,037 $0 $0 $0 $0 $0 $0CST $126,037
$75,000 $0 $0 $0 $0 $0 $0PE $75,000
$201,037 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $201,037
Project: DESOTO COUNTY
AT VARIOUS LOCATIONS
FPN: 4046792
Work: SIDEWALK
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$112,206 $0 $0 $0 $0 $0 $0CST $112,206
$65,701 $0 $0 $0 $0 $0 $0PE $65,701
$177,907 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $177,907
Project: DESOTO COUNTY
AT VARIOUS LOCATIONS
FPN: 4046793
Work: SIDEWALK
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$115,217 $0 $0 $0 $0 $0 $0CST $115,217
$38,928 $0 $0 $0 $0 $0 $0PE $38,928
$154,145 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $154,145
Project: DESOTO COUNTY
AT VARIOUS LOCATIONS
FPN: 4046794
Work: SIDEWALK
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$117,475 $0 $0 $0 $0 $0 $0CST $117,475
$24,181 $0 $0 $0 $0 $0 $0PE $24,181
$119,400 $0 $0 $0 $0 $0 $0PLN $119,400
$261,056 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $261,056
Page 3 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: DESOTO COUNTY
AT VARIOUS LOCATIONS
FPN: 4046795
Work: SIDEWALK
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$678,216 $0 $0 $0 $0 $0 $0CST $678,216
$63,130 $0 $0 $0 $0 $0 $0PE $63,130
$741,346 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $741,346
Project: DESOTO COUNTY
AT VARIOUS LOCATIONS
FPN: 4046797
Work: SIDEWALK
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$194,695 $665 $0 $0 $0 $0 $0SECST $195,360
$75,855 $0 $0 $0 $0 $0 $0SEPE $75,855
$84,000 $0 $0 $0 $0 $0 $0SEPLN $84,000
$354,550 $665 $0 $0 $0 $0 $0PROJECT TOTAL: $355,215
Project: DESOTO COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4126671
Work: TRAFFIC SIGNALS
Length: 0.162
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$39,535 $7,296 $10,457 $8,126 $8,370 $8,621 $8,880DDROPS $91,285
$39,535 $7,296 $10,457 $8,126 $8,370 $8,621 $8,880PROJECT TOTAL: $91,285
Project: GATEWAY SIGNS
AT VARIOUS LOCATIONS
FPN: 4300581
Work: MISCELLANEOUS CONSTRUCTION
Length: 0.001
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$140,000 $0 $0 $0 $0 $0 $0LFPCST $140,000
$380,700 $129 $0 $0 $0 $0 $0TALTCST $380,829
$520,700 $129 $0 $0 $0 $0 $0PROJECT TOTAL: $520,829
Project: HILLSBOROUGH AVENUE
FROM FLETCHER STREET TO ADEL STREET
FPN: 4366451
Work: RESURFACING
Length: 0.961
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $1,592,234 $0SCRACST $1,592,234
$0 $0 $0 $0 $0 $1,592,234 $0PROJECT TOTAL: $1,592,234
Page 4 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: MASTERS AVENUE
FROM US 17 TO DEAD END
FPN: 4318891
Work: RESURFACING
Length: 3.300
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $1,187,984 $0 $0 $0 $0 $0SCRACST $1,187,984
$0 $1,187,984 $0 $0 $0 $0 $0PROJECT TOTAL: $1,187,984
Project: NW WINDY PINE AVENUE
FROM SR 72 TO END OF ROAD
FPN: 4366491
Work: RESURFACING
Length: 1.046
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $627,724 $0 $0 $0SCRACST $627,724
$0 $0 $0 $627,724 $0 $0 $0PROJECT TOTAL: $627,724
Project: ROBERTS AVENUE EAST GIBSON SREET
NURSING HOME DRIVE
FPN: 4370991
Work: SIDEWALK
Length: 0.310
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $0 $731,787SNCST $731,787
$0 $0 $0 $0 $0 $175,000 $0SNPE $175,000
$0 $0 $0 $0 $0 $175,000 $731,787PROJECT TOTAL: $906,787
Project: SE DURRANCE STREET
FROM AIRPORT ROAD TO SR 31
FPN: 4366471
Work: RESURFACING
Length: 1.086
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $839,179 $0SCRACST $839,179
$0 $0 $0 $0 $0 $839,179 $0PROJECT TOTAL: $839,179
Project: SR 31 EXTENSION
FROM SR 70 TO US 17
FPN: 4312981
Work: NEW ROAD CONSTRUCTION
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $3,000,000 $0 $0 $0 $0CIGPPDE $3,000,000
$0 $0 $0 $0 $0 $1,450,000 $0SAPE $1,450,000
$0 $0 $0 $0 $0 $3,000,000 $0SNPE $3,000,000
$0 $0 $3,000,000 $0 $0 $4,450,000 $0PROJECT TOTAL: $7,450,000
Page 5 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 35 (US 17)
FROM LIVINGSTON STREET TO HARDEE
COUNTY LINE
FPN: 4369201
Work: RESURFACING
Length: 6.971
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $8,426,302 $0 $0 $0 $0DDRCST $8,426,302
$0 $0 $512,500 $0 $0 $0 $0DIHCST $512,500
$0 $0 $6,586,905 $0 $0 $0 $0DSCST $6,586,905
$0 $30,000 $100,000 $0 $0 $0 $0DDRENV $130,000
$5,043 $5,138 $0 $0 $0 $0 $0DIHPE $10,181
$253,346 $0 $0 $0 $0 $0 $0DSPE $253,346
$258,389 $35,138 $15,625,707 $0 $0 $0 $0PROJECT TOTAL: $15,919,234
Project: SR 70
AT CR 760
FPN: 4298431
Work: ADD LEFT TURN LANE(S)
Length: 0.348
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$553,491 $0 $0 $0 $0 $0 $0CIGPCST $553,491
$21,280 $215 $0 $0 $0 $0 $0DIHCST $21,495
$4,739 $0 $0 $0 $0 $0 $0DSCST $4,739
$71,164 $0 $0 $0 $0 $0 $0CIGPPE $71,164
$7,674 $0 $0 $0 $0 $0 $0DIHPE $7,674
$1,801 $0 $0 $0 $0 $0 $0DSPE $1,801
$660,149 $215 $0 $0 $0 $0 $0PROJECT TOTAL: $660,364
Project: SR 70
FROM ORANGE AVE TO TURNER AVE
FPN: 4365801
Work: RESURFACING
Length: 2.393
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $3,886,635 $0 $0 $0DDRCST $3,886,635
$0 $0 $0 $210,600 $0 $0 $0DIHCST $210,600
$0 $0 $0 $449,139 $0 $0 $0DSCST $449,139
$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000
$0 $0 $0 $300,000 $0 $0 $0DDRRRU $300,000
$0 $100,000 $0 $4,846,374 $0 $0 $0PROJECT TOTAL: $4,946,374
Project: SR72
FROM ROGER AVE TO E OF SW GATOR TRAIL
FPN: 4358071
Work: DRAINAGE IMPROVEMENTS
Length: 0.139
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$515 $0 $0 $0 $0 $0 $0DSCST $515
$3,052 $3,537 $0 $0 $0 $0 $0DIHPE $6,589
$51,582 $0 $0 $0 $0 $0 $0DSPE $51,582
$55,149 $3,537 $0 $0 $0 $0 $0PROJECT TOTAL: $58,686
Page 6 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SW FLETCHER ST
FROM US 17 TO HILLSBOROUGH AVE
FPN: 4350601
Work: WIDEN/RESURFACE EXIST LANES
Length: 0.968
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $460,981 $0 $0 $0 $0GRSCCST $460,981
$0 $0 $225,046 $0 $0 $0 $0SCWRCST $225,046
$0 $0 $686,027 $0 $0 $0 $0PROJECT TOTAL: $686,027
Project: SW SHORES AVENUE
FROM SW BEARD STREET TO SW CR 760A
FPN: 4366481
Work: WIDEN/RESURFACE EXIST LANES
Length: 1.250
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $562,349 $0 $0 $0 $0SCEDCST $562,349
$0 $0 $81,423 $0 $0 $0 $0SCOPCST $81,423
$0 $0 $1,022,945 $0 $0 $0 $0SCWRCST $1,022,945
$0 $0 $1,666,717 $0 $0 $0 $0PROJECT TOTAL: $1,666,717
Project: TURNER AVE
AT ROAN ST/GIBSON ST IMPROVEMENTS
FPN: 4350141
Work: INTERSECTION IMPROVEMENT
Length: 0.180
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $906,780 $0 $0SNCST $906,780
$0 $0 $0 $151,000 $0 $0 $0SNPE $151,000
$0 $0 $0 $151,000 $906,780 $0 $0PROJECT TOTAL: $1,057,780
Project: US 17 (SR 35)
AT CHARLOTTE C/L
FPN: 4298391
Work: MISCELLANEOUS CONSTRUCTION
Length: 0.100
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,967 $0 $0 $0 $0 $0 $0DSCST $1,967
$0 $171,916 $0 $0 $0 $0 $0SNCST $171,916
$1,967 $171,916 $0 $0 $0 $0 $0PROJECT TOTAL: $173,883
Page 7 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 17 (SR 35)
FROM 0.4 MI S OF SW COLLINS ST TO SOUTH
OF CR 760A
FPN: 4178761
Work: ADD LANES & RECONSTRUCT
Length: 5.665
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$487,919 $0 $0 $0 $0 $0 $0ACSLCST $487,919
$350,408 $0 $0 $0 $0 $0 $0ACTLCST $350,408
$1,936,870 $0 $0 $0 $0 $0 $0CMCST $1,936,870
$406,594 $0 $0 $0 $0 $0 $0DDRCST $406,594
$91,500 $0 $0 $0 $0 $0 $0DSCST $91,500
$6,191,844 $0 $0 $0 $0 $0 $0SLCST $6,191,844
$2,976,832 $0 $0 $0 $0 $0 $0SNCST $2,976,832
$1,341,078 $87,596 $0 $0 $0 $0 $0TALTCST $1,428,674
$150,000 $0 $0 $0 $0 $0 $0ACSLENV $150,000
$599,758 $0 $0 $0 $0 $0 $0TCSPENV $599,758
$207,791 $0 $0 $0 $0 $0 $0DDRPE $207,791
$215,556 $0 $0 $0 $0 $0 $0DIHPE $215,556
$19,184 $0 $0 $0 $0 $0 $0DSPE $19,184
$2,637,997 $0 $0 $0 $0 $0 $0GMRPE $2,637,997
$111,122 $0 $0 $0 $0 $0 $0TCSPPE $111,122
$13,989 $112,319 $0 $0 $0 $0 $0ACNPROW $126,308
$4,804,529 $44,815 $0 $0 $0 $0 $0NHROW $4,849,344
$214,321 $391,463 $0 $0 $0 $0 $0NHPPROW $605,784
$112,868 $0 $0 $0 $0 $0 $0LFRRU $112,868
$1,490,684 $0 $0 $0 $0 $0 $0LFDRRU $1,490,684
$24,360,844 $636,193 $0 $0 $0 $0 $0PROJECT TOTAL: $24,997,037
Project: US 17 (SR 35)
FROM 0.4 MI S OF SW COLLINS ST TO SOUTH
OF CR 760A
FPN: 4178762
Work: SIGNING/PAVEMENT MARKINGS
Length: 5.913
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$127,000 $51,709 $0 $0 $0 $0 $0DDRCST $178,709
$217 $35,748 $0 $0 $0 $0 $0DIHCST $35,965
$127,217 $87,457 $0 $0 $0 $0 $0PROJECT TOTAL: $214,674
Project: US 17 / SR 35 NB
FROM PALMETTO ST TO DESOTO AVENUE
FPN: 4291101
Work: RESURFACING
Length: 1.806
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,730,001 $7,525 $0 $0 $0 $0 $0DDRCST $1,737,526
$194 $10,060 $0 $0 $0 $0 $0DIHCST $10,254
$1,388 $0 $0 $0 $0 $0 $0DSCST $1,388
$9,023 $0 $0 $0 $0 $0 $0DIHPE $9,023
$231,455 $0 $0 $0 $0 $0 $0DSPE $231,455
$1,972,061 $17,585 $0 $0 $0 $0 $0PROJECT TOTAL: $1,989,646
Page 8 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 17 / SR 35 SB
FROM US 17 NB TO PALMETTO ST
FPN: 4291091
Work: RESURFACING
Length: 1.751
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,461 $20,039 $0 $0 $0 $0 $0DIHCST $21,500
$1,773,398 $35,286 $0 $0 $0 $0 $0DSCST $1,808,684
$20,726 $0 $0 $0 $0 $0 $0DIHPE $20,726
$233,432 $0 $0 $0 $0 $0 $0DSPE $233,432
$2,029,017 $55,325 $0 $0 $0 $0 $0PROJECT TOTAL: $2,084,342
Project: US 17
FROM CR 760A (NOCATEE) TO HEARD STREET
FPN: 1938981
Work: PRELIMINARY ENGINEERING
Length: 4.308
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$14,447 $0 $0 $0 $0 $0 $0PE $14,447
$14,447 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $14,447
Page 9 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 17
FROM CR 760A (NOCATEE) TO HEARD STREET
FPN: 1938982
Work: ADD LANES & REHABILITATE PVMNT
Length: 4.400
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $186,871 $0 $0 $0 $0 $0ACNPCST $186,871
$8,255,758 $14,764 $0 $0 $0 $0 $0DISCST $8,270,522
$93,990 $0 $0 $0 $0 $0 $0DSCST $93,990
$17,182,247 $138,273 $0 $0 $0 $0 $0NHPPCST $17,320,520
$100,000 $0 $0 $0 $0 $0 $0ACNPENV $100,000
$881,624 $0 $0 $0 $0 $0 $0ACSLENV $881,624
$233,103 $0 $0 $0 $0 $0 $0SLENV $233,103
$250,000 $0 $0 $0 $0 $0 $0TCSPENV $250,000
$0 $0 $600,000 $0 $0 $0 $0ACNPINC $600,000
$2,092,195 $0 $0 $0 $0 $0 $0DDRPE $2,092,195
$411,407 $0 $0 $0 $0 $0 $0DIHPE $411,407
$1,504,261 $0 $0 $0 $0 $0 $0DSPE $1,504,261
$525,984 $0 $0 $0 $0 $0 $0TCSPPE $525,984
$44,704 $67,589 $0 $0 $0 $0 $0ACSLROW $112,293
$1 $79,999 $0 $0 $0 $0 $0ACSNROW $80,000
$961,258 $37,603 $0 $0 $0 $0 $0BNDSROW $998,861
$4,533,617 $574,767 $0 $0 $0 $0 $0BNIRROW $5,108,384
$1,010,838 $17,995 $0 $0 $0 $0 $0DIHROW $1,028,833
$259,315 $0 $0 $0 $0 $0 $0DSROW $259,315
$1,636,446 $0 $0 $0 $0 $0 $0EBROW $1,636,446
$5,373,296 $0 $0 $0 $0 $0 $0SAROW $5,373,296
$4,991,160 $0 $0 $0 $0 $0 $0SLROW $4,991,160
$5,830,073 $41,692 $0 $0 $0 $0 $0SNROW $5,871,765
$391,950 $0 $0 $0 $0 $0 $0TALTROW $391,950
$291,536 $0 $0 $0 $0 $0 $0TCSPROW $291,536
$925,333 $0 $0 $0 $0 $0 $0DDRRRU $925,333
$4,339,216 $495,973 $0 $0 $0 $0 $0LFRRU $4,835,189
$164,857 $0 $0 $0 $0 $0 $0LFDRRU $164,857
$62,284,169 $1,655,526 $600,000 $0 $0 $0 $0PROJECT TOTAL: $64,539,695
$95,469,166 $4,269,202 $31,114,327 $5,679,951 $963,279 $7,114,607 $791,727
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:
$145,402,259
ALL YEARS
Page 10 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FIXED CAPITAL OUTLAY
Project: ARCADIA OPERATIONS CENTER
FPN: 4353951
Work: FIXED CAPITAL OUTLAY
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$180,258 $6,400 $0 $0 $0 $0 $0FCOCST $186,658
$180,258 $6,400 $0 $0 $0 $0 $0PROJECT TOTAL: $186,658
$180,258 $6,400 $0 $0 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FIXED CAPITAL
OUTLAY TOTAL: $186,658
ALL YEARS
Page 11 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: TRANSIT
Project: DESOTO COUNTY FTA SECTION 5311
OPERATING ASSISTANCE
FPN: 4101211
Work: OPERATING/ADMIN. ASSISTANCE
Length: 0.000
Comments: SECTION 5311 RURAL AND SMALL AREAS PARATRANSIT OPERATING
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$966,173 $188,817 $170,432 $170,432 $170,432 $134,317 $0DUOPS $1,800,603
$966,173 $188,817 $170,432 $170,432 $170,432 $134,317 $0LFOPS $1,800,603
$1,932,346 $377,634 $340,864 $340,864 $340,864 $268,634 $0PROJECT TOTAL: $3,601,206
$1,932,346 $377,634 $340,864 $340,864 $340,864 $268,634 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT
TOTAL: $3,601,206
ALL YEARS
$97,581,770 $4,653,236 $31,455,191 $6,020,815 $1,304,143 $7,383,241 $791,727
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16DESOTO TOTAL:
$149,190,123
ALL YEARS
Page 12 of 12
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
GLADES
Page 1 of 7
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HIGHWAYS
Project: 6TH STREET
FROM AVENUE A TO THATCHER BLVD
FPN: 4389241
Work: RESURFACING
Length: 1.035
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $135,990 $0 $0 $0 $0 $0LFCST $135,990
$0 $407,970 $0 $0 $0 $0 $0SCRCCST $407,970
$0 $543,960 $0 $0 $0 $0 $0PROJECT TOTAL: $543,960
Project: AVENUE R
FROM RIVERSIDE DRIVE TO WEST AVENUE
FPN: 4389231
Work: RESURFACING
Length: 0.774
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $106,132 $0 $0 $0 $0 $0LFCST $106,132
$0 $318,395 $0 $0 $0 $0 $0SCRCCST $318,395
$0 $424,527 $0 $0 $0 $0 $0PROJECT TOTAL: $424,527
Project: BIRCHWOOD PARKWAY
FROM HENDRY COUNTY LINE TO DEAD END
FPN: 4318901
Work: RESURFACING
Length: 2.624
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $860,198 $0 $0 $0 $0 $0SCRACST $860,198
$0 $860,198 $0 $0 $0 $0 $0PROJECT TOTAL: $860,198
Project: CR 74
FROM 2.5 MI E OF FIRETOWER TO SR 29
FPN: 4366571
Work: WIDEN/RESURFACE EXIST LANES
Length: 5.190
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $3,668,025 $0 $0GRSCCST $3,668,025
$0 $0 $0 $0 $1,778,278 $0 $0SCWRCST $1,778,278
$0 $0 $0 $0 $5,446,303 $0 $0PROJECT TOTAL: $5,446,303
Project: GLADES COUNTY SCOUR COUNTERMEASURE
AT VARIOUS LOCATIONS
FPN: 4350281
Work: BRIDGE-REPAIR/REHABILITATION
Length: 4.706
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$339,135 $0 $0 $0 $0 $0 $0BRRPCST $339,135
$341 $18,915 $0 $0 $0 $0 $0DIHCST $19,256
$12,770 $0 $0 $0 $0 $0 $0DSCST $12,770
$62,632 $0 $0 $0 $0 $0 $0BRRPPE $62,632
$5,584 $0 $0 $0 $0 $0 $0DIHPE $5,584
$420,462 $18,915 $0 $0 $0 $0 $0PROJECT TOTAL: $439,377
Page 2 of 7
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: GLADES COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4126681
Work: TRAFFIC SIGNALS
Length: 0.100
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$32,900 $8,512 $10,337 $9,479 $9,764 $10,057 $10,358DDROPS $91,407
$32,900 $8,512 $10,337 $9,479 $9,764 $10,057 $10,358PROJECT TOTAL: $91,407
Project: LOST TRAIL
FPN: 4281441
Work: BIKE PATH/TRAIL
Length: 4.039
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$549,408 $0 $0 $0 $0 $0 $0ACTNCST $549,408
$48,027 $0 $0 $0 $0 $0 $0TALLCST $48,027
$237,419 $0 $0 $0 $0 $0 $0TALNCST $237,419
$253,308 $1,988 $0 $0 $0 $0 $0ACTNPE $255,296
$1,088,162 $1,988 $0 $0 $0 $0 $0PROJECT TOTAL: $1,090,150
Project: LOST TRAIL OVER HARNEY POND PEDESTRIAN
BRIDGE
FPN: 4351031
Work: BIKE PATH/TRAIL
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $616,322 $0 $0SNPE $616,322
$0 $0 $0 $0 $616,322 $0 $0PROJECT TOTAL: $616,322
Project: MOORE HAVEN ELEMENTARY SCHOOL
FPN: 4328971
Work: SIDEWALK
Length: 0.100
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $96,346 $0 $0 $0 $0TALLCST $96,346
$0 $0 $157,666 $0 $0 $0 $0TALNCST $157,666
$90,600 $1,645 $0 $0 $0 $0 $0TALLPE $92,245
$90,600 $1,645 $254,012 $0 $0 $0 $0PROJECT TOTAL: $346,257
Project: MOORE HAVEN TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4139851
Work: TRAFFIC SIGNALS
Length: 0.100
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$17,188 $7,296 $9,061 $8,126 $8,370 $8,621 $8,880DDROPS $67,542
$17,188 $7,296 $9,061 $8,126 $8,370 $8,621 $8,880PROJECT TOTAL: $67,542
Page 3 of 7
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 25 (US 27)
AT BRONSON ROAD
FPN: 4357691
Work: INTERSECTION IMPROVEMENT
Length: 0.426
Comments: ADD RIGHT TURN LANE AND TWO LEFT TURN LANES CLOSE THE MEDIAN OPENING LOCATED EAST OF BRONSON
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,098 $50,297 $0 $0 $0 $0 $0DIHCST $51,395
$876,391 $484 $0 $0 $0 $0 $0DSCST $876,875
$14,933 $0 $0 $0 $0 $0 $0DIHPE $14,933
$311,595 $0 $0 $0 $0 $0 $0DSPE $311,595
$1,204,017 $50,781 $0 $0 $0 $0 $0PROJECT TOTAL: $1,254,798
Project: SR 25 (US 27)
FROM OLD 27 TO 5TH STREET
FPN: 4349631
Work: RESURFACING
Length: 1.294
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $28,537 $0 $0 $0 $0DIHCST $28,537
$0 $0 $2,010,800 $0 $0 $0 $0DSCST $2,010,800
$31,174 $70,872 $0 $0 $0 $0 $0DIHPE $102,046
$79,031 $0 $0 $0 $0 $0 $0DSPE $79,031
$110,205 $70,872 $2,039,337 $0 $0 $0 $0PROJECT TOTAL: $2,220,414
Project: SR 25/US 27
AT SR29
FPN: 4358201
Work: LIGHTING
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$4,267 $21,088 $0 $0 $0 $0 $0DIHCST $25,355
$191,550 $0 $0 $0 $0 $0 $0DSCST $191,550
$33,300 $0 $0 $0 $0 $0 $0DSRRU $33,300
$229,117 $21,088 $0 $0 $0 $0 $0PROJECT TOTAL: $250,205
Project: SR 29
FROM BERMONT RD (CR 74) TO US 27
FPN: 4178786
Work: ADD LANES & RECONSTRUCT
Length: 0.764
Comments: INCLUDES POSSIBLE INTERCHANGE AT US 27
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $5,275,000 $0 $0ACNPPE $5,275,000
$0 $0 $0 $0 $5,275,000 $0 $0PROJECT TOTAL: $5,275,000
Project: SR 29
FROM WHIDDEN RD (CR 731) TO BERMONT RD
(CR 74)
FPN: 4178789
Work: ADD LANES & RECONSTRUCT
Length: 11.673
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $2,050,000 $0 $0ACNPPE $2,050,000
$0 $0 $0 $0 $2,050,000 $0 $0PROJECT TOTAL: $2,050,000
Page 4 of 7
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 78
AT VARIOUS LOCATIONS
FPN: 4390301
Work: DRAINAGE IMPROVEMENTS
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000
$0 $5,000 $0 $0 $0 $0 $0PROJECT TOTAL: $5,000
Project: SR 78
FROM CANAL BOAT RAMP TO OKEECHOBEE
C/L
FPN: 4291011
Work: RESURFACING
Length: 8.813
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$771 $94,591 $0 $0 $0 $0 $0DSCST $95,362
$0 $5,064,315 $0 $0 $0 $0 $0SACST $5,064,315
$97,530 $5,763 $0 $0 $0 $0 $0DIHPE $103,293
$3,969 $0 $0 $0 $0 $0 $0DSPE $3,969
$102,270 $5,164,669 $0 $0 $0 $0 $0PROJECT TOTAL: $5,266,939
Project: SR 78
FROM N OF CANAL ROAD TO S OF KILPATRICK
DR
FPN: 4366831
Work: RAIL SAFETY PROJECT
Length: 0.076
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $10,250 $0 $0 $0 $0DIHCST $10,250
$0 $0 $0 $433,932 $0 $0 $0SNCST $433,932
$0 $10,000 $0 $0 $0 $0 $0DIHPE $10,000
$20,245 $155,000 $0 $0 $0 $0 $0DSPE $175,245
$0 $0 $50,000 $0 $0 $0 $0DSRRU $50,000
$20,245 $165,000 $60,250 $433,932 $0 $0 $0PROJECT TOTAL: $679,427
Project: SR 78 SIDEWALKS
AT VARIOUS LOCATIONS
FPN: 4370881
Work: SIDEWALK
Length: 1.370
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $200,000 $0SNPE $200,000
$0 $0 $0 $0 $0 $200,000 $0PROJECT TOTAL: $200,000
Project: US 27 (SR 25)
FROM S OF SCFE CROSSING TO N OF SCFE
CROSSING
FPN: 4349471
Work: RAIL SAFETY PROJECT
Length: 0.284
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $157,022 $0 $0 $0DIHCST $157,022
$0 $0 $0 $718,380 $0 $0 $0DSCST $718,380
$0 $0 $0 $453,194 $0 $0 $0SACST $453,194
$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000
$23,741 $21,606 $0 $0 $0 $0 $0DSPE $45,347
$0 $0 $100,000 $0 $0 $0 $0DSRRU $100,000
$23,741 $121,606 $100,000 $1,328,596 $0 $0 $0PROJECT TOTAL: $1,573,943
Page 5 of 7
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 27
AT 6TH STREET AND AT 7TH STREET
FPN: 4302621
Work: ADD TURN LANE(S)
Length: 0.078
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$584,253 $0 $0 $0 $0 $0 $0EM11CST $584,253
$10,000 $40,000 $0 $0 $0 $0 $0DSENV $50,000
$166,115 $0 $0 $0 $0 $0 $0EM11PE $166,115
$760,368 $40,000 $0 $0 $0 $0 $0PROJECT TOTAL: $800,368
Project: US27/SR25 OVER CALOOSAHATCHEE RIVER
FPN: 4360041
Work: BRIDGE-REPAIR/REHABILITATION
Length: 0.437
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$260,177 $0 $0 $0 $0 $0 $0BRRPCST $260,177
$2,171 $38,843 $0 $0 $0 $0 $0DIHCST $41,014
$7,854 $0 $0 $0 $0 $0 $0DSCST $7,854
$3,131 $0 $0 $0 $0 $0 $0DIHPE $3,131
$273,333 $38,843 $0 $0 $0 $0 $0PROJECT TOTAL: $312,176
Project: VANCE WHIDDEN PARK
FPN: 4281451
Work: BIKE PATH/TRAIL
Length: 0.000
Comments: GLADES COUNTY #1 ENHANCEMENT PROJECT
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$588,409 $0 $0 $0 $0 $0 $0ACTLCST $588,409
$149,896 $16,193 $0 $0 $0 $0 $0TALLCST $166,089
$189,896 $0 $0 $0 $0 $0 $0SEPE $189,896
$928,201 $16,193 $0 $0 $0 $0 $0PROJECT TOTAL: $944,394
Project: VANCE WHIDDEN PARK
FPN: 4281452
Work: BIKE PATH/TRAIL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$318,967 $0 $0 $0 $0 $0 $0DSB $318,967
$318,967 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $318,967
$5,619,776 $7,561,093 $2,472,997 $1,780,133 $13,405,759 $218,678 $19,238
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:
$31,077,674
ALL YEARS
Page 6 of 7
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: TRANSIT
Project: 5310 OPERATING ASSISTANCE FOR GOOD
WHEELS INC GLADES/HENDRY
FPN: 4389611
Work: OPERATING FOR FIXED ROUTE
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $115,638 $0 $0 $0 $0 $0DUOPS $115,638
$0 $115,638 $0 $0 $0 $0 $0LFOPS $115,638
$0 $231,276 $0 $0 $0 $0 $0PROJECT TOTAL: $231,276
Project: GLADES/HENDRY CO GOOD WHEELS INC FTA
SECT 5311 OPERATING ASSISTANCE
FPN: 4101221
Work: OPERATING/ADMIN. ASSISTANCE
Length: 0.000
Comments: SECTION 5311 RURAL AND SMALL AREAS PARATRANSIT OPERATING PARATRANSIT OPERATING
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$494,922 $50,000 $50,000 $50,000 $50,000 $50,000 $0DUOPS $744,922
$494,922 $50,000 $50,000 $50,000 $50,000 $50,000 $0LFOPS $744,922
$989,844 $100,000 $100,000 $100,000 $100,000 $100,000 $0PROJECT TOTAL: $1,489,844
$989,844 $331,276 $100,000 $100,000 $100,000 $100,000 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT
TOTAL: $1,721,120
ALL YEARS
$6,609,620 $7,892,369 $2,572,997 $1,880,133 $13,505,759 $318,678 $19,238
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16GLADES TOTAL:
$32,798,794
ALL YEARS
Page 7 of 7
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HARDEE
Page 1 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HIGHWAYS
Project: BOWLING GREEN TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4269131
Work: TRAFFIC SIGNALS
Length: 0.002
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$8,528 $3,648 $5,229 $4,063 $4,185 $4,311 $4,440DDROPS $34,404
$8,528 $3,648 $5,229 $4,063 $4,185 $4,311 $4,440PROJECT TOTAL: $34,404
Project: CHESTER AVE
FROM DOC COIL RD TO W. GRAPE ST
FPN: 4349841
Work: SIDEWALK
Length: 0.800
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $320,884 $0 $0 $0TALLCST $320,884
$0 $0 $0 $368,067 $0 $0 $0TALNCST $368,067
$0 $0 $0 $26,063 $0 $0 $0TALTCST $26,063
$0 $175,000 $0 $0 $0 $0 $0ACTNPE $175,000
$0 $12,000 $0 $0 $0 $0 $0TALNPE $12,000
$0 $187,000 $0 $715,014 $0 $0 $0PROJECT TOTAL: $902,014
Project: CR 663
FROM SR 64 TO SR 62
FPN: 4366541
Work: RESURFACING
Length: 7.856
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $4,334,595 $0GRSCCST $4,334,595
$0 $0 $0 $0 $0 $595,010 $0SCOPCST $595,010
$0 $0 $0 $0 $0 $4,929,605 $0PROJECT TOTAL: $4,929,605
Project: CR 665
FROM CR 663 TO SR 64
FPN: 4350621
Work: WIDEN/RESURFACE EXIST LANES
Length: 13.813
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $3,652,215 $0 $0 $0GRSCCST $3,652,215
$0 $0 $0 $3,892,393 $0 $0 $0SCRACST $3,892,393
$0 $0 $0 $1,744,627 $0 $0 $0SCWRCST $1,744,627
$0 $0 $0 $9,289,235 $0 $0 $0PROJECT TOTAL: $9,289,235
Project: CR664 BRIDGE #060034 OVER LITTLE PAYNE
CREEK
FPN: 4358301
Work: BRIDGE REPLACEMENT
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $1,476,206 $0ACSBCST $1,476,206
$0 $0 $0 $0 $0 $300,000 $0ACSBPE $300,000
$0 $0 $0 $0 $0 $1,776,206 $0PROJECT TOTAL: $1,776,206
Page 2 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: DOYLE PARKER AVE
FROM COUNTYLINE RD TO US 17
FPN: 4331931
Work: SIDEWALK
Length: 0.810
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $308,681 $0 $0 $0 $0 $0TALLCST $308,681
$113,335 $1,328 $0 $0 $0 $0 $0TALLPE $114,663
$113,335 $310,009 $0 $0 $0 $0 $0PROJECT TOTAL: $423,344
Project: GRIFFIN ROAD BRIDGE NUMBER 060030 OVER
PEACE RIVER
FPN: 4331921
Work: BRIDGE REPLACEMENT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $330,000 $0 $0 $0SNPDE $330,000
$0 $0 $0 $330,000 $0 $0 $0PROJECT TOTAL: $330,000
Project: HARDEE COUNTY SCOUR COUNTERMEASURE
AT VARIOUS LOCATIONS
FPN: 4350381
Work: BRIDGE-REPAIR/REHABILITATION
Length: 0.041
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $163,693 $0 $0 $0 $0 $0BRRPCST $163,693
$0 $23,292 $0 $0 $0 $0 $0DIHCST $23,292
$61,009 $0 $0 $0 $0 $0 $0BRRPPE $61,009
$1,973 $2,468 $0 $0 $0 $0 $0DIHPE $4,441
$62,982 $189,453 $0 $0 $0 $0 $0PROJECT TOTAL: $252,435
Project: HARDEE COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4126691
Work: TRAFFIC SIGNALS
Length: 1.830
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$20,490 $4,864 $6,507 $5,418 $5,581 $5,748 $5,921DDROPS $54,529
$20,490 $4,864 $6,507 $5,418 $5,581 $5,748 $5,921PROJECT TOTAL: $54,529
Project: MARTIN LUTHER KING JR BLVD
FROM JONES STREET TO GRAPE STREET
FPN: 4298161
Work: SIDEWALK
Length: 0.156
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $166,418 $0 $0 $0 $0 $0ACTLCST $166,418
$58,087 $0 $0 $0 $0 $0 $0TALLPE $58,087
$4,851 $850 $0 $0 $0 $0 $0TALTPE $5,701
$62,938 $167,268 $0 $0 $0 $0 $0PROJECT TOTAL: $230,206
Page 3 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SCHOOL HOUSE RD
FROM SR 64 TO STATE RD 66
FPN: 4349831
Work: SIDEWALK
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $191,870 $0 $0TALNCST $191,870
$0 $0 $105,000 $0 $0 $0 $0TALNPE $105,000
$0 $0 $105,000 $0 $191,870 $0 $0PROJECT TOTAL: $296,870
Project: SR 35 (US 17)
FROM S OF 3RD ST E TO RV PARK ENT
FPN: 4365861
Work: RESURFACING
Length: 0.925
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $25,000 $0 $0 $0DDRCST $25,000
$0 $0 $0 $116,469 $0 $0 $0DIHCST $116,469
$0 $0 $0 $889,077 $0 $0 $0SACST $889,077
$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000
$0 $100,000 $0 $1,030,546 $0 $0 $0PROJECT TOTAL: $1,130,546
Project: SR 64
AT CR 663
FPN: 4345031
Work: SIDEWALK
Length: 0.183
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $5,049 $0 $0 $0 $0 $0DDRCST $5,049
$0 $143,714 $0 $0 $0 $0 $0HSPCST $143,714
$0 $10,270 $0 $0 $0 $0 $0SNCST $10,270
$101,003 $9,617 $0 $0 $0 $0 $0TALNPE $110,620
$101,003 $168,650 $0 $0 $0 $0 $0PROJECT TOTAL: $269,653
Project: SR 64
AT SR 636
FPN: 4313401
Work: INTERSECTION IMPROVEMENT
Length: 0.601
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $46,125 $0 $0 $0 $0DDRCST $46,125
$1,027 $0 $0 $0 $0 $0 $0DSCST $1,027
$0 $0 $1,135,173 $0 $0 $0 $0SNCST $1,135,173
$56,566 $10,485 $0 $0 $0 $0 $0DIHPE $67,051
$87,774 $0 $0 $0 $0 $0 $0DSPE $87,774
$80,549 $52 $0 $0 $0 $0 $0DDRROW $80,601
$31,627 $3,840 $0 $0 $0 $0 $0DIHROW $35,467
$257,543 $14,377 $1,181,298 $0 $0 $0 $0PROJECT TOTAL: $1,453,218
Project: SR 64
FROM MANATEE CO. LINE TO W MAIN ST
FPN: 4365871
Work: RESURFACING
Length: 11.774
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $315,900 $0 $0 $0DIHCST $315,900
$0 $0 $0 $7,518,822 $0 $0 $0DSCST $7,518,822
$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000
$0 $100,000 $0 $7,834,722 $0 $0 $0PROJECT TOTAL: $7,934,722
Page 4 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 64
FROM PEAR ST TO EAST OF CRACKER TRAIL
FPN: 4319381
Work: DRAINAGE IMPROVEMENTS
Length: 0.255
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$857,793 $0 $0 $0 $0 $0 $0DDRCST $857,793
$98,598 $77,749 $0 $0 $0 $0 $0DIHCST $176,347
$1,597,340 $0 $0 $0 $0 $0 $0DSCST $1,597,340
$9,938 $0 $0 $0 $0 $0 $0DIHPE $9,938
$5,912 $0 $0 $0 $0 $0 $0DSPE $5,912
$2,569,581 $77,749 $0 $0 $0 $0 $0PROJECT TOTAL: $2,647,330
Project: SR 64
FROM W OF CR 663 TO E OF CR 663
FPN: 4349571
Work: RAIL SAFETY PROJECT
Length: 0.076
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $64,072 $0 $0 $0 $0DIHCST $64,072
$36 $0 $377,395 $0 $0 $0 $0DSCST $377,431
$0 $20,000 $0 $0 $0 $0 $0DDRENV $20,000
$0 $0 $80,000 $0 $0 $0 $0DSENV $80,000
$19,457 $10,985 $0 $0 $0 $0 $0DIHPE $30,442
$0 $495,000 $0 $0 $0 $0 $0DDRRRU $495,000
$19,493 $525,985 $521,467 $0 $0 $0 $0PROJECT TOTAL: $1,066,945
Project: US 17 (SR 35) BELL STREET TO S. POLK
STREET
FPN: 4344601
Work: DRAINAGE IMPROVEMENTS
Length: 0.161
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$39,272 $189 $0 $0 $0 $0 $0DIHCST $39,461
$623,828 $0 $0 $0 $0 $0 $0DSCST $623,828
$5,488 $0 $0 $0 $0 $0 $0DIHPE $5,488
$1,118 $0 $0 $0 $0 $0 $0DSPE $1,118
$669,706 $189 $0 $0 $0 $0 $0PROJECT TOTAL: $669,895
Project: US 17 (SR 35)
FROM CR 634 TO 7TH AVENUE
FPN: 4206334
Work: SIGNING/PAVEMENT MARKINGS
Length: 5.929
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$143,817 $0 $0 $0 $0 $0 $0CST $143,817
$143,817 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $143,817
Page 5 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 17
FROM DESOTO C/L TO CR 634 (SWEETWATER
RD)
FPN: 4145471
Work: ADD LANES & RECONSTRUCT
Length: 4.952
Comments: TWO NEW BRIDGES: 060061 AND 060062
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $31,351,314 $0 $0 $0 $0 $0DICST $31,351,314
$0 $54,461 $0 $0 $0 $0 $0DIHCST $54,461
$1,588 $0 $0 $0 $0 $0 $0DSCST $1,588
$0 $223,083 $0 $0 $0 $0 $0ACSLENV $223,083
$2,424,454 $0 $0 $0 $0 $0 $0EBENV $2,424,454
$0 $476,917 $0 $0 $0 $0 $0SLENV $476,917
$0 $0 $0 $800,000 $0 $0 $0DIINC $800,000
$304,129 $12,110 $0 $0 $0 $0 $0DIHPE $316,239
$21,668 $0 $0 $0 $0 $0 $0DSPE $21,668
$10,684 $0 $0 $0 $0 $0 $0HPPPE $10,684
$3,780,514 $0 $0 $0 $0 $0 $0SAPE $3,780,514
$311,220 $0 $0 $0 $0 $0 $0TCSPPE $311,220
$0 $25,913 $0 $0 $0 $0 $0ACSLROW $25,913
$11,005 $349,885 $0 $0 $0 $0 $0BNDSROW $360,890
$231,515 $18,109 $0 $0 $0 $0 $0DIHROW $249,624
$646,258 $0 $0 $0 $0 $0 $0DSROW $646,258
$2,106,090 $65,884 $0 $0 $0 $0 $0SLROW $2,171,974
$22,727 $0 $0 $0 $0 $0 $0ACSLRRU $22,727
$0 $900,000 $0 $0 $0 $0 $0DIRRU $900,000
$9,871,852 $33,477,676 $0 $800,000 $0 $0 $0PROJECT TOTAL: $44,149,528
Project: US 17
FROM KD REVELL RD TO REA ROAD
FPN: 4313411
Work: SIDEWALK
Length: 0.592
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $10,421 $0 $0 $0 $0 $0DDRCST $10,421
$256 $0 $0 $0 $0 $0 $0DSCST $256
$0 $267,982 $0 $0 $0 $0 $0SNCST $267,982
$13,546 $0 $0 $0 $0 $0 $0ACTLPE $13,546
$89,711 $6,785 $0 $0 $0 $0 $0TALLPE $96,496
$103,513 $285,188 $0 $0 $0 $0 $0PROJECT TOTAL: $388,701
Page 6 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 17
FROM S OF WEST 9TH STREET TO N OF WEST
3RD STREET(ZOLFO SPRINGS)
FPN: 4206333
Work: ADD LANES & RECONSTRUCT
Length: 1.111
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $4,967,825 $0 $0 $0 $0ACNPCST $4,967,825
$0 $0 $6,958,748 $0 $0 $0 $0DDRCST $6,958,748
$0 $0 $103,257 $0 $0 $0 $0DIHCST $103,257
$12,870 $0 $0 $0 $0 $0 $0DSCST $12,870
$0 $0 $1,052,154 $0 $0 $0 $0SNCST $1,052,154
$0 $200,000 $0 $0 $0 $0 $0SNENV $200,000
$0 $0 $0 $440,000 $0 $0 $0ACNPINC $440,000
$143,496 $0 $0 $0 $0 $0 $0ACSAPE $143,496
$176,273 $22,579 $0 $0 $0 $0 $0DIHPE $198,852
$1,666,572 $0 $0 $0 $0 $0 $0EBPE $1,666,572
$16,843 $0 $0 $0 $0 $0 $0SAPE $16,843
$215,696 $1,857,885 $0 $0 $0 $0 $0ACSLROW $2,073,581
$1,817,348 $0 $0 $0 $0 $0 $0SLROW $1,817,348
$0 $0 $300,000 $0 $0 $0 $0LFRRU $300,000
$0 $0 $500,000 $0 $0 $0 $0LFDRRU $500,000
$4,049,098 $2,080,464 $13,881,984 $440,000 $0 $0 $0PROJECT TOTAL: $20,451,546
Project: US 17
FROM SOUTH OF CR 634 TO 7TH AVENUE
FPN: 4206331
Work: ADD LANES & RECONSTRUCT
Length: 5.548
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$19,403,652 $0 $0 $0 $0 $0 $0CST $19,403,652
$2,417,934 $0 $0 $0 $0 $0 $0ENV $2,417,934
$3,830,688 $0 $0 $0 $0 $0 $0PE $3,830,688
$3,832,943 $0 $0 $0 $0 $0 $0ROW $3,832,943
$73,913 $0 $0 $0 $0 $0 $0RRU $73,913
$29,559,130 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $29,559,130
Project: WAUCHULA TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4136301
Work: TRAFFIC SIGNALS
Length: 3.468
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$115,218 $25,384 $37,838 $28,275 $29,123 $29,997 $30,897DDROPS $296,732
$115,218 $25,384 $37,838 $28,275 $29,123 $29,997 $30,897PROJECT TOTAL: $296,732
Page 7 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: ZOLFO SPRINGS STREETS
AT VARIOUS LOCATIONS
FPN: 4389261
Work: RESURFACING
Length: 0.800
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $66,101 $0 $0 $0 $0 $0LFCST $66,101
$0 $198,300 $0 $0 $0 $0 $0SCRCCST $198,300
$0 $264,401 $0 $0 $0 $0 $0PROJECT TOTAL: $264,401
Project: ZOLFO SPRINGS TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4136311
Work: TRAFFIC SIGNALS
Length: 0.207
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$30,540 $3,648 $9,729 $8,698 $8,959 $9,228 $9,505DDROPS $80,307
$30,540 $3,648 $9,729 $8,698 $8,959 $9,228 $9,505PROJECT TOTAL: $80,307
$47,758,767 $37,985,953 $15,749,052 $20,485,971 $239,718 $6,755,095 $50,763
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:
$129,025,319
ALL YEARS
Page 8 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: AVIATION
Project: WAUCHULA MUNICIPAL AIRPORT
FPN: 4255121
Work: AVIATION SAFETY PROJECT
Length: 0.000
Comments: INSTALL PERIMETER SECURITY FENCE
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$409,500 $7,928 $0 $0 $0 $0 $0DPTOCAP $417,428
$409,500 $7,928 $0 $0 $0 $0 $0PROJECT TOTAL: $417,428
Project: WAUCHULA MUNICIPAL AIRPORT CAPITAL
IMPROVEMENTS
FPN: 4348181
Work: AVIATION CAPACITY PROJECT
Length: 0.000
Comments: APRON EXPANSION DESIGN AND CONSTRUCTION
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $400,000 $0 $0DPTOCAP $400,000
$0 $0 $0 $0 $100,000 $0 $0LFCAP $100,000
$0 $0 $0 $0 $500,000 $0 $0PROJECT TOTAL: $500,000
Project: WAUCHULA MUNICIPAL APT DESIGN AND CNST
ACCESS RD EXTENSION
FPN: 4370651
Work: AVIATION CAPACITY PROJECT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$60,000 $500,000 $0 $0 $0 $0 $0DDRCAP $560,000
$60,000 $500,000 $0 $0 $0 $0 $0PROJECT TOTAL: $560,000
$469,500 $507,928 $0 $0 $500,000 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION
TOTAL: $1,477,428
ALL YEARS
$48,228,267 $38,493,881 $15,749,052 $20,485,971 $739,718 $6,755,095 $50,763
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HARDEE TOTAL:
$130,502,747
ALL YEARS
Page 9 of 9
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HENDRY
Page 1 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HIGHWAYS
Project: CITY OF LABELLE HARDSCAPE AND ENTRY
SIGNS
FPN: 4313181
Work: MISCELLANEOUS CONSTRUCTION
Length: 2.773
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $8,656 $0 $0DDRCST $8,656
$0 $0 $0 $0 $14,908 $0 $0SACST $14,908
$0 $0 $0 $0 $460,724 $0 $0SNCST $460,724
$0 $0 $40,000 $0 $0 $0 $0SAPE $40,000
$0 $0 $5,000 $90,000 $0 $0 $0SNPE $95,000
$0 $0 $45,000 $90,000 $484,288 $0 $0PROJECT TOTAL: $619,288
Project: CLEWISTON TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4136321
Work: TRAFFIC SIGNALS
Length: 1.600
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$94,066 $19,456 $29,429 $22,320 $22,990 $23,679 $24,390DDROPS $236,330
$94,066 $19,456 $29,429 $22,320 $22,990 $23,679 $24,390PROJECT TOTAL: $236,330
Project: CR 78
FROM KIRBY THOMPSON RD TO FT DENAUD
BRIDGE WAY
FPN: 4350501
Work: WIDEN/RESURFACE EXIST LANES
Length: 1.506
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $1,059,273 $0 $0 $0 $0SCEDCST $1,059,273
$0 $0 $1,059,273 $0 $0 $0 $0PROJECT TOTAL: $1,059,273
Project: CR 80A (COWBOY WAY)
FROM SR 80 TO BRIDGE STREET
FPN: 4366551
Work: RESURFACING
Length: 1.429
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $1,055,158 $0SCRACST $1,055,158
$0 $0 $0 $0 $0 $1,055,158 $0PROJECT TOTAL: $1,055,158
Project: CR 833
AT CR 846
FPN: 4336921
Work: INTERSECTION IMPROVEMENT
Length: 0.011
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $54,000 $0 $0 $0 $0 $0GRSCCST $54,000
$0 $549,267 $0 $0 $0 $0 $0SCEDCST $549,267
$0 $603,267 $0 $0 $0 $0 $0PROJECT TOTAL: $603,267
Page 2 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: E BASILIAN CRESCENT
FROM SW WC OWENS AVE TO DEAN DUFF
FPN: 4308941
Work: SIDEWALK
Length: 0.403
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,210 $0 $0 $0 $0 $0 $0ACTLCST $1,210
$143,012 $60,962 $0 $0 $0 $0 $0TALLCST $203,974
$81,888 $0 $0 $0 $0 $0 $0TALTPE $81,888
$226,110 $60,962 $0 $0 $0 $0 $0PROJECT TOTAL: $287,072
Project: FLAGHOLE ROAD
FROM WOODLAND BLVD TO US 27
FPN: 4318981
Work: RESURFACING
Length: 9.993
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $1,010,296 $0 $0 $0 $0 $0GRSCCST $1,010,296
$0 $602,208 $0 $0 $0 $0 $0SCEDCST $602,208
$432,752 $0 $0 $0 $0 $0 $0SCRACST $432,752
$432,752 $1,612,504 $0 $0 $0 $0 $0PROJECT TOTAL: $2,045,256
Project: FORREY DRIVE
FROM SOUTH OF COWBOY WAY TO SR 80
FPN: 4385701
Work: RESURFACING
Length: 1.100
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $543,329 $0 $0 $0 $0 $0SCRACST $543,329
$0 $543,329 $0 $0 $0 $0 $0PROJECT TOTAL: $543,329
Project: FORT DENAUD ROAD
FROM FT DENAUD BRIDGE WAY TO HUGGETTS
ROAD
FPN: 4366521
Work: RESURFACING
Length: 2.585
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $1,323,383 $0 $0SCRACST $1,323,383
$0 $0 $0 $0 $1,323,383 $0 $0PROJECT TOTAL: $1,323,383
Project: FRASER AVE
FROM HARDEE ST TO MAIN ST
FPN: 4308931
Work: SIDEWALK
Length: 0.488
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$134,856 $55,320 $0 $0 $0 $0 $0ACTNCST $190,176
$78,737 $0 $0 $0 $0 $0 $0TALLPE $78,737
$213,593 $55,320 $0 $0 $0 $0 $0PROJECT TOTAL: $268,913
Page 3 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: HELMS RD EXTENSION
FROM SR 29 TO SR 80
FPN: 4199481
Work: PD&E/EMO STUDY
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$300,000 $0 $0 $0 $0 $0 $0PDE $300,000
$300,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $300,000
Project: HELMS RD EXTENSION
FROM SR 29 TO SR 80
FPN: 4199482
Work: NEW ROAD CONSTRUCTION
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,664,624 $0 $0 $0 $0 $0 $0PE $1,664,624
$1,664,624 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $1,664,624
Project: HELMS RD EXTENSION
FROM SR 29 TO SR 80
FPN: 4199483
Work: ADD LANES & RECONSTRUCT
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$10,904,836 $264,035 $1,326,484 $741,800 $4,500,000 $0 $0CIGPCST $17,737,155
$10,904,836 $264,035 $1,326,484 $741,800 $4,500,000 $0 $0PROJECT TOTAL: $17,737,155
Project: HENDRY COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4126701
Work: TRAFFIC SIGNALS
Length: 0.100
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$37,523 $8,360 $16,280 $14,164 $14,589 $15,027 $15,477DDROPS $121,420
$37,523 $8,360 $16,280 $14,164 $14,589 $15,027 $15,477PROJECT TOTAL: $121,420
Project: JAYCEE-LYONS DR
FROM SR 29 TO LABELLE COMMUNITY PARK
FPN: 4350171
Work: SIDEWALK
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $81,756 $0 $0TALLCST $81,756
$0 $0 $0 $0 $258,255 $0 $0TALNCST $258,255
$0 $0 $150,000 $0 $0 $0 $0TALLPE $150,000
$0 $0 $150,000 $0 $340,011 $0 $0PROJECT TOTAL: $490,011
Page 4 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: LABELLE TRAFFIC SIGNALS REIMBURSEMENT
FPN: 4136331
Work: TRAFFIC SIGNALS
Length: 0.300
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$61,521 $10,792 $15,730 $12,237 $12,604 $12,982 $13,372DDROPS $139,238
$61,521 $10,792 $15,730 $12,237 $12,604 $12,982 $13,372PROJECT TOTAL: $139,238
Project: LEWIS BLVD
FROM GEORGIA AVENUE TO US 27
FPN: 4385711
Work: RESURFACING
Length: 1.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $578,257 $0 $0 $0 $0 $0SCRACST $578,257
$0 $578,257 $0 $0 $0 $0 $0PROJECT TOTAL: $578,257
Project: OLD CR 78
FROM CR 78 EAST TO SR 29
FPN: 4350161
Work: SIDEWALK
Length: 0.452
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $263,558 $0 $0SNCST $263,558
$0 $0 $0 $63,099 $0 $0 $0TALLPE $63,099
$0 $0 $0 $63,099 $263,558 $0 $0PROJECT TOTAL: $326,657
Project: SIDEWALKS
AT VARIOUS LOCATIONS
FPN: 4281051
Work: SIDEWALK
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $617,200 $0 $0 $0 $0ACSLCST $617,200
$0 $0 $617,200 $0 $0 $0 $0PROJECT TOTAL: $617,200
Project: SONORA AVE/CR 832
FROM WC OWEN TO DAVIDSON ROAD
FPN: 4318881
Work: RESURFACING
Length: 1.200
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $731,242 $0 $0 $0 $0SCOPCST $731,242
$0 $0 $731,242 $0 $0 $0 $0PROJECT TOTAL: $731,242
Page 5 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 29
FROM COLLIER COUNTY LINE TO CR 832 (KERI
RD)
FPN: 4178785
Work: ADD LANES & RECONSTRUCT
Length: 5.531
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $6,234,750 $0 $0 $0 $0 $0DIPE $6,234,750
$0 $200,250 $0 $0 $0 $0 $0DIHPE $200,250
$0 $6,435,000 $0 $0 $0 $0 $0PROJECT TOTAL: $6,435,000
Project: SR 29
FROM COWBOY WAY (CR 80A) TO WHIDDEN RD
(CR 731)
FPN: 4178788
Work: ADD LANES & RECONSTRUCT
Length: 2.576
Comments: ROUNDABOUT AT 80A, CONSTRUCT ONE-WAY PAIR OVER RIVER REPLACE BASCULE BRIDGE AND CONSTRUCT NEW BASCULE
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $120,000 $0 $0ACNPENV $120,000
$0 $8,500,000 $0 $0 $0 $0 $0DIPE $8,500,000
$0 $975,000 $0 $0 $0 $0 $0DIHPE $975,000
$0 $0 $0 $0 $0 $0 $7,338,043ACNPROW $7,338,043
$0 $9,475,000 $0 $0 $120,000 $0 $7,338,043PROJECT TOTAL: $16,933,043
Project: SR 29
FROM CR 832 (KERI RD) TO F RD
FPN: 4178787
Work: ADD LANES & RECONSTRUCT
Length: 5.241
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $3,377,653 $0 $0 $0 $0 $0DIPE $3,377,653
$0 $250,000 $0 $0 $0 $0 $0DIHPE $250,000
$0 $3,627,653 $0 $0 $0 $0 $0PROJECT TOTAL: $3,627,653
Project: SR 29
FROM F ROAD TO COWBOY WAY
FPN: 4178783
Work: ADD LANES & RECONSTRUCT
Length: 4.939
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$4,118 $0 $0 $0 $0 $0 $0DSCST $4,118
$0 $75,000 $0 $0 $30,000 $50,000 $0DDRENV $155,000
$103,152 $9,929 $0 $0 $0 $0 $0DIHPE $113,081
$4,645,320 $0 $0 $0 $0 $0 $0DSPE $4,645,320
$0 $2,063,298 $7,064,392 $0 $0 $0 $0BNIRROW $9,127,690
$0 $318,180 $281,820 $0 $0 $0 $0DIHROW $600,000
$0 $0 $0 $5,559,310 $0 $0 $0GMRROW $5,559,310
$4,752,590 $2,466,407 $7,346,212 $5,559,310 $30,000 $50,000 $0PROJECT TOTAL: $20,204,519
Page 6 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 29
FROM SOUTH OF CR 832 TO SOUTH OF C ROAD
FPN: 4365981
Work: RESURFACING
Length: 6.585
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $6,214,072 $0 $0 $0DDRCST $6,214,072
$0 $0 $0 $263,250 $0 $0 $0DIHCST $263,250
$1,708 $101,292 $0 $0 $0 $0 $0DIHPE $103,000
$125,882 $0 $0 $0 $0 $0 $0DSPE $125,882
$127,590 $101,292 $0 $6,477,322 $0 $0 $0PROJECT TOTAL: $6,706,204
Project: SR 80
AT US 27 NEW INTERCHANGE
FPN: 4082867
Work: INTERCHANGE (NEW)
Length: 0.981
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$20,787,893 $0 $0 $0 $0 $0 $0CST $20,787,893
$1,220,799 $0 $0 $0 $0 $0 $0ROW $1,220,799
$1,144,538 $0 $0 $0 $0 $0 $0RRU $1,144,538
$23,153,230 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $23,153,230
Project: SR 80
FR E CITY LIMITS LABELLE TO US 27
FPN: 4082861
Work: PD&E/EMO STUDY
Length: 21.462
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,211,826 $0 $0 $0 $0 $0 $0LAR $1,211,826
$1,430,395 $0 $0 $0 $0 $0 $0PDE $1,430,395
$2,642,221 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $2,642,221
Project: SR 80
FROM BIRCHWOOD PARKWAY TO DALTON
LANE
FPN: 4082863
Work: ADD LANES & RECONSTRUCT
Length: 4.997
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$16,777,907 $0 $0 $0 $0 $0 $0DDRCST $16,777,907
$142,836 $66,515 $0 $0 $0 $0 $0DIHCST $209,351
$550,887 $0 $0 $0 $0 $0 $0DSCST $550,887
$200,050 $0 $0 $0 $0 $0 $0DDRENV $200,050
$210,964 $0 $0 $0 $0 $0 $0DDRPE $210,964
$107,237 $0 $0 $0 $0 $0 $0DIHPE $107,237
$11,680 $0 $0 $0 $0 $0 $0DSPE $11,680
$2,828,561 $0 $0 $0 $0 $0 $0GMRPE $2,828,561
$20,830,122 $66,515 $0 $0 $0 $0 $0PROJECT TOTAL: $20,896,637
Project: SR 80
FROM BIRCHWOOD PARKWAY TO DALTON
LANE
FPN: 4357421
Work: SIGNING/PAVEMENT MARKINGS
Length: 5.830
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$3,225 $1,775 $0 $0 $0 $0 $0DIHCST $5,000
$265,873 $0 $0 $0 $0 $0 $0DSCST $265,873
$269,098 $1,775 $0 $0 $0 $0 $0PROJECT TOTAL: $270,873
Page 7 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 80
FROM BIRCHWOOD PKWY TO DALTON LANE
FPN: 4082868
Work: RIGHT OF WAY ACQUISITION
Length: 5.276
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$590,635 $0 $0 $0 $0 $0 $0ROW $590,635
$590,635 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $590,635
Project: SR 80
FROM CEDARWOOD PARKWAY TO LEXINGTON
PARKWAY
FPN: 4082864
Work: RIGHT OF WAY ACQUISITION
Length: 6.958
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$27 $0 $0 $0 $0 $0 $0ROW $27
$27 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $27
Project: SR 80
FROM CR 833 TO US 27
FPN: 4082862
Work: ADD LANES & RECONSTRUCT
Length: 1.987
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$9,070,209 $0 $0 $0 $0 $0 $0CST $9,070,209
$47,466 $0 $0 $0 $0 $0 $0ENV $47,466
$5,274,104 $0 $0 $0 $0 $0 $0PE $5,274,104
$2,309,745 $0 $0 $0 $0 $0 $0ROW $2,309,745
$365,617 $0 $0 $0 $0 $0 $0RRU $365,617
$17,067,141 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $17,067,141
Page 8 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 80
FROM DALTON LANE TO INDIAN HILLS DRIVE
FPN: 4082865
Work: ADD LANES & RECONSTRUCT
Length: 5.273
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $30,402,379 $0 $0 $0 $0ACNPCST $30,402,379
$3,210 $0 $0 $0 $0 $0 $0DSCST $3,210
$1 $154,864 $0 $0 $0 $0 $0ACSLENV $154,865
$25,000 $275,135 $0 $0 $0 $0 $0SLENV $300,135
$0 $0 $250,000 $0 $0 $0 $0SNENV $250,000
$0 $25,000 $0 $0 $0 $0 $0TCSPENV $25,000
$52,305 $0 $0 $0 $0 $0 $0ACNPPE $52,305
$8,083 $0 $0 $0 $0 $0 $0DSPE $8,083
$3,893,670 $767,997 $0 $0 $0 $0 $0NHPE $4,661,667
$139,321 $0 $0 $0 $0 $0 $0NHPPPE $139,321
$271,348 $161,253 $0 $0 $0 $0 $0ACNPROW $432,601
$2,812,707 $1,714,850 $50,000 $0 $0 $0 $0BNIRROW $4,577,557
$1,377,213 $0 $0 $0 $0 $0 $0NHPPROW $1,377,213
$96,505 $29,205 $0 $0 $0 $0 $0TCSPROW $125,710
$0 $0 $345,937 $0 $0 $0 $0ACNPRRU $345,937
$8,679,363 $3,128,304 $31,048,316 $0 $0 $0 $0PROJECT TOTAL: $42,855,983
Project: SR 80
FROM GRANDMAS BLVD TO HUGGETTS RD
FPN: 4349601
Work: RESURFACING
Length: 0.538
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $1,052,695 $0 $0 $0 $0DDRCST $1,052,695
$0 $0 $119,991 $0 $0 $0 $0DIHCST $119,991
$0 $15,000 $25,000 $0 $0 $0 $0DDRENV $40,000
$19,712 $82,121 $0 $0 $0 $0 $0DIHPE $101,833
$18,315 $0 $0 $0 $0 $0 $0DSPE $18,315
$38,027 $97,121 $1,197,686 $0 $0 $0 $0PROJECT TOTAL: $1,332,834
Page 9 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 80
FROM INDIAN HILLS DRIVE TO CR 833
FPN: 4082866
Work: ADD LANES & RECONSTRUCT
Length: 6.355
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $32,299,479 $0 $0 $0 $0ACNPCST $32,299,479
$5,625 $0 $0 $0 $0 $0 $0DSCST $5,625
$0 $215,000 $100,000 $0 $0 $0 $0DDRENV $315,000
$159,986 $0 $0 $0 $0 $0 $0DDRPE $159,986
$124,093 $14,440 $0 $0 $0 $0 $0DIHPE $138,533
$4,234,155 $0 $0 $0 $0 $0 $0DSPE $4,234,155
$192,456 $3,478,456 $1,309,341 $0 $0 $0 $0ACSNROW $4,980,253
$19 $303,431 $0 $0 $0 $0 $0BNDSROW $303,450
$0 $1,367,365 $0 $0 $0 $0 $0DDRROW $1,367,365
$102 $0 $0 $0 $0 $0 $0DIHROW $102
$597,633 $0 $968,217 $0 $0 $0 $0SNROW $1,565,850
$0 $0 $946,829 $0 $0 $0 $0ACNPRRU $946,829
$5,314,069 $5,378,692 $35,623,866 $0 $0 $0 $0PROJECT TOTAL: $46,316,627
Project: SR 82
FROM LEE C/L TO COLLIER C/L
FPN: 4258415
Work: ADD LANES & RECONSTRUCT
Length: 1.273
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $4,031,192 $0 $0 $0 $0 $0DDRCST $4,031,192
$0 $331,767 $0 $0 $0 $0 $0DIHCST $331,767
$22,237 $4,463,082 $0 $0 $0 $0 $0DSCST $4,485,319
$0 $50,000 $0 $0 $0 $0 $0DSENV $50,000
$1,249,882 $0 $0 $0 $0 $0 $0DDRPE $1,249,882
$40,600 $8,098 $0 $0 $0 $0 $0DIHPE $48,698
$1,312,719 $8,884,139 $0 $0 $0 $0 $0PROJECT TOTAL: $10,196,858
Project: SR25 (US27)/ SR 80
FROM INDUSTRIAL CANAL TO MERCHANT
STREET
FPN: 4312111
Work: RESURFACING
Length: 1.862
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$3,340,054 $0 $0 $0 $0 $0 $0DDRCST $3,340,054
$18,701 $32,769 $0 $0 $0 $0 $0DIHCST $51,470
$983 $0 $0 $0 $0 $0 $0DSCST $983
$60,000 $0 $0 $0 $0 $0 $0DDRENV $60,000
$122,555 $0 $0 $0 $0 $0 $0DIHPE $122,555
$38,162 $0 $0 $0 $0 $0 $0DSPE $38,162
$3,580,455 $32,769 $0 $0 $0 $0 $0PROJECT TOTAL: $3,613,224
Page 10 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 27 (SR 80)
FROM INDUSTRIAL CANAL TO CENTRAL
STREET
FPN: 4312991
Work: MISCELLANEOUS CONSTRUCTION
Length: 3.059
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $8,656 $0 $0DDRCST $8,656
$0 $0 $0 $0 $297,147 $0 $0SACST $297,147
$0 $0 $50,000 $0 $0 $0 $0SAPE $50,000
$0 $0 $5,000 $200,000 $0 $0 $0SNPE $205,000
$0 $0 $55,000 $200,000 $305,803 $0 $0PROJECT TOTAL: $560,803
Project: US 27 (SR 80) SIDEWALKS IN CLEWISTON
AT VARIOUS LOCATIONS
FPN: 4370981
Work: SIDEWALK
Length: 0.617
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $0 $978,669TALTCST $978,669
$0 $0 $0 $0 $0 $210,000 $0TALTPE $210,000
$0 $0 $0 $0 $0 $210,000 $978,669PROJECT TOTAL: $1,188,669
Project: US 27 HENDRY CO. VWS & BI-DIRECTIONAL
STATIC SCALES
FPN: 4303551
Work: MCCO WEIGH STATION STATIC/WIM
Length: 0.822
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$125,420 $121,236 $0 $0 $0 $0 $0ACNPCST $246,656
$104,230 $0 $0 $0 $0 $0 $0DSCST $104,230
$2,766,871 $85,815 $0 $0 $0 $0 $0DWSCST $2,852,686
$1,724,547 $0 $0 $0 $0 $0 $0NHPPCST $1,724,547
$645,354 $0 $0 $0 $0 $0 $0DDRPE $645,354
$37,648 $0 $0 $0 $0 $0 $0DIHPE $37,648
$15,875 $0 $0 $0 $0 $0 $0DSPE $15,875
$5,419,945 $207,051 $0 $0 $0 $0 $0PROJECT TOTAL: $5,626,996
Project: VENTURA AVE
FROM LOPEZ ST TO BERNER RD
FPN: 4350151
Work: SIDEWALK
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $230,727 $0TALLCST $230,727
$0 $0 $0 $90,000 $0 $0 $0TALLPE $90,000
$0 $0 $0 $90,000 $0 $230,727 $0PROJECT TOTAL: $320,727
Project: WC OWEN AVENUE
FROM GEORGIA AVENUE TO US 27
FPN: 4366511
Work: WIDEN/RESURFACE EXIST LANES
Length: 1.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $1,061,059 $0 $0 $0 $0 $0GRSCCST $1,061,059
$0 $13,554 $0 $0 $0 $0 $0SCEDCST $13,554
$0 $82,167 $0 $0 $0 $0 $0SCRACST $82,167
$0 $1,156,780 $0 $0 $0 $0 $0PROJECT TOTAL: $1,156,780
Page 11 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
$107,712,257 $44,814,780 $79,261,718 $13,270,252 $7,417,226 $1,597,573 $8,369,951
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:
$262,443,757
ALL YEARS
Page 12 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FIXED CAPITAL OUTLAY
Project: LABELLE OPERATIONS CENTER FCO MINOR
REPAIRS
FPN: 4368871
Work: FIXED CAPITAL OUTLAY
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $129,742 $0 $0 $0 $0 $0FCOCST $129,742
$0 $129,742 $0 $0 $0 $0 $0PROJECT TOTAL: $129,742
$0 $129,742 $0 $0 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FIXED CAPITAL
OUTLAY TOTAL: $129,742
ALL YEARS
Page 13 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: AVIATION
Project: LABELLE ARPT DESIGN AND CONSTRUCT
TERMINAL BUILDING
FPN: 4292101
Work: AVIATION CAPACITY PROJECT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $500,000 $400,000 $0 $0 $0DDRCAP $900,000
$1,000,000 $0 $0 $0 $0 $0 $0DPTOCAP $1,000,000
$1,000,000 $0 $500,000 $400,000 $0 $0 $0PROJECT TOTAL: $1,900,000
Project: LABELLE MUNICIPAL AIRPORT RPZ LAND
ACQUISITION
FPN: 4382831
Work: AVIATION SAFETY PROJECT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $10,000 $0 $0 $0 $0 $0DDRCAP $10,000
$0 $10,000 $0 $0 $0 $0 $0PROJECT TOTAL: $10,000
Project: LABELLE MUNICIPAL APT DESIGN AND CONST
ACCESS RD
FROM SR 29
FPN: 4318761
Work: AVIATION CAPACITY PROJECT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $1,380,000 $0 $0 $0 $0DDRCAP $1,380,000
$0 $0 $345,000 $0 $0 $0 $0LFCAP $345,000
$0 $0 $1,725,000 $0 $0 $0 $0PROJECT TOTAL: $1,725,000
Project: LABELLE MUNICIPAL APT LAND ACQ
FPN: 4370761
Work: AVIATION PRESERVATION PROJECT
Length: 0.000
Comments: LAND ACQUISITIONS
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $100,000 $0 $0 $0 $0DPTOCAP $100,000
$0 $0 $33,333 $0 $0 $0 $0LFCAP $33,333
$0 $0 $133,333 $0 $0 $0 $0PROJECT TOTAL: $133,333
$1,000,000 $10,000 $2,358,333 $400,000 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION
TOTAL: $3,768,333
ALL YEARS
Page 14 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: INTERMODAL
Project: AIRGLADES AIRPORT CAPITAL IMPROVEMENT
FPN: 4106631
Work: AVIATION CAPACITY PROJECT
Length: 0.000
Comments: DESIGN & CONSTRUCT AIRPORT ACCESS ROAD
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$10,762 $0 $0 $0 $0 $0 $0DPTOADM $10,762
$543,522 $0 $0 $0 $0 $0 $0DDRCAP $543,522
$1,209,755 $336,053 $0 $0 $0 $0 $0DPTOCAP $1,545,808
$1,797,500 $0 $0 $0 $0 $0 $0DSCAP $1,797,500
$3,048,480 $0 $0 $0 $0 $0 $0LFCAP $3,048,480
$10,762 $0 $0 $0 $0 $0 $0LFRCAP $10,762
$6,620,781 $336,053 $0 $0 $0 $0 $0PROJECT TOTAL: $6,956,834
$6,620,781 $336,053 $0 $0 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: INTERMODAL
TOTAL: $6,956,834
ALL YEARS
Page 15 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: TRANSIT
Project: GOOD WHEELS INC. CORRIDOR
FPN: 4260541
Work: OPERATING FOR FIXED ROUTE
Length: 0.000
Comments: CLEWISTON TO BELLE GLADE SEGMENT OF LAKE REGION COMMUTER ROUTE
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$75,000 $0 $0 $0 $0 $0 $0DDROPS $75,000
$278,219 $105,300 $97,655 $36,000 $120,000 $123,570 $0DPTOOPS $760,744
$278,219 $105,300 $97,655 $36,000 $120,000 $123,570 $0LFOPS $760,744
$631,438 $210,600 $195,310 $72,000 $240,000 $247,140 $0PROJECT TOTAL: $1,596,488
$631,438 $210,600 $195,310 $72,000 $240,000 $247,140 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT
TOTAL: $1,596,488
ALL YEARS
$115,964,476 $45,501,175 $81,815,361 $13,742,252 $7,657,226 $1,844,713 $8,369,951
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HENDRY TOTAL:
$274,895,154
ALL YEARS
Page 16 of 16
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HIGHLANDS
Page 1 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HIGHWAYS
Project: ARBUCKLE CREEK ROAD
AT LANDFILL ACCESS RD
FPN: 4366441
Work: ADD TURN LANE(S)
Length: 0.348
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $936,152 $0 $0 $0SCOPCST $936,152
$0 $0 $0 $936,152 $0 $0 $0PROJECT TOTAL: $936,152
Project: AVON PARK TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4136341
Work: TRAFFIC SIGNALS
Length: 0.756
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$90,732 $15,200 $27,450 $21,566 $26,987 $27,797 $28,630DDROPS $238,362
$90,732 $15,200 $27,450 $21,566 $26,987 $27,797 $28,630PROJECT TOTAL: $238,362
Project: BRIDGE REPLACEMENT ALONG SR 700 (US98)
OVER LORIDA CREEK(LORIDA)
FPN: 4358581
Work: PD&E/EMO STUDY
Length: 0.017
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$22,547 $6,154 $0 $0 $0 $0 $0DIHPDE $28,701
$2,711 $0 $0 $0 $0 $0 $0DSPE $2,711
$25,258 $6,154 $0 $0 $0 $0 $0PROJECT TOTAL: $31,412
Project: CEMETERY RD
FROM N RIDGEWOOD ST TO MLK BLVD XING
#627596-A
FPN: 4328001
Work: RAIL SAFETY PROJECT
Length: 0.297
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $270,600 $0 $0 $0 $0 $0RHHRRU $270,600
$0 $270,600 $0 $0 $0 $0 $0PROJECT TOTAL: $270,600
Page 2 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: CHANNEL IMPROVEMENTS SR 25 (US 27) OVER
LAKE JACKSON
FPN: 4352691
Work: DREDGE
Length: 0.016
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$552 $13,900 $0 $0 $0 $0 $0DIHCST $14,452
$897,484 $0 $0 $0 $0 $0 $0DSCST $897,484
$1,197 $0 $0 $0 $0 $0 $0LFCST $1,197
$3,525 $0 $0 $0 $0 $0 $0DSENV $3,525
$10,610 $0 $0 $0 $0 $0 $0DIHPE $10,610
$83,942 $0 $0 $0 $0 $0 $0DSPE $83,942
$59,860 $5,986 $0 $0 $0 $0 $0LFRRU $65,846
$1,057,170 $19,886 $0 $0 $0 $0 $0PROJECT TOTAL: $1,077,056
Project: CR 623 (KENILWORTH)
FROM HAYWOOD TAYLOR BLVD TO MINI
RANCH RD
FPN: 4366431
Work: RESURFACING
Length: 1.478
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $1,419,207 $0 $0SCRACST $1,419,207
$0 $0 $0 $0 $1,419,207 $0 $0PROJECT TOTAL: $1,419,207
Project: EAST INTERLAKE BLVD
FROM DEVANE CIRCLE TO US 27
FPN: 4389251
Work: RESURFACING
Length: 0.637
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $163,750 $0 $0 $0 $0 $0LFCST $163,750
$0 $491,250 $0 $0 $0 $0 $0SCRCCST $491,250
$0 $655,000 $0 $0 $0 $0 $0PROJECT TOTAL: $655,000
Project: HERON STREET
FROM HAMMOCK ROAD TO HOWEY ROAD
FPN: 4366411
Work: WIDEN/RESURFACE EXIST LANES
Length: 1.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $1,001,791 $0 $0SCOPCST $1,001,791
$0 $0 $0 $0 $1,001,791 $0 $0PROJECT TOTAL: $1,001,791
Project: HIGHLANDS COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4126711
Work: TRAFFIC SIGNALS
Length: 11.573
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$380,442 $77,064 $112,187 $108,587 $111,845 $115,200 $118,656DDROPS $1,023,981
$380,442 $77,064 $112,187 $108,587 $111,845 $115,200 $118,656PROJECT TOTAL: $1,023,981
Page 3 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: LAKE PLACID ELEMENTARY SRTS SAFETY
SIDEWALKS
FPN: 4309171
Work: SIDEWALK
Length: 0.200
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$65,667 $34,979 $0 $0 $0 $0 $0ACTNCST $100,646
$37,702 $0 $0 $0 $0 $0 $0TALNPE $37,702
$103,369 $34,979 $0 $0 $0 $0 $0PROJECT TOTAL: $138,348
Project: MEMORIAL DRIVE
FROM POMPINO DR TO SEBRING PARKWAY
FPN: 4350671
Work: SIDEWALK
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $161,000 $0 $0SLPE $161,000
$0 $0 $0 $0 $161,000 $0 $0PROJECT TOTAL: $161,000
Project: NORTH CENTRAL AVENUE
FROM US 17 TO MAIN STREET
FPN: 4389221
Work: RESURFACING
Length: 1.477
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $159,060 $0 $0 $0 $0 $0LFCST $159,060
$0 $477,180 $0 $0 $0 $0 $0SCRCCST $477,180
$0 $636,240 $0 $0 $0 $0 $0PROJECT TOTAL: $636,240
Project: PONCE DE LEON
FROM NADENA DR TO ADRIENNE ST
FPN: 4351981
Work: SIDEWALK
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $216,267 $0TALLCST $216,267
$0 $0 $0 $20,617 $0 $0 $0SLPE $20,617
$0 $0 $0 $50,383 $0 $0 $0TALLPE $50,383
$0 $0 $0 $71,000 $0 $216,267 $0PROJECT TOTAL: $287,267
Project: RUCKS DAIRY ROAD BRIDGE NUMBER 094031
OVER C-41 CANAL/SLOUGH
FPN: 4316191
Work: BRIDGE REPLACEMENT
Length: 0.208
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $3,150,801 $0 $0 $0 $0SLCST $3,150,801
$0 $50,900 $0 $0 $0 $0 $0SLENV $50,900
$60,689 $40,466 $0 $0 $0 $0 $0SLPE $101,155
$0 $0 $259,281 $0 $0 $0 $0ACSLRRU $259,281
$0 $0 $40,719 $0 $0 $0 $0SLRRU $40,719
$60,689 $91,366 $3,450,801 $0 $0 $0 $0PROJECT TOTAL: $3,602,856
Page 4 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SEBRING PKWY PHASE IIA
FROM DESOTO ROAD TO YOUTH CARE LANE
FPN: 4298411
Work: NEW ROAD CONSTRUCTION
Length: 0.613
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $3,811,072 $0 $0 $0 $0 $0CIGPCST $3,811,072
$0 $3,811,072 $0 $0 $0 $0 $0PROJECT TOTAL: $3,811,072
Project: SEBRING PKWY PHASE IIB
FROM US 27 TO DESOTO ROAD
FPN: 4335531
Work: ADD LANES & REHABILITATE PVMNT
Length: 0.503
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $3,714,624 $0 $0 $0CIGPCST $3,714,624
$0 $0 $0 $1,147,345 $0 $0 $0LFCST $1,147,345
$0 $0 $0 $4,861,969 $0 $0 $0PROJECT TOTAL: $4,861,969
Project: SEBRING TRAFFIC SIGNALS REIMBURSEMENT
FPN: 4136351
Work: TRAFFIC SIGNALS
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$50,240 $7,904 $11,199 $8,913 $9,180 $9,455 $0DDROPS $96,891
$50,240 $7,904 $11,199 $8,913 $9,180 $9,455 $0PROJECT TOTAL: $96,891
Project: SR 17 (EAST MAIN ST)
FROM SOUTH VERONA AVE TO SOUTH
DELANEY AVE
FPN: 4349671
Work: DRAINAGE IMPROVEMENTS
Length: 0.018
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$87,206 $13,000 $0 $0 $0 $0 $0DDRCST $100,206
$17,562 $1,251 $0 $0 $0 $0 $0DIHCST $18,813
$26,998 $0 $0 $0 $0 $0 $0DSCST $26,998
$8,119 $0 $0 $0 $0 $0 $0DIHPE $8,119
$139,885 $14,251 $0 $0 $0 $0 $0PROJECT TOTAL: $154,136
Project: SR 17 (SCENIC HIGHWAY)
FROM WOODLAND DRIVE TO MYRTLE STREET
FPN: 4390261
Work: DRAINAGE IMPROVEMENTS
Length: 0.474
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000
$0 $5,000 $0 $0 $0 $0 $0PROJECT TOTAL: $5,000
Page 5 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 17 (SE LAKEVIEW)
FROM US 27/98 TO KENILWORTH BLVD
FPN: 1944252
Work: RESURFACING
Length: 0.965
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $1,850,768 $0 $0 $0 $0 $0DDRCST $1,850,768
$0 $33,693 $0 $0 $0 $0 $0DIHCST $33,693
$1,138 $0 $0 $0 $0 $0 $0DSCST $1,138
$51,245 $2,914 $0 $0 $0 $0 $0DIHPE $54,159
$248,261 $0 $0 $0 $0 $0 $0DSPE $248,261
$300,644 $1,887,375 $0 $0 $0 $0 $0PROJECT TOTAL: $2,188,019
Project: SR 17
AT ARBUCKLE CREEK ROAD
FPN: 4332021
Work: ADD LEFT TURN LANE(S)
Length: 0.200
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $526,181 $0 $0DDRCST $526,181
$0 $0 $0 $0 $5,410 $0 $0DIHCST $5,410
$0 $75,000 $0 $0 $0 $0 $0DDRPE $75,000
$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000
$0 $80,000 $0 $0 $531,591 $0 $0PROJECT TOTAL: $611,591
Project: SR 17
AT MANATEE DR
FPN: 4350651
Work: ADD TURN LANE(S)
Length: 0.200
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $19,002 $0DSCST $19,002
$0 $0 $0 $0 $0 $170,284 $0SACST $170,284
$0 $0 $175,000 $0 $0 $0 $0SLPE $175,000
$0 $0 $175,000 $0 $0 $189,286 $0PROJECT TOTAL: $364,286
Project: SR 17
FROM HELENA ST TO SEBRING PARKWAY
FPN: 4350641
Work: ADD LEFT TURN LANE(S)
Length: 0.194
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $293,621 $0 $0SLCST $293,621
$0 $0 $15,000 $0 $0 $0 $0SLPE $15,000
$0 $0 $15,000 $0 $293,621 $0 $0PROJECT TOTAL: $308,621
Project: SR 17
FROM S RAILROAD AVE TO N CENTRAL
AVENUE
FPN: 4366811
Work: RAIL SAFETY PROJECT
Length: 0.076
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $10,250 $0 $0 $0 $0DIHCST $10,250
$0 $0 $0 $5,265 $0 $0 $0DSCST $5,265
$0 $0 $0 $434,285 $0 $0 $0SACST $434,285
$0 $30,000 $0 $0 $0 $0 $0DDRPE $30,000
$0 $10,000 $0 $0 $0 $0 $0DIHPE $10,000
$0 $0 $350,000 $0 $0 $0 $0DSRRU $350,000
$0 $40,000 $360,250 $439,550 $0 $0 $0PROJECT TOTAL: $839,800
Page 6 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 64
AT NORTH OLIVIA DRIVE
FPN: 4332011
Work: ADD RIGHT TURN LANE(S)
Length: 0.200
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $21,153 $0 $0 $0DSCST $21,153
$0 $0 $0 $265,910 $0 $0 $0SLCST $265,910
$0 $48,000 $0 $0 $0 $0 $0SLPE $48,000
$0 $48,000 $0 $287,063 $0 $0 $0PROJECT TOTAL: $335,063
Project: SR 64
AT US 27
FPN: 4349861
Work: INTERSECTION IMPROVEMENT
Length: 0.123
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $1,040,399 $0 $0SLCST $1,040,399
$0 $0 $202,000 $0 $0 $0 $0SLPE $202,000
$0 $0 $202,000 $0 $1,040,399 $0 $0PROJECT TOTAL: $1,242,399
Project: SR 66
AT ORANGE BLOSSOM BLVD
FPN: 4331941
Work: ADD TURN LANE(S)
Length: 0.200
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $514,196 $0 $0DDRCST $514,196
$0 $0 $0 $0 $5,410 $0 $0DIHCST $5,410
$0 $50,000 $0 $0 $0 $0 $0DIHPE $50,000
$0 $50,000 $0 $0 $519,606 $0 $0PROJECT TOTAL: $569,606
Project: SR 66
AT PAYNE ROAD
FPN: 4331981
Work: ADD RIGHT TURN LANE(S)
Length: 0.200
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $502,743 $0 $0DDRCST $502,743
$0 $0 $0 $0 $5,410 $0 $0DIHCST $5,410
$0 $50,000 $0 $0 $0 $0 $0DIHPE $50,000
$0 $50,000 $0 $0 $508,153 $0 $0PROJECT TOTAL: $558,153
Project: SR 66
AT SKIPPER LN
FPN: 4349871
Work: ADD RIGHT TURN LANE(S)
Length: 0.220
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $11,828 $0 $0DSCST $11,828
$0 $0 $0 $0 $310,893 $0 $0SLCST $310,893
$0 $0 $145,000 $0 $0 $0 $0ACSLPE $145,000
$0 $0 $8,000 $0 $0 $0 $0SLPE $8,000
$0 $0 $153,000 $0 $322,721 $0 $0PROJECT TOTAL: $475,721
Page 7 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 66
AT SR 25 (US 27)
FPN: 4300601
Work: ADD TURN LANE(S)
Length: 0.251
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$532,743 $0 $0 $0 $0 $0 $0CIGPCST $532,743
$5,097 $0 $0 $0 $0 $0 $0DDRCST $5,097
$19,085 $27,834 $0 $0 $0 $0 $0DIHCST $46,919
$877 $0 $0 $0 $0 $0 $0DSCST $877
$97,816 $0 $0 $0 $0 $0 $0DDRPE $97,816
$12,916 $0 $0 $0 $0 $0 $0DIHPE $12,916
$19,293 $0 $0 $0 $0 $0 $0DSPE $19,293
$687,827 $27,834 $0 $0 $0 $0 $0PROJECT TOTAL: $715,661
Project: SR 66
FROM HARDEE COUNTY LINE TO WEST OF US
98/US 27
FPN: 4366001
Work: RESURFACING
Length: 9.342
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $512,500 $0 $0 $0 $0DIHCST $512,500
$0 $0 $6,906,114 $0 $0 $0 $0SACST $6,906,114
$2,812 $7,463 $0 $0 $0 $0 $0DIHPE $10,275
$2,812 $7,463 $7,418,614 $0 $0 $0 $0PROJECT TOTAL: $7,428,889
Project: SR 70
FROM EAST OF CR 29 TO MARCIA GROVE RD
FPN: 4365431
Work: RESURFACING
Length: 2.770
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $52,650 $0 $0 $0DSCST $52,650
$0 $0 $0 $3,016,561 $0 $0 $0NHRECST $3,016,561
$0 $0 $0 $105,300 $0 $0 $0SACST $105,300
$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000
$0 $100,000 $0 $3,174,511 $0 $0 $0PROJECT TOTAL: $3,274,511
Project: SR 70
FROM JEFFERSON AVENUE TO CR 29
FPN: 4145061
Work: PD&E/EMO STUDY
Length: 6.507
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,690,721 $26,915 $0 $0 $0 $0 $0ACSLPDE $1,717,636
$1,690,721 $26,915 $0 $0 $0 $0 $0PROJECT TOTAL: $1,717,636
Project: SR 70
FROM W OF SCFE CROSSING TO E OF CR 17
(OLD SR 8)
FPN: 4349591
Work: RAIL SAFETY PROJECT
Length: 0.208
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $72,593 $0 $0 $0DIHCST $72,593
$0 $0 $0 $520,380 $0 $0 $0SACST $520,380
$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000
$0 $0 $100,000 $0 $0 $0 $0DSRRU $100,000
$0 $100,000 $100,000 $592,973 $0 $0 $0PROJECT TOTAL: $792,973
Page 8 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: THUNDERBIRD ROAD
FROM COMET TERRACE TO GRAND PRIX DRIVE
FPN: 4313431
Work: SIDEWALK
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $103,218 $0 $0 $0 $0TALNCST $103,218
$0 $0 $212,436 $0 $0 $0 $0TALTCST $212,436
$0 $68,559 $0 $0 $0 $0 $0TALTPE $68,559
$0 $68,559 $315,654 $0 $0 $0 $0PROJECT TOTAL: $384,213
Project: THUNDERBIRD ROAD
FROM GRAND PRIX BLVD TO COUGAR BLVD
FPN: 4332031
Work: SIDEWALK
Length: 0.516
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $105,612 $0 $0 $0 $0TALLCST $105,612
$0 $17,984 $0 $0 $0 $0 $0TALTPE $17,984
$0 $17,984 $105,612 $0 $0 $0 $0PROJECT TOTAL: $123,596
Project: US 17
AT CR 17A/TRUCK ROUTE
FPN: 4350661
Work: ADD RIGHT TURN LANE(S)
Length: 0.200
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $11,120 $0DSCST $11,120
$0 $0 $0 $0 $0 $235,524 $0SACST $235,524
$0 $0 $0 $0 $0 $11,100 $0SLCST $11,100
$0 $0 $0 $130,000 $0 $0 $0SLPE $130,000
$0 $0 $0 $130,000 $0 $257,744 $0PROJECT TOTAL: $387,744
Project: US 27 (HIGHWAY PARK)
FROM OLD SR 8 TO S MAIN AVENUE
FPN: 4313421
Work: LANDSCAPING
Length: 1.337
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $476,414 $0 $0 $0 $0DDRCST $476,414
$0 $0 $5,125 $0 $0 $0 $0DIHCST $5,125
$212 $0 $0 $0 $0 $0 $0DSCST $212
$242,351 $0 $0 $0 $0 $0 $0DDRPE $242,351
$2,842 $17,284 $0 $0 $0 $0 $0DIHPE $20,126
$11,925 $0 $0 $0 $0 $0 $0DSPE $11,925
$257,330 $17,284 $481,539 $0 $0 $0 $0PROJECT TOTAL: $756,153
Project: US 27
AT EAST PHOENIX ST
FPN: 4350631
Work: ADD LEFT TURN LANE(S)
Length: 0.200
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $125,904 $0 $0SLCST $125,904
$0 $0 $10,000 $0 $0 $0 $0SLPE $10,000
$0 $0 $10,000 $0 $125,904 $0 $0PROJECT TOTAL: $135,904
Page 9 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 27
AT S HIGHLANDS AVE
FPN: 4313251
Work: ADD RIGHT TURN LANE(S)
Length: 0.200
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $10,250 $0 $0 $0 $0ACSLCST $10,250
$0 $0 $13,325 $0 $0 $0 $0DDRCST $13,325
$0 $0 $320,351 $0 $0 $0 $0SLCST $320,351
$85,094 $11,119 $0 $0 $0 $0 $0SNPE $96,213
$85,094 $11,119 $343,926 $0 $0 $0 $0PROJECT TOTAL: $440,139
Project: US 27
AT SEBRING PARKWAY
FPN: 4313201
Work: ADD RIGHT TURN LANE(S)
Length: 0.086
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $7,829 $0 $0 $0 $0 $0DDRCST $7,829
$727 $0 $0 $0 $0 $0 $0DSCST $727
$0 $244,188 $0 $0 $0 $0 $0SLCST $244,188
$14,674 $7,221 $0 $0 $0 $0 $0ACSLPE $21,895
$12,855 $0 $0 $0 $0 $0 $0DSPE $12,855
$50,397 $0 $0 $0 $0 $0 $0SLPE $50,397
$78,653 $259,238 $0 $0 $0 $0 $0PROJECT TOTAL: $337,891
Project: US 27
AT VICKI DRIVE
FPN: 4313191
Work: ADD RIGHT TURN LANE(S)
Length: 0.089
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $317,942 $0 $0 $0 $0 $0ACSLCST $317,942
$0 $7,823 $0 $0 $0 $0 $0DDRCST $7,823
$638 $0 $0 $0 $0 $0 $0DSCST $638
$39,427 $5,125 $0 $0 $0 $0 $0ACSLPE $44,552
$10,221 $0 $0 $0 $0 $0 $0DSPE $10,221
$50,405 $0 $0 $0 $0 $0 $0SLPE $50,405
$100,691 $330,890 $0 $0 $0 $0 $0PROJECT TOTAL: $431,581
Project: US 98
AT ARBUCKLE CREEK RD
FPN: 4365021
Work: ADD TURN LANE(S)
Length: 0.400
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $215,000 $0SLPE $215,000
$0 $0 $0 $0 $0 $215,000 $0PROJECT TOTAL: $215,000
Page 10 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: US 98
FROM US 27 TO AIRPORT ROAD
FPN: 4145112
Work: ADD LANES & RECONSTRUCT
Length: 4.634
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $0 $29,858,549CST $29,858,549
$0 $0 $0 $0 $6,300,000 $0 $0DDRPE $6,300,000
$0 $0 $0 $0 $250,000 $0 $0DIHPE $250,000
$0 $0 $0 $0 $0 $0 $11,404,000ROW $11,404,000
$0 $0 $0 $0 $0 $0 $1,450,000RRU $1,450,000
$0 $0 $0 $0 $6,550,000 $0 $42,712,549PROJECT TOTAL: $49,262,549
Project: US 98
FROM US 27 TO E OF AIRPORT ROAD
FPN: 4145111
Work: PD&E/EMO STUDY
Length: 4.634
Comments: PD&E INCLUDING 30% DESIGN
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,499,981 $0 $0 $0 $0 $0 $0DDRPDE $1,499,981
$61,982 $10,063 $0 $0 $0 $0 $0DIHPDE $72,045
$1,561,963 $10,063 $0 $0 $0 $0 $0PROJECT TOTAL: $1,572,026
Project: WEST STRYKER ROAD
FROM NORTH OLIVIA DRIVE TO US 27
FPN: 4366421
Work: RESURFACING
Length: 1.999
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $1,941,246 $0 $0SCRACST $1,941,246
$0 $0 $0 $0 $1,941,246 $0 $0PROJECT TOTAL: $1,941,246
$6,673,520 $8,777,440 $13,282,232 $10,632,284 $14,563,251 $1,030,749 $42,859,835
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:
$97,819,311
ALL YEARS
Page 11 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FIXED CAPITAL OUTLAY
Project: SEBRING OPERATIONS CENTER
FPN: 4353991
Work: FIXED CAPITAL OUTLAY
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$156,786 $18,614 $0 $0 $0 $0 $0FCOCST $175,400
$12,214 $0 $0 $0 $0 $0 $0FCOPE $12,214
$169,000 $18,614 $0 $0 $0 $0 $0PROJECT TOTAL: $187,614
$169,000 $18,614 $0 $0 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FIXED CAPITAL
OUTLAY TOTAL: $187,614
ALL YEARS
Page 12 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: AVIATION
Project: AVON PARK EXECUTIVE AIRPORT APRON
EXPANSION
FPN: 4348141
Work: AVIATION CAPACITY PROJECT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $480,000 $0 $0DPTOCAP $480,000
$0 $0 $0 $0 $120,000 $0 $0LFCAP $120,000
$0 $0 $0 $0 $600,000 $0 $0PROJECT TOTAL: $600,000
Project: AVON PARK EXECUTIVE AIRPORT DESIGN AND
CONST T-HANGERS
FPN: 4336361
Work: AVIATION REVENUE/OPERATIONAL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $243,728 $0 $0 $0DDRCAP $243,728
$10,000 $127,072 $300,000 $91,700 $0 $0 $0DPTOCAP $528,772
$10,000 $127,072 $300,000 $335,428 $0 $0 $0PROJECT TOTAL: $772,500
Project: AVON PARK EXECUTIVE AIRPORT FUEL FARM
FPN: 4364111
Work: AVIATION REVENUE/OPERATIONAL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$439,515 $9,000 $0 $0 $0 $0 $0DDRCAP $448,515
$439,515 $9,000 $0 $0 $0 $0 $0PROJECT TOTAL: $448,515
Project: AVON PARK EXECUTIVE AIRPORT FUEL TRUCK
PURCHASE
FPN: 4388461
Work: AVIATION REVENUE/OPERATIONAL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $125,000 $0 $0 $0 $0 $0DDRCAP $125,000
$0 $125,000 $0 $0 $0 $0 $0PROJECT TOTAL: $125,000
Project: AVON PARK EXECUTIVE APT PARALLEL TW TO
RW 10-28
FPN: 4318801
Work: AVIATION ENVIRONMENTAL PROJECT
Length: 0.000
Comments: PARALLEL TAXIWAY TO RUNWAY 10-28 (ENVIRONMENTAL ASSESSMENT)
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $60,000 $0 $0 $0 $0DDRCAP $60,000
$0 $0 $15,000 $0 $0 $0 $0LFCAP $15,000
$0 $0 $75,000 $0 $0 $0 $0PROJECT TOTAL: $75,000
Page 13 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SEBRING REG APT CONST PARALLEL TW
BRAVO (B)
FPN: 4318781
Work: AVIATION PRESERVATION PROJECT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $45,680 $0 $0 $0 $0DDRCAP $45,680
$0 $0 $1,735,790 $0 $0 $0 $0FAACAP $1,735,790
$0 $0 $45,680 $0 $0 $0 $0LFCAP $45,680
$0 $0 $1,827,150 $0 $0 $0 $0PROJECT TOTAL: $1,827,150
$449,515 $261,072 $2,202,150 $335,428 $600,000 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION
TOTAL: $3,848,165
ALL YEARS
Page 14 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: RAIL
Project: S. CENTRAL FLORIDA EXPRESS INTERCHANGE
TRACK S
FPN: 4335151
Work: RAIL CAPACITY PROJECT
Length: 0.000
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $3,750,000 $0 $0 $0 $0DISRRU $3,750,000
$0 $0 $1,250,000 $0 $0 $0 $0LFRRU $1,250,000
$0 $0 $5,000,000 $0 $0 $0 $0PROJECT TOTAL: $5,000,000
$0 $0 $5,000,000 $0 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: RAIL TOTAL:
$5,000,000
ALL YEARS
Page 15 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: TRANSIT
Project: 5310 OPERATING ASSISTANCE FOR CENTRAL
FLORIDA REGIONAL PLANNING COUNC
FPN: 4358621
Work: OPERATING FOR FIXED ROUTE
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$610,000 $333,467 $0 $0 $0 $0 $0DUOPS $943,467
$610,000 $333,467 $0 $0 $0 $0 $0LFOPS $943,467
$1,220,000 $666,934 $0 $0 $0 $0 $0PROJECT TOTAL: $1,886,934
Project: 5310 OPERATING ASSISTANCE FOR RIDGE
AREA ARC
FPN: 4369481
Work: OPERATING FOR FIXED ROUTE
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$51,476 $52,500 $0 $0 $0 $0 $0DUOPS $103,976
$51,476 $52,500 $0 $0 $0 $0 $0LFOPS $103,976
$102,952 $105,000 $0 $0 $0 $0 $0PROJECT TOTAL: $207,952
Project: HIGHLANDS CO CEN FL REGNL PLAN COUNCIL
FTA SECTION 5311 OPERATING ASST
FPN: 4101241
Work: OPERATING/ADMIN. ASSISTANCE
Length: 0.000
Comments: SECTION 5311 RURAL AREAS ONLY
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$4,658,941 $596,495 $538,228 $538,228 $538,228 $672,738 $0DUOPS $7,542,858
$4,658,941 $596,495 $538,228 $538,228 $538,228 $672,738 $0LFOPS $7,542,858
$9,317,882 $1,192,990 $1,076,456 $1,076,456 $1,076,456 $1,345,476 $0PROJECT TOTAL: $15,085,716
$10,640,834 $1,964,924 $1,076,456 $1,076,456 $1,076,456 $1,345,476 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT
TOTAL: $17,180,602
ALL YEARS
Page 16 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
TRANSPORTATION PLANNING
Project: CENTRAL FLORIDA RPC JPA - HIGHLANDS
FPN: 4364031
Work: TRANSPORTATION PLANNING
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$150,000 $0 $0 $0 $0 $0 $0PLN $150,000
$150,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $150,000
Project: HEARTLAND REGIONAL TPO
FPN: 4364032
Work: TRANSPORTATION PLANNING
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $385,135 $384,463 $384,463 $384,463 $384,463 $0PLPLN $1,922,987
$0 $385,135 $384,463 $384,463 $384,463 $384,463 $0PROJECT TOTAL: $1,922,987
$150,000 $385,135 $384,463 $384,463 $384,463 $384,463 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16TRANSPORTATION
PLANNING TOTAL: $2,072,987
ALL YEARS
$18,082,869 $11,407,185 $21,945,301 $12,428,631 $16,624,170 $2,760,688 $42,859,835
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHLANDS
TOTAL: $126,108,679
ALL YEARS
Page 17 of 17
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
OKEECHOBEE
Page 1 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
HIGHWAYS
Project: CR 68 (MICCO BLUFF)
FROM KISSIMMEE CATTLE CO TO DEAD END
FPN: 4368671
Work: WIDEN/RESURFACE EXIST LANES
Length: 2.219
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $1,621,622 $0 $0 $0SCEDCST $1,621,622
$0 $0 $0 $1,019,733 $0 $0 $0SCOPCST $1,019,733
$0 $0 $0 $2,641,355 $0 $0 $0PROJECT TOTAL: $2,641,355
Project: CR 68 (MICCO BLUFF)
FROM SR 700 TO NW 285TH DRIVE
FPN: 4301911
Work: RESURFACING
Length: 6.365
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$304,873 $0 $0 $0 $0 $0 $0PE $304,873
$304,873 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $304,873
Project: CR 68 (MICCO BLUFF)
FROM SR 700 TO W KISSIMMEE CATTLE CO DR
FPN: 4301912
Work: RESURFACING
Length: 4.146
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$64,634 $467 $0 $0 $0 $0 $0DIHCST $65,101
$1,075,811 $36,140 $0 $0 $0 $0 $0GRSCCST $1,111,951
$1,215,557 $0 $0 $0 $0 $0 $0SCEDCST $1,215,557
$234,754 $0 $0 $0 $0 $0 $0SCOPCST $234,754
$2,590,756 $36,607 $0 $0 $0 $0 $0PROJECT TOTAL: $2,627,363
Project: CR 68 (NW 160TH ST)
FROM US 98 TO US 441
FPN: 4316031
Work: WIDEN/RESURFACE EXIST LANES
Length: 10.557
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $200,000 $0 $0 $0 $0 $0DIHCST $200,000
$0 $2,213,752 $0 $0 $0 $0 $0GRSCCST $2,213,752
$0 $421,825 $0 $0 $0 $0 $0SCEDCST $421,825
$0 $315,586 $0 $0 $0 $0 $0SCOPCST $315,586
$0 $4,818,054 $0 $0 $0 $0 $0SCRACST $4,818,054
$9,439 $14,962 $0 $0 $0 $0 $0DIHPE $24,401
$238,971 $0 $0 $0 $0 $0 $0SCOPPE $238,971
$248,410 $7,984,179 $0 $0 $0 $0 $0PROJECT TOTAL: $8,232,589
Page 2 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: CR 68 EAST -NE 224TH ST
FROM US 441 TO ST LUCIE C/L
FPN: 4316051
Work: RESURFACING
Length: 8.068
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$52,618 $5,466 $0 $0 $0 $0 $0DIHCST $58,084
$2,784,753 $0 $0 $0 $0 $0 $0GRSCCST $2,784,753
$211,032 $0 $0 $0 $0 $0 $0SCOPCST $211,032
$12,588 $0 $0 $0 $0 $0 $0DIHPE $12,588
$198,108 $0 $0 $0 $0 $0 $0SCOPPE $198,108
$3,259,099 $5,466 $0 $0 $0 $0 $0PROJECT TOTAL: $3,264,565
Project: NE 102ND STREET
AT US 441
FPN: 4332051
Work: ADD LEFT TURN LANE(S)
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $357,542 $0 $0SLCST $357,542
$0 $0 $45,000 $0 $0 $0 $0ACSLPE $45,000
$0 $0 $100,000 $0 $0 $0 $0SLPE $100,000
$0 $0 $145,000 $0 $357,542 $0 $0PROJECT TOTAL: $502,542
Project: NE 34TH AVENUE
FROM SR 710 TO SR 70
FPN: 4385631
Work: RESURFACING
Length: 0.425
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $247,462 $0 $0 $0 $0 $0SCEDCST $247,462
$0 $142,897 $0 $0 $0 $0 $0SCRACST $142,897
$0 $227,399 $0 $0 $0 $0 $0SCWRCST $227,399
$0 $617,758 $0 $0 $0 $0 $0PROJECT TOTAL: $617,758
Project: NE 36TH BLVD
FROM US 441 TO DEAD END
FPN: 4368661
Work: WIDEN/RESURFACE EXIST LANES
Length: 1.729
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $1,020,033 $0 $0GRSCCST $1,020,033
$0 $0 $0 $0 $1,621,622 $0 $0SCEDCST $1,621,622
$0 $0 $0 $0 $2,641,655 $0 $0PROJECT TOTAL: $2,641,655
Project: OKEECHOBEE CITY TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4136431
Work: TRAFFIC SIGNALS
Length: 0.100
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$93,844 $16,264 $24,170 $18,224 $18,771 $19,334 $19,914DDROPS $210,521
$93,844 $16,264 $24,170 $18,224 $18,771 $19,334 $19,914PROJECT TOTAL: $210,521
Page 3 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: OKEECHOBEE COUNTY SCOUR
COUNTERMEASURE
AT VARIOUS LOCATIONS
FPN: 4350282
Work: BRIDGE-REPAIR/REHABILITATION
Length: 0.033
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$231,857 $0 $0 $0 $0 $0 $0BRRPCST $231,857
$122 $17,758 $0 $0 $0 $0 $0DIHCST $17,880
$72 $0 $0 $0 $0 $0 $0DSCST $72
$29,483 $0 $0 $0 $0 $0 $0BRRPPE $29,483
$2,296 $2,204 $0 $0 $0 $0 $0DIHPE $4,500
$263,830 $19,962 $0 $0 $0 $0 $0PROJECT TOTAL: $283,792
Project: OKEECHOBEE COUNTY SIDEWALKS
AT VARIOUS LOCATIONS
FPN: 4313391
Work: SIDEWALK
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $3,399 $0 $0 $0DSCST $3,399
$0 $0 $0 $314,164 $0 $0 $0SLCST $314,164
$0 $183,358 $0 $0 $0 $0 $0TALTPE $183,358
$0 $183,358 $0 $317,563 $0 $0 $0PROJECT TOTAL: $500,921
Project: OKEECHOBEE COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
FPN: 4126741
Work: TRAFFIC SIGNALS
Length: 13.364
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$144,529 $33,440 $43,508 $37,248 $43,139 $44,434 $45,767DDROPS $392,065
$144,529 $33,440 $43,508 $37,248 $43,139 $44,434 $45,767PROJECT TOTAL: $392,065
Project: OKEECHOBEE TRAILHEAD
FPN: 2001051
Work: BIKE PATH/TRAIL
Length: 1.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$600,000 $0 $0 $0 $0 $0 $0CST $600,000
$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000
Project: OKEECHOBEE TRAILHEAD
FPN: 2001052
Work: BIKE PATH/TRAIL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$300,000 $0 $0 $0 $0 $0 $0CST $300,000
$300,000 $0 $0 $0 $0 $0 $0LAR $300,000
$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000
Page 4 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: OKEECHOBEE TRAILHEAD
FPN: 2001053
Work: BIKE PATH/TRAIL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$300,000 $0 $0 $0 $0 $0 $0CST $300,000
$300,000 $0 $0 $0 $0 $0 $0LAR $300,000
$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000
Project: OKEECHOBEE TRAILHEAD
FPN: 2001054
Work: BIKE PATH/TRAIL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$300,000 $0 $0 $0 $0 $0 $0CST $300,000
$300,000 $0 $0 $0 $0 $0 $0LAR $300,000
$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000
Project: OKEECHOBEE TRAILHEAD
FPN: 2001055
Work: BIKE PATH/TRAIL
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$119 $0 $0 $0 $0 $0 $0PE $119
$119 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $119
Project: OKEECHOBEE TRAILHEAD
FPN: 2001057
Work: BIKE PATH/TRAIL
Length: 0.164
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$1,043,477 $10,547 $0 $0 $0 $0 $0TALTCST $1,054,024
$476 $0 $0 $0 $0 $0 $0SEPE $476
$1,043,953 $10,547 $0 $0 $0 $0 $0PROJECT TOTAL: $1,054,500
Project: SE 34TH AVE & OTHERS
FROM SR 700 (US 98/441) TO SOUTH OF SR 710
FPN: 4301901
Work: WIDEN/RESURFACE EXIST LANES
Length: 2.761
Comments: (PHASE I)
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$20,405 $329 $0 $0 $0 $0 $0DIHCST $20,734
$1,031,247 $31,144 $0 $0 $0 $0 $0GRSCCST $1,062,391
$880,427 $0 $0 $0 $0 $0 $0SCOPCST $880,427
$15,758 $0 $0 $0 $0 $0 $0DIHPE $15,758
$238,837 $0 $0 $0 $0 $0 $0SCOPPE $238,837
$2,186,674 $31,473 $0 $0 $0 $0 $0PROJECT TOTAL: $2,218,147
Page 5 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 15/700(US 98/441)
FROM SR 78 TO SE 30TH TERRACE
FPN: 4349621
Work: RESURFACING
Length: 2.188
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $85,393 $0 $0 $0 $0ACSLCST $85,393
$0 $0 $391,475 $0 $0 $0 $0DDRCST $391,475
$0 $0 $1,260,527 $0 $0 $0 $0SLCST $1,260,527
$3,317 $0 $0 $0 $0 $0 $0DSPE $3,317
$13,358 $86,642 $0 $0 $0 $0 $0SAPE $100,000
$16,675 $86,642 $1,737,395 $0 $0 $0 $0PROJECT TOTAL: $1,840,712
Project: SR 70
AT US 441
FPN: 4258461
Work: INTERSECTION IMPROVEMENT
Length: 0.358
Comments: ADD DUAL LEFT TURN LANES IN ALL DIRECTIONS
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$3,468,055 $170,882 $0 $0 $0 $0 $0DDRCST $3,638,937
$47,614 $70,755 $0 $0 $0 $0 $0DIHCST $118,369
$17,804 $0 $0 $0 $0 $0 $0DSCST $17,804
$111,071 $0 $0 $0 $0 $0 $0LFCST $111,071
$70,000 $0 $0 $0 $0 $0 $0DDRENV $70,000
$0 $120,000 $0 $0 $0 $0 $0DDRINC $120,000
$370 $0 $0 $0 $0 $0 $0DIHPDE $370
$104,464 $0 $0 $0 $0 $0 $0DIHPE $104,464
$252 $0 $0 $0 $0 $0 $0DSPE $252
$258,708 $0 $0 $0 $0 $0 $0EBPE $258,708
$800,000 $0 $0 $0 $0 $0 $0SAPE $800,000
$917,448 $0 $0 $0 $0 $0 $0BNDSROW $917,448
$26,454 $0 $0 $0 $0 $0 $0DIHROW $26,454
$14,847 $2,381 $0 $0 $0 $0 $0LFRRU $17,228
$5,837,087 $364,018 $0 $0 $0 $0 $0PROJECT TOTAL: $6,201,105
Page 6 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 70
FROM NE 34TH AVENUE TO NE 80TH AVENUE
FPN: 1969042
Work: ADD LANES & RECONSTRUCT
Length: 3.659
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$13,282,253 $54,427 $0 $0 $0 $0 $0ACNPCST $13,336,680
$100,000 $0 $0 $0 $0 $0 $0DICST $100,000
$3,606,092 $0 $0 $0 $0 $0 $0DSCST $3,606,092
$790,698 $0 $0 $0 $0 $0 $0LFPCST $790,698
$4,277,965 $0 $0 $0 $0 $0 $0NHPPCST $4,277,965
$250,000 $0 $0 $0 $0 $0 $0ACNPENV $250,000
$900 $0 $0 $0 $0 $0 $0DSENV $900
$359,960 $0 $0 $0 $0 $0 $0HPPENV $359,960
$64,825 $0 $0 $0 $0 $0 $0NHENV $64,825
$114,363 $0 $0 $0 $0 $0 $0NHPPENV $114,363
$312,969 $0 $0 $0 $0 $0 $0DIHPE $312,969
$589,938 $0 $0 $0 $0 $0 $0DSPE $589,938
$3,199,717 $0 $0 $0 $0 $0 $0GMRPE $3,199,717
$142,500 $288,473 $0 $0 $0 $0 $0ACNPROW $430,973
$157,919 $0 $0 $0 $0 $0 $0BNDSROW $157,919
$4,612,606 $2,111,064 $0 $0 $0 $0 $0BNIRROW $6,723,670
$1,439,840 $0 $0 $0 $0 $0 $0HPPROW $1,439,840
$11,135,221 $128,018 $0 $0 $0 $0 $0NHROW $11,263,239
$978,259 $0 $0 $0 $0 $0 $0NHPPROW $978,259
$1,561,260 $0 $0 $0 $0 $0 $0NHPPRRU $1,561,260
$46,977,285 $2,581,982 $0 $0 $0 $0 $0PROJECT TOTAL: $49,559,267
Project: SR 70
FROM NE 80TH AVENUE TO BERMAN ROAD
FPN: 1969044
Work: ADD LANES & REHABILITATE PVMNT
Length: 3.311
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$2,605,348 $112,210 $0 $0 $0 $0 $0ACNPCST $2,717,558
$1,333,953 $0 $0 $0 $0 $0 $0DSCST $1,333,953
$2,483,250 $0 $0 $0 $0 $0 $0GMRCST $2,483,250
$30,119 $0 $0 $0 $0 $0 $0LFPCST $30,119
$2,928,894 $0 $0 $0 $0 $0 $0NHPPCST $2,928,894
$100,000 $0 $0 $0 $0 $0 $0DIENV $100,000
$130,000 $0 $0 $0 $0 $0 $0DISENV $130,000
$193,048 $1,059,902 $0 $0 $0 $0 $0ACNPROW $1,252,950
$6,710,107 $56,321 $0 $0 $0 $0 $0NHROW $6,766,428
$1,011,966 $0 $0 $0 $0 $0 $0NHPPROW $1,011,966
$377,619 $0 $0 $0 $0 $0 $0ACNPRRU $377,619
$17,904,304 $1,228,433 $0 $0 $0 $0 $0PROJECT TOTAL: $19,132,737
Page 7 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 70
FROM NE 80TH AVENUE TO ST. LUCIE COUNTY
LINE
FPN: 1969043
Work: PRELIM ENG FOR FUTURE CAPACITY
Length: 4.441
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$157,574 $7,651 $0 $0 $0 $0 $0DIHPE $165,225
$364,646 $0 $0 $0 $0 $0 $0DSPE $364,646
$2,738,740 $0 $0 $0 $0 $0 $0GMRPE $2,738,740
$3,260,960 $7,651 $0 $0 $0 $0 $0PROJECT TOTAL: $3,268,611
Project: SR 70
FROM SE 16TH AVENUE TO SE 31ST TERRACE
FPN: 4314611
Work: RESURFACING
Length: 1.225
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $2,284,091 $0 $0 $0 $0 $0DDRCST $2,284,091
$0 $20,540 $0 $0 $0 $0 $0DIHCST $20,540
$0 $45,000 $0 $0 $0 $0 $0DDRENV $45,000
$76,306 $38,516 $0 $0 $0 $0 $0DIHPE $114,822
$9,855 $0 $0 $0 $0 $0 $0DSPE $9,855
$86,161 $2,388,147 $0 $0 $0 $0 $0PROJECT TOTAL: $2,474,308
Project: SR 70
FROM W OF 34TH AVENUE TO BERMAN ROAD
FPN: 1969041
Work: PD&E/EMO STUDY
Length: 6.964
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$930,006 $0 $0 $0 $0 $0 $0PDE $930,006
$930,006 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $930,006
Project: SR 70 WEST
FROM SW 24TH AVENUE TO NW 38TH TERRACE
FPN: 4298191
Work: SIDEWALK
Length: 0.905
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $23,261 $0 $0 $0 $0 $0DIHCST $23,261
$565 $998,742 $0 $0 $0 $0 $0DSCST $999,307
$15 $0 $0 $0 $0 $0 $0DIHPE $15
$21,198 $0 $0 $0 $0 $0 $0DSPE $21,198
$223,889 $14,072 $0 $0 $0 $0 $0TALTPE $237,961
$245,667 $1,036,075 $0 $0 $0 $0 $0PROJECT TOTAL: $1,281,742
Project: SR 710
FROM E OF L-63 CANAL TO SHERMAN WOOD
RANCHES
FPN: 4193444
Work: ADD LANES & RECONSTRUCT
Length: 3.181
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $0 $3,500,000PE $3,500,000
$0 $0 $0 $0 $0 $0 $3,500,000PROJECT TOTAL: $3,500,000
Page 8 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR 710
FROM SHERMAN WOOD RANCHES TO CR 714
(MARTIN C/L)
FPN: 4193445
Work: ADD LANES & RECONSTRUCT
Length: 6.741
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $0 $0 $0 $6,500,000PE $6,500,000
$0 $0 $0 $0 $0 $0 $6,500,000PROJECT TOTAL: $6,500,000
Project: SR 710
FROM US 441 TO L-63 CANAL
FPN: 4193443
Work: NEW ROAD CONSTRUCTION
Length: 0.001
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $250,000 $0 $0 $0 $0 $0DDRENV $250,000
$3,628,908 $0 $0 $0 $0 $0 $0DDRPE $3,628,908
$111,813 $18,156 $0 $0 $0 $0 $0DIHPE $129,969
$12,280 $0 $0 $0 $0 $0 $0DSPE $12,280
$0 $0 $0 $1,453,873 $4,493,566 $4,329,658 $0DDRROW $10,277,097
$0 $0 $0 $137,684 $137,683 $0 $0DIHROW $275,367
$3,753,001 $268,156 $0 $1,591,557 $4,631,249 $4,329,658 $0PROJECT TOTAL: $14,573,621
Project: SR 710
FROM US 441 TO MARTIN COUNTY LINE
FPN: 4193442
Work: PD&E/EMO STUDY
Length: 9.922
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$388,371 $0 $0 $0 $0 $0 $0DDRPDE $388,371
$212,584 $5,314 $0 $0 $0 $0 $0DIHPDE $217,898
$110,423 $56,777 $0 $0 $0 $0 $0DSPDE $167,200
$1,083,275 $0 $0 $0 $0 $0 $0GMRPDE $1,083,275
$1,794,653 $62,091 $0 $0 $0 $0 $0PROJECT TOTAL: $1,856,744
Project: SR 78 OVER KISSIMMEE RIVER BRIDGE
NUMBER 910009
FPN: 4317231
Work: BRIDGE-REPAIR/REHABILITATION
Length: 0.126
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $901,988 $0 $0 $0 $0BRRPCST $901,988
$0 $0 $10,250 $0 $0 $0 $0DIHCST $10,250
$147 $0 $0 $0 $0 $0 $0DSCST $147
$10,000 $0 $0 $0 $0 $0 $0BRRPENV $10,000
$203,400 $0 $0 $0 $0 $0 $0BRRPPE $203,400
$0 $7,000 $0 $0 $0 $0 $0DIHPE $7,000
$213,547 $7,000 $912,238 $0 $0 $0 $0PROJECT TOTAL: $1,132,785
Project: SR15 (US 441)
FROM S OF NE 131ST LN TO S OF NE 224TH ST
FPN: 4349411
Work: RESURFACING
Length: 5.789
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $33,960 $0 $0 $0DIHCST $33,960
$0 $0 $0 $4,361,288 $0 $0 $0DSCST $4,361,288
$0 $0 $0 $339,608 $0 $0 $0SACST $339,608
$10,173 $20,137 $0 $0 $0 $0 $0DIHPE $30,310
$10,173 $20,137 $0 $4,734,856 $0 $0 $0PROJECT TOTAL: $4,765,166
Page 9 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: SR15/SR700 (US 441)
FROM S OF NE 224TH ST TO S OF NE 304TH ST
FPN: 4349401
Work: RESURFACING
Length: 5.378
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $3,945,866 $0 $0 $0 $0DDRCST $3,945,866
$0 $0 $32,118 $0 $0 $0 $0DIHCST $32,118
$9,656 $55,344 $0 $0 $0 $0 $0DIHPE $65,000
$9,656 $55,344 $3,977,984 $0 $0 $0 $0PROJECT TOTAL: $4,042,984
Project: US 441
AT CR 724 (240TH STREET)
FPN: 4313381
Work: ADD LEFT TURN LANE(S)
Length: 0.200
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $28,873 $0 $0 $0DSCST $28,873
$0 $0 $0 $211,588 $0 $0 $0SLCST $211,588
$0 $145,000 $0 $0 $0 $0 $0SLPE $145,000
$0 $145,000 $0 $240,461 $0 $0 $0PROJECT TOTAL: $385,461
Project: US 441
AT NW 144TH STREET
FPN: 4313371
Work: ADD LEFT TURN LANE(S)
Length: 1.200
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $28,431 $0 $0 $0DSCST $28,431
$0 $0 $0 $691,970 $0 $0 $0SLCST $691,970
$0 $238 $0 $0 $0 $0 $0DIHPE $238
$0 $238 $0 $720,401 $0 $0 $0PROJECT TOTAL: $720,639
Project: US 98/SR 700
FROM NW 9TH STREET TO SR 70
FPN: 4390271
Work: DRAINAGE IMPROVEMENTS
Length: 0.698
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000
$0 $5,000 $0 $0 $0 $0 $0PROJECT TOTAL: $5,000
$93,575,262 $17,194,968 $6,840,295 $10,301,665 $7,692,356 $4,393,426 $10,065,681
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:
$150,063,653
ALL YEARS
Page 10 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
FLP: AVIATION
Project: OKEECHOBEE COUNTY AIRPORT CAPITAL
IMPROVEMENTS
FPN: 4292731
Work: AVIATION SECURITY PROJECT
Length: 0.000
Comments:
SIS: No
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$125,000 $29,410 $0 $0 $0 $0 $0DDRCAP $154,410
$25,000 $0 $0 $0 $0 $0 $0DPTOCAP $25,000
$150,000 $29,410 $0 $0 $0 $0 $0PROJECT TOTAL: $179,410
$150,000 $29,410 $0 $0 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION
TOTAL: $179,410
ALL YEARS
Page 11 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
TURNPIKE
Project: CANAL PROTECTION ON TPK (SR91) IN
OKEECHOBEE COUNTY,MP 181.08 - 188.54
FPN: 4193281
Work: GUARDRAIL
Length: 7.472
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$701,375 $0 $0 $0 $0 $0 $0PKBDCST $701,375
$37,006 $899 $0 $0 $0 $0 $0PKYICST $37,905
$349,260 $1,414 $0 $0 $0 $0 $0PKYIPE $350,674
$1,087,641 $2,313 $0 $0 $0 $0 $0PROJECT TOTAL: $1,089,954
Project: FT DRUM SERVICE PLAZA MODIFICATION (MP
184)
FPN: 4224182
Work: REST AREA
Length: 0.507
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$37 $0 $0 $0 $0 $0 $0DCDSB $37
$5,524,233 $0 $0 $0 $0 $0 $0PKBDDSB $5,524,233
$17,682,380 $540 $0 $0 $0 $0 $0PKYIDSB $17,682,920
$1,342,982 $0 $0 $0 $0 $0 $0PKYIENV $1,342,982
$289 $1,211 $0 $0 $0 $0 $0PKYIPDE $1,500
$101,141 $0 $0 $0 $0 $0 $0PKYIPE $101,141
$255,126 $0 $0 $0 $0 $0 $0PKYIROW $255,126
$24,906,188 $1,751 $0 $0 $0 $0 $0PROJECT TOTAL: $24,907,939
Project: LANDSCAPING FOR TPK'S FT. DRUM SERVICE
PLAZA (MP 184)
FPN: 4339154
Work: LANDSCAPING
Length: 0.600
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$22,239 $1,500 $0 $0 $0 $0 $0PKYIPE $23,739
$22,239 $1,500 $0 $0 $0 $0 $0PROJECT TOTAL: $23,739
Project: RESURFACE OF TPK MAINLINE
FROM MP181.1 TO MP185.0 (OKEECHOBEE
COUNTY)
FPN: 4351651
Work: RESURFACING
Length: 3.900
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$21,806 $0 $0 $0 $0 $0 $0PKYICST $21,806
$0 $0 $3,958,976 $0 $0 $0 $0PKYRCST $3,958,976
$2,349 $0 $0 $0 $0 $0 $0PKYIPE $2,349
$9,722 $358,522 $0 $0 $0 $0 $0PKYRPE $368,244
$33,877 $358,522 $3,958,976 $0 $0 $0 $0PROJECT TOTAL: $4,351,375
Page 12 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
Project: RESURFACE OF TPK MAINLINE
FROM MP185.0 TO MP188.5 (OKEECHOBEE
COUNTY)
FPN: 4351661
Work: RESURFACING
Length: 3.500
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$17,022 $0 $0 $0 $0 $0 $0PKYICST $17,022
$0 $0 $3,623,585 $0 $0 $0 $0PKYRCST $3,623,585
$1,965 $0 $0 $0 $0 $0 $0PKYIPE $1,965
$915 $324,107 $0 $0 $0 $0 $0PKYRPE $325,022
$19,902 $324,107 $3,623,585 $0 $0 $0 $0PROJECT TOTAL: $3,967,594
Project: ROADSIDE IMPROVEMENT FOR TPK MAINLINE
FROM MP181.1 TO MP185.0
FPN: 4351653
Work: GUARDRAIL
Length: 3.900
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$10,614 $0 $492,169 $0 $0 $0 $0PKYICST $502,783
$171,264 $0 $0 $0 $0 $0 $0PKYIPE $171,264
$181,878 $0 $492,169 $0 $0 $0 $0PROJECT TOTAL: $674,047
Project: ROADSIDE IMPROVEMENT FOR TPK MAINLINE
FROM MP185.0 TO MP188.5
FPN: 4351663
Work: GUARDRAIL
Length: 3.500
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $456,293 $0 $0 $0 $0PKYICST $456,293
$151,227 $1,500 $0 $0 $0 $0 $0PKYIPE $152,727
$151,227 $1,500 $456,293 $0 $0 $0 $0PROJECT TOTAL: $609,020
Project: THERMOPLASTIC OF TPK MAINLINE
RESURFACING
FROM MP181.1 TO MP185.0
FPN: 4351652
Work: SIGNING/PAVEMENT MARKINGS
Length: 3.900
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $160,433 $0 $0 $0PKYRCST $160,433
$0 $0 $0 $160,433 $0 $0 $0PROJECT TOTAL: $160,433
Project: THERMOPLASTIC OF TPK MAINLINE
RESURFACING
FROM MP185.0 TO MP188.5
FPN: 4351662
Work: SIGNING/PAVEMENT MARKINGS
Length: 3.500
Comments:
SIS: Yes
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS
$0 $0 $0 $141,945 $0 $0 $0PKYRCST $141,945
$0 $0 $0 $141,945 $0 $0 $0PROJECT TOTAL: $141,945
$26,402,952 $689,693 $8,531,023 $302,378 $0 $0 $0
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16TURNPIKE TOTAL:
$35,926,046
ALL YEARS
Page 13 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT
July 1, 2015 through June 30, 2020
$120,128,214 $17,914,071 $15,371,318 $10,604,043 $7,692,356 $4,393,426 $10,065,681
2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16OKEECHOBEE
TOTAL: $186,169,109
ALL YEARS
Page 14 of 14
ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE
CODES
Report Date: 12/30/2015 Import Date: 12/30/2015