SETTLING TANK (by Mosonyi)
a d
Intake discharge Q = 25 m3/s 0.36 >1 mm
0.44 0.1-1 mm
Specific gravity of particles = 2.65 0.51
-
7/28/2019 Desilting basin
2/5
t = 568.64385 s
Length of tank = 111.8943 m
say 112 m
L/B = 4.7058824 (should be more than 4, preferable 8-10)
Cross Section for Hopper
5.5 m
2.4 m
0.8 m 45
0.65 m
0.5 m
4 m/s
0.3125 m2
Assume width of duct = 0.5 m
Depth of duct = 0.625 m
say 0.65 m
w0 X L = 2.052449 w0 X (D)^1/6 = 2.538687
U X D n X U X g
trap efficiency = 100 %
rugosity n = 0.018 (from Camp's sediment removal function)
Assume flow velocity =
Area reqd for SFD =
-
7/28/2019 Desilting basin
3/5
(by RS Varshney for Himalayan rivers)a d
0.55 >1 mm
0.66 0.1-1 mm
0.77
-