FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT July 1, 2015 through June 30, 2020 DESOTO Page 1 of 12 ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES Report Date: 12/30/2015 Import Date: 12/30/2015

Transcript of DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001...

Page 1: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

DESOTO

Page 1 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 2: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HIGHWAYS

Project: ARCADIA TRAFFIC SIGNALS REIMBURSEMENT

FPN: 4136281

Work: TRAFFIC SIGNALS

Length: 0.855

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$239,633 $43,168 $65,736 $46,727 $48,129 $49,573 $51,060DDROPS $544,026

$239,633 $43,168 $65,736 $46,727 $48,129 $49,573 $51,060PROJECT TOTAL: $544,026

Project: BRIDGE REPLACEMENT ON SR 70 OVER DCI

CANAL IN DESOTO COUNTY

FPN: 4361921

Work: PD&E/EMO STUDY

Length: 0.005

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$10,916 $9,084 $0 $0 $0 $0 $0DIHPDE $20,000

$10,916 $9,084 $0 $0 $0 $0 $0PROJECT TOTAL: $20,000

Project: CR 661

FROM SR 70 TO HARDEE COUNTY LINE

FPN: 4318841

Work: RESURFACING

Length: 7.576

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $4,048,269 $0 $0 $0 $0GRSCCST $4,048,269

$0 $0 $4,048,269 $0 $0 $0 $0PROJECT TOTAL: $4,048,269

Project: CR 763

FROM SR 31 TO SR 31

FPN: 4318921

Work: RESURFACING

Length: 9.800

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $122,525 $0 $0 $0 $0GRSCCST $122,525

$0 $0 $601,389 $0 $0 $0 $0SCOPCST $601,389

$0 $0 $4,687,500 $0 $0 $0 $0SCRACST $4,687,500

$0 $0 $5,411,414 $0 $0 $0 $0PROJECT TOTAL: $5,411,414

Project: CR 769 (KINGS HWY)

AT CHARLOTTE COUNTY LINE

FPN: 4301171

Work: MISCELLANEOUS CONSTRUCTION

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $162,916 $0 $0 $0 $0 $0SNCST $162,916

$0 $162,916 $0 $0 $0 $0 $0PROJECT TOTAL: $162,916

Page 2 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 3: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: CR 769 (KINGS HWY)

FROM CHARLOTTE CNTY LINE TO PEACE

RIVER STR

FPN: 4312971

Work: PD&E/EMO STUDY

Length: 2.237

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$757,930 $95,068 $0 $0 $0 $0 $0ACSLPDE $852,998

$247,002 $0 $0 $0 $0 $0 $0SLPDE $247,002

$1,004,932 $95,068 $0 $0 $0 $0 $0PROJECT TOTAL: $1,100,000

Project: DESOTO COUNTY

AT VARIOUS LOCATIONS

FPN: 4046791

Work: SIDEWALK

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$126,037 $0 $0 $0 $0 $0 $0CST $126,037

$75,000 $0 $0 $0 $0 $0 $0PE $75,000

$201,037 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $201,037

Project: DESOTO COUNTY

AT VARIOUS LOCATIONS

FPN: 4046792

Work: SIDEWALK

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$112,206 $0 $0 $0 $0 $0 $0CST $112,206

$65,701 $0 $0 $0 $0 $0 $0PE $65,701

$177,907 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $177,907

Project: DESOTO COUNTY

AT VARIOUS LOCATIONS

FPN: 4046793

Work: SIDEWALK

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$115,217 $0 $0 $0 $0 $0 $0CST $115,217

$38,928 $0 $0 $0 $0 $0 $0PE $38,928

$154,145 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $154,145

Project: DESOTO COUNTY

AT VARIOUS LOCATIONS

FPN: 4046794

Work: SIDEWALK

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$117,475 $0 $0 $0 $0 $0 $0CST $117,475

$24,181 $0 $0 $0 $0 $0 $0PE $24,181

$119,400 $0 $0 $0 $0 $0 $0PLN $119,400

$261,056 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $261,056

Page 3 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 4: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: DESOTO COUNTY

AT VARIOUS LOCATIONS

FPN: 4046795

Work: SIDEWALK

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$678,216 $0 $0 $0 $0 $0 $0CST $678,216

$63,130 $0 $0 $0 $0 $0 $0PE $63,130

$741,346 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $741,346

Project: DESOTO COUNTY

AT VARIOUS LOCATIONS

FPN: 4046797

Work: SIDEWALK

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$194,695 $665 $0 $0 $0 $0 $0SECST $195,360

$75,855 $0 $0 $0 $0 $0 $0SEPE $75,855

$84,000 $0 $0 $0 $0 $0 $0SEPLN $84,000

$354,550 $665 $0 $0 $0 $0 $0PROJECT TOTAL: $355,215

Project: DESOTO COUNTY TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4126671

Work: TRAFFIC SIGNALS

Length: 0.162

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$39,535 $7,296 $10,457 $8,126 $8,370 $8,621 $8,880DDROPS $91,285

$39,535 $7,296 $10,457 $8,126 $8,370 $8,621 $8,880PROJECT TOTAL: $91,285

Project: GATEWAY SIGNS

AT VARIOUS LOCATIONS

FPN: 4300581

Work: MISCELLANEOUS CONSTRUCTION

Length: 0.001

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$140,000 $0 $0 $0 $0 $0 $0LFPCST $140,000

$380,700 $129 $0 $0 $0 $0 $0TALTCST $380,829

$520,700 $129 $0 $0 $0 $0 $0PROJECT TOTAL: $520,829

Project: HILLSBOROUGH AVENUE

FROM FLETCHER STREET TO ADEL STREET

FPN: 4366451

Work: RESURFACING

Length: 0.961

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $1,592,234 $0SCRACST $1,592,234

$0 $0 $0 $0 $0 $1,592,234 $0PROJECT TOTAL: $1,592,234

Page 4 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 5: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: MASTERS AVENUE

FROM US 17 TO DEAD END

FPN: 4318891

Work: RESURFACING

Length: 3.300

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $1,187,984 $0 $0 $0 $0 $0SCRACST $1,187,984

$0 $1,187,984 $0 $0 $0 $0 $0PROJECT TOTAL: $1,187,984

Project: NW WINDY PINE AVENUE

FROM SR 72 TO END OF ROAD

FPN: 4366491

Work: RESURFACING

Length: 1.046

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $627,724 $0 $0 $0SCRACST $627,724

$0 $0 $0 $627,724 $0 $0 $0PROJECT TOTAL: $627,724

Project: ROBERTS AVENUE EAST GIBSON SREET

NURSING HOME DRIVE

FPN: 4370991

Work: SIDEWALK

Length: 0.310

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $0 $731,787SNCST $731,787

$0 $0 $0 $0 $0 $175,000 $0SNPE $175,000

$0 $0 $0 $0 $0 $175,000 $731,787PROJECT TOTAL: $906,787

Project: SE DURRANCE STREET

FROM AIRPORT ROAD TO SR 31

FPN: 4366471

Work: RESURFACING

Length: 1.086

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $839,179 $0SCRACST $839,179

$0 $0 $0 $0 $0 $839,179 $0PROJECT TOTAL: $839,179

Project: SR 31 EXTENSION

FROM SR 70 TO US 17

FPN: 4312981

Work: NEW ROAD CONSTRUCTION

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $3,000,000 $0 $0 $0 $0CIGPPDE $3,000,000

$0 $0 $0 $0 $0 $1,450,000 $0SAPE $1,450,000

$0 $0 $0 $0 $0 $3,000,000 $0SNPE $3,000,000

$0 $0 $3,000,000 $0 $0 $4,450,000 $0PROJECT TOTAL: $7,450,000

Page 5 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 6: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 35 (US 17)

FROM LIVINGSTON STREET TO HARDEE

COUNTY LINE

FPN: 4369201

Work: RESURFACING

Length: 6.971

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $8,426,302 $0 $0 $0 $0DDRCST $8,426,302

$0 $0 $512,500 $0 $0 $0 $0DIHCST $512,500

$0 $0 $6,586,905 $0 $0 $0 $0DSCST $6,586,905

$0 $30,000 $100,000 $0 $0 $0 $0DDRENV $130,000

$5,043 $5,138 $0 $0 $0 $0 $0DIHPE $10,181

$253,346 $0 $0 $0 $0 $0 $0DSPE $253,346

$258,389 $35,138 $15,625,707 $0 $0 $0 $0PROJECT TOTAL: $15,919,234

Project: SR 70

AT CR 760

FPN: 4298431

Work: ADD LEFT TURN LANE(S)

Length: 0.348

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$553,491 $0 $0 $0 $0 $0 $0CIGPCST $553,491

$21,280 $215 $0 $0 $0 $0 $0DIHCST $21,495

$4,739 $0 $0 $0 $0 $0 $0DSCST $4,739

$71,164 $0 $0 $0 $0 $0 $0CIGPPE $71,164

$7,674 $0 $0 $0 $0 $0 $0DIHPE $7,674

$1,801 $0 $0 $0 $0 $0 $0DSPE $1,801

$660,149 $215 $0 $0 $0 $0 $0PROJECT TOTAL: $660,364

Project: SR 70

FROM ORANGE AVE TO TURNER AVE

FPN: 4365801

Work: RESURFACING

Length: 2.393

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $3,886,635 $0 $0 $0DDRCST $3,886,635

$0 $0 $0 $210,600 $0 $0 $0DIHCST $210,600

$0 $0 $0 $449,139 $0 $0 $0DSCST $449,139

$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000

$0 $0 $0 $300,000 $0 $0 $0DDRRRU $300,000

$0 $100,000 $0 $4,846,374 $0 $0 $0PROJECT TOTAL: $4,946,374

Project: SR72

FROM ROGER AVE TO E OF SW GATOR TRAIL

FPN: 4358071

Work: DRAINAGE IMPROVEMENTS

Length: 0.139

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$515 $0 $0 $0 $0 $0 $0DSCST $515

$3,052 $3,537 $0 $0 $0 $0 $0DIHPE $6,589

$51,582 $0 $0 $0 $0 $0 $0DSPE $51,582

$55,149 $3,537 $0 $0 $0 $0 $0PROJECT TOTAL: $58,686

Page 6 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 7: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SW FLETCHER ST

FROM US 17 TO HILLSBOROUGH AVE

FPN: 4350601

Work: WIDEN/RESURFACE EXIST LANES

Length: 0.968

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $460,981 $0 $0 $0 $0GRSCCST $460,981

$0 $0 $225,046 $0 $0 $0 $0SCWRCST $225,046

$0 $0 $686,027 $0 $0 $0 $0PROJECT TOTAL: $686,027

Project: SW SHORES AVENUE

FROM SW BEARD STREET TO SW CR 760A

FPN: 4366481

Work: WIDEN/RESURFACE EXIST LANES

Length: 1.250

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $562,349 $0 $0 $0 $0SCEDCST $562,349

$0 $0 $81,423 $0 $0 $0 $0SCOPCST $81,423

$0 $0 $1,022,945 $0 $0 $0 $0SCWRCST $1,022,945

$0 $0 $1,666,717 $0 $0 $0 $0PROJECT TOTAL: $1,666,717

Project: TURNER AVE

AT ROAN ST/GIBSON ST IMPROVEMENTS

FPN: 4350141

Work: INTERSECTION IMPROVEMENT

Length: 0.180

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $906,780 $0 $0SNCST $906,780

$0 $0 $0 $151,000 $0 $0 $0SNPE $151,000

$0 $0 $0 $151,000 $906,780 $0 $0PROJECT TOTAL: $1,057,780

Project: US 17 (SR 35)

AT CHARLOTTE C/L

FPN: 4298391

Work: MISCELLANEOUS CONSTRUCTION

Length: 0.100

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,967 $0 $0 $0 $0 $0 $0DSCST $1,967

$0 $171,916 $0 $0 $0 $0 $0SNCST $171,916

$1,967 $171,916 $0 $0 $0 $0 $0PROJECT TOTAL: $173,883

Page 7 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 8: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 17 (SR 35)

FROM 0.4 MI S OF SW COLLINS ST TO SOUTH

OF CR 760A

FPN: 4178761

Work: ADD LANES & RECONSTRUCT

Length: 5.665

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$487,919 $0 $0 $0 $0 $0 $0ACSLCST $487,919

$350,408 $0 $0 $0 $0 $0 $0ACTLCST $350,408

$1,936,870 $0 $0 $0 $0 $0 $0CMCST $1,936,870

$406,594 $0 $0 $0 $0 $0 $0DDRCST $406,594

$91,500 $0 $0 $0 $0 $0 $0DSCST $91,500

$6,191,844 $0 $0 $0 $0 $0 $0SLCST $6,191,844

$2,976,832 $0 $0 $0 $0 $0 $0SNCST $2,976,832

$1,341,078 $87,596 $0 $0 $0 $0 $0TALTCST $1,428,674

$150,000 $0 $0 $0 $0 $0 $0ACSLENV $150,000

$599,758 $0 $0 $0 $0 $0 $0TCSPENV $599,758

$207,791 $0 $0 $0 $0 $0 $0DDRPE $207,791

$215,556 $0 $0 $0 $0 $0 $0DIHPE $215,556

$19,184 $0 $0 $0 $0 $0 $0DSPE $19,184

$2,637,997 $0 $0 $0 $0 $0 $0GMRPE $2,637,997

$111,122 $0 $0 $0 $0 $0 $0TCSPPE $111,122

$13,989 $112,319 $0 $0 $0 $0 $0ACNPROW $126,308

$4,804,529 $44,815 $0 $0 $0 $0 $0NHROW $4,849,344

$214,321 $391,463 $0 $0 $0 $0 $0NHPPROW $605,784

$112,868 $0 $0 $0 $0 $0 $0LFRRU $112,868

$1,490,684 $0 $0 $0 $0 $0 $0LFDRRU $1,490,684

$24,360,844 $636,193 $0 $0 $0 $0 $0PROJECT TOTAL: $24,997,037

Project: US 17 (SR 35)

FROM 0.4 MI S OF SW COLLINS ST TO SOUTH

OF CR 760A

FPN: 4178762

Work: SIGNING/PAVEMENT MARKINGS

Length: 5.913

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$127,000 $51,709 $0 $0 $0 $0 $0DDRCST $178,709

$217 $35,748 $0 $0 $0 $0 $0DIHCST $35,965

$127,217 $87,457 $0 $0 $0 $0 $0PROJECT TOTAL: $214,674

Project: US 17 / SR 35 NB

FROM PALMETTO ST TO DESOTO AVENUE

FPN: 4291101

Work: RESURFACING

Length: 1.806

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,730,001 $7,525 $0 $0 $0 $0 $0DDRCST $1,737,526

$194 $10,060 $0 $0 $0 $0 $0DIHCST $10,254

$1,388 $0 $0 $0 $0 $0 $0DSCST $1,388

$9,023 $0 $0 $0 $0 $0 $0DIHPE $9,023

$231,455 $0 $0 $0 $0 $0 $0DSPE $231,455

$1,972,061 $17,585 $0 $0 $0 $0 $0PROJECT TOTAL: $1,989,646

Page 8 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 9: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 17 / SR 35 SB

FROM US 17 NB TO PALMETTO ST

FPN: 4291091

Work: RESURFACING

Length: 1.751

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,461 $20,039 $0 $0 $0 $0 $0DIHCST $21,500

$1,773,398 $35,286 $0 $0 $0 $0 $0DSCST $1,808,684

$20,726 $0 $0 $0 $0 $0 $0DIHPE $20,726

$233,432 $0 $0 $0 $0 $0 $0DSPE $233,432

$2,029,017 $55,325 $0 $0 $0 $0 $0PROJECT TOTAL: $2,084,342

Project: US 17

FROM CR 760A (NOCATEE) TO HEARD STREET

FPN: 1938981

Work: PRELIMINARY ENGINEERING

Length: 4.308

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$14,447 $0 $0 $0 $0 $0 $0PE $14,447

$14,447 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $14,447

Page 9 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 10: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 17

FROM CR 760A (NOCATEE) TO HEARD STREET

FPN: 1938982

Work: ADD LANES & REHABILITATE PVMNT

Length: 4.400

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $186,871 $0 $0 $0 $0 $0ACNPCST $186,871

$8,255,758 $14,764 $0 $0 $0 $0 $0DISCST $8,270,522

$93,990 $0 $0 $0 $0 $0 $0DSCST $93,990

$17,182,247 $138,273 $0 $0 $0 $0 $0NHPPCST $17,320,520

$100,000 $0 $0 $0 $0 $0 $0ACNPENV $100,000

$881,624 $0 $0 $0 $0 $0 $0ACSLENV $881,624

$233,103 $0 $0 $0 $0 $0 $0SLENV $233,103

$250,000 $0 $0 $0 $0 $0 $0TCSPENV $250,000

$0 $0 $600,000 $0 $0 $0 $0ACNPINC $600,000

$2,092,195 $0 $0 $0 $0 $0 $0DDRPE $2,092,195

$411,407 $0 $0 $0 $0 $0 $0DIHPE $411,407

$1,504,261 $0 $0 $0 $0 $0 $0DSPE $1,504,261

$525,984 $0 $0 $0 $0 $0 $0TCSPPE $525,984

$44,704 $67,589 $0 $0 $0 $0 $0ACSLROW $112,293

$1 $79,999 $0 $0 $0 $0 $0ACSNROW $80,000

$961,258 $37,603 $0 $0 $0 $0 $0BNDSROW $998,861

$4,533,617 $574,767 $0 $0 $0 $0 $0BNIRROW $5,108,384

$1,010,838 $17,995 $0 $0 $0 $0 $0DIHROW $1,028,833

$259,315 $0 $0 $0 $0 $0 $0DSROW $259,315

$1,636,446 $0 $0 $0 $0 $0 $0EBROW $1,636,446

$5,373,296 $0 $0 $0 $0 $0 $0SAROW $5,373,296

$4,991,160 $0 $0 $0 $0 $0 $0SLROW $4,991,160

$5,830,073 $41,692 $0 $0 $0 $0 $0SNROW $5,871,765

$391,950 $0 $0 $0 $0 $0 $0TALTROW $391,950

$291,536 $0 $0 $0 $0 $0 $0TCSPROW $291,536

$925,333 $0 $0 $0 $0 $0 $0DDRRRU $925,333

$4,339,216 $495,973 $0 $0 $0 $0 $0LFRRU $4,835,189

$164,857 $0 $0 $0 $0 $0 $0LFDRRU $164,857

$62,284,169 $1,655,526 $600,000 $0 $0 $0 $0PROJECT TOTAL: $64,539,695

$95,469,166 $4,269,202 $31,114,327 $5,679,951 $963,279 $7,114,607 $791,727

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:

$145,402,259

ALL YEARS

Page 10 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 11: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FIXED CAPITAL OUTLAY

Project: ARCADIA OPERATIONS CENTER

FPN: 4353951

Work: FIXED CAPITAL OUTLAY

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$180,258 $6,400 $0 $0 $0 $0 $0FCOCST $186,658

$180,258 $6,400 $0 $0 $0 $0 $0PROJECT TOTAL: $186,658

$180,258 $6,400 $0 $0 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FIXED CAPITAL

OUTLAY TOTAL: $186,658

ALL YEARS

Page 11 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 12: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

DESOTO TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: TRANSIT

Project: DESOTO COUNTY FTA SECTION 5311

OPERATING ASSISTANCE

FPN: 4101211

Work: OPERATING/ADMIN. ASSISTANCE

Length: 0.000

Comments: SECTION 5311 RURAL AND SMALL AREAS PARATRANSIT OPERATING

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$966,173 $188,817 $170,432 $170,432 $170,432 $134,317 $0DUOPS $1,800,603

$966,173 $188,817 $170,432 $170,432 $170,432 $134,317 $0LFOPS $1,800,603

$1,932,346 $377,634 $340,864 $340,864 $340,864 $268,634 $0PROJECT TOTAL: $3,601,206

$1,932,346 $377,634 $340,864 $340,864 $340,864 $268,634 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT

TOTAL: $3,601,206

ALL YEARS

$97,581,770 $4,653,236 $31,455,191 $6,020,815 $1,304,143 $7,383,241 $791,727

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16DESOTO TOTAL:

$149,190,123

ALL YEARS

Page 12 of 12

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 13: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

GLADES

Page 1 of 7

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 14: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HIGHWAYS

Project: 6TH STREET

FROM AVENUE A TO THATCHER BLVD

FPN: 4389241

Work: RESURFACING

Length: 1.035

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $135,990 $0 $0 $0 $0 $0LFCST $135,990

$0 $407,970 $0 $0 $0 $0 $0SCRCCST $407,970

$0 $543,960 $0 $0 $0 $0 $0PROJECT TOTAL: $543,960

Project: AVENUE R

FROM RIVERSIDE DRIVE TO WEST AVENUE

FPN: 4389231

Work: RESURFACING

Length: 0.774

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $106,132 $0 $0 $0 $0 $0LFCST $106,132

$0 $318,395 $0 $0 $0 $0 $0SCRCCST $318,395

$0 $424,527 $0 $0 $0 $0 $0PROJECT TOTAL: $424,527

Project: BIRCHWOOD PARKWAY

FROM HENDRY COUNTY LINE TO DEAD END

FPN: 4318901

Work: RESURFACING

Length: 2.624

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $860,198 $0 $0 $0 $0 $0SCRACST $860,198

$0 $860,198 $0 $0 $0 $0 $0PROJECT TOTAL: $860,198

Project: CR 74

FROM 2.5 MI E OF FIRETOWER TO SR 29

FPN: 4366571

Work: WIDEN/RESURFACE EXIST LANES

Length: 5.190

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $3,668,025 $0 $0GRSCCST $3,668,025

$0 $0 $0 $0 $1,778,278 $0 $0SCWRCST $1,778,278

$0 $0 $0 $0 $5,446,303 $0 $0PROJECT TOTAL: $5,446,303

Project: GLADES COUNTY SCOUR COUNTERMEASURE

AT VARIOUS LOCATIONS

FPN: 4350281

Work: BRIDGE-REPAIR/REHABILITATION

Length: 4.706

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$339,135 $0 $0 $0 $0 $0 $0BRRPCST $339,135

$341 $18,915 $0 $0 $0 $0 $0DIHCST $19,256

$12,770 $0 $0 $0 $0 $0 $0DSCST $12,770

$62,632 $0 $0 $0 $0 $0 $0BRRPPE $62,632

$5,584 $0 $0 $0 $0 $0 $0DIHPE $5,584

$420,462 $18,915 $0 $0 $0 $0 $0PROJECT TOTAL: $439,377

Page 2 of 7

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 15: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: GLADES COUNTY TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4126681

Work: TRAFFIC SIGNALS

Length: 0.100

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$32,900 $8,512 $10,337 $9,479 $9,764 $10,057 $10,358DDROPS $91,407

$32,900 $8,512 $10,337 $9,479 $9,764 $10,057 $10,358PROJECT TOTAL: $91,407

Project: LOST TRAIL

FPN: 4281441

Work: BIKE PATH/TRAIL

Length: 4.039

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$549,408 $0 $0 $0 $0 $0 $0ACTNCST $549,408

$48,027 $0 $0 $0 $0 $0 $0TALLCST $48,027

$237,419 $0 $0 $0 $0 $0 $0TALNCST $237,419

$253,308 $1,988 $0 $0 $0 $0 $0ACTNPE $255,296

$1,088,162 $1,988 $0 $0 $0 $0 $0PROJECT TOTAL: $1,090,150

Project: LOST TRAIL OVER HARNEY POND PEDESTRIAN

BRIDGE

FPN: 4351031

Work: BIKE PATH/TRAIL

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $616,322 $0 $0SNPE $616,322

$0 $0 $0 $0 $616,322 $0 $0PROJECT TOTAL: $616,322

Project: MOORE HAVEN ELEMENTARY SCHOOL

FPN: 4328971

Work: SIDEWALK

Length: 0.100

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $96,346 $0 $0 $0 $0TALLCST $96,346

$0 $0 $157,666 $0 $0 $0 $0TALNCST $157,666

$90,600 $1,645 $0 $0 $0 $0 $0TALLPE $92,245

$90,600 $1,645 $254,012 $0 $0 $0 $0PROJECT TOTAL: $346,257

Project: MOORE HAVEN TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4139851

Work: TRAFFIC SIGNALS

Length: 0.100

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$17,188 $7,296 $9,061 $8,126 $8,370 $8,621 $8,880DDROPS $67,542

$17,188 $7,296 $9,061 $8,126 $8,370 $8,621 $8,880PROJECT TOTAL: $67,542

Page 3 of 7

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 16: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 25 (US 27)

AT BRONSON ROAD

FPN: 4357691

Work: INTERSECTION IMPROVEMENT

Length: 0.426

Comments: ADD RIGHT TURN LANE AND TWO LEFT TURN LANES CLOSE THE MEDIAN OPENING LOCATED EAST OF BRONSON

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,098 $50,297 $0 $0 $0 $0 $0DIHCST $51,395

$876,391 $484 $0 $0 $0 $0 $0DSCST $876,875

$14,933 $0 $0 $0 $0 $0 $0DIHPE $14,933

$311,595 $0 $0 $0 $0 $0 $0DSPE $311,595

$1,204,017 $50,781 $0 $0 $0 $0 $0PROJECT TOTAL: $1,254,798

Project: SR 25 (US 27)

FROM OLD 27 TO 5TH STREET

FPN: 4349631

Work: RESURFACING

Length: 1.294

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $28,537 $0 $0 $0 $0DIHCST $28,537

$0 $0 $2,010,800 $0 $0 $0 $0DSCST $2,010,800

$31,174 $70,872 $0 $0 $0 $0 $0DIHPE $102,046

$79,031 $0 $0 $0 $0 $0 $0DSPE $79,031

$110,205 $70,872 $2,039,337 $0 $0 $0 $0PROJECT TOTAL: $2,220,414

Project: SR 25/US 27

AT SR29

FPN: 4358201

Work: LIGHTING

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$4,267 $21,088 $0 $0 $0 $0 $0DIHCST $25,355

$191,550 $0 $0 $0 $0 $0 $0DSCST $191,550

$33,300 $0 $0 $0 $0 $0 $0DSRRU $33,300

$229,117 $21,088 $0 $0 $0 $0 $0PROJECT TOTAL: $250,205

Project: SR 29

FROM BERMONT RD (CR 74) TO US 27

FPN: 4178786

Work: ADD LANES & RECONSTRUCT

Length: 0.764

Comments: INCLUDES POSSIBLE INTERCHANGE AT US 27

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $5,275,000 $0 $0ACNPPE $5,275,000

$0 $0 $0 $0 $5,275,000 $0 $0PROJECT TOTAL: $5,275,000

Project: SR 29

FROM WHIDDEN RD (CR 731) TO BERMONT RD

(CR 74)

FPN: 4178789

Work: ADD LANES & RECONSTRUCT

Length: 11.673

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $2,050,000 $0 $0ACNPPE $2,050,000

$0 $0 $0 $0 $2,050,000 $0 $0PROJECT TOTAL: $2,050,000

Page 4 of 7

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 17: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 78

AT VARIOUS LOCATIONS

FPN: 4390301

Work: DRAINAGE IMPROVEMENTS

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000

$0 $5,000 $0 $0 $0 $0 $0PROJECT TOTAL: $5,000

Project: SR 78

FROM CANAL BOAT RAMP TO OKEECHOBEE

C/L

FPN: 4291011

Work: RESURFACING

Length: 8.813

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$771 $94,591 $0 $0 $0 $0 $0DSCST $95,362

$0 $5,064,315 $0 $0 $0 $0 $0SACST $5,064,315

$97,530 $5,763 $0 $0 $0 $0 $0DIHPE $103,293

$3,969 $0 $0 $0 $0 $0 $0DSPE $3,969

$102,270 $5,164,669 $0 $0 $0 $0 $0PROJECT TOTAL: $5,266,939

Project: SR 78

FROM N OF CANAL ROAD TO S OF KILPATRICK

DR

FPN: 4366831

Work: RAIL SAFETY PROJECT

Length: 0.076

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $10,250 $0 $0 $0 $0DIHCST $10,250

$0 $0 $0 $433,932 $0 $0 $0SNCST $433,932

$0 $10,000 $0 $0 $0 $0 $0DIHPE $10,000

$20,245 $155,000 $0 $0 $0 $0 $0DSPE $175,245

$0 $0 $50,000 $0 $0 $0 $0DSRRU $50,000

$20,245 $165,000 $60,250 $433,932 $0 $0 $0PROJECT TOTAL: $679,427

Project: SR 78 SIDEWALKS

AT VARIOUS LOCATIONS

FPN: 4370881

Work: SIDEWALK

Length: 1.370

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $200,000 $0SNPE $200,000

$0 $0 $0 $0 $0 $200,000 $0PROJECT TOTAL: $200,000

Project: US 27 (SR 25)

FROM S OF SCFE CROSSING TO N OF SCFE

CROSSING

FPN: 4349471

Work: RAIL SAFETY PROJECT

Length: 0.284

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $157,022 $0 $0 $0DIHCST $157,022

$0 $0 $0 $718,380 $0 $0 $0DSCST $718,380

$0 $0 $0 $453,194 $0 $0 $0SACST $453,194

$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000

$23,741 $21,606 $0 $0 $0 $0 $0DSPE $45,347

$0 $0 $100,000 $0 $0 $0 $0DSRRU $100,000

$23,741 $121,606 $100,000 $1,328,596 $0 $0 $0PROJECT TOTAL: $1,573,943

Page 5 of 7

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 18: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 27

AT 6TH STREET AND AT 7TH STREET

FPN: 4302621

Work: ADD TURN LANE(S)

Length: 0.078

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$584,253 $0 $0 $0 $0 $0 $0EM11CST $584,253

$10,000 $40,000 $0 $0 $0 $0 $0DSENV $50,000

$166,115 $0 $0 $0 $0 $0 $0EM11PE $166,115

$760,368 $40,000 $0 $0 $0 $0 $0PROJECT TOTAL: $800,368

Project: US27/SR25 OVER CALOOSAHATCHEE RIVER

FPN: 4360041

Work: BRIDGE-REPAIR/REHABILITATION

Length: 0.437

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$260,177 $0 $0 $0 $0 $0 $0BRRPCST $260,177

$2,171 $38,843 $0 $0 $0 $0 $0DIHCST $41,014

$7,854 $0 $0 $0 $0 $0 $0DSCST $7,854

$3,131 $0 $0 $0 $0 $0 $0DIHPE $3,131

$273,333 $38,843 $0 $0 $0 $0 $0PROJECT TOTAL: $312,176

Project: VANCE WHIDDEN PARK

FPN: 4281451

Work: BIKE PATH/TRAIL

Length: 0.000

Comments: GLADES COUNTY #1 ENHANCEMENT PROJECT

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$588,409 $0 $0 $0 $0 $0 $0ACTLCST $588,409

$149,896 $16,193 $0 $0 $0 $0 $0TALLCST $166,089

$189,896 $0 $0 $0 $0 $0 $0SEPE $189,896

$928,201 $16,193 $0 $0 $0 $0 $0PROJECT TOTAL: $944,394

Project: VANCE WHIDDEN PARK

FPN: 4281452

Work: BIKE PATH/TRAIL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$318,967 $0 $0 $0 $0 $0 $0DSB $318,967

$318,967 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $318,967

$5,619,776 $7,561,093 $2,472,997 $1,780,133 $13,405,759 $218,678 $19,238

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:

$31,077,674

ALL YEARS

Page 6 of 7

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 19: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

GLADES TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: TRANSIT

Project: 5310 OPERATING ASSISTANCE FOR GOOD

WHEELS INC GLADES/HENDRY

FPN: 4389611

Work: OPERATING FOR FIXED ROUTE

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $115,638 $0 $0 $0 $0 $0DUOPS $115,638

$0 $115,638 $0 $0 $0 $0 $0LFOPS $115,638

$0 $231,276 $0 $0 $0 $0 $0PROJECT TOTAL: $231,276

Project: GLADES/HENDRY CO GOOD WHEELS INC FTA

SECT 5311 OPERATING ASSISTANCE

FPN: 4101221

Work: OPERATING/ADMIN. ASSISTANCE

Length: 0.000

Comments: SECTION 5311 RURAL AND SMALL AREAS PARATRANSIT OPERATING PARATRANSIT OPERATING

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$494,922 $50,000 $50,000 $50,000 $50,000 $50,000 $0DUOPS $744,922

$494,922 $50,000 $50,000 $50,000 $50,000 $50,000 $0LFOPS $744,922

$989,844 $100,000 $100,000 $100,000 $100,000 $100,000 $0PROJECT TOTAL: $1,489,844

$989,844 $331,276 $100,000 $100,000 $100,000 $100,000 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT

TOTAL: $1,721,120

ALL YEARS

$6,609,620 $7,892,369 $2,572,997 $1,880,133 $13,505,759 $318,678 $19,238

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16GLADES TOTAL:

$32,798,794

ALL YEARS

Page 7 of 7

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 20: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HARDEE

Page 1 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 21: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HIGHWAYS

Project: BOWLING GREEN TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4269131

Work: TRAFFIC SIGNALS

Length: 0.002

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$8,528 $3,648 $5,229 $4,063 $4,185 $4,311 $4,440DDROPS $34,404

$8,528 $3,648 $5,229 $4,063 $4,185 $4,311 $4,440PROJECT TOTAL: $34,404

Project: CHESTER AVE

FROM DOC COIL RD TO W. GRAPE ST

FPN: 4349841

Work: SIDEWALK

Length: 0.800

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $320,884 $0 $0 $0TALLCST $320,884

$0 $0 $0 $368,067 $0 $0 $0TALNCST $368,067

$0 $0 $0 $26,063 $0 $0 $0TALTCST $26,063

$0 $175,000 $0 $0 $0 $0 $0ACTNPE $175,000

$0 $12,000 $0 $0 $0 $0 $0TALNPE $12,000

$0 $187,000 $0 $715,014 $0 $0 $0PROJECT TOTAL: $902,014

Project: CR 663

FROM SR 64 TO SR 62

FPN: 4366541

Work: RESURFACING

Length: 7.856

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $4,334,595 $0GRSCCST $4,334,595

$0 $0 $0 $0 $0 $595,010 $0SCOPCST $595,010

$0 $0 $0 $0 $0 $4,929,605 $0PROJECT TOTAL: $4,929,605

Project: CR 665

FROM CR 663 TO SR 64

FPN: 4350621

Work: WIDEN/RESURFACE EXIST LANES

Length: 13.813

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $3,652,215 $0 $0 $0GRSCCST $3,652,215

$0 $0 $0 $3,892,393 $0 $0 $0SCRACST $3,892,393

$0 $0 $0 $1,744,627 $0 $0 $0SCWRCST $1,744,627

$0 $0 $0 $9,289,235 $0 $0 $0PROJECT TOTAL: $9,289,235

Project: CR664 BRIDGE #060034 OVER LITTLE PAYNE

CREEK

FPN: 4358301

Work: BRIDGE REPLACEMENT

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $1,476,206 $0ACSBCST $1,476,206

$0 $0 $0 $0 $0 $300,000 $0ACSBPE $300,000

$0 $0 $0 $0 $0 $1,776,206 $0PROJECT TOTAL: $1,776,206

Page 2 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 22: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: DOYLE PARKER AVE

FROM COUNTYLINE RD TO US 17

FPN: 4331931

Work: SIDEWALK

Length: 0.810

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $308,681 $0 $0 $0 $0 $0TALLCST $308,681

$113,335 $1,328 $0 $0 $0 $0 $0TALLPE $114,663

$113,335 $310,009 $0 $0 $0 $0 $0PROJECT TOTAL: $423,344

Project: GRIFFIN ROAD BRIDGE NUMBER 060030 OVER

PEACE RIVER

FPN: 4331921

Work: BRIDGE REPLACEMENT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $330,000 $0 $0 $0SNPDE $330,000

$0 $0 $0 $330,000 $0 $0 $0PROJECT TOTAL: $330,000

Project: HARDEE COUNTY SCOUR COUNTERMEASURE

AT VARIOUS LOCATIONS

FPN: 4350381

Work: BRIDGE-REPAIR/REHABILITATION

Length: 0.041

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $163,693 $0 $0 $0 $0 $0BRRPCST $163,693

$0 $23,292 $0 $0 $0 $0 $0DIHCST $23,292

$61,009 $0 $0 $0 $0 $0 $0BRRPPE $61,009

$1,973 $2,468 $0 $0 $0 $0 $0DIHPE $4,441

$62,982 $189,453 $0 $0 $0 $0 $0PROJECT TOTAL: $252,435

Project: HARDEE COUNTY TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4126691

Work: TRAFFIC SIGNALS

Length: 1.830

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$20,490 $4,864 $6,507 $5,418 $5,581 $5,748 $5,921DDROPS $54,529

$20,490 $4,864 $6,507 $5,418 $5,581 $5,748 $5,921PROJECT TOTAL: $54,529

Project: MARTIN LUTHER KING JR BLVD

FROM JONES STREET TO GRAPE STREET

FPN: 4298161

Work: SIDEWALK

Length: 0.156

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $166,418 $0 $0 $0 $0 $0ACTLCST $166,418

$58,087 $0 $0 $0 $0 $0 $0TALLPE $58,087

$4,851 $850 $0 $0 $0 $0 $0TALTPE $5,701

$62,938 $167,268 $0 $0 $0 $0 $0PROJECT TOTAL: $230,206

Page 3 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 23: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SCHOOL HOUSE RD

FROM SR 64 TO STATE RD 66

FPN: 4349831

Work: SIDEWALK

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $191,870 $0 $0TALNCST $191,870

$0 $0 $105,000 $0 $0 $0 $0TALNPE $105,000

$0 $0 $105,000 $0 $191,870 $0 $0PROJECT TOTAL: $296,870

Project: SR 35 (US 17)

FROM S OF 3RD ST E TO RV PARK ENT

FPN: 4365861

Work: RESURFACING

Length: 0.925

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $25,000 $0 $0 $0DDRCST $25,000

$0 $0 $0 $116,469 $0 $0 $0DIHCST $116,469

$0 $0 $0 $889,077 $0 $0 $0SACST $889,077

$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000

$0 $100,000 $0 $1,030,546 $0 $0 $0PROJECT TOTAL: $1,130,546

Project: SR 64

AT CR 663

FPN: 4345031

Work: SIDEWALK

Length: 0.183

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $5,049 $0 $0 $0 $0 $0DDRCST $5,049

$0 $143,714 $0 $0 $0 $0 $0HSPCST $143,714

$0 $10,270 $0 $0 $0 $0 $0SNCST $10,270

$101,003 $9,617 $0 $0 $0 $0 $0TALNPE $110,620

$101,003 $168,650 $0 $0 $0 $0 $0PROJECT TOTAL: $269,653

Project: SR 64

AT SR 636

FPN: 4313401

Work: INTERSECTION IMPROVEMENT

Length: 0.601

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $46,125 $0 $0 $0 $0DDRCST $46,125

$1,027 $0 $0 $0 $0 $0 $0DSCST $1,027

$0 $0 $1,135,173 $0 $0 $0 $0SNCST $1,135,173

$56,566 $10,485 $0 $0 $0 $0 $0DIHPE $67,051

$87,774 $0 $0 $0 $0 $0 $0DSPE $87,774

$80,549 $52 $0 $0 $0 $0 $0DDRROW $80,601

$31,627 $3,840 $0 $0 $0 $0 $0DIHROW $35,467

$257,543 $14,377 $1,181,298 $0 $0 $0 $0PROJECT TOTAL: $1,453,218

Project: SR 64

FROM MANATEE CO. LINE TO W MAIN ST

FPN: 4365871

Work: RESURFACING

Length: 11.774

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $315,900 $0 $0 $0DIHCST $315,900

$0 $0 $0 $7,518,822 $0 $0 $0DSCST $7,518,822

$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000

$0 $100,000 $0 $7,834,722 $0 $0 $0PROJECT TOTAL: $7,934,722

Page 4 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 24: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 64

FROM PEAR ST TO EAST OF CRACKER TRAIL

FPN: 4319381

Work: DRAINAGE IMPROVEMENTS

Length: 0.255

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$857,793 $0 $0 $0 $0 $0 $0DDRCST $857,793

$98,598 $77,749 $0 $0 $0 $0 $0DIHCST $176,347

$1,597,340 $0 $0 $0 $0 $0 $0DSCST $1,597,340

$9,938 $0 $0 $0 $0 $0 $0DIHPE $9,938

$5,912 $0 $0 $0 $0 $0 $0DSPE $5,912

$2,569,581 $77,749 $0 $0 $0 $0 $0PROJECT TOTAL: $2,647,330

Project: SR 64

FROM W OF CR 663 TO E OF CR 663

FPN: 4349571

Work: RAIL SAFETY PROJECT

Length: 0.076

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $64,072 $0 $0 $0 $0DIHCST $64,072

$36 $0 $377,395 $0 $0 $0 $0DSCST $377,431

$0 $20,000 $0 $0 $0 $0 $0DDRENV $20,000

$0 $0 $80,000 $0 $0 $0 $0DSENV $80,000

$19,457 $10,985 $0 $0 $0 $0 $0DIHPE $30,442

$0 $495,000 $0 $0 $0 $0 $0DDRRRU $495,000

$19,493 $525,985 $521,467 $0 $0 $0 $0PROJECT TOTAL: $1,066,945

Project: US 17 (SR 35) BELL STREET TO S. POLK

STREET

FPN: 4344601

Work: DRAINAGE IMPROVEMENTS

Length: 0.161

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$39,272 $189 $0 $0 $0 $0 $0DIHCST $39,461

$623,828 $0 $0 $0 $0 $0 $0DSCST $623,828

$5,488 $0 $0 $0 $0 $0 $0DIHPE $5,488

$1,118 $0 $0 $0 $0 $0 $0DSPE $1,118

$669,706 $189 $0 $0 $0 $0 $0PROJECT TOTAL: $669,895

Project: US 17 (SR 35)

FROM CR 634 TO 7TH AVENUE

FPN: 4206334

Work: SIGNING/PAVEMENT MARKINGS

Length: 5.929

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$143,817 $0 $0 $0 $0 $0 $0CST $143,817

$143,817 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $143,817

Page 5 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 25: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 17

FROM DESOTO C/L TO CR 634 (SWEETWATER

RD)

FPN: 4145471

Work: ADD LANES & RECONSTRUCT

Length: 4.952

Comments: TWO NEW BRIDGES: 060061 AND 060062

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $31,351,314 $0 $0 $0 $0 $0DICST $31,351,314

$0 $54,461 $0 $0 $0 $0 $0DIHCST $54,461

$1,588 $0 $0 $0 $0 $0 $0DSCST $1,588

$0 $223,083 $0 $0 $0 $0 $0ACSLENV $223,083

$2,424,454 $0 $0 $0 $0 $0 $0EBENV $2,424,454

$0 $476,917 $0 $0 $0 $0 $0SLENV $476,917

$0 $0 $0 $800,000 $0 $0 $0DIINC $800,000

$304,129 $12,110 $0 $0 $0 $0 $0DIHPE $316,239

$21,668 $0 $0 $0 $0 $0 $0DSPE $21,668

$10,684 $0 $0 $0 $0 $0 $0HPPPE $10,684

$3,780,514 $0 $0 $0 $0 $0 $0SAPE $3,780,514

$311,220 $0 $0 $0 $0 $0 $0TCSPPE $311,220

$0 $25,913 $0 $0 $0 $0 $0ACSLROW $25,913

$11,005 $349,885 $0 $0 $0 $0 $0BNDSROW $360,890

$231,515 $18,109 $0 $0 $0 $0 $0DIHROW $249,624

$646,258 $0 $0 $0 $0 $0 $0DSROW $646,258

$2,106,090 $65,884 $0 $0 $0 $0 $0SLROW $2,171,974

$22,727 $0 $0 $0 $0 $0 $0ACSLRRU $22,727

$0 $900,000 $0 $0 $0 $0 $0DIRRU $900,000

$9,871,852 $33,477,676 $0 $800,000 $0 $0 $0PROJECT TOTAL: $44,149,528

Project: US 17

FROM KD REVELL RD TO REA ROAD

FPN: 4313411

Work: SIDEWALK

Length: 0.592

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $10,421 $0 $0 $0 $0 $0DDRCST $10,421

$256 $0 $0 $0 $0 $0 $0DSCST $256

$0 $267,982 $0 $0 $0 $0 $0SNCST $267,982

$13,546 $0 $0 $0 $0 $0 $0ACTLPE $13,546

$89,711 $6,785 $0 $0 $0 $0 $0TALLPE $96,496

$103,513 $285,188 $0 $0 $0 $0 $0PROJECT TOTAL: $388,701

Page 6 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 26: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 17

FROM S OF WEST 9TH STREET TO N OF WEST

3RD STREET(ZOLFO SPRINGS)

FPN: 4206333

Work: ADD LANES & RECONSTRUCT

Length: 1.111

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $4,967,825 $0 $0 $0 $0ACNPCST $4,967,825

$0 $0 $6,958,748 $0 $0 $0 $0DDRCST $6,958,748

$0 $0 $103,257 $0 $0 $0 $0DIHCST $103,257

$12,870 $0 $0 $0 $0 $0 $0DSCST $12,870

$0 $0 $1,052,154 $0 $0 $0 $0SNCST $1,052,154

$0 $200,000 $0 $0 $0 $0 $0SNENV $200,000

$0 $0 $0 $440,000 $0 $0 $0ACNPINC $440,000

$143,496 $0 $0 $0 $0 $0 $0ACSAPE $143,496

$176,273 $22,579 $0 $0 $0 $0 $0DIHPE $198,852

$1,666,572 $0 $0 $0 $0 $0 $0EBPE $1,666,572

$16,843 $0 $0 $0 $0 $0 $0SAPE $16,843

$215,696 $1,857,885 $0 $0 $0 $0 $0ACSLROW $2,073,581

$1,817,348 $0 $0 $0 $0 $0 $0SLROW $1,817,348

$0 $0 $300,000 $0 $0 $0 $0LFRRU $300,000

$0 $0 $500,000 $0 $0 $0 $0LFDRRU $500,000

$4,049,098 $2,080,464 $13,881,984 $440,000 $0 $0 $0PROJECT TOTAL: $20,451,546

Project: US 17

FROM SOUTH OF CR 634 TO 7TH AVENUE

FPN: 4206331

Work: ADD LANES & RECONSTRUCT

Length: 5.548

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$19,403,652 $0 $0 $0 $0 $0 $0CST $19,403,652

$2,417,934 $0 $0 $0 $0 $0 $0ENV $2,417,934

$3,830,688 $0 $0 $0 $0 $0 $0PE $3,830,688

$3,832,943 $0 $0 $0 $0 $0 $0ROW $3,832,943

$73,913 $0 $0 $0 $0 $0 $0RRU $73,913

$29,559,130 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $29,559,130

Project: WAUCHULA TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4136301

Work: TRAFFIC SIGNALS

Length: 3.468

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$115,218 $25,384 $37,838 $28,275 $29,123 $29,997 $30,897DDROPS $296,732

$115,218 $25,384 $37,838 $28,275 $29,123 $29,997 $30,897PROJECT TOTAL: $296,732

Page 7 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 27: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: ZOLFO SPRINGS STREETS

AT VARIOUS LOCATIONS

FPN: 4389261

Work: RESURFACING

Length: 0.800

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $66,101 $0 $0 $0 $0 $0LFCST $66,101

$0 $198,300 $0 $0 $0 $0 $0SCRCCST $198,300

$0 $264,401 $0 $0 $0 $0 $0PROJECT TOTAL: $264,401

Project: ZOLFO SPRINGS TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4136311

Work: TRAFFIC SIGNALS

Length: 0.207

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$30,540 $3,648 $9,729 $8,698 $8,959 $9,228 $9,505DDROPS $80,307

$30,540 $3,648 $9,729 $8,698 $8,959 $9,228 $9,505PROJECT TOTAL: $80,307

$47,758,767 $37,985,953 $15,749,052 $20,485,971 $239,718 $6,755,095 $50,763

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:

$129,025,319

ALL YEARS

Page 8 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 28: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HARDEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: AVIATION

Project: WAUCHULA MUNICIPAL AIRPORT

FPN: 4255121

Work: AVIATION SAFETY PROJECT

Length: 0.000

Comments: INSTALL PERIMETER SECURITY FENCE

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$409,500 $7,928 $0 $0 $0 $0 $0DPTOCAP $417,428

$409,500 $7,928 $0 $0 $0 $0 $0PROJECT TOTAL: $417,428

Project: WAUCHULA MUNICIPAL AIRPORT CAPITAL

IMPROVEMENTS

FPN: 4348181

Work: AVIATION CAPACITY PROJECT

Length: 0.000

Comments: APRON EXPANSION DESIGN AND CONSTRUCTION

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $400,000 $0 $0DPTOCAP $400,000

$0 $0 $0 $0 $100,000 $0 $0LFCAP $100,000

$0 $0 $0 $0 $500,000 $0 $0PROJECT TOTAL: $500,000

Project: WAUCHULA MUNICIPAL APT DESIGN AND CNST

ACCESS RD EXTENSION

FPN: 4370651

Work: AVIATION CAPACITY PROJECT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$60,000 $500,000 $0 $0 $0 $0 $0DDRCAP $560,000

$60,000 $500,000 $0 $0 $0 $0 $0PROJECT TOTAL: $560,000

$469,500 $507,928 $0 $0 $500,000 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION

TOTAL: $1,477,428

ALL YEARS

$48,228,267 $38,493,881 $15,749,052 $20,485,971 $739,718 $6,755,095 $50,763

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HARDEE TOTAL:

$130,502,747

ALL YEARS

Page 9 of 9

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 29: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HENDRY

Page 1 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 30: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HIGHWAYS

Project: CITY OF LABELLE HARDSCAPE AND ENTRY

SIGNS

FPN: 4313181

Work: MISCELLANEOUS CONSTRUCTION

Length: 2.773

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $8,656 $0 $0DDRCST $8,656

$0 $0 $0 $0 $14,908 $0 $0SACST $14,908

$0 $0 $0 $0 $460,724 $0 $0SNCST $460,724

$0 $0 $40,000 $0 $0 $0 $0SAPE $40,000

$0 $0 $5,000 $90,000 $0 $0 $0SNPE $95,000

$0 $0 $45,000 $90,000 $484,288 $0 $0PROJECT TOTAL: $619,288

Project: CLEWISTON TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4136321

Work: TRAFFIC SIGNALS

Length: 1.600

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$94,066 $19,456 $29,429 $22,320 $22,990 $23,679 $24,390DDROPS $236,330

$94,066 $19,456 $29,429 $22,320 $22,990 $23,679 $24,390PROJECT TOTAL: $236,330

Project: CR 78

FROM KIRBY THOMPSON RD TO FT DENAUD

BRIDGE WAY

FPN: 4350501

Work: WIDEN/RESURFACE EXIST LANES

Length: 1.506

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $1,059,273 $0 $0 $0 $0SCEDCST $1,059,273

$0 $0 $1,059,273 $0 $0 $0 $0PROJECT TOTAL: $1,059,273

Project: CR 80A (COWBOY WAY)

FROM SR 80 TO BRIDGE STREET

FPN: 4366551

Work: RESURFACING

Length: 1.429

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $1,055,158 $0SCRACST $1,055,158

$0 $0 $0 $0 $0 $1,055,158 $0PROJECT TOTAL: $1,055,158

Project: CR 833

AT CR 846

FPN: 4336921

Work: INTERSECTION IMPROVEMENT

Length: 0.011

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $54,000 $0 $0 $0 $0 $0GRSCCST $54,000

$0 $549,267 $0 $0 $0 $0 $0SCEDCST $549,267

$0 $603,267 $0 $0 $0 $0 $0PROJECT TOTAL: $603,267

Page 2 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 31: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: E BASILIAN CRESCENT

FROM SW WC OWENS AVE TO DEAN DUFF

FPN: 4308941

Work: SIDEWALK

Length: 0.403

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,210 $0 $0 $0 $0 $0 $0ACTLCST $1,210

$143,012 $60,962 $0 $0 $0 $0 $0TALLCST $203,974

$81,888 $0 $0 $0 $0 $0 $0TALTPE $81,888

$226,110 $60,962 $0 $0 $0 $0 $0PROJECT TOTAL: $287,072

Project: FLAGHOLE ROAD

FROM WOODLAND BLVD TO US 27

FPN: 4318981

Work: RESURFACING

Length: 9.993

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $1,010,296 $0 $0 $0 $0 $0GRSCCST $1,010,296

$0 $602,208 $0 $0 $0 $0 $0SCEDCST $602,208

$432,752 $0 $0 $0 $0 $0 $0SCRACST $432,752

$432,752 $1,612,504 $0 $0 $0 $0 $0PROJECT TOTAL: $2,045,256

Project: FORREY DRIVE

FROM SOUTH OF COWBOY WAY TO SR 80

FPN: 4385701

Work: RESURFACING

Length: 1.100

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $543,329 $0 $0 $0 $0 $0SCRACST $543,329

$0 $543,329 $0 $0 $0 $0 $0PROJECT TOTAL: $543,329

Project: FORT DENAUD ROAD

FROM FT DENAUD BRIDGE WAY TO HUGGETTS

ROAD

FPN: 4366521

Work: RESURFACING

Length: 2.585

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $1,323,383 $0 $0SCRACST $1,323,383

$0 $0 $0 $0 $1,323,383 $0 $0PROJECT TOTAL: $1,323,383

Project: FRASER AVE

FROM HARDEE ST TO MAIN ST

FPN: 4308931

Work: SIDEWALK

Length: 0.488

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$134,856 $55,320 $0 $0 $0 $0 $0ACTNCST $190,176

$78,737 $0 $0 $0 $0 $0 $0TALLPE $78,737

$213,593 $55,320 $0 $0 $0 $0 $0PROJECT TOTAL: $268,913

Page 3 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 32: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: HELMS RD EXTENSION

FROM SR 29 TO SR 80

FPN: 4199481

Work: PD&E/EMO STUDY

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$300,000 $0 $0 $0 $0 $0 $0PDE $300,000

$300,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $300,000

Project: HELMS RD EXTENSION

FROM SR 29 TO SR 80

FPN: 4199482

Work: NEW ROAD CONSTRUCTION

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,664,624 $0 $0 $0 $0 $0 $0PE $1,664,624

$1,664,624 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $1,664,624

Project: HELMS RD EXTENSION

FROM SR 29 TO SR 80

FPN: 4199483

Work: ADD LANES & RECONSTRUCT

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$10,904,836 $264,035 $1,326,484 $741,800 $4,500,000 $0 $0CIGPCST $17,737,155

$10,904,836 $264,035 $1,326,484 $741,800 $4,500,000 $0 $0PROJECT TOTAL: $17,737,155

Project: HENDRY COUNTY TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4126701

Work: TRAFFIC SIGNALS

Length: 0.100

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$37,523 $8,360 $16,280 $14,164 $14,589 $15,027 $15,477DDROPS $121,420

$37,523 $8,360 $16,280 $14,164 $14,589 $15,027 $15,477PROJECT TOTAL: $121,420

Project: JAYCEE-LYONS DR

FROM SR 29 TO LABELLE COMMUNITY PARK

FPN: 4350171

Work: SIDEWALK

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $81,756 $0 $0TALLCST $81,756

$0 $0 $0 $0 $258,255 $0 $0TALNCST $258,255

$0 $0 $150,000 $0 $0 $0 $0TALLPE $150,000

$0 $0 $150,000 $0 $340,011 $0 $0PROJECT TOTAL: $490,011

Page 4 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 33: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: LABELLE TRAFFIC SIGNALS REIMBURSEMENT

FPN: 4136331

Work: TRAFFIC SIGNALS

Length: 0.300

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$61,521 $10,792 $15,730 $12,237 $12,604 $12,982 $13,372DDROPS $139,238

$61,521 $10,792 $15,730 $12,237 $12,604 $12,982 $13,372PROJECT TOTAL: $139,238

Project: LEWIS BLVD

FROM GEORGIA AVENUE TO US 27

FPN: 4385711

Work: RESURFACING

Length: 1.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $578,257 $0 $0 $0 $0 $0SCRACST $578,257

$0 $578,257 $0 $0 $0 $0 $0PROJECT TOTAL: $578,257

Project: OLD CR 78

FROM CR 78 EAST TO SR 29

FPN: 4350161

Work: SIDEWALK

Length: 0.452

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $263,558 $0 $0SNCST $263,558

$0 $0 $0 $63,099 $0 $0 $0TALLPE $63,099

$0 $0 $0 $63,099 $263,558 $0 $0PROJECT TOTAL: $326,657

Project: SIDEWALKS

AT VARIOUS LOCATIONS

FPN: 4281051

Work: SIDEWALK

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $617,200 $0 $0 $0 $0ACSLCST $617,200

$0 $0 $617,200 $0 $0 $0 $0PROJECT TOTAL: $617,200

Project: SONORA AVE/CR 832

FROM WC OWEN TO DAVIDSON ROAD

FPN: 4318881

Work: RESURFACING

Length: 1.200

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $731,242 $0 $0 $0 $0SCOPCST $731,242

$0 $0 $731,242 $0 $0 $0 $0PROJECT TOTAL: $731,242

Page 5 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 34: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 29

FROM COLLIER COUNTY LINE TO CR 832 (KERI

RD)

FPN: 4178785

Work: ADD LANES & RECONSTRUCT

Length: 5.531

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $6,234,750 $0 $0 $0 $0 $0DIPE $6,234,750

$0 $200,250 $0 $0 $0 $0 $0DIHPE $200,250

$0 $6,435,000 $0 $0 $0 $0 $0PROJECT TOTAL: $6,435,000

Project: SR 29

FROM COWBOY WAY (CR 80A) TO WHIDDEN RD

(CR 731)

FPN: 4178788

Work: ADD LANES & RECONSTRUCT

Length: 2.576

Comments: ROUNDABOUT AT 80A, CONSTRUCT ONE-WAY PAIR OVER RIVER REPLACE BASCULE BRIDGE AND CONSTRUCT NEW BASCULE

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $120,000 $0 $0ACNPENV $120,000

$0 $8,500,000 $0 $0 $0 $0 $0DIPE $8,500,000

$0 $975,000 $0 $0 $0 $0 $0DIHPE $975,000

$0 $0 $0 $0 $0 $0 $7,338,043ACNPROW $7,338,043

$0 $9,475,000 $0 $0 $120,000 $0 $7,338,043PROJECT TOTAL: $16,933,043

Project: SR 29

FROM CR 832 (KERI RD) TO F RD

FPN: 4178787

Work: ADD LANES & RECONSTRUCT

Length: 5.241

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $3,377,653 $0 $0 $0 $0 $0DIPE $3,377,653

$0 $250,000 $0 $0 $0 $0 $0DIHPE $250,000

$0 $3,627,653 $0 $0 $0 $0 $0PROJECT TOTAL: $3,627,653

Project: SR 29

FROM F ROAD TO COWBOY WAY

FPN: 4178783

Work: ADD LANES & RECONSTRUCT

Length: 4.939

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$4,118 $0 $0 $0 $0 $0 $0DSCST $4,118

$0 $75,000 $0 $0 $30,000 $50,000 $0DDRENV $155,000

$103,152 $9,929 $0 $0 $0 $0 $0DIHPE $113,081

$4,645,320 $0 $0 $0 $0 $0 $0DSPE $4,645,320

$0 $2,063,298 $7,064,392 $0 $0 $0 $0BNIRROW $9,127,690

$0 $318,180 $281,820 $0 $0 $0 $0DIHROW $600,000

$0 $0 $0 $5,559,310 $0 $0 $0GMRROW $5,559,310

$4,752,590 $2,466,407 $7,346,212 $5,559,310 $30,000 $50,000 $0PROJECT TOTAL: $20,204,519

Page 6 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 35: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 29

FROM SOUTH OF CR 832 TO SOUTH OF C ROAD

FPN: 4365981

Work: RESURFACING

Length: 6.585

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $6,214,072 $0 $0 $0DDRCST $6,214,072

$0 $0 $0 $263,250 $0 $0 $0DIHCST $263,250

$1,708 $101,292 $0 $0 $0 $0 $0DIHPE $103,000

$125,882 $0 $0 $0 $0 $0 $0DSPE $125,882

$127,590 $101,292 $0 $6,477,322 $0 $0 $0PROJECT TOTAL: $6,706,204

Project: SR 80

AT US 27 NEW INTERCHANGE

FPN: 4082867

Work: INTERCHANGE (NEW)

Length: 0.981

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$20,787,893 $0 $0 $0 $0 $0 $0CST $20,787,893

$1,220,799 $0 $0 $0 $0 $0 $0ROW $1,220,799

$1,144,538 $0 $0 $0 $0 $0 $0RRU $1,144,538

$23,153,230 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $23,153,230

Project: SR 80

FR E CITY LIMITS LABELLE TO US 27

FPN: 4082861

Work: PD&E/EMO STUDY

Length: 21.462

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,211,826 $0 $0 $0 $0 $0 $0LAR $1,211,826

$1,430,395 $0 $0 $0 $0 $0 $0PDE $1,430,395

$2,642,221 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $2,642,221

Project: SR 80

FROM BIRCHWOOD PARKWAY TO DALTON

LANE

FPN: 4082863

Work: ADD LANES & RECONSTRUCT

Length: 4.997

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$16,777,907 $0 $0 $0 $0 $0 $0DDRCST $16,777,907

$142,836 $66,515 $0 $0 $0 $0 $0DIHCST $209,351

$550,887 $0 $0 $0 $0 $0 $0DSCST $550,887

$200,050 $0 $0 $0 $0 $0 $0DDRENV $200,050

$210,964 $0 $0 $0 $0 $0 $0DDRPE $210,964

$107,237 $0 $0 $0 $0 $0 $0DIHPE $107,237

$11,680 $0 $0 $0 $0 $0 $0DSPE $11,680

$2,828,561 $0 $0 $0 $0 $0 $0GMRPE $2,828,561

$20,830,122 $66,515 $0 $0 $0 $0 $0PROJECT TOTAL: $20,896,637

Project: SR 80

FROM BIRCHWOOD PARKWAY TO DALTON

LANE

FPN: 4357421

Work: SIGNING/PAVEMENT MARKINGS

Length: 5.830

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$3,225 $1,775 $0 $0 $0 $0 $0DIHCST $5,000

$265,873 $0 $0 $0 $0 $0 $0DSCST $265,873

$269,098 $1,775 $0 $0 $0 $0 $0PROJECT TOTAL: $270,873

Page 7 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 36: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 80

FROM BIRCHWOOD PKWY TO DALTON LANE

FPN: 4082868

Work: RIGHT OF WAY ACQUISITION

Length: 5.276

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$590,635 $0 $0 $0 $0 $0 $0ROW $590,635

$590,635 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $590,635

Project: SR 80

FROM CEDARWOOD PARKWAY TO LEXINGTON

PARKWAY

FPN: 4082864

Work: RIGHT OF WAY ACQUISITION

Length: 6.958

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$27 $0 $0 $0 $0 $0 $0ROW $27

$27 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $27

Project: SR 80

FROM CR 833 TO US 27

FPN: 4082862

Work: ADD LANES & RECONSTRUCT

Length: 1.987

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$9,070,209 $0 $0 $0 $0 $0 $0CST $9,070,209

$47,466 $0 $0 $0 $0 $0 $0ENV $47,466

$5,274,104 $0 $0 $0 $0 $0 $0PE $5,274,104

$2,309,745 $0 $0 $0 $0 $0 $0ROW $2,309,745

$365,617 $0 $0 $0 $0 $0 $0RRU $365,617

$17,067,141 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $17,067,141

Page 8 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 37: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 80

FROM DALTON LANE TO INDIAN HILLS DRIVE

FPN: 4082865

Work: ADD LANES & RECONSTRUCT

Length: 5.273

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $30,402,379 $0 $0 $0 $0ACNPCST $30,402,379

$3,210 $0 $0 $0 $0 $0 $0DSCST $3,210

$1 $154,864 $0 $0 $0 $0 $0ACSLENV $154,865

$25,000 $275,135 $0 $0 $0 $0 $0SLENV $300,135

$0 $0 $250,000 $0 $0 $0 $0SNENV $250,000

$0 $25,000 $0 $0 $0 $0 $0TCSPENV $25,000

$52,305 $0 $0 $0 $0 $0 $0ACNPPE $52,305

$8,083 $0 $0 $0 $0 $0 $0DSPE $8,083

$3,893,670 $767,997 $0 $0 $0 $0 $0NHPE $4,661,667

$139,321 $0 $0 $0 $0 $0 $0NHPPPE $139,321

$271,348 $161,253 $0 $0 $0 $0 $0ACNPROW $432,601

$2,812,707 $1,714,850 $50,000 $0 $0 $0 $0BNIRROW $4,577,557

$1,377,213 $0 $0 $0 $0 $0 $0NHPPROW $1,377,213

$96,505 $29,205 $0 $0 $0 $0 $0TCSPROW $125,710

$0 $0 $345,937 $0 $0 $0 $0ACNPRRU $345,937

$8,679,363 $3,128,304 $31,048,316 $0 $0 $0 $0PROJECT TOTAL: $42,855,983

Project: SR 80

FROM GRANDMAS BLVD TO HUGGETTS RD

FPN: 4349601

Work: RESURFACING

Length: 0.538

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $1,052,695 $0 $0 $0 $0DDRCST $1,052,695

$0 $0 $119,991 $0 $0 $0 $0DIHCST $119,991

$0 $15,000 $25,000 $0 $0 $0 $0DDRENV $40,000

$19,712 $82,121 $0 $0 $0 $0 $0DIHPE $101,833

$18,315 $0 $0 $0 $0 $0 $0DSPE $18,315

$38,027 $97,121 $1,197,686 $0 $0 $0 $0PROJECT TOTAL: $1,332,834

Page 9 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 38: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 80

FROM INDIAN HILLS DRIVE TO CR 833

FPN: 4082866

Work: ADD LANES & RECONSTRUCT

Length: 6.355

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $32,299,479 $0 $0 $0 $0ACNPCST $32,299,479

$5,625 $0 $0 $0 $0 $0 $0DSCST $5,625

$0 $215,000 $100,000 $0 $0 $0 $0DDRENV $315,000

$159,986 $0 $0 $0 $0 $0 $0DDRPE $159,986

$124,093 $14,440 $0 $0 $0 $0 $0DIHPE $138,533

$4,234,155 $0 $0 $0 $0 $0 $0DSPE $4,234,155

$192,456 $3,478,456 $1,309,341 $0 $0 $0 $0ACSNROW $4,980,253

$19 $303,431 $0 $0 $0 $0 $0BNDSROW $303,450

$0 $1,367,365 $0 $0 $0 $0 $0DDRROW $1,367,365

$102 $0 $0 $0 $0 $0 $0DIHROW $102

$597,633 $0 $968,217 $0 $0 $0 $0SNROW $1,565,850

$0 $0 $946,829 $0 $0 $0 $0ACNPRRU $946,829

$5,314,069 $5,378,692 $35,623,866 $0 $0 $0 $0PROJECT TOTAL: $46,316,627

Project: SR 82

FROM LEE C/L TO COLLIER C/L

FPN: 4258415

Work: ADD LANES & RECONSTRUCT

Length: 1.273

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $4,031,192 $0 $0 $0 $0 $0DDRCST $4,031,192

$0 $331,767 $0 $0 $0 $0 $0DIHCST $331,767

$22,237 $4,463,082 $0 $0 $0 $0 $0DSCST $4,485,319

$0 $50,000 $0 $0 $0 $0 $0DSENV $50,000

$1,249,882 $0 $0 $0 $0 $0 $0DDRPE $1,249,882

$40,600 $8,098 $0 $0 $0 $0 $0DIHPE $48,698

$1,312,719 $8,884,139 $0 $0 $0 $0 $0PROJECT TOTAL: $10,196,858

Project: SR25 (US27)/ SR 80

FROM INDUSTRIAL CANAL TO MERCHANT

STREET

FPN: 4312111

Work: RESURFACING

Length: 1.862

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$3,340,054 $0 $0 $0 $0 $0 $0DDRCST $3,340,054

$18,701 $32,769 $0 $0 $0 $0 $0DIHCST $51,470

$983 $0 $0 $0 $0 $0 $0DSCST $983

$60,000 $0 $0 $0 $0 $0 $0DDRENV $60,000

$122,555 $0 $0 $0 $0 $0 $0DIHPE $122,555

$38,162 $0 $0 $0 $0 $0 $0DSPE $38,162

$3,580,455 $32,769 $0 $0 $0 $0 $0PROJECT TOTAL: $3,613,224

Page 10 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 39: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 27 (SR 80)

FROM INDUSTRIAL CANAL TO CENTRAL

STREET

FPN: 4312991

Work: MISCELLANEOUS CONSTRUCTION

Length: 3.059

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $8,656 $0 $0DDRCST $8,656

$0 $0 $0 $0 $297,147 $0 $0SACST $297,147

$0 $0 $50,000 $0 $0 $0 $0SAPE $50,000

$0 $0 $5,000 $200,000 $0 $0 $0SNPE $205,000

$0 $0 $55,000 $200,000 $305,803 $0 $0PROJECT TOTAL: $560,803

Project: US 27 (SR 80) SIDEWALKS IN CLEWISTON

AT VARIOUS LOCATIONS

FPN: 4370981

Work: SIDEWALK

Length: 0.617

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $0 $978,669TALTCST $978,669

$0 $0 $0 $0 $0 $210,000 $0TALTPE $210,000

$0 $0 $0 $0 $0 $210,000 $978,669PROJECT TOTAL: $1,188,669

Project: US 27 HENDRY CO. VWS & BI-DIRECTIONAL

STATIC SCALES

FPN: 4303551

Work: MCCO WEIGH STATION STATIC/WIM

Length: 0.822

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$125,420 $121,236 $0 $0 $0 $0 $0ACNPCST $246,656

$104,230 $0 $0 $0 $0 $0 $0DSCST $104,230

$2,766,871 $85,815 $0 $0 $0 $0 $0DWSCST $2,852,686

$1,724,547 $0 $0 $0 $0 $0 $0NHPPCST $1,724,547

$645,354 $0 $0 $0 $0 $0 $0DDRPE $645,354

$37,648 $0 $0 $0 $0 $0 $0DIHPE $37,648

$15,875 $0 $0 $0 $0 $0 $0DSPE $15,875

$5,419,945 $207,051 $0 $0 $0 $0 $0PROJECT TOTAL: $5,626,996

Project: VENTURA AVE

FROM LOPEZ ST TO BERNER RD

FPN: 4350151

Work: SIDEWALK

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $230,727 $0TALLCST $230,727

$0 $0 $0 $90,000 $0 $0 $0TALLPE $90,000

$0 $0 $0 $90,000 $0 $230,727 $0PROJECT TOTAL: $320,727

Project: WC OWEN AVENUE

FROM GEORGIA AVENUE TO US 27

FPN: 4366511

Work: WIDEN/RESURFACE EXIST LANES

Length: 1.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $1,061,059 $0 $0 $0 $0 $0GRSCCST $1,061,059

$0 $13,554 $0 $0 $0 $0 $0SCEDCST $13,554

$0 $82,167 $0 $0 $0 $0 $0SCRACST $82,167

$0 $1,156,780 $0 $0 $0 $0 $0PROJECT TOTAL: $1,156,780

Page 11 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 40: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

$107,712,257 $44,814,780 $79,261,718 $13,270,252 $7,417,226 $1,597,573 $8,369,951

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:

$262,443,757

ALL YEARS

Page 12 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 41: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FIXED CAPITAL OUTLAY

Project: LABELLE OPERATIONS CENTER FCO MINOR

REPAIRS

FPN: 4368871

Work: FIXED CAPITAL OUTLAY

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $129,742 $0 $0 $0 $0 $0FCOCST $129,742

$0 $129,742 $0 $0 $0 $0 $0PROJECT TOTAL: $129,742

$0 $129,742 $0 $0 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FIXED CAPITAL

OUTLAY TOTAL: $129,742

ALL YEARS

Page 13 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 42: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: AVIATION

Project: LABELLE ARPT DESIGN AND CONSTRUCT

TERMINAL BUILDING

FPN: 4292101

Work: AVIATION CAPACITY PROJECT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $500,000 $400,000 $0 $0 $0DDRCAP $900,000

$1,000,000 $0 $0 $0 $0 $0 $0DPTOCAP $1,000,000

$1,000,000 $0 $500,000 $400,000 $0 $0 $0PROJECT TOTAL: $1,900,000

Project: LABELLE MUNICIPAL AIRPORT RPZ LAND

ACQUISITION

FPN: 4382831

Work: AVIATION SAFETY PROJECT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $10,000 $0 $0 $0 $0 $0DDRCAP $10,000

$0 $10,000 $0 $0 $0 $0 $0PROJECT TOTAL: $10,000

Project: LABELLE MUNICIPAL APT DESIGN AND CONST

ACCESS RD

FROM SR 29

FPN: 4318761

Work: AVIATION CAPACITY PROJECT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $1,380,000 $0 $0 $0 $0DDRCAP $1,380,000

$0 $0 $345,000 $0 $0 $0 $0LFCAP $345,000

$0 $0 $1,725,000 $0 $0 $0 $0PROJECT TOTAL: $1,725,000

Project: LABELLE MUNICIPAL APT LAND ACQ

FPN: 4370761

Work: AVIATION PRESERVATION PROJECT

Length: 0.000

Comments: LAND ACQUISITIONS

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $100,000 $0 $0 $0 $0DPTOCAP $100,000

$0 $0 $33,333 $0 $0 $0 $0LFCAP $33,333

$0 $0 $133,333 $0 $0 $0 $0PROJECT TOTAL: $133,333

$1,000,000 $10,000 $2,358,333 $400,000 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION

TOTAL: $3,768,333

ALL YEARS

Page 14 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 43: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: INTERMODAL

Project: AIRGLADES AIRPORT CAPITAL IMPROVEMENT

FPN: 4106631

Work: AVIATION CAPACITY PROJECT

Length: 0.000

Comments: DESIGN & CONSTRUCT AIRPORT ACCESS ROAD

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$10,762 $0 $0 $0 $0 $0 $0DPTOADM $10,762

$543,522 $0 $0 $0 $0 $0 $0DDRCAP $543,522

$1,209,755 $336,053 $0 $0 $0 $0 $0DPTOCAP $1,545,808

$1,797,500 $0 $0 $0 $0 $0 $0DSCAP $1,797,500

$3,048,480 $0 $0 $0 $0 $0 $0LFCAP $3,048,480

$10,762 $0 $0 $0 $0 $0 $0LFRCAP $10,762

$6,620,781 $336,053 $0 $0 $0 $0 $0PROJECT TOTAL: $6,956,834

$6,620,781 $336,053 $0 $0 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: INTERMODAL

TOTAL: $6,956,834

ALL YEARS

Page 15 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 44: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HENDRY TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: TRANSIT

Project: GOOD WHEELS INC. CORRIDOR

FPN: 4260541

Work: OPERATING FOR FIXED ROUTE

Length: 0.000

Comments: CLEWISTON TO BELLE GLADE SEGMENT OF LAKE REGION COMMUTER ROUTE

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$75,000 $0 $0 $0 $0 $0 $0DDROPS $75,000

$278,219 $105,300 $97,655 $36,000 $120,000 $123,570 $0DPTOOPS $760,744

$278,219 $105,300 $97,655 $36,000 $120,000 $123,570 $0LFOPS $760,744

$631,438 $210,600 $195,310 $72,000 $240,000 $247,140 $0PROJECT TOTAL: $1,596,488

$631,438 $210,600 $195,310 $72,000 $240,000 $247,140 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT

TOTAL: $1,596,488

ALL YEARS

$115,964,476 $45,501,175 $81,815,361 $13,742,252 $7,657,226 $1,844,713 $8,369,951

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HENDRY TOTAL:

$274,895,154

ALL YEARS

Page 16 of 16

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 45: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HIGHLANDS

Page 1 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 46: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HIGHWAYS

Project: ARBUCKLE CREEK ROAD

AT LANDFILL ACCESS RD

FPN: 4366441

Work: ADD TURN LANE(S)

Length: 0.348

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $936,152 $0 $0 $0SCOPCST $936,152

$0 $0 $0 $936,152 $0 $0 $0PROJECT TOTAL: $936,152

Project: AVON PARK TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4136341

Work: TRAFFIC SIGNALS

Length: 0.756

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$90,732 $15,200 $27,450 $21,566 $26,987 $27,797 $28,630DDROPS $238,362

$90,732 $15,200 $27,450 $21,566 $26,987 $27,797 $28,630PROJECT TOTAL: $238,362

Project: BRIDGE REPLACEMENT ALONG SR 700 (US98)

OVER LORIDA CREEK(LORIDA)

FPN: 4358581

Work: PD&E/EMO STUDY

Length: 0.017

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$22,547 $6,154 $0 $0 $0 $0 $0DIHPDE $28,701

$2,711 $0 $0 $0 $0 $0 $0DSPE $2,711

$25,258 $6,154 $0 $0 $0 $0 $0PROJECT TOTAL: $31,412

Project: CEMETERY RD

FROM N RIDGEWOOD ST TO MLK BLVD XING

#627596-A

FPN: 4328001

Work: RAIL SAFETY PROJECT

Length: 0.297

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $270,600 $0 $0 $0 $0 $0RHHRRU $270,600

$0 $270,600 $0 $0 $0 $0 $0PROJECT TOTAL: $270,600

Page 2 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 47: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: CHANNEL IMPROVEMENTS SR 25 (US 27) OVER

LAKE JACKSON

FPN: 4352691

Work: DREDGE

Length: 0.016

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$552 $13,900 $0 $0 $0 $0 $0DIHCST $14,452

$897,484 $0 $0 $0 $0 $0 $0DSCST $897,484

$1,197 $0 $0 $0 $0 $0 $0LFCST $1,197

$3,525 $0 $0 $0 $0 $0 $0DSENV $3,525

$10,610 $0 $0 $0 $0 $0 $0DIHPE $10,610

$83,942 $0 $0 $0 $0 $0 $0DSPE $83,942

$59,860 $5,986 $0 $0 $0 $0 $0LFRRU $65,846

$1,057,170 $19,886 $0 $0 $0 $0 $0PROJECT TOTAL: $1,077,056

Project: CR 623 (KENILWORTH)

FROM HAYWOOD TAYLOR BLVD TO MINI

RANCH RD

FPN: 4366431

Work: RESURFACING

Length: 1.478

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $1,419,207 $0 $0SCRACST $1,419,207

$0 $0 $0 $0 $1,419,207 $0 $0PROJECT TOTAL: $1,419,207

Project: EAST INTERLAKE BLVD

FROM DEVANE CIRCLE TO US 27

FPN: 4389251

Work: RESURFACING

Length: 0.637

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $163,750 $0 $0 $0 $0 $0LFCST $163,750

$0 $491,250 $0 $0 $0 $0 $0SCRCCST $491,250

$0 $655,000 $0 $0 $0 $0 $0PROJECT TOTAL: $655,000

Project: HERON STREET

FROM HAMMOCK ROAD TO HOWEY ROAD

FPN: 4366411

Work: WIDEN/RESURFACE EXIST LANES

Length: 1.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $1,001,791 $0 $0SCOPCST $1,001,791

$0 $0 $0 $0 $1,001,791 $0 $0PROJECT TOTAL: $1,001,791

Project: HIGHLANDS COUNTY TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4126711

Work: TRAFFIC SIGNALS

Length: 11.573

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$380,442 $77,064 $112,187 $108,587 $111,845 $115,200 $118,656DDROPS $1,023,981

$380,442 $77,064 $112,187 $108,587 $111,845 $115,200 $118,656PROJECT TOTAL: $1,023,981

Page 3 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 48: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: LAKE PLACID ELEMENTARY SRTS SAFETY

SIDEWALKS

FPN: 4309171

Work: SIDEWALK

Length: 0.200

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$65,667 $34,979 $0 $0 $0 $0 $0ACTNCST $100,646

$37,702 $0 $0 $0 $0 $0 $0TALNPE $37,702

$103,369 $34,979 $0 $0 $0 $0 $0PROJECT TOTAL: $138,348

Project: MEMORIAL DRIVE

FROM POMPINO DR TO SEBRING PARKWAY

FPN: 4350671

Work: SIDEWALK

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $161,000 $0 $0SLPE $161,000

$0 $0 $0 $0 $161,000 $0 $0PROJECT TOTAL: $161,000

Project: NORTH CENTRAL AVENUE

FROM US 17 TO MAIN STREET

FPN: 4389221

Work: RESURFACING

Length: 1.477

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $159,060 $0 $0 $0 $0 $0LFCST $159,060

$0 $477,180 $0 $0 $0 $0 $0SCRCCST $477,180

$0 $636,240 $0 $0 $0 $0 $0PROJECT TOTAL: $636,240

Project: PONCE DE LEON

FROM NADENA DR TO ADRIENNE ST

FPN: 4351981

Work: SIDEWALK

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $216,267 $0TALLCST $216,267

$0 $0 $0 $20,617 $0 $0 $0SLPE $20,617

$0 $0 $0 $50,383 $0 $0 $0TALLPE $50,383

$0 $0 $0 $71,000 $0 $216,267 $0PROJECT TOTAL: $287,267

Project: RUCKS DAIRY ROAD BRIDGE NUMBER 094031

OVER C-41 CANAL/SLOUGH

FPN: 4316191

Work: BRIDGE REPLACEMENT

Length: 0.208

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $3,150,801 $0 $0 $0 $0SLCST $3,150,801

$0 $50,900 $0 $0 $0 $0 $0SLENV $50,900

$60,689 $40,466 $0 $0 $0 $0 $0SLPE $101,155

$0 $0 $259,281 $0 $0 $0 $0ACSLRRU $259,281

$0 $0 $40,719 $0 $0 $0 $0SLRRU $40,719

$60,689 $91,366 $3,450,801 $0 $0 $0 $0PROJECT TOTAL: $3,602,856

Page 4 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 49: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SEBRING PKWY PHASE IIA

FROM DESOTO ROAD TO YOUTH CARE LANE

FPN: 4298411

Work: NEW ROAD CONSTRUCTION

Length: 0.613

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $3,811,072 $0 $0 $0 $0 $0CIGPCST $3,811,072

$0 $3,811,072 $0 $0 $0 $0 $0PROJECT TOTAL: $3,811,072

Project: SEBRING PKWY PHASE IIB

FROM US 27 TO DESOTO ROAD

FPN: 4335531

Work: ADD LANES & REHABILITATE PVMNT

Length: 0.503

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $3,714,624 $0 $0 $0CIGPCST $3,714,624

$0 $0 $0 $1,147,345 $0 $0 $0LFCST $1,147,345

$0 $0 $0 $4,861,969 $0 $0 $0PROJECT TOTAL: $4,861,969

Project: SEBRING TRAFFIC SIGNALS REIMBURSEMENT

FPN: 4136351

Work: TRAFFIC SIGNALS

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$50,240 $7,904 $11,199 $8,913 $9,180 $9,455 $0DDROPS $96,891

$50,240 $7,904 $11,199 $8,913 $9,180 $9,455 $0PROJECT TOTAL: $96,891

Project: SR 17 (EAST MAIN ST)

FROM SOUTH VERONA AVE TO SOUTH

DELANEY AVE

FPN: 4349671

Work: DRAINAGE IMPROVEMENTS

Length: 0.018

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$87,206 $13,000 $0 $0 $0 $0 $0DDRCST $100,206

$17,562 $1,251 $0 $0 $0 $0 $0DIHCST $18,813

$26,998 $0 $0 $0 $0 $0 $0DSCST $26,998

$8,119 $0 $0 $0 $0 $0 $0DIHPE $8,119

$139,885 $14,251 $0 $0 $0 $0 $0PROJECT TOTAL: $154,136

Project: SR 17 (SCENIC HIGHWAY)

FROM WOODLAND DRIVE TO MYRTLE STREET

FPN: 4390261

Work: DRAINAGE IMPROVEMENTS

Length: 0.474

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000

$0 $5,000 $0 $0 $0 $0 $0PROJECT TOTAL: $5,000

Page 5 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 50: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 17 (SE LAKEVIEW)

FROM US 27/98 TO KENILWORTH BLVD

FPN: 1944252

Work: RESURFACING

Length: 0.965

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $1,850,768 $0 $0 $0 $0 $0DDRCST $1,850,768

$0 $33,693 $0 $0 $0 $0 $0DIHCST $33,693

$1,138 $0 $0 $0 $0 $0 $0DSCST $1,138

$51,245 $2,914 $0 $0 $0 $0 $0DIHPE $54,159

$248,261 $0 $0 $0 $0 $0 $0DSPE $248,261

$300,644 $1,887,375 $0 $0 $0 $0 $0PROJECT TOTAL: $2,188,019

Project: SR 17

AT ARBUCKLE CREEK ROAD

FPN: 4332021

Work: ADD LEFT TURN LANE(S)

Length: 0.200

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $526,181 $0 $0DDRCST $526,181

$0 $0 $0 $0 $5,410 $0 $0DIHCST $5,410

$0 $75,000 $0 $0 $0 $0 $0DDRPE $75,000

$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000

$0 $80,000 $0 $0 $531,591 $0 $0PROJECT TOTAL: $611,591

Project: SR 17

AT MANATEE DR

FPN: 4350651

Work: ADD TURN LANE(S)

Length: 0.200

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $19,002 $0DSCST $19,002

$0 $0 $0 $0 $0 $170,284 $0SACST $170,284

$0 $0 $175,000 $0 $0 $0 $0SLPE $175,000

$0 $0 $175,000 $0 $0 $189,286 $0PROJECT TOTAL: $364,286

Project: SR 17

FROM HELENA ST TO SEBRING PARKWAY

FPN: 4350641

Work: ADD LEFT TURN LANE(S)

Length: 0.194

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $293,621 $0 $0SLCST $293,621

$0 $0 $15,000 $0 $0 $0 $0SLPE $15,000

$0 $0 $15,000 $0 $293,621 $0 $0PROJECT TOTAL: $308,621

Project: SR 17

FROM S RAILROAD AVE TO N CENTRAL

AVENUE

FPN: 4366811

Work: RAIL SAFETY PROJECT

Length: 0.076

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $10,250 $0 $0 $0 $0DIHCST $10,250

$0 $0 $0 $5,265 $0 $0 $0DSCST $5,265

$0 $0 $0 $434,285 $0 $0 $0SACST $434,285

$0 $30,000 $0 $0 $0 $0 $0DDRPE $30,000

$0 $10,000 $0 $0 $0 $0 $0DIHPE $10,000

$0 $0 $350,000 $0 $0 $0 $0DSRRU $350,000

$0 $40,000 $360,250 $439,550 $0 $0 $0PROJECT TOTAL: $839,800

Page 6 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 51: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 64

AT NORTH OLIVIA DRIVE

FPN: 4332011

Work: ADD RIGHT TURN LANE(S)

Length: 0.200

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $21,153 $0 $0 $0DSCST $21,153

$0 $0 $0 $265,910 $0 $0 $0SLCST $265,910

$0 $48,000 $0 $0 $0 $0 $0SLPE $48,000

$0 $48,000 $0 $287,063 $0 $0 $0PROJECT TOTAL: $335,063

Project: SR 64

AT US 27

FPN: 4349861

Work: INTERSECTION IMPROVEMENT

Length: 0.123

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $1,040,399 $0 $0SLCST $1,040,399

$0 $0 $202,000 $0 $0 $0 $0SLPE $202,000

$0 $0 $202,000 $0 $1,040,399 $0 $0PROJECT TOTAL: $1,242,399

Project: SR 66

AT ORANGE BLOSSOM BLVD

FPN: 4331941

Work: ADD TURN LANE(S)

Length: 0.200

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $514,196 $0 $0DDRCST $514,196

$0 $0 $0 $0 $5,410 $0 $0DIHCST $5,410

$0 $50,000 $0 $0 $0 $0 $0DIHPE $50,000

$0 $50,000 $0 $0 $519,606 $0 $0PROJECT TOTAL: $569,606

Project: SR 66

AT PAYNE ROAD

FPN: 4331981

Work: ADD RIGHT TURN LANE(S)

Length: 0.200

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $502,743 $0 $0DDRCST $502,743

$0 $0 $0 $0 $5,410 $0 $0DIHCST $5,410

$0 $50,000 $0 $0 $0 $0 $0DIHPE $50,000

$0 $50,000 $0 $0 $508,153 $0 $0PROJECT TOTAL: $558,153

Project: SR 66

AT SKIPPER LN

FPN: 4349871

Work: ADD RIGHT TURN LANE(S)

Length: 0.220

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $11,828 $0 $0DSCST $11,828

$0 $0 $0 $0 $310,893 $0 $0SLCST $310,893

$0 $0 $145,000 $0 $0 $0 $0ACSLPE $145,000

$0 $0 $8,000 $0 $0 $0 $0SLPE $8,000

$0 $0 $153,000 $0 $322,721 $0 $0PROJECT TOTAL: $475,721

Page 7 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 52: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 66

AT SR 25 (US 27)

FPN: 4300601

Work: ADD TURN LANE(S)

Length: 0.251

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$532,743 $0 $0 $0 $0 $0 $0CIGPCST $532,743

$5,097 $0 $0 $0 $0 $0 $0DDRCST $5,097

$19,085 $27,834 $0 $0 $0 $0 $0DIHCST $46,919

$877 $0 $0 $0 $0 $0 $0DSCST $877

$97,816 $0 $0 $0 $0 $0 $0DDRPE $97,816

$12,916 $0 $0 $0 $0 $0 $0DIHPE $12,916

$19,293 $0 $0 $0 $0 $0 $0DSPE $19,293

$687,827 $27,834 $0 $0 $0 $0 $0PROJECT TOTAL: $715,661

Project: SR 66

FROM HARDEE COUNTY LINE TO WEST OF US

98/US 27

FPN: 4366001

Work: RESURFACING

Length: 9.342

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $512,500 $0 $0 $0 $0DIHCST $512,500

$0 $0 $6,906,114 $0 $0 $0 $0SACST $6,906,114

$2,812 $7,463 $0 $0 $0 $0 $0DIHPE $10,275

$2,812 $7,463 $7,418,614 $0 $0 $0 $0PROJECT TOTAL: $7,428,889

Project: SR 70

FROM EAST OF CR 29 TO MARCIA GROVE RD

FPN: 4365431

Work: RESURFACING

Length: 2.770

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $52,650 $0 $0 $0DSCST $52,650

$0 $0 $0 $3,016,561 $0 $0 $0NHRECST $3,016,561

$0 $0 $0 $105,300 $0 $0 $0SACST $105,300

$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000

$0 $100,000 $0 $3,174,511 $0 $0 $0PROJECT TOTAL: $3,274,511

Project: SR 70

FROM JEFFERSON AVENUE TO CR 29

FPN: 4145061

Work: PD&E/EMO STUDY

Length: 6.507

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,690,721 $26,915 $0 $0 $0 $0 $0ACSLPDE $1,717,636

$1,690,721 $26,915 $0 $0 $0 $0 $0PROJECT TOTAL: $1,717,636

Project: SR 70

FROM W OF SCFE CROSSING TO E OF CR 17

(OLD SR 8)

FPN: 4349591

Work: RAIL SAFETY PROJECT

Length: 0.208

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $72,593 $0 $0 $0DIHCST $72,593

$0 $0 $0 $520,380 $0 $0 $0SACST $520,380

$0 $100,000 $0 $0 $0 $0 $0DIHPE $100,000

$0 $0 $100,000 $0 $0 $0 $0DSRRU $100,000

$0 $100,000 $100,000 $592,973 $0 $0 $0PROJECT TOTAL: $792,973

Page 8 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 53: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: THUNDERBIRD ROAD

FROM COMET TERRACE TO GRAND PRIX DRIVE

FPN: 4313431

Work: SIDEWALK

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $103,218 $0 $0 $0 $0TALNCST $103,218

$0 $0 $212,436 $0 $0 $0 $0TALTCST $212,436

$0 $68,559 $0 $0 $0 $0 $0TALTPE $68,559

$0 $68,559 $315,654 $0 $0 $0 $0PROJECT TOTAL: $384,213

Project: THUNDERBIRD ROAD

FROM GRAND PRIX BLVD TO COUGAR BLVD

FPN: 4332031

Work: SIDEWALK

Length: 0.516

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $105,612 $0 $0 $0 $0TALLCST $105,612

$0 $17,984 $0 $0 $0 $0 $0TALTPE $17,984

$0 $17,984 $105,612 $0 $0 $0 $0PROJECT TOTAL: $123,596

Project: US 17

AT CR 17A/TRUCK ROUTE

FPN: 4350661

Work: ADD RIGHT TURN LANE(S)

Length: 0.200

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $11,120 $0DSCST $11,120

$0 $0 $0 $0 $0 $235,524 $0SACST $235,524

$0 $0 $0 $0 $0 $11,100 $0SLCST $11,100

$0 $0 $0 $130,000 $0 $0 $0SLPE $130,000

$0 $0 $0 $130,000 $0 $257,744 $0PROJECT TOTAL: $387,744

Project: US 27 (HIGHWAY PARK)

FROM OLD SR 8 TO S MAIN AVENUE

FPN: 4313421

Work: LANDSCAPING

Length: 1.337

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $476,414 $0 $0 $0 $0DDRCST $476,414

$0 $0 $5,125 $0 $0 $0 $0DIHCST $5,125

$212 $0 $0 $0 $0 $0 $0DSCST $212

$242,351 $0 $0 $0 $0 $0 $0DDRPE $242,351

$2,842 $17,284 $0 $0 $0 $0 $0DIHPE $20,126

$11,925 $0 $0 $0 $0 $0 $0DSPE $11,925

$257,330 $17,284 $481,539 $0 $0 $0 $0PROJECT TOTAL: $756,153

Project: US 27

AT EAST PHOENIX ST

FPN: 4350631

Work: ADD LEFT TURN LANE(S)

Length: 0.200

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $125,904 $0 $0SLCST $125,904

$0 $0 $10,000 $0 $0 $0 $0SLPE $10,000

$0 $0 $10,000 $0 $125,904 $0 $0PROJECT TOTAL: $135,904

Page 9 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 54: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 27

AT S HIGHLANDS AVE

FPN: 4313251

Work: ADD RIGHT TURN LANE(S)

Length: 0.200

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $10,250 $0 $0 $0 $0ACSLCST $10,250

$0 $0 $13,325 $0 $0 $0 $0DDRCST $13,325

$0 $0 $320,351 $0 $0 $0 $0SLCST $320,351

$85,094 $11,119 $0 $0 $0 $0 $0SNPE $96,213

$85,094 $11,119 $343,926 $0 $0 $0 $0PROJECT TOTAL: $440,139

Project: US 27

AT SEBRING PARKWAY

FPN: 4313201

Work: ADD RIGHT TURN LANE(S)

Length: 0.086

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $7,829 $0 $0 $0 $0 $0DDRCST $7,829

$727 $0 $0 $0 $0 $0 $0DSCST $727

$0 $244,188 $0 $0 $0 $0 $0SLCST $244,188

$14,674 $7,221 $0 $0 $0 $0 $0ACSLPE $21,895

$12,855 $0 $0 $0 $0 $0 $0DSPE $12,855

$50,397 $0 $0 $0 $0 $0 $0SLPE $50,397

$78,653 $259,238 $0 $0 $0 $0 $0PROJECT TOTAL: $337,891

Project: US 27

AT VICKI DRIVE

FPN: 4313191

Work: ADD RIGHT TURN LANE(S)

Length: 0.089

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $317,942 $0 $0 $0 $0 $0ACSLCST $317,942

$0 $7,823 $0 $0 $0 $0 $0DDRCST $7,823

$638 $0 $0 $0 $0 $0 $0DSCST $638

$39,427 $5,125 $0 $0 $0 $0 $0ACSLPE $44,552

$10,221 $0 $0 $0 $0 $0 $0DSPE $10,221

$50,405 $0 $0 $0 $0 $0 $0SLPE $50,405

$100,691 $330,890 $0 $0 $0 $0 $0PROJECT TOTAL: $431,581

Project: US 98

AT ARBUCKLE CREEK RD

FPN: 4365021

Work: ADD TURN LANE(S)

Length: 0.400

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $215,000 $0SLPE $215,000

$0 $0 $0 $0 $0 $215,000 $0PROJECT TOTAL: $215,000

Page 10 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 55: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: US 98

FROM US 27 TO AIRPORT ROAD

FPN: 4145112

Work: ADD LANES & RECONSTRUCT

Length: 4.634

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $0 $29,858,549CST $29,858,549

$0 $0 $0 $0 $6,300,000 $0 $0DDRPE $6,300,000

$0 $0 $0 $0 $250,000 $0 $0DIHPE $250,000

$0 $0 $0 $0 $0 $0 $11,404,000ROW $11,404,000

$0 $0 $0 $0 $0 $0 $1,450,000RRU $1,450,000

$0 $0 $0 $0 $6,550,000 $0 $42,712,549PROJECT TOTAL: $49,262,549

Project: US 98

FROM US 27 TO E OF AIRPORT ROAD

FPN: 4145111

Work: PD&E/EMO STUDY

Length: 4.634

Comments: PD&E INCLUDING 30% DESIGN

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,499,981 $0 $0 $0 $0 $0 $0DDRPDE $1,499,981

$61,982 $10,063 $0 $0 $0 $0 $0DIHPDE $72,045

$1,561,963 $10,063 $0 $0 $0 $0 $0PROJECT TOTAL: $1,572,026

Project: WEST STRYKER ROAD

FROM NORTH OLIVIA DRIVE TO US 27

FPN: 4366421

Work: RESURFACING

Length: 1.999

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $1,941,246 $0 $0SCRACST $1,941,246

$0 $0 $0 $0 $1,941,246 $0 $0PROJECT TOTAL: $1,941,246

$6,673,520 $8,777,440 $13,282,232 $10,632,284 $14,563,251 $1,030,749 $42,859,835

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:

$97,819,311

ALL YEARS

Page 11 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 56: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FIXED CAPITAL OUTLAY

Project: SEBRING OPERATIONS CENTER

FPN: 4353991

Work: FIXED CAPITAL OUTLAY

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$156,786 $18,614 $0 $0 $0 $0 $0FCOCST $175,400

$12,214 $0 $0 $0 $0 $0 $0FCOPE $12,214

$169,000 $18,614 $0 $0 $0 $0 $0PROJECT TOTAL: $187,614

$169,000 $18,614 $0 $0 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FIXED CAPITAL

OUTLAY TOTAL: $187,614

ALL YEARS

Page 12 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 57: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: AVIATION

Project: AVON PARK EXECUTIVE AIRPORT APRON

EXPANSION

FPN: 4348141

Work: AVIATION CAPACITY PROJECT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $480,000 $0 $0DPTOCAP $480,000

$0 $0 $0 $0 $120,000 $0 $0LFCAP $120,000

$0 $0 $0 $0 $600,000 $0 $0PROJECT TOTAL: $600,000

Project: AVON PARK EXECUTIVE AIRPORT DESIGN AND

CONST T-HANGERS

FPN: 4336361

Work: AVIATION REVENUE/OPERATIONAL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $243,728 $0 $0 $0DDRCAP $243,728

$10,000 $127,072 $300,000 $91,700 $0 $0 $0DPTOCAP $528,772

$10,000 $127,072 $300,000 $335,428 $0 $0 $0PROJECT TOTAL: $772,500

Project: AVON PARK EXECUTIVE AIRPORT FUEL FARM

FPN: 4364111

Work: AVIATION REVENUE/OPERATIONAL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$439,515 $9,000 $0 $0 $0 $0 $0DDRCAP $448,515

$439,515 $9,000 $0 $0 $0 $0 $0PROJECT TOTAL: $448,515

Project: AVON PARK EXECUTIVE AIRPORT FUEL TRUCK

PURCHASE

FPN: 4388461

Work: AVIATION REVENUE/OPERATIONAL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $125,000 $0 $0 $0 $0 $0DDRCAP $125,000

$0 $125,000 $0 $0 $0 $0 $0PROJECT TOTAL: $125,000

Project: AVON PARK EXECUTIVE APT PARALLEL TW TO

RW 10-28

FPN: 4318801

Work: AVIATION ENVIRONMENTAL PROJECT

Length: 0.000

Comments: PARALLEL TAXIWAY TO RUNWAY 10-28 (ENVIRONMENTAL ASSESSMENT)

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $60,000 $0 $0 $0 $0DDRCAP $60,000

$0 $0 $15,000 $0 $0 $0 $0LFCAP $15,000

$0 $0 $75,000 $0 $0 $0 $0PROJECT TOTAL: $75,000

Page 13 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 58: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SEBRING REG APT CONST PARALLEL TW

BRAVO (B)

FPN: 4318781

Work: AVIATION PRESERVATION PROJECT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $45,680 $0 $0 $0 $0DDRCAP $45,680

$0 $0 $1,735,790 $0 $0 $0 $0FAACAP $1,735,790

$0 $0 $45,680 $0 $0 $0 $0LFCAP $45,680

$0 $0 $1,827,150 $0 $0 $0 $0PROJECT TOTAL: $1,827,150

$449,515 $261,072 $2,202,150 $335,428 $600,000 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION

TOTAL: $3,848,165

ALL YEARS

Page 14 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 59: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: RAIL

Project: S. CENTRAL FLORIDA EXPRESS INTERCHANGE

TRACK S

FPN: 4335151

Work: RAIL CAPACITY PROJECT

Length: 0.000

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $3,750,000 $0 $0 $0 $0DISRRU $3,750,000

$0 $0 $1,250,000 $0 $0 $0 $0LFRRU $1,250,000

$0 $0 $5,000,000 $0 $0 $0 $0PROJECT TOTAL: $5,000,000

$0 $0 $5,000,000 $0 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: RAIL TOTAL:

$5,000,000

ALL YEARS

Page 15 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 60: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: TRANSIT

Project: 5310 OPERATING ASSISTANCE FOR CENTRAL

FLORIDA REGIONAL PLANNING COUNC

FPN: 4358621

Work: OPERATING FOR FIXED ROUTE

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$610,000 $333,467 $0 $0 $0 $0 $0DUOPS $943,467

$610,000 $333,467 $0 $0 $0 $0 $0LFOPS $943,467

$1,220,000 $666,934 $0 $0 $0 $0 $0PROJECT TOTAL: $1,886,934

Project: 5310 OPERATING ASSISTANCE FOR RIDGE

AREA ARC

FPN: 4369481

Work: OPERATING FOR FIXED ROUTE

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$51,476 $52,500 $0 $0 $0 $0 $0DUOPS $103,976

$51,476 $52,500 $0 $0 $0 $0 $0LFOPS $103,976

$102,952 $105,000 $0 $0 $0 $0 $0PROJECT TOTAL: $207,952

Project: HIGHLANDS CO CEN FL REGNL PLAN COUNCIL

FTA SECTION 5311 OPERATING ASST

FPN: 4101241

Work: OPERATING/ADMIN. ASSISTANCE

Length: 0.000

Comments: SECTION 5311 RURAL AREAS ONLY

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$4,658,941 $596,495 $538,228 $538,228 $538,228 $672,738 $0DUOPS $7,542,858

$4,658,941 $596,495 $538,228 $538,228 $538,228 $672,738 $0LFOPS $7,542,858

$9,317,882 $1,192,990 $1,076,456 $1,076,456 $1,076,456 $1,345,476 $0PROJECT TOTAL: $15,085,716

$10,640,834 $1,964,924 $1,076,456 $1,076,456 $1,076,456 $1,345,476 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: TRANSIT

TOTAL: $17,180,602

ALL YEARS

Page 16 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 61: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

HIGHLANDS TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

TRANSPORTATION PLANNING

Project: CENTRAL FLORIDA RPC JPA - HIGHLANDS

FPN: 4364031

Work: TRANSPORTATION PLANNING

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$150,000 $0 $0 $0 $0 $0 $0PLN $150,000

$150,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $150,000

Project: HEARTLAND REGIONAL TPO

FPN: 4364032

Work: TRANSPORTATION PLANNING

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $385,135 $384,463 $384,463 $384,463 $384,463 $0PLPLN $1,922,987

$0 $385,135 $384,463 $384,463 $384,463 $384,463 $0PROJECT TOTAL: $1,922,987

$150,000 $385,135 $384,463 $384,463 $384,463 $384,463 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16TRANSPORTATION

PLANNING TOTAL: $2,072,987

ALL YEARS

$18,082,869 $11,407,185 $21,945,301 $12,428,631 $16,624,170 $2,760,688 $42,859,835

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHLANDS

TOTAL: $126,108,679

ALL YEARS

Page 17 of 17

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 62: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

OKEECHOBEE

Page 1 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 63: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

HIGHWAYS

Project: CR 68 (MICCO BLUFF)

FROM KISSIMMEE CATTLE CO TO DEAD END

FPN: 4368671

Work: WIDEN/RESURFACE EXIST LANES

Length: 2.219

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $1,621,622 $0 $0 $0SCEDCST $1,621,622

$0 $0 $0 $1,019,733 $0 $0 $0SCOPCST $1,019,733

$0 $0 $0 $2,641,355 $0 $0 $0PROJECT TOTAL: $2,641,355

Project: CR 68 (MICCO BLUFF)

FROM SR 700 TO NW 285TH DRIVE

FPN: 4301911

Work: RESURFACING

Length: 6.365

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$304,873 $0 $0 $0 $0 $0 $0PE $304,873

$304,873 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $304,873

Project: CR 68 (MICCO BLUFF)

FROM SR 700 TO W KISSIMMEE CATTLE CO DR

FPN: 4301912

Work: RESURFACING

Length: 4.146

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$64,634 $467 $0 $0 $0 $0 $0DIHCST $65,101

$1,075,811 $36,140 $0 $0 $0 $0 $0GRSCCST $1,111,951

$1,215,557 $0 $0 $0 $0 $0 $0SCEDCST $1,215,557

$234,754 $0 $0 $0 $0 $0 $0SCOPCST $234,754

$2,590,756 $36,607 $0 $0 $0 $0 $0PROJECT TOTAL: $2,627,363

Project: CR 68 (NW 160TH ST)

FROM US 98 TO US 441

FPN: 4316031

Work: WIDEN/RESURFACE EXIST LANES

Length: 10.557

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $200,000 $0 $0 $0 $0 $0DIHCST $200,000

$0 $2,213,752 $0 $0 $0 $0 $0GRSCCST $2,213,752

$0 $421,825 $0 $0 $0 $0 $0SCEDCST $421,825

$0 $315,586 $0 $0 $0 $0 $0SCOPCST $315,586

$0 $4,818,054 $0 $0 $0 $0 $0SCRACST $4,818,054

$9,439 $14,962 $0 $0 $0 $0 $0DIHPE $24,401

$238,971 $0 $0 $0 $0 $0 $0SCOPPE $238,971

$248,410 $7,984,179 $0 $0 $0 $0 $0PROJECT TOTAL: $8,232,589

Page 2 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 64: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: CR 68 EAST -NE 224TH ST

FROM US 441 TO ST LUCIE C/L

FPN: 4316051

Work: RESURFACING

Length: 8.068

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$52,618 $5,466 $0 $0 $0 $0 $0DIHCST $58,084

$2,784,753 $0 $0 $0 $0 $0 $0GRSCCST $2,784,753

$211,032 $0 $0 $0 $0 $0 $0SCOPCST $211,032

$12,588 $0 $0 $0 $0 $0 $0DIHPE $12,588

$198,108 $0 $0 $0 $0 $0 $0SCOPPE $198,108

$3,259,099 $5,466 $0 $0 $0 $0 $0PROJECT TOTAL: $3,264,565

Project: NE 102ND STREET

AT US 441

FPN: 4332051

Work: ADD LEFT TURN LANE(S)

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $357,542 $0 $0SLCST $357,542

$0 $0 $45,000 $0 $0 $0 $0ACSLPE $45,000

$0 $0 $100,000 $0 $0 $0 $0SLPE $100,000

$0 $0 $145,000 $0 $357,542 $0 $0PROJECT TOTAL: $502,542

Project: NE 34TH AVENUE

FROM SR 710 TO SR 70

FPN: 4385631

Work: RESURFACING

Length: 0.425

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $247,462 $0 $0 $0 $0 $0SCEDCST $247,462

$0 $142,897 $0 $0 $0 $0 $0SCRACST $142,897

$0 $227,399 $0 $0 $0 $0 $0SCWRCST $227,399

$0 $617,758 $0 $0 $0 $0 $0PROJECT TOTAL: $617,758

Project: NE 36TH BLVD

FROM US 441 TO DEAD END

FPN: 4368661

Work: WIDEN/RESURFACE EXIST LANES

Length: 1.729

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $1,020,033 $0 $0GRSCCST $1,020,033

$0 $0 $0 $0 $1,621,622 $0 $0SCEDCST $1,621,622

$0 $0 $0 $0 $2,641,655 $0 $0PROJECT TOTAL: $2,641,655

Project: OKEECHOBEE CITY TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4136431

Work: TRAFFIC SIGNALS

Length: 0.100

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$93,844 $16,264 $24,170 $18,224 $18,771 $19,334 $19,914DDROPS $210,521

$93,844 $16,264 $24,170 $18,224 $18,771 $19,334 $19,914PROJECT TOTAL: $210,521

Page 3 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 65: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: OKEECHOBEE COUNTY SCOUR

COUNTERMEASURE

AT VARIOUS LOCATIONS

FPN: 4350282

Work: BRIDGE-REPAIR/REHABILITATION

Length: 0.033

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$231,857 $0 $0 $0 $0 $0 $0BRRPCST $231,857

$122 $17,758 $0 $0 $0 $0 $0DIHCST $17,880

$72 $0 $0 $0 $0 $0 $0DSCST $72

$29,483 $0 $0 $0 $0 $0 $0BRRPPE $29,483

$2,296 $2,204 $0 $0 $0 $0 $0DIHPE $4,500

$263,830 $19,962 $0 $0 $0 $0 $0PROJECT TOTAL: $283,792

Project: OKEECHOBEE COUNTY SIDEWALKS

AT VARIOUS LOCATIONS

FPN: 4313391

Work: SIDEWALK

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $3,399 $0 $0 $0DSCST $3,399

$0 $0 $0 $314,164 $0 $0 $0SLCST $314,164

$0 $183,358 $0 $0 $0 $0 $0TALTPE $183,358

$0 $183,358 $0 $317,563 $0 $0 $0PROJECT TOTAL: $500,921

Project: OKEECHOBEE COUNTY TRAFFIC SIGNALS

REIMBURSEMENT

FPN: 4126741

Work: TRAFFIC SIGNALS

Length: 13.364

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$144,529 $33,440 $43,508 $37,248 $43,139 $44,434 $45,767DDROPS $392,065

$144,529 $33,440 $43,508 $37,248 $43,139 $44,434 $45,767PROJECT TOTAL: $392,065

Project: OKEECHOBEE TRAILHEAD

FPN: 2001051

Work: BIKE PATH/TRAIL

Length: 1.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$600,000 $0 $0 $0 $0 $0 $0CST $600,000

$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000

Project: OKEECHOBEE TRAILHEAD

FPN: 2001052

Work: BIKE PATH/TRAIL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$300,000 $0 $0 $0 $0 $0 $0CST $300,000

$300,000 $0 $0 $0 $0 $0 $0LAR $300,000

$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000

Page 4 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 66: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: OKEECHOBEE TRAILHEAD

FPN: 2001053

Work: BIKE PATH/TRAIL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$300,000 $0 $0 $0 $0 $0 $0CST $300,000

$300,000 $0 $0 $0 $0 $0 $0LAR $300,000

$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000

Project: OKEECHOBEE TRAILHEAD

FPN: 2001054

Work: BIKE PATH/TRAIL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$300,000 $0 $0 $0 $0 $0 $0CST $300,000

$300,000 $0 $0 $0 $0 $0 $0LAR $300,000

$600,000 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $600,000

Project: OKEECHOBEE TRAILHEAD

FPN: 2001055

Work: BIKE PATH/TRAIL

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$119 $0 $0 $0 $0 $0 $0PE $119

$119 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $119

Project: OKEECHOBEE TRAILHEAD

FPN: 2001057

Work: BIKE PATH/TRAIL

Length: 0.164

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$1,043,477 $10,547 $0 $0 $0 $0 $0TALTCST $1,054,024

$476 $0 $0 $0 $0 $0 $0SEPE $476

$1,043,953 $10,547 $0 $0 $0 $0 $0PROJECT TOTAL: $1,054,500

Project: SE 34TH AVE & OTHERS

FROM SR 700 (US 98/441) TO SOUTH OF SR 710

FPN: 4301901

Work: WIDEN/RESURFACE EXIST LANES

Length: 2.761

Comments: (PHASE I)

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$20,405 $329 $0 $0 $0 $0 $0DIHCST $20,734

$1,031,247 $31,144 $0 $0 $0 $0 $0GRSCCST $1,062,391

$880,427 $0 $0 $0 $0 $0 $0SCOPCST $880,427

$15,758 $0 $0 $0 $0 $0 $0DIHPE $15,758

$238,837 $0 $0 $0 $0 $0 $0SCOPPE $238,837

$2,186,674 $31,473 $0 $0 $0 $0 $0PROJECT TOTAL: $2,218,147

Page 5 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 67: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 15/700(US 98/441)

FROM SR 78 TO SE 30TH TERRACE

FPN: 4349621

Work: RESURFACING

Length: 2.188

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $85,393 $0 $0 $0 $0ACSLCST $85,393

$0 $0 $391,475 $0 $0 $0 $0DDRCST $391,475

$0 $0 $1,260,527 $0 $0 $0 $0SLCST $1,260,527

$3,317 $0 $0 $0 $0 $0 $0DSPE $3,317

$13,358 $86,642 $0 $0 $0 $0 $0SAPE $100,000

$16,675 $86,642 $1,737,395 $0 $0 $0 $0PROJECT TOTAL: $1,840,712

Project: SR 70

AT US 441

FPN: 4258461

Work: INTERSECTION IMPROVEMENT

Length: 0.358

Comments: ADD DUAL LEFT TURN LANES IN ALL DIRECTIONS

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$3,468,055 $170,882 $0 $0 $0 $0 $0DDRCST $3,638,937

$47,614 $70,755 $0 $0 $0 $0 $0DIHCST $118,369

$17,804 $0 $0 $0 $0 $0 $0DSCST $17,804

$111,071 $0 $0 $0 $0 $0 $0LFCST $111,071

$70,000 $0 $0 $0 $0 $0 $0DDRENV $70,000

$0 $120,000 $0 $0 $0 $0 $0DDRINC $120,000

$370 $0 $0 $0 $0 $0 $0DIHPDE $370

$104,464 $0 $0 $0 $0 $0 $0DIHPE $104,464

$252 $0 $0 $0 $0 $0 $0DSPE $252

$258,708 $0 $0 $0 $0 $0 $0EBPE $258,708

$800,000 $0 $0 $0 $0 $0 $0SAPE $800,000

$917,448 $0 $0 $0 $0 $0 $0BNDSROW $917,448

$26,454 $0 $0 $0 $0 $0 $0DIHROW $26,454

$14,847 $2,381 $0 $0 $0 $0 $0LFRRU $17,228

$5,837,087 $364,018 $0 $0 $0 $0 $0PROJECT TOTAL: $6,201,105

Page 6 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 68: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 70

FROM NE 34TH AVENUE TO NE 80TH AVENUE

FPN: 1969042

Work: ADD LANES & RECONSTRUCT

Length: 3.659

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$13,282,253 $54,427 $0 $0 $0 $0 $0ACNPCST $13,336,680

$100,000 $0 $0 $0 $0 $0 $0DICST $100,000

$3,606,092 $0 $0 $0 $0 $0 $0DSCST $3,606,092

$790,698 $0 $0 $0 $0 $0 $0LFPCST $790,698

$4,277,965 $0 $0 $0 $0 $0 $0NHPPCST $4,277,965

$250,000 $0 $0 $0 $0 $0 $0ACNPENV $250,000

$900 $0 $0 $0 $0 $0 $0DSENV $900

$359,960 $0 $0 $0 $0 $0 $0HPPENV $359,960

$64,825 $0 $0 $0 $0 $0 $0NHENV $64,825

$114,363 $0 $0 $0 $0 $0 $0NHPPENV $114,363

$312,969 $0 $0 $0 $0 $0 $0DIHPE $312,969

$589,938 $0 $0 $0 $0 $0 $0DSPE $589,938

$3,199,717 $0 $0 $0 $0 $0 $0GMRPE $3,199,717

$142,500 $288,473 $0 $0 $0 $0 $0ACNPROW $430,973

$157,919 $0 $0 $0 $0 $0 $0BNDSROW $157,919

$4,612,606 $2,111,064 $0 $0 $0 $0 $0BNIRROW $6,723,670

$1,439,840 $0 $0 $0 $0 $0 $0HPPROW $1,439,840

$11,135,221 $128,018 $0 $0 $0 $0 $0NHROW $11,263,239

$978,259 $0 $0 $0 $0 $0 $0NHPPROW $978,259

$1,561,260 $0 $0 $0 $0 $0 $0NHPPRRU $1,561,260

$46,977,285 $2,581,982 $0 $0 $0 $0 $0PROJECT TOTAL: $49,559,267

Project: SR 70

FROM NE 80TH AVENUE TO BERMAN ROAD

FPN: 1969044

Work: ADD LANES & REHABILITATE PVMNT

Length: 3.311

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$2,605,348 $112,210 $0 $0 $0 $0 $0ACNPCST $2,717,558

$1,333,953 $0 $0 $0 $0 $0 $0DSCST $1,333,953

$2,483,250 $0 $0 $0 $0 $0 $0GMRCST $2,483,250

$30,119 $0 $0 $0 $0 $0 $0LFPCST $30,119

$2,928,894 $0 $0 $0 $0 $0 $0NHPPCST $2,928,894

$100,000 $0 $0 $0 $0 $0 $0DIENV $100,000

$130,000 $0 $0 $0 $0 $0 $0DISENV $130,000

$193,048 $1,059,902 $0 $0 $0 $0 $0ACNPROW $1,252,950

$6,710,107 $56,321 $0 $0 $0 $0 $0NHROW $6,766,428

$1,011,966 $0 $0 $0 $0 $0 $0NHPPROW $1,011,966

$377,619 $0 $0 $0 $0 $0 $0ACNPRRU $377,619

$17,904,304 $1,228,433 $0 $0 $0 $0 $0PROJECT TOTAL: $19,132,737

Page 7 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 69: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 70

FROM NE 80TH AVENUE TO ST. LUCIE COUNTY

LINE

FPN: 1969043

Work: PRELIM ENG FOR FUTURE CAPACITY

Length: 4.441

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$157,574 $7,651 $0 $0 $0 $0 $0DIHPE $165,225

$364,646 $0 $0 $0 $0 $0 $0DSPE $364,646

$2,738,740 $0 $0 $0 $0 $0 $0GMRPE $2,738,740

$3,260,960 $7,651 $0 $0 $0 $0 $0PROJECT TOTAL: $3,268,611

Project: SR 70

FROM SE 16TH AVENUE TO SE 31ST TERRACE

FPN: 4314611

Work: RESURFACING

Length: 1.225

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $2,284,091 $0 $0 $0 $0 $0DDRCST $2,284,091

$0 $20,540 $0 $0 $0 $0 $0DIHCST $20,540

$0 $45,000 $0 $0 $0 $0 $0DDRENV $45,000

$76,306 $38,516 $0 $0 $0 $0 $0DIHPE $114,822

$9,855 $0 $0 $0 $0 $0 $0DSPE $9,855

$86,161 $2,388,147 $0 $0 $0 $0 $0PROJECT TOTAL: $2,474,308

Project: SR 70

FROM W OF 34TH AVENUE TO BERMAN ROAD

FPN: 1969041

Work: PD&E/EMO STUDY

Length: 6.964

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$930,006 $0 $0 $0 $0 $0 $0PDE $930,006

$930,006 $0 $0 $0 $0 $0 $0PROJECT TOTAL: $930,006

Project: SR 70 WEST

FROM SW 24TH AVENUE TO NW 38TH TERRACE

FPN: 4298191

Work: SIDEWALK

Length: 0.905

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $23,261 $0 $0 $0 $0 $0DIHCST $23,261

$565 $998,742 $0 $0 $0 $0 $0DSCST $999,307

$15 $0 $0 $0 $0 $0 $0DIHPE $15

$21,198 $0 $0 $0 $0 $0 $0DSPE $21,198

$223,889 $14,072 $0 $0 $0 $0 $0TALTPE $237,961

$245,667 $1,036,075 $0 $0 $0 $0 $0PROJECT TOTAL: $1,281,742

Project: SR 710

FROM E OF L-63 CANAL TO SHERMAN WOOD

RANCHES

FPN: 4193444

Work: ADD LANES & RECONSTRUCT

Length: 3.181

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $0 $3,500,000PE $3,500,000

$0 $0 $0 $0 $0 $0 $3,500,000PROJECT TOTAL: $3,500,000

Page 8 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 70: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR 710

FROM SHERMAN WOOD RANCHES TO CR 714

(MARTIN C/L)

FPN: 4193445

Work: ADD LANES & RECONSTRUCT

Length: 6.741

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $0 $0 $0 $6,500,000PE $6,500,000

$0 $0 $0 $0 $0 $0 $6,500,000PROJECT TOTAL: $6,500,000

Project: SR 710

FROM US 441 TO L-63 CANAL

FPN: 4193443

Work: NEW ROAD CONSTRUCTION

Length: 0.001

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $250,000 $0 $0 $0 $0 $0DDRENV $250,000

$3,628,908 $0 $0 $0 $0 $0 $0DDRPE $3,628,908

$111,813 $18,156 $0 $0 $0 $0 $0DIHPE $129,969

$12,280 $0 $0 $0 $0 $0 $0DSPE $12,280

$0 $0 $0 $1,453,873 $4,493,566 $4,329,658 $0DDRROW $10,277,097

$0 $0 $0 $137,684 $137,683 $0 $0DIHROW $275,367

$3,753,001 $268,156 $0 $1,591,557 $4,631,249 $4,329,658 $0PROJECT TOTAL: $14,573,621

Project: SR 710

FROM US 441 TO MARTIN COUNTY LINE

FPN: 4193442

Work: PD&E/EMO STUDY

Length: 9.922

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$388,371 $0 $0 $0 $0 $0 $0DDRPDE $388,371

$212,584 $5,314 $0 $0 $0 $0 $0DIHPDE $217,898

$110,423 $56,777 $0 $0 $0 $0 $0DSPDE $167,200

$1,083,275 $0 $0 $0 $0 $0 $0GMRPDE $1,083,275

$1,794,653 $62,091 $0 $0 $0 $0 $0PROJECT TOTAL: $1,856,744

Project: SR 78 OVER KISSIMMEE RIVER BRIDGE

NUMBER 910009

FPN: 4317231

Work: BRIDGE-REPAIR/REHABILITATION

Length: 0.126

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $901,988 $0 $0 $0 $0BRRPCST $901,988

$0 $0 $10,250 $0 $0 $0 $0DIHCST $10,250

$147 $0 $0 $0 $0 $0 $0DSCST $147

$10,000 $0 $0 $0 $0 $0 $0BRRPENV $10,000

$203,400 $0 $0 $0 $0 $0 $0BRRPPE $203,400

$0 $7,000 $0 $0 $0 $0 $0DIHPE $7,000

$213,547 $7,000 $912,238 $0 $0 $0 $0PROJECT TOTAL: $1,132,785

Project: SR15 (US 441)

FROM S OF NE 131ST LN TO S OF NE 224TH ST

FPN: 4349411

Work: RESURFACING

Length: 5.789

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $33,960 $0 $0 $0DIHCST $33,960

$0 $0 $0 $4,361,288 $0 $0 $0DSCST $4,361,288

$0 $0 $0 $339,608 $0 $0 $0SACST $339,608

$10,173 $20,137 $0 $0 $0 $0 $0DIHPE $30,310

$10,173 $20,137 $0 $4,734,856 $0 $0 $0PROJECT TOTAL: $4,765,166

Page 9 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 71: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: SR15/SR700 (US 441)

FROM S OF NE 224TH ST TO S OF NE 304TH ST

FPN: 4349401

Work: RESURFACING

Length: 5.378

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $3,945,866 $0 $0 $0 $0DDRCST $3,945,866

$0 $0 $32,118 $0 $0 $0 $0DIHCST $32,118

$9,656 $55,344 $0 $0 $0 $0 $0DIHPE $65,000

$9,656 $55,344 $3,977,984 $0 $0 $0 $0PROJECT TOTAL: $4,042,984

Project: US 441

AT CR 724 (240TH STREET)

FPN: 4313381

Work: ADD LEFT TURN LANE(S)

Length: 0.200

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $28,873 $0 $0 $0DSCST $28,873

$0 $0 $0 $211,588 $0 $0 $0SLCST $211,588

$0 $145,000 $0 $0 $0 $0 $0SLPE $145,000

$0 $145,000 $0 $240,461 $0 $0 $0PROJECT TOTAL: $385,461

Project: US 441

AT NW 144TH STREET

FPN: 4313371

Work: ADD LEFT TURN LANE(S)

Length: 1.200

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $28,431 $0 $0 $0DSCST $28,431

$0 $0 $0 $691,970 $0 $0 $0SLCST $691,970

$0 $238 $0 $0 $0 $0 $0DIHPE $238

$0 $238 $0 $720,401 $0 $0 $0PROJECT TOTAL: $720,639

Project: US 98/SR 700

FROM NW 9TH STREET TO SR 70

FPN: 4390271

Work: DRAINAGE IMPROVEMENTS

Length: 0.698

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $5,000 $0 $0 $0 $0 $0DIHPE $5,000

$0 $5,000 $0 $0 $0 $0 $0PROJECT TOTAL: $5,000

$93,575,262 $17,194,968 $6,840,295 $10,301,665 $7,692,356 $4,393,426 $10,065,681

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16HIGHWAYS TOTAL:

$150,063,653

ALL YEARS

Page 10 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 72: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

FLP: AVIATION

Project: OKEECHOBEE COUNTY AIRPORT CAPITAL

IMPROVEMENTS

FPN: 4292731

Work: AVIATION SECURITY PROJECT

Length: 0.000

Comments:

SIS: No

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$125,000 $29,410 $0 $0 $0 $0 $0DDRCAP $154,410

$25,000 $0 $0 $0 $0 $0 $0DPTOCAP $25,000

$150,000 $29,410 $0 $0 $0 $0 $0PROJECT TOTAL: $179,410

$150,000 $29,410 $0 $0 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16FLP: AVIATION

TOTAL: $179,410

ALL YEARS

Page 11 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 73: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

TURNPIKE

Project: CANAL PROTECTION ON TPK (SR91) IN

OKEECHOBEE COUNTY,MP 181.08 - 188.54

FPN: 4193281

Work: GUARDRAIL

Length: 7.472

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$701,375 $0 $0 $0 $0 $0 $0PKBDCST $701,375

$37,006 $899 $0 $0 $0 $0 $0PKYICST $37,905

$349,260 $1,414 $0 $0 $0 $0 $0PKYIPE $350,674

$1,087,641 $2,313 $0 $0 $0 $0 $0PROJECT TOTAL: $1,089,954

Project: FT DRUM SERVICE PLAZA MODIFICATION (MP

184)

FPN: 4224182

Work: REST AREA

Length: 0.507

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$37 $0 $0 $0 $0 $0 $0DCDSB $37

$5,524,233 $0 $0 $0 $0 $0 $0PKBDDSB $5,524,233

$17,682,380 $540 $0 $0 $0 $0 $0PKYIDSB $17,682,920

$1,342,982 $0 $0 $0 $0 $0 $0PKYIENV $1,342,982

$289 $1,211 $0 $0 $0 $0 $0PKYIPDE $1,500

$101,141 $0 $0 $0 $0 $0 $0PKYIPE $101,141

$255,126 $0 $0 $0 $0 $0 $0PKYIROW $255,126

$24,906,188 $1,751 $0 $0 $0 $0 $0PROJECT TOTAL: $24,907,939

Project: LANDSCAPING FOR TPK'S FT. DRUM SERVICE

PLAZA (MP 184)

FPN: 4339154

Work: LANDSCAPING

Length: 0.600

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$22,239 $1,500 $0 $0 $0 $0 $0PKYIPE $23,739

$22,239 $1,500 $0 $0 $0 $0 $0PROJECT TOTAL: $23,739

Project: RESURFACE OF TPK MAINLINE

FROM MP181.1 TO MP185.0 (OKEECHOBEE

COUNTY)

FPN: 4351651

Work: RESURFACING

Length: 3.900

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$21,806 $0 $0 $0 $0 $0 $0PKYICST $21,806

$0 $0 $3,958,976 $0 $0 $0 $0PKYRCST $3,958,976

$2,349 $0 $0 $0 $0 $0 $0PKYIPE $2,349

$9,722 $358,522 $0 $0 $0 $0 $0PKYRPE $368,244

$33,877 $358,522 $3,958,976 $0 $0 $0 $0PROJECT TOTAL: $4,351,375

Page 12 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 74: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

Project: RESURFACE OF TPK MAINLINE

FROM MP185.0 TO MP188.5 (OKEECHOBEE

COUNTY)

FPN: 4351661

Work: RESURFACING

Length: 3.500

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$17,022 $0 $0 $0 $0 $0 $0PKYICST $17,022

$0 $0 $3,623,585 $0 $0 $0 $0PKYRCST $3,623,585

$1,965 $0 $0 $0 $0 $0 $0PKYIPE $1,965

$915 $324,107 $0 $0 $0 $0 $0PKYRPE $325,022

$19,902 $324,107 $3,623,585 $0 $0 $0 $0PROJECT TOTAL: $3,967,594

Project: ROADSIDE IMPROVEMENT FOR TPK MAINLINE

FROM MP181.1 TO MP185.0

FPN: 4351653

Work: GUARDRAIL

Length: 3.900

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$10,614 $0 $492,169 $0 $0 $0 $0PKYICST $502,783

$171,264 $0 $0 $0 $0 $0 $0PKYIPE $171,264

$181,878 $0 $492,169 $0 $0 $0 $0PROJECT TOTAL: $674,047

Project: ROADSIDE IMPROVEMENT FOR TPK MAINLINE

FROM MP185.0 TO MP188.5

FPN: 4351663

Work: GUARDRAIL

Length: 3.500

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $456,293 $0 $0 $0 $0PKYICST $456,293

$151,227 $1,500 $0 $0 $0 $0 $0PKYIPE $152,727

$151,227 $1,500 $456,293 $0 $0 $0 $0PROJECT TOTAL: $609,020

Project: THERMOPLASTIC OF TPK MAINLINE

RESURFACING

FROM MP181.1 TO MP185.0

FPN: 4351652

Work: SIGNING/PAVEMENT MARKINGS

Length: 3.900

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $160,433 $0 $0 $0PKYRCST $160,433

$0 $0 $0 $160,433 $0 $0 $0PROJECT TOTAL: $160,433

Project: THERMOPLASTIC OF TPK MAINLINE

RESURFACING

FROM MP185.0 TO MP188.5

FPN: 4351662

Work: SIGNING/PAVEMENT MARKINGS

Length: 3.500

Comments:

SIS: Yes

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16PHASE FUND ALL YEARS

$0 $0 $0 $141,945 $0 $0 $0PKYRCST $141,945

$0 $0 $0 $141,945 $0 $0 $0PROJECT TOTAL: $141,945

$26,402,952 $689,693 $8,531,023 $302,378 $0 $0 $0

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16TURNPIKE TOTAL:

$35,926,046

ALL YEARS

Page 13 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015

Page 75: DESOTO - heartlandregionaltpo.org · FPN: 4301171 Work: MISCELLANEOUS CONSTRUCTION Length: 0.001 Comments: SIS: No PHASE FUND 2019/20

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

OKEECHOBEE TRANSPORTATION IMPROVEMENT PROGRAM REPORT

July 1, 2015 through June 30, 2020

$120,128,214 $17,914,071 $15,371,318 $10,604,043 $7,692,356 $4,393,426 $10,065,681

2015/16 2016/17 2017/18 2018/19 2019/20 >2019/20<2015/16OKEECHOBEE

TOTAL: $186,169,109

ALL YEARS

Page 14 of 14

ADM – Administration ● CAP – Capitol Improvement ● CST – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities

PHASE

CODES

Report Date: 12/30/2015 Import Date: 12/30/2015